{"id":98289,"date":"2026-10-15T08:04:36","date_gmt":"2026-10-15T08:04:36","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98289"},"modified":"2026-10-15T08:04:43","modified_gmt":"2026-10-15T08:04:43","slug":"heijunka","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/","title":{"rendered":"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Maanantaina suuri tilaus t\u00e4ytt\u00e4\u00e4 tuotantolinjan. Keskiviikkona toinen tuote on jo loppumassa, joten tuotantotiimi keskeytt\u00e4\u00e4 er\u00e4n, vaihtaa ty\u00f6kalut ja j\u00e4rjest\u00e4\u00e4 kaikki jonossa olevat ty\u00f6t uudelleen. Tehtaalla tehd\u00e4\u00e4n kovasti t\u00f6it\u00e4, mutta ty\u00f6kuorma kasautuu eri osastoille eri aikaan.<\/p>\n\n\n<p><strong>Tuotannon tasaaminen eli heijunka tarkoittaa tuotantom\u00e4\u00e4r\u00e4n ja tuotejakauman tasoittamista valitulla ajanjaksolla.<\/strong> Sen sijaan, ett\u00e4 jokainen tilauskertym\u00e4n vaihtelu siirtyisi suoraan tuotantoon, luot tasaisemman tuotantorytmin, joka vastaa silti asiakkaiden tarpeisiin.<\/p>\n\n\n<p>Tavoitteena on tasaisempi tuotantop\u00e4iv\u00e4: v\u00e4hemm\u00e4n \u00e4killisi\u00e4 kuormitusmuutoksia, asiakkaiden tarvitsemien tuotteiden tihe\u00e4mpi t\u00e4ydent\u00e4minen ja pienempi riippuvuus valtavista erist\u00e4. Tasainen kappalem\u00e4\u00e4r\u00e4 ei kuitenkaan v\u00e4ltt\u00e4m\u00e4tt\u00e4 tarkoita tasaista ty\u00f6m\u00e4\u00e4r\u00e4\u00e4. Tuotantorytmin on sovittava my\u00f6s koneisiin, asetusaikoihin ja toimituslupauksiin.<\/p>\n\n\n<p>T\u00e4ss\u00e4 SkyPlanner APS auttaa. Sin\u00e4 p\u00e4\u00e4t\u00e4t tuotannon prioriteeteista, ja sen aikataulutuksesta vastaava teko\u00e4ly Arcturus laskee ty\u00f6j\u00e4rjestyksen m\u00e4\u00e4ritt\u00e4miesi resurssien ja rajoitteiden perusteella. N\u00e4in voit arvioida tasaamistavoitetta todellista tuotantoaikataulua vasten sen sijaan, ett\u00e4 se j\u00e4isi houkuttelevaksi malliksi, jota tehdas ei pysty noudattamaan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 tuotannon tasaaminen muuttaa?<\/h2>\n\n\n<p>Heijunkassa tehd\u00e4\u00e4n kaksi toisiinsa liittyv\u00e4\u00e4 p\u00e4\u00e4t\u00f6st\u00e4:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tuotantom\u00e4\u00e4r\u00e4n tasaaminen:<\/strong> valmistettava m\u00e4\u00e4r\u00e4 jaetaan tasaisemmin ajalle sen sijaan, ett\u00e4 tuotanto seuraisi kunkin p\u00e4iv\u00e4n tilauskertym\u00e4\u00e4.<\/li><li><strong>Tuotejakauman tasaaminen:<\/strong> tarvittavia tuotetyyppej\u00e4 valmistetaan s\u00e4\u00e4nn\u00f6llisemmin pieniss\u00e4 eriss\u00e4 sen sijaan, ett\u00e4 ensin teht\u00e4isiin yksi valtava er\u00e4 ja vasta sitten siirrytt\u00e4isiin seuraavaan tuotteeseen.<\/li><\/ul>\n\n\n<p>Tehdas voi tasata tuotantom\u00e4\u00e4r\u00e4\u00e4 tasaamatta tuotejakaumaa. Sama p\u00e4ivitt\u00e4inen kokonaism\u00e4\u00e4r\u00e4 ei auta tuotetta B odottavaa asiakasta, jos koko viikko k\u00e4ytet\u00e4\u00e4n tuotteen A valmistamiseen.