{"id":29011,"date":"2023-11-02T11:34:53","date_gmt":"2023-11-02T11:34:53","guid":{"rendered":"https:\/\/skyplanner.ai\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2023\/"},"modified":"2026-06-19T21:04:22","modified_gmt":"2026-06-19T21:04:22","slug":"tuotantosuunnittelijan-palkka-unkarissa-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/","title":{"rendered":"Tuotannonsuunnittelijan palkka Unkarissa 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-hungary-2026\">Tuotannonsuunnittelijan palkka Unkarissa 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/fi\/oppaat\/\">Resurssit<\/a>&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Unkarissa 2026<\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF <strong>611,368<\/strong> kuukaudessa ennen veroja. T\u00e4h\u00e4n lukuun vaikuttavat kuitenkin useat tekij\u00e4t. Palkka voi vaihdella henkil\u00f6n koulutustaustan, maantieteellisen sijainnin maan sis\u00e4ll\u00e4 sek\u00e4 yrityksen tyypin mukaan.&nbsp;<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Vuonna 2026 Unkarin valmistava teollisuus, joka loistaa autoteollisuudessa, elektroniikassa, l\u00e4\u00e4keteollisuudessa ja muilla aloilla, on noussut innovaatiokeskukseksi Keski-Euroopassa. T\u00e4m\u00e4 kasvu on lis\u00e4nnyt osaavien tuotannonsuunnittelijoiden tarvetta, mik\u00e4 on ratkaisevan t\u00e4rke\u00e4\u00e4 tuotannon optimoinnissa n\u00e4ill\u00e4 toimialoilla. Mit\u00e4 t\u00e4m\u00e4 siis tarkoittaa tuotannonsuunnittelijan ansaintamahdollisuuksien kannalta Unkarissa vuonna 2026? Syvennyt\u00e4\u00e4n t\u00e4m\u00e4n keskeisen roolin arvoon ja palkitsevuuteen Unkarin kukoistavassa teollisessa ymp\u00e4rist\u00f6ss\u00e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Keskipalkka verrattuna tuotannonsuunnittelijan palkkaukseen Unkarissa<\/h2>\n\n\n\n<p>Kun arvioidaan ansioita Unkarissa, on valaisevaa tarkastella ensin yleist\u00e4 palkkatilannetta. Keskim\u00e4\u00e4rin yksil\u00f6t Unkarissa ansaitsevat noin <strong>HUF 609 761 kuukaudessa<\/strong> ennen veroja. T\u00e4m\u00e4 luku tarjoaa l\u00e4ht\u00f6kohdan laajemman taloudellisen ymp\u00e4rist\u00f6n ymm\u00e4rt\u00e4miseen.<\/p>\n\n\n\n<p>Keskittyen nyt erityisesti tuotannon suunnittelun alueeseen, taloudelliset palkkiot ovat huomattavasti korkeammat. Vuonna 2026 tuotannonsuunnittelijan keskipalkka Unkarissa on noin <strong>HUF <strong>7,336,425<\/strong> vuodessa<\/strong>, mik\u00e4 vastaa noin <strong>HUF 611,368 kuukaudessa<\/strong> ennen veroja. T\u00e4m\u00e4 ero korostaa n\u00e4iden ammattilaisten erikoistunutta luonnetta ja suurta kysynt\u00e4\u00e4 valmistusteollisuudessa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vertaileva analyysi naapurimaiden kanssa<\/h2>\n\n\n\n<p>Arvioitaessa Unkarin houkuttelevuutta tuotannonsuunnittelijoille on valaisevaa verrata heid\u00e4n ansioitaan naapurimaiden ansioihin. Yleisesti ottaen <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-puolassa-2026\/\">tuotannonsuunnittelijan palkka Puolassa<\/a> on hieman samankaltainen kuin sen vastineet Unkarissa, mik\u00e4 heijastaa laajempia taloudellisia trendej\u00e4 ja eroja elinkustannuksissa. Samaan aikaan <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-tsekissa-2026\/\">tuotannonsuunnittelijan palkka T\u0161ekiss\u00e4 <\/a>on korkeampi kuin Unkarissa, vaikka pieni\u00e4 vaihteluita saattaa esiinty\u00e4 riippuen tietyist\u00e4 teollisuudenaloista. <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-slovakiassa-2026\/\">Tuotannonsuunnittelijan palkka Slovakiassa<\/a> on my\u00f6s korkeampi; siell\u00e4 tuotannonsuunnittelijat saavat usein parempaa palkkaa kuin Unkarissa, mik\u00e4 vastaa sen omaleimaista talousrakennetta ja elinkustannuksia. T\u00e4m\u00e4 vertaileva analyysi korostaa Unkarin kilpailukykyist\u00e4 asemaa alueella t\u00e4m\u00e4n alan ammattilaisille.