{"id":11984,"date":"2023-06-27T15:00:23","date_gmt":"2023-06-27T15:00:23","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=11984"},"modified":"2026-06-19T20:09:41","modified_gmt":"2026-06-19T20:09:41","slug":"tooteinfo-haldamine-muugi-suurendamise-voti","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/","title":{"rendered":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-product-information-management-the-key-to-boosting-sales\">Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/\">Avaleht<\/a> \u00bb <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> \u00bb Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Eeldatav lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">19<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>Kujutage ette, et sirvite hotellibroneerimise veebisaiti. Te otsite internetis hotelli, mis sobiks teie puhkuseks ideaalselt, ja te satute hotelli, mis v\u00f5iks sobida. Kl\u00f5psate hotelli lehek\u00fcljel ja ei leia pilte tubadest, ei kirjeldusi mugavuste kohta ega kommentaare eelmistelt k\u00fclalistelt. Mida sa teed? T\u00f5en\u00e4oliselt liigute kiiresti edasi j\u00e4rgmisesse hotelli nimekirjas. Peamine p\u00f5hjus on see, et t\u00e4pne ja t\u00e4ielik tooteinfo on ostuotsuse tegemiseks h\u00e4davajalik.<\/p>\n\n\n\n<p>Sama kehtib ka iga e-kaubanduse ettev\u00f5tte kohta. Olenemata sellest, kas te m\u00fc\u00fcte autosid v\u00f5i golfiklubisid, on potentsiaalsetele klientidele \u00fcksikasjaliku ja t\u00e4pse tooteinfo pakkumine m\u00fc\u00fcgitehingu tegemiseks \u00fclioluline. Siinkohal tulebki m\u00e4ngu tooteinfo haldamise tarkvara.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-28d680c9\"><h2 class=\"uagb-heading-text\">TL;DR<\/h2><\/div>\n\n\n\n<p><strong>Tooteinfo haldamine <\/strong>(PIM) on v\u00f5imas tarkvaralahendus, mis tsentraliseerib, organiseerib ja \u00fchtlustab tooteandmeid k\u00f5igis kanalites. See tagab tooteteabe kvaliteedi ja j\u00e4rjepidevuse, parandab m\u00fc\u00fcki, v\u00e4hendab v\u00e4\u00e4rteomenetlusi ja edendab klientide usaldust. PIM integreerub selliste s\u00fcsteemidega nagu ERP ja CRM, optimeerides turundus- ja m\u00fc\u00fcgitegevust. Lisaks parandab see SEO-d, struktureerides tooteteavet \u00f5igete m\u00e4rks\u00f5nadega. PIMi koost\u00f6\u00f6 t\u00e4psem planeerimine ja ajastamineiga (APS) h\u00f5lbustab laitmatuid ja veenvaid tooteandmeid, optimeerides samal ajal tarneahela juhtimist. See duo suurendab m\u00e4rkimisv\u00e4\u00e4rselt konkurentsiv\u00f5imet, t\u00f5husust ja tootlikkust. Olenemata sellest, kas olete jaem\u00fc\u00fcgis, tootmises, tervishoius, autot\u00f6\u00f6stuses v\u00f5i hotellinduses, on PIM asendamatu vahend mitmesuguste tooteandmete haldamiseks, mis teeb sellest aruka investeeringu ettev\u00f5tetele, kes p\u00fc\u00fcavad t\u00e4nasel konkurentsiturul esikohta saavutada.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-f78abfe4\"><h2 class=\"uagb-heading-text\">Mis on tooteinfo haldamine?  <\/h2><\/div>\n\n\n<div class=\"gb-container gb-container-51461b32\"><div class=\"gb-inside-container\">\n\n<p><strong>Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>  See v\u00f5imaldab ettev\u00f5tetel tsentraliseerida, korraldada ja rikastada oma tooteandmeid \u00fches turvalises kohas. PIMi abil saavad ettev\u00f5tted h\u00f5lpsasti luua, hallata ja levitada tooteteavet klientidele, tarnijatele ja partneritele.<\/p>\n\n\n<div class=\"gb-container gb-container-4d075437\"><div class=\"gb-inside-container\">\n\n<p><strong><strong>Tervikuna on tooteinfo haldamine v\u00f5imas tarkvaralahendus, mis pakub keskset hoidlat tooteandmete kogumiseks, haldamiseks ja rikastamiseks.