{"id":111911,"date":"2026-10-28T19:23:39","date_gmt":"2026-10-28T19:23:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111911"},"modified":"2026-10-28T19:24:09","modified_gmt":"2026-10-28T19:24:09","slug":"epei","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/","title":{"rendered":"Every Part Every Interval: arvuta realistlik EPEI"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Every Part Every Interval: arvuta realistlik EPEI<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Every Part Every Interval: arvuta realistlik EPEI<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Soovid toota tootepere iga detaili sagedamini ja v\u00e4iksemate partiidena. Korduv tootmisj\u00e4rjestus n\u00e4ib lihtne: A, siis B, siis C ja tagasi A juurde. Kuid samal masinal tuleb t\u00e4ita ka klienditellimusi ning iga uue ringiga kaasnevad \u00fcmberseadistused.<\/p>\n\n\n<p>Every Part Every Interval ehk EPEI aitab hinnata, kui sageli saab tootepere tootmist korrata. K\u00fcsimus pole ainult selles, kui l\u00fchikest kordusintervalli soovid. Oluline on ka see, kas tootmisaeg, seadistused ja muud t\u00f6\u00f6d mahuvad selle sisse.<\/p>\n\n\n<p>Alusta sellest, et kontrollid tootmisv\u00f5imsuse piisavust. Seej\u00e4rel lisa korduvad tellimused \u00fclej\u00e4\u00e4nud tootmisega samasse ajakavasse. SkyPlanner APS aitab seda teha, ilma et peaksid valitud tootmisr\u00fctmi mahutamiseks pidevalt masinate t\u00f6\u00f6j\u00e4rjekordi eraldi \u00fcmber koostama.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mis on EPEI?<\/h2>\n\n\n<p><strong>EPEI on ajavahemik, mille j\u00e4rel j\u00f5uab kindla tootepere iga detail samas protsessis uuesti tootmisse.<\/strong> Kui EPEI siht on kaks t\u00f6\u00f6p\u00e4eva, t\u00e4hendab see tootepere iga detaili tootmist iga kahe t\u00f6\u00f6p\u00e4eva j\u00e4rel koguses, mida selle t\u00e4iendusr\u00fctmi jaoks vaja on.<\/p>\n\n\n<p>Kasutusel on ka nimetus \u201eevery product every interval\u201d v\u00f5i l\u00fchend EPEx, kus x t\u00e4histab valitud ajavahemikku. T\u00e4htis on tootmise kordumissagedus, mitte see, millist l\u00fchendit tehas kasutab.<\/p>\n\n\n<p>Enne arvu esitamist m\u00e4\u00e4ra, mille kohta see k\u00e4ib. \u201eKaks p\u00e4eva\u201d annab kasulikku teavet ainult siis, kui k\u00f5ik teavad, milliseid detaile, millist ressurssi ja millist t\u00f6\u00f6kalendrit see kirjeldab. Tootepere, mida t\u00f6\u00f6deldakse l\u00f5iket\u00f6\u00f6tluses iga kahe p\u00e4eva j\u00e4rel, v\u00f5ib siiski oodata j\u00e4rgmist protsessi, mis toimub kord n\u00e4dalas.<\/p>\n\n\n<p>Erista ka neid kolme asja:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Arvutuslik alampiir:<\/strong> l\u00fchim intervall, mille jaoks jagub v\u00f5imsust esitatud arvutuse j\u00e4rgi.<\/li><li><strong>Planeerimissiht:<\/strong> r\u00fctm, mille valid praktilist teostatavust, n\u00f5udlust ja tootmistingimusi arvestades.<\/li><li><strong>Tegelik intervall:<\/strong> aeg, mis iga detaili j\u00e4rjestikuste tootmiskordade vahele tegelikult j\u00e4i.<\/li><\/ul>\n\n\n<p>Korduvasse tootmisplaani m\u00e4rgitud siht ei t\u00f5esta, et tootmises sellest ka kinni peeti. Samuti ei ole EPEI \u00fche detaili valmistamise ts\u00fckliaeg, n\u00f5udlusest tulenev taktiaeg ega tellimuse kogu tootmise l\u00e4biminekuaeg.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kuidas arvutada EPEI v\u00f5imsusest tulenevat alampiiri?