{"id":28406,"date":"2023-10-26T14:51:09","date_gmt":"2023-10-26T14:51:09","guid":{"rendered":"https:\/\/skyplanner.ai\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2023\/"},"modified":"2026-06-19T21:00:19","modified_gmt":"2026-06-19T21:00:19","slug":"tuotantosuunnittelijan-palkka-norjassa-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/","title":{"rendered":"Tuotannonsuunnittelijan palkka Norjassa 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-norway-2026\">Tuotannonsuunnittelijan palkka Norjassa 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/fi\/oppaat\/\">Resurssit<\/a>&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Norjassa 2026<\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja. T\u00e4m\u00e4 luku on hieman maan keskiarvon yl\u00e4puolella, mik\u00e4 korostaa t\u00e4h\u00e4n rooliin liitetty\u00e4 arvostusta.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Norja, joka tunnetaan \u00f6ljyst\u00e4\u00e4n ja kalataloudestaan, on my\u00f6s ottanut merkitt\u00e4vi\u00e4 edistysaskeleita esimerkiksi laivanrakennuksen, raskaiden koneiden ja vesiviljelyteknologian valmistuksen aloilla. T\u00e4ss\u00e4 dynaamisessa valmistusymp\u00e4rist\u00f6ss\u00e4 tuotannonsuunnittelijoiden rooli on ensiarvoisen t\u00e4rke\u00e4. He varmistavat sujuvat ja tehokkaat prosessit, jotka vastaavat sek\u00e4 paikallisiin ett\u00e4 maailmanlaajuisiin tarpeisiin. Haluatko ymm\u00e4rt\u00e4\u00e4, mitk\u00e4 tekij\u00e4t vaikuttavat tuotannonsuunnittelijan palkkaan, mitk\u00e4 ovat h\u00e4nen keskeiset teht\u00e4v\u00e4ns\u00e4 ja mit\u00e4 taitoja h\u00e4n tuo mukanaan Norjan kehittyvill\u00e4 markkinoilla? Syvennyt\u00e4\u00e4n n\u00e4ihin n\u00e4k\u00f6kohtiin tarkemmin seuraavissa osioissa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Palkkamaisema: Norja fokuksessa<\/h2>\n\n\n\n<p>Ennen kuin sukellamme yksityiskohtiin, asetetaan laajempi tilannekuva. Norjan keskipalkka on noin&nbsp;<strong>NOK <strong>600,976<\/strong> vuodessa<\/strong> ennen veroja. Vaikka t\u00e4m\u00e4 antaa kontekstin, tuotannonsuunnittelijan alue maalaa hieman erilaisen kuvan.<\/p>\n\n\n\n<p>Vuonna 2026 tuotannonsuunnittelija Norjassa voi odottaa ansaitsevansa vuosipalkkaa noin&nbsp;<strong>NOK 602,726<\/strong>, mik\u00e4 tarkoittaa noin<strong>&nbsp;NOK 50,227 kuukaudessa<\/strong> ennen veroja. Erityisesti t\u00e4m\u00e4 summa ylitt\u00e4\u00e4 maan keskitulon, mik\u00e4 korostaa t\u00e4h\u00e4n ammattiin liitett\u00e4v\u00e4\u00e4 arvoa. Silti on syyt\u00e4 huomata, ett\u00e4 useat tekij\u00e4t voivat vaikuttaa t\u00e4h\u00e4n palkkahaarukkaan.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-36d74987 gb-headline-text\">Tuotannonsuunnittelijoiden palkat Skandinaviassa<\/h2>\n\n\n\n<p>Kun tarkastellaan tuotannonsuunnittelijoiden palkkakehityst\u00e4 Skandinaviassa, Norjassa palkat ovat usein hieman korkeampia, aivan kuten <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-ruotsissa-2026\/\">tuotannonsuunnittelijan palkka Ruotsissa<\/a>, mik\u00e4 johtuu maan korkeammista elinkustannuksista. Sen sijaan sek\u00e4 <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-suomessa-2026\/\">tuotannonsuunnittelijan palkka Suomessa<\/a> ett\u00e4 <a href=\"\/fi\/oppaat\/tuotantosuunnittelijan-palkka-tanskassa-2026\/\">tuotannonsuunnittelijan palkka Tanskassa<\/a> tarjoavat kilpailukykyisi\u00e4 palkkalukuja t\u00e4h\u00e4n teht\u00e4v\u00e4\u00e4n, mukaillen l\u00e4heisesti omien alueidensa taloudellista dynamiikkaa. Samaan aikaan Baltian naapurit, kuten Viro, tarjoavat yleens\u00e4 vaatimattomampaa palkkaa. N\u00e4m\u00e4 erot korostavat Skandinavian moninaisia taloudellisia maisemia ja kunkin maan houkuttelevuutta tuotannon suunnittelun alan ammattilaisille.