<\/p>\n\n\n<p>Tuotejakauman tasaaminen lyhent\u00e4\u00e4 odotusta, kun B palaa tuotantoon useammin. Samalla B:n komponenttien tarve tasoittuu edelt\u00e4viss\u00e4 prosesseissa. Vastapainona tuotevaihtoja tulee enemm\u00e4n, ja niiden on mahduttava k\u00e4ytett\u00e4viss\u00e4 olevaan tuotantoaikaan.<\/p>\n\n\n<p>Tasaaminen ei tarkoita sit\u00e4, ettei kysynn\u00e4n muutoksiin reagoitaisi. Se vaimentaa lyhytaikaista vaihtelua sovitun suunnittelujakson sis\u00e4ll\u00e4. Pysyv\u00e4mm\u00e4t kysynn\u00e4n muutokset edellytt\u00e4v\u00e4t tuotantotahdin tai tuotejakauman tarkistamista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Esimerkki tuotannon tasaamisesta: laske kappaleiden lis\u00e4ksi minuutit<\/h2>\n\n\n<p>Kuvitellaan tuoteperhe, jonka viikoittainen tarve on 300 kappaletta tuotetta A, 150 kappaletta tuotetta B ja 150 kappaletta tuotetta C. Viidelle tuotantop\u00e4iv\u00e4lle jaettuna 600 kappaletta tarkoittaa <strong>120 kappaletta p\u00e4iv\u00e4ss\u00e4<\/strong>.<\/p>\n\n\n<p>Yksi mahdollinen p\u00e4ivitt\u00e4inen tuotejakauma on 60 A:ta, 30 B:t\u00e4 ja 30 C:t\u00e4. N\u00e4in jokaista tuotetta valmistetaan p\u00e4ivitt\u00e4in sen sijaan, ett\u00e4 B ja C j\u00e4isiv\u00e4t loppuviikkoon.<\/p>\n\n\n<p>Tarkistetaan seuraavaksi yhteisell\u00e4 resurssilla tarvittava aika:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A:n valmistus kest\u00e4\u00e4 kaksi minuuttia kappaleelta: 60 kappaleeseen tarvitaan 120 minuuttia.<\/li><li>B:n valmistus kest\u00e4\u00e4 kolme minuuttia kappaleelta: 30 kappaleeseen tarvitaan 90 minuuttia.<\/li><li>C:n valmistus kest\u00e4\u00e4 viisi minuuttia kappaleelta: 30 kappaleeseen tarvitaan 150 minuuttia.<\/li><li>Oletetaan lis\u00e4ksi kolme asetusta, joista kukin kest\u00e4\u00e4 15 minuuttia: yhteens\u00e4 45 minuuttia lis\u00e4\u00e4.<\/li><\/ul>\n\n\n<p>P\u00e4ivitt\u00e4inen ajantarve on asetuksineen <strong>405 minuuttia<\/strong>. Kun k\u00e4ytett\u00e4viss\u00e4 on 420 minuuttia tuotantoaikaa, ty\u00f6 mahtuu p\u00e4iv\u00e4\u00e4n t\u00e4m\u00e4n yksinkertaistetun resurssilaskelman perusteella. Pelivaraa j\u00e4\u00e4 15 minuuttia.<\/p>\n\n\n<p>Sama p\u00e4ivitt\u00e4inen kokonaism\u00e4\u00e4r\u00e4 voi kuitenkin antaa aivan toisen tuloksen. Jos p\u00e4iv\u00e4ss\u00e4 valmistetaan 30 A:ta, 30 B:t\u00e4 ja 60 C:t\u00e4, kokonaism\u00e4\u00e4r\u00e4 on edelleen 120 kappaletta, mutta aikaa tarvitaan samoine asetusaikoineen <strong>495 minuuttia<\/strong>. Pelkk\u00e4 kappalem\u00e4\u00e4rien vertailu peitt\u00e4\u00e4 ylikuormituksen.<\/p>\n\n\n<p>Ota tasattu tuotejakauma l\u00e4ht\u00f6kohdaksi ja tarkista sitten kuormitus niill\u00e4 resursseilla, jotka todella rajoittavat tuotantoa. Huomioi asetusvaatimukset ja edelt\u00e4vien ty\u00f6vaiheiden ajoitus. Ensimm\u00e4inen tuotejakauma mahtuu esimerkin aikaraamiin, mutta se ei viel\u00e4 osoita, ett\u00e4 materiaalit, henkil\u00f6st\u00f6 ja kaikki muut ty\u00f6vaiheet olisivat ajoissa valmiina.<\/p>\n\n\n<p>T\u00e4m\u00e4 ero on erityisen t\u00e4rke\u00e4, kun tuotannossa on paljon erilaisia tuotteita. Toistuvasti valmistettavan tuoteperheen tasaamisesta voi olla hy\u00f6ty\u00e4, vaikka yksitt\u00e4isten tuotteiden valmistusajat eroaisivat toisistaan. Erilaisten kappaleiden k\u00e4sitteleminen kapasiteettilaskennassa samanarvoisina sen sijaan ei toimi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mihin vaihtelu siirtyy?