{"id":102518,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102518"},"modified":"2026-10-20T13:56:55","modified_gmt":"2026-10-20T13:56:55","slug":"keskenerainen-tuotanto","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/","title":{"rendered":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Keskener\u00e4inen tuotanto (KET, englanniksi WIP) tarkoittaa tuotteita, joiden valmistus on aloitettu mutta jotka eiv\u00e4t viel\u00e4 ole valmiita. Siihen kuuluvat sek\u00e4 k\u00e4sitelt\u00e4vin\u00e4 olevat osat ett\u00e4 ty\u00f6vaiheiden v\u00e4lill\u00e4 odottavat keskener\u00e4iset tuotteet. Kirjanpidossa keskener\u00e4isell\u00e4 tuotannolla tarkoitetaan my\u00f6s n\u00e4ihin tuotteisiin siihen menness\u00e4 kertyneit\u00e4 valmistuskustannuksia.<\/p>\n\n\n<p>N\u00e4m\u00e4 kaksi n\u00e4k\u00f6kulmaa vastaavat eri kysymyksiin. Kappalem\u00e4\u00e4r\u00e4 kertoo, kuinka paljon tuotteita on kesken. Kustannusluku kertoo, kuinka paljon niihin on sitoutunut valmistuskustannuksia. Kumpikaan ei yksin selit\u00e4, miksi er\u00e4 on odottanut maanantaista asti tai milloin se voi lopulta valmistua.<\/p>\n\n\n<p>Tuotantop\u00e4\u00e4llik\u00f6n kannalta juuri t\u00e4m\u00e4 on olennainen jatkokysymys. SkyPlanner APS sovittaa j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet kapasiteettiin, materiaalien saatavuuteen ja prioriteetteihin. Se auttaa saamaan ty\u00f6t valmiiksi sen sijaan, ett\u00e4 jonoihin lis\u00e4t\u00e4\u00e4n jatkuvasti uusia t\u00f6it\u00e4. Parempi ajoitus v\u00e4hent\u00e4\u00e4 tarpeetonta keskener\u00e4ist\u00e4 tuotantoa ja siihen sitoutuvaa p\u00e4\u00e4omaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 keskener\u00e4iseen tuotantoon kuuluu?<\/h2>\n\n\n<p>Varastoa voi tarkastella valmistusvirran kolmessa eri kohdassa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Raaka-aineet:<\/strong> materiaalit ja ostokomponentit, jotka odottavat k\u00e4ytt\u00f6\u00e4 tuotannossa.<\/li><li><strong>Keskener\u00e4inen tuotanto:<\/strong> tuotteet, joiden valmistus on aloitettu mutta jotka vaativat viel\u00e4 valmistusta, kokoonpanoa tai pakollisia lopputarkastuksia.<\/li><li><strong>Valmiit tuotteet:<\/strong> valmiiksi saadut tuotteet, vaikka niit\u00e4 ei olisi viel\u00e4 myyty tai l\u00e4hetetty.<\/li><\/ul>\n\n\n<p>Pinnoitusta odottava koneistettu kotelo on keskener\u00e4ist\u00e4 tuotantoa. Samoin on kokoonpantu yksikk\u00f6, joka odottaa valmistumisen edellytt\u00e4m\u00e4\u00e4 lopputarkastusta. Valmis ja hyv\u00e4ksytty yksikk\u00f6, joka odottaa kuljetusautoa, kuuluu valmistevarastoon eik\u00e4 keskener\u00e4iseen tuotantoon.<\/p>\n\n\n<p>Odottava keskener\u00e4inen tuote lasketaan edelleen mukaan m\u00e4\u00e4r\u00e4\u00e4n. Jonotus, siirrot ja tuotteen etenemisen keskeytykset voivat muodostaa suuren osan ajasta, jonka tuote viett\u00e4\u00e4 tuotannossa, vaikka yksik\u00e4\u00e4n kone ei sill\u00e4 hetkell\u00e4 ty\u00f6st\u00e4isi sit\u00e4.