{"id":99489,"date":"2026-10-16T00:41:10","date_gmt":"2026-10-16T00:41:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99489"},"modified":"2026-10-20T23:23:46","modified_gmt":"2026-10-20T23:23:46","slug":"tellimuspohine-koostamine","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/","title":{"rendered":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Tellimusp\u00f5hine koostamine (ATO) t\u00e4hendab, et standardkomponente v\u00f5i alamkooste hoitakse valmis ning l\u00f5pptoode koostatakse p\u00e4rast kliendi tellimuse saabumist. Eri tootevariantides kasutatavad osad valmistatakse ette, kuid neist ei koostata ette k\u00f5iki v\u00f5imalikke valmistootevariante.<\/p>\n\n\n<p>Nii saab pakkuda klientidele suuremat valikut ja l\u00fchemat ooteaega kui k\u00f5ike algusest peale valmistades. T\u00e4ielik osakomplekt ei t\u00e4henda aga, et koostekoht on vaba. Enne kui tellimus saab tehasest v\u00e4ljuda, vajab see endiselt inimesi, seadmeid ja sageli ka vaba katsetusv\u00f5imsust.<\/p>\n\n\n<p>Tootmise planeerijal on ATO puhul seega kaks omavahel seotud \u00fclesannet: tagada \u00f5igete moodulite saadavus ja leida kliendi valitud kombinatsioonile tootmises realistlik aeg. SkyPlanner APS teeb selleks vajalikud ajastusarvutused ning aitab valmis komponentidest toote koostamiseks luua koosk\u00f5lastatud plaani, mitte j\u00e4rjekordset t\u00f6\u00f6j\u00e4rjekorda, mida tuleb k\u00e4sitsi \u00fcmber t\u00f5sta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kuidas tellimusp\u00f5hine koostamine toimib?<\/h2>\n\n\n<p>ATO eristab eeldatava n\u00f5udluse katteks tehtavat t\u00f6\u00f6d konkreetse kliendi jaoks tehtavast t\u00f6\u00f6st. Enne tellimuse saabumist ostetakse komponendid v\u00f5i valmistatakse standardmoodulid. P\u00e4rast tellimuse saabumist valitakse vajalik kombinatsioon, koostatakse toode, tehakse n\u00f5utavad katsed v\u00f5i kontrollid ning valmistatakse see l\u00e4hetamiseks ette.<\/p>\n\n\n<p>Eri toodetes kasutatavate \u00fchiste komponentide laovaru asub klienditellimuse lahutuspunktis: piiril, kus prognoosip\u00f5hine ettevalmistus l\u00e4heb \u00fcle konkreetse tellimuse t\u00e4itmiseks. Oluline ei ole hoida laos k\u00f5iki valmistoote konfiguratsioone, vaid v\u00e4iksemat valikut komponente, mida saab kasutada mitmes konfiguratsioonis.<\/p>\n\n\n<p>Kujutame ette moodulpumbaagregaate tarnivat tootjat. Kliendid saavad valida heakskiidetud pumpade, mootorite ja juhtmoodulite kombinatsioonide seast. Tootja hoiab neid komponente laos ja koostab p\u00e4rast tellimuse saamist valitud kombinatsiooni standardsele alusraamile. Seej\u00e4rel tuleb veel teha l\u00f5plikud \u00fchendused, katsetused ja pakkimine.<\/p>\n\n\n<p>See ongi ATO. Kui sama tootja peab esmalt projekteerima t\u00e4iesti uue pumbalahenduse, on tegu juba teistsuguse tellimusega. Ainu\u00fcksi \u00fchiste osade kasutamine ei t\u00e4henda, et iga kliendi j\u00e4rgi kohandatud toode valmib tellimusp\u00f5hise koostamise teel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tellimusp\u00f5hine koostamine v\u00f5rreldes tellimusp\u00f5hise tootmise ja laotootmisega<\/h3>\n\n\n<p>K\u00f5ige selgem erinevus seisneb selles, mis on kliendi tellimuse saabumise ajaks valmis.