{"id":104561,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104561"},"modified":"2026-10-20T19:34:46","modified_gmt":"2026-10-20T19:34:46","slug":"ensisaanto","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/","title":{"rendered":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ensisaanto (FPY) kertoo, kuinka suuri osuus kappaleista t\u00e4ytt\u00e4\u00e4 sovitut laatuvaatimukset m\u00e4\u00e4ritellyss\u00e4 prosessissa ensimm\u00e4isell\u00e4 yrityksell\u00e4 ilman korjausta, uusintaty\u00f6t\u00e4 tai hyl\u00e4tyn tuloksen j\u00e4lkeist\u00e4 uusintatesti\u00e4. Se osoittaa, kuinka suuri osa tuotannosta onnistui kerralla, ei sit\u00e4, kuinka suuri osa saatiin lopulta hyv\u00e4ksytyksi.<\/p>\n\n\n<p>Ero on t\u00e4rke\u00e4, kun valmistuneiden kappaleiden m\u00e4\u00e4r\u00e4 n\u00e4ytt\u00e4\u00e4 hyv\u00e4lt\u00e4 mutta tehtaan on vaikea pysy\u00e4 aikataulussa. Korjatut osat voidaan ehk\u00e4 toimittaa, mutta niiden saaminen toimituskuntoon on vienyt aikaa, jota muut tilaukset olisivat tarvinneet. Kun FPY:n rinnalla seurataan korjaamiseen k\u00e4ytetty\u00e4 ty\u00f6t\u00e4, n\u00e4hd\u00e4\u00e4n se, mik\u00e4 hyv\u00e4ksyttyjen kappaleiden kokonaism\u00e4\u00e4r\u00e4st\u00e4 ei k\u00e4y ilmi. Kun korjausty\u00f6 yhdistet\u00e4\u00e4n SkyPlannerin tuotantokirjauksiin ja hienokuormitukseen, sen vaikutukset kapasiteettiin ja toimituksiin on helpompi hahmottaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4in lasket ensisaannon<\/h2>\n\n\n<p>K\u00e4yt\u00e4 seuraavaa kaavaa:<\/p>\n\n\n<p><strong>Ensisaanto (%) = Ensimm\u00e4isell\u00e4 yrityksell\u00e4 hyv\u00e4ksytyt kappaleet \u00f7 M\u00e4\u00e4riteltyyn prosessiin tulleet kappaleet \u00d7 100<\/strong><\/p>\n\n\n<p>Laske yksitt\u00e4isi\u00e4 kappaleita, \u00e4l\u00e4 tarkastuskertoja tai yksitt\u00e4isi\u00e4 virheit\u00e4. Osa, joka ensin hyl\u00e4t\u00e4\u00e4n ja sitten korjataan ja hyv\u00e4ksyt\u00e4\u00e4n, kuuluu lopulliseen hyv\u00e4ksyttyyn tuotantoon mutta ei ensisaantoon. Vaikka samassa osassa olisi useita virheit\u00e4, se lasketaan t\u00e4ss\u00e4 vain yhdeksi hyl\u00e4tyksi kappaleeksi.<\/p>\n\n\n<p>Rajaa mitattava prosessi ennen lukujen ker\u00e4\u00e4mist\u00e4. Voit mitata esimerkiksi koneistusvaihetta, testauspistett\u00e4 tai koko valmistusreitti\u00e4. Osoittajan ja nimitt\u00e4j\u00e4n on koskettava samaa kappalejoukkoa t\u00e4m\u00e4n rajauksen sis\u00e4ll\u00e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Esimerkki: ensisaanto 90 %, lopullinen saanto 96 %<\/h3>\n\n\n<p>Otetaan esimerkiksi 500 koneistetun osan er\u00e4, jonka kaikkien osien ensimm\u00e4iset tarkastustulokset ovat tiedossa:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ensimm\u00e4isen yrityksen tulos<\/th><th>Osia<\/th><th>Mit\u00e4 seuraavaksi tapahtuu<\/th><\/tr><\/thead><tbody><tr><td>Hyv\u00e4ksytty ilman korjausta<\/td><td>450<\/td><td>Valmiita seuraavaan ty\u00f6vaiheeseen<\/td><\/tr><tr><td>L\u00e4hetetty korjattavaksi<\/td><td>40<\/td><td>30 hyv\u00e4ksyt\u00e4\u00e4n my\u00f6hemmin, 10 p\u00e4\u00e4tyy