<\/h2>\n\n\n<p>Kui lihtsa tootepere detaile toodetakse \u00fchel ressursil \u00fcksteise j\u00e4rel, alusta kolmest l\u00e4hteandmest:<\/p>\n\n\n<p>1. <strong>Tooteperele igal t\u00f6\u00f6p\u00e4eval kasutada j\u00e4\u00e4v aeg.<\/strong> Lahuta planeeritud tootmisv\u00e4line aeg ja selle ressursi muudele t\u00f6\u00f6dele eraldatud v\u00f5imsus.<\/p>\n\n\n<p>2. <strong>N\u00f5udluse katmiseks vajalik p\u00e4evane t\u00f6\u00f6tlemisaeg.<\/strong> Korruta iga detaili keskmine p\u00e4evane n\u00f5udlus \u00fche detaili t\u00f6\u00f6tlemisajaga ning liida tulemused kokku.<\/p>\n\n\n<p>3. <strong>\u00dche t\u00e4ieliku korduva tootmisj\u00e4rjestuse seadistusaeg.<\/strong> Arvesta k\u00f5iki \u00fcleminekuid, sealhulgas viimase detaili tootmiselt tagasi esimesele.<\/p>\n\n\n<p>Kasutatava aja ja p\u00e4evase t\u00f6\u00f6tlemisaja vahe on seadistusteks j\u00e4\u00e4v v\u00f5imsus. P\u00f5hiarvutus on j\u00e4rgmine:<\/p>\n\n\n<p><strong>Minimaalne intervall t\u00f6\u00f6p\u00e4evades = korduva ts\u00fckli seadistusaeg kokku \u00f7 p\u00e4evas seadistusteks j\u00e4\u00e4v v\u00f5imsus<\/strong><\/p>\n\n\n<p>T\u00e4histame p\u00e4evas kasutada olevad minutid t\u00e4hega A, p\u00e4evas vajaliku t\u00f6\u00f6tlemisaja minutites t\u00e4hega R ja \u00fche t\u00e4ists\u00fckli seadistusaja minutites t\u00e4hega S:<\/p>\n\n\n<p><strong>T \u2265 S \u00f7 (A \u2212 R)<\/strong><\/p>\n\n\n<p>Loogika on lihtne. T t\u00f6\u00f6p\u00e4eva jooksul on vaja R \u00d7 T minutit t\u00f6\u00f6tlemiseks ja S minutit seadistusteks. Kokku ei tohi need \u00fcletada kasutada olevat aega A \u00d7 T minutit. Selle tingimuse teisendamisel saamegi \u00fclaltoodud intervalli.<\/p>\n\n\n<p>Kasuta \u00fchtseid \u00fchikuid. Kui n\u00f5udlus on antud t\u00fckkides p\u00e4eva kohta ja t\u00f6\u00f6tlemisaeg sekundites t\u00fcki kohta, teisenda saadud sekundid minutiteks, enne kui lahutad need p\u00e4evas kasutada olevatest minutitest.<\/p>\n\n\n<h3 class=\"wp-block-heading\">J\u00e4ta teadlikult varu k\u00f5ikumiste jaoks<\/h3>\n\n\n<p>P\u00f5hiarvutuse alampiiri korral kulub kogu \u00fclej\u00e4\u00e4nud v\u00f5imsus \u00fcmberseadistustele. Selline siht on ebakindel, kui tavap\u00e4raste k\u00f5ikumiste jaoks varu ei j\u00e4\u00e4.<\/p>\n\n\n<p>Enne intervalli arvutamist v\u00f5id j\u00e4tta iga p\u00e4ev kindla arvu minuteid taastumiseks v\u00f5i n\u00f5udluse k\u00f5ikumiste katteks. Lahuta see varu A-st. \u00c4ra lahuta sama ajavaru kaks korda: pausid, teadaolevad seisakud, muud sama v\u00f5imsuse p\u00e4rast konkureerivad t\u00f6\u00f6d ja taastumisaeg tuleb selgelt eraldi arvesse v\u00f5tta.<\/p>\n\n\n<p>Kui A \u2212 R on null v\u00f5i negatiivne, ei j\u00e4\u00e4 seadistusteks aega. Intervalli pikendamine ei lahenda olukorda, kus p\u00fcsiv t\u00f6\u00f6tlemiskoormus kasutab juba kogu saadaoleva v\u00f5imsuse. Muuta tuleb koormust, vajalikku t\u00f6\u00f6tlemisaega v\u00f5i v\u00f5imsust.<\/p>\n\n\n<p>See on v\u00f5imsusest tulenev alampiir, mitte majanduslikult optimaalne lahendus. Arvutus eeldab stabiilset ja t\u00fc\u00fcpilist n\u00f5udluse jaotust toodete vahel, iga detaili \u00fcht tootmiskorda ts\u00fckli jooksul ning etteantud j\u00e4rjestust. Minimaalsed partiikogused, kindla kestusega protsessid, materjalide saadavus ja muud operatsioonid v\u00f5ivad n\u00f5uda pikemat intervalli.