{"id":96582,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96582"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"tilausohjautuva-tuotanto","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/","title":{"rendered":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>Asiakas tilaa kotelon koossa, jota myyt harvoin. Sen valmistaminen vasta tilauksen saavuttua on j\u00e4rkev\u00e4\u00e4: varasto ei t\u00e4yty tuotevarianteista, joille ei ehk\u00e4 koskaan l\u00f6ydy ostajaa. Asiakas haluaa silti tiet\u00e4\u00e4 toimitusp\u00e4iv\u00e4n, ja viimeistelyresurssi on jo varattu.<\/p>\n\n\n<p>T\u00e4m\u00e4 on <strong>tilausohjautuvan tuotannon<\/strong> keskeinen kompromissi. Valmiita tuotteita tehd\u00e4\u00e4n v\u00e4hemm\u00e4n etuk\u00e4teen varastoon, mutta asiakkaat joutuvat odottamaan tilaustensa valmistusta. Onnistuminen edellytt\u00e4\u00e4, ett\u00e4 tied\u00e4t, mit\u00e4 tehtaan aikatauluun mahtuu \u2013 pelkk\u00e4 tieto siit\u00e4, mit\u00e4 pystyt valmistamaan, ei riit\u00e4.<\/p>\n\n\n<p>SkyPlanner tarjoaa k\u00e4yt\u00e4nn\u00f6llisen tavan hallita t\u00e4t\u00e4 kompromissia. Sen hienokuormituksesta vastaava teko\u00e4ly Arcturus laskee tuotantoj\u00e4rjestyksen kapasiteetin, materiaalien ja prioriteettien perusteella. N\u00e4et suunnitelman Gantt-aikajanalla ja voit antaa toimituslupauksia, kun edess\u00e4 olevasta ty\u00f6st\u00e4 on selke\u00e4mpi kuva.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 tilausohjautuva tuotanto tarkoittaa?<\/h2>\n\n\n<p>Tilausohjautuva tuotanto (MTO) on tuotantostrategia, jossa asiakastilaus k\u00e4ynnist\u00e4\u00e4 valmistuksen. Sen sijaan ett\u00e4 valmistaisit tuotteita ennustetun kysynn\u00e4n perusteella ja myisit ne varastosta, valmistat asiakkaan tilaaman m\u00e4\u00e4r\u00e4n h\u00e4nen m\u00e4\u00e4rittelyjens\u00e4 mukaisesti.<\/p>\n\n\n<p>Tuotteen ei tarvitse olla ainutkertainen keksint\u00f6. Valmistaja voi k\u00e4ytt\u00e4\u00e4 olemassa olevaa tuotesuunnitelmaa, materiaaliluetteloa ja tuotantoreitityst\u00e4 ja valmistaa tuotteen tilauksen mukaisessa koossa, halutulla pintak\u00e4sittelyll\u00e4 tai tilatun kokoisena er\u00e4n\u00e4. Ratkaisevaa on <strong>se, mik\u00e4 k\u00e4ynnist\u00e4\u00e4 tuotannon<\/strong>, ei tuotteen yksil\u00f6llisyys.<\/p>\n\n\n<p>Kuvittele ohutlevytuotteiden valmistaja, joka tarjoaa laitekoteloita eri mitoilla ja pintak\u00e4sittelyill\u00e4. Se pit\u00e4\u00e4 yleisesti k\u00e4ytetty\u00e4 levymateriaalia varastossa, mutta aloittaa kotelon leikkauksen, taivutuksen ja viimeistelyn vasta saatuaan asiakkaan tilauksen. T\u00e4m\u00e4 on tilausohjautuvaa tuotantoa: raaka-ainetta voi olla varastossa, vaikka valmiita koteloita ei ole.<\/p>\n\n\n<p>Tuotantostrategioita on helppo erottaa toisistaan kysym\u00e4ll\u00e4, mit\u00e4 on viel\u00e4 teht\u00e4v\u00e4 tilauksen saapuessa:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategia<\/th><th>Asiakastilauksen k\u00e4ynnist\u00e4m\u00e4 ty\u00f6<\/th><th>Suunnittelun keskeinen kysymys<\/th><\/tr><\/thead><tbody><tr><td>Varasto-ohjautuva tuotanto (MTS)<\/td><td>Ennustetun kysynn\u00e4n perusteella valmistetun tuotteen ker\u00e4ily ja l\u00e4hetys<\/td><td>Mit\u00e4 valmiita tuotteita pid\u00e4mme varastossa ja kuinka paljon?