{"id":96524,"date":"2026-10-08T07:03:09","date_gmt":"2026-10-08T07:03:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96524"},"modified":"2026-10-19T14:43:10","modified_gmt":"2026-10-19T14:43:10","slug":"pullonkaula","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/","title":{"rendered":"Tuotannon pullonkaulat: tilaukset taas liikkeelle"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tuotannon pullonkaulat: tilaukset taas liikkeelle<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Tuotannon pullonkaulat: tilaukset taas liikkeelle<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Laserilta on valmistunut taas yksi er\u00e4. Osat odottavat s\u00e4rm\u00e4yst\u00e4. Hitsaajat ovat valmiina t\u00f6ihin, mutta seuraavan tilauksen osat puuttuvat. Samaan aikaan asiakas kysyy, pit\u00e4\u00e4k\u00f6 perjantain toimitusaika edelleen.<\/p>\n\n\n\n<p>Tuotannon pullonkaulat tekev\u00e4t tuotannonsuunnittelijan p\u00e4iv\u00e4st\u00e4 vaikean, vaikka tehtaalla on kiire: selvit\u00e4t puuttuvien t\u00f6iden tilannetta, siirr\u00e4t t\u00f6it\u00e4 jonosta toiseen ja tarkistat toimituslupauksia. Tilanteen ratkaisemiseksi on ensin l\u00f6ydett\u00e4v\u00e4, mik\u00e4 est\u00e4\u00e4 tilausten valmistumisen, ja rakennettava muu aikataulu sen ymp\u00e4rille.<\/p>\n\n\n\n<p>SkyPlanner auttaa muuttamaan p\u00e4\u00e4t\u00f6ksen toimivaksi tuotantosuunnitelmaksi. Sen teko\u00e4lypohjainen laskentamoottori Arcturus laskee ty\u00f6j\u00e4rjestyksen kapasiteetin, materiaalien ja prioriteettien perusteella. Voit ohjata tuotantoa rakentamatta jokaista konekohtaista ty\u00f6jonoa itse uudelleen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mik\u00e4 on tuotannon pullonkaula?<\/h2>\n\n\n\n<p>Tuotannon pullonkaula on ty\u00f6vaihe tai resurssi, jonka k\u00e4ytett\u00e4viss\u00e4 oleva kapasiteetti rajoittaa t\u00f6iden etenemist\u00e4 tuotannossa. Ty\u00f6t jonoutuvat yleens\u00e4 sen eteen, ja my\u00f6hemm\u00e4t ty\u00f6vaiheet odottavat silt\u00e4 valmistuvia osia. Pullonkaula voi olla esimerkiksi s\u00e4rm\u00e4yskone, l\u00e4mp\u00f6k\u00e4sittelyuuni tai tiimi, jonka erityisosaamista on niukasti saatavilla.<\/p>\n\n\n\n<p>Ratkaisevaa on, paljonko kapasiteettia on <strong>k\u00e4ytett\u00e4viss\u00e4<\/strong>. Koneen nimellisnopeus ei kerro paljoakaan, jos vuorosta puuttuu k\u00e4ytt\u00e4j\u00e4 tai asetuksiin kuluu asiakastilauksiin tarvittava aika. My\u00f6s tuotejakauma vaikuttaa pullonkaulaan: t\u00e4m\u00e4n viikon ty\u00f6t saattavat vaatia paljon enemm\u00e4n s\u00e4rm\u00e4yst\u00e4 kuin ensi viikon ty\u00f6t.<\/p>\n\n\n\n<p>Siksi pisin jono on vihje, ei varma merkki pullonkaulasta. Tavoitteena on tunnistaa resurssi, joka rajoittaa <a href=\"\/fi\/oppaat\/tuotannon-lapimeno\/\">toimitettavien t\u00f6iden valmistumista<\/a>, eik\u00e4 vain kone, joka n\u00e4ytt\u00e4\u00e4 kiireisimm\u00e4lt\u00e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">L\u00f6yd\u00e4 pullonkaula seuraamalla my\u00f6h\u00e4ss\u00e4 olevia tilauksia<\/h2>\n\n\n\n<p>Valitse joukko my\u00f6h\u00e4styneit\u00e4 tai my\u00f6h\u00e4stymisvaarassa olevia tilauksia ja selvit\u00e4, miss\u00e4 ne ovat joutuneet odottamaan. Keskustele ty\u00f6n tekij\u00f6iden kanssa ja vertaa heid\u00e4n havaintojaan tuotannon kirjauksiin. Mist\u00e4 toistuva viive alkaa, ja mit\u00e4 se est\u00e4\u00e4 reitityksen my\u00f6hemmiss\u00e4 vaiheissa? Seuraa <a href=\"\/fi\/oppaat\/tuotantosuunnitelman-toteutuminen\/\">tuotantosuunnitelman toteutumista<\/a> ja selvit\u00e4, mitk\u00e4 aikataulutetut ty\u00f6vaiheet eiv\u00e4t valmistuneet sovitussa aikaikkunassa tai saavuttaneet sovittua valmistusm\u00e4\u00e4r\u00e4\u00e4. Tutki sitten poikkeamien syyt.