{"id":9276,"date":"2023-04-21T10:40:41","date_gmt":"2023-04-21T10:40:41","guid":{"rendered":"https:\/\/skyplanner.ai\/oppaat\/mrp-lyhyt-opas\/"},"modified":"2026-10-15T17:52:04","modified_gmt":"2026-10-15T17:52:04","slug":"mrp-lyhyt-opas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/","title":{"rendered":"MRP: lyhyt opas"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f\">\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/fi\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Artikkelit<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">MRP: lyhyt opas<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mrp-a-brief-guide\" style=\"color:#1f1f33\">MRP: lyhyt opas<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p>Suunnittelu on elint\u00e4rke\u00e4\u00e4 tavoitteen saavuttamisen kannalta. Oletetaan esimerkiksi, ett\u00e4 suunnittelet tapahtuman tai<br\/>matkan etuk\u00e4teen, jopa p\u00e4ivitt\u00e4iset toiminnot, kuten ruoanlaitto. T\u00e4ll\u00f6in tarvitset<br\/>organisaatiolta oikean m\u00e4\u00e4r\u00e4n aineksia ja kaikki tarvittavat v\u00e4lineet, jotta v\u00e4lt\u00e4t<br\/>ylim\u00e4\u00e4r\u00e4isten rahojen k\u00e4ytt\u00e4misen ja pystyt toteuttamaan kaiken suunnitellusti. Nyt n\u00e4m\u00e4 toiminnot ovat<br\/>suoraviivaisempia j\u00e4rjest\u00e4\u00e4 kuin tuotanto- ja palvelualojen prosessit.<\/p>\n\n\n\n<p>Nykyp\u00e4iv\u00e4n yritysmaailmassa on t\u00e4rke\u00e4\u00e4 tiet\u00e4\u00e4 tarvittavien varastojen ja laitteiden m\u00e4\u00e4r\u00e4<br\/>. Toisaalta varastojen loppuminen voi johtaa pullonkauloihin ja toimitusten my\u00f6h\u00e4stymiseen,<br\/>jolloin yritys ei ole tehokas eik\u00e4 kilpailukykyinen. Nyky\u00e4\u00e4n on olemassa materiaalitarpeiden<br\/>suunnittelu, joka auttaa t\u00e4ss\u00e4 ahdingossa, ja muut toiminnot t\u00e4m\u00e4n j\u00e4rjestelm\u00e4n lis\u00e4ksi<br\/>tekev\u00e4t n\u00e4ist\u00e4 prosesseista lastenleikki\u00e4.<\/p>\n\n\n\n<p>Selvitet\u00e4\u00e4n, miten materiaalitarpeiden suunnittelu toimii ja miten t\u00e4m\u00e4 j\u00e4rjestelm\u00e4 voi vied\u00e4 yrityksen<br\/>seuraavalle tasolle.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-what-is-material-requirements-planning\">Mit\u00e4 on materiaalitarpeiden suunnittelu?<\/h3>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Materiaalitarvelaskenta (MRP) laskee kysynn\u00e4n, materiaaliluetteloiden, varastotietojen ja l\u00e4pimenoaikojen perusteella, mit\u00e4 materiaaleja ja komponentteja tarvitaan, kuinka paljon ja milloin.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>MRP sovittaa materiaalien hankinnan tuotannon tarpeisiin. Sen ehdottamat tilausten p\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t tukevat <a href=\"\/fi\/oppaat\/mita-on-hienokuormitus\/\">tuotannon aikataulua<\/a>, mutta eiv\u00e4t yksin osoita, ett\u00e4 koneet ja henkil\u00f6st\u00f6 pystyv\u00e4t tekem\u00e4\u00e4n ty\u00f6t ajallaan. Kapasiteetin riitt\u00e4vyys on tarkistettava erikseen yksityiskohtaisessa hienokuormituksessa.<\/p>\n\n\n\n<p>Materiaalitarpeiden suunnittelu on erinomainen v\u00e4line, jonka avulla yritykset voivat vastata tehokkaammin lis\u00e4\u00e4ntyneeseen kysynt\u00e4\u00e4n ja est\u00e4\u00e4 viiv\u00e4styksi\u00e4 tai saatavuuden puutetta. T\u00e4t\u00e4 ty\u00f6kalua k\u00e4ytet\u00e4\u00e4n p\u00e4\u00e4asiassa tuotepohjaisissa yrityksiss\u00e4.