{"id":98168,"date":"2026-10-15T01:40:32","date_gmt":"2026-10-15T01:40:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98168"},"modified":"2026-10-15T01:40:40","modified_gmt":"2026-10-15T01:40:40","slug":"tuotannon-lapimeno","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/","title":{"rendered":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Alkup\u00e4\u00e4n koneet k\u00e4yv\u00e4t ja lavat t\u00e4yttyv\u00e4t, mutta kokoonpano odottaa yh\u00e4 tarvitsemiaan osia. Vuoron p\u00e4\u00e4ttyess\u00e4 t\u00f6it\u00e4 on aloitettu paljon, mutta tilauksia on valmistunut liian v\u00e4h\u00e4n.<\/p>\n\n\n<p>Tuotannon l\u00e4pimeno tuo t\u00e4m\u00e4n eron n\u00e4kyviin. <strong>Se kertoo, kuinka paljon hyv\u00e4ksytty\u00e4 tuotosta rajatusta tuotantoprosessista valmistuu aikayksik\u00f6ss\u00e4: esimerkiksi hyv\u00e4ksyttyj\u00e4 kokoonpanoja tunnissa tai valmista tuotetta tonneina vuorossa.<\/strong> Se mittaa sit\u00e4, mit\u00e4 prosessista tulee ulos, ei sit\u00e4, kuinka paljon sen sis\u00e4ll\u00e4 tehd\u00e4\u00e4n t\u00f6it\u00e4.<\/p>\n\n\n<p>L\u00e4pimenon parantamiseen ei riit\u00e4, ett\u00e4 ensimm\u00e4inen ty\u00f6vaihe nopeutuu. Oikeiden t\u00f6iden on ehditt\u00e4v\u00e4 seuraavaan vaiheeseen silloin, kun ne ehdit\u00e4\u00e4n viel\u00e4 saada valmiiksi. SkyPlanner auttaa tekem\u00e4\u00e4n t\u00e4st\u00e4 tuotantosuunnitelman: se sovittaa yhteen resurssien kapasiteetin, ty\u00f6vaiheiden riippuvuudet ja prioriteetit, jotta tiimisi voi keskitty\u00e4 tilausten valmistumiseen jonojen kasvattamisen sijaan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4in lasket tuotannon l\u00e4pimenon<\/h2>\n\n\n<p>K\u00e4yt\u00e4 t\u00e4t\u00e4 kaavaa:<\/p>\n\n\n<p><strong>Tuotannon l\u00e4pimeno = Valmistuneet hyv\u00e4ksytyt yksik\u00f6t \u00f7 Mittausjakson kesto<\/strong><\/p>\n\n\n<p>Oletetaan, ett\u00e4 kahdeksan tunnin vuoron aikana lopputarkastukseen tulee 80 kappaletta. Kahdeksan niist\u00e4 vaatii viel\u00e4 korjausta, eik\u00e4 niit\u00e4 ole hyv\u00e4ksytty. Vuoron hyv\u00e4ksytty tuotos on siis 72 kappaletta:<\/p>\n\n\n<p><strong>72 hyv\u00e4ksytty\u00e4 kappaletta \u00f7 8 tuntia = 9 hyv\u00e4ksytty\u00e4 kappaletta tunnissa<\/strong><\/p>\n\n\n<p>Korjausta odottavia kappaleita ei viel\u00e4 lasketa hyv\u00e4ksyttyyn tuotokseen. Jos ne korjataan ja hyv\u00e4ksyt\u00e4\u00e4n my\u00f6hemmin, laske ne mukaan kerran tuolloin, \u00e4l\u00e4 uudelleen joka kerta, kun ne k\u00e4sitell\u00e4\u00e4n koneella. Romutettavia kappaleita ei lasketa hyv\u00e4ksyttyyn tuotokseen.<\/p>\n\n\n<p>Jatkuvassa prosessissa k\u00e4yt\u00e4 kappaleiden sijaan sopivaa fyysist\u00e4 yksikk\u00f6\u00e4, kuten kilogrammaa tai litraa. Periaate on sama: m\u00e4\u00e4rit\u00e4 hyv\u00e4ksytt\u00e4v\u00e4 tuotos ja jaa sen m\u00e4\u00e4r\u00e4 sen jakson kestolla, jonka aikana se valmistui.