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Tuotannonsuunnittelijan palkkaan vaikuttavat tekij\u00e4t Unkarissa<\/h2>\n\n\n\n<p>Kun m\u00e4\u00e4ritet\u00e4\u00e4n tuotannonsuunnittelijan palkkaa Unkarissa, useat tekij\u00e4t tulevat mukaan. Jokainen n\u00e4ist\u00e4 elementeist\u00e4 voi merkitt\u00e4v\u00e4sti vaikuttaa ansaintapotentiaaliin t\u00e4ll\u00e4 alalla.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Koulutus<\/h4>\n\n\n\n<p>Korkeampi koulutustaso johtaa usein parempiin palkkatarjouksiin. Tuotannonsuunnittelijoille tutkinnot tuotantotekniikassa, liiketaloudessa tai toimitusketjun hallinnassa voivat olla erityisen hy\u00f6dyllisi\u00e4. Ty\u00f6nantajat arvostavat n\u00e4it\u00e4 koulutustaustoja, sill\u00e4 ne antavat suunnittelijoille tuotannon suunnittelussa vaadittavat teoreettiset tiedot ja analyyttiset taidot.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Kokemus<\/h4>\n\n\n\n<p>Kuten monilla aloilla, kokemuksella on ratkaiseva rooli palkan m\u00e4\u00e4r\u00e4ytymisess\u00e4. Tuotannonsuunnittelija, jolla on vuosien k\u00e4yt\u00e4nn\u00f6n kokemus tuotantolinjojen ja toimitusketjujen hallinnasta, pyyt\u00e4\u00e4 todenn\u00e4k\u00f6isesti korkeampaa palkkaa kuin alalle vasta tullut. T\u00e4m\u00e4 johtuu h\u00e4nen todistetusta kyvyst\u00e4\u00e4n k\u00e4sitell\u00e4 monimutkaisia tilanteita ja parantaa tuotannon tehokkuutta.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Taidot<\/h4>\n\n\n\n<p>Erityiset taidot, kuten hienokuormitus (APS) -j\u00e4rjestelmien tai <a href=\"\/fi\/oppaat\/mika-on-erp\/\">ERP-j\u00e4rjestelmien<\/a> osaaminen, varastonhallinta ja tuotannonohjaus, vaikuttavat suoraan ansaintapotentiaaliin. Tuotannonsuunnittelijat, jotka osaavat k\u00e4ytt\u00e4\u00e4 huipputeknologiaa ja ty\u00f6kaluja tuotannon suunnittelussa, ovat usein eritt\u00e4in kysyttyj\u00e4 ja voivat neuvotella korkeampia palkkoja.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Sijainti<\/h4>\n\n\n\n<p>Ty\u00f6n maantieteellinen sijainti Unkarissa vaikuttaa merkitt\u00e4v\u00e4sti palkkoihin. Esimerkiksi Budapestiss\u00e4, Unkarin p\u00e4\u00e4kaupungissa ja talouskeskuksessa, ty\u00f6skentelev\u00e4t tuotannonsuunnittelijat ansaitsevat tyypillisesti enemm\u00e4n kuin maaseudulla tai pienemmiss\u00e4 kaupungeissa ty\u00f6skentelev\u00e4t. T\u00e4m\u00e4 ero johtuu korkeammista elinkustannuksista ja suurten valmistusyritysten keskittymisest\u00e4 kaupunkikeskuksiin.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Yrityksen koko<\/h4>\n\n\n\n<p>Suuremmat yritykset tarjoavat yleens\u00e4 korkeampia palkkoja pienempiin yrityksiin verrattuna. T\u00e4m\u00e4 johtuu suurempien yritysten toiminnan suuremmasta monimutkaisuudesta ja laajuudesta, mik\u00e4 edellytt\u00e4\u00e4 taitavampia ja kokeneempia tuotannonsuunnittelijoita.