<\/p>\n\n\n\n<p>Etsi tilanteita, joissa seuraavat kolme merkki\u00e4 esiintyv\u00e4t yhdess\u00e4:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Jono muodostuu aina uudelleen.<\/strong> Ty\u00f6t kasaantuvat toistuvasti saman ty\u00f6vaiheen eteen, kun tilauskannan tuotejakauma on samankaltainen.<\/li><li><strong>Seuraava vaihe ei saa tarvitsemiaan osia.<\/strong> My\u00f6hemmiss\u00e4 ty\u00f6vaiheissa on ty\u00f6ntekij\u00e4t ja laitteet valmiina, mutta tarvittavia osia joudutaan odottamaan.<\/li><li><strong>Ty\u00f6t\u00e4 on enemm\u00e4n kuin k\u00e4ytett\u00e4viss\u00e4 olevaa aikaa.<\/strong> Ty\u00f6st\u00f6 ja asetukset eiv\u00e4t mahdu k\u00e4ytett\u00e4viss\u00e4 olevaan kapasiteettiin ennen kuin seuraavien ty\u00f6vaiheiden on alettava.<\/li><\/ul>\n\n\n\n<p>Tarkista, mit\u00e4 jonossa oikeasti on. Paljon my\u00f6hemmin tarvittavat ty\u00f6t voivat saada resurssin n\u00e4ytt\u00e4m\u00e4\u00e4n ylikuormitetulta ja samalla vied\u00e4 aikaa l\u00e4hiajan toimituksilta. Useampi osalaatikko voi my\u00f6s kuulua yhteen suureen er\u00e4\u00e4n eik\u00e4 useaan kiireelliseen tilaukseen. Laske ty\u00f6m\u00e4\u00e4r\u00e4 tunteina ja vertaa sit\u00e4 ajankohtaan, jolloin valmiita osia tarvitaan.<\/p>\n\n\n\n<p>Jos kone seisoo, selvit\u00e4 syy. Materiaalin, edellisen ty\u00f6vaiheen tai p\u00e4tev\u00e4n k\u00e4ytt\u00e4j\u00e4n odottaminen vaatii eri ratkaisun kuin tilanne, jossa kone k\u00e4y tasaisesti mutta ei ehdi tehd\u00e4 kaikkea tarvittavaa. Ratkaise seisomisen syy ennen kuin sitoudut hankkimaan lis\u00e4\u00e4 koneita.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">S\u00e4rm\u00e4ysjonosta puuttuu kuusi tuntia kapasiteettia<\/h3>\n\n\n\n<p>Kuvittele kolme tilausta, joiden s\u00e4rm\u00e4yksen on valmistuttava torstaihin menness\u00e4, jotta hitsaukseen ja kokoonpanoon j\u00e4\u00e4 riitt\u00e4v\u00e4sti aikaa. S\u00e4rm\u00e4ysajat sis\u00e4lt\u00e4v\u00e4t nykyisen ty\u00f6j\u00e4rjestyksen vaatimat asetusajat. Ainoalla t\u00f6ihin soveltuvalla s\u00e4rm\u00e4yskoneella on k\u00e4ytett\u00e4viss\u00e4 20 tuntia ennen t\u00e4t\u00e4 m\u00e4\u00e4r\u00e4aikaa.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tilaus<\/th><th>S\u00e4rm\u00e4ysaika asetuksineen<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>8 tuntia<\/td><\/tr><tr><td>B<\/td><td>10 tuntia<\/td><\/tr><tr><td>C<\/td><td>8 tuntia<\/td><\/tr><tr><td><strong>Yhteens\u00e4<\/strong><\/td><td><strong>26 tuntia<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Kapasiteettia puuttuu <strong>kuusi tuntia<\/strong>. Osien nopeampi leikkaaminen ei poista vajetta, vaan kasvattaa s\u00e4rm\u00e4yksen ty\u00f6jonoa. My\u00f6sk\u00e4\u00e4n vapaat tunnit koneella, joka ei sovellu n\u00e4ille osille, eiv\u00e4t auta.