{"id":96558,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96558"},"modified":"2026-10-08T10:45:53","modified_gmt":"2026-10-08T10:45:53","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/","title":{"rendered":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"\/et\/ressursid\/\">Ressursid<\/a> &raquo; SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Masina k\u00e4sutuses olev aeg kulub kas detailide valmistamisele v\u00f5i j\u00e4rgmise t\u00f6\u00f6 ettevalmistamisele. Kui \u00fcmberseadistused v\u00f5tavad sellest liiga suure osa, tuleb vastata kahele eri k\u00fcsimusele: kas meeskond saab iga \u00fcmberseadistuse l\u00fchemaks muuta ja kas planeerija saab osa neist paremat j\u00e4rjestust kasutades hoopis \u00e4ra hoida?<\/p>\n\n\n<p>Esimesele k\u00fcsimusele vastab SMED, teisele sarnasusel p\u00f5hinev j\u00e4rjestamine. Kasuta m\u00f5lemat koos, kuid m\u00f5\u00f5da nende m\u00f5ju eraldi, et l\u00fchenenud seisakut ei aetaks segi \u00fcmberseadistusega, mida polnudki vaja teha.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mida SMED ja mida j\u00e4rjestamine muudab<\/h2>\n\n\n<p>Tootmises valmistab seadistus ehk \u00fcmberseadistus seadme ette \u00fcleminekuks \u00fche toote v\u00f5i detaili valmistamiselt teise valmistamisele. See v\u00f5ib h\u00f5lmata t\u00f6\u00f6riistade vahetamist, kinnitusvahendite ettevalmistamist, seadistuste muutmist ja j\u00e4rgmise toote viimist vastuv\u00f5etava kvaliteediga tootmiseni.<\/p>\n\n\n<p>SMED t\u00e4hendab Single-Minute Exchange of Die (\u00fche minuti matriitsivahetus). Lean Enterprise Institute kirjeldab seda kui l\u00e4henemist, mis l\u00fchendab \u00fcmberseadistusaega, eraldades sisemise seadistuse v\u00e4lisest ja viies sobivad sisemised toimingud \u00fcle v\u00e4listesse t\u00f6\u00f6desse. Nimes peituv eesm\u00e4rk on \u00fchekohaline minutite arv ehk alla 10 minuti. See ei t\u00e4henda, et iga \u00fcmberseadistus v\u00f5taks \u00fche minuti, ega ole garanteeritud tulemus.<\/p>\n\n\n<p>Praktiline vahe on lihtne:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>SMED l\u00fchendab v\u00e4ltimatu \u00fcmberseadistuse t\u00f6\u00f6mahtu.<\/li><li>T\u00f6\u00f6de j\u00e4rjestamine aitab sarnaseid t\u00f6id kokku pannes v\u00e4ltida valitud omaduse korduvat vahetamist.<\/li><\/ul>\n\n\n<p>Ka h\u00e4sti j\u00e4rjestatud ajakava vajab p\u00e4ris \u00fcmberseadistusi. T\u00f6\u00f6riistad tuleb ette valmistada, seade \u00f5igesti seadistada ja j\u00e4rgmine toode peab vastama kvaliteedin\u00f5uetele.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00f5\u00f5da seadistusaega enne protsessi muutmist<\/h2>\n\n\n<p>Alusta \u00fchest korduvast \u00fcmberseadistusest, mida meeskond saab algusest l\u00f5puni j\u00e4lgida. Dokumenteeri praegune t\u00f6\u00f6v\u00f5te, enne kui otsustad, milliseid toiminguid muuta.<\/p>\n\n\n<p>Kasuta \u00fchtset m\u00f5\u00f5tmispiiri. Vorne&#8217;i LeanProduction SMED-juhendis m\u00f5\u00f5detakse \u00fcmberseadistusaega eelmise toote viimasest heast detailist t\u00e4iskiirusel kuni j\u00e4rgmise toote esimese hea detailini t\u00e4iskiirusel. Masina taask\u00e4ivitamine ei t\u00e4henda \u00fcmberseadistuse l\u00f5ppu, kui vastuv\u00f5etav tootmine pole veel taastunud.<\/p>\n\n\n<p>Lisaks kogu kulunud ajale registreeri:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>iga toiming, selle kestus ja t\u00e4itja.<\/li><li>j\u00e4rgmise t\u00f6\u00f6 jaoks vajalikud t\u00f6\u00f6riistad, materjalid ja kinnitusvahendid.<\/li><li>otsimisele, ootamisele, reguleerimisele v\u00f5i esimeste detailide parandamisele kulunud aeg.<\/li><li>toimingud, mis n\u00f5uavad seisvat seadet, ja toimingud, mida saab ohutult teha seadme t\u00f6\u00f6tamise ajal.