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strateegia<\/th><th>Enne tellimust valmis<\/th><th>Peamine t\u00f6\u00f6 p\u00e4rast tellimust<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/laotootmine\/\">Laotootmine (MTS)<\/a><\/td><td>Eeldatava n\u00f5udluse katteks valmistatud l\u00f5pptooted<\/td><td>Laos olevate toodete komplekteerimine, pakkimine ja l\u00e4hetamine<\/td><\/tr><tr><td>Tellimusp\u00f5hine koostamine (ATO)<\/td><td>Standardkomponendid v\u00f5i alamkoostud<\/td><td>Valitud kombinatsiooni koostamine, katsetamine ja l\u00e4hetuseks ettevalmistamine<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-tootmine\/\">Tellimusp\u00f5hine tootmine (MTO)<\/a><\/td><td>V\u00e4ljat\u00f6\u00f6tatud tootekonstruktsioon ja tehnoloogiline marsruut; osa materjale v\u00f5ib olla laos<\/td><td>Tellitud toote valmistamine k\u00f5iki vajalikke operatsioone tehes<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-projekteerimine-ja-tootmine\/\">Tellimusp\u00f5hine projekteerimine ja tootmine (ETO)<\/a><\/td><td>Taaskasutatavad teadmised ja m\u00f5nel juhul ka standardosad<\/td><td>Kliendip\u00f5hise lahenduse projekteerimine ja seej\u00e4rel valmistamine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><a href=\"\/et\/ressursid\/tellimuspohine-konfigureerimine\/\">Tellimusp\u00f5hine konfigureerimine (CTO)<\/a> t\u00e4hendab toote valimist eelnevalt m\u00e4\u00e4ratletud ja omavahel \u00fchilduvate valikute hulgast. ATO kirjeldab seda, kuidas ettevalmistatud komponentidest koostatakse p\u00e4rast tellimuse saamist valmistoode. Need kaks l\u00e4henemist v\u00f5ivad kattuda: klient saab konfigureerida pumbaseadme, mille tehas seej\u00e4rel tellimuse alusel koostab.<\/p>\n\n\n<p>Need eristused on kasulikud, kuid kogu ettev\u00f5tet ei pea \u00fche nimetuse alla mahutama. H\u00e4sti m\u00fc\u00fcvat standardagregaati v\u00f5ib hoida laos, raskemini prognoositavaid kombinatsioone koostada tellimuse alusel ning erilahendusi eraldi projekteerida.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Millal on ATO sobiv tootmisstrateegia?<\/h2>\n\n\n<p>ATO on k\u00f5ige atraktiivsem siis, kui kliendid soovivad valikuv\u00f5imalusi, kuid suurt osa tootest saab standardiseerida. Selle majanduslik otstarbekus s\u00f5ltub sellest, kas hallatava komponendivalikuga saab pakkuda \u00e4riliselt v\u00e4\u00e4rtuslikku valikut l\u00f5pptooteid.<\/p>\n\n\n<p>Kontrolli nelja eelduse t\u00e4itmist:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tootevariantides kasutatakse t\u00f5epoolest samu komponente.<\/strong> Mootor v\u00f5i juhtmoodul sobib mitmesse l\u00f5ppkonfiguratsiooni ega pea ootama \u00fcht ebat\u00f5en\u00e4olist m\u00fc\u00fcgiv\u00f5imalust.<\/li><li><strong>Kombinatsioonid on juba m\u00e4\u00e4ratletud.<\/strong> Insenerid on kindlaks teinud, millised komponendid kokku sobivad ning kuidas valitud toode koostatakse ja kontrollitakse.<\/li><li><strong>Allesj\u00e4\u00e4nud t\u00f6\u00f6 mahub kliendile sobivasse tarneaega.<\/strong> Koostamine, j\u00e4rjekorras ootamine, katsetamine ja l\u00e4hetuseks ettevalmistamine mahuvad aja sisse, mille klient on n\u00f5us ootama.<\/li><li><strong>Komponentide n\u00f5udlus on varude t\u00e4iendamiseks piisavalt prognoositav.<\/strong> Iga valmistoote kombinatsiooni n\u00f5udlust ei pea t\u00e4pselt ette n\u00e4gema, kuid nende valmistamiseks vajalikele osadele on siiski vaja usutavat tarneplaani.<\/li><\/ul>\n\n\n<p>Nii seotakse v\u00e4hem vahendeid vale valmistootevariandiga. Selle asemel et valmistada konkreetne pumba ja mootori kombinatsioon lootuses see maha m\u00fc\u00fca, j\u00e4etakse valik lahtiseks kuni tellimuse saabumiseni. \u00dchised moodulid v\u00f5ivad v\u00e4hendada valmistoodete laovarusse seotud kapitali, v\u00f5imaldades kliendil samal ajal valida sobiva toote.