{"id":7099,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=7099"},"modified":"2026-10-10T11:59:03","modified_gmt":"2026-10-10T11:59:03","slug":"mes-susteem-mis-see-on-ja-mida-see-teeb","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/","title":{"rendered":"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>MES-s\u00fcsteem<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/et\/ressursid\/mes-vs-erp-mis-vahe-on\/\">MES vs ERP<\/a><\/strong><br><br><strong><a href=\"\/et\/ressursid\/mes-erp-integratsiooni-voimsus\/\">MES-i ja ERP-i integratsioon<\/a><\/strong><br><br><a href=\"\/et\/ressursid\/mesi-funktsioonide-eelised\/\"><strong>MES-i v\u00f5imalused<\/strong><\/a><br>\u00b7 <a href=\"\/et\/ressursid\/mes-tootmise-jarelevalve\/\">Tootmise seire<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/mes-kvaliteedikontroll-tootmises\/\">Kvaliteedikontroll<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/mes-varude-optimeerimine\/\">Laovarude optimeerimine<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/mes-andmevoogude-juhtimine\/\">Andmevoo haldus<\/a><br>\u00b7<a href=\"\/et\/ressursid\/mes-tootmisanaluutika\/\"> Tootmisanal\u00fc\u00fctika<\/a><br>\u00b7<a href=\"\/et\/ressursid\/mes-tootmise-jalgimine\/\"> Tootmise j\u00e4lgimine<\/a><br><br><strong><a href=\"\/et\/ressursid\/mes-lahendused-kuidas-valida-oige\/\">MES-lahendused<\/a><\/strong><br>\u00b7<a href=\"\/et\/ressursid\/pilvepohine-mes\/\"> Pilvep\u00f5hine MES<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/kohapealne-mes\/\">Ettev\u00f5ttesisene MES<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/mes-vaikeettevotetele\/\">MES v\u00e4ikeettev\u00f5ttele<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/tehisintellektipohine-mes\/\">Tehisintellektil p\u00f5hinev MES<\/a><br>\u00b7 <a href=\"\/et\/ressursid\/ettevotte-mes\/\">Suurettev\u00f5tte MES<\/a><br>\u00b7<a href=\"\/et\/ressursid\/toostusspetsiifiline-mes\/\"> T\u00f6\u00f6stusharule kohandatud MES<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/et\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Artiklid<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">MES-s\u00fcsteem \u2013 mis see on ja mida see teeb<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">MES-s\u00fcsteem \u2013 mis see on ja mida see teeb<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">Kui automatiseerimine hakkas tootmisse j\u00f5udma, tekkis m\u00f5iste Manufacturing Execution System (MES). MES oli vahend automatiseeritud s\u00fcsteemide juhtimiseks, et tehased t\u00f6\u00f6taksid t\u00f5rgeteta. Selleks sujuvdas see protsesse, j\u00e4lgis neid tootmises ja dokumenteeris s\u00fcndmused automaatselt.<\/p>\n\n\n\n<p>Aja jooksul leidsid ettev\u00f5tted sellele uuele vahendile uusi kasutusviise. Kuna kohandatud toodete n\u00f5udlus kasvas, tuli protsesse t\u00f5husamaks muuta ning&nbsp;<a href=\"\/et\/\" target=\"_blank\" rel=\"noreferrer noopener\">tootmise planeerimine<\/a>&nbsp;vajas optimeerimist. Selleks on MES osutunud suurep\u00e4raseks vahendiks.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#mis-on-mes\" class=\"uagb-toc-link__trigger\">Mis on MES?<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-i-funktsioonid\" class=\"uagb-toc-link__trigger\">MES-i funktsioonid<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-i-v\u00f5imalused\" class=\"uagb-toc-link__trigger\">MES-i v\u00f5imalused<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-lahendused\" class=\"uagb-toc-link__trigger\">MES-lahendused<\/a><li class=\"uagb-toc__list\"><a href=\"#n\u00f5uanded-\u00f5ige-lahenduse-valimiseks\" class=\"uagb-toc-link__trigger\">N\u00f5uanded \u00f5ige lahenduse valimiseks<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-ja-erp\" class=\"uagb-toc-link__trigger\">MES ja ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-s\u00fcsteemi-kasutamise-eelised\" class=\"uagb-toc-link__trigger\">MES-s\u00fcsteemi kasutamise eelised<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-s\u00fcsteemi-tulevased-rakendused\" class=\"uagb-toc-link__trigger\">MES-s\u00fcsteemi tulevased rakendused<\/a><li class=\"uagb-toc__list\"><a href=\"#viige-oma-ettev\u00f5tte-protsesside-juhtimine-j\u00e4rgmisele-tasemele\" class=\"uagb-toc-link__trigger\">Viige oma ettev\u00f5tte protsesside juhtimine j\u00e4rgmisele tasemele!