<\/strong> <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>See on nagu v\u00e4ga h\u00e4sti organiseeritud raamatukogu kogu teie tooteinfo jaoks ja sellele on juurdep\u00e4\u00e4s mis tahes osakonnast teie organisatsioonis.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-1c690393 gb-headline-text\">PIM-tarkvara eesm\u00e4rgid<\/h3>\n\n\n\n<p>PIM-tarkvara esmane eesm\u00e4rk on parandada andmete kvaliteeti ja j\u00e4rjepidevust. See tagab, et k\u00f5ik tooteandmed on t\u00e4psed, t\u00e4ielikud ja j\u00e4rjepidevalt kuvatud k\u00f5igis teie kanalites, alates teie e-kaubanduse veebisaidist kuni teie jaem\u00fc\u00fcgipartneriteni. Lihtsamalt \u00f6eldes on PIM eesm\u00e4rk muuta teie tooteandmed teie jaoks t\u00f5husamaks ja arukamaks.<\/p>\n\n\n\n<p>PIM-s\u00fcsteem t\u00f6\u00f6tab suurep\u00e4raselt koos <a href=\"https:\/\/skyplanner.ai\/et\/\">t\u00e4iustatud planeerimise ja ajaplaneerimise<\/a> s\u00fcsteemiga. APS optimeerib teie tarneahela juhtimist, samas kui PIM tagab, et teie tooteandmed on laitmatu ja veenev. See v\u00f5imas duo v\u00f5ib lihtsustada teie ettev\u00f5tte t\u00f6\u00f6koormust, suurendada m\u00fc\u00fcki ja muuta \u00e4ri konkurentsiv\u00f5imelisemaks.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-e527ca84\"><h2 class=\"uagb-heading-text\">Kuidas toimib tooteinfo haldamine?<\/h2><\/div>\n\n\n\n<p>PIM-tarkvara integreerub ettev\u00f5tte teiste s\u00fcsteemidega, n\u00e4iteks ERP-, CRM- ja e-kaubanduse platvormidega. See v\u00f5imaldab turundusmeeskondadel, m\u00fc\u00fcgimeeskondadel ja muudel osakondadel h\u00f5lpsasti ligi p\u00e4\u00e4seda ja hallata tooteteavet, tagades selle j\u00e4rjepidevuse ja ajakohasuse k\u00f5igis kanalites.<\/p>\n\n\n\n<p>Turundusmeeskonnad saavad PIM-i kasutada tootekataloogide loomiseks ja avaldamiseks, samas kui m\u00fc\u00fcgimeeskonnad saavad juurdep\u00e4\u00e4su t\u00e4psele tooteinformatsioonile, et oma kliente paremini teenindada. PIM aitab k\u00f5ikide tooteandmete tsentraliseeritud asukoha kaudu v\u00e4ltida andmesilosid ja parandada andmete kvaliteeti.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-b7d778cd\"><h2 class=\"uagb-heading-text\">Tooteinfo haldamise eelised<\/h2><\/div>\n\n\n\n<p>Tooteinfo haldamise tarkvara kasutamisel on palju eeliseid, sealhulgas j\u00e4rgmised:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6e432ccd gb-headline-text\">Suurenenud m\u00fc\u00fck<\/h4>\n\n\n\n<p>See on oluline eelis, mida ettev\u00f5te saab PIM-s\u00fcsteemi soetamisest.Klientidele t\u00e4pse ja \u00fcksikasjaliku tooteinfo pakkumine aitab luua usaldust ja kindlustunnet teie kaubam\u00e4rgi vastu, mis omakorda suurendab m\u00fc\u00fcki. N\u00e4iteks kui klient soovib osta paari jooksukingi, v\u00f5ib \u00fcksikasjalik teave kinga omaduste, materjalide ja suuruse kohta aidata tal teha ostuotsuse.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cf7b2c83 gb-headline-text\">V\u00e4hem v\u00e4\u00e4rteomenetlusi<\/h4>\n\n\n\n<p>Kuna k\u00f5ik tooteandmed on koondatud \u00fchte kohta, v\u00e4hendab PIM osakondade vahelise v\u00e4\u00e4rteomenetluse ohtu. Selline haldamine v\u00f5ib parandada koost\u00f6\u00f6d ja t\u00f5hustada t\u00f6\u00f6vooge.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-47087fb2 gb-headline-text\">T\u00f5hustatud kliendi usaldus<\/h4>\n\n\n\n<p>Andes t\u00e4pset ja t\u00e4ielikku tooteinfot, saavad ettev\u00f5tted suurendada klientide usaldust ja lojaalsust. Klientide usaldus teie br\u00e4ndi vastu tugevneb, kui nad n\u00e4evad k\u00f5ikides kanalites sama tooteinfot. J\u00e4rjepidevus loob ettev\u00f5tte usaldusv\u00e4\u00e4rsuse.