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Tuotannonsuunnittelijan palkkaan vaikuttavat tekij\u00e4t Norjassa<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-2d957da1 gb-headline-text\">Koulutus<\/h4>\n\n\n\n<p>Tuotannon suunnittelussa henkil\u00f6n muodollisen koulutuksen taso voi vaikuttaa merkitt\u00e4v\u00e4sti h\u00e4nen palkkaansa. Ne, joilla on ylempi tutkinto tai erikoistuneita sertifiointeja erityisesti toimitusketjun hallinnan tai logistiikan kaltaisilla aloilla, ansaitsevat usein korkeampaa palkkaa. T\u00e4m\u00e4 heijastaa teknisen osaamisen sek\u00e4 monimutkaisten valmistus- ja tuotantoprosessien ymm\u00e4rt\u00e4misen arvostusta.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-462b2b34 gb-headline-text\">Kokemus<\/h4>\n\n\n\n<p>Kuten monissa ammateissa, kokemuksella on keskeinen rooli tuotannonsuunnittelijan palkan m\u00e4\u00e4r\u00e4ytymisess\u00e4. Ne, jotka ovat viett\u00e4neet vuosia alalla, k\u00e4sitelleet monenlaisia haasteita ja hallitsevat suunnittelun eri osa-alueet, saavat usein parempaa korvausta. Heid\u00e4n k\u00e4yt\u00e4nn\u00f6n osaamisestaan, joka on kertynyt ajan my\u00f6t\u00e4, tulee arvokas yrityksen voimavara.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c309bf35 gb-headline-text\">Taidot<\/h4>\n\n\n\n<p>Muodollisen koulutuksen ja kokemuksen lis\u00e4ksi tietyt taidot voivat vaikuttaa tuotannonsuunnittelijan palkkaan. Edistyneiden suunnitteluohjelmistojen k\u00e4yt\u00f6n hallinta, <a href=\"\/fi\/oppaat\/lean-manufacturing-lean-manufacturing-tehokkuuden-avaaminen\/\">lean-tuotannon<\/a> periaatteiden ymm\u00e4rt\u00e4minen sek\u00e4 data-analyysi- ja ennustamiskyvyt voivat parantaa ansaintamahdollisuuksia. Yritykset etsiv\u00e4t usein henkil\u00f6it\u00e4, jotka osaavat yhdist\u00e4\u00e4 perinteiset suunnittelustrategiat nykyaikaisiin teknologisiin ty\u00f6kaluihin.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-75f3e1b7 gb-headline-text\">Sijainti<\/h4>\n\n\n\n<p>Alue tai kaupunki, jossa tuotannonsuunnittelija ty\u00f6skentelee Norjassa, voi vaikuttaa h\u00e4nen palkkaukseensa. Kaupunkikeskukset, kuten Oslo, joissa on suuri keskittym\u00e4 valmistusyrityksi\u00e4, tai alueet, joilla on korkeammat elinkustannukset, saattavat tarjota parempia palkkoja verrattuna syrj\u00e4isempiin tai v\u00e4hemm\u00e4n teollistuneisiin alueisiin.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6744e7c3 gb-headline-text\">Yrityksen koko<\/h4>\n\n\n\n<p>Suuremmilla yrityksill\u00e4 tai monikansallisilla toimijoilla on yleens\u00e4 monimutkaisemmat tuotantoprosessit ja n\u00e4in ollen ne saattavat tarjota korkeampia palkkoja suunnittelijoille. N\u00e4ill\u00e4 yrityksill\u00e4 on usein resurssit ja tarve investoida huippuosaajiin varmistaakseen tehokkuuden suuressa mittakaavassa.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e205c28d gb-headline-text\">Yrityksen tyyppi<\/h4>\n\n\n\n<p>Toimiala tai sektori, jolla yritys toimii, voi my\u00f6s vaikuttaa palkan m\u00e4\u00e4rittymiseen. Esimerkiksi korkean teknologian tai erikoistuneiden valmistusalojen tuotannonsuunnittelijat saattavat ansaita enemm\u00e4n kuin perinteisemmill\u00e4 tai laajalle levinneill\u00e4 toimialoilla ty\u00f6skentelev\u00e4t, koska heilt\u00e4 vaaditaan erikoisosaamista.