{"id":104438,"date":"2026-10-20T17:47:49","date_gmt":"2026-10-20T17:47:49","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104438"},"modified":"2026-10-20T17:47:59","modified_gmt":"2026-10-20T17:47:59","slug":"taloudellinen-valmistuserakoko","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/","title":{"rendered":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Taloudellinen valmistuser\u00e4koko (EPQ) minimoi asetus- ja varastointikustannusten summan mallissa, jossa tuotteita valmistetaan v\u00e4hitellen ja kulutetaan samanaikaisesti. Se auttaa vastaamaan tuttuun kysymykseen: <strong>kuinka paljon kannattaa valmistaa ennen kuin tuotanto pys\u00e4ytet\u00e4\u00e4n ja tehd\u00e4\u00e4n seuraava asetus?<\/strong><\/p>\n\n\n<p>Suuremmat valmistuser\u00e4t v\u00e4hent\u00e4v\u00e4t asetusten m\u00e4\u00e4r\u00e4\u00e4 mutta kasvattavat varastoa. Pienemm\u00e4t er\u00e4t pienent\u00e4v\u00e4t varastoa, mutta asetuksia joudutaan tekem\u00e4\u00e4n useammin. EPQ laskee n\u00e4iden kustannusten perusteella taloudellisen er\u00e4koon vakaissa, ennakoitavissa olosuhteissa.<\/p>\n\n\n<p>Seuraavaksi on selvitett\u00e4v\u00e4, sopiiko laskettu er\u00e4koko tehtaasi tuotantoon. Laskennallisesti taloudellinen er\u00e4 voi silti viiv\u00e4stytt\u00e4\u00e4 toista tuotetta, joka tarvitsee samaa konetta. SkyPlanner APS yhdist\u00e4\u00e4 valitsemasi er\u00e4koot materiaaleihin, kapasiteettiin ja toimitusten t\u00e4rkeysj\u00e4rjestykseen. N\u00e4in voit arvioida vaikutuksia aikatauluun rakentamatta jokaisen koneen ty\u00f6jonoa k\u00e4sin uudelleen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miten EPQ eroaa EOQ:sta?<\/h2>\n\n\n<p>Taloudellisen tilauser\u00e4koon (EOQ) perusmallissa koko t\u00e4ydennyser\u00e4n oletetaan tulevan saataville kerralla. Varastom\u00e4\u00e4r\u00e4 kasvaa toimituksen saapuessa ja pienenee sitten kulutuksen my\u00f6t\u00e4.<\/p>\n\n\n<p>EPQ-mallissa varasto ei t\u00e4ydenny kerralla, vaan m\u00e4\u00e4r\u00e4tyll\u00e4 tuotantonopeudella. Osa valmistuvista tuotteista kulutetaan jo tuotannon aikana. Siksi varasto kasvaa tuotanto- ja kulutusnopeuden erotuksen verran, ei koko tuotantonopeudella. Kun er\u00e4n valmistus p\u00e4\u00e4ttyy, kulutus pienent\u00e4\u00e4 kertynytt\u00e4 varastoa seuraavan t\u00e4ydennysjakson alkuun asti.<\/p>\n\n\n<p>EPQ soveltuu siksi toistuvasti valmistettaville komponenteille, joita voidaan siirt\u00e4\u00e4 v\u00e4hitellen varastoon tai seuraavaan ty\u00f6vaiheeseen. Samasta mallista k\u00e4ytet\u00e4\u00e4n my\u00f6s nimityksi\u00e4 taloudellinen tuotantoer\u00e4koko ja taloudellinen er\u00e4koko. Ratkaiseva ero EOQ:n perusmalliin on tuotteiden asteittainen saatavuus, ei pelk\u00e4st\u00e4\u00e4n se, onko tilaus sis\u00e4inen vai ulkoinen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Taloudellisen valmistuser\u00e4koon kaava<\/h2>\n\n\n<p>Kun kysynt\u00e4 ja varastointikustannus on ilmoitettu vuositasolla, laskentakaava on:<\/p>\n\n\n<p><strong>EPQ = \u221a[2 \u00d7 D \u00d7 S \/ (H \u00d7 (1 \u2212 d\/p))]<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tunnus<\/th><th>Merkitys<\/th><th>T\u00e4ss\u00e4 