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Yrityksen tyyppi<\/h4>\n\n\n\n<p>My\u00f6s toimiala tai sektori, jolla yritys toimii, voi vaikuttaa palkkoihin. Esimerkiksi korkean teknologian tai l\u00e4\u00e4keteollisuuden aloilla ty\u00f6skentelev\u00e4t tuotannonsuunnittelijat saattavat ansaita enemm\u00e4n kuin perinteisill\u00e4 valmistusaloilla ty\u00f6skentelev\u00e4t, koska tuotteiden arvo ja monimutkaisuus ovat suurempia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tuotannonsuunnittelijan rooli ja vastuut<\/h2>\n\n\n\n<p>Tuotannonsuunnittelijalla on keskeinen rooli valmistusyrityksess\u00e4, sill\u00e4 h\u00e4n varmistaa, ett\u00e4 tuotantoprosessit toimivat tehokkaasti ja tuloksellisesti. H\u00e4nen vastuisiinsa kuuluu:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Tuotannon aikataulutus<\/strong>: Yksityiskohtaisten tuotantoaikataulujen laatiminen ja koordinointi useiden osastojen kanssa tuotteiden oikea-aikaisen valmistumisen varmistamiseksi.<\/li>\n\n\n\n<li><strong>Varastonhallinta<\/strong>: Varastotasojen valvonta sek\u00e4 tarvikkeiden ja materiaalien tilaaminen tarpeen mukaan tuotannon tarpeiden t\u00e4ytt\u00e4miseksi.<\/li>\n\n\n\n<li><strong>Laadunvalvonta<\/strong>: Yhteisty\u00f6 laadunvalvontatiimin kanssa tuotestandardien ja s\u00e4\u00e4d\u00f6stenmukaisuuden yll\u00e4pit\u00e4miseksi.<\/li>\n\n\n\n<li><strong>Prosessien parantaminen<\/strong>: Tuotantoprosessien optimointitapojen tunnistaminen ja toteuttaminen tehokkuuden lis\u00e4\u00e4miseksi ja kustannuss\u00e4\u00e4st\u00f6jen saavuttamiseksi.<\/li>\n\n\n\n<li><strong>Koordinointi osastojen kanssa<\/strong>: Yhteydenpito myynti-, toimitusketju- ja valmistusosastojen v\u00e4lill\u00e4 tuotannon sovittamiseksi markkinoiden kysynt\u00e4\u00e4n.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Tuotannonsuunnittelijan tarvitsemat taidot<\/h2>\n\n\n\n<p>Menesty\u00e4kseen t\u00e4ss\u00e4 roolissa tuotannonsuunnittelijalla tulee olla monipuolinen joukko taitoja:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analyyttinen ajattelu<\/strong>: Kyky analysoida tuotannon mittareita ja dataa perusteltujen p\u00e4\u00e4t\u00f6sten tekemiseksi.<\/li>\n\n\n\n<li><strong>Ongelmanratkaisutaidot<\/strong>: Tuotanto-ongelmien nopea k\u00e4sittely ja ratkaiseminen niiden ilmetess\u00e4.<\/li>\n\n\n\n<li><strong>Viestint\u00e4taidot<\/strong>: Tuotannonsuunnittelijalla on oltava vahvat viestint\u00e4taidot, jotta h\u00e4n voi koordinoida tehokkaasti eri osastojen kanssa.<\/li>\n\n\n\n<li><strong>Huolellisuus<\/strong>: Aikataulutuksen ja varastonhallinnan tarkkuuden varmistaminen tuotantoviiveiden ja ylim\u00e4\u00e4r\u00e4isten kustannusten v\u00e4ltt\u00e4miseksi.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-a08b80f8 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Teko\u00e4lyll\u00e4 tehostetun APS:n rooli tuotannonsuunnittelijoiden tukemisessa<\/h2>\n\n\n\n<p>Teko\u00e4lyyn integroitu kehittynyt suunnittelu- ja aikataulutusj\u00e4rjestelm\u00e4 (APS), kuten <a href=\"\/fi\/\">SkyPlanner<\/a>, voi merkitt\u00e4v\u00e4sti laajentaa tuotannonsuunnittelijan mahdollisuuksia. N\u00e4in se tapahtuu:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Parempi ennustaminen<\/strong>: Teko\u00e4lyalgoritmit voivat analysoida valtavia tietom\u00e4\u00e4ri\u00e4 kysynn\u00e4n ennustamiseksi tarkemmin, jolloin syntyy tehokkaampia tuotantoaikatauluja.<\/li>\n\n\n\n<li><strong>Resurssien optimointi<\/strong>: Teko\u00e4ly voi optimoida resurssien, kuten koneiden, materiaalien ja ty\u00f6voiman, kohdentamisen varmistaen niiden mahdollisimman tehokkaan k\u00e4yt\u00f6n.