{"id":96093,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96093"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"tootmisplaani-mall","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/","title":{"rendered":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega<\/h1>\n\n\n<p>Tootmisplaani mall annab tellimustele koha tabelis. Keerulisem k\u00fcsimus on, kas neile leidub koht ka tehases: vabal masinal, sobiva operaatoriga ning piisavalt vara, et j\u00f5uda j\u00e4rgmise operatsiooni ja kliendile tarnimisega \u00f5igeks ajaks valmis.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">Laadi alla tootmisplaani mall (CSV Exceli jaoks)<\/a>. See on lihtne tootmisn\u00e4ide, mida saad oma vajadustele kohandada. Iga operatsioon on eraldi real. Allolevas tabelis on kaks n\u00e4idist\u00f6\u00f6d; failis on lisaks kellaaegadele ka t\u00e4ielikud kuup\u00e4evad.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Tellimus \/ operatsioon<\/th>\n<th>Masin \/ operaator<\/th>\n<th style=\"text-align: right;\">Seadistusaeg, min<\/th>\n<th style=\"text-align: right;\">T\u00f6\u00f6tlusaeg, min<\/th>\n<th>Algus<\/th>\n<th>L\u00f5pp<\/th>\n<th>T\u00e4htaeg<\/th>\n<th>Olek<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>Planeeritud<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>Planeeritud<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Kasuta seda malli l\u00e4hteandmete m\u00f5istmiseks ja lihtsa t\u00f6\u00f6j\u00e4rjestuse katsetamiseks. Kui tootmisplaan peab j\u00e4\u00e4ma kasutatavaks ka uute tellimuste, viivituste ja muutuva tootmisv\u00f5imsuse korral, kasuta ajakava arvutamiseks SkyPlanner APS-i. Arvutustabelis saab n\u00e4idata sinu valitud algusaegu; SkyPlanner sobitab operatsioonid olemasoleva tootmisv\u00f5imsusega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mida peaks tootmisplaani mall n\u00e4itama?<\/h2>\n\n\n<p>Tootmise ajakava m\u00e4\u00e4rab, millal ja milliste ressurssidega t\u00f6id tehakse. Iga operatsiooni puhul peaks see vastama neljale k\u00fcsimusele:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Mida tehakse?<\/strong> M\u00e4rgi tellimus ja konkreetne operatsioon, mitte ainult toote nimi.<\/li>\n<li><strong>Kus saab t\u00f6\u00f6d teha?<\/strong> M\u00e4rgi masin v\u00f5i t\u00f6\u00f6keskus ning t\u00f6\u00f6 tegemiseks vajalikud inimesed.<\/li>\n<li><strong>Millal saab t\u00f6\u00f6d teha?<\/strong> Arvesta seadistus- ja t\u00f6\u00f6tlusajaga, t\u00f6\u00f6perioodidega ning k\u00f5igega, mis peab enne alustamist valmis olema.<\/li>\n<li><strong>Kas t\u00f6\u00f6 saab \u00f5igeks ajaks valmis?<\/strong> V\u00f5rdle tulemust operatsiooni n\u00f5utud l\u00f5puajaga ning arvesta enne v\u00e4ljasaatmist veel tegemist vajavate t\u00f6\u00f6dega.<\/li>\n<\/ul>\n\n\n<p>See viimane eristus on oluline. T\u00f6\u00f6tlusoperatsiooni l\u00f5ppemine ei t\u00e4henda, et tellimus oleks v\u00e4ljasaatmiseks valmis, kui sellele j\u00e4rgneb veel koostamine, kontroll v\u00f5i pakkimine. M\u00e4\u00e4ra igale operatsioonile l\u00f5ppt\u00e4htaeg, mis j\u00e4tab aega ka j\u00e4rgmistele etappidele.