lopulta romuksi<\/td><\/tr><tr><td>Romutettu heti<\/td><td>10<\/td><td>Eiv\u00e4t voi edet\u00e4 seuraavaan vaiheeseen<\/td><\/tr><tr><td>Ty\u00f6vaiheeseen tulleita yhteens\u00e4<\/td><td>500<\/td><td>Jokaisella osalla on yksi ensimm\u00e4isen yrityksen tulos<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ensisaanto on:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90 %<\/strong><\/p>\n\n\n<p>Korjausty\u00f6n j\u00e4lkeen hyv\u00e4ksyttyj\u00e4 osia on 480: alun perin hyv\u00e4ksytyt 450 osaa ja 30 onnistuneesti korjattua osaa. Er\u00e4n lopullinen saanto on siis:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96 %<\/strong><\/p>\n\n\n<p>Molemmat prosenttiluvut ovat hy\u00f6dyllisi\u00e4. FPY kuvaa onnistumista ensimm\u00e4isell\u00e4 yrityksell\u00e4. Lopullinen saanto kertoo lopulta hyv\u00e4ksyttyjen osuuden, johon sis\u00e4ltyv\u00e4t my\u00f6s onnistuneesti korjatut osat. Jos raportoidaan vain 96 %, n\u00e4iden 30 osan korjaamiseen tarvittu ty\u00f6 j\u00e4\u00e4 piiloon.<\/p>\n\n\n<p>My\u00f6sk\u00e4\u00e4n FPY-laskennassa j\u00e4ljelle j\u00e4\u00e4v\u00e4 10 % ei ole romuprosentti. T\u00e4ss\u00e4 esimerkiss\u00e4 lopulta romutetaan 20 osaa, joten lopullinen romuprosentti on 4 %. Loput 6 % alkuper\u00e4isest\u00e4 er\u00e4st\u00e4 saatiin hyv\u00e4ksytyksi lis\u00e4ty\u00f6ll\u00e4. Pelk\u00e4n romuosuuden v\u00e4hent\u00e4minen antaisi lopullisen saannon, ei ensisaantoa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Varmista laskentas\u00e4\u00e4nn\u00f6t ennen kuin luotat prosenttilukuun<\/h2>\n\n\n<p>Itse laskutoimitus on helppo. Sen varmistaminen, ett\u00e4 ensimm\u00e4isell\u00e4 yrityksell\u00e4 tarkoitetaan kirjauksissa aina samaa asiaa, vaatii enemm\u00e4n huolellisuutta, etenkin jos tuotanto- ja tarkastuskirjaukset tulevat eri j\u00e4rjestelmist\u00e4.<\/p>\n\n\n<p>1. <strong>Valitse yksi prosessi ja vertailukelpoinen tuoteryhm\u00e4.<\/strong> Koneistuksen ensisaanto ei tarkoita koko kokoonpanon lopullista hyv\u00e4ksynt\u00e4\u00e4. M\u00e4\u00e4rittele valmistusreitit ja hyv\u00e4ksymisvaatimukset selke\u00e4sti, jotta tuotejakauman muutos ei n\u00e4yt\u00e4 laadun paranemiselta.<\/p>\n\n\n<p>2. <strong>Varmista, ett\u00e4 tulokset koskevat juuri mitattavaa kappalejoukkoa.<\/strong> Aloita er\u00e4st\u00e4 tai muusta j\u00e4ljitett\u00e4v\u00e4st\u00e4 joukosta, jonka ensimm\u00e4isten yritysten tulokset ovat tiedossa. Jos jaat t\u00e4n\u00e4\u00e4n hyv\u00e4ksytysti valmistuneiden m\u00e4\u00e4r\u00e4n t\u00e4n\u00e4\u00e4n aloitettujen m\u00e4\u00e4r\u00e4ll\u00e4, laskentaan voi p\u00e4\u00e4ty\u00e4 eri kappaleita. N\u00e4in k\u00e4y erityisesti silloin, kun ty\u00f6t jatkuvat vuorosta toiseen.<\/p>\n\n\n<p>3. <strong>S\u00e4ilyt\u00e4 alkuper\u00e4inen tulos.<\/strong> Pid\u00e4 ensimm\u00e4isen yrityksen hyv\u00e4ksynt\u00e4 erill\u00e4\u00e4n korjauksen tai uusintatestauksen j\u00e4lkeisest\u00e4 hyv\u00e4ksynn\u00e4st\u00e4. Jos hyl\u00e4tty tulos korvataan hyv\u00e4ksytyll\u00e4 korjatun osan l\u00e4p\u00e4istess\u00e4 tarkastuksen, historia n\u00e4ytt\u00e4\u00e4 paremmalta, vaikka tapahtumat eiv\u00e4t muutu.