<\/li>\n\n\n\n<li><strong>Reaaliaikainen ongelmanratkaisu<\/strong>: Teko\u00e4lyn avulla APS-j\u00e4rjestelm\u00e4 voi nopeasti sopeutua tuotantoprosessin muutoksiin tai h\u00e4iri\u00f6ihin ehdottaen vaihtoehtoisia ratkaisuja ty\u00f6nkulun tehokkuuden yll\u00e4pit\u00e4miseksi.<\/li>\n\n\n\n<li><strong>Parempi p\u00e4\u00e4t\u00f6ksenteko<\/strong>: Teko\u00e4ly voi tarjota tuotannonsuunnittelijoille oivalluksia ja suosituksia datan trendien pohjalta auttaen tietoon perustuvien p\u00e4\u00e4t\u00f6sten tekemisess\u00e4.<\/li>\n\n\n\n<li><strong>Inhimillisten virheiden v\u00e4hent\u00e4minen<\/strong>: Rutiiniteht\u00e4vien automatisointi v\u00e4hent\u00e4\u00e4 inhimillisten virheiden todenn\u00e4k\u00f6isyytt\u00e4 ja parantaa siten tuotannon kokonaistarkkuutta ja tehokkuutta.<\/li>\n<\/ul>\n\n\n\n<p>Hy\u00f6dynt\u00e4m\u00e4ll\u00e4 teko\u00e4ly\u00e4 tuotannonsuunnittelijat voivat keskitty\u00e4 ty\u00f6ns\u00e4 strategisempiin osa-alueisiin luottaen siihen, ett\u00e4 teknologia hoitaa monimutkaisen data-analyysin ja rutiiniteht\u00e4vien optimoinnin.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Toimialat Unkarissa, jotka ty\u00f6llist\u00e4v\u00e4t tuotannonsuunnittelijoita<\/h2>\n\n\n\n<p>Unkarissa useat toimialat tunnistavat tuotannonsuunnittelijoiden kriittisen roolin toiminnassaan. Keskeisi\u00e4 sektoreita ovat:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Autoteollisuus<\/strong>: Unkarissa toimii useita suuria autonvalmistajia ja alihankkijoita, mik\u00e4 tekee siit\u00e4 keskeisen sektorin tuotannonsuunnittelijoille.<\/li>\n\n\n\n<li><strong>Elektroniikka ja teknologia<\/strong>: Kasvavan teknologiasektorin my\u00f6t\u00e4 tuotannonsuunnittelijat ovat keskeisi\u00e4 elektronisten komponenttien ja laitteiden monimutkaisen tuotannon hallinnassa.<\/li>\n\n\n\n<li><strong>L\u00e4\u00e4keteollisuus<\/strong>: Tiukasta s\u00e4\u00e4ntely-ymp\u00e4rist\u00f6st\u00e4\u00e4n tunnettu l\u00e4\u00e4keteollisuus ty\u00f6llist\u00e4\u00e4 tuotannonsuunnittelijoita varmistaakseen tehokkaat ja vaatimustenmukaiset valmistusprosessit.<\/li>\n\n\n\n<li><strong>Elintarvike- ja juomateollisuus<\/strong>: T\u00e4m\u00e4 sektori luottaa tuotannonsuunnittelijoihin toimitusketjun ja tuotantoaikataulujen hallinnassa, erityisesti aloilla, joilla k\u00e4sitell\u00e4\u00e4n pilaantuvia tuotteita.<\/li>\n\n\n\n<li><strong>Tekstiili- ja vaatetusteollisuus<\/strong>: T\u00e4m\u00e4n alan suunnittelijat koordinoivat tuotantoprosessia raaka-aineiden hankinnasta valmiiden tuotteiden jakeluun.<\/li>\n<\/ol>\n\n\n\n<p>N\u00e4m\u00e4 toimialat, joista jokaisella on omat haasteensa ja vaatimuksensa, tarjoavat tuotannonsuunnittelijoille Unkarissa monipuolisia mahdollisuuksia soveltaa taitojaan ja asiantuntemustaan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tuotannonsuunnittelijoiden lis\u00e4edut Unkarissa palkan ohella<\/h2>\n\n\n\n<p>Tuotannonsuunnittelijat Unkarissa nauttivat palkan ohella monenlaisista eduista, mik\u00e4 tekee heid\u00e4n kokonaisvaltaisesta ty\u00f6suhdepaketistaan poikkeuksellisen houkuttelevan:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Terveydenhuolto- ja hyvinvointiohjelmat<\/strong>: Ty\u00f6nantajat tarjoavat usein kattavia terveysetuja, mukaan lukien p\u00e4\u00e4syn laadukkaisiin terveydenhuoltopalveluihin, hyvinvointiohjelmiin ja toisinaan kuntosalij\u00e4senyyksiin tai terveyteen liittyviin tukiin.