{"id":98075,"date":"2026-10-15T00:12:46","date_gmt":"2026-10-15T00:12:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98075"},"modified":"2026-10-15T01:53:39","modified_gmt":"2026-10-15T01:53:39","slug":"sykliaika-tuotannossa","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/","title":{"rendered":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Koneistusvaiheelle on suunniteltu kaksi minuuttia kappaletta kohden, mutta er\u00e4 valmistuu toistuvasti my\u00f6h\u00e4ss\u00e4. Onko sykli odotettua hitaampi? Puuttuuko arviosta kappaleen lataaminen koneeseen? Vai onko asetusaika jaettu v\u00e4\u00e4r\u00e4lle er\u00e4koolle?<\/p>\n\n\n<p>Sykliajan mittaaminen tuotannossa auttaa vastaamaan n\u00e4ihin kysymyksiin. <strong>Ty\u00f6vaiheen sykliaika on mitattu aika, joka tarvitaan yhden kappaleen valmistamiseen tai yhden toistuvan ty\u00f6kierron suorittamiseen.<\/strong> Se kertoo ty\u00f6n todellisen etenemisnopeuden, ei sit\u00e4, miten nopeasti ty\u00f6n toivotaan sujuvan.<\/p>\n\n\n<p>Suunnittelijalle hy\u00f6ty ei rajoitu s\u00e4\u00e4stett\u00e4vien sekuntien l\u00f6yt\u00e4miseen. Luotettavat ty\u00f6vaiheajat antavat aikataululle kest\u00e4v\u00e4mm\u00e4n pohjan. SkyPlanner laskee niiden perusteella, milloin ty\u00f6t mahtuvat k\u00e4ytett\u00e4viss\u00e4 oleville resursseille. N\u00e4in voit laatia tuotannon todellisia olosuhteita vastaavan suunnitelman sen sijaan, ett\u00e4 korjaisit jatkuvasti vanhentuneisiin arvioihin perustuvaa aikataulua.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 sykliaika tuotannossa mittaa?<\/h2>\n\n\n<p>Sykliaika voi kuvata koneen ty\u00f6kiertoa, ty\u00f6ntekij\u00e4n toistuvaa ty\u00f6t\u00e4 tai tuotantolinjalta valmistuvien kappaleiden v\u00e4list\u00e4 aikaa. Koneen sykli voidaan mitata yhden syklin k\u00e4ynnistyssignaalista seuraavaan. Ty\u00f6ntekij\u00e4n ty\u00f6kiertoon voivat kuulua kappaleen lataaminen, ty\u00f6st\u00f6n avustavat teht\u00e4v\u00e4t, kappaleen purkaminen ja paluu samaan l\u00e4ht\u00f6tilanteeseen.<\/p>\n\n\n<p>N\u00e4m\u00e4 ajat eiv\u00e4t v\u00e4ltt\u00e4m\u00e4tt\u00e4 ole yht\u00e4 pitki\u00e4. Jos ty\u00f6ntekij\u00e4 k\u00e4ytt\u00e4\u00e4 useampaa kuin yht\u00e4 konetta, ty\u00f6ntekij\u00e4n ajank\u00e4ytt\u00f6\u00e4 ja koneiden varattunaoloa on tarkasteltava erikseen. Jos useita ty\u00f6pisteit\u00e4 toimii rinnakkain, valmistuvien kappaleiden v\u00e4linen aika ei ole sama kuin yhden kappaleen kulkuun koko linjan l\u00e4pi kuluva aika.<\/p>\n\n\n<p>Voit my\u00f6s t\u00f6rm\u00e4t\u00e4 siihen, ett\u00e4 <strong>tuotannon sykliajalla tarkoitetaan koko tuotantoon kuluvaa aikaa<\/strong> tuotantoon vapautuksesta valmistuksen, kokoonpanon ja testauksen loppuun. T\u00e4h\u00e4n laajempaan mittariin voivat sis\u00e4lty\u00e4 k\u00e4sittely, tarkastus, siirrot ja jonotus. Se auttaa ymm\u00e4rt\u00e4m\u00e4\u00e4n tuotannon virtausta, mutta se ei ole kappalekohtainen koneaika, jonka voi kertoa tilausm\u00e4\u00e4r\u00e4ll\u00e4.