<\/li><\/ul>\n\n\n<p>Hoia v\u00e4line ettevalmistus n\u00e4htaval. Toimingu viimine seisakust v\u00e4lja v\u00f5ib vabastada masinaaega, kuid ei kaota selle toimingu t\u00f6\u00f6j\u00f5uvajadust. Kasulik algtase eristab seadme seisaku meeskonna ettevalmistust\u00f6\u00f6 kogumahust.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rakenda SMED-i iga \u00fcmberseadistuse l\u00fchendamiseks<\/h2>\n\n\n<p>K\u00e4i \u00fcmberseadistus l\u00e4bi koos inimestega, kes seda teevad. Eesm\u00e4rk on korratav ja ohutu t\u00f6\u00f6v\u00f5te, mitte kiirem taask\u00e4ivitus, mis j\u00e4tab kvaliteediprobleemid j\u00e4rgmise operaatori lahendada.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Eralda sisemised ja v\u00e4lised seadistustoimingud<\/h3>\n\n\n<p>Sisemine seadistus n\u00f5uab seadme seiskamist. V\u00e4list seadistust saab teha seadme t\u00f6\u00f6tamise ajal.<\/p>\n\n\n<p>J\u00e4lgi kogu \u00fcmberseadistust ja jaga see \u00fcksikuteks toiminguteks. Liigita iga toiming selle j\u00e4rgi, mis tegelikult seisakut n\u00f5uab, mitte \u00e4ra eelda, et k\u00f5ik, mida praegu seisaku ajal tehakse, peabki seal toimuma.<\/p>\n\n\n<p>N\u00e4iteks j\u00e4rgmise t\u00f6\u00f6riista otsimine v\u00f5ib praegu toimuda alles p\u00e4rast masina seiskumist. See ei t\u00e4henda tingimata, et otsimiseks peaks masin seisma. Paigaldatud t\u00f6\u00f6riista eemaldamine v\u00f5ib seevastu n\u00f5uda seadme seiskamist ja ohutuks muutmist.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Vii sobiv ettevalmistus seisakust v\u00e4lja<\/h3>\n\n\n<p>Valmista j\u00e4rgmine t\u00f6\u00f6 ette enne jooksva t\u00f6\u00f6 l\u00f5ppu, kus see on ohutu ja otstarbekas. LeanProduction-juhend nimetab seisakust v\u00e4ljaviimise viisidena t\u00f6\u00f6riistade ja materjalide kokkukogumist, detailide kontrollimist ning lisakinnitusvahendi ettevalmistamist.<\/p>\n\n\n<p>Kontrolli, et vajalikud vahendid on olemas ja kasutusvalmis. Kui kinnitusvahendit saab eraldi ette valmistada, hinda, kas see v\u00e4hendab t\u00f6\u00f6d masina seisuperioodil.<\/p>\n\n\n<p>\u00c4ra mine kaitsepiiretest, isoleerimisprotseduuridest ega vajalikest kvaliteedikontrollidest m\u00f6\u00f6da. Toiming sobib v\u00e4lise seadistuse hulka ainult siis, kui meeskond saab seda ohutult teha k\u00e4imasolevat tegevust segamata.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Lihtsusta allesj\u00e4\u00e4nud sisemist t\u00f6\u00f6d<\/h3>\n\n\n<p>Vaata \u00fcle toimingud, mis ikka veel n\u00f5uavad seisakut. Paranda t\u00f6\u00f6riistade k\u00e4ttesaadavust, standardiseeri toimingute j\u00e4rjekord ja v\u00e4henda tarbetut reguleerimist. Hinda kinnituste muutmist v\u00f5i paralleelset t\u00f6\u00f6d tootmiskoha seadmete ja ohutusn\u00f5uete seisukohast.<\/p>\n\n\n<p>Katseta uut t\u00f6\u00f6v\u00f5tet terve \u00fcmberseadistuse jooksul, sealhulgas tagasip\u00f6\u00f6rdumist vastuv\u00f5etava tootmiseni. Dokumenteeri toimingute j\u00e4rjekord, et paranemine ei s\u00f5ltuks sellest, kas \u00fcks operaator m\u00e4letab mitteametlikku otseteed.<\/p>\n\n\n<p>M\u00f5\u00f5da uuesti, kasutades sama piiri nagu algm\u00f5\u00f5tmisel. Hoia vaatlusandmed dokumenteeritud t\u00f6\u00f6v\u00f5tte juures ja kasuta neid, et ajakohastada tootmise planeerimises kasutatavaid seadistusaja eeldusi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e4henda v\u00e4lditavaid \u00fcmberseadistusi parema t\u00f6\u00f6de j\u00e4rjestusega<\/h2>\n\n\n<p>Kui vajalik \u00fcmberseadistust\u00f6\u00f6 on selge, uuri, mis j\u00e4rjekorras t\u00f6\u00f6d masinale j\u00f5uavad. Sarnasus v\u00f5ib s\u00f5ltuda materjalist, v\u00e4rvist v\u00f5i m\u00f5\u00f5tmetest, mitte ainult \u00fchisest tootekoodist.