<\/h2>\n\n\n<p>Jos asiakkaat tilaavat ep\u00e4tasaisesti mutta tuotanto k\u00e4y tasaisesti, jonkin on otettava erotus vastaan. P\u00e4\u00e4t\u00e4, mik\u00e4 t\u00e4m\u00e4 puskuri on, ennen kuin sitoudut tuotantorytmiin.<\/p>\n\n\n<p><strong>Varasto-ohjautuvassa tuotannossa puskurina voi toimia lopputuotevarasto.<\/strong> Hallittu puskurivarasto palvelee lyhytaikaisia kysynt\u00e4piikkej\u00e4, kun tuotanto t\u00e4ydent\u00e4\u00e4 varastoa tasaisempaan tahtiin. Tarkista vaadittu palvelutaso, tuotteiden s\u00e4ilyvyys, varastointikustannukset ja vanhenemisriski. Tasaaminen ei oikeuta valmistamaan tuotteita, joille ei ole kysynt\u00e4\u00e4, vain jotta linja pysyisi k\u00e4ynniss\u00e4.<\/p>\n\n\n<p><strong>Muunneltavissa tuotteissa puskurina voi olla yhteisten puolivalmisteiden varasto.<\/strong> Voit t\u00e4ydent\u00e4\u00e4 vakiomuotoisia perustuotteita s\u00e4\u00e4nn\u00f6llisesti ja tehd\u00e4 asiakaskohtaiset ty\u00f6t my\u00f6hemmin, kunhan j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet mahtuvat luvattuun toimitusaikaan.<\/p>\n\n\n<p><strong>Tilausohjautuvassa tuotannossa puskurina voi toimia asiakkaan toimitusaikataulun sallima pelivara.<\/strong> Jos valmistus ehtii p\u00e4\u00e4tty\u00e4 hyviss\u00e4 ajoin ennen luvattua toimitusp\u00e4iv\u00e4\u00e4, tilaukset voivat joskus odottaa suunniteltua tuotantovuoroaan. Jos jokainen tilaus on jo kiireellinen, t\u00e4t\u00e4 pelivaraa ei ole.<\/p>\n\n\n<p>Pysyv\u00e4\u00e4 kysynn\u00e4n kasvua ei voi loputtomiin kattaa varastoja pienent\u00e4m\u00e4ll\u00e4 tai jonoa pident\u00e4m\u00e4ll\u00e4. Arvioi tuotantotahti ja kapasiteetti uudelleen. Ei riit\u00e4, ett\u00e4 kysyt: \u201dVoimmeko tasata t\u00e4m\u00e4n viikon tuotantoa?\u201d Olennaisempaa on kysy\u00e4: \u201dVoimmeko jatkaa t\u00e4ll\u00e4 rytmill\u00e4 ja silti pit\u00e4\u00e4 toimituslupauksemme?\u201d<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4in otat heijunkan k\u00e4ytt\u00f6\u00f6n lis\u00e4\u00e4m\u00e4tt\u00e4 h\u00e4iri\u00f6it\u00e4<\/h2>\n\n\n<p>Aloita tuoteperheest\u00e4, jonka tuotteilla on riitt\u00e4v\u00e4sti yhteisi\u00e4 tuotantovaiheita ja tarpeeksi toistuvaa kysynt\u00e4\u00e4 s\u00e4\u00e4nn\u00f6llisen rytmin luomiseen. Jos yrit\u00e4t sovittaa jokaisen kertaluonteisen ty\u00f6n samaan toistuvaan kiertoon, p\u00e4\u00e4t\u00f6ksenteon kannalta olennaiset asiat yleens\u00e4 h\u00e4m\u00e4rtyv\u00e4t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Valitse realistinen tuotantokierron pituus<\/h3>\n\n\n<p>P\u00e4\u00e4t\u00e4, kuinka usein tuoteperheen ja sen t\u00e4rkeimpien tuotteiden tulisi palata tuotantoon. P\u00e4ivitt\u00e4inen t\u00e4ydent\u00e4minen voi houkutella, mutta tuotevaihtoihin kuluva aika ratkaisee, onko se mahdollista. Pidempi kierto voi olla sopiva l\u00e4ht\u00f6kohta sill\u00e4 aikaa, kun <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/smed\/\">lyhenn\u00e4t asetusaikoja<\/a>.