<\/p>\n\n\n<p>K\u00e4yt\u00e4nn\u00f6n s\u00e4\u00e4nt\u00f6 on m\u00e4\u00e4ritell\u00e4 mittauksen rajat ennen luvun k\u00e4ytt\u00f6\u00e4. T\u00e4ss\u00e4 oppaassa keskityt\u00e4\u00e4n ty\u00f6vaihe- ja kappaleaikoihin tuotannonsuunnittelun l\u00e4ht\u00f6tietoina.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Mittari<\/th><th>Mihin se vastaa?<\/th><th>Tyypillinen yksikk\u00f6<\/th><\/tr><\/thead><tbody><tr><td>Ty\u00f6vaiheen sykliaika<\/td><td>Kuinka kauan toistuva ty\u00f6vaihe kest\u00e4\u00e4?<\/td><td>Sekuntia tai minuuttia sykli\u00e4 tai kappaletta kohden<\/td><\/tr><tr><td><a href=\"\/fi\/oppaat\/miten-optimoida-lapimenoaika-valmistuksessa\/\">Tuotannon l\u00e4pimenoaika<\/a><\/td><td>Kuinka kauan kappaleen kulku m\u00e4\u00e4ritellyn tuotantoreitin l\u00e4pi kest\u00e4\u00e4 odotuksineen?<\/td><td>Kulunut aika tunteina tai p\u00e4ivin\u00e4<\/td><\/tr><tr><td>Tahtiaika<\/td><td>Millaista tuotantotahtia asiakaskysynn\u00e4n t\u00e4ytt\u00e4minen edellytt\u00e4\u00e4?<\/td><td>K\u00e4ytett\u00e4viss\u00e4 oleva tuotantoaika tarvittavaa kappaletta kohden<\/td><\/tr><tr><td>Tuotantonopeus<\/td><td>Kuinka paljon tuotantoa valmistuu tietyss\u00e4 ajassa?<\/td><td>Kappaletta tunnissa tai p\u00e4iv\u00e4ss\u00e4<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tahtiaika kertoo kysynn\u00e4n perusteella lasketun vaatimuksen. Sykliaika puolestaan on prosessista mitattu arvo. <a href=\"\/fi\/oppaat\/tuotannon-lapimeno\/\">Tuotantonopeus kertoo, kuinka paljon tuotteita valmistuu aikayksik\u00f6ss\u00e4<\/a>. Kun n\u00e4m\u00e4 k\u00e4sitteet pidet\u00e4\u00e4n erill\u00e4\u00e4n, v\u00e4ltet\u00e4\u00e4n yleinen virhe: kappaletta minuutissa -lukua ei pid\u00e4 tulkita minuuttia kappaletta kohti -luvuksi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4in lasket sykliajan tuotannossa<\/h2>\n\n\n<p>Yksitt\u00e4isen havaitun syklin kesto saadaan v\u00e4hent\u00e4m\u00e4ll\u00e4 aloitushetken aikaleima lopetushetken aikaleimasta. K\u00e4yt\u00e4 jokaisessa havainnossa samoja aloitus- ja lopetustapahtumia.<\/p>\n\n\n<p>Kun samaa nimikett\u00e4 valmistetaan toistuvasti samassa ty\u00f6vaiheessa, laske keskim\u00e4\u00e4r\u00e4inen kappaleaika:<\/p>\n\n\n<p><strong>Keskim\u00e4\u00e4r\u00e4inen sykliaika kappaletta kohden = mitattu tuotantoaika \u00f7 siin\u00e4 ajassa valmistuneiden kappaleiden m\u00e4\u00e4r\u00e4<\/strong><\/p>\n\n\n<p>Tuloksena on aika kappaletta kohden. K\u00e4\u00e4nteinen laskutoimitus antaa tuotantonopeuden:<\/p>\n\n\n<p><strong>Tuotantonopeus = valmistuneiden kappaleiden m\u00e4\u00e4r\u00e4 \u00f7 mitattu tuotantoaika<\/strong><\/p>\n\n\n<p>Valitse mittausjakso harkiten. K\u00e4ynniss\u00e4 olevan ty\u00f6kierron mittauksesta j\u00e4tet\u00e4\u00e4n pois erikseen kirjatut pys\u00e4hdykset. Jos taas tarkastellaan koko havaintojaksoa pys\u00e4hdyksineen, tuloksena on toteutunut keskim\u00e4\u00e4r\u00e4inen valmistuvien kappaleiden v\u00e4linen aika kyseisell\u00e4 jaksolla. Molemmat voivat olla hy\u00f6dyllisi\u00e4, mutta ne vastaavat eri kysymyksiin. Kirjaa k\u00e4ytt\u00e4m\u00e4si mittaustapa ennen kuin vertaat tulosta nykyiseen ohjeaikaan.