{"id":100426,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100426"},"modified":"2026-10-16T22:47:40","modified_gmt":"2026-10-16T22:47:40","slug":"toimitusvarmuus","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/","title":{"rendered":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Toimitust\u00e4sm\u00e4llisyys (OTD) mittaa, kuinka hyvin asiakkaan kanssa sovitut toimitusajat pit\u00e4v\u00e4t.<\/strong> Valmistuksessa sen parantaminen tarkoittaa, ett\u00e4 oikeat tilaukset p\u00e4\u00e4sev\u00e4t etenem\u00e4\u00e4n tuotannossa, valmistuvat ja saapuvat sovittuun toimituspaikkaan ajoissa.<\/p>\n\n\n<p>Se ei ole sama asia kuin kaikkien koneiden pit\u00e4minen k\u00e4ynniss\u00e4. Leikkaus voi olla aikataulusta edell\u00e4, vaikka huomenna l\u00e4htev\u00e4st\u00e4 tilauksesta puuttuu yh\u00e4 yksi hitsattu osa. Tehdas n\u00e4ytt\u00e4\u00e4 tuottavalta, mutta asiakas saa toimituksensa silti my\u00f6h\u00e4ss\u00e4.<\/p>\n\n\n<p>K\u00e4yt\u00e4nn\u00f6n kysymys kuuluu: <strong>onko nykyisell\u00e4 tuotantoaikataululla viel\u00e4 mahdollista pit\u00e4\u00e4 luvatut toimitusajat?<\/strong> SkyPlanner APS auttaa vastaamaan t\u00e4h\u00e4n ajoittamalla toisiinsa liittyv\u00e4t ty\u00f6t kapasiteetin, materiaalien ja prioriteettien mukaan ja laskemalla aikataulun uudelleen tuotannon muuttuessa. Koneiden ty\u00f6jonojen uudelleenj\u00e4rjestelyyn kuluu v\u00e4hemm\u00e4n aikaa, ja voit keskitty\u00e4 huomiota vaativien tilausten toimitusaikojen turvaamiseen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4in lasket toimitust\u00e4sm\u00e4llisyyden<\/h2>\n\n\n<p>Jotta OTD-mittarista on hy\u00f6ty\u00e4, on ensin sovittava, mit\u00e4 ajoissa toimittaminen tarkoittaa. Onko lupauksena l\u00e4hett\u00e4\u00e4 tavarat, toimittaa ne asiakkaan toimipisteeseen vai asettaa ne noudettaviksi? Tuotantotilauksen valmistuminen ei automaattisesti tarkoita, ett\u00e4 asiakkaalle sovittu toimitus on toteutunut ajoissa.<\/p>\n\n\n<p>Kun mittaat toimitust\u00e4sm\u00e4llisyytt\u00e4 tilauksittain, k\u00e4yt\u00e4 kaavaa:<\/p>\n\n\n<p><strong>Toimitust\u00e4sm\u00e4llisyys (%) = Tarkastelujaksolla toimitettaviksi sovitut tilaukset, jotka toimitettiin sovitussa aikaikkunassa \u00f7 Kaikki tarkastelujaksolla toimitettaviksi sovitut tilaukset \u00d7 100<\/strong><\/p>\n\n\n<p>Oletetaan, ett\u00e4 t\u00e4ss\u00e4 kuussa oli m\u00e4\u00e4r\u00e4 toimittaa 50 tilausta. Niist\u00e4 44 saapui sovittuun toimituspaikkaan hyv\u00e4ksytyn aikaikkunan sis\u00e4ll\u00e4. OTD-luku on t\u00e4ll\u00f6in 88 %. My\u00f6s tilaukset, joiden toimitusaika on mennyt mutta joita ei ole viel\u00e4 toimitettu, pidet\u00e4\u00e4n nimitt\u00e4j\u00e4ss\u00e4. Muuten pahimmat viiv\u00e4stykset voivat j\u00e4\u00e4d\u00e4 kokonaan pois mittarista.<\/p>\n\n\n<p>Sopikaa mittaria k\u00e4ytt\u00e4vien kesken seuraavista s\u00e4\u00e4nn\u00f6ist\u00e4:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Laskentayksikk\u00f6:<\/strong> kokonaiset tilaukset, tilausrivit tai sovitut toimituser\u00e4t. K\u00e4yt\u00e4 samaa yksikk\u00f6\u00e4 johdonmukaisesti.