<\/p>\n\n\n<p>Pikema l\u00e4biminekuaega n\u00f5udvate t\u00f6\u00f6de ette tegemine v\u00f5ib l\u00fchendada ka kliendi ooteaega v\u00f5rreldes sellega, kui neid operatsioone alustataks alles p\u00e4rast m\u00fc\u00fcki. Standardmoodulid toetavad korduvaid ostu-, tootmis- ja kvaliteedikontrolliprotsesse; tellimusp\u00f5hine t\u00f6\u00f6 koondub protsessi l\u00f5ppu.<\/p>\n\n\n<p>Samas laovarude risk ei kao, vaid kandub mujale. Uue mudeliga asendatud juhtmoodul v\u00f5ib endiselt kasutuks vananeda. N\u00f5udluse h\u00fcppeline kasv \u00fche mootori j\u00e4rele v\u00f5ib takistada mitme tootevariandi valmimist. Laia tootevalikut on raske kiiresti tarnida ka siis, kui iga valik n\u00f5uab erinevat ja aegan\u00f5udvat katsetusprotseduuri.<\/p>\n\n\n<p>Kui kliendid n\u00f5uavad viivitamatut l\u00e4hetamist, v\u00f5ib populaarsemate toodete puhul olla parem hoida laos valmistooteid. Kui peaaegu iga tellimus vajab uut projekteerimist v\u00f5i ainulaadseid pika tarneajaga osi, annab ATO v\u00e4iksema edumaa. Vali see nende tooteperekondade jaoks, kus \u00fchiste osade kasutamine v\u00e4hendab t\u00f5epoolest t\u00f6\u00f6d, mille valmimist klient peab ootama.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miks v\u00f5ib tarne hilineda ka siis, kui osad on valmis?<\/h2>\n\n\n<p>Tuleme tagasi kujuteldava pumbaagregaatide tootja juurde. Vajalik pump, mootor ja juhtmoodul on k\u00f5ik olemas. Koostamiseks on vaba aeg, nii et tellimuse t\u00e4itmine tundub lihtne.<\/p>\n\n\n<p>Valmis agregaat vajab aga katsestendi, mis on juba teiste tellimustega h\u00f5ivatud. Kooste varasem l\u00f5petamine viib j\u00e4rjekorra lihtsalt katsetamise ette. Klient ei saa katsetamata agregaati kasutada, seega ei ole kooste valmimise kuup\u00e4ev veel tarnekuup\u00e4ev.<\/p>\n\n\n<p>Kujutame n\u00fc\u00fcd ette, et mitu klienti valivad variandi, mille katsetamine v\u00f5tab kauem aega. Tellimuste arv v\u00f5ib j\u00e4\u00e4da samaks, kuid katsestendi koormus suureneb. Tootmisplaan, mis kasutab k\u00f5igi konfiguratsioonide jaoks \u00fcht keskmist l\u00e4biminekuaega, v\u00f5ib selle muutuse t\u00e4helepanuta j\u00e4tta.<\/p>\n\n\n<p>Seega ei piisa k\u00fcsimusest \u201eKas meil on osad olemas?\u201d. K\u00fcsida tuleb hoopis: \u201eMillal saab see kombinatsioon l\u00e4bida k\u00f5ik allesj\u00e4\u00e4nud operatsioonid koos t\u00f6\u00f6dega, mille t\u00e4htajad oleme juba lubanud?\u201d<\/p>\n\n\n<p>Selleks on vaja \u00fchist \u00fclevaadet materjalide saadavusest, operatsioonide j\u00e4rjekorrast ja jagatud tootmisv\u00f5imsusest. SkyPlanner paigutab need operatsioonid samasse tootmisplaani, nii et katsetamise j\u00e4rjekord muutub n\u00e4htavaks ajal, mil plaani saab veel muuta v\u00f5i teise tarnekuup\u00e4eva \u00fcle l\u00e4bi r\u00e4\u00e4kida.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planeeri nii komponentide varude t\u00e4iendamist kui ka tellimuste koostet\u00f6id<\/h2>\n\n\n<p>Toimiv ATO-protsess seob komponentide varude t\u00e4iendamise klienditellimuste ajastamisega. Kui parandada ainult \u00fcht poolt, v\u00f5ib teine endiselt tarneid edasi l\u00fckata.<\/p>\n\n\n<h3 class=\"wp-block-heading\">T\u00e4ienda nende moodulite varu, mida tootevalik tegelikult vajab<\/h3>\n\n\n<p>Planeeri \u00fchiseid komponente k\u00f5igi valmistootevariantide kogun\u00f5udluse alusel. Vaata kokkulepitud laovarude juhtimise p\u00f5him\u00f5tete j\u00e4rgi \u00fcle kasutatav laovaru, veel saabumata tarned ja eeldatav tarbimine, sealhulgas kinnitatud tellimused. Kui klienditellimus asendab osa prognoosist, \u00e4ra arvesta sama n\u00f5udlust teist korda.