{"id":111600,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111600"},"modified":"2026-10-28T00:43:48","modified_gmt":"2026-10-28T00:43:48","slug":"mtm-meetod","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/","title":{"rendered":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Uue koostu tootmist saab hakata planeerima, kuid seda pole veel piisavalt valmistatud, et leida usaldusv\u00e4\u00e4rne keskmine ajakulu. Ometi tuleb v\u00f5rrelda t\u00f6\u00f6keskuste paigutusvariante, hinnata t\u00f6\u00f6koormust ja otsustada, kas esimesed tellimused mahuvad tootmisplaani.<\/p>\n\n\n<p>MTM-meetod v\u00f5imaldab anal\u00fc\u00fcsida k\u00e4sitsi tehtava t\u00f6\u00f6 meetodit enne regulaarse tootmise algust. Tehtud t\u00f6\u00f6de ajaloo ootamise asemel m\u00e4\u00e4ratakse ajakulu kindlaksm\u00e4\u00e4ratud liigutuste ja v\u00e4ljat\u00f6\u00f6tatud ajaandmete p\u00f5hjal. K\u00f5igepealt tuleb paika panna t\u00f6\u00f6meetod: v\u00e4iksemast ajan\u00e4idust on kasu vaid siis, kui see vastab t\u00f6\u00f6le, mida inimene saab tegelikult ohutult ja \u00f5igesti teha.<\/p>\n\n\n<p>Kui m\u00e4\u00e4ratud aeg on planeerimiseks kinnitatud, aitab SkyPlanner APS selle kasutusele v\u00f5tta. Selle ajastamiseks m\u00f5eldud tehisintellekt Arcturus sobitab operatsioonide kestused \u00fchisesse tootmisplaani. Nii aitab parem t\u00f6\u00f6meetod koostada paremini p\u00f5hjendatud plaani, mitte ei j\u00e4\u00e4 \u00fcksikuks arvuks tehnilises dokumendis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mis on MTM-meetod?<\/h2>\n\n\n<p>MTM-meetod on etteantud liigutusaegadel p\u00f5hinev s\u00fcsteem k\u00e4sitsi tehtava t\u00f6\u00f6 kirjeldamiseks, anal\u00fc\u00fcsimiseks ja hindamiseks. Anal\u00fc\u00fctik jagab kindlaksm\u00e4\u00e4ratud t\u00f6\u00f6meetodi liigutusteks v\u00f5i protsessielementideks, rakendab asjakohaseid ajaandmeid ja reegleid ning m\u00e4\u00e4rab selle meetodi ajakulu v\u00f5rdlustasemeks v\u00f5etud t\u00f6\u00f6tempo juures.<\/p>\n\n\n<p>\u00dcksikasjalikus MTM-1 anal\u00fc\u00fcsis eristatakse muu hulgas sirutamist, haaramist, teisaldamist, paigaldamist ja vabastamist. Tingimused on olulised: h\u00f5lpsasti k\u00e4ttesaadava detaili v\u00f5tmine ei ole sama mis raskesti k\u00e4sitsetava komponendi valimine ja paigaldamine. MTM toob need erinevused selgelt v\u00e4lja, mitte ei peida neid \u00fche \u00fcldhinnangu sisse.<\/p>\n\n\n<p>MTM-i ajav\u00e4\u00e4rtusi v\u00e4ljendatakse aja\u00fchikutes t\u00e4hisega TMU. \u00dcks TMU v\u00f5rdub 0,036 sekundiga; 1 000 TMU v\u00f5rdub seega 36 sekundiga. TMU on aja\u00fchik, mitte efektiivsusprotsent.<\/p>\n\n\n<p>Oluline on ka v\u00f5rdluseks kasutatav t\u00f6\u00f6tempo. MTM ei l\u00e4htu sellest, et m\u00f5\u00f5detakse kiireima operaatori aega ja v\u00f5etakse see normiks. MTM-i ajaandmed p\u00f5hinevad juba kindlaksm\u00e4\u00e4ratud t\u00f6\u00f6tempol. \u00c4rge korrigeerige neid lisaks stopperiga ajauuringus kasutatava t\u00f6\u00f6tempo hinnangu alusel \u00fcksnes seet\u00f5ttu, et m\u00f5nes teises uuringus seda kasutati.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Millal eelistada MTM-i teistele ajakulu m\u00e4\u00e4ramise meetoditele?