<\/li><li><strong>P\u00e4iv\u00e4m\u00e4\u00e4r\u00e4 ja aikaikkuna:<\/strong> sovittu toimitusp\u00e4iv\u00e4 ja se, kuinka paljon toimitus saa aikaistua tai my\u00f6h\u00e4sty\u00e4. Etuajassa toimittaminen ei aina k\u00e4y, jos asiakas ei voi vastaanottaa tai varastoida tavaraa.<\/li><li><strong>Osatoimitukset:<\/strong> m\u00e4\u00e4rit\u00e4, milloin tilaus katsotaan toimitetuksi. Ensimm\u00e4inen l\u00e4hetys ei viel\u00e4 tarkoita, ett\u00e4 koko tilaus on toimitettu.<\/li><li><strong>Muuttuneet toimituslupaukset:<\/strong> s\u00e4ilyt\u00e4 alkuper\u00e4inen sovittu p\u00e4iv\u00e4m\u00e4\u00e4r\u00e4 muutettujen p\u00e4iv\u00e4m\u00e4\u00e4rien rinnalla, jotta toimitusajan siirt\u00e4minen ei peit\u00e4 my\u00f6h\u00e4stymist\u00e4.<\/li><\/ul>\n\n\n<p>OTD mittaa toimituksen ajoitusta. <strong>Ajallaan ja t\u00e4ysim\u00e4\u00e4r\u00e4isen\u00e4 toimittaminen (OTIF)<\/strong> huomioi lis\u00e4ksi sen, toimitettiinko koko sovittu m\u00e4\u00e4r\u00e4. <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotantosuunnitelman-toteutuminen\/\">Tuotantosuunnitelman toteutuminen<\/a> vastaa eri kysymykseen: toteutuivatko sis\u00e4iset ty\u00f6vaiheet suunnitellussa aikataulussa? Konepaja voi kuroa umpeen ty\u00f6vaiheen viiv\u00e4styksen ja toimittaa silti ajoissa. Toisaalta se voi noudattaa ep\u00e4realistista tuotantosuunnitelmaa ja silti my\u00f6h\u00e4sty\u00e4 asiakkaalle luvatusta toimituksesta.<\/p>\n\n\n<p>Arvioi OTD-luvulla asiakkaalle toteutunutta toimitusta ja selvit\u00e4 sis\u00e4isill\u00e4 mittareilla, mist\u00e4 tulos johtuu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miksi kiireinenkin tehdas toimittaa my\u00f6h\u00e4ss\u00e4?<\/h2>\n\n\n<p>Toimitusongelmat syntyv\u00e4t usein ty\u00f6vaiheiden v\u00e4liss\u00e4, eiv\u00e4t vain sill\u00e4 koneella, jonka ty\u00f6 lopulta my\u00f6h\u00e4styy. Osa odottaa materiaalia, menett\u00e4\u00e4 sen vuoksi suunnitellun paikkansa s\u00e4rm\u00e4yksess\u00e4 ja saapuu kokoonpanoon vasta, kun muut siihen kuuluvat osat ovat jo siell\u00e4.<\/p>\n\n\n<p>Jokaisen osaston ty\u00f6jono voi n\u00e4ytt\u00e4\u00e4 j\u00e4rkev\u00e4lt\u00e4. Ongelmana on, ett\u00e4 jonot kilpailevat yhteisest\u00e4 kapasiteetista ja ovat riippuvaisia toisistaan. Kiireellisen ty\u00f6n nostaminen yhden koneen jonossa voi siirt\u00e4\u00e4 syrj\u00e4\u00e4n toisen tilauksen, jonka my\u00f6hemmille ty\u00f6vaiheille on v\u00e4hemm\u00e4n aikaa.<\/p>\n\n\n<p>Erien muodostamisessakin on punnittava eri tavoitteita. Samankaltaisten t\u00f6iden ajaminen per\u00e4kk\u00e4in voi s\u00e4\u00e4st\u00e4\u00e4 asetusaikaa, mutta pitk\u00e4 ja tehokas er\u00e4 ei ole hyv\u00e4 valinta, jos se viiv\u00e4stytt\u00e4\u00e4 t\u00e4n\u00e4\u00e4n l\u00e4htev\u00e4\u00e4 tilausta. Tavoitteena on k\u00e4ytt\u00e4\u00e4 kapasiteettia tehokkaasti ja saada oikeat tilaukset valmiiksi, ei maksimoida tekemist\u00e4 jokaisella ty\u00f6pisteell\u00e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">Toimitusaikoihin