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Varmista vertailukelpoisuus ennen kuin tavoittelet parempaa lukua<\/h3>\n\n\n<p>L\u00e4pimenon mittaus on rajattava selke\u00e4sti. Koneistussolu voi mitata solusta l\u00e4htevi\u00e4 hyv\u00e4ksyttyj\u00e4 osia, tehdas puolestaan lopputarkastuksessa hyv\u00e4ksyttyj\u00e4 valmiita tuotteita. Molemmat ovat hy\u00f6dyllisi\u00e4 mittareita, mutta solun suurempi l\u00e4pimeno ei osoita, ett\u00e4 tehtaasta olisi valmistunut enemm\u00e4n tuotteita.<\/p>\n\n\n<p>Pid\u00e4 n\u00e4m\u00e4 kolme valintaa samoina:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Mittauspiste.<\/strong> Laske valmistuneet tuotteet aina samassa vaiheessa. Jos siirr\u00e4t mittauksen lopullisesta hyv\u00e4ksynn\u00e4st\u00e4 aiempaan ty\u00f6vaiheeseen, tuotos voi n\u00e4ytt\u00e4\u00e4 paremmalta, vaikka valmiiden tuotteiden m\u00e4\u00e4r\u00e4 ei kasva.<\/li><li><strong>Mittausjakso.<\/strong> Esimerkiss\u00e4 jakajana ovat vuoron kaikki kahdeksan tuntia keskeytyksineen. Pelkilt\u00e4 koneen k\u00e4yntitunneilta laskettu l\u00e4pimeno vastaa eri kysymykseen. Nime\u00e4 se erilliseksi mittariksi sen sijaan, ett\u00e4 poistaisit menetetyn ajan vuorojen vertailusta.<\/li><li><strong>Tuotejakauma.<\/strong> Yksinkertaisia kiinnikkeit\u00e4 valmistava vuoro ei ole suoraan verrattavissa monimutkaisia kokoonpanoja valmistavaan vuoroon. Vertaa samankaltaisia tuoteperheit\u00e4 tai k\u00e4yt\u00e4 dokumentoitua tapaa muuntaa tuotos yhteismitalliseksi, jos tuotejakauma vaihtelee huomattavasti.<\/li><\/ul>\n\n\n<p>Tilausohjautuvassa tuotannossa l\u00e4pimenoa on seurattava yhdess\u00e4 toimitusvarmuuden kanssa. Suuri m\u00e4\u00e4r\u00e4 helposti valmistuvia kappaleita ei ole onnistuminen, jos asiakkaiden tarvitsemat tilaukset odottavat yh\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tuotannon l\u00e4pimeno ei ole sama asia kuin l\u00e4pimenoaika<\/h2>\n\n\n<p>Nimet muistuttavat toisiaan, mutta mittayksik\u00f6t kertovat, mihin kysymykseen vastaat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tuotannon l\u00e4pimeno:<\/strong> kuinka paljon hyv\u00e4ksytty\u00e4 tuotosta valmistuu tunnissa, vuorossa tai p\u00e4iv\u00e4ss\u00e4?<\/li><li><strong>L\u00e4pimenoaika:<\/strong> kuinka kauan yksikk\u00f6 tai er\u00e4 kulkee rajatun tuotantoprosessin l\u00e4pi odotuksineen?<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/\">Tuotannon sykliaika<\/a>:<\/strong> kuinka kauan toistettava ty\u00f6vaihe tai tuotantosykli kest\u00e4\u00e4? Joissakin organisaatioissa sykliajalla tarkoitetaan koko tuotantoon kuluvaa aikaa, joten kerro, mit\u00e4 mittaus kattaa.<\/li><li><strong>Kapasiteetti:<\/strong> kuinka paljon ty\u00f6t\u00e4 k\u00e4ytett\u00e4viss\u00e4 olevat resurssit voisivat k\u00e4sitell\u00e4 m\u00e4\u00e4ritellyill\u00e4 toimintaedellytyksill\u00e4?<\/li><li><strong>K\u00e4ytt\u00f6aste:<\/strong> kuinka suuri osa resurssin k\u00e4ytett\u00e4viss\u00e4 olevasta ajasta on k\u00e4yt\u00f6ss\u00e4?