<\/p>\n\n\n<p>4. <strong>Laske kukin kappale vain kerran m\u00e4\u00e4ritellyn rajauksen sis\u00e4ll\u00e4.<\/strong> Useat virheet, uusintatestit tai toistuvat aikakirjaukset eiv\u00e4t lis\u00e4\u00e4 alkuper\u00e4isten kappaleiden m\u00e4\u00e4r\u00e4\u00e4. K\u00e4yt\u00e4 kappalekohtaisia tunnisteita tai t\u00e4sm\u00e4ytetty\u00e4 er\u00e4kirjanpitoa, jossa m\u00e4\u00e4r\u00e4t ja korjaushistoria s\u00e4ilyv\u00e4t.<\/p>\n\n\n<p>5. <strong>Tuo avoimet tulokset n\u00e4kyviin.<\/strong> Tarkastusta odottavat osat eiv\u00e4t ole automaattisesti hyv\u00e4ksyttyj\u00e4 eiv\u00e4tk\u00e4 hyl\u00e4ttyj\u00e4. N\u00e4yt\u00e4 niiden m\u00e4\u00e4r\u00e4 ja vahvista seurattavan kappalejoukon FPY vasta, kun kaikki ensimm\u00e4isten yritysten tulokset ovat tiedossa. \u00c4l\u00e4 j\u00e4t\u00e4 hankalia osia vaivihkaa pois laskennasta.<\/p>\n\n\n<p>Ty\u00f6vaiheen normaaliin reittiin voi kuulua useita suunniteltuja tarkastuksia. Sovitun tarkastussarjan suorittaminen oikein ensimm\u00e4isell\u00e4 kerralla on eri asia kuin hyl\u00e4tyn testin uusiminen tai virheen korjaaminen. Kirjaa t\u00e4m\u00e4 ero mittarin m\u00e4\u00e4ritelm\u00e4\u00e4n ja noudata sit\u00e4 johdonmukaisesti.<\/p>\n\n\n<p>Jos raportissa ovat vain <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantoraportti\/\">valmistuneiden ja viallisten kappaleiden kokonaism\u00e4\u00e4r\u00e4t<\/a>, tarkista kenttien merkitys ennen kuin k\u00e4yt\u00e4t niit\u00e4 FPY-laskentaan. Sinun on tiedett\u00e4v\u00e4, sis\u00e4ltyv\u00e4tk\u00f6 korjatut osat hyv\u00e4ksyttyjen m\u00e4\u00e4r\u00e4\u00e4n ja onko toistuva k\u00e4sittely laskettu mukaan useammin kuin kerran.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ensisaanto ja l\u00e4pivy\u00f6rytetty saanto<\/h2>\n\n\n<p>Yksitt\u00e4inen ty\u00f6vaihe voi n\u00e4ytt\u00e4\u00e4 sujuvan hyvin, vaikka koko valmistusreitill\u00e4 tarvitaan paljon korjausty\u00f6t\u00e4. L\u00e4pivy\u00f6rytetty saanto (RTY) kertoo, kuinka per\u00e4kk\u00e4isten ty\u00f6vaiheiden ensisaannot vaikuttavat yhdess\u00e4 koko reitin tulokseen.<\/p>\n\n\n<p>Kun per\u00e4kk\u00e4isten vaiheiden laskentaperusteet ovat yhten\u00e4iset, kerro niiden ensisaannot kesken\u00e4\u00e4n desimaalilukuina:<\/p>\n\n\n<p><strong>RTY (%) = Vaiheen 1 ensisaanto \u00d7 Vaiheen 2 ensisaanto \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>Kuvitellaan, ett\u00e4 seuraat 1 000 osan etenemist\u00e4 kolmen ty\u00f6vaiheen l\u00e4pi. T\u00e4ss\u00e4 esimerkiss\u00e4 seurattavassa joukossa jatkavat vain osat, jotka on hyv\u00e4ksytty joka vaiheessa ensimm\u00e4isell\u00e4 yrityksell\u00e4. Korjatut osat eiv\u00e4t palaa t\u00e4h\u00e4n joukkoon.