{"id":43676,"date":"2024-10-09T09:22:41","date_gmt":"2024-10-09T09:22:41","guid":{"rendered":"https:\/\/skyplanner.ai\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/"},"modified":"2024-10-10T08:12:31","modified_gmt":"2024-10-10T08:12:31","slug":"lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/","title":{"rendered":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-which-is-right-for-you\">Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/\">Home<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &#8221; Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Eeldatav lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>T\u00f5hususe maksimeerimine ja j\u00e4\u00e4tmete minimeerimine ei ole enam lihtsalt &#8220;<em>nice to have<\/em>&#8221; &#8211; need on vajalikud, kui soovite tootmismaailmas ellu j\u00e4\u00e4da. Seoses kasvavate n\u00f5udmistega v\u00e4hendada kulusid, parandada toodete kvaliteeti ja t\u00f5hustada protsesse, leiavad tootjad end sageli v\u00f5rdlevat Lean Manufacturing&#8217;i ja Six Sigma vahel. Need kaks meetodit on aidanud ettev\u00f5tetel kogu maailmas oma tegevust optimeerida, kuid kumb neist on teie tootmise jaoks \u00f5ige?  <\/p>\n\n\n\n<p>Selles artiklis selgitame, mis on Lean Manufacturing ja Six Sigma, toome v\u00e4lja peamised erinevused ja n\u00e4itame, kuidas tootmise planeerijad saavad oma elu lihtsamaks teha, integreerides <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/aps-tootmise-planeerimine-ja-ajastamine\/\">t\u00e4iustatud planeerimis- ja ajaplaneerimislahenduse (t\u00e4psem planeerimine ja ajastamine<\/a>, APS).<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-62514f8d      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-\u00f5ige\" class=\"uagb-toc-link__trigger\">Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#lean-manufacturing-vs-six-sigma-m\u00f5istete-m\u00f5istmine\" class=\"uagb-toc-link__trigger\">Lean Manufacturing vs Six Sigma: m\u00f5istete m\u00f5istmine<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#lean-manufacturing-teekond-ratsionaliseeritud-t\u00f5hususe-poole\" class=\"uagb-toc-link__trigger\">Lean Manufacturing: Teekond ratsionaliseeritud t\u00f5hususe poole<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kuus-sigmat-meetod-protsessi-t\u00e4iuslikkuse-taga\" class=\"uagb-toc-link__trigger\">Kuus Sigmat: meetod protsessi t\u00e4iuslikkuse taga<\/a><\/li><\/ul><li class=\"uagb-toc__list\"><a href=\"#lean-manufacturing-vs-six-sigma-mis-on-peamine-erinevus\" class=\"uagb-toc-link__trigger\">Lean Manufacturing vs Six Sigma: mis on peamine erinevus?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#milline-meetod-on-parem\" class=\"uagb-toc-link__trigger\">Milline meetod on parem?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#lean-manufacturing-six-sigma-ja-aps-t\u00e4iuslik-kooslus\" class=\"uagb-toc-link__trigger\">Lean Manufacturing, Six Sigma ja APS: T\u00e4iuslik kooslus<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#maksimeerige-t\u00f5husust-ja-t\u00e4psust-skyplanneriga\" class=\"uagb-toc-link__trigger\">Maksimeerige t\u00f5husust ja t\u00e4psust SkyPlanneriga<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-understanding-the-concepts\">Lean Manufacturing vs Six Sigma: m\u00f5istete m\u00f5istmine<\/h2>\n\n\n\n<p>Lean Manufacturing ja Six Sigma v\u00f5rdlemisel on oluline m\u00f5ista, et m\u00f5lema metoodika eesm\u00e4rk on tootmisprotsesside parandamine, kuid selle eesm\u00e4rgi saavutamiseks kasutatakse erinevaid l\u00e4henemisviise.