<\/p>\n\n\n<p>N\u00e4dala koguseline tootmisplaan on kasulik, kuid vastab teisele k\u00fcsimusele. <a href=\"\/et\/ressursid\/master-production-schedule\/\">Tootmise p\u00f5hiplaan<\/a> m\u00e4\u00e4rab, milliseid valmistooteid ja millal vaja on. See mall on m\u00f5eldud j\u00e4rgmise tasandi jaoks: konkreetsed operatsioonid, mis vajavad samade masinate ja operaatorite aega. <a href=\"\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">Tootmise ajakava koostamise juhend<\/a> selgitab, kuidas neist l\u00e4hteandmetest saab teostatav t\u00f6\u00f6j\u00e4rjestus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vaata n\u00e4idet kui tootmisv\u00f5imsuse broneerimist<\/h2>\n\n\n<p>Kujutle tootmist, kus kaks t\u00f6\u00f6d ootavad sama masinat M1 ja sama operaatorit O1. M\u00f5lema t\u00f6\u00f6 materjalid on valmis. Masin ja operaator on katkestusteta saadaval 08:00 kuni 16:00 ning kummalgi operatsioonil pole l\u00f5petamata eelnevat operatsiooni.<\/p>\n\n\n<p>T\u00f6\u00f6 A jaoks on ette n\u00e4htud 30 minutit seadistamiseks ja 120 minutit t\u00f6\u00f6tlemiseks. Ressurss on selle t\u00f6\u00f6ga h\u00f5ivatud kuni 10:30. Seej\u00e4rel kulub t\u00f6\u00f6 B seadistamiseks 15 minutit ja t\u00f6\u00f6tlemiseks 180 minutit ning t\u00f6\u00f6 l\u00f5peb 13:45. T\u00f6\u00f6d ei kattu ajaliselt ja m\u00f5lemad saavad valmis enne m\u00e4rgitud t\u00e4htaega.<\/p>\n\n\n<p>See t\u00f6\u00f6j\u00e4rjestus on teostatav, sest eeldused seda v\u00f5imaldavad. Kui O1 peab kell 11:00 t\u00f6\u00f6tama teisel masinal, ei ole B reale m\u00e4rgitud plaan enam teostatav, kuigi M1 on endiselt vaba. L\u00f5unapausi korral ei ole t\u00f6\u00f6periood enam katkematu. Kui need on vaheoperatsioonid, tuleb leida tootmisv\u00f5imsus ka j\u00e4rgnevatele etappidele.<\/p>\n\n\n<p>Tabeli v\u00e4\u00e4rtus ei peitu selle v\u00e4rvilahenduses, vaid selles, et iga rida broneerib osa ressursi kasutada olevast ajast.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kohanda malli nii, et piirangud j\u00e4\u00e4ksid n\u00e4htavaks<\/h2>\n\n\n<p>Ava CSV Excelis ja salvesta t\u00f6\u00f6koopia Exceli t\u00f6\u00f6vihikuna. Kui k\u00f5ik andmed ilmuvad \u00fches veerus, impordi fail, kasutades eraldajana koma. Allalaaditud CSV sisaldab n\u00e4idisandmeid, mitte automaatset ajakava koostamise mudelit.<\/p>\n\n\n<p>N\u00e4ite kuup\u00e4ev on <strong>5. oktoober 2026<\/strong>. Asenda see tegelike t\u00f6\u00f6kuup\u00e4evadega ja veendu, et veergudes Algus, L\u00f5pp ja T\u00e4htaeg oleksid arvutustabeli kuup\u00e4eva- ja kellaajav\u00e4\u00e4rtused, mitte imporditud tekst. Kuva koos kellaajaga ka kuup\u00e4ev, muidu v\u00f5ib homne 08:00 paista t\u00e4nasena.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e4\u00e4ra igale operatsioonile tunnus ja ajakulu arvestamise alus<\/h3>\n\n\n<p>Asenda A ja B oma tellimuste ja operatsioonide tunnustega. Kui tellimus n\u00f5uab l\u00f5ikamist, painutamist ja keevitamist, kasuta nende operatsioonide jaoks eraldi ridu. Nende j\u00e4rjekorra m\u00e4\u00e4rab <a href=\"\/et\/ressursid\/tootmisprotsessi-toimingujada\/\">tehnoloogiline marsruut<\/a>, mitte see, milline rida juhtub tabelis j\u00e4rgmisena olema.