<\/p>\n\n\n\n<p>Nyt voit arvioida konkreettisia vaihtoehtoja. Voisiko toinen ty\u00f6j\u00e4rjestys v\u00e4hent\u00e4\u00e4 asetuksia? Onko k\u00e4ytett\u00e4viss\u00e4 toinen soveltuva resurssi? Riitt\u00e4isik\u00f6 miehitetty lis\u00e4vuoro kattamaan j\u00e4ljelle j\u00e4\u00e4v\u00e4n vajeen? Jos ei, mink\u00e4 tilauksen toimituslupausta on muutettava?<\/p>\n\n\n\n<p>Tarkastele k\u00e4ytett\u00e4viss\u00e4 olevaa aikaa suhteessa tilauksen ty\u00f6vaiheisiin. Torstain j\u00e4lkeen vapautuvat tunnit eiv\u00e4t auta hitsausta alkamaan torstaina. Lue lis\u00e4\u00e4 ty\u00f6vaiheiden sovittamisesta resurssien todellisiin kalentereihin artikkelista <a href=\"\/fi\/oppaat\/aarellinen-kuormitus\/\">\u00e4\u00e4rellinen kuormitus<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">K\u00e4yt\u00e4 pullonkaulan aika t\u00f6ihin, jotka edist\u00e4v\u00e4t toimituksia<\/h2>\n\n\n\n<p>Kun rajoittava ty\u00f6vaihe on tiedossa, hy\u00f6dynn\u00e4 siihen k\u00e4ytett\u00e4viss\u00e4 oleva aika tehokkaasti. Hy\u00f6dyllisimm\u00e4t parannukset l\u00f6ytyv\u00e4t usein t\u00f6iden valmistelusta ja ty\u00f6j\u00e4rjestyksest\u00e4 ennen kuin tarvitaan uutta konetta.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Valmistele seuraava ty\u00f6 ennen nykyisen valmistumista<\/h3>\n\n\n\n<p>Varmista etuk\u00e4teen materiaalit, piirustukset, ty\u00f6kalut, edellisten ty\u00f6vaiheiden valmistuminen ja tarvittavat ty\u00f6ntekij\u00e4t. Kun kone, jonka kapasiteettia on niukasti k\u00e4ytett\u00e4viss\u00e4, odottaa puuttuvaa osaa, menetetty\u00e4 aikaa ei saada takaisin pelk\u00e4st\u00e4\u00e4n nopeuttamalla my\u00f6hempi\u00e4 ty\u00f6vaiheita.<\/p>\n\n\n\n<p>Pid\u00e4 riitt\u00e4v\u00e4sti t\u00f6it\u00e4 valmiina aloitettavaksi, jotta pullonkaula ei joudu odottamaan, mutta \u00e4l\u00e4 t\u00e4yt\u00e4 tuotantoa liian aikaisin k\u00e4ynnistetyill\u00e4 t\u00f6ill\u00e4. <a href=\"\/fi\/oppaat\/drum-buffer-rope\/\">Vapauta edelt\u00e4viin ty\u00f6vaiheisiin t\u00f6it\u00e4 sen mukaan, mit\u00e4 rajoittava ty\u00f6vaihe pystyy k\u00e4sittelem\u00e4\u00e4n<\/a>. Tavoitteena on varmistaa, ett\u00e4 oikeat ty\u00f6t ovat aina saatavilla, ei koota mahdollisimman suurta osakasaa.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">V\u00e4henn\u00e4 asetuksia toimitusaikoja unohtamatta<\/h3>\n\n\n\n<p>Ty\u00f6t kannattaa usein tehd\u00e4 per\u00e4kk\u00e4in, jos niiss\u00e4 k\u00e4ytet\u00e4\u00e4n samoja ty\u00f6kaluja tai niit\u00e4 yhdist\u00e4\u00e4 sama materiaalipaksuus tai muu olennainen ominaisuus. V\u00e4hemm\u00e4t asetukset j\u00e4tt\u00e4v\u00e4t enemm\u00e4n aikaa tuotannolle. Pitk\u00e4 sarja samankaltaisia t\u00f6it\u00e4 ei kuitenkaan auta, jos kiireellinen tilaus joutuu odottamaan sellaisten t\u00f6iden takana, joita ei viel\u00e4 tarvita.<\/p>\n\n\n\n<p>Huomioi t\u00f6iden ryhmittely ja toimitusten t\u00e4rkeys yhdess\u00e4 hienokuormituksessa. Oppaamme <a href=\"\/fi\/oppaat\/smed\/\">tuotannon asetusajan lyhent\u00e4miseen<\/a> kertoo, miten itse ty\u00f6vaiheesta voidaan vapauttaa aikaa.