<\/p>\n\n\n<div class=\"gb-container gb-container-51461b32\"><div class=\"gb-inside-container\">\n\n<p><strong>MRP muuntaa tuotannon kysynn\u00e4n ajankohdittain eritellyiksi materiaalitarpeiksi ja suunnitelluiksi hankinta- ja tuotantotilauksiksi. Kysynt\u00e4ennusteet ovat suunnittelun l\u00e4ht\u00f6tietoja, eiv\u00e4t MRP-laskennan automaattisesti tuottama tulos.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>MRP laskee materiaalien nettotarpeen kysynn\u00e4n, materiaaliluetteloiden, k\u00e4ytett\u00e4viss\u00e4 olevien varastosaldojen, ajoitettujen saapumisten ja l\u00e4pimenoaikojen perusteella. Tarkista <a href=\"\/fi\/oppaat\/tuotannon-kapasiteettisuunnittelu\/\">kapasiteetin suunnittelun<\/a> avulla koneiden ja ty\u00f6ntekij\u00f6iden k\u00e4ytett\u00e4viss\u00e4 oleva aika ennen kuin pid\u00e4t suunniteltuja tuotantop\u00e4iv\u00e4m\u00e4\u00e4ri\u00e4 toteuttamiskelpoisina.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-types\">MRP-tyypit<\/h3>\n\n\n\n<p>Materiaalitarvelaskenta (MRP I) on erotettava laajemmasta valmistuksen resurssien suunnittelusta (MRP II):<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>MRP I<\/strong><\/h4>\n\n\n\n<p>MRP I laskee raaka-aineiden ja komponenttien tarpeet materiaaliluetteloista, v\u00e4hent\u00e4\u00e4 niist\u00e4 k\u00e4ytett\u00e4viss\u00e4 olevan varaston ja odotetut saapumiset sek\u00e4 ehdottaa tilausten p\u00e4iv\u00e4m\u00e4\u00e4ri\u00e4 l\u00e4pimenoaikojen perusteella. N\u00e4m\u00e4 p\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t muodostavat materiaalisuunnitelman, eiv\u00e4t koneiden \u00e4\u00e4rellist\u00e4 kuormitussuunnitelmaa.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a8fa4314 gb-headline-text\"><strong>MRP II<\/strong><\/h4>\n\n\n\n<p>Valmistuksen resurssien suunnittelu (MRP II) laajentaa materiaalisuunnittelun kattamaan my\u00f6s kapasiteetin ja talouden suunnittelun. T\u00e4m\u00e4 laajempi kokonaisuus ei tee MRP I -peruslaskennasta \u00e4\u00e4rellisen kuormituksen ty\u00f6kalua. Tarkista, mit\u00e4 suunnittelutoimintoja k\u00e4ytt\u00e4m\u00e4si j\u00e4rjestelm\u00e4 todella tarjoaa.<\/p>\n\n\n\n<p>MRP I:t\u00e4 ja MRP II:ta pidet\u00e4\u00e4n <a href=\"\/fi\/oppaat\/mika-on-erp\/\">Enterprise Resource Planning<\/a> -j\u00e4rjestelm\u00e4n (<a href=\"\/fi\/oppaat\/valmistuksen-erp\/\">ERP<\/a>) suorina edelt\u00e4jin\u00e4. ERP tukee yrityksen muita keskeisi\u00e4 toimintoja, kuten <a href=\"\/fi\/oppaat\/mita-on-toimitusketjun-hallinta-scm\/\">toimitusketjun hallintaa<\/a>, markkinointia, henkil\u00f6st\u00f6hallintoa ja kirjanpitoa. Yritys voi integroida MRP-j\u00e4rjestelm\u00e4t ERP-j\u00e4rjestelm\u00e4\u00e4n, jolloin tietovirta on paremmin n\u00e4ht\u00e4viss\u00e4 ja valmistusprosessia voi hallita tarkemmin: mahdolliset pullonkaulat tunnistetaan ja varastotasot pysyv\u00e4t hallinnassa.<\/p>\n\n\n\n<p>Toiminnanohjausj\u00e4rjestelm\u00e4 on v\u00e4ltt\u00e4m\u00e4t\u00f6n suurille yrityksille, koska t\u00e4ll\u00e4 ohjelmistolla voidaan keskitt\u00e4\u00e4 erilaisia tuotantoprosesseja ja pit\u00e4\u00e4 ne virtaviivaisina sek\u00e4 jakaa avoimempaa tietoa eri osastoista.