k\u00e4ytetyt yksik\u00f6t<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Vuoden kokonaiskysynt\u00e4<\/td><td>Kpl\/vuosi<\/td><\/tr><tr><td>S<\/td><td>Kiinte\u00e4 asetuskustannus valmistuser\u00e4\u00e4 kohti<\/td><td>Rahayksikk\u00f6\u00e4\/er\u00e4<\/td><\/tr><tr><td>H<\/td><td>Yhden kappaleen vuotuinen varastointikustannus<\/td><td>Rahayksikk\u00f6\u00e4\/kpl\/vuosi<\/td><\/tr><tr><td>d<\/td><td>Kysynt\u00e4- tai kulutusnopeus<\/td><td>Kpl\/ty\u00f6p\u00e4iv\u00e4<\/td><\/tr><tr><td>p<\/td><td>Tuotantonopeus nimikkeen valmistuksen aikana<\/td><td>Kpl\/ty\u00f6p\u00e4iv\u00e4<\/td><\/tr><tr><td>Q<\/td><td>Yhdess\u00e4 er\u00e4ss\u00e4 valmistettava m\u00e4\u00e4r\u00e4<\/td><td>Kpl<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>K\u00e4yt\u00e4 yhten\u00e4isi\u00e4 aikayksik\u00f6it\u00e4.<\/strong> D ja H ilmoitetaan samalle vuoden jaksolle, ja d:n ja p:n aikayksik\u00f6n on oltava kesken\u00e4\u00e4n sama. Jos tuotanto mitataan ty\u00f6p\u00e4iv\u00e4\u00e4 kohti, laske d jakamalla vuosikysynt\u00e4 ty\u00f6p\u00e4ivien m\u00e4\u00e4r\u00e4ll\u00e4, ei kalenterip\u00e4ivien m\u00e4\u00e4r\u00e4ll\u00e4.<\/p>\n\n\n<p>K\u00e4yt\u00e4 p:n arvona nimikkeen tuotantonopeutta silloin, kun sit\u00e4 valmistetaan. \u00c4l\u00e4 k\u00e4yt\u00e4 vuosituotannosta laskettua keskiarvoa, johon sis\u00e4ltyv\u00e4t my\u00f6s viikot, jolloin kone valmistaa muita tuotteita. Malli edellytt\u00e4\u00e4, ett\u00e4 p on suurempi kuin d.<\/p>\n\n\n<p>S on kustannus, ei kesto. Se kuvaa er\u00e4n valmistelun kiinte\u00e4\u00e4 kustannusta, joka ei riipu er\u00e4n kappalem\u00e4\u00e4r\u00e4st\u00e4. H on raham\u00e4\u00e4r\u00e4inen varastointikustannus kappaletta ja vuotta kohti, ei pelkk\u00e4 varastointikustannusprosentti. Jos l\u00e4ht\u00f6tietosi on prosenttiluku, muunna se raham\u00e4\u00e4r\u00e4ksi k\u00e4ytt\u00e4en asianmukaista kappalearvoa ja kustannusm\u00e4\u00e4ritelm\u00e4\u00e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miksi tuotanto- ja kulutusnopeuden huomioiva kerroin on t\u00e4rke\u00e4?<\/h3>\n\n\n<p>Q kappaleen er\u00e4n valmistus kest\u00e4\u00e4 Q\/p ty\u00f6p\u00e4iv\u00e4\u00e4. Kulutus jatkuu t\u00e4n\u00e4 aikana, joten kiertovaraston enimm\u00e4ism\u00e4\u00e4r\u00e4 on:<\/p>\n\n\n<p><strong>Enimm\u00e4isvarasto = Q \u00d7 (1 \u2212 d\/p)<\/strong><\/p>\n\n\n<p>Perusmallissa keskim\u00e4\u00e4r\u00e4inen kiertovarasto on puolet enimm\u00e4isvarastosta. Er\u00e4koon mukana muuttuvat vuosikustannukset ovat siis:<\/p>\n\n\n<p><strong>Vuotuinen asetuskustannus = (D\/Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Vuotuinen varastointikustannus = (Q\/2) \u00d7 (1 \u2212 d\/p) \u00d7 H<\/strong><\/p>\n\n\n<p>N\u00e4iden summa antaa tarkasteltavan er\u00e4koon Q vertailussa huomioitavat vuosikustannukset. EPQ minimoi t\u00e4m\u00e4n summan. Laskennallisessa optimikohdassa n\u00e4m\u00e4 kaksi kustannusta ovat yht\u00e4 suuret.