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ty\u00f6vaihe<\/th><th>Seurattavia osia vaiheeseen tullessa<\/th><th>Ensimm\u00e4isell\u00e4 yrityksell\u00e4 hyv\u00e4ksyttyj\u00e4 osia<\/th><th>Vaiheen ensisaanto<\/th><\/tr><\/thead><tbody><tr><td>Koneistus<\/td><td>1 000<\/td><td>900<\/td><td>90 %<\/td><\/tr><tr><td>Viimeistely<\/td><td>900<\/td><td>810<\/td><td>90 %<\/td><\/tr><tr><td>Testaus<\/td><td>810<\/td><td>729<\/td><td>90 %<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9 % RTY<\/strong><\/p>\n\n\n<p>Jokaisen ty\u00f6vaiheen ensisaanto on 90 %, mutta alkuper\u00e4isist\u00e4 1 000 osasta vain 729 l\u00e4p\u00e4isee kaikki kolme vaihetta ilman hylk\u00e4yst\u00e4. Kolmen prosenttiluvun keskiarvo olisi 90 %, jolloin vaiheiden yhteisvaikutus j\u00e4isi piiloon.<\/p>\n\n\n<p>Todellisessa tuotannossa korjatut osat voivat palata tuotantovirtaan, ja tuotteet voivat kulkea eri reittej\u00e4. K\u00e4yt\u00e4 vaihekohtaisia ensisaantoja, jotka kuvaavat samaa valmistusreitti\u00e4 ja perustuvat yhten\u00e4isiin laskentas\u00e4\u00e4nt\u00f6ihin. \u00c4l\u00e4 kerro toisiinsa liittym\u00e4tt\u00f6mi\u00e4 osastokohtaisia keskiarvoja kesken\u00e4\u00e4n ja esit\u00e4 tulosta koko reitilt\u00e4 mitattuna onnistumisasteena. Kun s\u00e4ilyt\u00e4t jokaisen kappaleen ensimm\u00e4isten yritysten historian, voit tarkistaa, kuinka moni alkuper\u00e4isist\u00e4 kappaleista todella l\u00e4p\u00e4isi koko reitin ilman korjausta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Millainen ensisaanto on hyv\u00e4?<\/h2>\n\n\n<p>Hy\u00f6dyllinen tavoite ottaa huomioon tuotteen, prosessin, laatuvaatimukset ja ep\u00e4onnistumisen seuraukset. Yleinen vertailuarvo ei riit\u00e4 kertomaan, suoriutuuko juuri sinun tuotantosi hyvin.<\/p>\n\n\n<p>Aloita tarkastelemalla vertailukelpoisten t\u00f6iden kehityst\u00e4. Katso prosenttiluvun rinnalla mitattujen kappaleiden m\u00e4\u00e4r\u00e4\u00e4, hylk\u00e4ysten syit\u00e4 ja korjausty\u00f6n m\u00e4\u00e4r\u00e4\u00e4. Korkeampi FPY kertoo todellisesta muutoksesta vain, jos hyv\u00e4ksymiss\u00e4\u00e4nn\u00f6t pysyv\u00e4t samoina. Kyse ei ole parannuksesta, jos tarkastuskriteerej\u00e4 on vain h\u00f6llennetty tai hankalat kappaleet on poistettu nimitt\u00e4j\u00e4st\u00e4.<\/p>\n\n\n<p>Kun haluat parantaa tulosta, etsi toistuva ongelma, johon voit vaikuttaa. Ryhmittele ensimm\u00e4isen yrityksen hylk\u00e4ykset ty\u00f6vaiheen ja vahvistetun syyn mukaan. Yhden tuotteen toistuva mittavirhe voi ohjata tutkimaan ty\u00f6kalua, kiinnitint\u00e4, materiaalia tai menetelm\u00e4\u00e4, mutta pelkk\u00e4 prosenttiluku ei kerro, mik\u00e4 niist\u00e4 on syyn\u00e4. K\u00e4y havainnot l\u00e4pi ty\u00f6t\u00e4 tekevien ihmisten kanssa, korjaa syy ja mittaa vertailukelpoista tuotantoa uudelleen.<\/p>\n\n\n<p>Huomioi my\u00f6s korjausty\u00f6n aiheuttama kuormitus. Kahden ty\u00f6vaiheen FPY voi olla sama, mutta seuraukset voivat olla hyvin erilaiset, jos toisessa riitt\u00e4\u00e4 nopea korjaus ja toisessa korjausty\u00f6 sitoo yhteisen koneen tunneiksi. T\u00e4ll\u00f6in laatutulos vaikuttaa siihen, miten tuotanto suunnitellaan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Laske FPY:n taustalla olevan korjausty\u00f6n todellinen kapasiteettitarve<\/h2>\n\n\n<p>Palataan 500 kappaleen er\u00e4\u00e4n. Oletetaan, ett\u00e4 jokainen sen 40 korjausyrityksest\u00e4 vie samalla ty\u00f6st\u00f6keskuksella 12 minuuttia lis\u00e4aikaa riippumatta siit\u00e4, hyv\u00e4ksyt\u00e4\u00e4nk\u00f6 kappale lopulta vai romutetaanko se.