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Tuotannonsuunnittelu ja hienokuormitus tuotekuva suora n\u00e4kym\u00e4\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Edistynytt\u00e4 tuotannonsuunnittelua teko\u00e4lyll\u00e4 &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Lue lis\u00e4\u00e4 tuotannonsuunnittelusta ja optimoinnista teko\u00e4lyn avulla.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/fi\/\" aria-label=\"Varaa demo\">Tuotannonsuunnittelu teko\u00e4lyll\u00e4<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-processes-of-mrp\">MRP:n prosessit<\/h3>\n\n\n\n<p>MRP muuntaa tuotannon kysynn\u00e4n materiaalisuunnitelmaksi. Se k\u00e4ytt\u00e4\u00e4 sille annettuja kysynt\u00e4tietoja eik\u00e4 ennusta itsen\u00e4isesti markkinoiden kehityst\u00e4. Keskeiset vaiheet ovat:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Laskee kysynn\u00e4n mukaiset materiaalitarpeet<\/strong>: MRP laskee raaka-aineiden ja komponenttien bruttotarpeet suunniteltujen tuotem\u00e4\u00e4rien ja materiaaliluetteloiden perusteella.<br><\/li>\n\n\n\n<li><strong>Tarkistaa varaston ja odotetut saapumiset<\/strong>: MRP laskee nettotarpeet vertaamalla bruttotarpeita k\u00e4ytett\u00e4viss\u00e4 olevaan varastoon ja saapuviin materiaaleihin. Varastotietojen on oltava tarkkoja. MRP ei itse p\u00e4\u00e4t\u00e4, miss\u00e4 materiaalit fyysisesti varastoidaan.<br><\/li>\n\n\n\n<li><strong>Suunnittelee hankittavat m\u00e4\u00e4r\u00e4t ja ajankohdat<\/strong>: MRP ehdottaa osto- tai tuotantotilauksia ja niiden vapautusp\u00e4iv\u00e4m\u00e4\u00e4ri\u00e4 nettotarpeiden, er\u00e4kokos\u00e4\u00e4nt\u00f6jen ja l\u00e4pimenoaikojen perusteella.<br><br>Ty\u00f6vaiheiden sijoittaminen koneille ja ty\u00f6pisteille edellytt\u00e4\u00e4 yksityiskohtaista hienokuormitusmallia, jossa huomioidaan reititykset, ty\u00f6vaiheiden kestot, asetusajat ja k\u00e4ytett\u00e4viss\u00e4 oleva kapasiteetti. MRP-peruslaskenta ei m\u00e4\u00e4rit\u00e4 resursseille toteuttamiskelpoista ty\u00f6j\u00e4rjestyst\u00e4.<br><\/li>\n\n\n\n<li><strong>Ilmoittaa materiaalisuunnitelman muutostarpeista<\/strong>: MRP voi tunnistaa materiaalipuutteita tai tilauksia, joiden ajankohtaa on muutettava kysynn\u00e4n tai saatavuuden muuttuessa. Kapasiteettiristiriitojen ratkaiseminen tai koneiden kuormitussuunnitelman laatiminen uudelleen edellytt\u00e4\u00e4 erillist\u00e4 kapasiteetin suunnittelua ja hienokuormitusta.<\/li>\n<\/ol>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-inputs\">MRP-sy\u00f6tteet<\/h3>\n\n\n\n<p>Ajantasaiset tiedot ovat v\u00e4ltt\u00e4m\u00e4tt\u00f6mi\u00e4 parempien tulosten ja tehokkaamman tuotannon aikaansaamiseksi. Lis\u00e4ksi johtajat voivat lis\u00e4t\u00e4 lis\u00e4\u00e4 tietoja, joita kutsutaan MRP-sy\u00f6tteiksi; t\u00e4rkeimpi\u00e4 n\u00e4ist\u00e4 ovat:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Materiaaliluettelot (BOM)<\/strong>: Tuoterakenne, jossa luetellaan tarvittavat materiaalit ja komponentit m\u00e4\u00e4rineen. Ty\u00f6vaiheiden j\u00e4rjestys, ty\u00f6pisteet ja asetusvaatimukset kuuluvat tuotantoreititykseen, eiv\u00e4t pelkk\u00e4\u00e4n materiaaliluetteloon.<br><\/li>\n\n\n\n<li><strong><a href=\"\/fi\/oppaat\/master-production-schedule\/\">Tuotannon p\u00e4\u00e4suunnitelma (MPS)<\/a><\/strong>: Nimikkeitt\u00e4in laadittu <a href=\"\/fi\/\">tuotantosuunnitelma<\/a>, joka m\u00e4\u00e4ritt\u00e4\u00e4, mit\u00e4 tuotteita valmistetaan, kuinka paljon ja mill\u00e4 ajanjaksoilla. MRP laskee suunnitellun valmistuksen komponenttitarpeet. Yksityiskohtaisessa hienokuormituksessa tarkistetaan resurssien ty\u00f6j\u00e4rjestys.