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-7405e830 gb-headline-text\">Tuotannonsuunnittelijan rooli ja vastuut<\/h2>\n\n\n\n<p>Norjan teollisesti dynaamisessa ymp\u00e4rist\u00f6ss\u00e4 tuotannonsuunnittelija on elint\u00e4rke\u00e4 silta, joka yhdist\u00e4\u00e4 valmistusosaamisen ja toiminnan johdonmukaisuuden. H\u00e4nen teht\u00e4v\u00e4n\u00e4\u00e4n on ohjata tuotannon kulkua, oli kyse sitten yksitt\u00e4isest\u00e4 tuotteesta tai monipuolisesta tuotevalikoimasta, ja h\u00e4n valvoo tarkasti tuotantopolun jokaista vaihetta. H\u00e4nen p\u00e4\u00e4teht\u00e4viins\u00e4 kuuluvat:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Ennustaminen<\/strong>: Datapohjaisten oivallusten hy\u00f6dynt\u00e4minen, jotta voidaan arvioida m\u00e4\u00e4r\u00e4tyill\u00e4 ajanjaksoilla tuotettaviksi vaadittavien tuotteiden m\u00e4\u00e4r\u00e4.<\/li>\n\n\n\n<li><strong>Resurssienhallinta<\/strong>: Vastuu resurssien, olivatpa ne raaka-aineita, koneita tai ty\u00f6voimaa, harkitusta kohdentamisesta keskeytym\u00e4tt\u00f6m\u00e4n tuotannon virtauksen varmistamiseksi.<\/li>\n\n\n\n<li><strong>Aikataulutus<\/strong>: Sellaisen perusteellisen tuotantosuunnitelman laatiminen, joka vastaa organisaation tavoitteita ja markkinoiden vaatimuksia.<\/li>\n\n\n\n<li><strong>Yhteydenpito<\/strong>: Synergisten kumppanuuksien luominen organisaation eri osastojen kanssa myynnist\u00e4 hankintaan, vahvistaen yhten\u00e4ist\u00e4 tuotantopolkua.<\/li>\n\n\n\n<li><strong>Ongelmanratkaisu<\/strong>: Tuotantosyklin mahdollisten h\u00e4iri\u00f6iden kohtaaminen ja neutralointi sek\u00e4 suojautuminen takaiskuja tai toiminnallisia ongelmia vastaan.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Taidot, joita tuotannonsuunnittelija tarvitsee<\/h2>\n\n\n\n<p>Menesty\u00e4kseen teht\u00e4v\u00e4ss\u00e4\u00e4n tuotannonsuunnittelijat tarvitsevat sek\u00e4 teknisten taitojen ett\u00e4 pehmeiden taitojen yhdistelm\u00e4\u00e4:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analyyttiset kyvyt<\/strong>: Kyky k\u00e4sitell\u00e4 suuria tietom\u00e4\u00e4ri\u00e4, ennustaa kysynt\u00e4\u00e4 ja optimoida tuotantoaikatauluja.<\/li>\n\n\n\n<li><strong>Ohjelmisto-osaaminen<\/strong>: Tuotannon suunnittelun ty\u00f6kalujen ja ohjelmistojen tuntemus on usein v\u00e4ltt\u00e4m\u00e4t\u00f6nt\u00e4.<\/li>\n\n\n\n<li><strong>Viestint\u00e4taidot<\/strong>: Tehokas koordinointi eri osastojen ja sidosryhmien kanssa.<\/li>\n\n\n\n<li><strong>Ongelmanratkaisu<\/strong>: Kyky vastata odottamattomiin haasteisiin tai h\u00e4iri\u00f6ihin tuotantoprosessissa.<\/li>\n\n\n\n<li><strong>Ajanhallinta<\/strong>: Sen varmistaminen, ett\u00e4 tuotantoaikataulut pit\u00e4v\u00e4t ja teht\u00e4v\u00e4t priorisoidaan tehokkaasti.<\/li>\n\n\n\n<li><strong>Valmistuksen periaatteiden ymm\u00e4rt\u00e4minen<\/strong>: Tuotantoprosessien, laadunvalvonnan ja lean-valmistusmenetelmien tuntemus.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">APS ja teko\u00e4ly: tuotannonsuunnittelijan liittolainen<\/h2>\n\n\n\n<p><a href=\"\/fi\/\">SkyPlannerin kaltainen teko\u00e4lyll\u00e4 (AI) vahvistettu kehittynyt tuotannonsuunnittelu- ja aikataulutusj\u00e4rjestelm\u00e4 (APS)<\/a> voi auttaa valtavasti tuotannonsuunnittelijan ty\u00f6ss\u00e4. N\u00e4in se toimii:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Ennakoiva analytiikka<\/strong>: Teko\u00e4lyvetoiset APS-j\u00e4rjestelm\u00e4t pystyv\u00e4t analysoimaan valtavia tietom\u00e4\u00e4ri\u00e4 ja ennustamaan kysynt\u00e4\u00e4 huomattavan tarkasti. T\u00e4m\u00e4 mahdollistaa sen, ett\u00e4 tuotannonsuunnittelijat voivat optimoida resurssien kohdentamisen, minimoida hukan ja v\u00e4hent\u00e4\u00e4 kustannuksia.