<\/p>\n\n\n<p><strong>40 korjausyrityst\u00e4 \u00d7 12 minuuttia = 480 minuuttia = 8 konetuntia<\/strong><\/p>\n\n\n<p>Lopullisen saannon raportissa n\u00e4kyy 480 hyv\u00e4ksytty\u00e4 kappaletta. Tuotantosuunnitelmassa on huomioitava my\u00f6s nuo kahdeksan lis\u00e4tuntia. Ylim\u00e4\u00e4r\u00e4iset asetukset, tarkastukset tai k\u00e4sittelyt voivat vaatia lis\u00e4\u00e4 aikaa muualla.<\/p>\n\n\n<p>\u00c4l\u00e4 oleta, ett\u00e4 10 %:n hylk\u00e4ysosuus ensimm\u00e4isell\u00e4 yrityksell\u00e4 tarkoittaa t\u00e4sm\u00e4lleen 10 %:n kapasiteettimenetyst\u00e4. Korjausty\u00f6n reitit ja kestot vaihtelevat. Laske todellinen ty\u00f6m\u00e4\u00e4r\u00e4 niille resursseille, joilla ty\u00f6 on teht\u00e4v\u00e4. Pid\u00e4 my\u00f6s konetunnit ja ty\u00f6ntekij\u00e4tunnit erill\u00e4\u00e4n, kun ne kuvaavat eri kapasiteettirajoitteita.<\/p>\n\n\n<p>Jos ty\u00f6st\u00f6keskuksen kapasiteetti on jo varattu t\u00e4rke\u00e4n toimituksen l\u00e4hetykseen asti, korjausty\u00f6n sovittaminen erilliseen sivujonoon ei luo lis\u00e4\u00e4 kapasiteettia. Se muuttaa sit\u00e4, mik\u00e4 tilaus voi valmistua ensin. Kun ristiriita n\u00e4kyy ajoissa, ehdit p\u00e4\u00e4tt\u00e4\u00e4 ty\u00f6j\u00e4rjestyksest\u00e4, k\u00e4ytt\u00e4\u00e4 toista soveltuvaa resurssia tai harkita toimituslupausta uudelleen ennen kuin tilanne yll\u00e4tt\u00e4\u00e4 viime hetkell\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ota kirjattu korjausty\u00f6 osaksi seuraavaa tuotantosuunnitelmaa SkyPlannerilla<\/h2>\n\n\n<p>SkyPlanner yhdist\u00e4\u00e4 tuotannon aikakirjaukset, yksityiskohtaiset raportit ja teko\u00e4lypohjaisen hienokuormituksen. Jos korjausty\u00f6t h\u00e4iritsev\u00e4t jatkuvasti tehtaan toimituksia, seuraava hy\u00f6dyllinen askel on tehd\u00e4 niiden kuormitus n\u00e4kyv\u00e4ksi ja varata hyv\u00e4ksytyille korjaust\u00f6ille realistinen paikka asiakastilausten rinnalle.<\/p>\n\n\n<p>SkyPlannerin Timer-toiminnolla kirjataan ty\u00f6aikaa sek\u00e4 valmistuneiden tai viallisten kappaleiden m\u00e4\u00e4ri\u00e4. All Timelogs Report -raportti yhdist\u00e4\u00e4 kirjauksiin ty\u00f6n, ty\u00f6vaiheen, ty\u00f6pisteen, henkil\u00f6n, aloitus- ja lopetusajat, valmistuneet ja vialliset kappaleet, kirjatun ajan sek\u00e4 muistiinpanot. Raportissa kirjauksia voi tarkastella, muokata ja hyv\u00e4ksy\u00e4.<\/p>\n\n\n<p>Kun korjausty\u00f6 on yksil\u00f6ity ty\u00f6n tiedoissa ja aikakirjauksissa, voit selvitt\u00e4\u00e4, mihin siihen kirjattu aika kului. N\u00e4in aika ei huku erittelem\u00e4tt\u00f6m\u00e4\u00e4n p\u00e4iv\u00e4n kokonaissummaan. S\u00e4ilyt\u00e4 laatu- tai MES-j\u00e4rjestelm\u00e4n tiedot ensimm\u00e4isell\u00e4 yrityksell\u00e4 hyv\u00e4ksytyist\u00e4 kappaleista ja korjaushistoriasta FPY-laskentaa varten. Ne selitt\u00e4v\u00e4t laatutuloksen, ja niihin liittyv\u00e4t aikakirjaukset kertovat korjausty\u00f6n vaatimasta ajasta.