{"id":100149,"date":"2026-10-16T17:01:26","date_gmt":"2026-10-16T17:01:26","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100149"},"modified":"2026-10-16T17:01:33","modified_gmt":"2026-10-16T17:01:33","slug":"tilauskanta","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/","title":{"rendered":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Tilauskanta koostuu vahvistetuista asiakastilauksista, joita ei ole viel\u00e4 toimitettu kokonaan.<\/strong> Valmistavassa teollisuudessa sill\u00e4 tarkoitetaan yleens\u00e4 viel\u00e4 toimittamatta olevia tilauksia, m\u00e4\u00e4ri\u00e4 tai niiden arvoa. Osaa tilauksista ei ehk\u00e4 ole viel\u00e4 aloitettu, osa on jo tuotannossa ja osa odottaa l\u00e4hetyst\u00e4.<\/p>\n\n\n<p>Tilauskanta ei itsess\u00e4\u00e4n ole ongelma. Se voi kertoa tulevan kysynn\u00e4n terveest\u00e4 tasosta. Tuotannon kannalta ratkaisevaa on, saadaanko j\u00e4ljell\u00e4 olevat ty\u00f6t valmiiksi ajoissa, jotta jo luvatuista toimitusp\u00e4ivist\u00e4 voidaan pit\u00e4\u00e4 kiinni.<\/p>\n\n\n<p>Pelkk\u00e4 tilauskannan kokonaism\u00e4\u00e4r\u00e4 ei vastaa t\u00e4h\u00e4n. SkyPlanner APS yhdist\u00e4\u00e4 tilauskannan edellytt\u00e4m\u00e4t tuotantoty\u00f6t k\u00e4ytett\u00e4viss\u00e4 olevaan kapasiteettiin. N\u00e4in k\u00e4yt\u00f6ss\u00e4 on yhteinen aikataulu eik\u00e4 j\u00e4lleen uusi lista, joka on rakennettava uudelleen aina asiakkaan pyyt\u00e4ess\u00e4 aikaisempaa toimitusta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 tilauskantaan kuuluu?<\/h2>\n\n\n<p>Laske tilauskantaan vahvistetut tilaukset, joihin liittyy viel\u00e4 t\u00e4ytt\u00e4m\u00e4t\u00f6n toimitusvelvoite. Mukaan kuuluu my\u00f6s osittain toimitetun tilauksen toimittamaton osuus. Pid\u00e4 tarjoukset, tiedustelut ja vahvistamattomat myyntimahdollisuudet erill\u00e4\u00e4n: ne voivat olla t\u00e4rkeit\u00e4 tulevan toiminnan suunnittelussa, mutta ne eiv\u00e4t vastaa sitovia asiakastilauksia.<\/p>\n\n\n<p>Oletetaan, ett\u00e4 asiakas tilaa 100 koteloa ja toimitat niist\u00e4 40. Tilauskantaan j\u00e4\u00e4 t\u00e4lt\u00e4 tilaukselta 60 koteloa, ei alkuper\u00e4isi\u00e4 100:aa. J\u00e4ljell\u00e4 olevien 60 kotelon valmistuminen ei viel\u00e4 yksin tarkoita toimitusvelvoitteen t\u00e4yttymist\u00e4: ne on ehk\u00e4 viel\u00e4 tarkastettava, pakattava tai l\u00e4hetett\u00e4v\u00e4.<\/p>\n\n\n<p>Kun m\u00e4\u00e4r\u00e4t mitataan samalla perusteella, tilauskannan saldo lasketaan n\u00e4in:<\/p>\n\n\n<p><strong>Tilauskanta kauden lopussa = tilauskanta kauden alussa + uudet vahvistetut m\u00e4\u00e4r\u00e4t \u2212 toimitetut m\u00e4\u00e4r\u00e4t \u2212 perutut m\u00e4\u00e4r\u00e4t<\/strong>. Muut sovitut tilausmuutokset huomioidaan oikaisuina.<\/p>\n\n\n<p>K\u00e4yt\u00e4 laskentaa tuotekohtaisesti tai valitse muu tarkoituksenmukainen yhteinen mittayksikk\u00f6. Erilaisten tuotteiden laskeminen yhteen kappalem\u00e4\u00e4r\u00e4ksi voi peitt\u00e4\u00e4 enemm\u00e4n kuin paljastaa. Tilauskannan arvo antaa johdolle kaupallisen n\u00e4kym\u00e4n, mutta se ei kerro, kuinka monta konetuntia viel\u00e4 tarvitaan.<\/p>\n\n\n<p>M\u00e4\u00e4rittele selke\u00e4sti, miss\u00e4 vaiheessa tilaus katsotaan raportissa toimitetuksi: esimerkiksi silloin, kun se l\u00e4hetet\u00e4\u00e4n tai kun se saapuu asiakkaalle. K\u00e4yt\u00e4 samaa m\u00e4\u00e4ritelm\u00e4\u00e4 johdonmukaisesti. Muuten myynti ja tuotanto voivat n\u00e4ytt\u00e4\u00e4 olevan eri mielt\u00e4 vain siksi, ett\u00e4 ne mittaavat eri asioita.