<\/p>\n\n\n<p>My\u00f6s kappalem\u00e4\u00e4r\u00e4ll\u00e4 on merkityst\u00e4. Jos syntyy hylky\u00e4, jakaminen kaikkien valmistuneiden kappaleiden m\u00e4\u00e4r\u00e4ll\u00e4 antaa eri tuloksen kuin jakaminen hyv\u00e4ksyttyjen kappaleiden m\u00e4\u00e4r\u00e4ll\u00e4. Merkitse selv\u00e4sti, jos mittari perustuu hyv\u00e4ksyttyyn tuotantoon. \u00c4l\u00e4 anna laatuh\u00e4vikin muuttaa huomaamatta sit\u00e4, mit\u00e4 kutsut koneen sykliajaksi.<\/p>\n\n\n<p>Jos kone valmistaa useita kappaleita yhdell\u00e4 syklill\u00e4, tarvitaan viel\u00e4 yksi erottelu: <strong>sekunnit koneen sykli\u00e4 kohden eiv\u00e4t ole sekunteja kappaletta kohden<\/strong>. Saat keskim\u00e4\u00e4r\u00e4isen kappaleajan jakamalla syklin keston sen aikana valmistuvien kappaleiden m\u00e4\u00e4r\u00e4ll\u00e4. S\u00e4ilyt\u00e4 silti er\u00e4n todellinen sykliaika resurssin kuormitusta suunnitellessasi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Koneistusesimerkki: pid\u00e4 asetusaika erill\u00e4\u00e4n<\/h2>\n\n\n<p>Kuvitellaan koneistuskeskus, joka valmistaa yhden kappaleen kerrallaan. Havaitset 120 minuutin toistuvan tuotannon aikana 60 valmistunutta kappaletta. Aikaan sis\u00e4ltyv\u00e4t tavanomainen lataaminen ja purkaminen. T\u00e4ss\u00e4 esimerkiss\u00e4 ei ole pys\u00e4hdyksi\u00e4 eik\u00e4 hyl\u00e4ttyj\u00e4 kappaleita. Erikseen teht\u00e4v\u00e4 asetus kest\u00e4\u00e4 30 minuuttia.<\/p>\n\n\n<p>Keskim\u00e4\u00e4r\u00e4inen ty\u00f6vaiheaika on:<\/p>\n\n\n<p><strong>120 minuuttia \u00f7 60 kappaletta = 2 minuuttia kappaletta kohden<\/strong><\/p>\n\n\n<p>T\u00e4m\u00e4 vastaa <strong>30 kappaletta tunnissa havaitun tuotantoajon aikana<\/strong>. Se ei tarkoita, ett\u00e4 koko tilaus asetuksineen valmistuisi samalla nopeudella.<\/p>\n\n\n<p>T\u00e4ss\u00e4 ty\u00f6vaiheessa asetus ja tuotanto varaavat saman resurssin per\u00e4kk\u00e4in ilman p\u00e4\u00e4llekk\u00e4isyytt\u00e4. Suunniteltu kesto on siis:<\/p>\n\n\n<p><strong>Ty\u00f6vaiheen kesto = asetusaika + m\u00e4\u00e4r\u00e4 \u00d7 kappaleaika<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tilausm\u00e4\u00e4r\u00e4<\/th><th>Asetusaika<\/th><th>Toistuva tuotanto<\/th><th>Ty\u00f6vaiheen kokonaiskesto<\/th><\/tr><\/thead><tbody><tr><td>60 kappaletta<\/td><td>30 minuuttia<\/td><td>120 minuuttia<\/td><td>150 minuuttia<\/td><\/tr><tr><td>120 kappaletta<\/td><td>30 minuuttia<\/td><td>240 minuuttia<\/td><td>270 minuuttia<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jos sis\u00e4llyt\u00e4t asetusajan ensimm\u00e4isest\u00e4 er\u00e4st\u00e4 laskettuun keskim\u00e4\u00e4r\u00e4iseen kappaleaikaan, luku ei skaalaudu oikein toiseen er\u00e4\u00e4n. <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/smed\/\">Kun pid\u00e4t asetusajan ja toistuvan ty\u00f6ajan erill\u00e4\u00e4n<\/a>, voit muuttaa m\u00e4\u00e4r\u00e4\u00e4 laskematta samaa asetusaikaa kahteen kertaan.