<\/a><li class=\"uagb-toc__list\"><a href=\"#korduma-kippuvad-k\u00fcsimused\" class=\"uagb-toc-link__trigger\">Korduma kippuvad k\u00fcsimused<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>MES-s\u00fcsteem j\u00e4lgib ja dokumenteerib tootmist tootmissaalis ning annab meeskonnale ajakohast teavet t\u00f6\u00f6de, materjalide ja kvaliteedi kohta. ERP tegeleb ettev\u00f5tte tegevuse planeerimisega, MES aga toetab tootmise teostamist. ISA-95 kirjeldab mudeleid ja terminoloogiat tootmise juhtimise ning ettev\u00f5tte \u00e4ritegevuse vaheliseks infovahetuseks; see ei ole MES-i kohustuslike funktsioonide kontrollnimekiri. T\u00e4nap\u00e4evased MES-s\u00fcsteemid v\u00f5imaldavad muu hulgas j\u00e4lgida tootmist ja laovarusid ning anal\u00fc\u00fcsida tootmisandmeid. MES-i \u00fchendamine SkyPlanner APS-iga lisab v\u00f5imaluse ajastada tootmist tootmisandmete ja planeerija m\u00e4\u00e4ratud prioriteetide alusel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Mis on MES?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>MES-s\u00fcsteem on tarkvara, mis j\u00e4lgib, dokumenteerib ja toetab tootmise teostamist tootmissaalis. See kogub andmeid operaatoritelt, seadmetelt ja \u00fchendatud s\u00fcsteemidest, et meeskond saaks j\u00e4lgida t\u00f6\u00f6de edenemist, materjalikasutust ja kvaliteeti.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">MES ja ERP t\u00e4iendavad teineteist. ERP toetab \u00e4riprotsesse, n\u00e4iteks tellimuste haldamist, ostmist ja finantsarvestust; MES annab \u00fcksikasjalikumat teavet tootmise teostamise kohta. Integratsioon v\u00f5imaldab kahel s\u00fcsteemil vahetada teavet tootmisele esitatavate n\u00f5uete ja tootmistulemuste kohta.<\/p>\n\n\n\n<p>MES on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib seadmeid, materjale ja t\u00f6\u00f6tajaid. See toob esile protsesside kitsaskohad, aitab seadmete hooldust ette planeerida ning v\u00f5imaldab anda t\u00f6\u00f6tajatele ja seadmetele tellimusep\u00f5hiseid kohandatud juhiseid. Nii p\u00fcsivad protsessid sujuvad ja ajastamine on usaldusv\u00e4\u00e4rsem.<\/p>\n\n\n\n<p>Kui MES oli alles lapsekingades, oli selle m\u00e4\u00e4ratlus \u00fcsna l\u00f5tv. MES-iks v\u00f5is nimetada peaaegu iga meetodit, millega protsessi j\u00e4lgiti, dokumenteeriti v\u00f5i juhiti. See tekitas probleeme MES-i ja teiste s\u00fcsteemide vaheliste liideste kasutamisel.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> m\u00e4\u00e4ratleb mudelid, terminoloogia ja infovahetuse tootmise juhtimise \u00fchendamiseks ettev\u00f5tte \u00e4ritegevusega. Selle integratsioonik\u00e4sitlus erineb <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a> varem v\u00e4lja t\u00f6\u00f6tatud MES-i funktsioonimudelitest. Allj\u00e4rgnev loetelu annab \u00fclevaate MES-i levinud funktsioonidest, mitte ISA-95 kohustuslikest n\u00f5uetest:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">MES-i funktsioonid<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Andmete kogumine<\/li>\n\n\n\n<li>Kvaliteedikontroll<\/li>\n\n\n\n<li>Ajastamine<\/li>\n\n\n\n<li>Tulemuslikkuse anal\u00fc\u00fcs<\/li>\n\n\n\n<li>Toodete liikumine<\/li>\n\n\n\n<li>P\u00e4ritolu ja j\u00e4lgitavus<\/li>\n\n\n\n<li>Protsessihaldus<\/li>\n\n\n\n<li>Ressursside haldus<\/li>\n\n\n\n<li>Personali haldus<\/li>\n\n\n\n<li>Hoolduse haldus<\/li>\n\n\n\n<li>Dokumendihaldus<\/li>\n<\/ol>\n\n\n\n<p>Konkreetse MES-i funktsioonid s\u00f5ltuvad tootest ja selle juurutusest. M\u00e4\u00e4rake kindlaks, milline s\u00fcsteem vastutab iga \u00fclesande eest ning kuidas liiguvad andmed MES-i, ERP ja ajastamistarkvara, n\u00e4iteks APS-i vahel.