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPEI arvutusn\u00e4ide: kolm detaili \u00fchel masinal<\/h2>\n\n\n<p>Kujutame ette t\u00f6\u00f6tlusrakku, kus toodetakse korduvalt kolme detaili. P\u00e4rast planeeritud tootmisv\u00e4lise aja ja muudele t\u00f6\u00f6dele eraldatud aja mahaarvamist j\u00e4\u00e4b sellele tooteperele kasutada <strong>420 minutit t\u00f6\u00f6p\u00e4evas<\/strong>.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Detail<\/th><th>N\u00f5udlus t\u00f6\u00f6p\u00e4eva kohta<\/th><th>\u00dche detaili t\u00f6\u00f6tlemisaeg<\/th><th>Vajalik t\u00f6\u00f6tlemisaeg t\u00f6\u00f6p\u00e4evas<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>100 t\u00fckki<\/td><td>2 minutit<\/td><td>200 minutit<\/td><\/tr><tr><td>B<\/td><td>60 t\u00fckki<\/td><td>1,5 minutit<\/td><td>90 minutit<\/td><\/tr><tr><td>C<\/td><td>40 t\u00fckki<\/td><td>1 minut<\/td><td>40 minutit<\/td><\/tr><tr><td>Kokku<\/td><td>200 t\u00fckki<\/td><td>\u2014<\/td><td>330 minutit<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>T\u00e4ieliku A\u2013B\u2013C\u2013A j\u00e4rjestuse \u00fcmberseadistusteks kulub 90 minutit. See h\u00f5lmab ka C-lt A-le tagasiminekut. Vastasel juhul algaks j\u00e4rgmine ts\u00fckkel seadistusega, mis oli arvutusest v\u00e4lja j\u00e4\u00e4nud.<\/p>\n\n\n<p>Ilma varuta j\u00e4\u00e4b seadistusteks p\u00e4evas 420 \u2212 330 = 90 minutit. Arvutuslik minimaalne intervall on seega <strong>90 \u00f7 90 = \u00fcks t\u00f6\u00f6p\u00e4ev<\/strong>. Igap\u00e4evane tootmine mahuks t\u00e4pselt \u00e4ra, kuid taastumiseks ei j\u00e4\u00e4ks varu.<\/p>\n\n\n<p>J\u00e4tame n\u00fc\u00fcd varuks 45 minutit p\u00e4evas. Seadistusteks j\u00e4\u00e4b siis 420 \u2212 45 \u2212 330 = 45 minutit p\u00e4evas ning saame:<\/p>\n\n\n<p><strong>EPEI v\u00f5imsusest tulenev alampiir = 90 \u00f7 45 = kaks t\u00f6\u00f6p\u00e4eva<\/strong><\/p>\n\n\n<p>Selle r\u00fctmi korral toodetakse \u00fche ts\u00fckliga 200 detaili A, 120 detaili B ja 80 detaili C. T\u00f6\u00f6tlemiseks kulub 660 minutit, seadistusteks veel 90. Kokku kulub kahe p\u00e4eva jooksul 750 minutit saadaolevast 840 minutist, nii et alles j\u00e4\u00e4b kavandatud 90-minutiline varu.<\/p>\n\n\n<p>Seega on kaks t\u00f6\u00f6p\u00e4eva usutav siht, kuid mitte veel kontrollitud ajakava. Veendu, et j\u00e4rjestus mahub tegelikesse vahetustesse, detailid ja t\u00f6\u00f6riistad on valmis ning j\u00e4rgmised operatsioonid suudavad t\u00f6\u00f6 vastu v\u00f5tta. N\u00e4dalavahetuse t\u00f5ttu v\u00f5ivad kaks t\u00f6\u00f6p\u00e4eva ulatuda rohkem kui kahe kalendrip\u00e4eva peale.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mis muudaks intervalli l\u00fchemaks v\u00f5i pikemaks?<\/h3>\n\n\n<p>Kui t\u00e4ists\u00fckli seadistusaeg v\u00e4heneb 90 minutilt 45 minutile ja k\u00f5ik muu j\u00e4\u00e4b samaks, on varu arvestav alampiir <strong>45 \u00f7 45 = \u00fcks t\u00f6\u00f6p\u00e4ev<\/strong>. Seadistusaja v\u00e4hendamine v\u00f5imaldab iga detaili sagedamini toota, mitte \u00fcksnes kiiremini \u00fcmber seadistada.<\/p>\n\n\n<p>Vastupidine m\u00f5ju j\u00e4\u00e4b kergesti m\u00e4rkamata. Kui p\u00e4evane t\u00f6\u00f6tlemisvajadus kasvab 330 minutilt 360 minutile, j\u00e4\u00e4b sama ajavaru korral seadistusteks vaid 420 \u2212 45 \u2212 360 = 15 minutit p\u00e4evas. Algse 90-minutilise seadistusts\u00fckli korral on intervalli alampiir siis <strong>kuus t\u00f6\u00f6p\u00e4eva<\/strong>.