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-22bcec0a gb-headline-text\">Parem koost\u00f6\u00f6<\/h4>\n\n\n\n<p>\u00dchise tooteandmete ressursi abil muutub osakondade vaheline koost\u00f6\u00f6 sujuvamaks ja t\u00f5husamaks.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d419205a gb-headline-text\">Suurenenud tootlikkus<\/h4>\n\n\n\n<p>Andmehalduse automatiseerimisega v\u00f5ib PIM vabastada teie t\u00f6\u00f6tajate aega, et nad saaksid keskenduda strateegilistele \u00fclesannetele, suurendades seega \u00fcldist tootlikkust.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a3cac4b8 gb-headline-text\">Konkurentsiv\u00f5ime suurendamine<\/h4>\n\n\n\n<p>Kasutades sellist t\u00f6\u00f6riista nagu PIM-tarkvara, saavad ettev\u00f5tted j\u00e4\u00e4da ettepoole, pakkudes potentsiaalsetele klientidele t\u00e4pset, \u00fcksikasjalikku ja veenvat tooteteavet. See v\u00f5ib aidata suurendada m\u00fc\u00fcki ja muuta ettev\u00f5tte konkurentsiv\u00f5imelisemaks.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8ee545f9 gb-headline-text\">Parem aeg kuni turulej\u00f5udmiseni<\/h4>\n\n\n\n<p>PIM-tarkvara v\u00f5ib aidata ettev\u00f5tetel kiiresti ja lihtsalt uusi tooteid turule tuua, pakkudes t\u00e4iustatud protsessi tooteteabe haldamiseks. See abi v\u00f5ib parandada turule j\u00f5udmise aega ja j\u00e4\u00e4da konkurentidest ettepoole.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-459944a1 gb-headline-text\">SEO optimeerimine<\/h4>\n\n\n\n<p>PIM-tarkvara v\u00f5ib aidata kaasa otsingumootorite optimeerimisele (SEO), tagades, et tooteinfo on \u00f5igesti struktureeritud ja kasutab \u00f5igeid m\u00e4rks\u00f5nu. Seda tehes v\u00f5ib PIM suurendada ettev\u00f5tte veebilehe n\u00e4htavust ja k\u00fclastatavust.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3f74df66 gb-headline-text\">V\u00e4hendatud tootepagasite tagasisaatmine<\/h4>\n\n\n\n<p>Kui klientidel on t\u00e4pne tooteinfo, on v\u00e4hem t\u00f5en\u00e4oline, et nad toote valeinfo t\u00f5ttu tagasi saadavad. V\u00e4ltides seda v\u00e4\u00e4rteomenetlust, v\u00f5ib PIM aidata ettev\u00f5tetel s\u00e4\u00e4sta aega ja raha.  <\/p>\n\n\n\n<p>Need ja muud eelised v\u00f5ivad aidata PIM-s\u00fcsteemi abil v\u00e4hendada<a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/kuidas-optimeerida-tootmises-kasutusaega\/\"> tootmise ooteaega <\/a>, parandades andmete t\u00e4psust, edendades koost\u00f6\u00f6d, t\u00f5hustades tooteinfo haldamist, parandades varude haldamist ja hallates t\u00f5husamalt mitmeid m\u00fc\u00fcgikanaleid.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-478ebab5 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-8322962f\"><h2 class=\"uagb-heading-text\">L\u00e4hemalt: Viis t\u00f6\u00f6stusharu, mis saavad kasu PIMist<\/h2><\/div>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Jaem\u00fc\u00fck<\/strong>: PIM tagab toodete j\u00e4rjepideva v\u00e4ljapaneku nii f\u00fc\u00fcsilistes kui ka veebipoodides, suurendades kliendikogemust ja m\u00fc\u00fcki.<\/li>\n\n\n\n<li><strong>Tootmine<\/strong>: PIM lihtsustab andmete jagamist tarnijate ja turustajatega, suurendades tootmist\u00f6\u00f6stuse t\u00f5husust.<\/li>\n\n\n\n<li><strong>Tervishoid<\/strong>: PIM aitab tervishoiuteenuste pakkujatele hallata suurt hulka meditsiinitoodete ja -seadmete kogumit, tagades t\u00e4pse j\u00e4lgimise ja patsiendi ohutuse.<\/li>\n\n\n\n<li><strong>Autot\u00f6\u00f6stus<\/strong>: PIM parandab klientide jaoks autode konfigureerimise kogemust, suurendades online-m\u00fc\u00fcki autot\u00f6\u00f6stuses.