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">MES-i v\u00f5imalused<\/h2>\n\n\n\n<p>S\u00fcsteemi s\u00fcgavamalt uurides j\u00f5uame uuema ja p\u00f5neva tahuni:&nbsp;<a href=\"\/et\/ressursid\/mesi-funktsioonide-eelised\/\">MES-i v\u00f5imalused<\/a>. Selle vahendi n\u00fcansside m\u00f5istmisel on oluline eristada MES-i funktsiooni ja MES-i v\u00f5imalust.<\/p>\n\n\n\n<p>Lihtsalt \u00f6eldes on MES-i funktsioon p\u00f5hitegevus v\u00f5i \u00fclesanne, mida s\u00fcsteem suudab t\u00e4ita. Need funktsioonid moodustavad MES-s\u00fcsteemi selgroo. V\u00f5imalused seevastu on s\u00fcsteemi konkreetsed vahendid ehk oskused, mis laiendavad selle funktsionaalset potentsiaali. MES-s\u00fcsteeme uurides t\u00f5ime esile kuus uuenduslikku v\u00f5imalust, mis silma paistavad:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/et\/ressursid\/mes-tootmise-jarelevalve\/\">Tootmise seire<\/a><\/strong>: see v\u00f5imalus annab reaalajas \u00fclevaate tootmisprotsessist ning tagab, et k\u00f5ik toimib sujuvalt ja t\u00f5husalt. Seire kaudu saavad tootmise planeerijad hindamatuid teadmisi ja vajaduse korral muudatusi teha.<\/li>\n\n\n\n<li><a href=\"\/et\/ressursid\/mes-kvaliteedikontroll-tootmises\/\"><strong>Kvaliteedikontroll tootmises<\/strong>:<\/a> V\u00f5imekas MES-s\u00fcsteem ei piirdu \u00fcksnes tootmise j\u00e4lgimisega, vaid k\u00e4sitleb ka valmistatavate toodete kvaliteeti. See salvestab kvaliteedikontrollide tulemused ja juhib t\u00e4helepanu k\u00f5rvalekalletele, et meeskond saaks tegutseda n\u00f5utud standardite j\u00e4rgi.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/mes-varude-optimeerimine\/\">Laovarude optimeerimine<\/a><\/strong>: Tootmise k\u00f5rval on oluline ka laovarude haldamine. MES-s\u00fcsteemid j\u00e4lgivad materjalide liikumist ja tarbimist, aidates meeskonnal tuvastada puuduj\u00e4\u00e4ke ja \u00fcleliigseid varusid.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/mes-andmevoogude-juhtimine\/\">Andmevoo haldus<\/a><\/strong>: meie digiajastul on andmed kuningas, mist\u00f5ttu on andmevoo haldamine \u00fclioluline. Selle v\u00f5imalusega MES-s\u00fcsteem tagab andmete sujuva liikumise, salvestamise ja juurdep\u00e4\u00e4su, mis muudab otsuste tegemise lihtsamaks.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/mes-tootmisanaluutika\/\">Tootmisanal\u00fc\u00fctika<\/a><\/strong>: andmetesse s\u00fcvenedes saavad MES-s\u00fcsteemid v\u00e4lja tuua olulist anal\u00fc\u00fctikat. Selle abil m\u00e4rkavad tootmise planeerijad mustreid, prognoosivad trende ja teevad p\u00f5hjendatud otsuseid.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/mes-tootmise-jalgimine\/\">Tootmise j\u00e4lgimine<\/a><\/strong>: viimane, kuid mitte v\u00e4hemoluline \u2013 tootmise j\u00e4lgimine on t\u00f5eline p\u00e4rl. See annab selge \u00fclevaate, kus iga toode tootmisliinil parajasti on, ning sillutab teed ressursside paremale jaotamisele ja t\u00f5hususele.<\/li>\n<\/ol>\n\n\n\n<p>Vaatame \u00fchte neist v\u00f5imalustest l\u00e4hemalt. Tootmise seire annab p\u00f5hjaliku \u00fclevaate tootmisprotsessist. M\u00f5elge sellest kui valvsast vahimehest. See avastab aktiivselt k\u00f5rvalekaldeid, v\u00f5imalikke ebat\u00f5husaid kohti ja s\u00fcsteemirikete m\u00e4rke. <\/p>\n\n\n\n<p>Pakkudes viimase minutini ajakohaseid andmeid, hoiab tootmise seire tootmise planeerijad alati kursis, nii et nad saavad kiiresti tegutseda ja protsesse vajaduse korral parandada.<br><br>MES-s\u00fcsteemide maailm areneb edasi ja pakub \u00fcha keerukamaid vahendeid ja v\u00f5imalusi. Kui tootmise planeerijad p\u00fcsivad kursis, saavad nad neis s\u00fcsteemides peituva potentsiaali t\u00e4ielikult \u00e4ra kasutada ja viia oma tegevuse helgemasse homsesse.