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Lean Manufacturing: Teekond ratsionaliseeritud t\u00f5hususe poole<\/h3>\n\n\n\n<p><strong>Lean Manufacturing t\u00e4hendab t\u00f5hususe parandamist, k\u00f5rvaldades k\u00f5ik, mis ei anna tootmisprotsessile lisav\u00e4\u00e4rtust<\/strong>. See sai alguse Toyotast ja keskendub sellele, et teha v\u00e4hemaga rohkem. Idee on lihtne: kasuta ainult seda, mis on kliendi n\u00f5udmiste rahuldamiseks h\u00e4davajalik, mitte midagi enamat. Selline l\u00e4henemine ei aita mitte ainult v\u00e4hendada kulusid, vaid parandab ka kvaliteeti ja kiirendab tootmist. Seega v\u00f5idavad k\u00f5ik, kui soovite t\u00e4nap\u00e4eva tootmismaailmas konkurentsiv\u00f5imeliseks j\u00e4\u00e4da.    <\/p>\n\n\n\n<p>Lean Manufacturing&#8217;i keskmes on pidev t\u00e4iustamine ehk <strong>Kaizen<\/strong>, mis h\u00f5lmab k\u00f5iki ettev\u00f5tte t\u00f6\u00f6tajaid alates tippjuhtkonnast kuni tootmisliinini. Keskendutakse kaheksa konkreetse j\u00e4\u00e4tmet\u00fc\u00fcbi k\u00f5rvaldamisele, mis aeglustavad tootmist v\u00f5i suurendavad kulusid. Neid j\u00e4\u00e4tmeid tuntakse akron\u00fc\u00fcmi <strong>TIMWOODS<\/strong> (ingliskeelse l\u00fchendi j\u00e4rgi):  <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>T<\/strong> &#8211; <strong>Transport<\/strong>: Materjalide v\u00f5i toodete tarbetu liikumine protsesside vahel.<\/li>\n\n\n\n<li><strong>I<\/strong> &#8211; <strong>inventuur<\/strong>: \u00dcleliigsed materjalid v\u00f5i tooted, mida ei vajata kohe.<\/li>\n\n\n\n<li><strong>M<\/strong> &#8211; <strong>Liikumine<\/strong>: Inimeste tarbetu liikumine, n\u00e4iteks t\u00f6\u00f6tajate ebat\u00f5hus liikumine t\u00f6\u00f6ruumis.<\/li>\n\n\n\n<li><strong>W<\/strong> &#8211; <strong>ootamine<\/strong>: T\u00fchik\u00e4ik, kui protsesside v\u00f5i toodete kallal ei toimu aktiivset t\u00f6\u00f6d.<\/li>\n\n\n\n<li><strong>O<\/strong> &#8211; <strong>\u00fcletootmine<\/strong>: Tootmine rohkem kui vaja v\u00f5i toodetakse asju enne, kui neid vajatakse.<\/li>\n\n\n\n<li><strong>O<\/strong> &#8211; <strong>liigne t\u00f6\u00f6tlemine<\/strong>: Suurema t\u00f6\u00f6 tegemine v\u00f5i rohkemate funktsioonide lisamine, mis ei ole kliendi n\u00f5udmiste rahuldamiseks vajalikud.<\/li>\n\n\n\n<li><strong>D<\/strong> &#8211; <strong>Vead<\/strong>: Defektsete toodete tootmine, mis vajavad \u00fcmbert\u00f6\u00f6tamist v\u00f5i parandamist.<\/li>\n\n\n\n<li><strong>S<\/strong> &#8211; <strong>Oskused (t\u00f6\u00f6tajate talentide alakasutamine)<\/strong>: T\u00f6\u00f6tajate oskuste, kogemuste v\u00f5i teadmiste mittet\u00e4ielik kasutamine.<\/li>\n<\/ol>\n\n\n\n<p>Nende j\u00e4\u00e4tmetega tegelemine lihtsustab teie tegevust ja<a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-efektiivsus-saavuta-rohkem-vahema-vaevaga\/\"> parandab tootmise t\u00f5husust<\/a>. \u00dcks Lean-meetodi viis selleks on &#8220;<em>just-in-time<\/em>&#8221; s\u00fcsteem. Selle asemel, et toota tooteid suurtes kogustes ja lasta neil seisma j\u00e4\u00e4da, valmistate t\u00e4pselt seda, mida on vaja, just siis, kui seda vajatakse. See v\u00e4hendab \u00fcleliigseid varusid ja tagab, et kasutate oma ressursse targalt. Lean-filosoofia on lihtne: <em>Protsessi iga samm peab lisama v\u00e4\u00e4rtust<\/em>. Kui see ei anna, tuleb midagi muuta.     <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Kuus Sigmat: meetod protsessi t\u00e4iuslikkuse taga<\/h3>\n\n\n\n<p><strong>Six Sigma on andmep\u00f5hine meetod, mis parandab protsessi kvaliteeti, tuvastades ja k\u00f5rvaldades defektide p\u00f5hjused ning v\u00e4hendades samal ajal tootmise varieeruvust<\/strong>. See meetod keskendub vigade v\u00e4hendamisele ja selle tagamisele, et k\u00f5ik j\u00e4\u00e4ks j\u00e4rjepidevaks. Eesm\u00e4rk? Saavutada v\u00f5imalikult suurel m\u00e4\u00e4ral null defektid.   <\/p>\n\n\n\n<p>Six Sigma kasutab v\u00e4ga struktureeritud protsessi nimega <strong>DMAIC<\/strong> (selle l\u00fchend inglise keeles). See toimib j\u00e4rgmiselt: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>D<\/strong> <strong>&#8211;<\/strong> <strong>Defineeri<\/strong> &#8211; m\u00e4\u00e4ratle probleem ja m\u00f5tle v\u00e4lja, mida sa tahad saavutada.<\/li>\n\n\n\n<li><strong>M<\/strong> <strong>&#8211;<\/strong> <strong>m\u00f5\u00f5tmine<\/strong> &#8211; peate koguma kogu teabe selle kohta, kuidas asjad toimivad, et n\u00e4ha, kus protsess seisab.<\/li>\n\n\n\n<li><strong>A &#8211;<\/strong> <strong>Anal\u00fc\u00fcs<\/strong> &#8211; Uurige andmeid, et tuvastada defektide v\u00f5i probleemide algp\u00f5hjus.<\/li>\n\n\n\n<li><strong>I &#8211;<\/strong> <strong>Parandamine<\/strong> &#8211; Lahenduste rakendamine, et k\u00f5rvaldada defektid ja parandada protsessi tulemuslikkust.<\/li>\n\n\n\n<li><strong>C &#8211; kontroll<\/strong> &#8211; j\u00e4lgige parandusi, et tagada pikaajaline edu ja j\u00e4rjepidevus.<\/li>\n<\/ol>\n\n\n\n<p>\u00dcks reaalne n\u00e4ide Six Sigma toimimisest on tootmisettev\u00f5te, mis n\u00e4eb pidevalt defekte \u00fches oma tootes. Nad kasutavad selle parandamiseks<strong> DMAIC-protsessi<\/strong>. K\u00f5igepealt <strong>tuvastatakse<\/strong> probleem; n\u00e4iteks on tootmises liiga palju defekte. Seej\u00e4rel <strong>m\u00f5\u00f5davad<\/strong> nad, kui palju defekte esineb, vaadeldes hiljutiste tootmisetappide andmeid. P\u00e4rast andmete anal\u00fc\u00fcsimist leiavad nad algp\u00f5hjuse &#8211; masin on h\u00e4\u00e4lestamata. Seega <strong>parandavad<\/strong> nad olukorda, kalibreerides masinat uuesti ja kehtestades korrap\u00e4rased kontrollid. L\u00f5puks <strong>kontrollivad<\/strong> nad seda, j\u00e4lgides masinat regulaarselt, et veenduda, et probleem ei korduks.      <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-what-s-the-key-difference\">Lean Manufacturing vs Six Sigma: mis on peamine erinevus?<\/h2>\n\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<p><strong>Peamine erinevus Lean Manufacturing ja Six Sigma vahel on nende keskendumine<\/strong>. Lean Manufacturing seisneb selles, et kogu s\u00fcsteem t\u00f6\u00f6taks t\u00f5husalt. K\u00f5ik, mis raiskab aega v\u00f5i ressursse, j\u00e4etakse v\u00e4lja &#8211; see on laiaulatuslik l\u00e4henemine. Te vaatate, kuidas ratsionaliseerida kogu tootmisprotsessi. Six Sigma on veidi erinev. See keskendub rohkem konkreetsete probleemide uurimisele, defekte p\u00f5hjustavate probleemide leidmisele ja nende k\u00f5rvaldamisele.     <\/p>\n\n\n\n<p><strong>Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Milline meetod on parem?<\/h2>\n\n\n\n<p>Otsustamine, kas <strong>Lean Manufacturing<\/strong> <strong>v\u00f5i<\/strong> <strong>Six Sigma<\/strong> on parem, s\u00f5ltub tegelikult sellest, mida teie ettev\u00f5te vajab. Kui asjad tunduvad ebaefektiivsed, n\u00e4iteks on liiga palju raisatud aega, liiga palju varusid, mis seisavad ringi ja suurendavad kulusid, v\u00f5i lihtsalt liiga palju ebavajalikke samme, siis on Lean<strong>Manufacturing<\/strong> teie parim valik. See muudab kogu s\u00fcsteemi kiiremaks ja sujuvamaks. Seega, kui soovite suurendada t\u00f5husust, siis on Lean teie valik.   <\/p>\n\n\n\n<p>Kuid kui teie ettev\u00f5te on rohkem mures kvaliteedi p\u00e4rast &#8211; n\u00e4iteks kui teil ilmnevad defektid v\u00f5i asjad on ebaj\u00e4rjekindlad -, siis peaksite keskenduma Six Sigmale. Six Sigma keskendub laseriga kvaliteedi parandamisele. See kaevub detailidesse, leiab t\u00e4pselt v\u00e4lja, kus on probleemid, ja parandab need. See sobib suurep\u00e4raselt t\u00f6\u00f6stusharudele, kus t\u00e4psus on eluliselt t\u00e4htis, n\u00e4iteks farmaatsiat\u00f6\u00f6stus v\u00f5i elektroonika, kus te ei saa endale vigu lubada.   <\/p>\n\n\n\n<p>Kuid te ei pea tingimata valima. Kuigi Lean Manufacturing ja Six Sigma kasutavad erinevaid l\u00e4henemisviise, kasutavad m\u00f5ned tootjad m\u00f5lemat koos, luues h\u00fcbriidmeetodi. K\u00f5igepealt alustage Lean Manufacturingiga, et lihtsustada ja kiirendada protsesse, mis on t\u00f5hususe seisukohalt suurep\u00e4rane. Seej\u00e4rel tuleb appi Six Sigma, et tagada, et need kiiremad protsessid s\u00e4ilitaksid k\u00f5rge kvaliteedi ja j\u00e4rjepidevuse. Nende kahe meetodi kombineerimine annab v\u00f5imsa strateegia, mis parandab t\u00f5husust ja kvaliteeti. See on nagu kahe k\u00e4rbest \u00fche hoobiga l\u00f6\u00f6mine.     <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Lean Manufacturing, Six Sigma ja APS: T\u00e4iuslik kooslus<\/h2>\n\n\n\n<p>T\u00e4iustatud planeerimis- ja ajaplaneerimiss\u00fcsteem on suurep\u00e4rane vahend igale tootmise planeerijale, kes kasutab <strong>Lean Manufacturing<\/strong> v\u00f5i <strong>Six Sigmat<\/strong>. APSi abil saate tagada oma ressursside t\u00f5husa kasutamise, v\u00e4hendades raiskamist t\u00e4pselt seal, kus seda vaja on. <strong>Six Sigma<\/strong> puhul aitab APS teil s\u00e4ilitada k\u00f5rget kvaliteeti, v\u00e4hendades defekte, mis toob kaasa sujuvamad toimingud ja <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/valti-klientide-rahulolematust-aps-susteemiga\/\">hoiab \u00e4ra klientide rahulolematuse<\/a>. See annab teile j\u00e4rjepidevuse ja t\u00f5hususe, mida vajate, et k\u00f5ik toimiks t\u00f5rgeteta.   <\/p>\n\n\n\n<p>APS muutub veelgi olulisemaks, kui kasutate nii Lean- kui ka Six Sigmat. See aitab teil tasakaalustada t\u00f5husust ja kvaliteeti reaalajas toimivate uuenduste, optimeeritud t\u00f6\u00f6voogude ja automatiseerimise abil. See t\u00e4hendab, et te mitte ainult ei v\u00e4henda raiskamist, vaid hoiate ka kvaliteeti k\u00f5rgel. Kaks peamist <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/aps-susteemi-eelised\/\">APS-s\u00fcsteemi eelist<\/a>, mis aitavad teil hoida k\u00f5ik t\u00f5husalt ja tulemuslikult, v\u00e4iksema vaeva ja suurema kontrolliga.   <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Maksimeerige t\u00f5husust ja t\u00e4psust SkyPlanneriga<\/h2>\n\n\n\n<p>On selge, et t\u00f5husus ja kvaliteet on Lean Manufacturing v\u00f5i Six Sigma puhul v\u00e4ga olulised. <a href=\"https:\/\/skyplanner.ai\/et\/\">Skyplanneri tehisintellekti<\/a> abil saate parandada m\u00f5lemat. See optimeerib tootmisvoogu Leani puhul, kasutades ressursse t\u00f5husalt, ja Six Sigma puhul v\u00e4hendab defekte, et s\u00e4ilitada kvaliteeti. Samal ajal kui AI tegeleb detailidega, saab teie meeskond keskenduda olulisemate probleemide lahendamisele. Nii k\u00f5rvaldate ebat\u00f5hususe, hoides samal ajal k\u00f5ik parimal v\u00f5imalikul tasemel.    <\/p>\n\n\n\n<p>Unustage<a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/excel-tootmise-planeerimine-probleemid-skyplanner-aps\/\"> Exceli tootmise planeerimise<\/a> ja k\u00e4sitsi t\u00f6\u00f6ga seotud peavalu. Skyplanner tagab masinate t\u00e4ieliku kasutamise ja optimeerib t\u00f6\u00f6j\u00e4rjekorrad. Kas olete valmis oma tootmist muutma? Miks mitte seda ise katsetada? Proovige meie 14-p\u00e4evast tasuta prooviperioodi ja veenduge omal nahal, kuidas <a href=\"https:\/\/skyplanner.ai\/et\/funktsioonid\/\">Skyplanneri funktsioonid<\/a> v\u00f5ivad parandada teie Lean- ja Six Sigma-protsesse. Meie meeskond on siin, et juhendada teid igal sammul!     <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? Home &#8221; Ressursid &#8221; Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele. T\u00f5hususe maksimeerimine ja j\u00e4\u00e4tmete minimeerimine ei ole enam &#8230; <a title=\"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/\" aria-label=\"Read more about Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43733,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[313,2549],"tags":[],"class_list":["post-43676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressursid","category-tootmise-tohusus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?\" \/>\n<meta property=\"og:description\" content=\"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-09T09:22:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-10T08:12:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?\",\"datePublished\":\"2024-10-09T09:22:41+00:00\",\"dateModified\":\"2024-10-10T08:12:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/\"},\"wordCount\":1419,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"articleSection\":[\"ressursid\",\"Tootmise t\u00f5husus\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/\",\"name\":\"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"datePublished\":\"2024-10-09T09:22:41+00:00\",\"dateModified\":\"2024-10-10T08:12:31+00:00\",\"description\":\"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"width\":4990,\"height\":3327,\"caption\":\"Lean Manufacturing vs Six Sigma. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? &#8211; SkyPlanner","description":"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/","og_locale":"et_EE","og_type":"article","og_title":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?","og_description":"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-09T09:22:41+00:00","article_modified_time":"2024-10-10T08:12:31+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"7 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?","datePublished":"2024-10-09T09:22:41+00:00","dateModified":"2024-10-10T08:12:31+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/"},"wordCount":1419,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","articleSection":["ressursid","Tootmise t\u00f5husus"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/","name":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","datePublished":"2024-10-09T09:22:41+00:00","dateModified":"2024-10-10T08:12:31+00:00","description":"Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","width":4990,"height":3327,"caption":"Lean Manufacturing vs Six Sigma. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/lean-manufacturing-vs-six-sigma-kumb-on-teie-jaoks-oige\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/et\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? Home &#8221; Ressursid &#8221; Lean Manufacturing vs Six Sigma: kumb on teie jaoks \u00f5ige? Lean Manufacturing on tervikuna meetod, mille abil k\u00f5rvaldatakse j\u00e4\u00e4tmed ja parandatakse voolu, samas kui Six Sigma on meetodite kogum, mis keskendub defektide v\u00e4hendamisele. T\u00f5hususe maksimeerimine ja j\u00e4\u00e4tmete minimeerimine ei ole enam&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/43676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=43676"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/43676\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/43733"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=43676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=43676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=43676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}