<\/li>\n\n\n\n<li><strong>Reaaliaikaiset s\u00e4\u00e4d\u00f6t<\/strong>: Teko\u00e4lyn kyky k\u00e4sitell\u00e4 tietoa nopeasti antaa APS-j\u00e4rjestelmille mahdollisuuden s\u00e4\u00e4t\u00e4\u00e4 tuotantoaikatauluja reaaliajassa ennakoimattomien muutosten, kuten \u00e4killisen laitevian tai raaka-ainepulan, perusteella.<\/li>\n\n\n\n<li><strong>Optimoitu resurssien k\u00e4ytt\u00f6<\/strong>: Analysoimalla trendej\u00e4 ja kaavoja teko\u00e4ly voi suositella optimaalista resurssien k\u00e4ytt\u00f6\u00e4, mik\u00e4 varmistaa materiaalien, koneiden ja ty\u00f6voiman mahdollisimman tehokkaan hy\u00f6dynt\u00e4misen.<\/li>\n\n\n\n<li><strong>Tehostettu yhteisty\u00f6<\/strong>: Teko\u00e4lyll\u00e4 varustettu APS voi integroitua saumattomasti muihin yritysj\u00e4rjestelmiin, mik\u00e4 edist\u00e4\u00e4 tiedon jakamista ja yhteisty\u00f6t\u00e4 osastojen, kuten hankinnan, logistiikan ja myynnin, v\u00e4lill\u00e4.<\/li>\n\n\n\n<li><strong>Skenaariosimulointi<\/strong>: Teko\u00e4ly voi simuloida erilaisia tuotantoskenaarioita, jolloin suunnittelijat voivat arvioida eri p\u00e4\u00e4t\u00f6sten mahdollisia vaikutuksia ennen varsinaista toteutusta.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Toimialat, jotka ty\u00f6llist\u00e4v\u00e4t tuotannonsuunnittelijoita Norjassa<\/h2>\n\n\n\n<p>Vaikka tuotannonsuunnittelijat ovat t\u00e4rkeit\u00e4 lukuisilla aloilla, seuraavat viisi toimialaa erottuvat yleisimpin\u00e4 ty\u00f6nantajina Norjassa:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u00d6ljy ja kaasu<\/strong>: Johtavana \u00f6ljynviej\u00e4n\u00e4 Norja luottaa vahvasti tuotannonsuunnittelijoihin \u00f6ljynporaus- ja jalostusprosessien tehostamisessa.<\/li>\n\n\n\n<li><strong>Meriteollisuus ja laivanrakennus<\/strong>: Rikkaan meriperinteens\u00e4 ansiosta Norjan laivanrakennusala etsii s\u00e4\u00e4nn\u00f6llisesti taitavia tuotannonsuunnittelijoita alusten rakentamiseen ja yll\u00e4pitoon.<\/li>\n\n\n\n<li><strong>Uusiutuva energia<\/strong>: Kest\u00e4vi\u00e4 k\u00e4yt\u00e4nt\u00f6j\u00e4 korostava Norjan uusiutuvan energian sektori, erityisesti tuuli- ja vesivoima, ty\u00f6llist\u00e4\u00e4 tuotannonsuunnittelijoita valvomaan projektien elinkaaria.<\/li>\n\n\n\n<li><strong>Kalanjalostus<\/strong>: Kalateollisuudestaan tunnettu Norja tarvitsee tuotannonsuunnittelijoita varmistamaan kalatuotteiden tehokkaan jalostuksen ja jakelun.<\/li>\n\n\n\n<li><strong>Kulutuselektroniikka<\/strong>: Kulutuselektroniikkayritykset, jotka edustavat Norjassa kasvavaa alaa, palkkaavat tuotannonsuunnittelijoita hallitsemaan erilaisten teknisten laitteiden tuotantoa.<\/li>\n<\/ol>\n\n\n\n<p>N\u00e4m\u00e4 toimialat havainnollistavat tuotannonsuunnittelijoille Norjassa tarjolla olevia monipuolisia mahdollisuuksia, joista jokainen tuo mukanaan omat haasteensa ja palkitsevuutensa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Palkan lis\u00e4ksi tulevat edut tuotannonsuunnittelijoille Norjassa<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Kattava terveydenhuolto<\/strong>: Norjalla on vankka julkinen terveydenhuoltoj\u00e4rjestelm\u00e4, joka varmistaa minimaaliset omakustannukset l\u00e4\u00e4ketieteellisest\u00e4 hoidosta.<\/li>\n\n\n\n<li><strong>Anteliaat palkalliset vapaat<\/strong>: Tuotannonsuunnittelijat hy\u00f6tyv\u00e4t usein laajennetuista palkallisten vapaiden k\u00e4yt\u00e4nn\u00f6ist\u00e4, mik\u00e4 varmistaa ty\u00f6n ja vapaa-ajan tasapainon.