<\/p>\n\n\n<p>Summa ei kata valmistajan kaikkia vuotuisia tuotantokustannuksia. M\u00e4\u00e4r\u00e4st\u00e4 riippumaton kappalekohtainen valmistuskustannus ei vaikuta parhaaseen Q:n arvoon, joten sen voi j\u00e4tt\u00e4\u00e4 t\u00e4st\u00e4 vertailusta pois. M\u00e4\u00e4r\u00e4alennukset, ylity\u00f6lis\u00e4t tai muut m\u00e4\u00e4r\u00e4st\u00e4 riippuvat kustannukset muuttaisivat laskentatilannetta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPQ-laskuesimerkki: er\u00e4koko ei ole enimm\u00e4isvarasto<\/h2>\n\n\n<p>Azim Abbasin ja Seyed Gooshehin teoksen <em>Fundamentals of Operations Management<\/em> <a href=\"https:\/\/biz.libretexts.org\/@go\/page\/129023\">vaihteistoja k\u00e4sittelev\u00e4ss\u00e4 opetusesimerkiss\u00e4<\/a> k\u00e4ytet\u00e4\u00e4n seuraavia l\u00e4ht\u00f6tietoja:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Vuosikysynt\u00e4 D: 48 000 vaihteistoa.<\/li><li>Tuotantonopeus p: 800 vaihteistoa ty\u00f6p\u00e4iv\u00e4ss\u00e4.<\/li><li>Ty\u00f6p\u00e4ivi\u00e4: 240 vuodessa.<\/li><li>Asetuskustannus S: 45 $ er\u00e4\u00e4 kohti.<\/li><li>Vuotuinen varastointikustannus H: 1 $ vaihteistoa kohti.<\/li><\/ul>\n\n\n<p>N\u00e4m\u00e4 ovat opetusesimerkin l\u00e4ht\u00f6tietoja, eiv\u00e4t valmistuskustannusten vertailuarvoja tai SkyPlanner-asiakkaan tuloksia.<\/p>\n\n\n<p>P\u00e4ivitt\u00e4inen kysynt\u00e4 on 48 000 \u00f7 240 = <strong>200 vaihteistoa<\/strong>. Tuotanto- ja kulutusnopeuden huomioiva kerroin on 1 \u2212 200\/800 = <strong>0,75<\/strong>.<\/p>\n\n\n<p><strong>EPQ = \u221a[(2 \u00d7 48 000 \u00d7 45) \/ (1 \u00d7 0,75)] = 2 400 vaihteistoa<\/strong><\/p>\n\n\n<p>T\u00e4ll\u00e4 er\u00e4koolla vuotuinen asetuskustannus on (48 000 \/ 2 400) \u00d7 45 $ = <strong>900 $<\/strong>. Vuotuinen varastointikustannus on (2 400 \/ 2) \u00d7 0,75 \u00d7 1 $ = <strong>900 $<\/strong>. Mallin mukaiset kustannukset ovat siis yhteens\u00e4 <strong>1 800 $ vuodessa<\/strong>.<\/p>\n\n\n<p>Er\u00e4n valmistus kest\u00e4\u00e4 <strong>3 ty\u00f6p\u00e4iv\u00e4\u00e4<\/strong> ilman asetusaikaa: 2 400 \/ 800. Koko t\u00e4ydennysjakso kest\u00e4\u00e4 <strong>12 ty\u00f6p\u00e4iv\u00e4\u00e4<\/strong>: 2 400 \/ 200. J\u00e4ljelle j\u00e4\u00e4vien yhdeks\u00e4n ty\u00f6p\u00e4iv\u00e4n aikana nimikett\u00e4 ei valmisteta, vaan kysynt\u00e4 katetaan varastosta.<\/p>\n\n\n<p>Enimm\u00e4isvarasto on <strong>1 800 vaihteistoa<\/strong>, ei 2 400. Kolmen p\u00e4iv\u00e4n valmistuksen aikana on jo kulutettu 600 vaihteistoa. Keskim\u00e4\u00e4r\u00e4inen kiertovarasto on 900.<\/p>\n\n\n<p>Samoilla l\u00e4ht\u00f6tiedoilla voidaan vertailla vaihtoehtoisia er\u00e4kokoja:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Er\u00e4koko<\/th><th>Vuotuinen asetuskustannus<\/th><th>Vuotuinen varastointikustannus<\/th><th>Vuosikustannukset yhteens\u00e4<\/th><\/tr><\/thead><tbody><tr><td>1 200<\/td><td>1 800 $<\/td><td>450 $<\/td><td>2 250 $<\/td><\/tr><tr><td>2 400<\/td><td>900 $<\/td><td>900 $<\/td><td>1 800 $<\/td><\/tr><tr><td>4 800<\/td><td>450 $<\/td><td>1 800 $<\/td><td>2 250 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Taulukko osoittaa, miksi pelkk\u00e4 asetusten v\u00e4hent\u00e4minen ei riit\u00e4. Taloudellisen er\u00e4koon kaksinkertaistaminen puolittaa asetuskustannukset mutta kaksinkertaistaa varastointikustannukset. Se havainnollistaa my\u00f6s suunnittelijan tekem\u00e4\u00e4 vertailua silloin, kun toisen toimituksen vuoksi tarvitaan pienempi er\u00e4: kyse on mallin mukaisesta kustannusvertailusta, ei s\u00e4\u00e4nn\u00f6st\u00e4, jonka mukaan jokaisen tehtaan olisi aina valmistettava 2 400 kappaleen eri\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Milloin EPQ:n perusmallista on hy\u00f6ty\u00e4?