<\/li>\n\n\n\n<li><strong>K\u00fclalislahkus<\/strong>: PIM-i abil saavad hotellid hallata toa \u00fcksikasju, vabade kohtade ja mugavuste teavet, parandades k\u00fclaliste broneerimiskogemust.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-56af90d9\"><h2 class=\"uagb-heading-text\">PIM-i ja tooteandmete haldamise (PDM) v\u00f5rdlemine<\/h2><\/div>\n\n\n\n<p>Kuigi PIM ja <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooteandmete-haldamine-pdm\/\">tooteandmete haldamine <\/a>(PDM) v\u00f5ivad tunduda sarnased, on neil oluline erinevus. PIM on kliendikeskne, tegeledes tooteandmete turundus- ja m\u00fc\u00fcgiaspektidega. Teisest k\u00fcljest on PDM rohkem tehniline, keskendudes toote disainile ja tootmisprotsessile.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-8c622e6e\"><h2 class=\"uagb-heading-text\">Millist teavet PIM haldab?<\/h2><\/div>\n\n\n\n<p>N\u00fc\u00fcd, kui me teame erinevusi PIM ja PDM vahel, keskendume sellele, millist t\u00fc\u00fcpi teavet PIM-tarkvara haldab. Tooteinfo haldamine (PIM) sisaldab suurt hulka tootega seotud andmeid, tagades, et kogu tootega seotud teave on konsolideeritud, korrastatud ja ajakohane. See h\u00f5lmab muu hulgas j\u00e4rgmist:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Olulised tooteandmed<\/strong>: Need h\u00f5lmavad p\u00f5hilisi identifikaatoreid ja kirjeldusi, nagu tootenimed, tootetunnused, SKU-d (Stock Keeping Units), kirjeldused, kategooriad ja hinnad.<\/li>\n\n\n\n<li><strong>Tehnilised andmed<\/strong>: S\u00f5ltuvalt tootest v\u00f5ivad olla tehnilised spetsifikatsioonid, nagu suurus, kaal, materjal, vastupidavus, energiatarve ja muud tootespetsiifilised omadused.<\/li>\n\n\n\n<li><strong>Meediafailid<\/strong>: Siia kuulub kogu tootega seotud visuaalne ja audioteave, n\u00e4iteks pildid, videod, helifailid ja PDF-dokumendid.<\/li>\n\n\n\n<li><strong>Tarnija andmed<\/strong>: Andmed tarnija kohta, sealhulgas nimi, kontaktandmed ja asjakohased tingimused.<\/li>\n\n\n\n<li><strong>Logistiline teave<\/strong>: Andmed, mis on seotud toote ladustamise, pakendamise ja saatmisega, n\u00e4iteks m\u00f5\u00f5tmed, kaal, ladustamisjuhised ja saatmismeetodid.<\/li>\n\n\n\n<li><strong>M\u00fc\u00fcgiinfo<\/strong>: \u00dcksikasjad olemasolevate varude, m\u00fc\u00fcgikanalite ja eelseisvate kampaaniate v\u00f5i allahindluste kohta.<\/li>\n\n\n\n<li><strong>Klientide arvustused ja hinnangud<\/strong>: See h\u00f5lmab kasutajate loodud sisu, mis v\u00f5ib olla potentsiaalsete klientide jaoks otsustav tegur.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-6687e2b7\"><h2 class=\"uagb-heading-text\">PIMi tulevased suundumused t\u00f6\u00f6tlevas t\u00f6\u00f6stuses<\/h2><\/div>\n\n\n\n<p>Nagu paljud teisedki t\u00f6\u00f6stusharud, on ka t\u00f6\u00f6tlev t\u00f6\u00f6stus tehnoloogiliste edusammude t\u00f5ttu olulisel m\u00e4\u00e4ral muutumas. Vaatleme m\u00f5ningaid uusi suundumusi tooteinfo halduses (PIM), mis hakkavad tootmismaastikku \u00fcmber kujundama.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Nutikas andmeanal\u00fc\u00fcs<\/h4>\n\n\n\n<p>L\u00e4hiaastatel on PIM-s\u00fcsteemid nagu teie isiklik andmeedetektor. Nad s\u00f5eluvad l\u00e4bi k\u00f5ik faktid ja arvud, koostades tervikpildi. Kui nende t\u00f6\u00f6riistakomplektis on masin\u00f5pe, annavad nad \u00fclevaateid ja soovitusi, muutes andmed t\u00f5hususe suurendamise ja intelligentsemate otsuste tegemise v\u00f5imsaks vahendiks.