<\/li><\/ul>\n\n\n<p>Koneen k\u00e4ytt\u00f6aste voi olla korkea, vaikka se valmistaa osia, jotka odottavat kokoonpanoa p\u00e4ivi\u00e4. Yksitt\u00e4isen ty\u00f6vaiheen lyhent\u00e4minenk\u00e4\u00e4n ei v\u00e4ltt\u00e4m\u00e4tt\u00e4 lis\u00e4\u00e4 valmiiden tuotteiden m\u00e4\u00e4r\u00e4\u00e4, jos toinen vaihe ei pysty vastaanottamaan lis\u00e4ty\u00f6t\u00e4.<\/p>\n\n\n<p>T\u00e4ss\u00e4 l\u00e4pimenolla tarkoitetaan hyv\u00e4ksytyn fyysisen tuotoksen m\u00e4\u00e4r\u00e4\u00e4 aikayksik\u00f6ss\u00e4. L\u00e4pimenolaskennassa eli throughput accounting -menetelm\u00e4ss\u00e4 k\u00e4ytet\u00e4\u00e4n taloudellista mittaria. \u00c4l\u00e4 sekoita raham\u00e4\u00e4r\u00e4ist\u00e4 l\u00e4pimenoa ja kappaleita tunnissa samaan suorituskykykaavioon.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miksi useampien t\u00f6iden aloittaminen ei v\u00e4ltt\u00e4m\u00e4tt\u00e4 lis\u00e4\u00e4 valmiita tilauksia<\/h2>\n\n\n<p>Kuvitellaan tehdas, jossa kootaan pumppuyksik\u00f6it\u00e4. Jokaiseen valmiiseen yksikk\u00f6\u00f6n tarvitaan koneistettu runko ja akseli. Molemmat osat voidaan valmistaa samalla koneistuskeskuksella. V\u00e4ltt\u00e4\u00e4kseen tuotevaihdon koneenk\u00e4ytt\u00e4j\u00e4 jatkaa seuraavalla runkoer\u00e4ll\u00e4. Kokoonpanossa on sill\u00e4 v\u00e4lin runkoja valmiina, mutta akselit puuttuvat.<\/p>\n\n\n<p>Koneistuskeskuksen pit\u00e4minen k\u00e4ynniss\u00e4 runkoja valmistamalla lis\u00e4\u00e4 keskener\u00e4ist\u00e4 tuotantoa. Puuttuva osa ei silti valmistu, eik\u00e4 pumppu tule valmiiksi.<\/p>\n\n\n<p>Valmistumiseen t\u00e4ht\u00e4\u00e4v\u00e4 suunnitelma l\u00e4htee kokoonpanon tarpeista ja etenee niist\u00e4 taaksep\u00e4in. Se sovittaa runkojen ja akselien ty\u00f6vaiheet yhteen niin, ett\u00e4 yhteensopivat osat ovat saatavilla ennen suunniteltua kokoonpanoajankohtaa. Koneet eiv\u00e4t ole nopeutuneet. Ty\u00f6j\u00e4rjestys vain palvelee valmistumista paremmin.<\/p>\n\n\n<p>T\u00e4m\u00e4 ei tarkoita kaikkien jonojen poistamista. Jos aloitusvalmiita t\u00f6it\u00e4 on liian v\u00e4h\u00e4n, kriittinen resurssi voi j\u00e4\u00e4d\u00e4 ilman ty\u00f6t\u00e4 edelt\u00e4v\u00e4n vaiheen viiv\u00e4styess\u00e4. Tavoitteena on riitt\u00e4v\u00e4sti oikeaa ty\u00f6t\u00e4 oikeassa kohdassa, ei mahdollisimman pieni jono kaikkialla.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/\">Tuotannon pullonkauloilla<\/a> on silti merkityst\u00e4: aidosti kapasiteetiltaan rajoittunut ty\u00f6vaihe asettaa rajan, jota pelkk\u00e4 ty\u00f6j\u00e4rjestys ei poista. Ennen laitehankintoja on kuitenkin erotettava todellinen kapasiteettipula sellaisesta odottamisesta, joka johtuu materiaalien, yhteen kuuluvien osien tai toimivan ty\u00f6j\u00e4rjestyksen puutteesta ja joka olisi v\u00e4ltett\u00e4viss\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Suunnittele SkyPlannerilla ty\u00f6j\u00e4rjestys, joka auttaa saamaan valmista<\/h2>\n\n\n<p>Tilauskannan muuttuessa n\u00e4iden p\u00e4\u00e4t\u00f6sten yhteensovittaminen k\u00e4sin k\u00e4y nopeasti vaikeaksi. Yhden ty\u00f6n siirt\u00e4minen vaikuttaa muiden t\u00f6iden k\u00e4ytett\u00e4viss\u00e4 olevaan kapasiteettiin, niiden seuraaviin ty\u00f6vaiheisiin ja valmistumisp\u00e4iviin.