<br><\/li>\n\n\n\n<li><strong>Inventaarion tilatiedosto (ISF)<\/strong>: Ajantasaiset tiedot k\u00e4ytett\u00e4viss\u00e4 olevan varaston tilasta ja siit\u00e4, kuinka paljon sit\u00e4 tarvitaan ostotilauksen t\u00e4ytt\u00e4miseksi.<br\/><\/li>\n\n\n\n<li><strong>Kysynt\u00e4ennuste<\/strong>: Ennusteet ja vahvistetut asiakastilaukset tuovat suunnitteluun kysynt\u00e4tiedot. MRP laskee materiaalitarpeet n\u00e4iden tietojen perusteella, mutta ei itse laadi kysynt\u00e4ennustetta.<\/li>\n<\/ul>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-outputs\">MRP-tuotokset<\/h3>\n\n\n\n<p>On joitakin MRP-ohjelmasi tuottamia tuotoksia, joita valmistusprosessisi voi k\u00e4ytt\u00e4\u00e4<br\/>, kuten:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Ostotilausehdotukset<\/strong>: MRP m\u00e4\u00e4ritt\u00e4\u00e4 materiaalim\u00e4\u00e4r\u00e4t ja p\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t, jotka hankinnan on tarkistettava. J\u00e4rjestelm\u00e4st\u00e4 riippuen tuloksena voi olla suunniteltu tilaus tai ostoehdotus, ei automaattisesti toimittajalle tehty tilaus.<br><\/li>\n\n\n\n<li><strong>Materiaalisuunnitelma<\/strong>: Materiaalisuunnitelma: T\u00e4h\u00e4n suunnitelmaan sis\u00e4ltyv\u00e4t yksityiskohdat, kuten raaka-aineiden eritelm\u00e4t, kokoonpano-osat ja komponentit, joita tarvitaan lopputuotteen viimeistelyyn. Materiaalisuunnitelma sis\u00e4lt\u00e4\u00e4 my\u00f6s kunkin resurssin m\u00e4\u00e4r\u00e4n ja aikataulun siit\u00e4, milloin niit\u00e4 tarvitaan.<br\/><\/li>\n\n\n\n<li><strong>Ty\u00f6m\u00e4\u00e4r\u00e4ykset<\/strong>: T\u00e4h\u00e4n kuuluvat lopputuotteen valmistukseen liittyv\u00e4t ty\u00f6t. Ty\u00f6m\u00e4\u00e4r\u00e4yksess\u00e4 ilmoitetaan yksityiskohtaisesti tarvittavat raaka-aineet ja komponentit, lopputuotteen alku- ja loppup\u00e4iv\u00e4t sek\u00e4 kaikki osastokohtaiset vastuualueet, jotta ty\u00f6skentely olisi johdonmukaista.<br\/><\/li>\n\n\n\n<li><strong>Ensisijaiset ja t\u00e4ydent\u00e4v\u00e4t raportit<\/strong>: J\u00e4rjestelm\u00e4st\u00e4 riippuen raportit n\u00e4ytt\u00e4v\u00e4t suunnitellut hankinta- ja tuotantotilaukset, muutokset olemassa oleviin tilauksiin, poikkeamat ja suunnittelun tuloksellisuuden. Kysynn\u00e4n ennustaminen ja yksityiskohtainen kapasiteetin kuormitus ovat erillisi\u00e4 toimintoja, vaikka ne sis\u00e4ltyisiv\u00e4t samaan ohjelmistokokonaisuuteen.<\/li>\n<\/ul>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-benefits-of-material-requirements-planning\">Materiaalitarpeiden suunnittelun edut<\/h3>\n\n\n\n<p>Monentyyppiset yritykset, kuten teknologiateollisuus, huonekalujen valmistajat, elintarviketeollisuus tai jopa palveluala, hy\u00f6tyv\u00e4t monista syist\u00e4 MRP-j\u00e4rjestelm\u00e4st\u00e4 tuotantoprosesseissaan:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Parempi varastonhallinta<\/strong>: Materiaalitarpeiden vertaaminen varastoon ja saapuviin materiaaleihin auttaa suunnittelijoita tunnistamaan puutteet ja v\u00e4ltt\u00e4m\u00e4\u00e4n tarpeettomia t\u00e4ydennyksi\u00e4. Tulokset riippuvat kysynt\u00e4-, varasto- ja tuotetietojen tarkkuudesta.