<\/p>\n\n\n<p>Sama p\u00e4tee my\u00f6s toiseen suuntaan: \u00e4l\u00e4 lis\u00e4\u00e4 asetusaikaa uudelleen, jos se sis\u00e4ltyy jo aika-arvioon. Uunin tai muun er\u00e4prosessin kesto voi pysy\u00e4 vakiona sallitun er\u00e4koon rajoissa. K\u00e4yt\u00e4 silloin er\u00e4n kestoa sen sijaan, ett\u00e4 kertoisit l\u00e4mmityssyklin keston er\u00e4n kappalem\u00e4\u00e4r\u00e4ll\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ker\u00e4\u00e4 havaintoja, joita voit todella hy\u00f6dynt\u00e4\u00e4 suunnittelussa<\/h2>\n\n\n<p>Aikatutkimuksesta ei tarvitse tehd\u00e4 suurta kehitysprojektia, jotta siit\u00e4 olisi hy\u00f6ty\u00e4 suunnittelussa. Aloita ty\u00f6vaiheesta, jonka todellinen kesto poikkeaa toistuvasti suunnitellusta.<\/p>\n\n\n<p>M\u00e4\u00e4rittele tuote, ty\u00f6vaihe, ty\u00f6h\u00f6n soveltuva kone ja ty\u00f6menetelm\u00e4. Sovi mittauksen aloitus- ja lopetustapahtumista ty\u00f6n tekij\u00f6iden kanssa. Kirjaa kappalem\u00e4\u00e4r\u00e4 ja havainnoi toistuvaa ty\u00f6t\u00e4 riitt\u00e4v\u00e4n pitk\u00e4\u00e4n n\u00e4hd\u00e4ksesi, pysyyk\u00f6 aika vakaana vai vaihteleeko se huomattavasti. Pid\u00e4 asetukset, pys\u00e4hdykset, hylky ja poikkeuksellinen korjausty\u00f6 eroteltavissa.<\/p>\n\n\n<p>Vertaa sitten kesken\u00e4\u00e4n vertailukelpoisia havaintoja. Vaihtelun voi selitt\u00e4\u00e4 eri materiaali, ohjelma, ty\u00f6kalu, ty\u00f6ntekij\u00e4n ty\u00f6menetelm\u00e4 tai kone. Kun tuotevalikoima on laaja, erilaisista tuotteista laskettu yhteinen keskiarvo voi peitt\u00e4\u00e4 enemm\u00e4n kuin paljastaa. Nopein havaittu sykli on hy\u00f6dyllinen vertailukohta kehitt\u00e4miselle, mutta se ei ole automaattisesti realistinen suunnittelun ohjeaika.<\/p>\n\n\n<p>Kysy ty\u00f6ntekij\u00e4lt\u00e4, mit\u00e4 luku j\u00e4tt\u00e4\u00e4 huomiotta. Materiaalin noutaminen, ensimm\u00e4isen kappaleen tarkastaminen tai kiinnittimen puhdistaminen voi olla v\u00e4ltt\u00e4m\u00e4t\u00f6nt\u00e4 ty\u00f6t\u00e4, vaikka se ei n\u00e4kyisi koneen lastuamisajan n\u00e4yt\u00f6ss\u00e4. Sen sivuuttaminen ei poista ty\u00f6t\u00e4, vaan saa aikataulun aliarvioimaan siihen tarvittavan ajan.<\/p>\n\n\n<p>P\u00e4\u00e4t\u00e4 lopuksi, miss\u00e4 kukin aikah\u00e4vikki huomioidaan. Jos mittaukseen eiv\u00e4t sis\u00e4lly ty\u00f6vuoron tauot, huomioi ne k\u00e4ytett\u00e4viss\u00e4 olevassa ty\u00f6ajassa. Jos toteutuneeseen aikaan on jo sis\u00e4llytetty varaus toistuville pys\u00e4hdyksille, \u00e4l\u00e4 lis\u00e4\u00e4 samaa varausta uudelleen muualla. N\u00e4in mitatusta kestosta tulee johdonmukainen suunnittelun l\u00e4ht\u00f6tieto eik\u00e4 vain uusi optimistinen luku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kehit\u00e4 ty\u00f6kiertoa unohtamatta koko tilausta<\/h2>\n\n\n<p>Sykliajan mittaaminen osoittaa, mit\u00e4 kannattaa tutkia tarkemmin. Pitk\u00e4t k\u00e4sittelyvaiheet voivat viitata tarpeeseen kehitt\u00e4\u00e4 kiinnittimi\u00e4 tai j\u00e4rjest\u00e4\u00e4 ty\u00f6kalut ja materiaalit helpommin k\u00e4ytett\u00e4viksi. Syklien vaihtelu voi edellytt\u00e4\u00e4 paremmin toistettavaa ty\u00f6menetelm\u00e4\u00e4 tai kunnossapitoa. Pitk\u00e4t asetusajat on analysoitava erikseen, ei piilotettava suurempaan kappaleaikaan.