<\/p>\n\n\n<p>SkyPlanner APS <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">hoitaa t\u00e4m\u00e4n ajoituslaskennan<\/a>. Sen teko\u00e4lymoottori Arcturus ajoittaa ty\u00f6vaiheet m\u00e4\u00e4ritellyn ty\u00f6pistekapasiteetin, riippuvuuksien ja prioriteettien mukaan. Tuloksena syntyv\u00e4 suunnitelma n\u00e4kyy Gantt-aikajanalla. Sin\u00e4 asetat prioriteetit, s\u00e4\u00e4nn\u00f6t ja lukitukset, ja Arcturus laskee aikataulun niiden puitteissa.<\/p>\n\n\n<p>L\u00e4pimenon parantamisessa erityisen hy\u00f6dyllisi\u00e4 ovat kolme ajoitukseen liittyv\u00e4\u00e4 p\u00e4\u00e4t\u00f6st\u00e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ajoita aloitusvalmiit ty\u00f6t realistiseen j\u00e4rjestykseen<\/h3>\n\n\n<p>Koneen vapaa aika ei juuri auta, jos tarvittava materiaali saapuu vasta huomenna. Kun materiaalien saatavuuden huomioiva ajoitus on k\u00e4yt\u00f6ss\u00e4, SkyPlanner ottaa saatavuuden mukaan ajoituslaskentaan. Ty\u00f6vaiheiden riippuvuudet puolestaan yhdist\u00e4v\u00e4t aiemmat vaiheet niit\u00e4 seuraaviin vaiheisiin.<\/p>\n\n\n<p>N\u00e4in suunnitelma perustuu siihen, milloin ty\u00f6 voi edet\u00e4, eik\u00e4 jonoon, jossa kaiken oletetaan olevan valmista aloitettavaksi. K\u00e4yt\u00e4 suunnitelmaa tuotannossa t\u00f6iden vapauttamisen tukena ja tarkista aloitusedellytykset ennen kuin vapautat lis\u00e4\u00e4 t\u00f6it\u00e4 tuotantoon.<\/p>\n\n\n<h3 class=\"wp-block-heading\">V\u00e4henn\u00e4 tuotevaihtoja ja pid\u00e4 m\u00e4\u00e4r\u00e4ajat mieless\u00e4<\/h3>\n\n\n<p>Toistuvat ty\u00f6kalun, materiaalin tai v\u00e4rin vaihdot voivat vied\u00e4 aikaa varsinaiselta tuotannolta. SkyPlanner voi ryhmitell\u00e4 ominaisuuksiltaan yhteensopivia t\u00f6it\u00e4 ty\u00f6pistes\u00e4\u00e4nt\u00f6jen ja dynaamisten prioriteettien avulla. Toisistaan poikkeaville t\u00f6ille se k\u00e4ytt\u00e4\u00e4 m\u00e4\u00e4ritelty\u00e4 <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/smed\/\">asetusaikaa<\/a>.<\/p>\n\n\n<p>Hy\u00f6tyn\u00e4 on harkitumpi ty\u00f6j\u00e4rjestys: yhteensopivat ty\u00f6t voidaan ajaa per\u00e4kk\u00e4in sen sijaan, ett\u00e4 jokaisesta tuotevaihdosta p\u00e4\u00e4tett\u00e4isiin erikseen. Huomioi ryhmittelyss\u00e4 my\u00f6s valmistumisp\u00e4iv\u00e4t ja asiakasprioriteetit. Pitk\u00e4 ja vaivaton er\u00e4 ei ole oikea valinta, jos se viiv\u00e4stytt\u00e4\u00e4 kiireellisen tilauksen valmistumiseen tarvittavia osia.