<\/td><\/tr><tr><td><a href=\"\/fi\/oppaat\/tilauksesta-kokoonpano\/\">Tilauksesta kokoonpano (ATO)<\/a><\/td><td>Tuotteen kokoonpano valmiista komponenteista tai osakokoonpanoista<\/td><td>Ovatko tarvittavat komponentit ja kokoonpanokapasiteetti k\u00e4ytett\u00e4viss\u00e4?<\/td><\/tr><tr><td>Tilausohjautuva tuotanto (MTO)<\/td><td>Tilatun tuotteen valmistus olemassa olevan tuotesuunnitelman ja tuotantoreitityksen mukaisesti<\/td><td>Milloin tarvittavat ty\u00f6vaiheet mahtuvat tuotannon aikatauluun?<\/td><\/tr><tr><td><a href=\"\/fi\/oppaat\/tilauksesta-suunnittelu\/\">Tilauksesta suunnittelu (ETO)<\/a><\/td><td>Tuotteen suunnittelu ja sen j\u00e4lkeinen valmistus<\/td><td>Milloin suunnitelma valmistuu ja mit\u00e4 ty\u00f6t\u00e4 sen toteuttaminen vaatii?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MTO ei my\u00f6sk\u00e4\u00e4n tarkoita samaa kuin funktionaalinen tuotanto eli job shop. MTO kuvaa tilauksen roolia tuotannon k\u00e4ynnist\u00e4j\u00e4n\u00e4. Job shop puolestaan kuvaa tuotantoymp\u00e4rist\u00f6\u00e4, jossa ty\u00f6t voivat kulkea eri reittej\u00e4 yhteisten resurssien kautta. Tehdas voi toimia molemmilla tavoilla. <a href=\"\/fi\/oppaat\/konepajan-tuotannonohjaus\/\">Funktionaalisen tuotannon hienokuormitusoppaamme<\/a> k\u00e4sittelee t\u00e4t\u00e4 tuotantoreitityksen haastetta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Milloin tilausohjautuva tuotanto on oikea valinta?<\/h2>\n\n\n<p>MTO on houkutteleva vaihtoehto, kun kaikkien valmiiden tuotevarianttien varastointi olisi kallista, yksitt\u00e4isten varianttien kysynt\u00e4 vaihtelee ja asiakkaat ovat valmiita odottamaan valmistusta. Sen avulla voit tarjota laajemman valikoiman valmistamatta kaikkia mahdollisia tuotteita etuk\u00e4teen.<\/p>\n\n\n<p>Hy\u00f6ty n\u00e4kyy selvimmin valmistevarastossa: v\u00e4hemm\u00e4n tuotteita j\u00e4\u00e4 myym\u00e4tt\u00e4 siksi, ett\u00e4 arvioit eri varianttien kysynn\u00e4n v\u00e4\u00e4rin. Ty\u00f6 perustuu todelliseen asiakastilaukseen, jossa voidaan m\u00e4\u00e4ritell\u00e4 tarvittavat mitat, materiaali tai pintak\u00e4sittely.<\/p>\n\n\n<p>Vastapainona on l\u00e4pimenoaika. Varasto-ohjautuvassa tuotannossa tuote voi olla jo valmis l\u00e4hetett\u00e4v\u00e4ksi. Tilausohjautuvassa tuotannossa asiakkaan odotusaikaan sis\u00e4ltyv\u00e4t valmistus ja jonotus ty\u00f6vaiheiden v\u00e4lill\u00e4. Tilausten saapuminen voi my\u00f6s aiheuttaa ep\u00e4tasaisen kuormituksen: hiljaisen viikon j\u00e4lkeen useat tilaukset kilpailevat samasta resurssista.<\/p>\n\n\n<p><strong>Tilausohjautuva tuotanto ei tarkoita varastottomuutta eik\u00e4 automaattisesti pienempi\u00e4 kokonaiskustannuksia.<\/strong> Raaka-aineita, ostokomponentteja ja keskener\u00e4ist\u00e4 tuotantoa voidaan silti tarvita. Pienet er\u00e4t voivat edellytt\u00e4\u00e4 usein toistuvia asetust\u00f6it\u00e4. Jos asiakkaat tarvitsevat tuotteet heti l\u00e4hetett\u00e4viksi ja ostavat toistuvasti samaa vakiotuotetta, <a href=\"\/fi\/oppaat\/varasto-ohjautuva-tuotanto\/\">tuotteen valmistaminen varastoon<\/a> voi olla sopivampi vaihtoehto.