<\/p>\n\n\n<p>Vertaa ehdotettua kierron pituutta asiakkaiden toimitusvaatimuksiin ja siihen, kuinka suurta puskuria olet valmis yll\u00e4pit\u00e4m\u00e4\u00e4n. Tehtaalle sopivasta rytmist\u00e4 on v\u00e4h\u00e4n hy\u00f6ty\u00e4, jos asiakas joutuu sen vuoksi toistuvasti odottamaan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Laske ajantarve realistisesti<\/h3>\n\n\n<p>Varaa aikaa valmistukseen ja asetuksiin sek\u00e4 huomioi tiedossa olevat k\u00e4ytt\u00f6katkot. K\u00e4yt\u00e4 todellista tuotejakaumaa, \u00e4l\u00e4 yht\u00e4 keskim\u00e4\u00e4r\u00e4ist\u00e4 sykliaikaa, joka peitt\u00e4\u00e4 hitaampien tuotteiden vaikutuksen. Tarkista my\u00f6s ne resurssit, joita tuoteperhe k\u00e4ytt\u00e4\u00e4 yhdess\u00e4 muiden t\u00f6iden kanssa.<\/p>\n\n\n<p>Jos tihe\u00e4mm\u00e4t tuotevaihdot viev\u00e4t valmistukseen tarvitsemasi kapasiteetin, lyhenn\u00e4 asetusaikoja, muuta er\u00e4kokoja ja valmistusj\u00e4rjestyst\u00e4 tai lis\u00e4\u00e4 kapasiteettia perustellusti. \u00c4l\u00e4 oleta, ett\u00e4 tasaaminen itsess\u00e4\u00e4n nopeuttaisi tuotevaihtoja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sovi, miten poikkeukset otetaan suunnitelmaan<\/h3>\n\n\n<p>P\u00e4\u00e4t\u00e4, kuka saa muuttaa prioriteetteja ja mik\u00e4 lasketaan poikkeukseksi. J\u00e4t\u00e4 k\u00e4yt\u00e4nn\u00f6n pelivaraa prosessissasi esiintyv\u00e4lle vaihtelulle. Jos t\u00e4yt\u00e4t paperilla jokaisen k\u00e4ytett\u00e4viss\u00e4 olevan minuutin, pienest\u00e4kin keskeytyksest\u00e4 on vaikea toipua.<\/p>\n\n\n<p>Tarkastele muutoksen j\u00e4lkeen sen vaikutusta muuhun aikatauluun sen sijaan, ett\u00e4 vain lis\u00e4isit uuden kiireellisen ty\u00f6n jonon k\u00e4rkeen. T\u00e4ss\u00e4 ty\u00f6jonojen k\u00e4sin yll\u00e4pito k\u00e4y kalliiksi: vaikutukset rajoittuvat harvoin yhteen ty\u00f6pisteeseen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tarkastele toimituksia, varastoa ja tuotannon vakautta yhdess\u00e4<\/h3>\n\n\n<p>Seuraa, ovatko tuotteet saatavilla tarvittaessa, kasvavatko varastot, valmistetaanko tuotteita suunnitellussa suhteessa ja kuinka usein tuotanto joutuu poikkeamaan sovitusta rytmist\u00e4. T\u00f6iden tasaisemmasta vapauttamisesta tuotantoon on hy\u00f6ty\u00e4 vain, jos se tukee asiakaspalvelua siirt\u00e4m\u00e4tt\u00e4 ongelmaa ylivarastoon tai my\u00f6h\u00e4styviin tilauksiin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 heijunka-taulu tekee ja mit\u00e4 ei?<\/h2>\n\n\n<p>Heijunka-taulu on visuaalinen ty\u00f6kalu, jolla tuotannon ohjaussignaalit jaetaan ajalle. Tavallisesti tuotetyypit ovat riveill\u00e4 ja aikav\u00e4lit sarakkeissa. Kanban-kortit osoittavat, mitk\u00e4 ty\u00f6t kullakin aikav\u00e4lill\u00e4 vapautetaan tuotantoon. Tahdistetuissa j\u00e4rjestelmiss\u00e4 vapautusv\u00e4li ilmaistaan usein pitch-aikana: tahtiaika kerrotaan pakkauser\u00e4n kappalem\u00e4\u00e4r\u00e4ll\u00e4.