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Lis\u00e4\u00e4 kapasiteettia sinne, miss\u00e4 se auttaa tilauksia valmistumaan<\/h3>\n\n\n\n<p>Jos kapasiteettivajetta j\u00e4\u00e4, harkitse miehitetty\u00e4 lis\u00e4vuoroa, teknisesti soveltuvaa vaihtoehtoista konetta tai alihankintaa. Arvioi muutosta tilausten koko ty\u00f6vaiheketjun kannalta: ehtiv\u00e4tk\u00f6 s\u00e4rm\u00e4yksest\u00e4 valmistuvat lis\u00e4osat ajoissa hitsaukseen ja kokoonpanoon, ja riitt\u00e4\u00e4k\u00f6 n\u00e4iden vaiheiden kapasiteetti?<\/p>\n\n\n\n<p>T\u00e4ss\u00e4 vaiheessa kannattaa arvioida my\u00f6s suurempaa investointia. Toistuva kapasiteettivaje, jonka syyt tunnetaan, on vahvempi peruste kapasiteetin lis\u00e4\u00e4miselle kuin puutteellisesta valmistelusta tai liian aikaisin aloitetuista t\u00f6ist\u00e4 syntynyt jono.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Muuta p\u00e4\u00e4t\u00f6s uudeksi aikatauluksi SkyPlannerilla<\/h2>\n\n\n\n<p>Pullonkaulan l\u00f6yt\u00e4minen on vasta puolet ty\u00f6st\u00e4. Sen j\u00e4lkeen on viel\u00e4 p\u00e4\u00e4tett\u00e4v\u00e4, mik\u00e4 ty\u00f6 tehd\u00e4\u00e4n seuraavaksi kullakin resurssilla, johon tilanne vaikuttaa. S\u00e4rm\u00e4yksen ty\u00f6j\u00e4rjestyksen muutos voi siirt\u00e4\u00e4 hitsausta, kokoonpanoa ja tilausten valmistumisaikoja. Juuri n\u00e4iden vaikutusten laskeminen k\u00e4sin kerta toisensa j\u00e4lkeen tekee pullonkaulojen hallinnasta niin ty\u00f6l\u00e4st\u00e4.<\/p>\n\n\n\n<p><a href=\"\/fi\/\">SkyPlannerin hienokuormitusohjelmisto<\/a> tekee t\u00e4m\u00e4n laskennan puolestasi. M\u00e4\u00e4rit\u00e4t ty\u00f6pisteet, ty\u00f6vuorot, koneiden k\u00e4ytt\u00e4j\u00e4t, ty\u00f6vaiheketjut, kestot ja t\u00f6ihin soveltuvat resurssit. Arcturus aikatauluttaa ty\u00f6t t\u00e4m\u00e4n kapasiteetin ja asettamiesi prioriteettien perusteella. Gantt-n\u00e4kym\u00e4ss\u00e4 n\u00e4et lasketun ty\u00f6j\u00e4rjestyksen ja resurssien k\u00e4ytett\u00e4vyyden.<\/p>\n\n\n\n<p>S\u00e4rm\u00e4ysesimerkiss\u00e4 suunnittelu etenee selke\u00e4sti:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>M\u00e4\u00e4rit\u00e4 todellinen k\u00e4ytett\u00e4viss\u00e4 oleva kapasiteetti.<\/strong> Kirjaa miehitetyt ty\u00f6vuorot sek\u00e4 huollot ja muut ty\u00f6pisteiden k\u00e4ytt\u00f6katkot. SkyPlanner voi huomioida estettyjen ajanjaksojen vaikutuksen aikatauluun sen sijaan, ett\u00e4 laskisi ne k\u00e4ytett\u00e4viss\u00e4 oleviksi tunneiksi.<\/li><li><strong>Aseta ty\u00f6jonon prioriteetit.<\/strong> Anna toimitusten kannalta kriittisille t\u00f6ille oikea prioriteetti. Jos asetuksiin kuluu merkitt\u00e4v\u00e4sti aikaa, m\u00e4\u00e4rit\u00e4 samankaltaisten t\u00f6iden ryhmittely tuoteominaisuuden, kuten ty\u00f6kalujen tai materiaalipaksuuden, perusteella.<\/li><li><strong>Laske aikataulu uudelleen p\u00e4\u00e4t\u00f6ksen j\u00e4lkeen.<\/strong> Lis\u00e4\u00e4 hyv\u00e4ksytty ty\u00f6vuoro, muuta prioriteettia tai ota soveltuva vaihtoehtoinen resurssi k\u00e4ytt\u00f6\u00f6n. Anna sitten Arcturus-laskentamoottorin laskea uusi aikataulu.<\/li><li><strong>Tarkista koko ty\u00f6vaiheketju.<\/strong> Tarkastele muutoksen vaikutuspiiriss\u00e4 olevia t\u00f6it\u00e4 Gantt-n\u00e4kym\u00e4ss\u00e4 ja tarkista niiden valmistumisajat. N\u00e4et, auttaako muutos niit\u00e4 tilauksia, joiden toimitukset halusit turvata, vai tyhjent\u00e4\u00e4k\u00f6 se vain yhden koneen jonoa.