<\/p>\n\n\n<p>Erilist t\u00e4helepanu vajavad sageli kasutatavad pika tarneajaga moodulid. Odava liitmiku puudumine v\u00f5ib kalli koostu valmimise peatada sama kindlalt kui puuduv mootor. Hinda puuduj\u00e4\u00e4ke selle j\u00e4rgi, kuidas need m\u00f5jutavad tellimuste terviklikku t\u00e4itmist, mitte ainult komponentide v\u00e4\u00e4rtuse alusel.<\/p>\n\n\n<p>Kui valmistad mooduleid ise, eralda tootmisv\u00f5imsust ka nende varude t\u00e4iendamiseks. Standardsete alusraamide partii v\u00f5ib konkureerida kliendip\u00f5histe t\u00f6\u00f6dega sama mehaanilise t\u00f6\u00f6tlemise v\u00f5i kontrolli v\u00f5imsuse p\u00e4rast. Kui varude t\u00e4iendamine peab pidevalt teistele t\u00f6\u00f6dele teed andma, tekib l\u00f5puks l\u00f5ppkoostes puuduj\u00e4\u00e4k.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kontrolli, millised komponendid on valitud tellimuse jaoks kasutatavad<\/h3>\n\n\n<p>M\u00e4\u00e4ra kliendi valikute p\u00f5hjal \u00f5iged komponendikogused ja vajalikud operatsioonid. Kontrolli, milliseid osi saab selle tellimuse jaoks kasutada, mitte \u00fcksnes seda, kas need on kusagil laos olemas. Tegelikku kasutatavust m\u00f5jutavad varasemad broneeringud, kontrolli t\u00f5ttu blokeeritud varud ja eeldatavad saabumised.<\/p>\n\n\n<p>Hoidke oodatavad tarned ja juba vastu v\u00f5etud laovaru lahus. Kui moodul on veel tellimisel, s\u00f5ltub koostamise plaan selle saabumisest. Tarnija muudetud tarnekuup\u00e4ev peab j\u00f5udma tootmisplaani enne, kui meeskond hakkab valmistuma t\u00f6\u00f6ks, mida ei saa alustada. Enne tellimuse koostamisse andmist <a href=\"\/et\/ressursid\/komplekteerimine-tootmises\/\">koguge komplekteerimise k\u00e4igus vajalikud osad kokku ja kontrollige need \u00fcle<\/a> ning tooge v\u00f5imalikud puuduj\u00e4\u00e4gid selgelt esile.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ajasta kogu allesj\u00e4\u00e4nud operatsioonijada<\/h3>\n\n\n<p>Kaasa koostamine, k\u00f5ik konfiguratsioonist s\u00f5ltuvad t\u00f6\u00f6d ning vajaduse korral katsetamine, kontroll ja pakkimine. L\u00e4htu tegelikest t\u00f6\u00f6tlemis- ja seadistusn\u00f5uetest, sobivatest t\u00f6\u00f6keskustest, vahetustest ning operaatorite saadavusest. V\u00f5rdle saadud tootmise l\u00f5ppaega n\u00f5utud l\u00e4hetusajaga, arvestades transpordiks kuluvat aega eraldi.<\/p>\n\n\n<p>Ajasta need t\u00f6\u00f6d koos teiste tellimuste ja asjakohaste varude t\u00e4iendamise t\u00f6\u00f6dega. Kaks tellimust ei saa kumbki samal ajal sama katsestendi ainukasutusse lihtsalt seet\u00f5ttu, et m\u00f5lema jaoks on vajalikud komponendid olemas.<\/p>\n\n\n<p>Kui t\u00f6\u00f6 plaani ei mahu, hinda tegelikke lahendusi: heakskiidetud alternatiivne t\u00f6\u00f6keskus, lisav\u00f5imsus, prioriteedi muutmine v\u00f5i hilisema t\u00e4htaja lubamine. Enne kui loed kiirtellimuse k\u00fcsimuse lahendatuks, vaata \u00fcle m\u00f5ju teistele klientidele.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Muuda plaani, kui materjalide saadavus v\u00f5i tootmisv\u00f5imsus muutub<\/h3>\n\n\n<p>Hilinenud komponendi t\u00f5ttu v\u00f5ib tellimus kaotada talle kavandatud koosteaja. Selle aja v\u00f5ib seej\u00e4rel t\u00e4ita teine tellimus, mist\u00f5ttu l\u00f5plik tarneviivitus ei pruugi v\u00f5rduda tarnija hilinemisega. Ka j\u00e4rgnevate t\u00f6\u00f6de j\u00e4rjekord tuleb \u00fcmber arvutada.