<\/li>\n\n\n\n<li><strong>El\u00e4ke- ja vanhuudenturvaedut<\/strong>: Monet ty\u00f6nantajat Unkarissa tarjoavat huomattavia el\u00e4kej\u00e4rjestelyj\u00e4. N\u00e4m\u00e4 j\u00e4rjestelyt edist\u00e4v\u00e4t ty\u00f6ntekij\u00f6idens\u00e4 pitk\u00e4n aikav\u00e4lin taloudellista vakautta ja muodostavat olennaisen osan kokonaiskorvauspakettia.<\/li>\n\n\n\n<li><strong>Ty\u00f6n ja vapaa-ajan tasapaino<\/strong>: Unkarilaiset yritykset keskittyv\u00e4t yh\u00e4 enemm\u00e4n varmistamaan ty\u00f6ntekij\u00f6illeen tasapainoisen ty\u00f6n ja vapaa-ajan suhteen tarjoamalla joustavia ty\u00f6aikoja, et\u00e4ty\u00f6mahdollisuuksia ja runsaasti lomaa.<\/li>\n\n\n\n<li><strong>Kulttuuriset ja sosiaaliset edut<\/strong>: Unkarissa asuminen tarjoaa rikkaan kulttuurikokemuksen, ja monet organisaatiot j\u00e4rjest\u00e4v\u00e4t kulttuuritoimintaa, sosiaalisia tapahtumia tai ryhm\u00e4ytymisretki\u00e4, mik\u00e4 vahvistaa ty\u00f6n sosiaalista puolta.<\/li>\n<\/ol>\n\n\n\n<p>N\u00e4m\u00e4 kattavat edut yhdess\u00e4 Unkarin kilpailukykyisen palkkapaketin kanssa tekev\u00e4t siit\u00e4 suotuisan kohteen tuotannonsuunnittelijoille, jotka etsiv\u00e4t palkitsevaa uraa ja korkeaa el\u00e4m\u00e4nlaatua.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Onko Unkari lupaava kohde tuotannonsuunnittelijoille?<\/h2>\n\n\n\n<p>Unkari tarjoaa tuotannonsuunnittelijoille vuonna 2026 todellakin muutakin kuin houkuttelevan palkkapaketin. Kun otetaan huomioon maan panostus ammatilliseen kehittymiseen, Unkari tarjoaa kattavan urakokemuksen.<\/p>\n\n\n\n<p>Lis\u00e4ksi sitoutuminen ty\u00f6n ja vapaa-ajan tasapainoon, rikas kulttuuriymp\u00e4rist\u00f6 ja strateginen sijainti Euroopassa lis\u00e4\u00e4v\u00e4t Unkarin vetovoimaa. Yhdistettyn\u00e4 mahdollisuuteen olla osa elinvoimaista ja kasvavaa teollisuussektoria, Unkari on houkutteleva valinta tuotannonsuunnittelijoille, jotka haluavat edist\u00e4\u00e4 uraansa dynaamisessa ja kannustavassa ymp\u00e4rist\u00f6ss\u00e4.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tuotannonsuunnittelijan palkka Unkarissa 2026 Etusivu&nbsp;\u00bb&nbsp;Resurssit&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Unkarissa 2026 Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja. T\u00e4h\u00e4n lukuun vaikuttavat kuitenkin useat tekij\u00e4t. Palkka voi vaihdella henkil\u00f6n koulutustaustan, maantieteellisen sijainnin maan sis\u00e4ll\u00e4 sek\u00e4 yrityksen tyypin mukaan.&nbsp; Vuonna 2026 Unkarin valmistava teollisuus, joka loistaa autoteollisuudessa, elektroniikassa, &#8230; <a title=\"Tuotannonsuunnittelijan palkka Unkarissa 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tuotannonsuunnittelijan palkka Unkarissa 2026\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":6,"featured_media":28760,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2663],"tags":[],"class_list":["post-29011","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-ura-ja-palkat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tuotannonsuunnittelijan palkka Unkarissa 2026<\/title>\n<meta name=\"description\" content=\"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tuotannonsuunnittelijan palkka Unkarissa 2026\" \/>\n<meta property=\"og:description\" content=\"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-02T11:34:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:04:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Tuotannonsuunnittelijan palkka Unkarissa 