<\/p>\n\n\n<p>Kui seadistusteks j\u00e4\u00e4b v\u00e4he aega, v\u00f5ib isegi tagasihoidlik t\u00f6\u00f6tlemiskoormuse kasv kordusintervalli j\u00e4rsult pikendada. Kontrollige EPEI-d uuesti alati, kui tootevalik v\u00f5i sama ressurssi kasutav muu koormus muutub, mitte ainult p\u00e4rast seadistusaegade l\u00fchendamise projekti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Valige r\u00fctm n\u00f5udluse, mitte \u00fcksnes tootmisringi j\u00e4rgi<\/h2>\n\n\n<p>L\u00fchem kordusintervall v\u00f5imaldab detaili varu varem t\u00e4iendada ning tootmiskordade vahel tuleb katta l\u00fchema aja n\u00f5udlus. Nii saab kasutada v\u00e4iksemaid t\u00e4ienduspartiisid ja hoida tootmiskordade vahel v\u00e4hem varu. Intervalli l\u00fchendamine t\u00e4hendab aga ka sagedasemaid seadistusi.<\/p>\n\n\n<p>Stabiilse n\u00f5udluse korral saab esialgse partiikoguse arvutada, korrutades t\u00f6\u00f6p\u00e4eva n\u00f5udluse valitud intervalliga. N\u00e4ites tuleb detaili A igal tootmiskorral valmistada 100 \u00d7 2 = 200 t\u00fckki. See on ts\u00fckli n\u00f5udlusele vastav kogus, mitte terviklik turvavaru- v\u00f5i varude t\u00e4iendamise reeglistik. Arvestada tuleb ka olemasoleva varu, puuduj\u00e4\u00e4kide, minimaalsete partiisuuruste ja n\u00f5udluse muutustega.<\/p>\n\n\n<p>R\u00fctmi valides v\u00e4ltige kolme levinud viga.<\/p>\n\n\n<p><strong>\u00c4rge ajage varude katvust segi tootmisv\u00f5imekusega.<\/strong> Varu jagamine p\u00e4evase n\u00f5udlusega n\u00e4itab, kui kauaks v\u00f5iks sellest tarbimise katmiseks piisata. See ei n\u00e4ita, kas ressursil on v\u00f5imalik kogu tootepere piisavalt sageli l\u00e4bi toota ja vajalikke \u00fcmberseadistusi teha, et varu t\u00e4iendada.<\/p>\n\n\n<p><strong>\u00c4rge tootke igal ringil k\u00f5iki v\u00e4ikese n\u00f5udlusega tooteid.<\/strong> Regulaarselt toodetavate detailide r\u00fchma puhul v\u00f5ib l\u00fchike kordusintervall olla p\u00f5hjendatud, samal ajal kui juhusliku n\u00f5udlusega tooteid valmistatakse harvem ja tegeliku vajaduse j\u00e4rgi. M\u00e4\u00e4ratlege see piir selgelt. Kui toodet valmistatakse vaid igal kolmandal ringil, ei ole selle EPEI sama mis igal ringil toodetavatel detailidel.<\/p>\n\n\n<p><strong>\u00c4rge optimeerige seadistusi muust tootmisest eraldi.<\/strong> Kui \u00fcmberseadistuse suund on oluline, l\u00e4htuge valitud tootmisj\u00e4rjestuse tegelikest \u00fcleminekutest. <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/seadistusaegade-maatriks\/\">Seadistusaegade maatriks<\/a> aitab leida t\u00f5husama j\u00e4rjestuse. Ent kui koondate t\u00f6\u00f6d \u00fcmberseadistuste v\u00e4hendamiseks \u00fchte v\u00e4ga pikka tootmisseeriasse, v\u00f5ib m\u00f5ne teise detaili j\u00e4rgmine tootmiskord liiga kaugele nihkuda.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/heijunka\/\">Tootmise \u00fchtlustamine<\/a> h\u00f5lmab laiemalt tootmismahtude ja tootevaliku jaotamist ajas. EPEI aitab selle raames vastata konkreetsele k\u00fcsimusele: kui sageli saame nende detailide tootmise juurde tagasi tulla? Leidke vastus, surumata kogu tootevalikut j\u00e4ika kordusmustrisse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lisage korduvad t\u00f6\u00f6d tegelikku tootmisplaani<\/h2>\n\n\n<p>Tootmisv\u00f5imsuse arvutus on teadlikult lihtsustatud. Teie tehase tootmisplaan seda ei ole. Samu masinaid kasutavad ka teised tellimused, operaatorid t\u00f6\u00f6tavad kindlates vahetustes ning puuduv materjal v\u00f5ib j\u00e4rgmise kavandatud tootmiskorra katkestada.