<\/p>\n\n\n<p>Keskity ensin ty\u00f6vaiheeseen, joka rajoittaa toimitettavien t\u00f6iden etenemist\u00e4. Ajan s\u00e4\u00e4st\u00e4minen voimakkaasti kuormitetussa pullonkaulassa voi vapauttaa arvokasta tuotantokapasiteettia. Sama ajans\u00e4\u00e4st\u00f6 v\u00e4lj\u00e4sti kuormitetulla resurssilla ei v\u00e4ltt\u00e4m\u00e4tt\u00e4 muuta tilauksen valmistumisp\u00e4iv\u00e4\u00e4, jos seuraavaa ty\u00f6vaihetta ei edelleenk\u00e4\u00e4n p\u00e4\u00e4st\u00e4 aloittamaan.<\/p>\n\n\n<p>Siksi kehitt\u00e4minen ja aikataulutus kuuluvat yhteen. <strong>Nopeampi ty\u00f6vaihe muuttaa ty\u00f6n tarvitsemaa aikaa; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">tuotantoaikataulu<\/a> n\u00e4ytt\u00e4\u00e4, miss\u00e4 vapautuva aika voidaan hy\u00f6dynt\u00e4\u00e4.<\/strong> Kun menetelm\u00e4 paranee, p\u00e4ivit\u00e4 suunnittelussa k\u00e4ytett\u00e4v\u00e4 kesto ja tarkastele sen vaikutusta ty\u00f6j\u00e4rjestykseen. \u00c4l\u00e4 oleta, ett\u00e4 jokainen toimitus aikaistuu saman verran.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Laadi parempi suunnitelma mitattujen aikojen pohjalta SkyPlannerilla<\/h2>\n\n\n<p>SkyPlannerissa voit m\u00e4\u00e4ritt\u00e4\u00e4 ty\u00f6vaiheen keston laskentatavaksi <strong>Aika\/kappale, Kappaletta\/aika tai Kiinte\u00e4 aika<\/strong> ja kirjata asetusajan erikseen. N\u00e4in voit kuvata kappalekohtaisen koneistusvaiheen, tuotantonopeuteen perustuvan ty\u00f6vaiheen tai kiinte\u00e4n pituisen er\u00e4prosessin ty\u00f6h\u00f6n sopivalla tavalla.<\/p>\n\n\n<p>My\u00f6s aiempi tuotantotieto auttaa tarkentamaan arviota. SkyPlanner voi ehdottaa ty\u00f6vaiheen kestoa sen aiempien toteutuneiden tuotantoaikojen perusteella, ja voit hyv\u00e4ksy\u00e4 ehdotuksen oletusarvon sijaan. T\u00e4m\u00e4 edellytt\u00e4\u00e4 kyseiseen ty\u00f6h\u00f6n soveltuvaa aiempaa tuotantotietoa. Se ei korvaa k\u00e4ytt\u00f6kelpoisten havaintojen ker\u00e4\u00e4mist\u00e4.<\/p>\n\n\n<p>Hy\u00f6ty syntyy k\u00e4yt\u00e4nn\u00f6n palautekierrosta: tuotannossa kirjataan ty\u00f6h\u00f6n kuluva aika, sin\u00e4 tarkistat keston ja seuraava suunnitelma voi perustua tarkempaan l\u00e4ht\u00f6tietoon. Sinun ei tarvitse en\u00e4\u00e4 tukeutua normiaikaan, joka m\u00e4\u00e4ritettiin ennen ty\u00f6kalujen, menetelm\u00e4n tai tuotteen muuttumista.<\/p>\n\n\n<p>T\u00e4m\u00e4n j\u00e4lkeen SkyPlannerin teko\u00e4lypohjainen aikataulutusmoottori Arcturus ajoittaa ty\u00f6vaiheet m\u00e4\u00e4ritetyn ty\u00f6pistekapasiteetin, riippuvuuksien ja prioriteettien mukaan. <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/gantt-kaavio-tuotannonsuunnittelussa\/\">Gantt-aikataulu<\/a> n\u00e4ytt\u00e4\u00e4 resursseille suunnitellut ty\u00f6t. Korjattu ty\u00f6vaiheaika tulee mukaan laskentaan, jossa huomioidaan my\u00f6s muut samoista k\u00e4ytett\u00e4viss\u00e4 olevista tunneista kilpailevat tilaukset.