<br><\/li>\n\n\n\n<li><strong>Hankinnan suunnittelu<\/strong>: MRP ehdottaa ostettavia m\u00e4\u00e4ri\u00e4 ja niiden tarveajankohtia. Ostajat voivat laatia ostotilaukset n\u00e4iden ehdotusten pohjalta. Automaattinen viestint\u00e4 toimittajien kanssa riippuu hankintaj\u00e4rjestelm\u00e4st\u00e4 ja sen asetuksista.<br><\/li>\n\n\n\n<li><strong>Aikaisemmat varoitukset materiaalipuutteista<\/strong>: Kun kysynt\u00e4 tai materiaalien saatavuus muuttuu, materiaalitarpeiden uudelleenlaskenta auttaa suunnittelijoita tunnistamaan puuttuvat komponentit ja tarkistamaan saapumisp\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t. Materiaalipoikkeaman tunnistaminen ei kuitenkaan tuota konekohtaista varasuunnitelmaa.<br><\/li>\n\n\n\n<li><strong>Tukee tuottavuutta<\/strong>: Materiaalisuunnitelma auttaa tuotannon henkil\u00f6st\u00f6\u00e4 valmistelemaan ty\u00f6ss\u00e4 tarvittavat komponentit. Koneiden ja henkil\u00f6st\u00f6n k\u00e4ytt\u00f6aste riippuu silti reitityksist\u00e4, kapasiteetista ja yksityiskohtaisesta kuormitussuunnitelmasta.<br><\/li>\n\n\n\n<li><strong>Tukee resurssien suunnittelua<\/strong>: MRP tuottaa materiaalim\u00e4\u00e4r\u00e4t ja tarveajankohdat hankinnan ja tuotannonsuunnittelun k\u00e4ytt\u00f6\u00f6n. Koneiden ja henkil\u00f6st\u00f6n kapasiteetti on tarkistettava erikseen. Pelkk\u00e4 materiaalien saatavuus ei takaa, ett\u00e4 tilaus valmistuu ajallaan.<br><\/li>\n\n\n\n<li><strong>Tarjoaa tietojen organisoinnin<\/strong>: N\u00e4m\u00e4 tiedot on analysoitava ja dokumentoitava organisoidusti. MRP auttaa k\u00e4sittelem\u00e4\u00e4n t\u00e4t\u00e4 ty\u00f6l\u00e4st\u00e4 teht\u00e4v\u00e4\u00e4 ja hallitsee paremmin yrityksess\u00e4 ker\u00e4tt\u00e4vi\u00e4 tietoja.<br\/><\/li>\n\n\n\n<li><strong>Auttaa v\u00e4ltt\u00e4m\u00e4\u00e4n liiallisia ostoja<\/strong>: K\u00e4ytett\u00e4viss\u00e4 olevan varaston ja odotettujen saapumisten v\u00e4hent\u00e4minen materiaalitarpeista voi v\u00e4hent\u00e4\u00e4 tarpeettomia hankintoja. MRP ei takaa pienimpi\u00e4 hankinnan, varastoinnin tai kuljetuksen kokonaiskustannuksia.<br><\/li>\n\n\n\n<li><strong>Suunnitteluajan tehokkaampi k\u00e4ytt\u00f6<\/strong>: J\u00e4rjestelm\u00e4 voi automatisoida toistuvat materiaalilaskelmat ja tilausehdotusten laatimisen. Suunnittelijoiden on silti pidett\u00e4v\u00e4 l\u00e4ht\u00f6tiedot tarkkoina, tarkistettava poikkeamat ja sovitettava hankinnan ja tuotannon p\u00e4\u00e4t\u00f6kset yhteen.<br><\/li>\n\n\n\n<li><strong>Lis\u00e4\u00e4 asiakastyytyv\u00e4isyytt\u00e4<\/strong>: MRP auttaa lyhent\u00e4m\u00e4\u00e4n toimitusaikoja, mik\u00e4 luo asiakasuskollisuutta ja luo yritykselle hyv\u00e4n maineen, mik\u00e4 tekee yrityksest\u00e4 luotettavamman tuleville asiakkaille.<\/li>\n<\/ol>\n\n\n\n<p>MRP tarvitsee tarkat materiaaliluettelot, varastotiedot, kysynt\u00e4tiedot ja l\u00e4pimenoajat. Perusmuotoinen MRP-laskenta k\u00e4ytt\u00e4\u00e4 yleens\u00e4 suunniteltuja l\u00e4pimenoaikoja eik\u00e4 ratkaise rajallisesta kapasiteetista johtuvia ristiriitoja. Siksi sen ehdottamien p\u00e4iv\u00e4m\u00e4\u00e4rien toteutettavuus edellytt\u00e4\u00e4 <a href=\"\/fi\/oppaat\/kapasiteettitarvelaskenta\/\">erillist\u00e4 kapasiteetin tarkistusta<\/a>. Jos l\u00e4ht\u00f6tiedot tai toimitusp\u00e4iv\u00e4t muuttuvat, laske materiaalitarpeet uudelleen ja tarkista yksityiskohtainen tuotantoaikataulu.