<\/p>\n\n\n<p>Koko tehdasta ei tarvitse sovittaa yhteen tuotantomalliin. Vakiotuotteita voi pit\u00e4\u00e4 varastossa ja valmistaa vaikeammin ennakoitavat variantit tilauksesta. <a href=\"\/fi\/oppaat\/master-production-schedule\/\">Tuotannon p\u00e4\u00e4suunnitelma<\/a> auttaa m\u00e4\u00e4ritt\u00e4m\u00e4\u00e4n, mit\u00e4 t\u00f6it\u00e4 t\u00e4m\u00e4n laajemman tuotevalikoiman valmistaminen edellytt\u00e4\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tilaus tarvitsee paikan aikataulussa, ei vain toimitusp\u00e4iv\u00e4\u00e4<\/h2>\n\n\n<p>Palataan kuvitteelliseen kotelovalmistajaan. Uusi tilaus vaatii leikkausta, taivutusta ja viimeistely\u00e4. Materiaali on valmiina ja leikkauksessa on vapaata kapasiteettia, joten myynnin tekisi mieli luvata nopea toimitus. Viimeistelyn kapasiteetti on kuitenkin jo varattu muille asiakkaille.<\/p>\n\n\n<p>Leikkauksen aloittaminen heti ei poista ristiriitaa. Se saattaa vain tuoda yhden osan lis\u00e4\u00e4 odottamaan viimeistely\u00e4. Olennaista on selvitt\u00e4\u00e4, saadaanko <strong>koko ty\u00f6vaiheketju<\/strong> valmiiksi ajoissa muiden jo luvattujen tilausten rinnalla.<\/p>\n\n\n<p>Kokoa jokaisesta uudesta tilauksesta seuraavat tiedot:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tarvittava ty\u00f6:<\/strong> oikeat tuotem\u00e4\u00e4rittelyt, m\u00e4\u00e4r\u00e4, ty\u00f6vaihej\u00e4rjestys sek\u00e4 k\u00e4sittely- ja asetusajat.<\/li><li><strong>Ty\u00f6h\u00f6n soveltuvat resurssit:<\/strong> mahdolliset ty\u00f6pisteet, ty\u00f6vuorot, ty\u00f6ntekij\u00e4t ja tarvittavat ty\u00f6kalut.<\/li><li><strong>Materiaalien saatavuus:<\/strong> varastossa olevat m\u00e4\u00e4r\u00e4t sek\u00e4 ostettavien materiaalien tai komponenttien arvioitu saatavuus.<\/li><li><strong>Aiemmat sitoumukset:<\/strong> samoista resursseista jo kilpailevat ty\u00f6vaiheet ja niiden prioriteetit.<\/li><li><strong>Toimitukseen tarvittava aika:<\/strong> j\u00e4ljell\u00e4 oleviin tuotantovaiheisiin, tarkastukseen, pakkaukseen ja tarvittaessa kuljetukseen varattava aika.<\/li><\/ul>\n\n\n<p><a href=\"\/fi\/oppaat\/tyomaarain\/\">Ty\u00f6m\u00e4\u00e4r\u00e4in<\/a> sis\u00e4lt\u00e4\u00e4 ty\u00f6n toteutustiedot. <a href=\"\/fi\/oppaat\/mita-on-hienokuormitus\/\">Hienokuormitus<\/a> sovittaa ty\u00f6n k\u00e4ytett\u00e4viss\u00e4 olevaan aikaan. Pelkk\u00e4 pyydetty toimitusp\u00e4iv\u00e4 ei tee kumpaakaan.<\/p>\n\n\n<p>Jos pyydetty p\u00e4iv\u00e4 ei sovi aikatauluun, sinun on teht\u00e4v\u00e4 p\u00e4\u00e4t\u00f6s. Ty\u00f6h\u00f6n soveltuva vaihtoehtoinen ty\u00f6piste, ty\u00f6vuoron muutos tai prioriteetin vaihtaminen voi auttaa. Muussa tapauksessa sovi my\u00f6hemm\u00e4st\u00e4 p\u00e4iv\u00e4st\u00e4 ennen kuin asiakas alkaa luottaa mahdottomaan lupaukseen. Jos yhteinen ty\u00f6vaihe viiv\u00e4stytt\u00e4\u00e4 toimituksia toistuvasti, selvit\u00e4 <a href=\"\/fi\/oppaat\/pullonkaula\/\">tuotannon pullonkaula<\/a> sen sijaan, ett\u00e4 vapauttaisit lis\u00e4\u00e4 t\u00f6it\u00e4 sen jonoon.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sin\u00e4 p\u00e4\u00e4t\u00e4t prioriteetit, SkyPlanner laskee suunnitelman<\/h2>\n\n\n<p>Vaikeinta ei ole n\u00e4iden tietojen tarkistaminen kerran, vaan niiden pit\u00e4minen ajan tasalla ja yhteydess\u00e4 toisiinsa, kun uusia tilauksia saapuu, materiaalien toimitusp\u00e4iv\u00e4t muuttuvat ja tuotanto kest\u00e4\u00e4 suunniteltua kauemmin. Kun suunnittelija siirt\u00e4\u00e4 jokaisen ty\u00f6n k\u00e4sin konejonosta toiseen, h\u00e4n vastaa p\u00e4\u00e4t\u00f6ksenteon lis\u00e4ksi my\u00f6s aikataululaskennan yll\u00e4pidosta.