<\/h2>\n\n\n<p>MTM on eriti kasulik k\u00e4sitsi tehtava t\u00f6\u00f6 kavandamisel: n\u00e4iteks uue toote, muudetud rakise, komponentide uue etteandeviisi v\u00f5i kahe koostej\u00e4rjestuse vahel valimise korral. T\u00f6\u00f6mahtu saab v\u00f5rrelda enne meetodi kasuks otsustamist.<\/p>\n\n\n<p>See ei t\u00e4henda, et MTM sobiks vastuseks igale ajakulu puudutavale k\u00fcsimusele. Valige andmete kogumise viis vastavalt otsusele, mida peate tegema:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Kui palju aega peaks selle kindlaksm\u00e4\u00e4ratud meetodiga k\u00e4sitsi tehtav t\u00f6\u00f6 n\u00f5udma? Sobib t\u00f6\u00f6 kavandamiseks ja variantide v\u00f5rdlemiseks enne piisava tootmisajaloo tekkimist.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooaja-normeerimine\/\">Stopperiga ajauuring<\/a>:<\/strong> Kui kaua vaadeldavad t\u00f6\u00f6elemendid kindlaksm\u00e4\u00e4ratud tingimustes kestavad ja milline p\u00f5hjendatud ajanorm sellest tuleneb? Sobib siis, kui operatsioon on juba kasutusel ja seda saab uurida.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooaja-hetkvaatlus\/\">T\u00f6\u00f6aja hetkvaatlus<\/a>:<\/strong> Kui suur osa ajast kulub koostamisele, seadistamisele, ootamisele v\u00f5i muudele tegevustele? Aitab m\u00f5ista t\u00f6\u00f6perioodi jaotumist, mitte m\u00f5\u00f5ta iga l\u00fchikese liigutuse kestust.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/\">T\u00f6\u00f6de ajakulu arvestus<\/a>:<\/strong> Mis selle tellimuse v\u00f5i operatsiooni t\u00e4itmisel tegelikult toimus? Aitab anal\u00fc\u00fcsida tootmiskogemust ja selgitada erinevusi plaanist.<\/li><\/ul>\n\n\n<p>Need l\u00e4henemised v\u00f5ivad \u00fcksteist t\u00e4iendada. MTM-anal\u00fc\u00fcsiga saab m\u00e4\u00e4rata kavandatud t\u00f6\u00f6meetodi ajakulu ning hilisemad tootmisvaatlused v\u00f5ivad tuua esile puuduva t\u00f6\u00f6elemendi v\u00f5i muutunud tingimuse. Ent registreeritud t\u00f6\u00f6tundide keskmine, mis sisaldab ka materjali ootamist, ei ole sama mis ette m\u00e4\u00e4ratud k\u00e4sitsit\u00f6\u00f6 maht.<\/p>\n\n\n<p>Automaatse masinats\u00fckli korral m\u00e4\u00e4rake protsessist tulenev aeg eraldi. MTM v\u00f5ib kirjeldada operaatori laadimis-, mahalaadimis- ja k\u00e4sitsemist\u00f6\u00f6d, kuid ei muuda masina l\u00f5ikeprogrammi ega n\u00f5utavat k\u00f5venemisaega k\u00e4eliigutuseks.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 ja MTM-UAS: valige sobiv detailsus<\/h2>\n\n\n<p>MTM h\u00f5lmab eri detailsusega s\u00fcsteeme. Valik m\u00f5jutab nii seda, mida anal\u00fc\u00fcs kirjeldab, kui ka selle koostamiseks vajalikku t\u00f6\u00f6mahtu.<\/p>\n\n\n<p><strong>MTM-1<\/strong> k\u00e4sitleb t\u00f6\u00f6d p\u00f5hiliigutuste tasandil. See sobib l\u00fchikeste korduvate k\u00e4sitsit\u00f6\u00f6de \u00fcksikasjalikuks uurimiseks, kui t\u00f6\u00f6 kavandamisel on olulised iga liigutuse tingimused.<\/p>\n\n\n<p><strong>MTM-2<\/strong> \u00fchendab p\u00f5hiliigutused suuremateks r\u00fchmadeks. Sobiva t\u00f6\u00f6 puhul v\u00f5imaldab see v\u00e4hem \u00fcksikasjalikku anal\u00fc\u00fcsi, ilma et iga MTM-1 liigutust tuleks eraldi kirja panna.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong> ehk Universal Analyzing System kasutab suuremaid protsessielemente ja on seotud partiiviisilise tootmisega. See ei ole lihtsalt MTM-1 teine nimetus.