<\/p>\n\n\n<p>Vaatleme n\u00e4iteks t\u00f6id, mis vahelduvad kahe materjali vahel. \u00dche materjali t\u00f6\u00f6de r\u00fchmitamine kokku ja seej\u00e4rel teise materjali omade tegemine v\u00f5ib \u00e4ra hoida korduvaid materjalivahetusi. See on j\u00e4rjestamise n\u00e4ide, mitte kliendi tulemus ega lubadus, et k\u00f5ik seadistused kaovad.<\/p>\n\n\n<p>Vali sarnasuse omadus, mis t\u00f5esti m\u00f5jutab ettevalmistust selles t\u00f6\u00f6keskuses. Kaks sama materjaliga t\u00f6\u00f6d v\u00f5ivad siiski vajada erinevaid t\u00f6\u00f6riistu v\u00f5i seadistusi. Nende r\u00fchmitamine ei kaota \u00fclej\u00e4\u00e4nud \u00fcmberseadistust\u00f6\u00f6 allikaid.<\/p>\n\n\n<p>SMED ja j\u00e4rjestamine vajavad seet\u00f5ttu erinevaid m\u00f5\u00f5dikuid. L\u00fchem \u00fcksik seisak viitab \u00fcmberseadistuse t\u00f6\u00f6v\u00f5tte paranemisele. Valitud omaduse v\u00e4hem vahetusi viitab j\u00e4rjestuse paranemisele. Kumbki v\u00f5ib aidata, kuid kumbki \u00fcksi ei t\u00f5esta, et tootmise ajakava tervikuna on parem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Arvesta otsuses t\u00e4htaegu ja kasutatavat v\u00f5imsust<\/h2>\n\n\n<p>Pikk sarnaste t\u00f6\u00f6de jada v\u00f5ib s\u00e4\u00e4sta ettevalmistusaega ja olla siiski vale tootmisotsus. See v\u00f5ib l\u00fckata kiireloomulise tellimuse edasi v\u00f5i tugineda materjalile, mida pole jada alustamise ajaks kohal.<\/p>\n\n\n<p>V\u00f5rdle v\u00f5imalikku seadistusaja kokkuhoidu <a href=\"\/et\/ressursid\/tellimuspohine-tootmine\/\">tellimuste valmimist\u00e4htaegade<\/a>, materjali saadavuse ja kasutatava t\u00f6\u00f6keskuse v\u00f5imsusega. Enne j\u00e4rjekorra muutmist otsusta, millised prioriteedid on praeguse t\u00f6\u00f6mahu puhul olulised.<\/p>\n\n\n<p>SkyPlanneri Dynamic Priorities sisaldab selliseid tegureid nagu l\u00e4biminekuaeg, valmimiskuup\u00e4ev, kliendi olulisus ja kestus. Planeerijad m\u00e4\u00e4ravad prioriteedid; tehisintellekt j\u00e4rgib neid prioriteete ajakava koostamisel. Sarnasus on planeerimiseelistus, mida tuleb tasakaalustada \u00fclej\u00e4\u00e4nud tootmisega, mitte k\u00e4sk r\u00fchmitada k\u00f5ik sarnased t\u00f6\u00f6d tagaj\u00e4rgedest hoolimata.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Seadista sarnasusel p\u00f5hinev j\u00e4rjestamine SkyPlanneris<\/h2>\n\n\n<p>SkyPlanner toetab t\u00f6\u00f6de r\u00fchmitamist t\u00f6\u00f6keskuse omaduse, n\u00e4iteks v\u00e4rvi, m\u00f5\u00f5tmete v\u00f5i materjali j\u00e4rgi. Dokumenteeritud sarnasuseseaded \u00fchendavad omaduse valiku, erinevate t\u00f6\u00f6de seadistusaja ja j\u00e4rjestikuste sarnaste t\u00f6\u00f6de prioriteedikaalu.<\/p>\n\n\n<p>Selle l\u00e4henemise seadistamiseks:<\/p>\n\n\n<p>1. M\u00e4\u00e4ra tegurile \u201eAllow similar jobs\u201c vaates Dynamic Priorities t\u00e4htsus.<\/p>\n\n\n<p>2. Ava t\u00f6\u00f6keskuse seaded ja l\u00fclita sisse \u201eAllow similarity\u201c.<\/p>\n\n\n<p>3. M\u00e4\u00e4ra \u201eSetup time for differing jobs (min)\u201c nii, et see v\u00e4ljendaks aega, mis kulub erinevate omaduste vahel \u00fcmberl\u00fclitumiseks.<\/p>\n\n\n<p>4. Vali omadus v\u00e4ljal \u201eType of similar jobs\u201c.<\/p>\n\n\n<p>5. M\u00e4\u00e4ra prioriteedikaal \u201eSimilar jobs in succession\u201c.<\/p>\n\n\n<p>6. Salvesta seaded ja arvuta ajakava uuesti.<\/p>\n\n\n<p>Kasuta m\u00f5\u00f5detud seadistusaja eeldust, mis sobib t\u00f6\u00f6keskuse ja valitud omadusega. Seade toetab seadistusaega arvestavat j\u00e4rjestamist; see ei kiirenda t\u00f6\u00f6riista v\u00f5i materjali f\u00fc\u00fcsilist vahetamist. Selle t\u00f6\u00f6 parandamine j\u00e4\u00e4b \u00fcmberseadistuse t\u00f6\u00f6v\u00f5tte ja tootmismeeskonna \u00fclesandeks.