<\/p>\n\n\n<p>Englanniksi k\u00e4ytet\u00e4\u00e4n my\u00f6s ilmaisua <strong>work in progress<\/strong>, joka tarkoittaa keskener\u00e4ist\u00e4 ty\u00f6t\u00e4. Termien k\u00e4ytt\u00f6 vaihtelee yrityksitt\u00e4in ja toimialoittain. T\u00e4ss\u00e4 oppaassa WIP tarkoittaa valmistuksessa olevia keskener\u00e4isi\u00e4 tuotteita, ei projektin laskutukseen liittyv\u00e4\u00e4 laskelmaa tai ohjelmistotiimin teht\u00e4v\u00e4taululla olevien teht\u00e4vien m\u00e4\u00e4r\u00e4\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miten keskener\u00e4isen tuotannon fyysinen m\u00e4\u00e4r\u00e4 mitataan?<\/h2>\n\n\n<p>Rajaa ensin selke\u00e4sti, mit\u00e4 mittaat: esimerkiksi yht\u00e4 tuoteperhett\u00e4 ensimm\u00e4isest\u00e4 valmistusvaiheesta lopulliseen hyv\u00e4ksynt\u00e4\u00e4n. Laske rajauksen sis\u00e4ll\u00e4 olevat keskener\u00e4iset kappaleet tiettyn\u00e4 ajankohtana. Irtotavaran tuotannossa sopiva yksikk\u00f6 voi olla kappaleen sijaan kilogramma tai litra.<\/p>\n\n\n<p>Kuvitellaan tehdas, jossa seurataan yht\u00e4 samanlaisten koteloiden tuoteperhett\u00e4. Perjantain ty\u00f6vuoron lopussa tilanne on seuraava:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Nykyinen sijainti<\/th><th>Keskener\u00e4isi\u00e4 koteloita<\/th><th>J\u00e4ljell\u00e4 olevat ty\u00f6t<\/th><\/tr><\/thead><tbody><tr><td>Koneistuksessa<\/td><td>20<\/td><td>Koneistuksen loppuun saattaminen, viimeistely ja tarkastus<\/td><\/tr><tr><td>Odottamassa viimeistely\u00e4<\/td><td>60<\/td><td>Viimeistely ja tarkastus<\/td><\/tr><tr><td>Odottamassa lopputarkastusta<\/td><td>20<\/td><td>Tarkastus ja hyv\u00e4ksynt\u00e4<\/td><\/tr><tr><td><strong>Keskener\u00e4isi\u00e4 yhteens\u00e4<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>J\u00e4ljell\u00e4 oleva ty\u00f6m\u00e4\u00e4r\u00e4 vaihtelee<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Laske jokainen kotelo vain kerran sen nykyisen sijainnin mukaan. \u00c4l\u00e4 laske samaa er\u00e4\u00e4 uudelleen jokaisen reitityksess\u00e4 viel\u00e4 j\u00e4ljell\u00e4 olevan ty\u00f6vaiheen kohdalla.<\/p>\n\n\n<p>Voit my\u00f6s t\u00e4sm\u00e4ytt\u00e4\u00e4 m\u00e4\u00e4r\u00e4n tarkastelurajan ylitt\u00e4vien siirtojen perusteella. Oletetaan, ett\u00e4 viikon alussa keskener\u00e4isi\u00e4 koteloita oli 120, tuotantoon tuli 480 lis\u00e4\u00e4 ja 500 siirtyi valmiiksi tuotteiksi. Jos romutuksia tai muita siirtoja ei ollut:<\/p>\n\n\n<p><strong>Keskener\u00e4inen tuotanto jakson lopussa = 120 + 480 \u2212 500 = 100 koteloa<\/strong><\/p>\n\n\n<p>Jos tulos poikkeaa fyysisess\u00e4 laskennassa saadusta m\u00e4\u00e4r\u00e4st\u00e4, selvit\u00e4 puuttuvat valmistumiskirjaukset, kirjaamattomat siirrot, romutukset ja laskennan katkaisuajankohta ennen kuin teet johtop\u00e4\u00e4t\u00f6ksi\u00e4 tuotannon suorituskyvyst\u00e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kappalem\u00e4\u00e4r\u00e4 ei ole sama asia kuin j\u00e4ljell\u00e4 oleva ty\u00f6m\u00e4\u00e4r\u00e4<\/h3>\n\n\n<p>Taulukossa on 100 keskener\u00e4ist\u00e4 kappaletta, mutta tarkastusta odottavat 20 kappaletta vaativat huomattavasti v\u00e4hemm\u00e4n ty\u00f6t\u00e4 kuin koneistuksessa viel\u00e4 olevat 20 kappaletta. Kaksi yht\u00e4 suurta jonoa voi siis kuormittaa kapasiteettia hyvin eri tavoin.