<\/li><\/ol>\n\n\n\n<p>Kun materiaalien saatavuuden huomioiva aikataulutus on k\u00e4yt\u00f6ss\u00e4, my\u00f6s materiaalit otetaan mukaan laskentaan. Prioriteettien ja lukitusten avulla tuotantoa koskevat p\u00e4\u00e4t\u00f6kset pysyv\u00e4t k\u00e4siss\u00e4si. Sinun ei tarvitse hyv\u00e4ksy\u00e4 ohjelmiston tuottamaa ty\u00f6j\u00e4rjestyst\u00e4 ilman mahdollisuutta ohjata sit\u00e4.<\/p>\n\n\n\n<p>SkyPlanner ei voi saada kapasiteetiltaan liian pient\u00e4 resurssia tekem\u00e4\u00e4n rajattomasti ty\u00f6t\u00e4. Se antaa m\u00e4\u00e4ritt\u00e4m\u00e4\u00e4si kapasiteettiin perustuvan suunnitelman, selke\u00e4mm\u00e4n n\u00e4kym\u00e4n j\u00e4ljell\u00e4 olevaan vajeeseen ja huomattavasti helpomman tavan laskea aikataulu uudelleen tilanteen muuttuessa. Jos ty\u00f6t eiv\u00e4t viel\u00e4k\u00e4\u00e4n mahdu aikatauluun, voit puuttua kapasiteettivajeeseen ennen seuraavaa toimituslupausta.<\/p>\n\n\n\n<p>N\u00e4in pullonkaulojen hallinnasta tulee osa p\u00e4ivitt\u00e4ist\u00e4 <a href=\"\/fi\/oppaat\/mita-on-hienokuormitus\/\">hienokuormitusta<\/a> eik\u00e4 erillinen kehitysprojekti, jonka havainnot eiv\u00e4t koskaan vaikuta tuotannon ty\u00f6jonoihin.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 KJH-Comp muutti s\u00e4rm\u00e4yksen pullonkaulassa?<\/h2>\n\n\n\n<p>Suomalaisella ohutlevyjen sopimusvalmistajalla KJH-Compilla oli viikkotason kuormitustiedot C9000 ERP -j\u00e4rjestelm\u00e4ss\u00e4 ja taulukoissa. T\u00f6iden p\u00e4ivitt\u00e4inen jakaminen koneille tehtiin silti k\u00e4sin, ja kaksi ty\u00f6njohtajaa k\u00e4ytti kumpikin v\u00e4hint\u00e4\u00e4n puolet ty\u00f6ajastaan t\u00f6iden kuormittamiseen k\u00e4ytett\u00e4viss\u00e4 olevan kapasiteetin mukaan.<\/p>\n\n\n\n<p>Yritys valitsi SkyPlannerin \u00e4\u00e4relliseen kuormitukseen ja s\u00e4ilytti C9000-j\u00e4rjestelm\u00e4n. Tilaukset kirjataan edelleen nykyiseen ERP-j\u00e4rjestelm\u00e4\u00e4n, ja SkyPlannerin teko\u00e4ly jakaa ty\u00f6t koneille ja laatii aikataulun.<\/p>\n\n\n\n<p>Muutos n\u00e4kyy konkreettisesti yhdell\u00e4 koneella. Kun KJH-Compin ty\u00f6pituudeltaan nelimetrisen s\u00e4rm\u00e4yskoneen kuormitus ylitt\u00e4\u00e4 kapasiteetin, ty\u00f6njohtaja n\u00e4kee tilanteen ty\u00f6jonossa ja voi reagoida siihen. Kahden viikon p\u00e4\u00e4st\u00e4 tarvittava ty\u00f6 ei en\u00e4\u00e4 vie paikkaa huomenna toimitettavalta tilaukselta. Samoilla ty\u00f6kaluilla ja samalla materiaalipaksuudella teht\u00e4vien s\u00e4rm\u00e4yst\u00f6iden ryhmittely lyhent\u00e4\u00e4 asetusaikoja ja v\u00e4hent\u00e4\u00e4 koneen odotusaikaa.<\/p>\n\n\n\n<p>KJH-Comp kertoo toimitusvarmuutensa nousseen noin 50 %:sta <strong>jopa 98 %:iin vuonna 2026<\/strong>. Hienokuormituksen vastuu siirtyi kahdelta ty\u00f6njohtajalta yhdelle, ja toinen siirtyi muihin teht\u00e4viin. N\u00e4m\u00e4 ovat KJH-Compin vaiheittaisen k\u00e4ytt\u00f6\u00f6noton tuloksia. Ne osoittavat, mik\u00e4 muuttui, kun p\u00e4ivitt\u00e4isess\u00e4 hienokuormituksessa voitiin huomioida tehtaan todelliset kapasiteettirajoitteet.