<\/p>\n\n\n<p><a href=\"\/fi\/\">SkyPlanner APS<\/a> hoitaa t\u00e4m\u00e4n aikataululaskennan. Sin\u00e4 m\u00e4\u00e4rittelet ty\u00f6pisteet, ty\u00f6vuorot, ty\u00f6ntekij\u00e4t, materiaalit ja prioriteetit sek\u00e4 kunkin tuotteen ty\u00f6vaiheet ja niiden kestot. Arcturus aikatauluttaa ty\u00f6t m\u00e4\u00e4ritetyn kapasiteetin ja riippuvuuksien mukaan. Gantt-n\u00e4kym\u00e4 n\u00e4ytt\u00e4\u00e4 ty\u00f6j\u00e4rjestyksen eri ty\u00f6pisteiss\u00e4, joten voit seurata kotelon etenemist\u00e4 leikkauksesta viimeistelyyn sen sijaan, ett\u00e4 tarkistaisit erillisi\u00e4 jonoja.<\/p>\n\n\n<p>Koteloesimerkiss\u00e4 t\u00e4m\u00e4 tarkoittaa, ett\u00e4 viimeistelyn kuormitus on mukana suunnitelmassa alusta l\u00e4htien. Jos kiireellinen tilaus pit\u00e4\u00e4 asettaa etusijalle, muutat prioriteettia ja lasket aikataulun uudelleen. Tarkista sitten muiden tilausten uudet valmistumisajat ennen uuden toimituslupauksen vahvistamista. Hy\u00f6ty ei ole vain nopeampi vastaus yhdelle asiakkaalle: n\u00e4et my\u00f6s, mit\u00e4 vastaus tarkoittaa jo odottaville asiakkaille.<\/p>\n\n\n<p>Materiaalien saatavuuden huomioiva hienokuormitus tuo samaan laskentaan toisen tilausohjautuvan tuotannon yleisen haasteen. Kun t\u00e4m\u00e4 s\u00e4\u00e4nt\u00f6 on k\u00e4yt\u00f6ss\u00e4, Arcturus huomioi materiaalien saatavuuden eik\u00e4 suunnittele t\u00f6it\u00e4 olettaen, ett\u00e4 kaikki nimikkeet ovat valmiina. Ostotilausten toimitusp\u00e4iv\u00e4t kuvaavat arvioitua saatavuutta. Kun saapuminen vahvistetaan merkitsem\u00e4ll\u00e4 toimitus vastaanotetuksi, varastosaldo p\u00e4ivittyy. N\u00e4iden p\u00e4ivien pit\u00e4minen ajan tasalla on t\u00e4rke\u00e4\u00e4, kun toimittajan viive muuttaa sit\u00e4, mit\u00e4 voidaan tehd\u00e4 seuraavaksi.<\/p>\n\n\n<p>Sin\u00e4 p\u00e4\u00e4t\u00e4t edelleen prioriteetit ja suojaat aikataulutusp\u00e4\u00e4t\u00f6ksi\u00e4 lukituksilla. Arcturus laskee aikataulun n\u00e4iden ohjeiden puitteissa. Se ei voi luoda puuttuvaa fyysist\u00e4 kapasiteettia, mutta se voi antaa selke\u00e4mm\u00e4n pohjan p\u00e4\u00e4t\u00f6kselle siit\u00e4, muutetaanko suunnitelmaa vai toimituslupausta.<\/p>\n\n\n<p>SkyPlanner integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapintansa kautta. Voit yhdist\u00e4\u00e4 nykyiset tilaus- ja tuotantotiedot aikatauluun ilman, ett\u00e4 parempi tilausohjautuvan tuotannon suunnittelu edellytt\u00e4\u00e4 ensin ERP-j\u00e4rjestelm\u00e4n vaihtamista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 kapasiteetin n\u00e4kyvyys muutti Fredman Operationsilla?<\/h2>\n\n\n<p>Elintarvikek\u00e4ytt\u00f6\u00f6n soveltuvia keitti\u00f6- ja pakkausratkaisuja valmistava Fredman Operations tarvitsi selke\u00e4mp\u00e4\u00e4 n\u00e4kyvyytt\u00e4 kapasiteettiin tilausm\u00e4\u00e4rien kasvaessa. Ty\u00f6kortit siirrettiin k\u00e4sin L7 ERP -j\u00e4rjestelm\u00e4st\u00e4 LTR-tuotannonhallintaan, ja suunnittelija priorisoi t\u00f6it\u00e4 ilman tarkkaa tietoa koneiden vapautumisajoista tai ty\u00f6vuorojen kapasiteetista. Kiireellinen aikataulun uudelleenj\u00e4rjestely saattoi kest\u00e4\u00e4 tunnin tai kauemmin.