<\/p>\n\n\n\n<p>MRP-j\u00e4rjestelm\u00e4 ottaa kuitenkin vastaan vaivalloisen teht\u00e4v\u00e4n laskea tarvittavat raaka-aineet ja komponentit sek\u00e4 hallita tuotantosuunnitelmia tehokkaammin ja p\u00e4tev\u00e4mmin kuin k\u00e4sin arvaaminen ja ty\u00f6l\u00e4iden taulukkolaskentaohjelmien k\u00e4ytt\u00f6.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tehosta yrityksesi toimintaa hetkess\u00e4!<\/h3>\n\n\n\n<p>MRP vastaa materiaalien tarvetta koskeviin kysymyksiin: mit\u00e4 tarvitaan, kuinka paljon ja milloin. SkyPlanner APS puolestaan vastaa hienokuormituksen kysymyksiin: mik\u00e4 ty\u00f6 tehd\u00e4\u00e4n mill\u00e4kin ty\u00f6pisteell\u00e4, milloin ja miss\u00e4 j\u00e4rjestyksess\u00e4. Se ottaa huomioon materiaalien saatavuuden, ty\u00f6vuorot, prioriteetit ja toimitusp\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t. SkyPlanner ei korvaa ERP-j\u00e4rjestelm\u00e4\u00e4, vaan se voidaan liitt\u00e4\u00e4 mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapinnan kautta. Suunnittelijat m\u00e4\u00e4ritt\u00e4v\u00e4t prioriteetit ja s\u00e4\u00e4nn\u00f6t, ja Arcturus laskee kuormitussuunnitelman.<\/p>\n\n\n\n<p>Tutustu siihen, miten voimme auttaa sinua p\u00e4ivitt\u00e4m\u00e4\u00e4n ja parantamaan yrityksesi kilpailukyky\u00e4.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS - Tuotannonsuunnittelu ja hienokuormitus n\u00e4kym\u00e4\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Tehosta tuotantoasi SkyPlanner APSn avulla<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Varaa demo asiantuntijoidemme kanssa n\u00e4hd\u00e4ksesi miten SkyPlanner APS toimii oikeassa el\u00e4m\u00e4ss\u00e4.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/fi\/ota-yhteytta\/\" aria-label=\"Varaa demo\">Varaa demo<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":5,"featured_media":9052,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2662,300],"tags":[],"class_list":["post-9276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-fi","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MRP: mit\u00e4 materiaaleja tilataan ja milloin? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MRP: lyhyt opas\" \/>\n<meta property=\"og:description\" content=\"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-21T10:40:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T17:52:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Teemu Hakala\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Teemu Hakala\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/\"},\"author\":{\"name\":\"Teemu Hakala\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/c6a20b9cdaae7e4429ef319efc97d730\"},\"headline\":\"MRP: lyhyt opas\",\"datePublished\":\"2023-04-21T10:40:41+00:00\",\"dateModified\":\"2026-10-15T17:52:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/\"},\"wordCount\":1479,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"articleSection\":[\"ERP\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/\",\"name\":\"MRP: mit\u00e4 materiaaleja tilataan ja milloin? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"datePublished\":\"2023-04-21T10:40:41+00:00\",\"dateModified\":\"2026-10-15T17:52:04+00:00\",\"description\":\"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"MRP: A Brief Guide\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/mrp-lyhyt-opas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Artikkelit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"MRP: lyhyt opas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/c6a20b9cdaae7e4429ef319efc97d730\",\"name\":\"Teemu Hakala\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"caption\":\"Teemu Hakala\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MRP: mit\u00e4 materiaaleja tilataan ja milloin? &#8211; SkyPlanner","description":"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/","og_locale":"fi_FI","og_type":"article","og_title":"MRP: lyhyt opas","og_description":"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/","og_site_name":"SkyPlanner","article_published_time":"2023-04-21T10:40:41+00:00","article_modified_time":"2026-10-15T17:52:04+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","type":"image\/jpeg"}],"author":"Teemu Hakala","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Teemu Hakala","Arvioitu lukuaika":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/"},"author":{"name":"Teemu Hakala","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/c6a20b9cdaae7e4429ef319efc97d730"},"headline":"MRP: lyhyt opas","datePublished":"2023-04-21T10:40:41+00:00","dateModified":"2026-10-15T17:52:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/"},"wordCount":1479,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","articleSection":["ERP","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/","name":"MRP: mit\u00e4 materiaaleja tilataan ja milloin? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","datePublished":"2023-04-21T10:40:41+00:00","dateModified":"2026-10-15T17:52:04+00:00","description":"Mit\u00e4 materiaaleja pit\u00e4\u00e4 ostaa ja milloin? MRP yhdist\u00e4\u00e4 kysynn\u00e4n, varastosaldot ja toimitusajat tuotannon materiaalitarpeiksi ja tilausten pohjaksi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","width":2560,"height":1707,"caption":"MRP: A Brief Guide"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/mrp-lyhyt-opas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Artikkelit","item":"https:\/\/skyplanner.ai\/fi\/oppaat\/"},{"@type":"ListItem","position":3,"name":"MRP: lyhyt opas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/c6a20b9cdaae7e4429ef319efc97d730","name":"Teemu Hakala","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","caption":"Teemu Hakala"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg",360,240,false]},"uagb_author_info":{"display_name":"Teemu Hakala","author_link":"https:\/\/skyplanner.ai\/fi\/author\/teemu\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/9276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=9276"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/9276\/revisions"}],"predecessor-version":[{"id":93175,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/9276\/revisions\/93175"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/9052"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=9276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=9276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=9276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}