t\u00e4ht\u00e4\u00e4v\u00e4 tuotantoaikataulu<\/a> tekee n\u00e4m\u00e4 riippuvuudet n\u00e4kyviksi. Sen sijaan, ett\u00e4 kysyisit vain, mik\u00e4 ty\u00f6 on t\u00e4ll\u00e4 ty\u00f6pisteell\u00e4 kiireellisin, voit arvioida, mill\u00e4 ty\u00f6j\u00e4rjestyksell\u00e4 koko tilauskannan ty\u00f6t voidaan saada valmiiksi k\u00e4ytett\u00e4viss\u00e4 olevassa ajassa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Muuta toimituslupaus tuotannon tavoitteeksi<\/h2>\n\n\n<p>L\u00e4hde asiakkaan odottamasta toimitusajankohdasta ja laske taaksep\u00e4in, milloin tuotannon on valmistuttava. Varaa tilauksen edellytt\u00e4m\u00e4 aika lopputarkastukseen, pakkaamiseen ja kuljetukseen sek\u00e4 ota huomioon l\u00e4hetysten viimeiset j\u00e4tt\u00f6ajat.<\/p>\n\n\n<p>Jos asiakas tarvitsee tavarat perjantaina ja niiden on l\u00e4hdett\u00e4v\u00e4 tehtaalta torstaina, tuotannon valmistumistavoite ei voi olla perjantai. Tuotannon on valmistuttava riitt\u00e4v\u00e4n ajoissa torstain l\u00e4hetysvalmisteluja varten.<\/p>\n\n\n<p>SkyPlannerissa tilauksen <strong>toimitusp\u00e4iv\u00e4<\/strong> tarkoittaa p\u00e4iv\u00e4\u00e4, johon menness\u00e4 tilauksen pit\u00e4isi olla valmis ja l\u00e4hetysvalmiina. K\u00e4yt\u00e4 t\u00e4t\u00e4 tuotannon tavoitep\u00e4iv\u00e4\u00e4, kun viet asiakkaalle annetun toimituslupauksen aikatauluun. N\u00e4in tehtaan m\u00e4\u00e4r\u00e4aika pysyy yhteydess\u00e4 toimitussopimukseen, mutta tuotannon valmistuminen ei sekoitu siihen, milloin asiakas vastaanottaa tavaran.<\/p>\n\n\n<p>Ennen kuin lupaat uuden toimitusajan, tarkista, ett\u00e4 se sopii nykyiseen ty\u00f6kuormaan. Kun tilaus on hyv\u00e4ksytty, tarkista aikataulun muuttuessa jatkuvasti, voidaanko lupaus yh\u00e4 pit\u00e4\u00e4. Viime viikolla mahdollinen toimitusaika ei ehk\u00e4 en\u00e4\u00e4 onnistu konerikon tai toimittajan viiv\u00e4styksen j\u00e4lkeen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Turvaa luvatut toimitusajat p\u00e4ivitt\u00e4isess\u00e4 tuotantoaikataulussa<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Sovita jokaisen tilauksen aikataulu k\u00e4ytett\u00e4viss\u00e4 olevaan kapasiteettiin<\/h3>\n\n\n<p>Ajoita j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet yhten\u00e4 kokonaisuutena ja huomioi niiden vaatimat koneet, vuorot, henkil\u00f6t ja ty\u00f6vaiheiden v\u00e4liset riippuvuudet. Vapaasta ajasta leikkauksessa on hy\u00f6ty\u00e4 vain, jos my\u00f6hemm\u00e4tkin ty\u00f6vaiheet ehtiv\u00e4t valmistua ajoissa.<\/p>\n\n\n<p>SkyPlannerin teko\u00e4lypohjainen ajoitusmoottori Arcturus laskee aikataulun tuotannon resurssien ja s\u00e4\u00e4nt\u00f6jen perusteella. Gantt-aikajanalta n\u00e4et, mihin ty\u00f6t on ajoitettu. Erillisten ty\u00f6jonolaskelmien sijaan saat yhten\u00e4isen n\u00e4kym\u00e4n siihen, miten tilaukset kilpailevat k\u00e4ytett\u00e4viss\u00e4 olevasta ajasta.