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 tootmise planeerimise ja ajastamise toote pilt eestvaates\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">T\u00e4iustatud tootmise planeerimine tehisintellektiga &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Loe l\u00e4hemalt meie l\u00e4henemisest tootmise planeerimisele ja optimeerimisele, mis kasutab \u00e4ra tehisintellekti v\u00f5imalusi.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/et\/\" aria-label=\"Broneerige demo\">Tootmise planeerimine tehisintellektiga<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">MES-lahendused<\/h2>\n\n\n\n<p>Mitmesugused <a href=\"\/et\/ressursid\/mes-lahendused-kuidas-valida-oige\/\">MES-lahendused <\/a>on valmis lahendama erinevaid t\u00f6\u00f6korralduslikke probleeme MES-s\u00fcsteemide laias valdkonnas. Iga\u00fchel on oma ainulaadne v\u00e4\u00e4rtuspakkumine, alates pilvep\u00f5histe s\u00fcsteemide sujuvatest v\u00f5imalustest kuni t\u00f6\u00f6stusharule kohandatud MES-i spetsiaalsete lahendusteni. Vaatame need variandid koos \u00fcle ja selgitame, kuidas iga\u00fcks saab teie ettev\u00f5tte konkreetseid tootmisvajadusi parimal viisil toetada ja t\u00e4iendada.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/et\/ressursid\/pilvepohine-mes\/\">Pilvep\u00f5hine MES<\/a><\/strong>: t\u00f6\u00f6tab pilves, mis t\u00e4hendab, et sellele p\u00e4\u00e4seb ligi igal pool, kus on interneti\u00fchendus. See pakub paindlikkust ja sageli on esialgsed kulud v\u00e4iksemad. Samas s\u00f5ltub see stabiilsest interneti\u00fchendusest.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/kohapealne-mes\/\">Ettev\u00f5ttesisene MES<\/a><\/strong>: see s\u00fcsteem paigaldatakse ettev\u00f5tte enda riistvarale ja serveritele. Kuigi esialgne investeering v\u00f5ib olla suurem, annab see andmete \u00fcle parema kontrolli ja seda saab kohandada ettev\u00f5tte vajadustele.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/mes-vaikeettevotetele\/\">MES v\u00e4ikeettev\u00f5ttele<\/a><\/strong>: spetsiaalselt v\u00e4iksematele ettev\u00f5tetele kohandatud s\u00fcsteemid on tavaliselt lihtsamad ja kulut\u00f5husamad. Need keskenduvad p\u00f5hiv\u00f5imalustele, mida v\u00e4ikeettev\u00f5te vajab, ega koorma kasutajat keerukate funktsioonidega.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/tehisintellektipohine-mes\/\">Tehisintellektil p\u00f5hinev MES<\/a><\/strong>: tehisintellekti kasutades suudavad need s\u00fcsteemid prognoosida trende, automatiseerida \u00fclesandeid ja optimeerida protsesse. See on suurep\u00e4rane valik ettev\u00f5tetele, kes soovivad innovatsioonis esirinnas p\u00fcsida.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/ettevotte-mes\/\">Suurettev\u00f5tte MES<\/a><\/strong>: suurettev\u00f5tetele keerukate vajadustega m\u00f5eldud lahendus pakub laia valikut v\u00f5imalusi, suudab k\u00e4sitleda suuri andmemahtusid ja integreerub sujuvalt teiste ettev\u00f5ttes\u00fcsteemidega.<\/li>\n\n\n\n<li><strong><a href=\"\/et\/ressursid\/toostusspetsiifiline-mes\/\">T\u00f6\u00f6stusharule kohandatud MES<\/a><\/strong>: need on kohandatud konkreetsetele t\u00f6\u00f6stusharudele, n\u00e4iteks farmaatsiale v\u00f5i autot\u00f6\u00f6stusele. Neil on valmis kaasas just nende sektorite jaoks ainulaadsed vahendid ja v\u00f5imalused.<\/li>\n<\/ol>\n\n\n\n<p>\u00d5ige MES-lahenduse valik v\u00f5ib olla teie tootmisprotsessi t\u00f5hususe ja edu seisukohalt otsustav.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">N\u00f5uanded \u00f5ige lahenduse valimiseks<\/h2>\n\n\n\n<p>Parima valiku tegemine nii mitmekesisest MES-s\u00fcsteemide hulgast v\u00f5ib alguses tunduda heidutav. Oluline on, et valitud s\u00fcsteem vastaks ettev\u00f5tte konkreetsetele t\u00f6\u00f6vajadustele ja tulevikueesm\u00e4rkidele. Selle olulise otsuse tegemiseks on siin m\u00f5ned v\u00e4\u00e4rtuslikud n\u00e4pun\u00e4ited:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>M\u00f5istke oma vajadusi<\/strong>: enne otsustamist kaardistage ettev\u00f5tte konkreetsed n\u00f5uded. Kas vajate keerukat funktsionaalsust v\u00f5i piisab p\u00f5hiv\u00f5imalustest?