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Laske aikataulu uudelleen tilanteen muuttuessa<\/h3>\n\n\n<p>Ty\u00f6n viiv\u00e4styminen tai prioriteetin muutos voi tehd\u00e4 eilisest\u00e4 ty\u00f6j\u00e4rjestyksest\u00e4 sopimattoman t\u00e4m\u00e4n p\u00e4iv\u00e4n tarpeisiin. Arcturus voi laskea aikataulun uudelleen p\u00e4ivitettyjen tietojen perusteella. Gantt-n\u00e4kym\u00e4st\u00e4 voit tarkistaa, mille resursseille ty\u00f6t on ajoitettu ja milloin ne valmistuvat.<\/p>\n\n\n<p>Sen sijaan, ett\u00e4 rakentaisit jokaisen koneen ty\u00f6jonon uudelleen k\u00e4sin, voit keskitty\u00e4 p\u00e4\u00e4t\u00f6ksiin: mink\u00e4 ty\u00f6n on valmistuttava ensin, vaatiiko kapasiteetti toimenpiteit\u00e4 ja millaisia toimituslupauksia p\u00e4ivitetyn suunnitelman perusteella voi antaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 materiaalien saatavuuden huomioiminen muutti Eskomaticilla<\/h2>\n\n\n<p>Suomalainen sopimuskoneistaja Eskomatic j\u00e4rjesti aiemmin ty\u00f6jononsa pitk\u00e4lti k\u00e4sin ik\u00e4\u00e4ntyv\u00e4ss\u00e4 tuotannonohjausj\u00e4rjestelm\u00e4ss\u00e4. Materiaalitilanteeseen oli rajallinen n\u00e4kyvyys, joten puutteet saattoivat tulla ilmi liian l\u00e4hell\u00e4 ty\u00f6n suunniteltua aloitusta.<\/p>\n\n\n<p>Kun SkyPlanner yhdistettiin k\u00e4yt\u00f6ss\u00e4 olevaan ERP-j\u00e4rjestelm\u00e4\u00e4n, tiimi sai selke\u00e4mm\u00e4t ty\u00f6jonot Gantt-n\u00e4kym\u00e4\u00e4n, automaattisen kuormituksen ajoituksen ja paremman n\u00e4kyvyyden materiaalipuutteisiin. Eskomaticin mukaan puuttuvista materiaaleista johtuvat tuotantokatkokset ovat v\u00e4hentyneet ja toimitusp\u00e4iv\u00e4t pystyt\u00e4\u00e4n m\u00e4\u00e4ritt\u00e4m\u00e4\u00e4n tarkemmin.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/eskomatic\/\">Eskomaticin kokemukset<\/a> osoittavat, miksi aloitusedellytykset ovat t\u00e4rkeit\u00e4 tuotannon virtaukselle: toimiva aikataulu ottaa huomioon sek\u00e4 ty\u00f6n etenemismahdollisuudet ett\u00e4 sen paikan jonossa. Kun p\u00e4ivitt\u00e4iset ty\u00f6t ovat selke\u00e4mpi\u00e4 ja materiaalipuutteista johtuvia keskeytyksi\u00e4 on v\u00e4hemm\u00e4n, suunnittelijalta kuluu v\u00e4hemm\u00e4n aikaa puutteiden selvittelyyn sen j\u00e4lkeen, kun ty\u00f6n olisi pit\u00e4nyt jo alkaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Varmista, ett\u00e4 lis\u00e4tuotos on juuri sit\u00e4, mit\u00e4 tarvitaan<\/h2>\n\n\n<p>Kun olet muuttanut ty\u00f6j\u00e4rjestyst\u00e4 tai t\u00f6iden tuotantoon vapauttamisen k\u00e4yt\u00e4nt\u00f6\u00e4, mittaa valmistuneen ja hyv\u00e4ksytyn tuotoksen m\u00e4\u00e4r\u00e4 uudelleen samoilla rajauksilla. Tarkastele vertailukelpoisia vuoroja tai viikkoja, \u00e4l\u00e4 vain ensimm\u00e4ist\u00e4 kiireist\u00e4 iltap\u00e4iv\u00e4\u00e4.