<\/li>\n\n\n\n<li><strong>El\u00e4kej\u00e4rjestelyt<\/strong>: Norjan el\u00e4kej\u00e4rjestelm\u00e4 on kattava ja tarjoaa turvaa el\u00e4kkeelle siirtymisen j\u00e4lkeiseen el\u00e4m\u00e4\u00e4n.<\/li>\n\n\n\n<li><strong>Jatkuvat oppimismahdollisuudet<\/strong>: Monet norjalaiset yritykset panostavat ty\u00f6ntekij\u00f6iden koulutukseen ja kehitt\u00e4miseen, mik\u00e4 varmistaa, ett\u00e4 tuotannonsuunnittelijat pysyv\u00e4t alan kehityksen k\u00e4rjess\u00e4.<\/li>\n\n\n\n<li><strong>Ty\u00f6ymp\u00e4rist\u00f6<\/strong>: Norjan painotus ty\u00f6ntekij\u00f6iden hyvinvointiin n\u00e4kyy ergonomisina ty\u00f6paikkoina, terveellisin\u00e4 ty\u00f6aikoina ja kokonaisvaltaisesti positiivisena ty\u00f6kulttuurina.<\/li>\n\n\n\n<li><strong>Muuttoapu<\/strong>: Kansainv\u00e4lisille rekrytoinneille yritykset tarjoavat usein tukea asumisavun, kielikurssien ja kotoutumisohjelmien kautta.<\/li>\n\n\n\n<li><strong>Ty\u00f6ntekij\u00f6iden hyvinvointiohjelmat<\/strong>: Kokonaisvaltaista hyvinvointia korostaen monet yritykset tarjoavat kuntosalij\u00e4senyyksi\u00e4, mielenterveystukea ja virkistystoimintaa.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Onko Norja ihanteellinen kohde tuotannonsuunnittelijoille?<\/h2>\n\n\n\n<p>Norja tarjoaa todellakin kokonaisvaltaisen kokonaisuuden, kun otat huomioon muutakin kuin pelk\u00e4t taloudelliset palkkiot. Matkansa aikana tuotannonsuunnittelijat l\u00f6yt\u00e4v\u00e4t runsaasti v\u00e4yli\u00e4 asiantuntemuksensa hiomiseen, etenkin kun huipputeknologiat yleistyv\u00e4t tuotannon suunnittelun alalla. Lis\u00e4ksi houkuttelevan palkan ohella Norjan sitoutuminen harmonisen ty\u00f6- ja yksityisel\u00e4m\u00e4n tasapainon yll\u00e4pit\u00e4miseen, sen huippuluokan valmistusmenetelm\u00e4t sek\u00e4 jatkuvan oppimisen mahdollisuudet tekev\u00e4t siit\u00e4 houkuttelevan kohteen tuotannonsuunnittelijoille maailmanlaajuisesti.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tuotannonsuunnittelijan palkka Norjassa 2026 Etusivu&nbsp;\u00bb&nbsp;Resurssit&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Norjassa 2026 Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja. T\u00e4m\u00e4 luku on hieman maan keskiarvon yl\u00e4puolella, mik\u00e4 korostaa t\u00e4h\u00e4n rooliin liitetty\u00e4 arvostusta. Norja, joka tunnetaan \u00f6ljyst\u00e4\u00e4n ja kalataloudestaan, on my\u00f6s ottanut merkitt\u00e4vi\u00e4 edistysaskeleita esimerkiksi laivanrakennuksen, raskaiden koneiden ja &#8230; <a title=\"Tuotannonsuunnittelijan palkka Norjassa 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tuotannonsuunnittelijan palkka Norjassa 2026\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":6,"featured_media":28737,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2663],"tags":[],"class_list":["post-28406","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-ura-ja-palkat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tuotannonsuunnittelijan palkka Norjassa 2026<\/title>\n<meta name=\"description\" content=\"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tuotannonsuunnittelijan palkka Norjassa 2026\" \/>\n<meta property=\"og:description\" content=\"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-26T14:51:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:00:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Tuotannonsuunnittelijan palkka Norjassa 2026\",\"datePublished\":\"2023-10-26T14:51:09+00:00\",\"dateModified\":\"2026-06-19T21:00:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/\"},\"wordCount\":1270,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Norway-scaled.jpg\",\"articleSection\":[\"oppaat\",\"Ura