<\/h2>\n\n\n<p>EPQ on hy\u00f6dyllinen vertailukohta, kun nimikkeen kysynt\u00e4 on toistuvaa, varasto t\u00e4ydentyy v\u00e4hitellen ja er\u00e4koon valinnassa ratkaisee ennen kaikkea kiinte\u00e4n asetuskustannuksen ja kiertovaraston varastointikustannuksen v\u00e4linen tasapaino.<\/p>\n\n\n<p>Tarkista seuraavat ehdot ennen tuloksen k\u00e4ytt\u00f6\u00e4:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Kysynt\u00e4 tunnetaan ja on melko tasaista.<\/strong> Vuoden kokonaism\u00e4\u00e4r\u00e4 voi peitt\u00e4\u00e4 alleen kausihuiput tai yksitt\u00e4isten projektien tarpeet. Tasainen vuosikeskiarvo ei kerro tilausten toimitusajankohtia.<\/li><li><strong>Tuotantonopeus on tasainen ja kulutusnopeutta suurempi.<\/strong> Jos p ei ole suurempi kuin d, mallissa ei voi kerty\u00e4 varastoa, jolla katetaan kysynt\u00e4 valmistuserien v\u00e4lill\u00e4.<\/li><li><strong>Asetus- ja varastointikustannukset pysyv\u00e4t vakaina.<\/strong> M\u00e4\u00e4rittele kustannukset johdonmukaisesti. Jos tuotevaihdon kustannus riippuu ajoj\u00e4rjestyksest\u00e4 tai tuotantokustannukset valmistusm\u00e4\u00e4r\u00e4st\u00e4, yksi kiinte\u00e4 asetuskustannus ei riit\u00e4 kuvaamaan niit\u00e4.<\/li><li><strong>Valmistuvat tuotteet ovat k\u00e4ytett\u00e4viss\u00e4 v\u00e4hitellen.<\/strong> Jos koko er\u00e4n on ensin kovetuttava, l\u00e4p\u00e4ist\u00e4v\u00e4 tarkastus tai saatava laadunvalvonnan hyv\u00e4ksynt\u00e4 ennen kuin yht\u00e4k\u00e4\u00e4n kappaletta voidaan k\u00e4ytt\u00e4\u00e4, mallin oletus varaston kertymisest\u00e4 ei kuvaa t\u00e4t\u00e4 tilannetta.<\/li><li><strong>Perusmallin t\u00e4ydennysjakson aikana ei synny puutteita.<\/strong> Yll\u00e4 oleva kaava ei laske j\u00e4lkitoimitusten kustannuksia eik\u00e4 varmuusvarastoa kysynn\u00e4n ja tarjonnan ep\u00e4varmuuden varalle.<\/li><li><strong>K\u00e4yt\u00e4nn\u00f6n rajoitteet eiv\u00e4t est\u00e4 ehdotetun er\u00e4koon toteuttamista.<\/strong> Varastotila, s\u00e4ilyvyysaika, s\u00e4ili\u00f6iden koot, prosessin v\u00e4himm\u00e4iser\u00e4t ja yhteisk\u00e4yt\u00f6ss\u00e4 olevat laitteet voivat tehd\u00e4 ilman rajoitteita lasketusta tuloksesta k\u00e4ytt\u00f6kelvottoman.<\/li><\/ul>\n\n\n<p>Vaikka malli huomioi rajallisen tuotantonopeuden, se ei tarkoita, ett\u00e4 se olisi ajoittanut tuotannon tehtaan rajallisen kapasiteetin mukaan. Malli tarkastelee yhden nimikkeen t\u00e4ydennysjaksoa. Se ei sijoita kaikkien tuotteiden valmistuseri\u00e4, asetuksia ja my\u00f6hempi\u00e4 ty\u00f6vaiheita samaan konekalenteriin.