2026\",\"datePublished\":\"2023-11-02T11:34:53+00:00\",\"dateModified\":\"2026-06-19T21:04:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/\"},\"wordCount\":1240,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"articleSection\":[\"oppaat\",\"Ura ja palkat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/\",\"name\":\"Tuotannonsuunnittelijan palkka Unkarissa 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"datePublished\":\"2023-11-02T11:34:53+00:00\",\"dateModified\":\"2026-06-19T21:04:22+00:00\",\"description\":\"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Hungary\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-unkarissa-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tuotannonsuunnittelijan palkka Unkarissa 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tuotannonsuunnittelijan palkka Unkarissa 2026","description":"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/","og_locale":"fi_FI","og_type":"article","og_title":"Tuotannonsuunnittelijan palkka Unkarissa 2026","og_description":"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-02T11:34:53+00:00","article_modified_time":"2026-06-19T21:04:22+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"SkyPlanner","Arvioitu lukuaika":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Tuotannonsuunnittelijan palkka Unkarissa 2026","datePublished":"2023-11-02T11:34:53+00:00","dateModified":"2026-06-19T21:04:22+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/"},"wordCount":1240,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","articleSection":["oppaat","Ura ja palkat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/","name":"Tuotannonsuunnittelijan palkka Unkarissa 2026","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","datePublished":"2023-11-02T11:34:53+00:00","dateModified":"2026-06-19T21:04:22+00:00","description":"Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","width":4990,"height":3327,"caption":"Production Planner Hungary"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-unkarissa-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tuotannonsuunnittelijan palkka Unkarissa 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fi\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Tuotannonsuunnittelijan palkka Unkarissa 2026 Etusivu&nbsp;\u00bb&nbsp;Resurssit&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Unkarissa 2026 Tuotannonsuunnittelijan keskim\u00e4\u00e4r\u00e4inen palkka Unkarissa vuonna 2026 on noin HUF 7,336,425 vuodessa, mik\u00e4 vastaa noin HUF 611,368 kuukaudessa ennen veroja. T\u00e4h\u00e4n lukuun vaikuttavat kuitenkin useat tekij\u00e4t. Palkka voi vaihdella henkil\u00f6n koulutustaustan, maantieteellisen sijainnin maan sis\u00e4ll\u00e4 sek\u00e4 yrityksen tyypin mukaan.&nbsp; Vuonna 2026 Unkarin valmistava teollisuus, joka loistaa autoteollisuudessa, elektroniikassa,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/29011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=29011"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/29011\/revisions"}],"predecessor-version":[{"id":94368,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/29011\/revisions\/94368"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/28760"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=29011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=29011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=29011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}