<\/p>\n\n\n\n<p><a href=\"\/fi\/asiakastarinat\/kjh-comp\/\">Lue KJH-Compin koko asiakastarina<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aloita resurssista, joka jatkuvasti viiv\u00e4stytt\u00e4\u00e4 tilauksiasi<\/h2>\n\n\n\n<p>Valitse yksi toistuva ongelma: koneen ty\u00f6jono, rajallisesti saatavilla oleva osaaminen tai ty\u00f6vaihe, joka jatkuvasti viiv\u00e4stytt\u00e4\u00e4 l\u00e4hetyksi\u00e4. Ota <a href=\"\/fi\/ota-yhteytta\/\">SkyPlanner-esittelyyn<\/a> mukaan tiedot kyseisten tilausten ty\u00f6vaiheketjuista ja ty\u00f6vuoroista sek\u00e4 muutama esimerkki viimeaikaisista viiv\u00e4styksist\u00e4. N\u00e4iden pohjalta voimme n\u00e4ytt\u00e4\u00e4 k\u00e4yt\u00e4nn\u00f6ss\u00e4, miten ty\u00f6kuormasi sopisi k\u00e4ytett\u00e4viss\u00e4 olevan kapasiteetin mukaiseen aikatauluun ja miten muutos vaikuttaisi muuhun tuotantoon.<\/p>\n\n\n\n<p>Sinun ei tarvitse vaihtaa ERP-j\u00e4rjestelm\u00e4\u00e4, joka jo hoitaa tilauksesi hyvin. <strong>SkyPlanner integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapintansa kautta<\/strong> ja yhdist\u00e4\u00e4 nykyiset j\u00e4rjestelm\u00e4si teko\u00e4lypohjaiseen tuotannon aikataulutukseen.<\/p>\n\n\n\n<p>Jos haluat mieluummin tutustua ensin itse, <a href=\"\/fi\/kokeilu\/\">kokeile SkyPlanneria demodatalla<\/a>. Katso, millaista on muuttaa prioriteettia ja k\u00e4ytt\u00e4\u00e4 sen perusteella p\u00e4ivittyv\u00e4\u00e4 aikataulua sen sijaan, ett\u00e4 siirt\u00e4isit jokaista ty\u00f6t\u00e4 k\u00e4sin.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Usein kysytyt kysymykset<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Onko kuormitetuin kone aina pullonkaula?<\/h3>\n\n\n\n<p>Ei. Kone voi olla kiireinen tehdess\u00e4\u00e4n t\u00f6it\u00e4, joita ei viel\u00e4 tarvita. Selvit\u00e4, rajoittaako sen kapasiteetti toimitettavien tilausten valmistumista. Toistuvat ty\u00f6jonot, odottelu seuraavissa ty\u00f6vaiheissa ja ty\u00f6kuorman vertaaminen kapasiteettiin kertovat tilanteesta enemm\u00e4n kuin pelkk\u00e4 k\u00e4ytt\u00f6aste.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Miksi pullonkaula siirtyy ty\u00f6pisteest\u00e4 toiseen?<\/h3>\n\n\n\n<p>Tuotantoa rajoittava resurssi voi vaihtua, kun tilauskannan koostumus, k\u00e4ytett\u00e4viss\u00e4 oleva osaaminen, ty\u00f6vuorot tai koneiden k\u00e4ytett\u00e4vyys muuttuvat. My\u00f6s yhden ty\u00f6vaiheen tehostaminen voi tehd\u00e4 toisesta vaiheesta uuden pullonkaulan. Tarkista parannuksen j\u00e4lkeen koko ty\u00f6vaiheketju uudelleen sen sijaan, ett\u00e4 olettaisit alkuper\u00e4isen pullonkaulan m\u00e4\u00e4r\u00e4\u00e4v\u00e4n aina tuotannon tahdin.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Voiko hienokuormitusohjelmisto poistaa tuotannon pullonkaulan?<\/h3>\n\n\n\n<p>Se voi v\u00e4hent\u00e4\u00e4 viiv\u00e4styksi\u00e4, jotka johtuvat ylikuormitetuista suunnitelmista, huonosti toimivasta ty\u00f6j\u00e4rjestyksest\u00e4 ja v\u00e4ltett\u00e4viss\u00e4 olevista asetusten vaihdoista. SkyPlanner aikatauluttaa ty\u00f6t m\u00e4\u00e4ritetyn kapasiteetin, riippuvuuksien ja prioriteettien mukaan ja auttaa k\u00e4ytt\u00e4m\u00e4\u00e4n saatavilla olevia resursseja tehokkaasti. Jos kapasiteettia on jatkuvasti liian v\u00e4h\u00e4n, tarvitaan silti p\u00e4\u00e4t\u00f6s kapasiteetin, prosessin tai toimituksen muuttamisesta.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is the busiest machine always the bottleneck?