<\/p>\n\n\n<p>Kun ty\u00f6kuorma ei mahdu k\u00e4ytett\u00e4viss\u00e4 olevaan aikaan, aikataulu antaa pohjan p\u00e4\u00e4t\u00f6ksille: harkitse lis\u00e4kapasiteettia tarvittavine ty\u00f6ntekij\u00f6ineen, ty\u00f6h\u00f6n soveltuvaa vaihtoehtoista ty\u00f6pistett\u00e4 tai erilaista ty\u00f6j\u00e4rjestyst\u00e4. Jos mik\u00e4\u00e4n n\u00e4ist\u00e4 ei turvaa luvattua toimitusaikaa, k\u00e4sittele toimitusongelma silloin, kun asiakkaalla on viel\u00e4 aikaa reagoida.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ota materiaalien saatavuus osaksi suunnitelmaa<\/h3>\n\n\n<p>Vapaa kone ei viel\u00e4 tarkoita, ett\u00e4 tilauksen valmistus voidaan aloittaa. Puuttuva raaka-aine tai ostokomponentti voi pys\u00e4ytt\u00e4\u00e4 ty\u00f6n etenemisen, vaikka kapasiteettia olisi saatavilla.<\/p>\n\n\n<p>SkyPlanner huomioi ajoituksessa varastosaldot ja saapuvat materiaalit, kun materiaalien saatavuutta koskeva s\u00e4\u00e4nt\u00f6 on k\u00e4yt\u00f6ss\u00e4. Silloin materiaalien saatavuus vaikuttaa suoraan t\u00f6iden ajoitukseen eik\u00e4 j\u00e4\u00e4 erilliseksi muistiinpanoksi, joka suunnittelijan on muistettava ty\u00f6jonoja j\u00e4rjestelless\u00e4\u00e4n.<\/p>\n\n\n<p>Pid\u00e4 hankinnan p\u00e4ivitykset mukana tuotannonsuunnittelussa. Kun materiaalin saapumisp\u00e4iv\u00e4 muuttuu, olennaista ei ole vain se, milloin materiaali saapuu, vaan my\u00f6s se, mitk\u00e4 sovitut toimitukset tarvitsevat nyt uuden tuotantosuunnitelman.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e4\u00e4t\u00e4 prioriteetit harkiten, \u00e4l\u00e4 viimeisimm\u00e4n puhelun perusteella<\/h3>\n\n\n<p>Kun p\u00e4\u00e4t\u00e4t kiireellisen pyynn\u00f6n toteuttamisesta, huomioi p\u00e4\u00e4t\u00f6ksen seuraukset. Ty\u00f6n aikaistaminen voi vied\u00e4 kapasiteettia, jota tarvitaan toisen tilauksen toimittamiseen luvatussa ajassa.<\/p>\n\n\n<p>SkyPlannerin dynaamisten prioriteettien avulla valmistumisp\u00e4iv\u00e4t ja muut liiketoiminnan prioriteetit vaikuttavat t\u00f6iden ajoitusj\u00e4rjestykseen. Suunnittelijat m\u00e4\u00e4ritt\u00e4v\u00e4t prioriteetit ja s\u00e4\u00e4nn\u00f6t, ja Arcturus soveltaa niit\u00e4 laskennassa. Voit turvata t\u00e4rke\u00e4t toimituslupaukset ilman, ett\u00e4 joudut siirt\u00e4m\u00e4\u00e4n jokaista muutoksen koskettamaa ty\u00f6vaihetta k\u00e4sin yh\u00e4 uudelleen.<\/p>\n\n\n<p>\u00c4l\u00e4 anna jokaiselle tilaukselle korkeinta prioriteettia. Jos kapasiteetti ei aidosti riit\u00e4, prioriteettimerkint\u00f6jen muuttaminen ei ratkaise ongelmaa. P\u00e4\u00e4t\u00e4 prioriteeteilla, mille t\u00f6ille niukka aika varataan, ja tarkista sitten vaikutukset muihin toimituslupauksiin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e4ivit\u00e4 suunnitelmaa tuotannon tilanteen muuttuessa<\/h3>\n\n\n<p>Kirjaa valmistuneet ty\u00f6t, tarkentuneet kestot, seisokit ja kapasiteettimuutokset viipym\u00e4tt\u00e4. Eiliseen tilanteeseen perustuva aikataulu voi antaa v\u00e4\u00e4r\u00e4n l\u00e4ht\u00f6kohdan t\u00e4m\u00e4n p\u00e4iv\u00e4n toimitusaikakeskustelulle.