<\/p>\n\n\n<p>Taulu tekee valitun tuotantorytmin n\u00e4kyv\u00e4ksi. Se ei varmista, ett\u00e4 tarvittavat koneet, materiaalit ja henkil\u00f6t ovat k\u00e4ytett\u00e4viss\u00e4. Tuotannon tasaaminen ei my\u00f6sk\u00e4\u00e4n ole sama asia kuin linjan tasapainottaminen: tasapainottamisessa ty\u00f6 jaetaan ty\u00f6pisteiden tai ty\u00f6ntekij\u00f6iden kesken, kun taas tasaamisessa tasoitetaan tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa ajan mittaan.<\/p>\n\n\n<p>Kun tuotantoreitit, kestot ja prioriteetit vaihtelevat, tasattu tuotantorytmi tarvitsee tuekseen <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">hienokuormitusta<\/a>. SkyPlannerin teht\u00e4v\u00e4n\u00e4 on laskea ja yll\u00e4pit\u00e4\u00e4 t\u00e4t\u00e4 aikataulua, ei korvata tuotannon toimintaperiaatteita automaattisella heijunka-taulun s\u00e4\u00e4nn\u00f6ll\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tee tuotantorytmist\u00e4 toteuttamiskelpoinen SkyPlannerilla<\/h2>\n\n\n<p>Hyv\u00e4t tasaamisen periaatteet m\u00e4\u00e4ritt\u00e4v\u00e4t, mit\u00e4 tuotannolla halutaan saavuttaa. SkyPlanner auttaa n\u00e4kem\u00e4\u00e4n, miten tavoitteen edellytt\u00e4m\u00e4t ty\u00f6t voidaan tehd\u00e4 k\u00e4ytett\u00e4viss\u00e4 olevassa ajassa ja k\u00e4ytett\u00e4viss\u00e4 olevilla resursseilla.<\/p>\n\n\n<p>Arcturus aikatauluttaa ty\u00f6vaiheet ty\u00f6pisteiden kapasiteetin, ty\u00f6vuorojen, ty\u00f6vaiheiden v\u00e4listen riippuvuuksien ja asettamiesi prioriteettien perusteella. Valmistus- ja asetusajat m\u00e4\u00e4ritt\u00e4v\u00e4t tarvittavan ajan. Kun materiaalit huomioiva aikataulutus on k\u00e4yt\u00f6ss\u00e4, my\u00f6s materiaalien saatavuus vaikuttaa laskentaan. <a href=\"https:\/\/skyplanner.ai\/fi\/ominaisuudet\/\">Gantt-n\u00e4kym\u00e4<\/a> n\u00e4ytt\u00e4\u00e4 laskennan tuloksena syntyv\u00e4t ty\u00f6jonot ja ajoituksen eri ty\u00f6pisteiss\u00e4.<\/p>\n\n\n<p>N\u00e4in saat k\u00e4yt\u00e4nn\u00f6llisen tavan hallita muutoksia, jotka h\u00e4iritsev\u00e4t tasattua suunnitelmaa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Saapuu etusijalle asetettava tilaus: m\u00e4\u00e4rit\u00e4 sen prioriteetti ja tarkista vaikutus muihin t\u00f6ihin.<\/li><li>Resurssin k\u00e4ytett\u00e4viss\u00e4 oleva aika v\u00e4henee: kirjaa muutos ja anna Arcturus laskea aikataulu uudelleen p\u00e4ivitetyn kapasiteetin perusteella.<\/li><li>L\u00e4hiajan ty\u00f6j\u00e4rjestys on pidett\u00e4v\u00e4 vakaana: suojaa tehdyt p\u00e4\u00e4t\u00f6kset aikataulutuslukituksilla, kun muut ty\u00f6t suunnitellaan uudelleen.<\/li><\/ul>\n\n\n<p>Hy\u00f6ty ei rajoitu selke\u00e4mp\u00e4\u00e4n kaavioon. K\u00e4yt\u00e4t v\u00e4hemm\u00e4n aikaa yksitt\u00e4isten t\u00f6iden siirtelyyn jonosta toiseen ja enemm\u00e4n sen arvioimiseen, ovatko tuotejakauma, toimituslupaukset ja k\u00e4ytett\u00e4viss\u00e4 oleva kapasiteetti yh\u00e4 kesken\u00e4\u00e4n linjassa. SkyPlanner voidaan integroida mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n sen avoimen REST API -rajapinnan kautta, joten parempi aikataulutus voi perustua nykyisiin tilaus- ja tuotantotietoihisi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Asiakasesimerkki: ennakoitavaa tuotantoa, jossa on tilaa muutoksille<\/h3>\n\n\n<p>Opes Corporation valmistaa erikoistuotteita varastoon p\u00e4\u00e4osin asiakkaiden ennakoitavien kolmen kuukauden sitoumusten pohjalta. T\u00e4m\u00e4 luo hyv\u00e4t edellytykset s\u00e4\u00e4nn\u00f6lliselle tuotantorytmille, mutta mukaan on silti mahduttava tuotekehitysajoja ja kiireellisi\u00e4 pientilauksia.