<\/p>\n\n\n<p>Kolme erottelua helpottaa tilauskannan tulkintaa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tilauskanta ja my\u00f6h\u00e4styneet tilaukset:<\/strong> ensi kuussa toimitettava tilaus voi kuulua tilauskantaan olematta my\u00f6h\u00e4ss\u00e4. My\u00f6h\u00e4styneit\u00e4 ovat ne tilaukset, joiden sovittu toimitusp\u00e4iv\u00e4 on jo ohitettu.<\/li><li><strong>Tilauskanta ja keskener\u00e4inen tuotanto:<\/strong> keskener\u00e4inen tuotanto eli WIP tarkoittaa aloitettua mutta viel\u00e4 valmistumatonta tuotantoa. Tilauskantaan voi kuulua my\u00f6s aloittamattomia tilauksia ja toimitusta odottavia valmiita tuotteita. Varastoon valmistettava tuote voi puolestaan olla keskener\u00e4ist\u00e4 tuotantoa kuulumatta vahvistettuun asiakastilauskantaan.<\/li><li><strong>Tilauskanta ja j\u00e4lkitoimitukset:<\/strong> j\u00e4lkitoimituksella tarkoitetaan tavallisesti tilausta, jota ei pystyt\u00e4 juuri nyt toimittamaan saatavilla olevasta varastosta. Tilauskanta on t\u00e4t\u00e4 laajempi k\u00e4site: siihen kuuluvat my\u00f6s tilaukset, jotka on vahvistettu toimitettaviksi normaalisti my\u00f6hemmin.<\/li><\/ul>\n\n\n<p>Siksi tilauskanta ei pienene pelk\u00e4st\u00e4\u00e4n aloittamalla lis\u00e4\u00e4 t\u00f6it\u00e4. Oikeat ty\u00f6t on saatava valmiiksi ja toimitettua.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miksi samankokoinen tilauskanta voi tarkoittaa aivan erilaista ty\u00f6kuormaa?<\/h2>\n\n\n<p>Oletetaan, ett\u00e4 tehtaallasi on kolme toimittamatonta kotelotilausta. Tilausten vaihe ratkaisee, mit\u00e4 tehtaalla on viel\u00e4 teht\u00e4v\u00e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tilauksen tila<\/th><th>J\u00e4ljell\u00e4 olevat ty\u00f6t<\/th><th>Suunnittelussa ratkaistava kysymys<\/th><\/tr><\/thead><tbody><tr><td>Vahvistettu, ei aloitettu<\/td><td>Leikkaus, s\u00e4rm\u00e4ys, pinnoitus ja kokoonpano<\/td><td>Mihin koko valmistusketju mahtuu jo sovittujen t\u00f6iden rinnalle?<\/td><\/tr><tr><td>Osittain valmistettu<\/td><td>Pinnoitus ja kokoonpano<\/td><td>Milloin pinnoituskapasiteettia vapautuu, ja ehtiik\u00f6 kokoonpano valmistua sen j\u00e4lkeen ajoissa?<\/td><\/tr><tr><td>Tuotanto valmis<\/td><td>Pakkaus ja l\u00e4hetys<\/td><td>Mik\u00e4 est\u00e4\u00e4 valmiin tilauksen l\u00e4hett\u00e4misen?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kaikki kolme kuuluvat toimittamattomaan tilauskantaan. Kaikkien ei silti tarvitse en\u00e4\u00e4 kulkea koko valmistusketjun l\u00e4pi. Alkuper\u00e4isen ty\u00f6kuorman ajoittaminen uudelleen liioittelisi tuotannon kapasiteettitarvetta, kun taas aloittamattoman tilauksen sivuuttaminen aliarvioisi sit\u00e4.<\/p>\n\n\n<p>Nyt osittain valmistetun tilauksen asiakas pyyt\u00e4\u00e4 aikaistamaan toimitusta. Tilauksen siirt\u00e4minen pinnoitusjonon k\u00e4rkeen vaikuttaa hyv\u00e4lt\u00e4 ratkaisulta. My\u00f6s aloittamaton tilaus tarvitsee kuitenkin my\u00f6hemmin samaa pinnoitusresurssia, ja sen j\u00e4lkeen sen on ehditt\u00e4v\u00e4 kokoonpanon l\u00e4pi omaan luvattuun toimitusp\u00e4iv\u00e4\u00e4ns\u00e4 menness\u00e4.<\/p>\n\n\n<p>Sinun on n\u00e4ht\u00e4v\u00e4, miten muutos vaikuttaa molempiin tilauksiin, ei vain sit\u00e4, saadaanko yksi er\u00e4 mahdutettua pinnoitukseen. L\u00e4hetyst\u00e4 odottavaa valmista tilausta tuotannon kiirehtiminen ei puolestaan auta lainkaan.