<\/li>\n\n\n\n<li><strong>Eelarve<\/strong>: kuigi vajadustele vastav s\u00fcsteem on oluline, on sama t\u00e4htis kaaluda, kui palju olete n\u00f5us investeerima.<\/li>\n\n\n\n<li><strong>Skaleeritavus<\/strong>: m\u00f5elge pikaajaliselt. Valige MES-s\u00fcsteem, mis saab ettev\u00f5ttega koos kasvada.<\/li>\n\n\n\n<li><strong>Integratsioon<\/strong>: veenduge, et Manufacturing Execution System integreerub h\u00e4sti muu teie kasutatava tarkvaraga.<\/li>\n\n\n\n<li><strong>Kasutajas\u00f5bralikkus<\/strong>: keeruline s\u00fcsteem v\u00f5ib tootlikkust p\u00e4rssida. Eelistage intuitiivset ja kasutajas\u00f5bralikku.<\/li>\n\n\n\n<li><strong>Tugi ja koolitus<\/strong>: uurige, kas pakkuja pakub piisavalt tuge ja koolitusi, et teie meeskond s\u00fcsteemiga tuttavaks saaks.<\/li>\n<\/ul>\n\n\n\n<p>Kuigi MES-s\u00fcsteeme on mitu, on \u00f5ige valik alati see, mis sobib k\u00f5ige paremini teie ettev\u00f5tte ainulaadsete vajaduste ja kasvuplaanidega.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES ja ERP<\/h2>\n\n\n\n<p>T\u00f6\u00f6stustarkvara n\u00fcansse uurides kerkib sageli \u00fcles vaidlus \u201e<a href=\"\/et\/ressursid\/mes-vs-erp-mis-vahe-on\/\">MES vs ERP<\/a>\u201c ja p\u00f5hjus on kergesti m\u00f5istetav.<\/p>\n\n\n\n<p class=\"has-text-align-left\">MES ja&nbsp;<a href=\"\/et\/ressursid\/tootmise-erp-pohjalik-juhend\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;vajavad sageli selgitamist, sest on raske aru saada, kus \u00fcks l\u00f5peb ja teine algab. M\u00f5lemal s\u00fcsteemil on osaliselt kattuvaid funktsioone ning m\u00f5ne lihtsama juhtumi puhul ei ole MES-i \u00fcldse vaja. Siiski v\u00f5ib tehase t\u00f6\u00f6 optimeerimine ainult ERP abil osutuda keeruliseks.<\/p>\n\n\n\n<p>ERP (Enterprise Resource Planning) on tarkvaras\u00fcsteem, mis on m\u00f5eldud kogu ettev\u00f5tte juhtimiseks. See p\u00fc\u00fcab siduda ja hallata k\u00f5iki ettev\u00f5tte tegevusvaldkondi. ERP toimib pidevalt uuenevana s\u00fcndmuste andmebaasina k\u00f5igil tasanditel. Seda teavet saab k\u00e4sitsi v\u00f5i automaatselt kasutada selleks, et hallata ressursse, mida on vaja optimaalseks toimimiseks.<\/p>\n\n\n\n<p>MES seevastu ei ulatu tehase keskkonnast kaugemale. Selle t\u00f6\u00f6riista peamine \u00fclesanne on hinnata, millised ressursid (tooraine, personal, seadmed) on olemas ja kuidas neid kasutada, et tellitud tooteid optimaalselt valmistada. See h\u00f5lmab muu hulgas <a href=\"\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">ajastamist<\/a>, seadmete hooldust, laoseisu kontrolli, kvaliteedikontrolli ja dokumenteerimist.<\/p>\n\n\n\n<p>Ideaalsel juhul oskab ERP turuprognooside p\u00f5hjal ennustada teatud toodete tulevast n\u00f5udlust ja edastada selle teabe MES-ile. MES saab seej\u00e4rel kohandada tootmist vastavalt ERP vajadustele. MES-s\u00fcsteem suudab suure n\u00f5udlusega toodete valmistamiseks optimaalselt ja automaatselt eraldada rohkem ressursse. Nii saavad ERP ja MES t\u00f6\u00f6tada sujuvalt koos.<\/p>\n\n\n\n<p>Kuigi ERP-iga <em>saab <\/em>hallata isegi tootmisprotsessi k\u00f5ige v\u00e4iksemaid detaile, on see \u00fclesanne sageli parem j\u00e4tta MES-s\u00fcsteemile. ERP-tarkvara tegeleb ideaalis sellega, mis tehasesse siseneb ja sealt v\u00e4ljub, MES aga k\u00f5igega, mis toimub tehasehoone sees.<\/p>\n\n\n\n<p>MES- ja ERP-s\u00fcsteemide integreerimine ei ole pelgalt mugavus, vaid strateegiline samm, mis v\u00f5ib ettev\u00f5tte tegevust p\u00f5hjalikult muuta. Kui need kaks v\u00f5imsat s\u00fcsteemi on s\u00fcnkroonis, annavad nad \u00fchtse \u00fclevaate tootmisest ja \u00e4riprotsessidest ning tagavad, et otsused p\u00f5hinevad terviklikel reaalajas andmetel. Selline integratsioon kaotab \u00fclearused t\u00f6\u00f6d, t\u00e4idab infol\u00fcngad ja t\u00f5stab \u00fcldist t\u00f5husust.