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Partnerlus asjade internetiga<\/h4>\n\n\n\n<p>Kujutage ette, et teie tehase masinad oskavad r\u00e4\u00e4kida. Mida nad \u00fctleksid? T\u00e4nu asjade internetile (Internet of Things, IoT) saame selle peagi teada. Kui mootorid hakkavad andmeid koguma ja jagama, on PIM-s\u00fcsteemid olemas selle teabe haldamiseks ja t\u00f5lgendamiseks. See toob kaasa parema j\u00e4lgimise, kvaliteedikontrolli ja varude haldamise &#8211; tuleviku tehases on t\u00f5epoolest s\u00f5rmed pulsil.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Rohkem \u00fchendatud maailm<\/h4>\n\n\n\n<p>Tootmise tulevik on koht, kus k\u00f5ik ja k\u00f5ik on \u00fchendatud. PIM-s\u00fcsteemid m\u00e4ngivad selles olulist rolli, aidates jagada andmeid tarnijate, turustajate ja isegi klientidega. Selline \u00fchendus parandab tarneahela toiminguid ja parandab kliendikogemust &#8211; sellest v\u00f5idavad k\u00f5ik!<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">N\u00f5udluse rahuldamine isikup\u00e4rastamise j\u00e4rele<\/h4>\n\n\n\n<p>Kliendid hakkavad k\u00fcsima tooteid, mis on nende vajadustele kohandatud. See t\u00e4hendab, et tuleb hallata \u00fcha suurenevat tootevariatsioonide valikut. Kuid \u00e4rge muretsege &#8211; tulevased PIM-s\u00fcsteemid astuvad vahele, tagades, et \u00f5ige teave on alati k\u00e4ttesaadav, olenemata sellest, kui mitmekesine on tootepakkumine.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-d843a325\"><h2 class=\"uagb-heading-text\">Tehke oma ettev\u00f5ttele arukas investeering!  <\/h2><\/div>\n\n\n\n<p>Seega annavad need suundumused p\u00f5neva pildi PIMi tulevikust tootmises. Kuid miks peaksid ettev\u00f5tted praegu kaaluma investeerimist PIMi?<\/p>\n\n\n\n<p>Investeerimine PIM-tarkvarasse v\u00f5ib aidata teie ettev\u00f5ttel j\u00e4\u00e4da konkurentsiv\u00f5imeliseks t\u00e4nap\u00e4eva kiirelt arenevas maailmas, eriti e-kaubanduses. PIM-tarkvara aitab parandada kliendikogemust, suurendada m\u00fc\u00fcki ja \u00fchtlustada t\u00f6\u00f6vooge, muutes teie ettev\u00f5tte konkurentsiv\u00f5imelisemaks.<\/p>\n\n\n\n<p>Lisaks t\u00f6\u00f6tab PIM-tarkvara suurep\u00e4raselt koos t\u00e4psem planeerimine ja ajastamine (APS) s\u00fcsteemidega, mis aitavad teie ettev\u00f5ttel optimeerida tootmise planeerimist ja ajastamist, mis toob kaasa t\u00f5hususe ja kasumlikkuse paranemise.<strong> <\/strong>PIM-i ja <a href=\"https:\/\/skyplanner.ai\/et\/lahendused\/\">Skyplanneri APS-i<\/a> kombineerides saab teie ettev\u00f5te konkurentsieelise ja teha paremini informeeritud otsuseid tootearenduse, tootmise ja turustamise kohta.<\/p>\n\n\n\n<p>Meie kvalifitseeritud spetsialistid on valmis teid abistama! <a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">V\u00f5tke meiega \u00fchendust<\/a> ja alustage oma m\u00fc\u00fcgi suurendamist.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-9c0944e7 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Solutions-header-mobiili.png\" alt=\"SkyPlanner APS Lahendused tootmise planeerimise probleemidele\" class=\"uag-image-2090\" width=\"693\" height=\"467\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-0002acb1\"><h2 class=\"uagb-heading-text\">Korduma kippuvad k\u00fcsimused (KKK)<\/h2><\/div>\n\n\n\n<p>Selles segmendis k\u00e4sitletakse sageli esitatud k\u00fcsimusi tooteinfo haldamise kohta ja selgitatakse, kuidas Skyplanneri t\u00e4iustatud planeerimiss\u00fcsteem saab teie \u00e4ri toetada.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-03444469 gb-headline-text\">Mis on tooteinfo haldamine (PIM)?<\/h4>\n\n\n\n<p>Tooteinfo haldamine (PIM) on tarkvaralahendus, mis aitab ettev\u00f5tetel tsentraliseerida, organiseerida ja rikastada tooteandmeid turvalises kohas. See s\u00fcsteem v\u00f5imaldab ettev\u00f5tetel t\u00f5husalt hallata ja levitada tooteteavet erinevates kanalites, parandades andmete kvaliteeti, j\u00e4rjepidevust ja ligip\u00e4\u00e4setavust organisatsioonis.