<\/p>\n\n\n<p>Seadistusaja kokkuhoid peab sobima kogu \u00fclej\u00e4\u00e4nud plaaniga. SkyPlanneri <a href=\"\/et\/\">tootmise ajakava koostamise tarkvara<\/a> koostab tootmise ajakava sinu m\u00e4\u00e4ratud prioriteetide alusel. SkyPlanner \u00fchendub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga, nii et <a href=\"\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">tootmise ajakava koostamise saab siduda<\/a> s\u00fcsteemidega, kus sinu tootmisandmeid hoitakse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kontrolli, kas uus plaan tootmist parandab<\/h2>\n\n\n<p>P\u00e4rast t\u00f6\u00f6v\u00f5tte v\u00f5i j\u00e4rjestuse muutmist v\u00f5rdle \u00fcmberseadistuste tegelikku arvu ja nende t\u00f5ttu seisnud tootmisaega v\u00f5rreldava t\u00f6\u00f6koormuse korral. Kontrolli ka tellimuste valmimist ja tagasip\u00f6\u00f6rdumist vastuv\u00f5etava tootmiseni p\u00e4rast iga \u00fcmberseadistust.<\/p>\n\n\n<p>Esita kolm k\u00fcsimust:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Kas vajalikud \u00fcmberseadistused muutusid sama m\u00f5\u00f5tmispiiri kasutades l\u00fchemaks?<\/li><li>Kas uus j\u00e4rjestus aitas v\u00e4ltida valitud omaduse vahetusi?<\/li><li>Kas plaan s\u00e4ilitas vajaliku tasakaalu valmimiskuup\u00e4evade, olemasolevate materjalide ja v\u00f5imsuse vahel?<\/li><\/ul>\n\n\n<p>V\u00e4hem \u00fcmberseadistusi ei ole piisav, kui tellimused lihtsalt hilinevad v\u00f5i k\u00e4ivituskvaliteet halveneb. Hoia uus t\u00f6\u00f6v\u00f5te dokumenteerituna ja ajakohasta planeerimisel kasutatavat seadistusaega, kui m\u00f5\u00f5tmised t\u00e4psemaks muutuvad. See on tootmise hindamise protsess, mitte v\u00e4ide, et SkyPlanner m\u00f5\u00f5dab \u00fcmberseadistusaega automaatselt.<\/p>\n\n\n<p>Kui soovid oma tootmises sarnasusel p\u00f5hinevat ajakava koostamist arutada, <a href=\"\/et\/kontakt-muugiga\/\">broneeri demo<\/a>. V\u00f5ta kaasa omadus, mis sinu \u00fcmberseadistusi p\u00f5hjustab, m\u00f5\u00f5detud \u00fcmberseadistusaeg ja k\u00f5ige olulisemad valmimiskuup\u00e4eva prioriteedid.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Mis on SMED tootmises?<\/h3>\n\n\n<p>SMED on meetod seadme \u00fcmberseadistusaja l\u00fchendamiseks. See eraldab sisemised toimingud, mis n\u00f5uavad seisvat seadet, v\u00e4listest toimingutest, mida saab teha seadme t\u00f6\u00f6tamise ajal. Meeskond viib sobiva ettevalmistuse seisakust v\u00e4lja ja lihtsustab \u00fclej\u00e4\u00e4nud t\u00f6\u00f6d.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas SMED t\u00e4hendab, et iga \u00fcmberseadistus v\u00f5tab \u00fche minuti?<\/h3>\n\n\n<p>Ei. Single-Minute Exchange of Die t\u00e4hendab sihti j\u00e4\u00e4da \u00fchekohalise minutiarvu piiresse ehk alla 10 minuti. See ei luba \u00fcheminutilist \u00fcmberseadistust ega garanteeri, et iga protsess selle sihini j\u00f5uab.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuidas m\u00f5\u00f5ta seadistusaega ehk \u00fcmberseadistuse kestust?<\/h3>\n\n\n<p>Kasuta \u00fchtset m\u00f5\u00f5tepiiri: eelmise toote viimasest heast detailist t\u00e4iskiirusel kuni j\u00e4rgmise toote esimese hea detailini t\u00e4iskiirusel. Fikseeri nii \u00fcksikud tegevused kui ka kogu kestus. \u00c4ra l\u00f5peta m\u00f5\u00f5tmist masina taask\u00e4ivitamisel, kui vastuv\u00f5etav toodang pole veel taastunud.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mis vahe on sisemisel ja v\u00e4lisel seadistusel?<\/h3>\n\n\n<p>Sisemine seadistus eeldab, et seade on seisatud. V\u00e4list seadistust saab teha siis, kui seade t\u00f6\u00f6tab. Ettevalmistuse viimisel seisakust v\u00e4lja tuleb arvestada seadme ohutusn\u00f5uetega ning m\u00f6\u00f6da ei tohi minna vajalikest kvaliteedikontrollidest.