<\/p>\n\n\n<p>Opes kertoo <a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/opes-corporation\/\">SkyPlanner-asiakastarinassaan<\/a>, miten kapasiteettin\u00e4kym\u00e4 ja p\u00e4ivitetty tuotantosuunnitelma n\u00e4ytt\u00e4v\u00e4t lis\u00e4t\u00f6iden vaikutukset valmistumis- ja toimitusaikoihin. Tiimi n\u00e4kee, milloin ty\u00f6t valmistuvat, ja pystyy muuttamaan aikataulua aiempaa nopeammin.<\/p>\n\n\n<p>Juuri t\u00e4llaista joustavuutta s\u00e4\u00e4nn\u00f6llinen tuotantorytmi tarvitsee: ennakoitava perusty\u00f6kuorma pysyy n\u00e4kyviss\u00e4, ja poikkeuksen vaikutukset ymm\u00e4rret\u00e4\u00e4n ennen kuin se sekoittaa muun ty\u00f6jonon.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rakenna tasaisempi tuotantop\u00e4iv\u00e4 toteutuskelpoisen aikataulun varaan<\/h2>\n\n\n<p>Tuotannon tasaaminen toimii, kun toistuva tuotejakauma, tuotevaihdot ja kysynn\u00e4n vaihtelua tasaava puskuri sopivat yhteen. Kun tehtaan tilanteet vaihtelevat, hy\u00f6dynn\u00e4 tasaamista siell\u00e4, miss\u00e4 toistuvuudesta on apua. Aikatauluta sitten todelliset ty\u00f6t todellisten rajoitteiden mukaan.<\/p>\n\n\n<p>Valitse SkyPlanner, kun aikataulun yll\u00e4pito vie aikaa tuotantoa koskevilta p\u00e4\u00e4t\u00f6ksilt\u00e4. Arcturus hoitaa aikataulun laskennan, ja sin\u00e4 p\u00e4\u00e4t\u00e4t edelleen prioriteeteista ja t\u00f6ist\u00e4, joiden aikataulua ei saa muuttaa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a>, jossa voimme k\u00e4yd\u00e4 l\u00e4pi yhden toistuvan tuoteperheesi, sen asetusvaatimukset ja jonkin viimeaikaisen h\u00e4iri\u00f6n. N\u00e4e, miten tuotantosi prioriteetit n\u00e4kyv\u00e4t aikataulussa ja mik\u00e4 muuttuu, kun mukaan tulee kiiretilaus tai yksi ty\u00f6vuoro j\u00e4\u00e4 pois. Jos haluat ensin tutustua itse, <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile SkyPlanneria demodatalla<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma Etusivu &raquo; Resurssit &raquo; Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma Maanantaina suuri tilaus t\u00e4ytt\u00e4\u00e4 tuotantolinjan. Keskiviikkona toinen tuote on jo loppumassa, joten tuotantotiimi keskeytt\u00e4\u00e4 er\u00e4n, vaihtaa ty\u00f6kalut ja j\u00e4rjest\u00e4\u00e4 kaikki jonossa olevat ty\u00f6t uudelleen. Tehtaalla tehd\u00e4\u00e4n kovasti t\u00f6it\u00e4, mutta ty\u00f6kuorma kasautuu eri osastoille &#8230; <a title=\"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":98330,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-98289","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Heijunka: tasaisempi tuotanto, toimiva suunnitelma<\/title>\n<meta name=\"description\" content=\"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma\" \/>\n<meta