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-00f65c2b gb-headline-text\">Millised on PIM-tarkvara peamised eesm\u00e4rgid?<\/h4>\n\n\n\n<p>PIM-tarkvara esmane eesm\u00e4rk on parandada andmete kvaliteeti ja j\u00e4rjepidevust k\u00f5igis kanalites. See tagab tooteandmete t\u00e4pse ja j\u00e4rjepideva kuvamise k\u00f5ikjal, alates teie e-kaubanduse veebisaidist kuni teie jaem\u00fc\u00fcgipartneriteni.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3071c882 gb-headline-text\">Kuidas PIM t\u00f6\u00f6tab?<\/h4>\n\n\n\n<p>PIM-tarkvara integreerub ettev\u00f5tte teiste s\u00fcsteemidega, n\u00e4iteks ERP-, CRM- ja e-kaubanduse platvormidega, v\u00f5imaldades eri osakondadele juurdep\u00e4\u00e4su tooteinformatsioonile ja selle haldamist. See aitab tagada tooteandmete j\u00e4rjepidevuse ja ajakohasuse k\u00f5igis kanalites.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9defef99 gb-headline-text\">Millised on PIM-tarkvara kasutamise eelised?<\/h4>\n\n\n\n<p>Kasu on muu hulgas suurem m\u00fc\u00fck, v\u00e4henenud v\u00e4\u00e4rteomenetlus, suurem klientide usaldus, parem koost\u00f6\u00f6, suurem tootlikkus, konkurentsieelis, parem turuleviimise aeg, SEO optimeerimine ja v\u00e4iksem tootepagas.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-439bc29c gb-headline-text\">Millised t\u00f6\u00f6stusharud saavad PIMist kasu?<\/h4>\n\n\n\n<p>Paljud t\u00f6\u00f6stusharud saavad PIMist kasu, sealhulgas jaem\u00fc\u00fck, tootmine, tervishoid, autot\u00f6\u00f6stus ja hotellindus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7af29f6b gb-headline-text\">Mis vahe on PIMi ja tooteandmete haldamise (PDM) vahel?<\/h4>\n\n\n\n<p>Kui PIM keskendub tooteandmete turundus- ja m\u00fc\u00fcgiaspektidele, siis PDM on tehnilisem, keskendudes toote disainile ja tootmisprotsessile.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5c6dfeda gb-headline-text\">Millist liiki teavet PIM haldab?<\/h4>\n\n\n\n<p>PIM haldab mitmesuguseid tootega seotud andmeid, sealhulgas olulisi tooteandmeid, tehnilisi spetsifikatsioone, meediafaile, tarnijaandmeid, logistilist teavet, m\u00fc\u00fcgiteavet ning klientide kommentaare ja hinnanguid.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c9416d2b gb-headline-text\">Millised on PIMi tulevased suundumused t\u00f6\u00f6tlevas t\u00f6\u00f6stuses?<\/h4>\n\n\n\n<p>Tulevikusuundumuste hulka kuuluvad arukas andmeanal\u00fc\u00fcs, partnerlus asjade internetiga, suurem \u00fchenduvus ja personaliseerimise n\u00f5udluse rahuldamine.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5f432805 gb-headline-text\">Miks peaks ettev\u00f5te investeerima PIMi?<\/h4>\n\n\n\n<p>Investeeringud PIM-i v\u00f5ivad aidata ettev\u00f5tetel s\u00e4ilitada konkurentsiv\u00f5imet, parandada kliendikogemust, suurendada m\u00fc\u00fcki ja \u00fchtlustada t\u00f6\u00f6vooge. Kombineerituna t\u00e4iustatud planeerimis- ja ajaplaneerimiss\u00fcsteemidega (APS) v\u00f5ib PIM optimeerida ka tootmise planeerimist ja ajaplaneerimist, parandades t\u00f5husust ja kasumlikkust.