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas t\u00f6\u00f6de j\u00e4rjestamine v\u00f5ib SMED-i asendada?<\/h3>\n\n\n<p>Ei. Sarnaseid t\u00f6id r\u00fchmitades saab j\u00e4rjestamisega v\u00e4ltida m\u00f5nda korduvat omaduse vahetust. SMED parandab nende \u00fcmberseadistuste f\u00fc\u00fcsilist t\u00f6\u00f6d, mis siiski alles j\u00e4\u00e4vad. M\u00f5lemad peavad sobima tootmise plaaniga.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuidas SkyPlanner aitab v\u00e4hendada tarbetuid seadistusi?<\/h3>\n\n\n<p>SkyPlanneris saab planeerija valida t\u00f6\u00f6keskuses sarnasuse omaduse, m\u00e4\u00e4rata erinevate t\u00f6\u00f6de seadistusaja ning anda prioriteetides kaalu j\u00e4rjestikustele sarnastele t\u00f6\u00f6dele. See toetab seadistusaega arvestavat t\u00f6\u00f6de j\u00e4rjestamist. Masina f\u00fc\u00fcsilist \u00fcmberseadistust\u00f6\u00f6d see iseenesest ei l\u00fchenda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas sarnased t\u00f6\u00f6d tuleks alati koos ette v\u00f5tta?<\/h3>\n\n\n<p>Ei. Planeerijad peavad arvestama ka valmimist\u00e4htaegu, materjale ja v\u00f5imsust. Sarnaste t\u00f6\u00f6de r\u00fchmitamine on kasulik siis, kui ettevalmistuse kokkuhoid sobib nende prioriteetidega ega l\u00fckka olulisemat t\u00f6\u00f6d edasi.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is SMED in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SMED is a method for reducing equipment changeover time. It separates internal tasks, which require stopped equipment, from external tasks, which can happen while equipment runs. The team moves suitable preparation outside the stoppage and simplifies the remaining work.\"}},{\"@type\":\"Question\",\"name\":\"Does SMED mean every changeover takes one minute?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Single-Minute Exchange of Die refers to a target of single-digit minutes, or less than 10 minutes. It does not promise a one-minute changeover or guarantee that every process reaches that target.\"}},{\"@type\":\"Question\",\"name\":\"How do you measure setup or changeover time?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Use a consistent boundary from the last good part of the previous product at full production speed to the first good part of the next product at full production speed. Record the individual tasks as well as the total time. Do not stop measuring at machine restart if acceptable production has not returned.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between internal and external setup?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Internal setup requires the equipment to be stopped. External setup can be performed while it runs. Moving preparation outside the stoppage must respect the equipment's safety requirements and must not bypass necessary quality checks.\"}},{\"@type\":\"Question\",\"name\":\"Can job sequencing replace SMED?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Sequencing can avoid some repeated property changes by grouping similar jobs. SMED improves the physical work of the changeovers that remain. Both need to fit the production plan.\"}},{\"@type\":\"Question\",\"name\":\"How does SkyPlanner help reduce unnecessary setups?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SkyPlanner lets planners select a similarity property at a workstation, define setup time for differing jobs and weight consecutive similar jobs in the priorities. This supports setup-aware job sequencing. It does not shorten the machine's physical changeover work by itself.