<\/p>\n\n\n\n<p><a href=\"\/et\/ressursid\/mes-erp-integratsiooni-voimsus\/\" target=\"_blank\" rel=\"noreferrer noopener\">MES-i ja ERP-i integratsioon<\/a>&nbsp;annab \u00fchtse ja sidusa vaate, mis aitab ettev\u00f5tetel olla paindlikumad, kiiremini reageerida ja olla konkurentsiv\u00f5imelisemad.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">MES-s\u00fcsteemi kasutamise eelised<\/h2>\n\n\n\n<p class=\"has-text-align-left\">MES-s\u00fcsteem kogub tootmisandmeid \u00fchendatud seadmetelt, operaatoritelt ja teistest s\u00fcsteemidest ning teeb need meeskonnale k\u00e4ttesaadavaks. Juhid saavad selle teabe p\u00f5hjal tuvastada viivitusi ja otsustada, mida muuta. Andmed tootmistegevuse, materjalikasutuse ja kvaliteedikontrollide kohta toetavad kvaliteedi ja laovarude kontrolli.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner APS (Advanced Planning and Scheduling) tootmise planeerimine\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/et\/ressursid\/kuidas-optimeerida-tootmises-kasutusaega\/\" target=\"_blank\" rel=\"noreferrer noopener\">L\u00e4bimisaja optimeerimine on edu saavutamiseks h\u00e4davajalik<\/a> ning MES-s\u00fcsteem aitab sellele kaasa, tuues n\u00e4htavale t\u00f6\u00f6de edenemise ja viivitused. Kui tellimus muutub, aitavad ajakohased tootmisandmed meeskonnal hinnata, millised toimingud on veel tegemata ja kas muudatus on teostatav. M\u00f5ju l\u00e4bimisajale s\u00f5ltub vabast tootmisv\u00f5imsusest, materjalidest ja juba tehtud t\u00f6\u00f6st; tellimuse kohandamine ei kulge h\u00e4ireteta.<\/p>\n\n\n\n<p>MES saab edastada tootmistulemused ERP-sse, hoides ettev\u00f5tte andmed koosk\u00f5las tootmissaalis toimuvaga. ERP haldab ettev\u00f5tte tasandi protsesse, MES aga annab \u00fcksikasjalikku teavet tootmise teostamise kohta. Need on teineteist t\u00e4iendavad s\u00fcsteemid, mida \u00fchendab integratsioon.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">MES-s\u00fcsteemi tulevased rakendused<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Tulevased MES-i rakendused v\u00f5ivad \u00fchendada tootmisandmed anal\u00fc\u00fctika ja tehisintellektiga, et aidata meeskonnal tuvastada mustreid ning reageerida muutustele. Prognoosimist\u00f6\u00f6riistu tuleb hinnata tegelike tootmisandmete ja nende otsuste p\u00f5hjal, mille tegemist need peaksid toetama.<\/p>\n\n\n\n<p>Tehisintellektil p\u00f5hineval ajastamisel on MES-i k\u00f5rval juba praktiline roll. SkyPlanner APS-is m\u00e4\u00e4ravad planeerijad prioriteedid ja piirangud ning Arcturus arvutab ajakava tootmisandmete, tootmisv\u00f5imsuse ja materjalide alusel. Nende reeglite ja lukustuste kaudu j\u00e4\u00e4b kontroll planeerijate k\u00e4tte. See on ajastamise automatiseerimine, mitte kogu ettev\u00f5tte autonoomne juhtimine.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Viige oma ettev\u00f5tte protsesside juhtimine j\u00e4rgmisele tasemele!<\/h2>\n\n\n\n<p class=\"has-text-align-left\">MES-s\u00fcsteemi integreerimine <a href=\"\/et\/\">APS-iga, n\u00e4iteks SkyPlanneriga<\/a>, seob tootmise teostamise andmed ajastamisega. <a href=\"\/et\/funktsioonid\/\">SkyPlanner APS<\/a> integreerub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga ning kasutab neid andmeid planeerimisel tootmise planeerijate m\u00e4\u00e4ratud prioriteetide alusel.<\/p>\n\n\n\n<p>Kui tellimused, tootmisv\u00f5imsus v\u00f5i t\u00f6\u00f6de edenemine muutuvad, kasutab SkyPlanner APS ajakava \u00fcmberarvutamiseks mootorit Arcturus, j\u00e4rgides planeerija reegleid ja prioriteete. Kui Autopilot on sisse l\u00fclitatud, v\u00f5ivad muudatused k\u00e4ivitada automaatse \u00fcmberajastamise, kusjuures reeglid ja lukustused j\u00e4\u00e4vad kehtima. Gantt-ajajoon n\u00e4itab t\u00f6\u00f6kohtadele ajastatud t\u00f6id, et meeskond n\u00e4eks uuendatud plaani.<\/p>\n\n\n\n<p>Kas soovite oma tootmises \u00e4ra kasutada <a href=\"\/et\/ressursid\/aps-tootmise-planeerimine-ja-ajastamine\/\">MES-i ja APS-i<\/a> \u00fchist j\u00f5udu? <a href=\"\/et\/kontakt-muugiga\/\">V\u00f5tke meiega \u00fchendust ja uurige l\u00e4hemalt!