<\/p>\n\n\n<p><strong>Tarkastele toimituslupausta ja j\u00e4ljell\u00e4 olevaa ty\u00f6t\u00e4 yhdess\u00e4.<\/strong> N\u00e4in selvi\u00e4\u00e4, kannattaako seuraavaksi muuttaa aikataulua, tehd\u00e4 kapasiteettia koskeva p\u00e4\u00e4t\u00f6s vai yksinkertaisesti saada valmis tilaus matkaan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Muuta tilauskanta tuotantosuunnitelmaksi SkyPlannerilla<\/h2>\n\n\n<p>Asiakastilausten ja toimitusten hallinta voi edelleen tapahtua ERP-j\u00e4rjestelm\u00e4ss\u00e4si. SkyPlanner integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n avoimen REST API -rajapintansa kautta ja yhdist\u00e4\u00e4 olemassa olevat tilaus- ja tuotantotiedot <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/mita-on-hienokuormitus\/\">tuotannon hienokuormitukseen<\/a>. Saat ty\u00f6kalun t\u00f6iden suunnitteluun ilman, ett\u00e4 sitovat asiakastilaukset kirjaavaa j\u00e4rjestelm\u00e4\u00e4 tarvitsee vaihtaa.<\/p>\n\n\n<p>Ajoituksen l\u00e4ht\u00f6tiedot kuvaavat j\u00e4ljell\u00e4 olevaa ty\u00f6t\u00e4: ty\u00f6vaiheita, niiden j\u00e4rjestyst\u00e4 ja kestoa, soveltuvia ty\u00f6pisteit\u00e4, ty\u00f6vuoroja, ty\u00f6ntekij\u00f6it\u00e4 ja prioriteetteja. SkyPlannerin ajoitusteko\u00e4ly Arcturus sijoittaa ty\u00f6t aikatauluun m\u00e4\u00e4ritellyn kapasiteetin ja riippuvuuksien perusteella. Kun materiaalit huomioiva ajoitus on k\u00e4yt\u00f6ss\u00e4, my\u00f6s materiaalien saatavuus otetaan mukaan laskentaan.<\/p>\n\n\n<p>Kotelotehtaassa t\u00e4m\u00e4 tarkoittaa niiden leikkaus-, s\u00e4rm\u00e4ys-, pinnoitus- ja kokoonpanot\u00f6iden suunnittelua, joita vahvistettujen tilausten valmistaminen viel\u00e4 edellytt\u00e4\u00e4. Sen sijaan, ett\u00e4 arvioisit toimitusaikaa tilauskannan koon perusteella, voit seurata ajoitettua ty\u00f6t\u00e4 sen arvioituun valmistumiseen asti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ota ajoittamattomat ty\u00f6t mukaan suunnitelmaan<\/h3>\n\n\n<p>Vahvistettua tilausta ei v\u00e4ltt\u00e4m\u00e4tt\u00e4 ole viel\u00e4 ajoitettu. Pid\u00e4 n\u00e4kyviss\u00e4 my\u00f6s ty\u00f6t, joita ei ole viel\u00e4 sijoitettu suunnitelmaan. N\u00e4in selke\u00e4lt\u00e4 n\u00e4ytt\u00e4v\u00e4 Gantt ei peit\u00e4 sen ulkopuolella odottavia toimitusvelvoitteita.<\/p>\n\n\n<p>SkyPlannerissa voit ajoittaa valitsemasi ajoittamattomat ty\u00f6t. My\u00f6s sen avustajassa on toiminto ajoittamattomien t\u00f6iden ajoittamiseen. Kun ty\u00f6 on sijoitettu aikatauluun, se on osa tuotantosuunnitelmaa ja sit\u00e4 voi tarkastella muiden t\u00f6iden rinnalla.<\/p>\n\n\n<p>T\u00e4m\u00e4 on eri asia kuin <strong>Ajoita kaikki uudelleen<\/strong> -toiminto, joka laskee aikajanalla jo olevien t\u00f6iden ajoituksen uudelleen. Ensimm\u00e4isell\u00e4 ajoituksella ty\u00f6t tuodaan suunnitelmaan, ja uudelleenajoituksella jo ajoitetut ty\u00f6t mukautetaan muuttuviin olosuhteisiin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Katso vaikutus toimitukseen, \u00e4l\u00e4 vain seuraavaa vapaata aikaa<\/h3>\n\n\n<p>Gantt-aikajana n\u00e4ytt\u00e4\u00e4, miss\u00e4 ja milloin ty\u00f6t on suunniteltu teht\u00e4viksi. <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tuotannon-kapasiteettisuunnittelu\/\">Kapasiteetti- ja ty\u00f6kuormatiedoista<\/a> n\u00e4et, mitk\u00e4 resurssit on jo varattu ja miss\u00e4 j\u00e4ljell\u00e4 olevat ty\u00f6t kilpailevat samasta ajasta.