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. It may be busy making work that is not yet needed. Confirm whether its capacity is limiting the completion of the orders you need to deliver. Recurring queues, downstream waiting and a workload-to-capacity comparison give you a better diagnosis than utilization alone.\"}},{\"@type\":\"Question\",\"name\":\"Why does a bottleneck move between workstations?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The limiting resource can change when the order mix, available skills, shifts or equipment availability changes. Improving one operation can also make another step the new constraint. Recheck the full route after an improvement rather than assuming that the original bottleneck will always set the pace.\"}},{\"@type\":\"Question\",\"name\":\"Can scheduling software eliminate a production bottleneck?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It can reduce delays caused by overloaded plans, unsuitable sequences and avoidable setup changes. SkyPlanner schedules against configured capacity, dependencies and priorities, helping you use available resources effectively. A persistent physical shortage still needs a capacity, process or delivery decision.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Tuotannon pullonkaulat: tilaukset taas liikkeelle Etusivu &raquo; Resurssit &raquo; Tuotannon pullonkaulat: tilaukset taas liikkeelle Laserilta on valmistunut taas yksi er\u00e4. Osat odottavat s\u00e4rm\u00e4yst\u00e4. Hitsaajat ovat valmiina t\u00f6ihin, mutta seuraavan tilauksen osat puuttuvat. Samaan aikaan asiakas kysyy, pit\u00e4\u00e4k\u00f6 perjantain toimitusaika edelleen. Tuotannon pullonkaulat tekev\u00e4t tuotannonsuunnittelijan p\u00e4iv\u00e4st\u00e4 vaikean, vaikka tehtaalla on kiire: selvit\u00e4t puuttuvien t\u00f6iden tilannetta, siirr\u00e4t &#8230; <a title=\"Tuotannon pullonkaulat: tilaukset taas liikkeelle\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tuotannon pullonkaulat: tilaukset taas liikkeelle\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":97010,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-96524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-hienokuormitus","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tuotannon pullonkaulat: tilaukset liikkeelle &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tuotannon pullonkaulat: tilaukset taas liikkeelle\" \/>\n<meta property=\"og:description\" content=\"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:03:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tuotannon pullonkaulat: tilaukset taas liikkeelle\",\"datePublished\":\"2026-10-08T07:03:09+00:00\",\"dateModified\":\"2026-10-19T14:43:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/\"},\"wordCount\":1889,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-bottlenecks-hero.png\",\"articleSection\":[\"APS ja hienokuormitus\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/\",\"name\":\"Tuotannon pullonkaulat: tilaukset liikkeelle &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-bottlenecks-hero.png\",\"datePublished\":\"2026-10-08T07:03:09+00:00\",\"dateModified\":\"2026-10-19T14:43:10+00:00\",\"description\":\"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-bottlenecks-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-bottlenecks-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Parts queue before a machining station while its output conveyor has little completed work.