<\/p>\n\n\n<p>Kun Autopilot on k\u00e4yt\u00f6ss\u00e4, SkyPlanner voi laskea aikataulun uudelleen m\u00e4\u00e4ritettyjen tapahtumien perusteella tai ajastetusti s\u00e4ilytt\u00e4en asettamasi s\u00e4\u00e4nn\u00f6t ja lukitukset. My\u00f6h\u00e4ss\u00e4 olevien t\u00f6iden korostus Gantt-aikajanalla auttaa havaitsemaan tarkistusta vaativat ty\u00f6t. Saat k\u00e4ytt\u00f6\u00f6si ajan tasalla pidett\u00e4v\u00e4n suunnitelman, jonka pohjalta voit toimia, sen sijaan ett\u00e4 rakentaisit ty\u00f6jonot k\u00e4sin uudelleen jokaisen muutoksen j\u00e4lkeen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tee toimitusriski\u00e4 koskeva p\u00e4\u00e4t\u00f6s ennen l\u00e4hetysp\u00e4iv\u00e4\u00e4<\/h2>\n\n\n<p>Kuvitellaan hyv\u00e4ksytty tilaus, jonka on oltava l\u00e4hetysvalmis torstaina. Leikkaus on valmis, mutta kokoonpanossa tarvittava ostokomponentti saapuukin suunniteltua my\u00f6hemmin. Sama kokoonpanotiimi tekee my\u00f6s toista tilausta, jonka toimitusaika on seuraavalla viikolla.<\/p>\n\n\n<p>Ensimm\u00e4isen tilauksen merkitseminen kiireelliseksi ei tuo puuttuvaa komponenttia paikalle. Muiden t\u00f6iden aloittaminen etuajassa voi pit\u00e4\u00e4 ihmiset kiireisin\u00e4, mutta j\u00e4tt\u00e4\u00e4 liian v\u00e4h\u00e4n kokoonpanokapasiteettia siihen hetkeen, kun komponentti saapuu.<\/p>\n\n\n<p>Tarkastele tilausten yhteist\u00e4 aikataulua p\u00e4ivitetyn materiaalin saapumisp\u00e4iv\u00e4n perusteella. Mahtuvatko j\u00e4ljell\u00e4 oleva kokoonpano ja tarkastus viel\u00e4 ennen l\u00e4hetyst\u00e4? Voisiko my\u00f6hemmin toimitettavan tilauksen t\u00f6it\u00e4 siirt\u00e4\u00e4 vaarantamatta sen toimituslupausta? Ratkaisisiko lis\u00e4ty\u00f6aika tarvittavine ty\u00f6ntekij\u00f6ineen ongelman, vai saapuuko materiaali joka tapauksessa liian my\u00f6h\u00e4\u00e4n?<\/p>\n\n\n<p>SkyPlanner ottaa materiaalit, kapasiteetin ja prioriteetit mukaan aikataulun laskentaan. N\u00e4in suunnittelijalla on selke\u00e4mpi pohja valita korjaava toimenpide. Jos toteuttamiskelpoista vaihtoehtoa ei en\u00e4\u00e4 ole, kerro ongelmasta ja sovi jatkosta sen sijaan, ett\u00e4 odottaisit torstain vahvistavan sen, mink\u00e4 suunnitelma jo n\u00e4ytt\u00e4\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mik\u00e4 muuttui KJH-Compilla?<\/h2>\n\n\n<p>Suomalaisella ohutlevyalan sopimusvalmistajalla KJH-Compilla oli haasteena sovittaa viikkotason tuotanton\u00e4kym\u00e4 tiettyihin p\u00e4iviin sidottuihin toimituslupauksiin. C9000 ERP ja taulukkolaskenta n\u00e4yttiv\u00e4t viikkojen kokonaiskuormituksen, mutta ty\u00f6njohtajat jakoivat ty\u00f6t koneille k\u00e4sin.<\/p>\n\n\n<p>SkyPlannerin my\u00f6t\u00e4 <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/aarellinen-kuormitus\/\">\u00e4\u00e4rellisen kapasiteetin kuormitus<\/a> ja t\u00f6iden jakaminen koneille automatisoituivat. Lis\u00e4ksi yrityksen hitsausta edelt\u00e4v\u00e4ss\u00e4 valmiustarkistuksessa varmistetaan, ett\u00e4 kaikki tarvittavat osat, my\u00f6s ostokomponentit, ovat koossa ennen ty\u00f6n siirtymist\u00e4 jonoon. N\u00e4in aloitusvalmiit ty\u00f6t yhdistyv\u00e4t niiden tarvitsemaan kapasiteettiin ja tavoitep\u00e4iviin.