<\/p>\n\n\n<p>Monenlaisia tuotteita valmistavassa tehtaassa ty\u00f6m\u00e4\u00e4r\u00e4inten lukum\u00e4\u00e4r\u00e4 kertoo viel\u00e4 v\u00e4hemm\u00e4n: yksi ty\u00f6 voi vaatia lyhyen tarkastuksen, toinen useita p\u00e4ivi\u00e4 useilla eri resursseilla. Seuraa m\u00e4\u00e4ri\u00e4 tuotteittain tai tarkoituksenmukaisina tuoteperhein\u00e4 ja arvioi kuormitusta j\u00e4ljell\u00e4 olevien ty\u00f6vaiheiden kestojen perusteella. Ilmoita kuormitus tunteina. Se ei tarkoita samaa kuin keskener\u00e4isen tuotannon kappalem\u00e4\u00e4r\u00e4 tai rahallinen arvo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Keskener\u00e4isen tuotannon kustannuslaskentakaava<\/h2>\n\n\n<p>Jakson kustannukset voidaan t\u00e4sm\u00e4ytt\u00e4\u00e4 yksinkertaistetusti n\u00e4in:<\/p>\n\n\n<p><strong>Keskener\u00e4isen tuotannon arvo jakson lopussa = keskener\u00e4isen tuotannon arvo jakson alussa + jakson aikana lis\u00e4tyt valmistuskustannukset \u2212 valmistuneen tuotannon kustannukset<\/strong><\/p>\n\n\n<p>Lis\u00e4ttyihin valmistuskustannuksiin sis\u00e4ltyv\u00e4t k\u00e4ytetyt v\u00e4litt\u00f6m\u00e4t materiaalit, v\u00e4lit\u00f6n ty\u00f6 ja kohdistetut valmistuksen yleiskustannukset. <strong>Valmistuneen tuotannon kustannukset (COGM)<\/strong> tarkoittavat kustannuksia, jotka siirtyv\u00e4t pois keskener\u00e4isest\u00e4 tuotannosta tuotteiden valmistuessa. Kyse ei ole myyntihinnasta eik\u00e4 jakson aikana myytyjen tuotteiden kustannuksista.<\/p>\n\n\n<p>Tarkastellaan erillist\u00e4 esimerkki\u00e4 yhden kuukauden kustannuksista. Keskener\u00e4isen tuotannon alkuarvo on 18 000 dollaria, valmistuksesta kertyy lis\u00e4\u00e4 72 000 dollaria ja valmistevarastoon siirtyy tuotteita, joiden kustannukset ovat 65 000 dollaria. Jos muita oikaisuja ei ole:<\/p>\n\n\n<p><strong>18 000 $ + 72 000 $ \u2212 65 000 $ = 25 000 $ keskener\u00e4isen tuotannon arvona jakson lopussa<\/strong><\/p>\n\n\n<p>T\u00e4m\u00e4 on kustannussaldo, ei 25 000 kappaletta eik\u00e4 25 000 dollaria tulevaa voittoa. Esimerkki on erillinen edell\u00e4 esitetyst\u00e4 koteloiden kappalem\u00e4\u00e4r\u00e4laskelmasta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miksi kappalem\u00e4\u00e4r\u00e4 ei kerro rahallista arvoa?<\/h3>\n\n\n<p>Keskener\u00e4iseen tuotteeseen on kertynyt vain sille siihen menness\u00e4 kohdistetut kustannukset. Jos keskener\u00e4isten kappaleiden m\u00e4\u00e4r\u00e4 kerrotaan valmiin tuotteen koko yksikk\u00f6kustannuksella, arvo voi muodostua liian suureksi. My\u00f6sk\u00e4\u00e4n reitityksen puoliv\u00e4liss\u00e4 oleva tuote ei v\u00e4ltt\u00e4m\u00e4tt\u00e4 ole kerrytt\u00e4nyt puolta kokonaiskustannuksistaan: kallis materiaali saatetaan lis\u00e4t\u00e4 jo alussa, kun taas ty\u00f6- ja k\u00e4sittelykustannukset kertyv\u00e4t my\u00f6hemmin.<\/p>\n\n\n<p>K\u00e4yt\u00e4 taloushallintonne kustannuslaskennan tietoja ja laskentaperiaatteita. Alkusaldosta loppusaldoon teht\u00e4v\u00e4 t\u00e4sm\u00e4ytys selitt\u00e4\u00e4 kustannusten muutoksen, mutta taloudellinen raportointi voi edellytt\u00e4\u00e4 my\u00f6s sovellettavan tilinp\u00e4\u00e4t\u00f6snormiston mukaisia arvostusoikaisuja.