<\/p>\n\n\n<p>Jos kysynt\u00e4 on ep\u00e4s\u00e4\u00e4nn\u00f6llist\u00e4 tai ty\u00f6 asiakaskohtaista, l\u00e4hde liikkeelle todellisista, ajoitetuista tarpeista sen sijaan, ett\u00e4 sovittaisit ne v\u00e4kisin EPQ-jaksoon. Kun malli soveltuu tilanteeseen, k\u00e4yt\u00e4 tulosta vertailukohtana ja arvioi sit\u00e4 l\u00e4hell\u00e4 olevia toteutuskelpoisia er\u00e4kokoja todellisia rajoitteita vasten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pienempi asetuskustannus muuttaa taloudellista valmistuser\u00e4kokoa<\/h2>\n\n\n<p>Er\u00e4koon kasvattaminen ei ole ainoa keino jakaa asetusten vaatimaa panostusta useammalle kappaleelle. Kun kiinte\u00e4 asetuskustannus pienenee, my\u00f6s pienemm\u00e4t ja useammin toistuvat valmistuser\u00e4t muuttuvat mallissa taloudellisiksi. Koska EPQ riippuu S:n neli\u00f6juuresta, S:n puolittaminen pienent\u00e4\u00e4 lasketun er\u00e4koon noin 71 %:iin aiemmasta, kun muut l\u00e4ht\u00f6tiedot pysyv\u00e4t ennallaan.<\/p>\n\n\n<p>Siksi asetusty\u00f6n v\u00e4hent\u00e4mist\u00e4 ja er\u00e4kokojen valintaa kannattaa k\u00e4sitell\u00e4 yhdess\u00e4. <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/smed\/\">SMED<\/a> auttaa kehitt\u00e4m\u00e4\u00e4n itse tuotevaihtoa, kun taas EPQ auttaa arvioimaan, miten muutos vaikuttaa asetus- ja varastointikustannusten tasapainoon. Jos parannus lyhent\u00e4\u00e4 asetusaikaa mutta ei pienenn\u00e4 kaikkia asetuksiin liittyvi\u00e4 kustannuksia, p\u00e4ivit\u00e4 laskennan kustannustieto sen mukaisesti. \u00c4l\u00e4 oleta ajan ja kustannusten pienenev\u00e4n samalla prosenttiosuudella.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sovita valittu er\u00e4koko tuotantoon SkyPlannerilla<\/h2>\n\n\n<p>Kuvitellaan, ett\u00e4 vaihdelaatikoiden valmistuser\u00e4 k\u00e4ytt\u00e4\u00e4 samaa konetta kuin toinen komponentti, jota kokoonpano tarvitsee kiireellisesti. EPQ-laskelma voi puoltaa suurempaa er\u00e4\u00e4, mutta se ei ole tarkistanut toisen komponentin m\u00e4\u00e4r\u00e4aikaa eik\u00e4 sit\u00e4, ovatko seuraavan ty\u00f6vaiheen materiaalit valmiina. T\u00e4m\u00e4 kilpailu samasta kapasiteetista on n\u00e4ht\u00e4v\u00e4 ennen koneajan varaamista.<\/p>\n\n\n<p>SkyPlanner tuo n\u00e4m\u00e4 riippuvuudet <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">yhteiseen tuotantoaikatauluun<\/a>. M\u00e4\u00e4rittele tuotteen ty\u00f6vaiheet, niiden kestot, soveltuvat ty\u00f6pisteet, materiaalit ja materiaaliluettelo kerran. Tilauksille kirjataan t\u00e4m\u00e4n j\u00e4lkeen tuote, m\u00e4\u00e4r\u00e4 ja toimitusp\u00e4iv\u00e4. SkyPlannerin teko\u00e4lypohjainen ajoitusmoottori Arcturus ajoittaa tilaukset yhdess\u00e4, joten sinun ei tarvitse sovittaa yhteen erillisi\u00e4 nimikekohtaisia suunnitelmia.<\/p>\n\n\n<p>Kun materiaalien saatavuuden huomioiva ajoitus on k\u00e4yt\u00f6ss\u00e4, my\u00f6s materiaalitilanne vaikuttaa laskentaan. Gantt-aikajana n\u00e4ytt\u00e4\u00e4 ajoituksen eri ty\u00f6pisteill\u00e4, jolloin on helpompi n\u00e4hd\u00e4, miten valittu er\u00e4koko vaikuttaa muihin t\u00f6ihin ja luvattuihin toimituksiin. Sin\u00e4 asetat prioriteetit, ja Arcturus laskee ajoituksen antamiesi ohjeiden mukaisesti.