<\/p>\n\n\n<p>KJH-Comp kertoo toimitusvarmuutensa nousseen noin 50 %:sta parhaimmillaan 98 %:iin vuonna 2026. Muille valmistajille keskeinen oppi on tuloksen taustalla oleva suunnittelutavan muutos: viikon kokonaiskuormitus ei riit\u00e4, kun asiakkaat odottavat tilauksiaan tiettyn\u00e4 p\u00e4iv\u00e4n\u00e4.<\/p>\n\n\n<p>Lue tarkemmin k\u00e4ytt\u00f6\u00f6notosta ja tuloksista <a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/kjh-comp\/\">KJH-Compin SkyPlanner-kokemuksista<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tunnista toimitusriskit ennen kuin toimitukset my\u00f6h\u00e4styv\u00e4t<\/h2>\n\n\n<p>Keskittyk\u00e4\u00e4 p\u00e4ivitt\u00e4isess\u00e4 suunnittelupalaverissa hyv\u00e4ksyttyihin tilauksiin, joiden valmistumistavoite on vaarassa. Selvitt\u00e4k\u00e4\u00e4 kunkin tilauksen kohdalla, mik\u00e4 materiaali, ty\u00f6vaihe tai resurssi rajoittaa etenemist\u00e4. Valitkaa toimenpide ja tarkistakaa, mihin muihin toimituslupauksiin se vaikuttaa. Tuokaa n\u00e4in muodostuva ty\u00f6j\u00e4rjestys ty\u00f6ntekij\u00f6iden n\u00e4kyville.<\/p>\n\n\n<p>Seuratkaa OTD-luvun lis\u00e4ksi sit\u00e4, kuinka paljon toimitukset my\u00f6h\u00e4styiv\u00e4t ja mitk\u00e4 syyt toistuvat my\u00f6h\u00e4stymisten taustalla. Jos materiaalit eiv\u00e4t ole ajoissa k\u00e4ytett\u00e4viss\u00e4, tarvitaan eri toimenpiteit\u00e4 kuin silloin, kun sama ty\u00f6piste ylikuormittuu toistuvasti. Seuratkaa toteutuneita toimituksia sek\u00e4 alkuper\u00e4isi\u00e4 lupauksia ett\u00e4 muutettuja sitoumuksia vasten, jotta toimitusvarmuus todella paranee eik\u00e4 vain toimitusp\u00e4ivi\u00e4 siirret\u00e4.<\/p>\n\n\n<p>Jos tarkastelun p\u00e4\u00e4tteeksi jonkun on yh\u00e4 korjattava usean koneen ty\u00f6jonoja k\u00e4sin, SkyPlanner on k\u00e4yt\u00e4nn\u00f6llinen seuraava askel. Se <a href=\"https:\/\/skyplanner.ai\/fi\/integraatiot\/\">integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n<\/a> avoimen REST API -rajapintansa kautta ja muodostaa tuotantotiedoistasi aikataulun, joka voi pysy\u00e4 muutosten mukana.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa esittely<\/a>, jossa l\u00e4ht\u00f6kohtana ovat hyv\u00e4ksytty tilaus ja tehtaasi todellinen h\u00e4iri\u00f6tilanne. N\u00e4e, miten j\u00e4ljell\u00e4 olevat ty\u00f6vaiheet, muu kuormitus ja toimitustavoite saadaan sovitettua yhteen. Tai <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">aloita kokeilu esimerkkiaineistolla<\/a> ja tutustu siihen, miten SkyPlanner voi auttaa tiimi\u00e4si pit\u00e4m\u00e4\u00e4n seuraavan lupauksensa.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi Etusivu &raquo; Resurssit &raquo; Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi Toimitust\u00e4sm\u00e4llisyys (OTD) mittaa, kuinka hyvin asiakkaan kanssa sovitut toimitusajat pit\u00e4v\u00e4t. Valmistuksessa sen parantaminen tarkoittaa, ett\u00e4 oikeat tilaukset p\u00e4\u00e4sev\u00e4t etenem\u00e4\u00e4n tuotannossa, valmistuvat ja saapuvat sovittuun toimituspaikkaan ajoissa. Se ei ole sama asia kuin