<\/p>\n\n\n<p>T\u00f6\u00f6tlusaeg, min t\u00e4hendab <strong>kogu partii t\u00f6\u00f6tlemiseks kuluvat aega<\/strong>. Kui hinnang on antud \u00fche t\u00fcki kohta, korruta see enne sisestamist kogusega. Seadistusaeg, min on lisaaeg, mille jooksul masin on h\u00f5ivatud. \u00c4ra liida seda kogukestusele ilma selgituseta ega arvesta seda kaks korda.<\/p>\n\n\n<p>Katkematult tehtava operatsiooni puhul asenda lahtris F2 olev fikseeritud l\u00f5ppaeg j\u00e4rgmise valemiga ja kopeeri see allapoole:<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>Valem lisab algusajale seadistamiseks ja t\u00f6\u00f6tlemiseks kuluvad minutid. See ei vali algusaega, v\u00e4ldi kattumist teise t\u00f6\u00f6ga ega paiguta t\u00f6\u00f6d \u00fcmber ajale, mil vahetus t\u00f6\u00f6tab. Selles tabelis j\u00e4\u00e4vad need ajakava koostamise otsused sinu teha.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pane kirja, mis peab enne t\u00f6\u00f6 alustamist saadaval olema<\/h3>\n\n\n<p>Pane operatsioonide loendi k\u00f5rvale kirja iga masina ja operaatori t\u00f6\u00f6perioodid koos kuup\u00e4evadega. M\u00e4rgi pausid, hooldused ja muud ajad, mil neid kasutada ei saa. Kui pead masinale ja operaatorile m\u00e4\u00e4ratud t\u00f6id eraldi kontrollima, paiguta Masin ja Operaator eraldi veergudesse.<\/p>\n\n\n<p>Mitmeastmeliste tellimuste puhul lisa veerg Eelnev operatsioon ja m\u00e4rgi sinna eelmise operatsiooni tunnus. Kui alustamine s\u00f5ltub tarnest, lisa teave materjali valmisoleku kohta. Reale m\u00e4rgitud t\u00f6\u00f6 saab ajakavasse paigutada alles siis, kui vajalikud sisendid on valmis ja eelnevad t\u00f6\u00f6d l\u00f5petatud.<\/p>\n\n\n<p>Kui operatsiooni ei saa katkestada, vajab see katkematut t\u00f6\u00f6perioodi, mis mahutab nii seadistamise kui ka t\u00f6\u00f6tlemise. Kui operatsiooni saab katkestada, ei suuda lihtne l\u00f5ppaja valem arvutada, millal mitmele t\u00f6\u00f6perioodile jaotuv operatsioon l\u00f5peb. Selleks on vaja eraldi arvutust, mis arvestab t\u00f6\u00f6kalendriga.<\/p>\n\n\n<p>Siin hakkab mall n\u00e4itama, milles planeerimist\u00f6\u00f6 tegelikult seisneb: mitte uute ridade sisestamises, vaid nende vastastikuse m\u00f5ju kontrollimises.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katseta plaani, muutes \u00fcht eeldust<\/h2>\n\n\n<p>Enne arvutustabelis koostatud ajakava usaldamist vaata, mis juhtub tootmise muutumisel.<\/p>\n\n\n<p>Oletame, et A on l\u00f5petatud kell 10:30, kuid M1 pole kasutatav 10:30 kuni 13:00. B pole veel alanud. Selle seadistamiseks ja t\u00f6\u00f6tlemiseks vajalikud 195 minutit viiksid l\u00f5ppaja n\u00fc\u00fcd 16:15 peale, kui t\u00f6\u00f6 toimuks katkestusteta.<\/p>\n\n\n<p>See l\u00f5ppaeg \u00fcletab nii kell 16:00 l\u00f5ppevat t\u00f6\u00f6perioodi kui ka B t\u00e4htaega 16:00. See on hoiatus, mitte kinnitatud uus ajakava. B algusaja muutmine lahtris t\u00f5i probleemi esile, kuid ei lahendanud seda.