ja palkat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/\",\"name\":\"Tuotannonsuunnittelijan palkka Norjassa 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Norway-scaled.jpg\",\"datePublished\":\"2023-10-26T14:51:09+00:00\",\"dateModified\":\"2026-06-19T21:00:19+00:00\",\"description\":\"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Norway-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Norway-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Production Planner Norway\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tuotantosuunnittelijan-palkka-norjassa-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tuotannonsuunnittelijan palkka Norjassa 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tuotannonsuunnittelijan palkka Norjassa 2026","description":"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/","og_locale":"fi_FI","og_type":"article","og_title":"Tuotannonsuunnittelijan palkka Norjassa 2026","og_description":"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-26T14:51:09+00:00","article_modified_time":"2026-06-19T21:00:19+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"SkyPlanner","Arvioitu lukuaika":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Tuotannonsuunnittelijan palkka Norjassa 2026","datePublished":"2023-10-26T14:51:09+00:00","dateModified":"2026-06-19T21:00:19+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/"},"wordCount":1270,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg","articleSection":["oppaat","Ura ja palkat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/","name":"Tuotannonsuunnittelijan palkka Norjassa 2026","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg","datePublished":"2023-10-26T14:51:09+00:00","dateModified":"2026-06-19T21:00:19+00:00","description":"Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg","width":2560,"height":1707,"caption":"Production Planner Norway"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnittelijan-palkka-norjassa-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tuotannonsuunnittelijan palkka Norjassa 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Norway-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fi\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Tuotannonsuunnittelijan palkka Norjassa 2026 Etusivu&nbsp;\u00bb&nbsp;Resurssit&nbsp;\u00bb&nbsp;Tuotannonsuunnittelijan palkka Norjassa 2026 Tuotannonsuunnittelijan keskipalkka Norjassa vuonna 2026 on noin 602,726 NOK vuodessa, mik\u00e4 vastaa noin 50,227 NOK kuukaudessa ennen veroja. T\u00e4m\u00e4 luku on hieman maan keskiarvon yl\u00e4puolella, mik\u00e4 korostaa t\u00e4h\u00e4n rooliin liitetty\u00e4 arvostusta. Norja, joka tunnetaan \u00f6ljyst\u00e4\u00e4n ja kalataloudestaan, on my\u00f6s ottanut merkitt\u00e4vi\u00e4 edistysaskeleita esimerkiksi laivanrakennuksen, raskaiden koneiden ja&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/28406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=28406"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/28406\/revisions"}],"predecessor-version":[{"id":94296,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/28406\/revisions\/94296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/28737"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=28406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=28406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=28406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}