<\/p>\n\n\n<p>Siin on abi SkyPlanner APS-ist. Selle asemel et hoida eraldi tootmisringi ja sobitada k\u00f5ik muu k\u00e4sitsi selle \u00fcmber, <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">ajastage valitud varude t\u00e4iendamise tellimused koos \u00fclej\u00e4\u00e4nud tellimustega<\/a>. Nii n\u00e4ete selgemalt, kas korduvad t\u00f6\u00f6d ja klientidele antud lubadused on \u00fchildatavad, ning kulutate iga p\u00e4ev v\u00e4hem aega masinate t\u00f6\u00f6j\u00e4rjekordade koosk\u00f5lastamisele.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Modelleerige tootepere tegelik ajavajadus<\/h3>\n\n\n<p>SkyPlanner v\u00f5imaldab m\u00e4\u00e4rata protsessietapile t\u00fcki t\u00f6\u00f6tlemisaja, tootmiskiiruse v\u00f5i fikseeritud kestuse ning lisada seadistusajad ja sobivad t\u00f6\u00f6keskused. Kasutage iga operatsiooni puhul sobivat meetodit, selle asemel et arvutada iga partii kestus lihtsalt t\u00fckkide arvu ja ts\u00fckliaja korrutisena.<\/p>\n\n\n<p>Lisage tootmisplaani valitud kogused, operatsioonide j\u00e4rjestused ja t\u00e4htajad koos asjakohaste vahetuste ning ressursside tootmisv\u00f5imsusega. SkyPlanneri ajastusmootor Arcturus paigutab t\u00f6\u00f6d plaani seadistatud prioriteetide ja operatsioonidevaheliste s\u00f5ltuvuste alusel. Kui materjalide saadavust arvestav ajastamine on sisse l\u00fclitatud, m\u00f5jutab arvutust ka materjalide olemasolu. Saadud t\u00f6\u00f6j\u00e4rjestus on n\u00e4htav Gantti ajajoonel.<\/p>\n\n\n<p>Planeerimisotsused j\u00e4\u00e4vad teile: millise tootepere tootmine peaks korduma, milline sihtintervall on m\u00f5istlik ja millised erandid peaksid saama eelisj\u00e4rjekorra. Kui tellimust ei tohiks liiga vara tootmisse v\u00f5tta, saab varaseima lubatud alguskuup\u00e4evaga takistada selle ajastamist varasemaks. See piirab varaseimat algust, kuid ei taga j\u00e4rgmist tootmiskorda kindlal ajal.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u00e4\u00e4stke seadistusaega, kuid pidage silmas j\u00e4rgmist vajalikku tootmiskorda<\/h3>\n\n\n<p>SkyPlanner saab r\u00fchmitada t\u00f6id \u00fchiste omaduste, n\u00e4iteks t\u00f6\u00f6riistade, materjali v\u00f5i v\u00e4rvi j\u00e4rgi. T\u00f6\u00f6keskuse sarnasusreeglid arvestavad valitud omadust ja erinevate t\u00f6\u00f6de vahelist seadistusaega. R\u00fchmitamise kaalu saab m\u00e4\u00e4rata d\u00fcnaamiliste prioriteetide kaudu.<\/p>\n\n\n<p>Nii saab s\u00e4\u00e4sta aega, mis muidu kuluks v\u00e4lditavatele \u00fcmberseadistustele. Seadistusaja kokkuhoid ja l\u00fchike kordusintervall ei ole aga alati sama eesm\u00e4rk. Kui hoida sarnaseid t\u00f6id liiga kaua koos, v\u00f5ib teise detaili j\u00e4rgmine tootmiskord hilineda. M\u00e4\u00e4rake r\u00fchmitamise kaal koos tarnete prioriteetidega ning kontrollige seej\u00e4rel, kas saadud j\u00e4rjestus vastab valitud intervallile.<\/p>\n\n\n<p>Ettev\u00f5ttes <a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/kjh-comp\/\">KJH-Comp<\/a> planeeriti varem n\u00e4dalakoormust ERP-is ja arvutustabelites, kuid t\u00f6\u00f6de igap\u00e4evane jaotamine masinatele j\u00e4i t\u00f6\u00f6juhtide \u00fclesandeks. SkyPlanneriga muutusid piiratud tootmisv\u00f5imsust arvestav ajastamine ja t\u00f6\u00f6de masinatele m\u00e4\u00e4ramine automaatseks. Ettev\u00f5tte s\u00f5nul r\u00fchmitatakse painutust\u00f6id samade t\u00f6\u00f6riistade ja materjalipaksuse j\u00e4rgi, mis l\u00fchendab seadistusi ning v\u00e4hendab j\u00f5udeaega.