<\/p>\n\n\n<p>Yritys valitsi SkyPlannerin sen selke\u00e4n, yhteisen Gantt-n\u00e4kym\u00e4n vuoksi ja yhdisti L7- ja LTR-j\u00e4rjestelm\u00e4ns\u00e4 siihen. Koneet, vapaa ja varattu kapasiteetti sek\u00e4 t\u00f6iden eteneminen tulivat n\u00e4kyviin yhdess\u00e4 n\u00e4kym\u00e4ss\u00e4. Tuotannon henkil\u00f6st\u00f6 n\u00e4ki suunnitellut aloitus- ja lopetusajat, ja myynti sai paremman pohjan toimituslupauksille.<\/p>\n\n\n<p>Fredmanin asiakastarinassa kerrotaan ylit\u00f6iden v\u00e4hentyneen ja reagoinnin aikataulumuutoksiin nopeutuneen. Tilausohjautuvaa tuotantoa k\u00e4ytt\u00e4v\u00e4lle valmistajalle olennainen oppi on tuotannon ja myynnin v\u00e4linen yhteys: toimituslupaus on helpompi perustella, kun kaikki n\u00e4kev\u00e4t sen taustalla olevan kapasiteetin. <a href=\"\/fi\/asiakastarinat\/fredman-operations\/\">Lue Fredman Operationsin asiakastarina<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katso, miten seuraava tilauksesi sopisi aikatauluun<\/h2>\n\n\n<p>Tilausohjautuva tuotanto auttaa v\u00e4ltt\u00e4m\u00e4\u00e4n sellaisten valmiiden tuotteiden varastointia, joille ei ole kysynt\u00e4\u00e4. Toteuttamiskelpoinen aikataulu auttaa puolestaan v\u00e4ltt\u00e4m\u00e4\u00e4n sen, ett\u00e4 varasto-ongelman tilalle syntyy my\u00f6h\u00e4styneiden asiakastilausten jono.<\/p>\n\n\n<p><a href=\"\/fi\/ota-yhteytta\/\">Varaa esittely<\/a> ja katso, miten SkyPlanner suunnittelisi tuotantosi. Ota mukaan esimerkki tyypillisen tilauksen ty\u00f6vaiheketjusta, tieto resurssista, josta useimmat tilaukset kilpailevat, sek\u00e4 esimerkki viimeaikaisesta muutoksesta, joka sekoitti toimitusaikatauluja. N\u00e4iden pohjalta voimme n\u00e4ytt\u00e4\u00e4, miten Arcturus ja Gantt-aikataulu voisivat helpottaa suunnitteluty\u00f6si arkea.<\/p>\n\n\n<p>Haluatko tutustua ensin itse? <a href=\"\/fi\/kokeilu\/\">Kokeile SkyPlanneria demodatalla<\/a> ja katso, miten tilaukset ja kapasiteetti sovitetaan yhteen aikataulussa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Usein kysytyt kysymykset<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Tarkoittaako tilausohjautuva tuotanto, ett\u00e4 jokainen tuote suunnitellaan asiakkaalle erikseen?<\/h3>\n\n\n<p>Ei. MTO-tuotteen rakenne ja ty\u00f6vaiheketju voivat olla ennalta m\u00e4\u00e4riteltyj\u00e4, vaikka valmistus alkaa vasta asiakkaan tilauksesta. Jos tilaus k\u00e4ynnist\u00e4\u00e4 my\u00f6s uuden tuotteen suunnittelun, osuvampi nimitys on tilausohjautuva tuotesuunnittelu eli engineer to order.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Voiko tilausohjautuvassa tuotannossa pit\u00e4\u00e4 materiaaleja varastossa?<\/h3>\n\n\n<p>Kyll\u00e4. MTO m\u00e4\u00e4rittelee, mik\u00e4 k\u00e4ynnist\u00e4\u00e4 valmistuksen, eik\u00e4 se kiell\u00e4 varastointia. Yleisesti k\u00e4ytettyj\u00e4 raaka-aineita ja osto-osia voidaan pit\u00e4\u00e4 varastossa, jotta tuotanto p\u00e4\u00e4see alkamaan nopeammin. Valmis tuote valmistetaan asiakastilausta varten, ei valmiiden tuotteiden kysynt\u00e4ennusteen perusteella.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miksi toimitusajat voivat muuttua tilausohjautuvassa tuotannossa?