<\/p>\n\n\n<p>Tuotannon p\u00e4\u00e4t\u00f6ksenteossa olennainen ero on yksinkertaisempi: kertyneet kustannukset kertovat, mit\u00e4 ty\u00f6h\u00f6n on t\u00e4h\u00e4n menness\u00e4 k\u00e4ytetty. J\u00e4ljell\u00e4 oleva reititys kertoo, mit\u00e4 valmistuminen viel\u00e4 edellytt\u00e4\u00e4. Tarvitset molemmat n\u00e4k\u00f6kulmat, eik\u00e4 toinen korvaa toista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 suuri tai pieni keskener\u00e4isen tuotannon m\u00e4\u00e4r\u00e4 kertoo?<\/h2>\n\n\n<p>Suuri keskener\u00e4isen tuotannon m\u00e4\u00e4r\u00e4 antaa aiheen selvitt\u00e4\u00e4 tilannetta, mutta ei yksin kerro ongelman syyt\u00e4. Taustalla voi olla kasvanut kysynt\u00e4, erilainen tuotejakauma, tietoisesti turvattu kapasiteetti tai keskeytyksen vuoksi kasautuva ty\u00f6. Pieni m\u00e4\u00e4r\u00e4 voi kertoa sujuvasta virtauksesta, mutta my\u00f6s siit\u00e4, ettei kriittiselle resurssille ole riitt\u00e4v\u00e4sti aloitusvalmiita t\u00f6it\u00e4.<\/p>\n\n\n<p>Tavoitteena ei ole poistaa keskener\u00e4ist\u00e4 tuotantoa kokonaan. Tavoitteena on pit\u00e4\u00e4 ty\u00f6n alla riitt\u00e4v\u00e4sti oikeita t\u00f6it\u00e4, jotta ne valmistuvat luotettavasti ilman tarpeettoman aikaisia aloituksia, odottelua ja k\u00e4sittely\u00e4.<\/p>\n\n\n<p>Palataan viimeistely\u00e4 odottaviin 60 koteloon. Jos ne on koneistettu t\u00e4n\u00e4 aamuna iltap\u00e4iv\u00e4ksi suunniteltua viimeistelyaikaa varten, jono voi olla t\u00e4ysin perusteltu. Jos ne ovat odottaneet viikon viimeistelyresurssin k\u00e4sitelless\u00e4 muita tilauksia, sama kappalem\u00e4\u00e4r\u00e4 kertoo aivan erilaisesta ongelmasta.<\/p>\n\n\n<p>Selvit\u00e4 jonon tilanteen arvioimiseksi seuraavat asiat:<\/p>\n\n\n<p>1. <strong>Ik\u00e4:<\/strong> milloin er\u00e4 tuli tuotantoon ja kuinka kauan se on odottanut t\u00e4ss\u00e4?<\/p>\n\n\n<p>2. <strong>Seuraava ty\u00f6vaihe:<\/strong> mit\u00e4 resurssia, materiaalia tai hyv\u00e4ksynt\u00e4\u00e4 eteneminen edellytt\u00e4\u00e4?<\/p>\n\n\n<p>3. <strong>Suunniteltu valmistuminen:<\/strong> milloin j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet mahtuvat aikatauluun ja t\u00e4yttyyk\u00f6 tilaukselle annettu lupaus?<\/p>\n\n\n<p>4. <strong>Odottamisen syy:<\/strong> onko kyse suunnitellusta puskurista, kapasiteetista kilpailevista t\u00f6ist\u00e4, puuttuvasta materiaalista, laatusyist\u00e4 keskeytetyst\u00e4 etenemisest\u00e4 vai muusta keskeytyksest\u00e4?<\/p>\n\n\n<p>N\u00e4in toteamus \u201dmeill\u00e4 on liikaa keskener\u00e4ist\u00e4 tuotantoa\u201d muuttuu konkreettisten p\u00e4\u00e4t\u00f6sten pohjaksi. Puuttuva ostokomponentti vaatii erilaisen ratkaisun kuin ylikuormittunut viimeistelypiste. Uuden er\u00e4n koneistaminen ei ratkaise kumpaakaan ongelmaa.<\/p>\n\n\n<p>Tarkastele keskener\u00e4ist\u00e4 tuotantoa yhdess\u00e4 <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-lapimeno\/\">valmistuneen tuotannon m\u00e4\u00e4r\u00e4n<\/a> ja toimitusvarmuuden kanssa. Jos tuotantoon tulee enemm\u00e4n t\u00f6it\u00e4 kuin sielt\u00e4 poistuu valmiina tuotteina eik\u00e4 muita poistumia ole, keskener\u00e4inen tuotanto kasvaa. Jos m\u00e4\u00e4r\u00e4 pienenee vain siksi, ettei tuotantoon en\u00e4\u00e4 tule tilauksia, se ei osoita prosessin parantuneen. Vertaa