<\/p>\n\n\n<p>V\u00f5id uurida v\u00f5imalust kasutada teist sobivat masinat koos vaba operaatoriga, pikendada t\u00f6\u00f6aega heakskiidu alusel v\u00f5i leppida kokku teise tarneaja. B mujale paigutamisel tuleb aga kontrollida ka sinna juba m\u00e4\u00e4ratud t\u00f6id. Kui B-le j\u00e4rgneb veel \u00fcks operatsioon, v\u00f5ib muutmist vajada ka selle algusaeg.<\/p>\n\n\n<p>Selles seisnebki aritmeetika ja <a href=\"\/et\/ressursid\/piiratud-voimsusega-planeerimine\/\">piiratud v\u00f5imsusega planeerimise<\/a> erinevus. Aritmeetika arvutab, millal valitud paigutuse korral t\u00f6\u00f6 l\u00f5ppeks. Ajakava koostamisel leitakse t\u00f6\u00f6le koht, \u00fcletamata selleks saadaolevat tootmisv\u00f5imsust.<\/p>\n\n\n<p>Enne tabelis koostatud plaani t\u00f6\u00f6sse andmist kontrolli masinate ja operaatorite t\u00f6\u00f6de ajalisi kattumisi, materjale, eelnevaid operatsioone, t\u00f6\u00f6perioode ja n\u00f5utud l\u00f5ppaegu. S\u00e4ilita l\u00f5petatud t\u00f6\u00f6de tegelikud ajad ning m\u00e4rgista kinnitatud versioon selgelt, et tootmissaalis ei l\u00e4htutaks aegunud koopiast.<\/p>\n\n\n<p>Selle n\u00e4ite puhul on kontrollid j\u00f5ukohased. Pidevalt muutuvas tehases tuleb neid aga korrata iga m\u00f5jutatud tellimuse puhul \u2014 just selle t\u00f6\u00f6 v\u00f5iks ajakava koostamise tarkvara sinu eest \u00e4ra teha. P\u00f5hjalikum <a href=\"\/et\/ressursid\/excel-tootmise-planeerimine-probleemid-skyplanner-aps\/\">\u00fclevaade Excelis tootmise planeerimise raskustest<\/a> selgitab, miks plaani ajakohasena hoidmise koormus kasvab.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lase SkyPlanneril t\u00f6\u00f6d ajakavasse sobitada, juhtides ise plaani<\/h2>\n\n\n<p>SkyPlanner arvestab ajakava koostamisel sinu t\u00f6\u00f6keskuste, vahetuste, operaatorite, prioriteetide ja materjalidega. Sina m\u00e4\u00e4rad tootmisressursid ja operatsioonide andmed; ajakava koostav tehisintellekt Arcturus arvutab t\u00f6\u00f6j\u00e4rjestuse, l\u00e4htudes seadistatud tootmisv\u00f5imsusest ja s\u00f5ltuvustest. Tulemus kuvatakse Gantt-ajateljel, kus igal t\u00f6\u00f6keskusel on oma t\u00f6\u00f6j\u00e4rjekord ning omavahel seotud protsessietappide vahel on n\u00e4ha seosed.<\/p>\n\n\n<p>M1 t\u00f6\u00f6katkestuse korral m\u00e4rgid aja, mil masinat kasutada ei saa, ja arvutad ajakava uuesti. Arcturus paigutab t\u00f6\u00f6d kasutatavatele aegadele, l\u00e4htudes sinu m\u00e4\u00e4ratud ressursivalikutest ja piirangutest. Seej\u00e4rel saad tulemuse \u00fcle vaadata ja n\u00e4ha, milliste tellimuste valmimine vajab t\u00e4helepanu, selle asemel et ise tabeliridade kaupa k\u00f5iki kaasnevaid muutusi j\u00e4lgida.<\/p>\n\n\n<p>Kui materjalidega arvestav ajakava koostamine on sisse l\u00fclitatud, saab arvutuses arvesse v\u00f5tta ka nende saadavust. Lukustused kaitsevad t\u00f6id, mida sa ei soovi liigutada, ning eelm\u00e4\u00e4ratud prioriteedid n\u00e4itavad, millised kohustused on k\u00f5ige olulisemad. <strong>Sina m\u00e4\u00e4rad prioriteedid, tehisintellekt j\u00e4rgib neid.<\/strong> Nende otsuste rakendamiseks ei pea sa iga t\u00f6\u00f6d eraldi paika panema.