<\/p>\n\n\n<p>Korduvalt toodetava tootepere puhul on olulised samad v\u00f5idud: v\u00e4hem v\u00e4lditavaid seadistusi ja v\u00e4hem aega p\u00e4evaplaani \u00fcmbertegemiseks. J\u00e4rgmine samm on kontrollida valitud kordusintervalli sobivust kogu t\u00f6\u00f6koormusega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kontrollige kordusintervalli tootmise muutudes<\/h2>\n\n\n<p>Kui olete sihtintervalli valinud, registreerige iga detaili j\u00e4rjestikuste tootmiskordade ajad kokkulepitud protsessietapis \u00fchtsel viisil. L\u00e4htuge alati samast s\u00fcndmusest, n\u00e4iteks tootmiskorra algusest, ja samast t\u00f6\u00f6kalendrist. Vaadake \u00fcle tootmiskordade vahed, eriti kavandatust hilisemad kordused: pelk keskmine v\u00f5ib varjata detaili, mis peab korduvalt liiga kaua ootama.<\/p>\n\n\n<p>Kui j\u00e4rgmine tootmiskord hilineb, selgitage enne sihtintervalli muutmist v\u00e4lja p\u00f5hjus. Kas algselt seadistusteks arvestatud aeg oli liiga optimistlik? Kas tootmisv\u00f5imsuse h\u00f5ivas teine tellimus? Kas materjal polnud saadaval v\u00f5i takistas m\u00f5ni j\u00e4rgneva tootmisetapi piirang kavandatud t\u00f6\u00f6voogu?<\/p>\n\n\n<p>Uuendage asjakohast teavet tootmisv\u00f5imsuse, materjalide v\u00f5i prioriteetide kohta ja arvutage tootmisplaan SkyPlanneris uuesti. Seej\u00e4rel vaadake j\u00e4rgmised varude t\u00e4iendamise partiid \u00fcle koos m\u00f5jutatud klienditellimustega. Eesm\u00e4rk on lahendada tegelik vastuolu, mitte s\u00e4ilitada eilset tootmisringi paberil, samal ajal kui t\u00f6\u00f6j\u00e4rjekorrad sellest \u00fcha enam lahknevad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katsetage \u00fche tootepere korduvat tootmist SkyPlanneriga<\/h2>\n\n\n<p>Praktiliselt kasulik EPEI seob kolm planeerimisotsust: millist intervalli tootmisv\u00f5imsus v\u00f5imaldab, millist varude t\u00e4iendamise r\u00fctmi n\u00f5udlus vajab ning milline tootmisplaan suudab m\u00f5lemad teiste tellimuste k\u00f5rval ellu viia.<\/p>\n\n\n<p>SkyPlanner pakub selle kolmanda otsuse tegemiseks vajalikku ajastamistarkvara. See integreerub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga. Nii saate s\u00e4ilitada olemasoleva \u00e4ritarkvara ning paigutada korduva tootmise \u00fclej\u00e4\u00e4nud tootmisega samasse plaani, mis arvestab piiratud tootmisv\u00f5imsusega.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri esitlus<\/a> ning v\u00f5tke arutelu aluseks \u00fcks tootepere, selle t\u00f6\u00f6tlemis- ja \u00fcmberseadistusajad, vahetuste kalender ning muud sama ressurssi kasutavad tellimused. Koos saate vaadata, kuidas teie pakutud r\u00fctm tegeliku t\u00f6\u00f6koormusega sobituks. Kui soovite esmalt keskkonnaga ise tutvuda, <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlannerit demoandmetega<\/a> v\u00f5i l\u00e4bige assistendi tehisintellekti toel juhendatud alustamistoimingud.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Every Part Every Interval: arvuta realistlik EPEI Avaleht &raquo; Ressursid &raquo; Every Part Every Interval: arvuta realistlik EPEI Soovid toota tootepere iga detaili sagedamini ja v\u00e4iksemate partiidena. Korduv tootmisj\u00e4rjestus n\u00e4ib lihtne: A, siis B, siis C ja tagasi A juurde. Kuid samal masinal tuleb t\u00e4ita ka klienditellimusi ning iga uue ringiga kaasnevad \u00fcmberseadistused. Every Part &#8230; <a title=\"Every Part Every Interval: arvuta realistlik EPEI\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/\" aria-label=\"Read more about Every Part Every Interval: arvuta realistlik