<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner APS (Advanced Planning and Scheduling) \u2013 lahendused tootmisprobleemidele\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n\n\n<p>Siin on m\u00f5ned korduma kippuvad k\u00fcsimused MES-s\u00fcsteemide (Manufacturing Execution System) kohta, mis aitavad t\u00e4nap\u00e4evase tootmise seda olulist osa p\u00f5hjalikumalt tundma \u00f5ppida. Need k\u00fcsimused ja vastused annavad p\u00f5hjaliku \u00fclevaate MES-s\u00fcsteemist alates p\u00f5him\u00e4\u00e4ratlusest kuni erinevuseni teistest s\u00fcsteemidest, n\u00e4iteks ERP-st. Olgu teid huvitamas selle funktsioonid, t\u00e4nap\u00e4evaste MES-s\u00fcsteemide v\u00f5imalused v\u00f5i arengulugu \u2013 siit leiate vastused. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Mis on MES-s\u00fcsteem (Manufacturing Execution System)?<\/h4>\n\n\n\n<p>MES-s\u00fcsteem on tarkvara, mis j\u00e4lgib, dokumenteerib ja toetab tootmise teostamist tootmissaalis. See kogub andmeid operaatoritelt, seadmetelt ja \u00fchendatud s\u00fcsteemidest, et anda \u00fclevaade t\u00f6\u00f6de edenemisest, materjalikasutusest ja kvaliteedist.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">Kuidas erineb MES ERP-st?<\/h4>\n\n\n\n<p>Kui ERP (Enterprise Resource Planning) on m\u00f5eldud kogu ettev\u00f5tte juhtimiseks, \u00fchendades ja hallates k\u00f5iki valdkondi, siis MES keskendub just tootmistehase tegevusele, optimeerides ressursse ja protsesse.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Millised on MES-s\u00fcsteemi peamised funktsioonid?<\/h4>\n\n\n\n<p>T\u00f6\u00f6riista p\u00f5hifunktsioonide hulka kuuluvad muu hulgas andmete kogumine, kvaliteedikontroll, ajastamine, tulemuslikkuse anal\u00fc\u00fcs, toodete liikumine ja ressursihaldus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Milliseid funktsioone pakuvad t\u00e4nap\u00e4evased MES-s\u00fcsteemid?<\/h4>\n\n\n\n<p>T\u00e4nap\u00e4evased MES-s\u00fcsteemid pakuvad selliseid v\u00f5imalusi nagu tootmise reaalajas j\u00e4lgimine, tootmise kvaliteedikontroll, laoseisu optimeerimine, andmevoo haldus, tootmisanal\u00fc\u00fctika ja tootmise j\u00e4lgimine.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Kuidas on MES-i m\u00e4\u00e4ratlus aja jooksul muutunud?<\/h4>\n\n\n\n<p>MES-i funktsioonimudelid on aja jooksul aidanud kirjeldada tootmise teostamisega seotud tegevusi. MESA on avaldanud mitu tootmisettev\u00f5tetele m\u00f5eldud mudelit. ISA-95 k\u00e4sitleb tootmise juhtimise ja ettev\u00f5tte \u00e4ritegevuse integreerimist \u00fchiste mudelite, terminoloogia ja infovahetuse kaudu; see ei ole MES-i n\u00f5utavate funktsioonide kindel kontrollnimekiri.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Millised MES-lahendused on saadaval?<\/h4>\n\n\n\n<p>MES-lahendused v\u00f5ivad olla pilvep\u00f5hised, kohapealsed, v\u00e4ikeettev\u00f5tetele kohandatud, tehisintellektil p\u00f5hinevad, suurettev\u00f5tetele m\u00f5eldud v\u00f5i kindlatele t\u00f6\u00f6stusharudele, n\u00e4iteks farmaatsiale, suunatud.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Kuidas v\u00f5ib MES-i integreerimine teiste s\u00fcsteemidega ettev\u00f5ttele kasulik olla?<\/h4>\n\n\n\n<p>MES annab andmed tootmise teostamise kohta, APS aga arvutab ajakava. SkyPlanner APS \u00fchendub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga. Arcturus ajastab t\u00f6\u00f6d tootmisandmete ja planeerija m\u00e4\u00e4ratud prioriteetide alusel ning Gantt-ajajoon n\u00e4itab saadud plaani.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Kuidas kohaneb MES tulevikus?<\/h4>\n\n\n\n<p>MES v\u00f5ib \u00fcha enam siduda tootmisandmeid anal\u00fc\u00fctika ja tehisintellekti toel t\u00f6\u00f6tavate t\u00f6\u00f6riistadega. \u00dcks praegune praktiline rakendus on APS-iga ajastamine MES-i k\u00f5rval: planeerijad m\u00e4\u00e4ravad prioriteedid ning ajastamismootor arvutab plaani \u00fcmber, kui tootmises toimuvad muutused. Ajastamise automatiseerimisel j\u00e4\u00e4vad m\u00e4\u00e4ravaks planeerija reeglid ja piirangud.