<\/p>\n\n\n<p>Tulemuseks pole pelgalt korrastatum tellimuste loend, vaid plaan, millega saad t\u00f6\u00f6tada ka tehase olude muutumisel. Saad keskenduda tootmisotsustele: kas lisada tootmisv\u00f5imsust, muuta prioriteeti v\u00f5i r\u00e4\u00e4kida kliendiga tarneajast. SkyPlanner teeb nende otsuste taga vajalikud ajakava arvutused.<\/p>\n\n\n<p><a href=\"\/et\/funktsioonid\/\">Tutvu SkyPlanneri ajakava koostamise v\u00f5imalustega<\/a> ja vaata, kuidas Gantt, ressursside saadavus ja automaatne ajakava koostamine seda t\u00f6\u00f6d toetavad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mida muutis UTU jaoks \u00fcleminek Excelilt SkyPlannerile<\/h2>\n\n\n<p>UTU Ulvila tehas valmistab elektrikilpe ja l\u00fclitusseadmeid. Enne SkyPlanneri kasutuselev\u00f5ttu planeerisid osakonnad t\u00f6\u00f6d oma Exceli tabelites, mida uuendati k\u00e4sitsi. ERP-is tehtud t\u00f6\u00f6j\u00e4rjestuse muudatused ei j\u00f5udnud alati tootmissaali ning tegelikust tootmisv\u00f5imsusest oli raske \u00fclevaadet saada.<\/p>\n\n\n<p>Probleem polnud lihtsalt puuduvas veerus. Raskus seisnes tellimuste teabe, t\u00f6\u00f6j\u00e4rjestuse ja t\u00f6\u00f6 tegijate \u00fchtses infov\u00e4ljas hoidmises.<\/p>\n\n\n<p>UTU valis SkyPlanneri Oracle NetSuite&#8217;ile \u00fclemineku ajal. UTU lahenduses on SkyPlanner \u00fchendatud NetSuite&#8217;i ja palgaarvestuss\u00fcsteemiga ning koondab tehase liinid ja osakonnad \u00fchte s\u00fcsteemi. Meeskond t\u00f5stab esile tehisintellekti abil ajakava koostamise ja Gantt-ajatelje kombinatsiooni: t\u00f6\u00f6j\u00e4rjestus, tootmisv\u00f5imsus ja t\u00f6\u00f6de edenemine on n\u00e4htavad \u00fches vaates.<\/p>\n\n\n<p>UTU s\u00f5nul s\u00e4\u00e4stab ettev\u00f5te <strong>arvutustabelite k\u00e4sitsi uuendamiselt umbes kaks tundi n\u00e4dalas<\/strong> ning uuendatud t\u00f6\u00f6j\u00e4rjekord j\u00f5uab paigaldajateni sekunditega. See on praktiline edasiminek v\u00f5rreldes malliga: koopiate ajakohasena hoidmine n\u00f5uab v\u00e4hem vaeva ja t\u00f6\u00f6 tegijatel on t\u00f6\u00f6de j\u00e4rjekorrast selgem \u00fclevaade.<\/p>\n\n\n<p><a href=\"\/et\/klientide-lood\/utu\/\">Loe UTU kogemusest Excelilt SkyPlannerile \u00fcleminekul<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e4ilita vajalikud l\u00e4hteandmed. L\u00f5peta ajakava pidev \u00fcmberkoostamine.<\/h2>\n\n\n<p>Mall aitab v\u00e4lja selgitada, mida on ajakava koostamiseks vaja: operatsioonid, nende kestused, ressursid, nende saadavus ja n\u00f5utavad l\u00f5petamisajad. Nende l\u00e4hteandmete kasutamiseks ei pea sa Excelis pidevalt arvutama, kuidas need \u00fcksteist m\u00f5jutavad.<\/p>\n\n\n<p><strong>SkyPlanner on avatud REST API kaudu integreeritav mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga.<\/strong> Tootmise ajakava saab paremini koostada ka olemasolevatele s\u00fcsteemidele tuginedes, kusjuures prioriteetide m\u00e4\u00e4ramine ja tootmisotsused j\u00e4\u00e4vad sinu k\u00e4tesse.