<\/p>\n\n\n<p>Tuo sitten <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tyomaarain\/\">hyv\u00e4ksytyt korjaavat ty\u00f6vaiheet<\/a>, niiden kestot ja niihin soveltuvat resurssit aikatauluun. SkyPlannerin hienokuormituksesta vastaava teko\u00e4ly Arcturus ajoittaa ty\u00f6t m\u00e4\u00e4ritellyn kapasiteetin, ty\u00f6vaiheiden riippuvuuksien ja prioriteettien perusteella. Gantt-aikajana n\u00e4ytt\u00e4\u00e4 n\u00e4in muodostuvan ty\u00f6j\u00e4rjestyksen ja valmistumisp\u00e4iv\u00e4t. Sin\u00e4 p\u00e4\u00e4t\u00e4t prioriteeteista ja siit\u00e4, mitk\u00e4 p\u00e4\u00e4t\u00f6kset pidet\u00e4\u00e4n voimassa. Arcturus hoitaa toisiinsa kytkeytyvien t\u00f6iden ajoituslaskennan.<\/p>\n\n\n<p>Kuvitteellisen esimerkkier\u00e4n kohdalla kysymys on konkreettinen: mihin kahdeksan ylim\u00e4\u00e4r\u00e4ist\u00e4 konetuntia mahtuu, ja mit\u00e4 tapahtuu tilauksille, jotka jo k\u00e4ytt\u00e4v\u00e4t samaa resurssia? <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">Yhteisen suunnitelman<\/a> uudelleenlaskenta tekee t\u00e4m\u00e4n valintatilanteen n\u00e4kyv\u00e4ksi ilman, ett\u00e4 jokaisen vaikutuspiiriin kuuluvan ty\u00f6pisteen erillist\u00e4 ty\u00f6jonoa tarvitsee korjata k\u00e4sin.<\/p>\n\n\n<p>SkyPlanner voidaan integroida mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapinnan kautta. Voit s\u00e4ilytt\u00e4\u00e4 tilaukset ja laatuhistorian nykyisiss\u00e4 j\u00e4rjestelmiss\u00e4 ja tuoda niist\u00e4 syntyv\u00e4t ty\u00f6t osaksi \u00e4\u00e4relliseen kapasiteettiin perustuvaa hienokuormitusta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Selvit\u00e4, miten ensimm\u00e4isen yrityksen hylk\u00e4ykset vaikuttavat toimituksiin<\/h2>\n\n\n<p>Valitse yksi ty\u00f6vaihe, jossa lopullinen hyv\u00e4ksytty kappalem\u00e4\u00e4r\u00e4 peitt\u00e4\u00e4 toistuvasti alleen ylim\u00e4\u00e4r\u00e4ist\u00e4 ty\u00f6t\u00e4. Ota SkyPlanner-esittelyyn mukaan sen ensimm\u00e4isen yrityksen tulokset, tyypillinen hyv\u00e4ksytty korjausreitti ja asiakastilaus, johon korjausty\u00f6 vaikuttaa.<\/p>\n\n\n<p>N\u00e4in saat selke\u00e4n l\u00e4ht\u00f6kohdan sen tarkasteluun, miten tuotantokirjaukset ja yhteinen aikataulu voivat auttaa tiimi\u00e4si reagoimaan: selvitt\u00e4m\u00e4\u00e4n korjausty\u00f6n vaatiman kuormituksen, tarkastelemaan kapasiteettiristiriitaa ja tekem\u00e4\u00e4n seuraavan toimitusp\u00e4\u00e4t\u00f6ksen suunnitelman pohjalta, joka huomioi my\u00f6s j\u00e4ljell\u00e4 olevat ty\u00f6t. <a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a>, jossa voimme tarkastella prosessiasi, tai <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile ensin SkyPlanneria demotiedoilla<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6 Etusivu &raquo; Resurssit &raquo; Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6 Ensisaanto (FPY) kertoo, kuinka suuri osuus kappaleista t\u00e4ytt\u00e4\u00e4 sovitut laatuvaatimukset m\u00e4\u00e4ritellyss\u00e4 prosessissa ensimm\u00e4isell\u00e4 yrityksell\u00e4 