<\/p>\n\n\n<p>Valige s\u00fcsteem koos vastava v\u00e4lja\u00f5ppega anal\u00fc\u00fctikuga, l\u00e4htudes protsessist, selle korduvusest ja varieeruvusest ning otsusest, mida tulemus peab toetama. Suurem detailsus tasub \u00e4ra siis, kui see v\u00f5ib otsust m\u00f5jutada. \u00d5igeks rakendamiseks on vaja valitud s\u00fcsteemi v\u00e4lja\u00f5pet, kehtivaid andmeid ja reegleid; \u00fcldine juhend neid ei asenda.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kuidas saada MTM-anal\u00fc\u00fcsist planeerimiseks sobiv aeg<\/h2>\n\n\n<p>Kasulik tulemus ei piirdu kestusega. See h\u00f5lmab dokumenteeritud t\u00f6\u00f6meetodit ja aega, mille t\u00e4hendusest saab aru ka j\u00e4rgmine planeerija.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. M\u00e4\u00e4ratlege t\u00f6\u00f6 ja tingimused<\/h3>\n\n\n<p>Valige tootevariant, operatsioon ja t\u00f6\u00f6meetodi versioon. Kirjeldage t\u00f6\u00f6riistu, rakist, komponentide etteandeviisi, t\u00f6\u00f6j\u00e4rjestust, kvaliteedikontrolle ning t\u00f6\u00f6 algust ja l\u00f5ppu m\u00e4\u00e4ravaid s\u00fcndmusi. M\u00e4rkige, kas anal\u00fc\u00fcs h\u00f5lmab \u00fcht t\u00fckki, \u00fcht ts\u00fcklit v\u00f5i partiid.<\/p>\n\n\n<p>Kaasake inimesed, kes seda t\u00f6\u00f6d teevad v\u00f5i tegema hakkavad. Nad v\u00f5ivad m\u00e4rgata ebamugavat sirutust, vajalikku kontrolli v\u00f5i mahuti vahetust, mis ka korralikult koostatud jooniselt v\u00e4lja ei paista. Veenduge, et t\u00f6\u00f6meetod tagab ohutu k\u00e4sitsemise ja toote kvaliteedi: vajaliku t\u00f6\u00f6 v\u00e4ljaj\u00e4tmine ei ole parendus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Anal\u00fc\u00fcsige t\u00f6\u00f6j\u00e4rjestust valitud s\u00fcsteemiga<\/h3>\n\n\n<p>V\u00e4lja\u00f5ppinud anal\u00fc\u00fctik kirjeldab t\u00f6\u00f6d sobivate elementide ja neid m\u00f5jutavate tingimuste abil. Anal\u00fc\u00fcs peab arvestama tegeliku t\u00f6\u00f6ga, sealhulgas tegevustega, mida tehakse vaid kindlate ajavahemike v\u00f5i korduste j\u00e4rel.<\/p>\n\n\n<p>J\u00e4rgige s\u00fcsteemi reegleid j\u00e4rjestikuste ja samaaegsete tegevuste k\u00e4sitlemisel. Kahe k\u00e4e samaaegne liikumine ei t\u00e4henda tingimata kaht j\u00e4rjestikust ajavahemikku. Samuti ei tohi puuduliku meetodikirjelduse l\u00fcnga t\u00e4itmiseks liigutusaega v\u00e4lja m\u00f5elda.<\/p>\n\n\n<p>Hoidke seadistamine ja korduv t\u00f6\u00f6 eristatavana. Kogu partii jaoks \u00fche korra tehtavat rakise ettevalmistust ei tohi arvestada iga t\u00fcki juures uuesti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. V\u00f5rrelge meetodeid, mitte ainult koguaegu<\/h3>\n\n\n<p>Kasutage anal\u00fc\u00fcsi, et selgitada, miks \u00fcks meetod n\u00f5uab v\u00e4hem t\u00f6\u00f6d. Kas komponendi saaks ette anda alati samas asendis? Kas rakis v\u00f5imaldaks v\u00e4ltida korduvat \u00fcmberpaigutamist? Kas muudetud t\u00f6\u00f6j\u00e4rjestus j\u00e4taks \u00e4ra k\u00e4sitsemise, s\u00e4ilitades samal ajal kontrolli?<\/p>\n\n\n<p>V\u00f5rrelge variante sama anal\u00fc\u00fcsiulatuse ja samade kvaliteedin\u00f5uete alusel. Kui meetod n\u00e4ib kiirem vaid seet\u00f5ttu, et materjalide t\u00e4iendamine v\u00f5i kontroll on anal\u00fc\u00fcsist v\u00e4lja j\u00e4etud, ei pruugi t\u00f6\u00f6maht tegelikult v\u00e4heneda. Just nii saab MTM-ist t\u00f6\u00f6 kavandamise vahend, mitte pelgalt ametliku ilmega ajahinnang.