<\/p>\n\n\n<p><a href=\"\/et\/kontakt-muugiga\/\">Broneeri SkyPlanneri esitlus<\/a> ning m\u00f5tle selleks l\u00e4bi \u00fche t\u00fc\u00fcpilise tellimuse tehnoloogiline marsruut ja m\u00f5ni hiljutine ajakava muudatus. Nende n\u00e4idete abil saad uurida, kuidas oma t\u00f6id ajastada, kui masinate ja inimeste saadavus ning t\u00e4htajad seavad vastuolulisi n\u00f5udeid. V\u00f5i <a href=\"\/et\/prooviperiood\/\">proovi SkyPlannerit n\u00e4idisandmetega<\/a> ja vaata ajakava Gantt-vaates, enne kui hakkad enda seadistust kavandama.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega Tootmisplaani mall annab tellimustele koha tabelis. Keerulisem k\u00fcsimus on, kas neile leidub koht ka tehases: vabal masinal, sobiva operaatoriga ning piisavalt vara, et j\u00f5uda j\u00e4rgmise operatsiooni ja kliendile tarnimisega \u00f5igeks ajaks valmis. Laadi alla tootmisplaani mall (CSV Exceli jaoks). See on lihtne tootmisn\u00e4ide, mida saad oma vajadustele kohandada. Iga operatsioon &#8230; <a title=\"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/\" aria-label=\"Read more about Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-96093","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega<\/title>\n<meta name=\"description\" content=\"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\" \/>\n<meta property=\"og:description\" content=\"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/\"},\"wordCount\":1729,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/\",\"name\":\"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmisplaani-mall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega","description":"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/","og_locale":"et_EE","og_type":"article","og_title":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega","og_description":"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/"},"wordCount":1729,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/","name":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"Laadi alla tootmisplaani mall Exceli jaoks, vaata, kuidas t\u00f6\u00f6d tootmisse mahuvad ja kuidas SkyPlanner muudab plaani, kui tootmine muutub.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmisplaani-mall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tootmisplaani mall: sobita t\u00f6\u00f6d tootmisv\u00f5imsusega Tootmisplaani mall annab tellimustele koha tabelis. Keerulisem k\u00fcsimus on, kas neile leidub koht ka tehases: vabal masinal, sobiva operaatoriga ning piisavalt vara, et j\u00f5uda j\u00e4rgmise operatsiooni ja kliendile tarnimisega \u00f5igeks ajaks valmis. Laadi alla tootmisplaani mall (CSV Exceli jaoks). See on lihtne tootmisn\u00e4ide, mida saad oma vajadustele kohandada. Iga operatsioon&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=96093"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96093\/revisions"}],"predecessor-version":[{"id":96122,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/96093\/revisions\/96122"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=96093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=96093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=96093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}