<\/p>\n\n\n<p>N\u00e4in er\u00e4koon valinnalle on selke\u00e4mm\u00e4t perusteet ja ty\u00f6jonojen k\u00e4sin yll\u00e4pito v\u00e4henee. Jos valittu er\u00e4 vaarantaa toisen luvatun toimituksen, voit p\u00e4\u00e4tt\u00e4\u00e4, muutatko er\u00e4kokoa, s\u00e4\u00e4d\u00e4tk\u00f6 prioriteetteja vai lis\u00e4\u00e4tk\u00f6 kapasiteettia. Sen j\u00e4lkeen voit laskea aikataulun uudelleen p\u00e4\u00e4t\u00f6ksen pohjalta. SkyPlanner integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapintansa kautta, joten ajoitus voi perustua nykyisiin tilauksiin ja tuotantotietoihin.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/kjh-comp\/\">KJH-Compin kokemukset<\/a> osoittavat, miksi yhteinen n\u00e4kym\u00e4 on t\u00e4rke\u00e4. Ohutlevyjen sopimusvalmistaja k\u00e4ytti aiemmin karkeaa viikkokuormitusta ja jakoi ty\u00f6t koneille p\u00e4iv\u00e4tasolla k\u00e4sin. SkyPlannerin avulla ty\u00f6njohtaja n\u00e4kee yhteisk\u00e4yt\u00f6ss\u00e4 olevan s\u00e4rm\u00e4yskoneen ylikuormituksen ja voi reagoida siihen. Yritys kertoo my\u00f6s ajoittavansa per\u00e4kk\u00e4in ty\u00f6t, joissa k\u00e4ytet\u00e4\u00e4n samaa ty\u00f6kalustoa ja samanpaksuista materiaalia. Samalla v\u00e4ltet\u00e4\u00e4n sit\u00e4, ett\u00e4 liian aikaisin teht\u00e4v\u00e4t ty\u00f6t syrj\u00e4ytt\u00e4isiv\u00e4t aiemmin toimitettavia t\u00f6it\u00e4. N\u00e4in asetusten tehokkuus ja toimitusten t\u00e4rkeysj\u00e4rjestys voidaan huomioida samassa suunnitelmassa erillisten, kesken\u00e4\u00e4n kilpailevien listojen sijaan.<\/p>\n\n\n<p>Valmistuserien ja siirtoerien k\u00e4yt\u00e4nn\u00f6n yhteensovittamisesta voit lukea lis\u00e4\u00e4 <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/eratuotanto\/\">er\u00e4tuotannon oppaasta<\/a>. T\u00e4ss\u00e4 keskeinen ero on yksinkertaisempi: <strong>EPQ arvioi taloudellisen er\u00e4koon annetuilla oletuksilla. Tuotantoaikataulu n\u00e4ytt\u00e4\u00e4, miten valitsemasi er\u00e4koko sopii yhteen jo lupaamiesi t\u00f6iden kanssa.<\/strong><\/p>\n\n\n<p>Jos haluat n\u00e4hd\u00e4 t\u00e4m\u00e4n yhteyden omassa tuotannossasi, <a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">varaa SkyPlanner-esittely<\/a>. Ota tarkasteluun toistuvasti valmistettava tuote, ehdotus sen er\u00e4kooksi sek\u00e4 kone, jota k\u00e4ytet\u00e4\u00e4n my\u00f6s muihin t\u00f6ihin. Arvioi, miten n\u00e4m\u00e4 tarpeet sopivat yhteen, ennen kuin lupaat seuraavan toimituksen. Jos haluat ensin tutustua itse, <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile SkyPlanneria demotiedoilla<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset Etusivu &raquo; Resurssit &raquo; Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset Taloudellinen valmistuser\u00e4koko (EPQ) minimoi asetus- ja varastointikustannusten summan mallissa, jossa tuotteita valmistetaan v\u00e4hitellen ja kulutetaan samanaikaisesti. Se auttaa vastaamaan tuttuun kysymykseen: kuinka paljon kannattaa valmistaa ennen kuin tuotanto pys\u00e4ytet\u00e4\u00e4n ja tehd\u00e4\u00e4n seuraava asetus? Suuremmat valmistuser\u00e4t v\u00e4hent\u00e4v\u00e4t asetusten m\u00e4\u00e4r\u00e4\u00e4 mutta &#8230; <a title=\"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":104472,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2550],"tags":[],"class_list":["post-104438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-tuotannon-tehokkuus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset<\/title>\n<meta