property=\"og:description\" content=\"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T08:04:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T08:04:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma\",\"datePublished\":\"2026-10-15T08:04:36+00:00\",\"dateModified\":\"2026-10-15T08:04:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/\"},\"wordCount\":1737,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/\",\"name\":\"Heijunka: tasaisempi tuotanto, toimiva suunnitelma\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"datePublished\":\"2026-10-15T08:04:36+00:00\",\"dateModified\":\"2026-10-15T08:04:43+00:00\",\"description\":\"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"width\":1776,\"height\":999},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/heijunka\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Heijunka: tasaisempi tuotanto, toimiva suunnitelma","description":"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/","og_locale":"fi_FI","og_type":"article","og_title":"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma","og_description":"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T08:04:36+00:00","article_modified_time":"2026-10-15T08:04:43+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma","datePublished":"2026-10-15T08:04:36+00:00","dateModified":"2026-10-15T08:04:43+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/"},"wordCount":1737,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","articleSection":["APS &amp; Scheduling","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/","name":"Heijunka: tasaisempi tuotanto, toimiva suunnitelma","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","datePublished":"2026-10-15T08:04:36+00:00","dateModified":"2026-10-15T08:04:43+00:00","description":"Heijunka tasaa tuotantom\u00e4\u00e4r\u00e4\u00e4 ja tuotejakaumaa. Lue, mihin se sopii, miten asetusajat vaikuttavat kapasiteettiin ja miten SkyPlanner pit\u00e4\u00e4 aikataulun toimivana.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","width":1776,"height":999},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/heijunka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma Etusivu &raquo; Resurssit &raquo; Heijunka eli tuotannon tasaaminen: tasaisempi tuotejakauma ja toteuttamiskelpoinen suunnitelma Maanantaina suuri tilaus t\u00e4ytt\u00e4\u00e4 tuotantolinjan. Keskiviikkona toinen tuote on jo loppumassa, joten tuotantotiimi keskeytt\u00e4\u00e4 er\u00e4n, vaihtaa ty\u00f6kalut ja j\u00e4rjest\u00e4\u00e4 kaikki jonossa olevat ty\u00f6t uudelleen. Tehtaalla tehd\u00e4\u00e4n kovasti t\u00f6it\u00e4, mutta ty\u00f6kuorma kasautuu eri osastoille&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=98289"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98289\/revisions"}],"predecessor-version":[{"id":98352,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98289\/revisions\/98352"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/98330"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=98289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=98289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=98289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}