<\/h3>\n\n\n<p>Tilaukset k\u00e4ytt\u00e4v\u00e4t samoja resursseja. Materiaalin viiv\u00e4styminen, kapasiteetin v\u00e4heneminen tai prioriteettien muutos voi siirt\u00e4\u00e4 ty\u00f6vaihetta ja vaikuttaa sit\u00e4 seuraaviin t\u00f6ihin. Aikataulun laskeminen uudelleen tuo n\u00e4m\u00e4 vaikutukset n\u00e4kyviin, jotta suunnittelija voi reagoida ja tarvittaessa p\u00e4ivitt\u00e4\u00e4 toimituslupauksia.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset Etusivu &raquo; Resurssit &raquo; Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset Asiakas tilaa kotelon koossa, jota myyt harvoin. Sen valmistaminen vasta tilauksen saavuttua on j\u00e4rkev\u00e4\u00e4: varasto ei t\u00e4yty tuotevarianteista, joille ei ehk\u00e4 koskaan l\u00f6ydy ostajaa. Asiakas haluaa silti tiet\u00e4\u00e4 toimitusp\u00e4iv\u00e4n, ja viimeistelyresurssi on jo varattu. T\u00e4m\u00e4 on tilausohjautuvan tuotannon keskeinen &#8230; <a title=\"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-96582","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-hienokuormitus","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n varastoa &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset\" \/>\n<meta property=\"og:description\" content=\"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/\"},\"wordCount\":1589,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS ja hienokuormitus\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/\",\"name\":\"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n varastoa &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilausohjautuva-tuotanto\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n varastoa &#8211; SkyPlanner","description":"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/","og_locale":"fi_FI","og_type":"article","og_title":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset","og_description":"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/"},"wordCount":1589,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS ja hienokuormitus","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/","name":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n varastoa &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"Tilausohjautuva tuotanto v\u00e4hent\u00e4\u00e4 valmistevarastoa, mutta vaatii realistiset toimitusp\u00e4iv\u00e4t. Katso, miten SkyPlanner luo tilauskannasta toimivan aikataulun.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset Etusivu &raquo; Resurssit &raquo; Tilausohjautuva tuotanto: v\u00e4hemm\u00e4n valmistevarastoa, paremmat toimituslupaukset Asiakas tilaa kotelon koossa, jota myyt harvoin. Sen valmistaminen vasta tilauksen saavuttua on j\u00e4rkev\u00e4\u00e4: varasto ei t\u00e4yty tuotevarianteista, joille ei ehk\u00e4 koskaan l\u00f6ydy ostajaa. Asiakas haluaa silti tiet\u00e4\u00e4 toimitusp\u00e4iv\u00e4n, ja viimeistelyresurssi on jo varattu. T\u00e4m\u00e4 on tilausohjautuvan tuotannon keskeinen&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=96582"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96582\/revisions"}],"predecessor-version":[{"id":96868,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96582\/revisions\/96868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=96582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=96582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=96582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}