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 tootmise planeerimise ja ajastamise vaade\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">T\u00f5stke oma tootmine uuele tasemele SkyPlanner APS-iga<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Broneerige demo meie tehnikameeskonnaga ja vaadake, kuidas SkyPlanner APS p\u00e4riselus t\u00f6\u00f6tab.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/et\/kontakt-muugiga\/\" aria-label=\"Broneerige demo\">Broneerige demo<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":7045,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2676,313],"tags":[],"class_list":["post-7099","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mes-susteemid","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MES-s\u00fcsteem: olemus ja \u00fclesanded | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb\" \/>\n<meta property=\"og:description\" content=\"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T11:59:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T11:59:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/\"},\"wordCount\":2416,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"MES s\u00fcsteemid\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/\",\"name\":\"MES-s\u00fcsteem: olemus ja \u00fclesanded | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T11:59:03+00:00\",\"description\":\"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"MES - What it is and what it does header image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mes-susteem-mis-see-on-ja-mida-see-teeb\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Artiklid\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MES-s\u00fcsteem: olemus ja \u00fclesanded | SkyPlanner APS","description":"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/","og_locale":"et_EE","og_type":"article","og_title":"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb","og_description":"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T11:59:03+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jesse Sinisalo","Est. reading time":"12 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T11:59:03+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/"},"wordCount":2416,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["MES s\u00fcsteemid","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/","name":"MES-s\u00fcsteem: olemus ja \u00fclesanded | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T11:59:03+00:00","description":"MES (Manufacturing Execution System) on andurite ja tarkvara integreeritud s\u00fcsteem, mis j\u00e4lgib, dokumenteerib ja juhib tootmist.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280,"caption":"MES - What it is and what it does header image"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mes-susteem-mis-see-on-ja-mida-see-teeb\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Artiklid","item":"https:\/\/skyplanner.ai\/et\/ressursid\/"},{"@type":"ListItem","position":3,"name":"MES-s\u00fcsteem \u2013 mis see on ja mida see teeb"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/et\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/7099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=7099"}],"version-history":[{"count":4,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/7099\/revisions"}],"predecessor-version":[{"id":95216,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/7099\/revisions\/95216"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/7045"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=7099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=7099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=7099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}