samankaltaisia jaksoja ja tuoteperheit\u00e4, jotta tuotejakauman muutos ei n\u00e4yt\u00e4 virheellisesti parannukselta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Suunnittele keskener\u00e4isten t\u00f6iden valmistuminen SkyPlannerilla<\/h2>\n\n\n<p>Kun tied\u00e4t, miss\u00e4 ty\u00f6t odottavat, ajoituskysymys on konkreettinen: miten j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet sovitetaan yhteen kaiken muun tehtaassa valmiiksi saatavan ty\u00f6n kanssa?<\/p>\n\n\n<p>SkyPlanner kokoaa ty\u00f6pisteet, ty\u00f6vuorot, ty\u00f6ntekij\u00e4t, ty\u00f6vaiheet ja niiden kestot <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">yhteiseen tuotantoaikatauluun<\/a>. Sen ajoituksesta vastaava teko\u00e4ly Arcturus ajoittaa ty\u00f6vaiheet m\u00e4\u00e4ritetyn kapasiteetin, riippuvuuksien ja prioriteettien mukaan. Gantt-n\u00e4kym\u00e4 n\u00e4ytt\u00e4\u00e4 n\u00e4in muodostuvan ty\u00f6j\u00e4rjestyksen eri resursseilla sen sijaan, ett\u00e4 jokainen osasto yll\u00e4pit\u00e4isi omaa jonoaan.<\/p>\n\n\n<p>Odottavien koteloiden viimeistelyvaihetta voi tarkastella suhteessa sit\u00e4 edelt\u00e4viin ja seuraaviin t\u00f6ihin. Onko resurssi varattu aiemmin luvatulle ty\u00f6lle? Mahtuuko tarkastus aikatauluun viimeistelyn j\u00e4lkeen? Kasvattaisiko uuden koteloer\u00e4n aloittaminen nyt vain odottavien t\u00f6iden m\u00e4\u00e4r\u00e4\u00e4?<\/p>\n\n\n<p>Kun materiaalien saatavuuden huomioiva ajoitus on k\u00e4yt\u00f6ss\u00e4, Arcturus ottaa huomioon my\u00f6s varastotilanteen ja saapuvien materiaalien saatavuuden. T\u00e4m\u00e4 on t\u00e4rke\u00e4\u00e4, jos my\u00f6hemm\u00e4ss\u00e4 ty\u00f6vaiheessa tarvitaan ostokomponenttia: ensimm\u00e4isen koneen vapaa kapasiteetti ei riit\u00e4, jos tilausta ei voida vied\u00e4 kokoonpanon l\u00e4pi.<\/p>\n\n\n<p>Ajantasainen tieto t\u00f6iden etenemisest\u00e4 pit\u00e4\u00e4 suunnitelman k\u00e4ytt\u00f6kelpoisena. SkyPlannerin Timer kirjaa t\u00f6iden aloitukset, pys\u00e4ytykset ja valmistuneet m\u00e4\u00e4r\u00e4t, ja avoimen REST API -rajapinnan kautta SkyPlanner voidaan yhdist\u00e4\u00e4 mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n. Kun t\u00f6iden eteneminen, saatavuus tai prioriteetit muuttuvat, Arcturus voi laskea aikataulun uudelleen p\u00e4ivitettyjen tietojen perusteella. Sin\u00e4 p\u00e4\u00e4t\u00e4t prioriteetit, teko\u00e4ly hoitaa ajoituslaskennan.<\/p>\n\n\n<p>Yksitt\u00e4isten koneiden ty\u00f6jonojen korjailuun kuluu p\u00e4ivitt\u00e4in v\u00e4hemm\u00e4n aikaa, ja p\u00e4\u00e4t\u00f6kset seuraavaksi edistett\u00e4vist\u00e4 t\u00f6ist\u00e4 voidaan tehd\u00e4 selke\u00e4mm\u00e4lt\u00e4 pohjalta. Voit v\u00e4ltt\u00e4\u00e4 materiaalien ja ty\u00f6panoksen sitomista tilauksiin liian aikaisin ja keskitty\u00e4 niihin keskener\u00e4isiin t\u00f6ihin, joita toimitukset edellytt\u00e4v\u00e4t.