<\/p>\n\n\n<p>Tarkastele l\u00e4pimenoa yhdess\u00e4 keskener\u00e4isen tuotannon, laadun ja toimitusvarmuuden kanssa. Jos tuotantoon tulee enemm\u00e4n t\u00f6it\u00e4 mutta hyv\u00e4ksytyn tuotoksen m\u00e4\u00e4r\u00e4 pysyy ennallaan, parannus saattaa olla vain pidempi jono. Jos tuotos kasvaa siksi, ett\u00e4 valmistukseen valittiin helpompia tuotteita, tuotejakauma selitt\u00e4\u00e4 ainakin osan muutoksesta. Jos valmiiden tuotteiden varasto kasvaa ilman kysynt\u00e4\u00e4, suurempi l\u00e4pimeno voi sitoa rahaa sen sijaan, ett\u00e4 se hy\u00f6dytt\u00e4isi liiketoimintaa.<\/p>\n\n\n<p>Ajoitus on vain osa ratkaisua. Toistuvat laiterikot, laatuvirheet tai riitt\u00e4m\u00e4t\u00f6n fyysinen kapasiteetti vaativat kunnossapidon, laadunhallinnan tai kapasiteetin kehitt\u00e4misen toimia. Parempi suunnitelma auttaa sovittamaan k\u00e4ytett\u00e4viss\u00e4 olevien resurssien k\u00e4yt\u00f6n yhteen. Se ei korvaa resursseja eik\u00e4 yksin tee ep\u00e4vakaasta prosessista luotettavaa.<\/p>\n\n\n<p>Jos tehtaasi ty\u00f6t odottavat toistuvasti v\u00e4\u00e4r\u00e4ss\u00e4 paikassa, SkyPlanner on k\u00e4yt\u00e4nn\u00f6llinen seuraava askel. Se voidaan integroida mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapintansa kautta. N\u00e4in nykyiset tuotantotiedot saadaan kapasiteettirajoitteet huomioivan hienokuormituksen k\u00e4ytt\u00f6\u00f6n ilman, ett\u00e4 yrityst\u00e4si jo palvelevaa j\u00e4rjestelm\u00e4\u00e4 tarvitsee vaihtaa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a>, niin keskustellaan t\u00f6ist\u00e4, joita tehtaasi on vaikea saada valmiiksi. Ota mukaan esimerkki tyypillisest\u00e4 ty\u00f6vaiheketjusta, viimeaikaisesta materiaaliviiveest\u00e4 ja valmistumista kuvaavasta mittarista, jota haluat parantaa. Olennaista ei ole vain se, voisiko jokainen kone k\u00e4yd\u00e4 enemm\u00e4n. Olennaista on, miten parempi ty\u00f6j\u00e4rjestys voisi auttaa saamaan enemm\u00e4n oikeita t\u00f6it\u00e4 tuotannosta ulos, hyv\u00e4ksyttyin\u00e4 ja valmiina asiakkaalle.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla Etusivu &raquo; Resurssit &raquo; Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla Alkup\u00e4\u00e4n koneet k\u00e4yv\u00e4t ja lavat t\u00e4yttyv\u00e4t, mutta kokoonpano odottaa yh\u00e4 tarvitsemiaan osia. Vuoron p\u00e4\u00e4ttyess\u00e4 t\u00f6it\u00e4 on aloitettu paljon, mutta tilauksia on valmistunut liian v\u00e4h\u00e4n. Tuotannon l\u00e4pimeno tuo t\u00e4m\u00e4n eron n\u00e4kyviin. Se kertoo, kuinka paljon hyv\u00e4ksytty\u00e4 tuotosta rajatusta tuotantoprosessista valmistuu &#8230; <a title=\"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":98209,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-98168","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-hienokuormitus","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla<\/title>\n<meta name=\"description\" content=\"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\" \/>\n<meta