kaikkien koneiden pit\u00e4minen k\u00e4ynniss\u00e4. Leikkaus voi olla aikataulusta edell\u00e4, vaikka huomenna &#8230; <a title=\"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[300,2550],"tags":[],"class_list":["post-100426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oppaat","category-tuotannon-tehokkuus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi<\/title>\n<meta name=\"description\" content=\"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\" \/>\n<meta property=\"og:description\" content=\"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:47:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:47:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/\"},\"wordCount\":1755,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"oppaat\",\"Tuotannon tehokkuus\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/\",\"name\":\"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:47:40+00:00\",\"description\":\"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/toimitusvarmuus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi","description":"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/","og_locale":"fi_FI","og_type":"article","og_title":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi","og_description":"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:47:40+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:47:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/"},"wordCount":1755,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["oppaat","Tuotannon tehokkuus"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/","name":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:47:40+00:00","description":"Tilaukset my\u00f6h\u00e4ss\u00e4, vaikka tehdas k\u00e4y t\u00e4ysill\u00e4? Opi mittaamaan toimitusvarmuutta ja pit\u00e4m\u00e4\u00e4n tuotanto luvatussa aikataulussa SkyPlannerin avulla.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/toimitusvarmuus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi Etusivu &raquo; Resurssit &raquo; Toimitusvarmuus valmistuksessa: pid\u00e4 lupauksesi Toimitust\u00e4sm\u00e4llisyys (OTD) mittaa, kuinka hyvin asiakkaan kanssa sovitut toimitusajat pit\u00e4v\u00e4t. Valmistuksessa sen parantaminen tarkoittaa, ett\u00e4 oikeat tilaukset p\u00e4\u00e4sev\u00e4t etenem\u00e4\u00e4n tuotannossa, valmistuvat ja saapuvat sovittuun toimituspaikkaan ajoissa. Se ei ole sama asia kuin kaikkien koneiden pit\u00e4minen k\u00e4ynniss\u00e4. Leikkaus voi olla aikataulusta edell\u00e4, vaikka huomenna&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=100426"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100426\/revisions"}],"predecessor-version":[{"id":100485,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100426\/revisions\/100485"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=100426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=100426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=100426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}