<\/p>\n\n\n<p>Seuraa koteloesimerkiss\u00e4 ty\u00f6t\u00e4 pinnoituksesta kokoonpanoon asti. Aikaisemmasta pinnoitusajasta on hy\u00f6ty\u00e4 vain, jos my\u00f6s loput ty\u00f6vaiheet mahdollistavat valmistumisen pyydettyyn aikaan. Huomioi pakkaus, kuljetus ja muut tuotannon j\u00e4lkeiset velvoitteet ennen kuin vahvistat toimitusp\u00e4iv\u00e4n asiakkaalle.<\/p>\n\n\n<p>Myynti ja tuotanto voivat silloin keskustella laskettuun aikatauluun perustuvasta suunnitelmasta sen sijaan, ett\u00e4 kumpikin arvioisi erikseen, kuinka kiireiselt\u00e4 tehdas n\u00e4ytt\u00e4\u00e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Laske aikataulu uudelleen sen sijaan, ett\u00e4 kokoaisit sen k\u00e4sin<\/h3>\n\n\n<p>Kun asiakas pyyt\u00e4\u00e4 aikaisempaa toimitusta, p\u00e4ivit\u00e4 kyseisen ty\u00f6n prioriteetti ja anna Arcturus-teko\u00e4lyn laskea aikataulussa olevien t\u00f6iden ajoitus uudelleen. Tarkista muuttuneet valmistumisajat ennen uuden lupauksen antamista. Asettamasi prioriteetit ja lukitukset ohjaavat laskentaa, ja ohjelmisto hoitaa toisiinsa liittyvien t\u00f6iden ajoituksen.<\/p>\n\n\n<p>Pid\u00e4 my\u00f6s tuotannon etenemistiedot ajan tasalla. Valmistuneet ty\u00f6vaiheet ja k\u00e4ytett\u00e4viss\u00e4 olevan kapasiteetin muutokset vaikuttavat siihen, mik\u00e4 on viel\u00e4 mahdollista. Kun Autopilot on k\u00e4yt\u00f6ss\u00e4, m\u00e4\u00e4ritellyt tapahtumat tai ajastetut ajot voivat k\u00e4ynnist\u00e4\u00e4 uudelleenajoituksen ilman jatkuvaa k\u00e4sin ohjaamista.<\/p>\n\n\n<p>N\u00e4in ty\u00f6vaiheiden siirtelyyn jonosta toiseen kuluu v\u00e4hemm\u00e4n aikaa, ja enemm\u00e4n aikaa j\u00e4\u00e4 tulosten pohjalta teht\u00e4ville p\u00e4\u00e4t\u00f6ksille. Voit vastata toimitusta koskevaan pyynt\u00f6\u00f6n asiakkaan viel\u00e4 odottaessa vastausta sen sijaan, ett\u00e4 tarvitsisit taas uuden kierroksen k\u00e4sin laskentaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fredman: toimituslupaukset kapasiteettitiedon pohjalta<\/h2>\n\n\n<p>Kasvavat tilausm\u00e4\u00e4r\u00e4t toivat t\u00e4m\u00e4n ongelman Fredman Operationsille, suomalaiselle elintarviketurvallisten keitti\u00f6- ja pakkausratkaisujen valmistajalle. Ty\u00f6kortteja siirrettiin k\u00e4sin L7-toiminnanohjausj\u00e4rjestelm\u00e4n ja LTR-tuotannonohjausohjelmiston v\u00e4lill\u00e4. Suunnittelijalla ei ollut tarkkaa n\u00e4kyvyytt\u00e4 koneiden vapautumisaikoihin eik\u00e4 vuorokohtaiseen kapasiteettiin. Kiireellinen uudelleenajoitus saattoi vied\u00e4 tunnin tai enemm\u00e4n.<\/p>\n\n\n<p>SkyPlannerin ansiosta Fredmanin Gantt-n\u00e4kym\u00e4 kokoaa yhteen koneet, vapaan ja varatun kapasiteetin sek\u00e4 t\u00f6iden etenemisen. Vuorokohtainen kapasiteetti on osa p\u00e4ivitt\u00e4ist\u00e4 suunnittelua, ja tuotantotiimi n\u00e4kee kunkin ty\u00f6n suunnitellun alkamis- ja p\u00e4\u00e4ttymisajan.<\/p>\n\n\n<p>Fredman kertoo, ett\u00e4 myynti pystyy antamaan kapasiteettitietoon perustuvia toimituslupauksia jopa kuuden kuukauden p\u00e4\u00e4h\u00e4n. Aikataulumuutoksia koskeviin pyynt\u00f6ihin saadaan vastaukset sekunneissa tuntien sijaan. Yritys kertoo my\u00f6s ylity\u00f6tarpeen v\u00e4hentyneen.