property=\"og:description\" content=\"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T01:40:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T01:40:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\",\"datePublished\":\"2026-10-15T01:40:32+00:00\",\"dateModified\":\"2026-10-15T01:40:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/\"},\"wordCount\":1640,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"articleSection\":[\"APS ja hienokuormitus\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/\",\"name\":\"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"datePublished\":\"2026-10-15T01:40:32+00:00\",\"dateModified\":\"2026-10-15T01:40:40+00:00\",\"description\":\"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotannon-lapimeno\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla","description":"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/","og_locale":"fi_FI","og_type":"article","og_title":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla","og_description":"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T01:40:32+00:00","article_modified_time":"2026-10-15T01:40:40+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla","datePublished":"2026-10-15T01:40:32+00:00","dateModified":"2026-10-15T01:40:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/"},"wordCount":1640,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","articleSection":["APS ja hienokuormitus","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/","name":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","datePublished":"2026-10-15T01:40:32+00:00","dateModified":"2026-10-15T01:40:40+00:00","description":"Koneet k\u00e4yv\u00e4t, mutta tilaukset eiv\u00e4t aina valmistu. Mittaa tuotannon l\u00e4pimeno ja ajoita ty\u00f6t SkyPlannerilla niin, ett\u00e4 oikeat tilaukset valmistuvat.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla Etusivu &raquo; Resurssit &raquo; Tuotannon l\u00e4pimeno: enemm\u00e4n valmista samoilla ty\u00f6tunneilla Alkup\u00e4\u00e4n koneet k\u00e4yv\u00e4t ja lavat t\u00e4yttyv\u00e4t, mutta kokoonpano odottaa yh\u00e4 tarvitsemiaan osia. Vuoron p\u00e4\u00e4ttyess\u00e4 t\u00f6it\u00e4 on aloitettu paljon, mutta tilauksia on valmistunut liian v\u00e4h\u00e4n. Tuotannon l\u00e4pimeno tuo t\u00e4m\u00e4n eron n\u00e4kyviin. Se kertoo, kuinka paljon hyv\u00e4ksytty\u00e4 tuotosta rajatusta tuotantoprosessista valmistuu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=98168"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98168\/revisions"}],"predecessor-version":[{"id":98231,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98168\/revisions\/98231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/98209"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=98168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=98168"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=98168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}