<\/p>\n\n\n<p>Pelkk\u00e4 valmistuminen ei vapauta rahaa: kun tuotteet siirtyv\u00e4t keskener\u00e4isest\u00e4 tuotannosta valmistevarastoon, niiden tila muuttuu, mutta ne ovat edelleen varastoa. Taloudellinen hy\u00f6ty syntyy tarpeettoman varaston v\u00e4hent\u00e4misest\u00e4 ja oikeiden t\u00f6iden saattamisesta valmiiksi asiakaskysynn\u00e4n mukaan, ei pelk\u00e4st\u00e4\u00e4n keskener\u00e4isen tuotannon arvon pienent\u00e4misest\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 parempi ajoitus muutti Mamecilla<\/h2>\n\n\n<p>Suomalainen Mamec valmistaa teollisuuden sekoituslaitteita sek\u00e4 korkean teknologian tuotteita sopimusvalmistuksena. Aiemmin yritys priorisoi tuhansia toisistaan riippuvaisia ty\u00f6m\u00e4\u00e4r\u00e4imi\u00e4 paperisiin tilauksiin merkittyjen toimitusp\u00e4ivien perusteella. ERP-j\u00e4rjestelm\u00e4n suunnittelutoiminnot eiv\u00e4t tarjonneet kokonaiskuvaa, ja johdon k\u00e4sitys tuotannon kuormituksesta perustui subjektiivisiin arvioihin.<\/p>\n\n\n<p>Kun SkyPlanner integroitiin Mamecin Oscar ERP -ymp\u00e4rist\u00f6\u00f6n, yritys sai k\u00e4ytt\u00f6\u00f6ns\u00e4 rajallisen kapasiteetin huomioivan ajoituksen sek\u00e4 yhteisen n\u00e4kym\u00e4n tilausten tilanteeseen ja aikatauluihin. Henkil\u00f6st\u00f6 pystyi tarkistamaan tilauksen tiedot sen sijaan, ett\u00e4 olisi joutunut tukeutumaan eri ihmisten tulkintoihin tilanteesta.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/mamec\/\">Mamecin mukaan<\/a> l\u00e4pimenoajat ovat j\u00e4rkev\u00f6ityneet ja suunnittelun ty\u00f6m\u00e4\u00e4r\u00e4 keventynyt. My\u00f6s k\u00e4ytt\u00f6p\u00e4\u00e4omaa sitoutuu tarpeettomasti keskener\u00e4iseen tuotantoon aiempaa v\u00e4hemm\u00e4n, kun ty\u00f6t aloitetaan oikeaan aikaan. T\u00e4ss\u00e4 n\u00e4kyy keskener\u00e4isen tuotannon ja ajoituksen k\u00e4yt\u00e4nn\u00f6n yhteys: tehtaalla on edelleen t\u00f6it\u00e4 tuotannossa, mutta nyt voidaan perustellummin p\u00e4\u00e4tt\u00e4\u00e4, milloin niiden on oltava siell\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Aloita yhdest\u00e4 liian pitk\u00e4\u00e4n odottaneesta er\u00e4st\u00e4<\/h2>\n\n\n<p>Valitse keskener\u00e4inen tilaus, jonka viiv\u00e4styminen on tiimillesi tuttu. Ota SkyPlanner-esittelyyn mukaan tiedot tilauksen nykyisest\u00e4 vaiheesta, j\u00e4ljell\u00e4 olevista ty\u00f6vaiheista, materiaalitarpeista ja luvatusta toimitusajasta. K\u00e4yt\u00e4nn\u00f6ss\u00e4 kannattaa testata, saatko n\u00e4kyviin yhten\u00e4isen suunnitelman tilauksen saattamiseksi valmiiksi niin, ett\u00e4 my\u00f6s muut samoista resursseista kilpailevat tilaukset on huomioitu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a> ja tarkastele suunnitelmaa oman tuotantotilanteesi pohjalta tai <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile ensin SkyPlanneria esimerkkiaineistolla<\/a>. Keskener\u00e4isen tuotannon tunnuslukujen parantaminen alkaa keskener\u00e4isten t\u00f6iden tilanteen ymm\u00e4rt\u00e4misest\u00e4. Parempi tuotantoaikataulu auttaa tarttumaan tilanteeseen.