ilman korjausta, uusintaty\u00f6t\u00e4 tai hyl\u00e4tyn tuloksen j\u00e4lkeist\u00e4 uusintatesti\u00e4. Se osoittaa, kuinka suuri osa tuotannosta onnistui kerralla, ei sit\u00e4, kuinka suuri osa saatiin lopulta &#8230; <a title=\"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2550],"tags":[],"class_list":["post-104561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-tuotannon-tehokkuus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6<\/title>\n<meta name=\"description\" content=\"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\" \/>\n<meta property=\"og:description\" content=\"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:34:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:34:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/\"},\"wordCount\":1743,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"oppaat\",\"Tuotannon tehokkuus\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/\",\"name\":\"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:34:46+00:00\",\"description\":\"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/ensisaanto\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6","description":"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/","og_locale":"fi_FI","og_type":"article","og_title":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6","og_description":"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:34:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:34:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/"},"wordCount":1743,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["oppaat","Tuotannon tehokkuus"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/","name":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:34:46+00:00","description":"Laske ensisaanto ilman korjattuja osia. Katso, miten korjausty\u00f6 vie kapasiteettia ja miten SkyPlanner auttaa huomioimaan sen suunnittelussa.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/ensisaanto\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6 Etusivu &raquo; Resurssit &raquo; Ensisaanto: kaava, esimerkki ja piiloon j\u00e4\u00e4v\u00e4 korjausty\u00f6 Ensisaanto (FPY) kertoo, kuinka suuri osuus kappaleista t\u00e4ytt\u00e4\u00e4 sovitut laatuvaatimukset m\u00e4\u00e4ritellyss\u00e4 prosessissa ensimm\u00e4isell\u00e4 yrityksell\u00e4 ilman korjausta, uusintaty\u00f6t\u00e4 tai hyl\u00e4tyn tuloksen j\u00e4lkeist\u00e4 uusintatesti\u00e4. Se osoittaa, kuinka suuri osa tuotannosta onnistui kerralla, ei sit\u00e4, kuinka suuri osa saatiin lopulta&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=104561"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104561\/revisions"}],"predecessor-version":[{"id":104623,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104561\/revisions\/104623"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=104561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=104561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=104561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}