<\/p>\n\n\n<p>Fredmanin kokemus osoittaa, mit\u00e4 hy\u00f6ty\u00e4 tilauskannan yhdist\u00e4misest\u00e4 tuotantoon on k\u00e4yt\u00e4nn\u00f6ss\u00e4: yhteinen vastaus siihen, mit\u00e4 tehdas voi ottaa teht\u00e4v\u00e4kseen ja milloin, saadaan nopeammin. Lue tiimin kokemuksista lis\u00e4\u00e4 <a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/fredman-operations\/\">Fredman Operationsin koko SkyPlanner-asiakastarinasta<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 tehd\u00e4, kun tilauskanta ei mahdu aikatauluun?<\/h2>\n\n\n<p>Parempi aikataulu voi tehostaa nykyisen kapasiteetin k\u00e4ytt\u00f6\u00e4. Se ei kuitenkaan anna ylikuormitetulle pinnoituslinjalle rajattomasti k\u00e4ytt\u00f6tunteja.<\/p>\n\n\n<p>Selvit\u00e4 suunnitelman avulla, mitk\u00e4 toimituslupaukset ovat vaarassa ja mik\u00e4 est\u00e4\u00e4 t\u00f6iden mahtumisen aikatauluun. Kohdista sitten toimenpiteet oikein:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Muuta prioriteetteja, kun se on kaupallisesti perusteltua, ja tarkista vaikutukset muihin tilauksiin.<\/li><li>Lis\u00e4\u00e4 miehitetty\u00e4 k\u00e4ytt\u00f6aikaa tai k\u00e4yt\u00e4 hyv\u00e4ksytty\u00e4 vaihtoehtoista resurssia siell\u00e4, miss\u00e4 se todella voi helpottaa kapasiteettipulaa.<\/li><li>Ratkaise materiaalipuutteet ja muut ty\u00f6n tekemisen edellytyksiin liittyv\u00e4t ongelmat sen sijaan, ett\u00e4 siirt\u00e4isit ty\u00f6t\u00e4 yh\u00e4 uudelleen n\u00e4iden esteiden vuoksi.<\/li><li>Sovi asiakkaan kanssa uudesta toimitusp\u00e4iv\u00e4st\u00e4 tai h\u00e4nt\u00e4 hy\u00f6dytt\u00e4v\u00e4st\u00e4 osatoimituksesta, kun alkuper\u00e4ist\u00e4 toimituslupausta ei en\u00e4\u00e4 voida pit\u00e4\u00e4.<\/li><\/ul>\n\n\n<p>Tarkastele my\u00f6h\u00e4ss\u00e4 olevia tilauksia erill\u00e4\u00e4n tulevista toimituksista. Vaikka tilauskanta kokonaisuutena pienenee, yksitt\u00e4isen asiakkaan toimitus voi silti my\u00f6h\u00e4sty\u00e4 yh\u00e4 enemm\u00e4n. Kasvavakin tilauskanta voi puolestaan olla hallittavissa, jos ty\u00f6t mahtuvat tulevaan kapasiteettiin.<\/p>\n\n\n<p>Tavoitteena ei ole mahdollisimman pieni tilauskanta, vaan tilauskanta, jonka vaatimukset tunnet ja jonka pystyt toimittamaan kannattavasti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Selvit\u00e4, millaisia toimituslupauksia voit antaa tilauskannan perusteella<\/h2>\n\n\n<p>Jos pyynt\u00f6 aikaistaa toimitusta vie tuotannonsuunnittelijasi yh\u00e4 takaisin taulukkolaskentaan, SkyPlanner on k\u00e4yt\u00e4nn\u00f6llinen seuraava askel. Se kokoaa j\u00e4ljell\u00e4 olevat tuotantoty\u00f6t, kapasiteetin ja prioriteetit aikatauluksi, jonka pohjalta tiimisi voi tehd\u00e4 seuraavan toimitusp\u00e4\u00e4t\u00f6ksen.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a> ja ota esimerkiksi tyypillinen tilaus, resurssi, jonka kapasiteetista se kilpailee, sek\u00e4 hiljattain saatu pyynt\u00f6 aikaistaa toimitusta. N\u00e4iden avulla voidaan havainnollistaa, miten suunnitelma muuttuu ja mihin muihin toimituslupauksiin muutos vaikuttaa. Voit my\u00f6s ensin <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeilla SkyPlanneria demodatalla<\/a> ja tutustua hienokuormitusymp\u00e4rist\u00f6\u00f6n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tilauskanta: mit\u00e4 se merkitsee tehtaallesi? Etusivu &raquo; Resurssit &raquo; Tilauskanta: mit\u00e4 se merkitsee tehtaallesi? Tilauskanta koostuu vahvistetuista asiakastilauksista, joita ei ole viel\u00e4 toimitettu kokonaan. Valmistavassa