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta Etusivu &raquo; Resurssit &raquo; Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta Keskener\u00e4inen tuotanto (KET, englanniksi WIP) tarkoittaa tuotteita, joiden valmistus on aloitettu mutta jotka eiv\u00e4t viel\u00e4 ole valmiita. Siihen kuuluvat sek\u00e4 k\u00e4sitelt\u00e4vin\u00e4 olevat osat ett\u00e4 ty\u00f6vaiheiden v\u00e4lill\u00e4 odottavat keskener\u00e4iset tuotteet. Kirjanpidossa keskener\u00e4isell\u00e4 tuotannolla tarkoitetaan my\u00f6s n\u00e4ihin tuotteisiin siihen menness\u00e4 kertyneit\u00e4 &#8230; <a title=\"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2550],"tags":[],"class_list":["post-102518","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-tuotannon-tehokkuus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta<\/title>\n<meta name=\"description\" content=\"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\" \/>\n<meta property=\"og:description\" content=\"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:56:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:56:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/\"},\"wordCount\":1791,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"oppaat\",\"Tuotannon tehokkuus\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/\",\"name\":\"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:56:55+00:00\",\"description\":\"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/keskenerainen-tuotanto\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta","description":"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/","og_locale":"fi_FI","og_type":"article","og_title":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta","og_description":"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:56:55+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:56:55+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/"},"wordCount":1791,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["oppaat","Tuotannon tehokkuus"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/","name":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:56:55+00:00","description":"Mit\u00e4 keskener\u00e4inen tuotanto tarkoittaa? Erota m\u00e4\u00e4r\u00e4 ja arvo, laske kustannukset ja selvit\u00e4, miten SkyPlanner auttaa v\u00e4hent\u00e4m\u00e4\u00e4n turhaa odotusta.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/keskenerainen-tuotanto\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta Etusivu &raquo; Resurssit &raquo; Keskener\u00e4inen tuotanto: m\u00e4\u00e4r\u00e4, kustannukset ja hallinta Keskener\u00e4inen tuotanto (KET, englanniksi WIP) tarkoittaa tuotteita, joiden valmistus on aloitettu mutta jotka eiv\u00e4t viel\u00e4 ole valmiita. Siihen kuuluvat sek\u00e4 k\u00e4sitelt\u00e4vin\u00e4 olevat osat ett\u00e4 ty\u00f6vaiheiden v\u00e4lill\u00e4 odottavat keskener\u00e4iset tuotteet. Kirjanpidossa keskener\u00e4isell\u00e4 tuotannolla tarkoitetaan my\u00f6s n\u00e4ihin tuotteisiin siihen menness\u00e4 kertyneit\u00e4&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/102518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=102518"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/102518\/revisions"}],"predecessor-version":[{"id":102637,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/102518\/revisions\/102637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=102518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=102518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=102518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}