<\/p>\n\n\n<p>Sama kehtib katsestendi t\u00f6\u00f6katkestuse v\u00f5i vahetuse tootmisv\u00f5imsuse v\u00e4henemise korral. Iga t\u00f6\u00f6j\u00e4rjekorra k\u00e4sitsi ajakohastamine kulutab planeerimisaega ja raskendab tagaj\u00e4rgede n\u00e4gemist kogu tehases. Just siin muutub SkyPlanneri automaatne ajastamine eriti v\u00e4\u00e4rtuslikuks.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Seo komponentide saadavus koostev\u00f5imsusega SkyPlanneri abil<\/h2>\n\n\n<p>SkyPlanner koondab t\u00f6\u00f6keskused, vahetused, operaatorid, materjalid ja prioriteedid \u00fchte tootmisplaani. Sina m\u00e4\u00e4rad toote protsessietapid, nende kestused ja ressursivajaduse. Ajastamiseks m\u00f5eldud tehisintellekt Arcturus arvutab t\u00f6\u00f6de j\u00e4rjekorra m\u00e4\u00e4ratud v\u00f5imsuse, s\u00f5ltuvuste ja reeglite alusel.<\/p>\n\n\n<p>Pumbaagregaadi n\u00e4ites muutuvad koostamine ja katsetamine omavahel seotud operatsioonideks, mitte eri osakondade eraldiseisvateks kuup\u00e4evadeks. <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/gantti-diagramm-tootmise-planeerimiseks\/\">Gantt-ajatelg<\/a> n\u00e4itab, kus t\u00f6\u00f6 toimub, millised teised t\u00f6\u00f6d kasutavad samu ressursse ja millal t\u00f6\u00f6 peaks valmima. Nii n\u00e4ed, kas valmis detailidest saab \u00f5igeks ajaks valmis agregaat, mitte \u00fcksnes seda, kas koostemeeskonnal on k\u00e4ed t\u00f6\u00f6d t\u00e4is.<\/p>\n\n\n<p>Kui materjalide saadavust arvestav ajastamine on sisse l\u00fclitatud, v\u00f5tab Arcturus algusaegade arvutamisel arvesse ka laoseisu ja saabuvaid materjale. Ostutellimuste tarnekuup\u00e4evad n\u00e4itavad eeldatavat saadavust; kauba vastuv\u00f5tu kinnitamine uuendab laoseisu. Kui tarnija teatatud kuup\u00e4ev muutub, uuenda l\u00e4hteandmeid ja arvuta plaan \u00fcmber, selle asemel et l\u00e4htuda koostamisel vanast eeldusest.<\/p>\n\n\n<p>Tellimuse raames valmistatavate alamtoodete puhul toetab SkyPlanner tootmiss\u00f5ltuvusi, mille abil ajastatakse nende valmimine enne p\u00f5hitoote koostamist. Laokomponendid saab siduda materjalidena, et materjalide saadavust arvestav ajastamine v\u00f5taks lisaks veel tegemata operatsioonidele arvesse ka nende k\u00e4ttesaadavust.<\/p>\n\n\n<p>Sina m\u00e4\u00e4rad prioriteedid ja kaitsed ajastamisotsuseid lukustustega. Arcturus teeb arvutused nende juhiste piires. Kui lisandub kiirtellimus v\u00f5i muutub tootmisv\u00f5imsus, kulub sul v\u00e4hem aega t\u00f6\u00f6keskuste t\u00f6\u00f6j\u00e4rjekordade \u00fcmbertegemisele ning rohkem aega j\u00e4\u00e4b otsustamiseks, millistest lubatud tarnet\u00e4htaegadest tuleb kinni pidada.<\/p>\n\n\n<p>See aitab ka olemasolevat tootmisv\u00f5imsust t\u00f5husamalt kasutada. Saad eristada komponente ootavaid t\u00f6id neist, mis ootavad vaba aega koostamiseks v\u00f5i katsetamiseks, ning tegeleda seej\u00e4rel piiranguga, millest valmimine tegelikult s\u00f5ltub. Rohkemate detailide ostmine ei k\u00f5rvalda \u00fclekoormatud katsetusj\u00e4rjekorda.<\/p>\n\n\n<p>SkyPlanner liidestub mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga <a href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/\">avatud REST API<\/a> kaudu. Kasuta olemasolevaid tellimuste, toodete ja tootmise andmeid t\u00f6\u00f6de \u00fcksikasjalikuks ajastamiseks, s\u00e4ilitades s\u00fcsteemid, millega juba oma ettev\u00f5tet juhid. Koostamise paremaks ajastamiseks ei pea alustama ERP-s\u00fcsteemi v\u00e4ljavahetamisest.