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/pullonkaula\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tuotannon pullonkaulat: tilaukset taas liikkeelle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tuotannon pullonkaulat: tilaukset liikkeelle &#8211; SkyPlanner","description":"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/","og_locale":"fi_FI","og_type":"article","og_title":"Tuotannon pullonkaulat: tilaukset taas liikkeelle","og_description":"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:03:09+00:00","article_modified_time":"2026-10-19T14:43:10+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tuotannon pullonkaulat: tilaukset taas liikkeelle","datePublished":"2026-10-08T07:03:09+00:00","dateModified":"2026-10-19T14:43:10+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/"},"wordCount":1889,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png","articleSection":["APS ja hienokuormitus","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/","name":"Tuotannon pullonkaulat: tilaukset liikkeelle &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png","datePublished":"2026-10-08T07:03:09+00:00","dateModified":"2026-10-19T14:43:10+00:00","description":"Koneet k\u00e4yv\u00e4t, tilaukset my\u00f6h\u00e4ss\u00e4? L\u00f6yd\u00e4 toimituksia jarruttava tuotannon pullonkaula ja laadi SkyPlannerilla aikataulu, jolla ty\u00f6t etenev\u00e4t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png","width":1672,"height":941,"caption":"Parts queue before a machining station while its output conveyor has little completed work."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/pullonkaula\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tuotannon pullonkaulat: tilaukset taas liikkeelle"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-bottlenecks-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tuotannon pullonkaulat: tilaukset taas liikkeelle Etusivu &raquo; Resurssit &raquo; Tuotannon pullonkaulat: tilaukset taas liikkeelle Laserilta on valmistunut taas yksi er\u00e4. Osat odottavat s\u00e4rm\u00e4yst\u00e4. Hitsaajat ovat valmiina t\u00f6ihin, mutta seuraavan tilauksen osat puuttuvat. Samaan aikaan asiakas kysyy, pit\u00e4\u00e4k\u00f6 perjantain toimitusaika edelleen. Tuotannon pullonkaulat tekev\u00e4t tuotannonsuunnittelijan p\u00e4iv\u00e4st\u00e4 vaikean, vaikka tehtaalla on kiire: selvit\u00e4t puuttuvien t\u00f6iden tilannetta, siirr\u00e4t&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=96524"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96524\/revisions"}],"predecessor-version":[{"id":96695,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/96524\/revisions\/96695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/97010"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=96524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=96524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=96524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}