\"}},{\"@type\":\"Question\",\"name\":\"Should similar jobs always run together?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Planners also need to consider completion dates, materials and capacity. Grouping similar jobs is useful when its preparation benefit fits those priorities, rather than delaying more important work.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega Avaleht &raquo; Ressursid &raquo; SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega Masina k\u00e4sutuses olev aeg kulub kas detailide valmistamisele v\u00f5i j\u00e4rgmise t\u00f6\u00f6 ettevalmistamisele. Kui \u00fcmberseadistused v\u00f5tavad sellest liiga suure osa, tuleb vastata kahele eri k\u00fcsimusele: kas meeskond saab iga \u00fcmberseadistuse l\u00fchemaks muuta ja kas planeerija saab osa neist paremat j\u00e4rjestust kasutades hoopis &#8230; <a title=\"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/\" aria-label=\"Read more about SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97039,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-96558","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega\" \/>\n<meta property=\"og:description\" content=\"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:45:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/\"},\"wordCount\":1704,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/\",\"name\":\"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"description\":\"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machining fixtures and a wrench prepared beside a workbench for a production changeover.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega &#8211; SkyPlanner","description":"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/","og_locale":"et_EE","og_type":"article","og_title":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega","og_description":"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-08T10:45:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"8 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/"},"wordCount":1704,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","articleSection":["APS &amp; Scheduling","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/","name":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","description":"L\u00fchenda seadistusaega SMED-iga ja koonda sarnased t\u00f6\u00f6d, et v\u00e4ltida \u00fcmberseadistusi. Vaata, kuidas SkyPlanner toetab seadistusaega arvestavat ajakava koostamist.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","width":1672,"height":941,"caption":"Machining fixtures and a wrench prepared beside a workbench for a production changeover."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega Avaleht &raquo; Ressursid &raquo; SMED: l\u00fchenda seadistusaega nutika j\u00e4rjestusega Masina k\u00e4sutuses olev aeg kulub kas detailide valmistamisele v\u00f5i j\u00e4rgmise t\u00f6\u00f6 ettevalmistamisele. Kui \u00fcmberseadistused v\u00f5tavad sellest liiga suure osa, tuleb vastata kahele eri k\u00fcsimusele: kas meeskond saab iga \u00fcmberseadistuse l\u00fchemaks muuta ja kas planeerija saab osa neist paremat j\u00e4rjestust kasutades hoopis&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=96558"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96558\/revisions"}],"predecessor-version":[{"id":96757,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96558\/revisions\/96757"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/97039"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=96558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=96558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=96558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}