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp seob detailide valmisoleku t\u00f6\u00f6de ajastamisega<\/h3>\n\n\n<p>Soome lehtmetalli allhanketootja KJH-Comp valmistab keeviskonstruktsioone ning t\u00e4ielikult koostatud ja katsetatud tooteid. Varem andsid ettev\u00f5tte C9000 ERP ja arvutustabelid vaid ligikaudse \u00fclevaate n\u00e4dalakoormustest, kuid t\u00f6\u00f6de p\u00e4evakaupa masinatele jaotamine k\u00e4is k\u00e4sitsi. Kaks t\u00f6\u00f6juhti kulutasid kumbki v\u00e4hemalt poole oma t\u00f6\u00f6ajast tootmisv\u00f5imsuse ajastamisele.<\/p>\n\n\n<p>SkyPlanneri kasutamisel sisestatakse tellimused endiselt olemasolevasse ERP-s\u00fcsteemi, kuid piiratud v\u00f5imsust arvestav ajastamine ja t\u00f6\u00f6de masinatele m\u00e4\u00e4ramine on automatiseeritud. KJH-Compi lahenduses kontrollitakse keevituseelses komplekteerimisetapis, et k\u00f5ik vajalikud detailid, sealhulgas ostudetailid, oleksid enne t\u00f6\u00f6 j\u00e4rjekorda lisamist valmis. Varem kontrolliti seda k\u00e4sitsi.<\/p>\n\n\n<p>Ettev\u00f5tte s\u00f5nul l\u00e4ks ajastamise eest vastutamine kahelt t\u00f6\u00f6juhilt \u00fcle \u00fchele ning teine suunati muudele t\u00f6\u00f6dele. Samuti m\u00e4rgib ettev\u00f5te, et tootmisv\u00f5imsuse kitsaskohad saavad varem n\u00e4htavaks. Koostamist planeeriva inimese jaoks on siin oluline just seos: detailide valmisolekut ja realistlikku t\u00f6\u00f6de j\u00e4rjekorda tuleb k\u00e4sitleda koos. <a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/kjh-comp\/\">KJH-Compi kogemus SkyPlanneriga<\/a> n\u00e4itab, kuidas see muutus praktikas toimis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Muuda j\u00e4rgmine koostetellimus teostatavaks plaaniks<\/h2>\n\n\n<p>Tellimusp\u00f5hine koostamine ehk ATO \u00f5igustab end siis, kui \u00fchised komponendid pakuvad klientidele sisulist valikuv\u00f5imalust, ilma et peaksid iga valmistootekombinatsiooni laos hoidma. Selle eelise s\u00e4ilitamiseks planeeri tellimuse saamisele j\u00e4rgnevat t\u00f6\u00f6d sama hoolikalt kui sellele eelnevaid laovarusid.<\/p>\n\n\n<p>Vali SkyPlanner, kui valmis komponentidega tellimuste, koostemeeskondade ja j\u00e4rgnevate etappide ressursside koordineerimine on toonud kaasa koormava igap\u00e4evase \u00fcmberajastamise. Arcturus arvutab plaani, Gantt-vaade n\u00e4itab selgelt selle m\u00f5ju ning prioriteetide \u00fcle otsustad endiselt sina.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneeri SkyPlanneri esitlus<\/a> ja v\u00f5ta n\u00e4iteks \u00fcks t\u00fc\u00fcpiline koostetellimus koos selle komponendivajaduse ning ressursiga, mis k\u00f5ige sagedamini valmimist edasi l\u00fckkab. Lisa teine tellimus, mis vajab sama ressurssi. Nii on meil konkreetne l\u00e4htekoht, et n\u00e4idata, kuidas SkyPlanner aitab s\u00e4\u00e4sta \u00fcmberplaneerimisele kuluvat aega ja lihtsustab tarnet\u00e4htaegade hindamist.<\/p>\n\n\n<p>Soovid esmalt ise tutvuda? <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">Proovi SkyPlannerit n\u00e4idisandmetega<\/a> ja vaata, kuidas operatsioonid ja tootmisv\u00f5imsus \u00fches ajakavas kokku saavad.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni Avaleht &raquo; Ressursid &raquo; Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni Tellimusp\u00f5hine koostamine (ATO) t\u00e4hendab, et standardkomponente v\u00f5i alamkooste hoitakse valmis ning l\u00f5pptoode koostatakse p\u00e4rast kliendi tellimuse saabumist. Eri tootevariantides kasutatavad osad valmistatakse ette, kuid neist ei koostata ette k\u00f5iki v\u00f5imalikke valmistootevariante. Nii saab pakkuda klientidele suuremat valikut ja l\u00fchemat &#8230; <a title=\"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/\" aria-label=\"Read more about Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99518,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-99489","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni<\/title>\n<meta name=\"description\" content=\"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\" \/>\n<meta property=\"og:description\" content=\"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T00:41:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T23:23:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1942\" \/>\n\t<meta property=\"og:image:height\" content=\"809\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-20T23:23:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/\"},\"wordCount\":2212,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/\",\"name\":\"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-20T23:23:46+00:00\",\"description\":\"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"width\":1942,\"height\":809},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tellimuspohine-koostamine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni","description":"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/","og_locale":"et_EE","og_type":"article","og_title":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni","og_description":"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T00:41:10+00:00","article_modified_time":"2026-10-20T23:23:46+00:00","og_image":[{"width":1942,"height":809,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-20T23:23:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/"},"wordCount":2212,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/","name":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-20T23:23:46+00:00","description":"Tellimusp\u00f5hine koostamine pakub valikut k\u00f5iki variante lattu tootmata. Vaata, millal see sobib ja kuidas SkyPlanner seob valmis osad koostev\u00f5imsusega.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","width":1942,"height":809},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tellimuspohine-koostamine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-300x125.png",300,125,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-768x320.png",768,320,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1024x427.png",1024,427,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1536x640.png",1536,640,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-360x150.png",360,150,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni Avaleht &raquo; Ressursid &raquo; Tellimusp\u00f5hine koostamine: valmis osadest \u00f5igeaegse koosteni Tellimusp\u00f5hine koostamine (ATO) t\u00e4hendab, et standardkomponente v\u00f5i alamkooste hoitakse valmis ning l\u00f5pptoode koostatakse p\u00e4rast kliendi tellimuse saabumist. Eri tootevariantides kasutatavad osad valmistatakse ette, kuid neist ei koostata ette k\u00f5iki v\u00f5imalikke valmistootevariante. Nii saab pakkuda klientidele suuremat valikut ja l\u00fchemat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/99489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=99489"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/99489\/revisions"}],"predecessor-version":[{"id":99547,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/99489\/revisions\/99547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/99518"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=99489"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=99489"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=99489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}