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti Avaleht \u00bb Ressursid \u00bb Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti Kujutage ette, et sirvite hotellibroneerimise veebisaiti. Te otsite internetis hotelli, mis sobiks teie puhkuseks ideaalselt, ja te satute hotelli, mis v\u00f5iks sobida. Kl\u00f5psate hotelli lehek\u00fcljel ja ei leia pilte tubadest, ei kirjeldusi mugavuste kohta ega kommentaare eelmistelt k\u00fclalistelt. Mida sa teed? &#8230; <a title=\"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/\" aria-label=\"Read more about Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":11766,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[313],"tags":[],"class_list":["post-11984","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti\" \/>\n<meta property=\"og:description\" content=\"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-27T15:00:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:09:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti\",\"datePublished\":\"2023-06-27T15:00:23+00:00\",\"dateModified\":\"2026-06-19T20:09:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/\"},\"wordCount\":1914,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"articleSection\":[\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/\",\"name\":\"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"datePublished\":\"2023-06-27T15:00:23+00:00\",\"dateModified\":\"2026-06-19T20:09:41+00:00\",\"description\":\"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Product Information Management, PIM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooteinfo-haldamine-muugi-suurendamise-voti\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti &#8211; SkyPlanner","description":"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/","og_locale":"et_EE","og_type":"article","og_title":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti","og_description":"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/","og_site_name":"SkyPlanner","article_published_time":"2023-06-27T15:00:23+00:00","article_modified_time":"2026-06-19T20:09:41+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"8 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti","datePublished":"2023-06-27T15:00:23+00:00","dateModified":"2026-06-19T20:09:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/"},"wordCount":1914,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","articleSection":["ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/","name":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","datePublished":"2023-06-27T15:00:23+00:00","dateModified":"2026-06-19T20:09:41+00:00","description":"Tooteinfo haldamine (PIM) on tarkvaralahendus, mis haldab ja edastab tooteinfot k\u00f5igis kanalites.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","width":2560,"height":1707,"caption":"Product Information Management, PIM"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooteinfo-haldamine-muugi-suurendamise-voti\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/et\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti Avaleht \u00bb Ressursid \u00bb Tooteinfo haldamine: M\u00fc\u00fcgi suurendamise v\u00f5ti Kujutage ette, et sirvite hotellibroneerimise veebisaiti. Te otsite internetis hotelli, mis sobiks teie puhkuseks ideaalselt, ja te satute hotelli, mis v\u00f5iks sobida. Kl\u00f5psate hotelli lehek\u00fcljel ja ei leia pilte tubadest, ei kirjeldusi mugavuste kohta ega kommentaare eelmistelt k\u00fclalistelt. Mida sa teed?&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/11984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=11984"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/11984\/revisions"}],"predecessor-version":[{"id":93292,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/11984\/revisions\/93292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/11766"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=11984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=11984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=11984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}