<\/p>\n\n\n<p>Sen sijaan, ett\u00e4 pident\u00e4isit palkkia k\u00e4sin ja korjaisit kaikki muutoksen vaikutuspiiriss\u00e4 olevat ty\u00f6jonot, voit antaa SkyPlannerin laskea aikataulun uudelleen ja tarkastella vaikutuksia. Sin\u00e4 ohjaat prioriteetteja ja varmistat p\u00e4\u00e4t\u00f6sten pysyvyyden s\u00e4\u00e4nn\u00f6ill\u00e4 ja lukituksilla. Tuloksena ei ole vain uskottavampi kestoarvio, vaan my\u00f6s selke\u00e4mpi kuva siit\u00e4, mit\u00e4 kesto merkitsee lupaamiesi t\u00f6iden kannalta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">N\u00e4in se toimii kiireisess\u00e4 konepajassa<\/h3>\n\n\n<p>Suomalainen alihankintakoneistaja <a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/eskomatic\/\">Eskomatic<\/a> j\u00e4rjesti ty\u00f6jononsa pitk\u00e4lti k\u00e4sin, vaikka tuotevalikoima oli laaja ja er\u00e4koot vaihtelivat. SkyPlanner toi tiimin k\u00e4ytt\u00f6\u00f6n selke\u00e4mm\u00e4n visuaalisen ty\u00f6jonon ja automaattisen hienokuormituksen. Yrityksen mukaan t\u00e4m\u00e4 helpottaa realististen toimitusp\u00e4ivien hahmottamista ja niiden ilmoittamista asiakkaille entist\u00e4 tarkemmin.<\/p>\n\n\n<p>Kokemus havainnollistaa mittaamista seuraavaa askelta: tuotantotieto otetaan pohjaksi selke\u00e4mm\u00e4lle p\u00e4ivitt\u00e4iselle aikataulutukselle ja toimituslupauksille.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ota seuraavan aikatutkimuksesi tulokset hy\u00f6tyk\u00e4ytt\u00f6\u00f6n<\/h2>\n\n\n<p>Jos suunnittelussa k\u00e4ytetyt ty\u00f6vaiheajat ja tuotannon toteuma erkanevat jatkuvasti toisistaan, \u00e4l\u00e4 tyydy korjaamaan lukua taulukkolaskennassa. K\u00e4yt\u00e4 tarkempaa kestoa aikataulutusj\u00e4rjestelm\u00e4ss\u00e4, joka n\u00e4ytt\u00e4\u00e4 sen vaikutukset tilauksen koko ty\u00f6vaiheketjuun ja muuhun ty\u00f6kuormaan.<\/p>\n\n\n<p>SkyPlanner voidaan integroida mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n sen avoimen REST API -rajapinnan kautta. N\u00e4in saat SkyPlannerin suunnittelutoiminnot k\u00e4ytt\u00f6\u00f6n nykyisten j\u00e4rjestelmiesi rinnalle. Valitse osana integraation toteutusta, miten tuotantoajat ker\u00e4t\u00e4\u00e4n ja siirret\u00e4\u00e4n.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a> ja ota mukaan tyypillisen tuotteen ty\u00f6vaiheketju, hiljattain mitattu ty\u00f6vaiheaika sek\u00e4 suunnittelussa t\u00e4ll\u00e4 hetkell\u00e4 k\u00e4ytt\u00e4m\u00e4si normiaika. Niiden avulla voit tarkastella konkreettisesti, miten realistisemmat kestot voisivat parantaa tuotantoaikatauluasi. Jos haluat ensin tutustua itse, <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile SkyPlanneria esimerkkidatalla<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa Etusivu &raquo; Resurssit &raquo; Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa Koneistusvaiheelle on suunniteltu kaksi minuuttia kappaletta kohden, mutta er\u00e4 valmistuu toistuvasti my\u00f6h\u00e4ss\u00e4. Onko sykli odotettua hitaampi? Puuttuuko arviosta kappaleen lataaminen koneeseen? Vai onko asetusaika jaettu v\u00e4\u00e4r\u00e4lle er\u00e4koolle? Sykliajan mittaaminen tuotannossa auttaa vastaamaan n\u00e4ihin kysymyksiin. Ty\u00f6vaiheen sykliaika on mitattu aika, &#8230; <a title=\"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":98110,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-98075","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa<\/title>\n<meta