name=\"description\" content=\"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\" \/>\n<meta property=\"og:description\" content=\"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T17:47:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T17:47:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:47:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/\"},\"wordCount\":1694,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"articleSection\":[\"oppaat\",\"Tuotannon tehokkuus\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/\",\"name\":\"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:47:59+00:00\",\"description\":\"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/taloudellinen-valmistuserakoko\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset","description":"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/","og_locale":"fi_FI","og_type":"article","og_title":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset","og_description":"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T17:47:49+00:00","article_modified_time":"2026-10-20T17:47:59+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:47:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/"},"wordCount":1694,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","articleSection":["oppaat","Tuotannon tehokkuus"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/","name":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:47:59+00:00","description":"Laske er\u00e4koko EPQ:lla ja tarkista oletusten sopivuus. SkyPlanner n\u00e4ytt\u00e4\u00e4, miten valitsemasi taloudellinen valmistuser\u00e4koko vaikuttaa muihin tilauksiin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","width":1672,"height":941,"caption":"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/taloudellinen-valmistuserakoko\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset Etusivu &raquo; Resurssit &raquo; Taloudellinen valmistuser\u00e4koko: kaava, esimerkki ja rajoitukset Taloudellinen valmistuser\u00e4koko (EPQ) minimoi asetus- ja varastointikustannusten summan mallissa, jossa tuotteita valmistetaan v\u00e4hitellen ja kulutetaan samanaikaisesti. Se auttaa vastaamaan tuttuun kysymykseen: kuinka paljon kannattaa valmistaa ennen kuin tuotanto pys\u00e4ytet\u00e4\u00e4n ja tehd\u00e4\u00e4n seuraava asetus? Suuremmat valmistuser\u00e4t v\u00e4hent\u00e4v\u00e4t asetusten m\u00e4\u00e4r\u00e4\u00e4 mutta&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=104438"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104438\/revisions"}],"predecessor-version":[{"id":104532,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/104438\/revisions\/104532"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/104472"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=104438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=104438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=104438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}