teollisuudessa sill\u00e4 tarkoitetaan yleens\u00e4 viel\u00e4 toimittamatta olevia tilauksia, m\u00e4\u00e4ri\u00e4 tai niiden arvoa. Osaa tilauksista ei ehk\u00e4 ole viel\u00e4 aloitettu, osa on jo tuotannossa ja osa odottaa l\u00e4hetyst\u00e4. Tilauskanta ei itsess\u00e4\u00e4n &#8230; <a title=\"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":100177,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-100149","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-hienokuormitus","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?<\/title>\n<meta name=\"description\" content=\"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\" \/>\n<meta property=\"og:description\" content=\"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T17:01:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T17:01:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/\"},\"wordCount\":1620,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"articleSection\":[\"APS ja hienokuormitus\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/\",\"name\":\"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:33+00:00\",\"description\":\"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/tilauskanta\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?","description":"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/","og_locale":"fi_FI","og_type":"article","og_title":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?","og_description":"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T17:01:26+00:00","article_modified_time":"2026-10-16T17:01:33+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/"},"wordCount":1620,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","articleSection":["APS ja hienokuormitus","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/","name":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:33+00:00","description":"Kasvava tilauskanta ei ole toimitussuunnitelma. SkyPlanner yhdist\u00e4\u00e4 vahvistetut tilaukset, j\u00e4ljell\u00e4 olevan ty\u00f6n ja kapasiteetin realistisiksi aikatauluiksi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","width":1672,"height":941,"caption":"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauskanta\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tilauskanta: mit\u00e4 se merkitsee tehtaallesi? Etusivu &raquo; Resurssit &raquo; Tilauskanta: mit\u00e4 se merkitsee tehtaallesi? Tilauskanta koostuu vahvistetuista asiakastilauksista, joita ei ole viel\u00e4 toimitettu kokonaan. Valmistavassa teollisuudessa sill\u00e4 tarkoitetaan yleens\u00e4 viel\u00e4 toimittamatta olevia tilauksia, m\u00e4\u00e4ri\u00e4 tai niiden arvoa. Osaa tilauksista ei ehk\u00e4 ole viel\u00e4 aloitettu, osa on jo tuotannossa ja osa odottaa l\u00e4hetyst\u00e4. Tilauskanta ei itsess\u00e4\u00e4n&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=100149"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100149\/revisions"}],"predecessor-version":[{"id":100211,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/100149\/revisions\/100211"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/100177"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=100149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=100149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=100149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}