EPEI\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111941,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-111911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Every Part Every Interval: arvuta realistlik EPEI<\/title>\n<meta name=\"description\" content=\"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Every Part Every Interval: arvuta realistlik EPEI\" \/>\n<meta property=\"og:description\" content=\"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T19:23:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T19:24:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Every Part Every Interval: arvuta realistlik EPEI\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:24:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/\"},\"wordCount\":2170,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/\",\"name\":\"Every Part Every Interval: arvuta realistlik EPEI\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:24:09+00:00\",\"description\":\"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/epei\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Every Part Every Interval: arvuta realistlik EPEI\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Every Part Every Interval: arvuta realistlik EPEI","description":"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/","og_locale":"et_EE","og_type":"article","og_title":"Every Part Every Interval: arvuta realistlik EPEI","og_description":"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T19:23:39+00:00","article_modified_time":"2026-10-28T19:24:09+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Every Part Every Interval: arvuta realistlik EPEI","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:24:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/"},"wordCount":2170,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/","name":"Every Part Every Interval: arvuta realistlik EPEI","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:24:09+00:00","description":"Kas iga detail j\u00f5uab \u00f5igel ajal uuesti tootmisse? Arvuta j\u00f5ukohane EPEI, arvesta \u00fcmberseadistusi ja too korduvad t\u00f6\u00f6d SkyPlannerisse.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/epei\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","width":1774,"height":887,"caption":"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/epei\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Every Part Every Interval: arvuta realistlik EPEI"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Every Part Every Interval: arvuta realistlik EPEI Avaleht &raquo; Ressursid &raquo; Every Part Every Interval: arvuta realistlik EPEI Soovid toota tootepere iga detaili sagedamini ja v\u00e4iksemate partiidena. Korduv tootmisj\u00e4rjestus n\u00e4ib lihtne: A, siis B, siis C ja tagasi A juurde. Kuid samal masinal tuleb t\u00e4ita ka klienditellimusi ning iga uue ringiga kaasnevad \u00fcmberseadistused. Every Part&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=111911"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111911\/revisions"}],"predecessor-version":[{"id":111975,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111911\/revisions\/111975"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/111941"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=111911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=111911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=111911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}