name=\"description\" content=\"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\" \/>\n<meta property=\"og:description\" content=\"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T00:12:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T01:53:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\",\"datePublished\":\"2026-10-15T00:12:46+00:00\",\"dateModified\":\"2026-10-15T01:53:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/\"},\"wordCount\":1728,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/\",\"name\":\"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"datePublished\":\"2026-10-15T00:12:46+00:00\",\"dateModified\":\"2026-10-15T01:53:39+00:00\",\"description\":\"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/sykliaika-tuotannossa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa","description":"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/","og_locale":"fi_FI","og_type":"article","og_title":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa","og_description":"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T00:12:46+00:00","article_modified_time":"2026-10-15T01:53:39+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa","datePublished":"2026-10-15T00:12:46+00:00","dateModified":"2026-10-15T01:53:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/"},"wordCount":1728,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","articleSection":["APS &amp; Scheduling","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/","name":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","datePublished":"2026-10-15T00:12:46+00:00","dateModified":"2026-10-15T01:53:39+00:00","description":"Nopeampi kone ei yksin paranna suunnitelmaa. Mittaa sykliaika oikein ja ajoita ty\u00f6t SkyPlannerissa realististen ty\u00f6vaiheaikojen pohjalta.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/sykliaika-tuotannossa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa Etusivu &raquo; Resurssit &raquo; Sykliaika tuotannossa: mittaa ja hy\u00f6dynn\u00e4 suunnittelussa Koneistusvaiheelle on suunniteltu kaksi minuuttia kappaletta kohden, mutta er\u00e4 valmistuu toistuvasti my\u00f6h\u00e4ss\u00e4. Onko sykli odotettua hitaampi? Puuttuuko arviosta kappaleen lataaminen koneeseen? Vai onko asetusaika jaettu v\u00e4\u00e4r\u00e4lle er\u00e4koolle? Sykliajan mittaaminen tuotannossa auttaa vastaamaan n\u00e4ihin kysymyksiin. Ty\u00f6vaiheen sykliaika on mitattu aika,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98075","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=98075"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98075\/revisions"}],"predecessor-version":[{"id":98139,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/98075\/revisions\/98139"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/98110"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=98075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=98075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=98075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}