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. M\u00e4\u00e4rake kindlaks, mida kasutusse antav aeg sisaldab<\/h3>\n\n\n<p>Enne tulemuse nimetamist tootmise ajanormiks kontrollige selle arvutusalust. Tehke kindlaks korduvad abitegevused ning see, kuidas arvestatakse isiklike vajaduste, taastumise ja v\u00e4ltimatute viivitustega. Dokumenteerige, millised ajalisandid on kaasatud ja kuidas neid arvutatakse; \u00e4rge eeldage universaalset protsenti.<\/p>\n\n\n<p>K\u00e4sitlege v\u00e4lditavaid katkestusi selgelt lahendamist vajavate probleemidena. Puuduva komponendi ootamine ei tohiks m\u00e4rkamatult muutuda iga sirutus- ja haaramisj\u00e4rjestuse osaks. Kui planeerimisel kasutatavast kestusest j\u00e4etakse v\u00e4lja vajalikud korduvad tegevused, n\u00e4ib uut meetodit lihtsam ajastada, kui see tegelikult on.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Kontrollige meetodi teostatavust ja kinnitage see kasutamiseks<\/h3>\n\n\n<p>Enne kasutuselev\u00f5ttu kontrollige, kas kavandatud meetodit saab rakendada etten\u00e4htud seadmete ja materjalide etteandeviisiga ning n\u00f5utavat kvaliteeti tagades. Kui katsetootmise v\u00f5i esimeste tootmispartiide andmed on olemas, uurige erinevusi v\u00f5rreldava t\u00f6\u00f6 suhtes. \u00d5ppimisest, muudetud rakisest ja anal\u00fc\u00fcsist puudu j\u00e4\u00e4nud elemendist tingitud erinevused vajavad eri lahendusi.<\/p>\n\n\n<p>S\u00e4ilitage anal\u00fc\u00fcs, kasutatud s\u00fcsteem, t\u00f6\u00f6meetodi versioon, eeldused, arvestatud ajalisandid, heakskiit ja j\u00f5ustumiskuup\u00e4ev. Kui meetod v\u00f5i selle rakendamise tingimused muutuvad, vaadake ajakulu uuesti \u00fcle. Eesm\u00e4rk ei ole hoida muljetavaldavat arvu l\u00f5putult muutumatuna, vaid s\u00e4ilitada usaldusv\u00e4\u00e4rne seos t\u00f6\u00f6 ja plaani vahel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4ide: parem koostamismeetod ei j\u00f5ua iseenesest tootmisplaani<\/h2>\n\n\n<p>Kujutage ette k\u00e4sitsi koostamise t\u00f6\u00f6kohta, kuhu detailid saabuvad l\u00e4bisegi eri asendites. Kavandatud t\u00f6\u00f6meetodis kasutatakse t\u00e4iustatud etteandealust ja positsioneerimisrakist, mist\u00f5ttu kulub v\u00e4hem t\u00f6\u00f6d detailide valimisele ja \u00fcmberpaigutamisele. Meeskond kontrollib meetodit ja kiidab selle kasutamise heaks.<\/p>\n\n\n<p>Oletame, et planeerimisel kasutatav ajakulu v\u00e4heneb selle tulemusel kahelt minutilt pooleteisele minutile t\u00fcki kohta. Need on n\u00e4itlikud, heakskiidetud planeerimise l\u00e4hteandmed, mitte MTM-i andmekaardilt v\u00f5etud v\u00e4\u00e4rtused. Eeldame, et \u00fcks inimene teeb \u00fches t\u00f6\u00f6kohas t\u00f6\u00f6d j\u00e4rjestikku, ilma samaaegselt kulgeva masinats\u00fcklita, ning ajalisandite arvestus on kestustes ja t\u00f6\u00f6kalendri vabas t\u00f6\u00f6ajas omavahel koosk\u00f5las.<\/p>\n\n\n<p>120 t\u00fckist koosneva tellimuse korral, kui seadistusaeg on endiselt 30 minutit:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Varasem meetod:<\/strong> 120 \u00d7 2 minutit + 30 minutit = 270 minutit ehk neli ja pool tundi.<\/li><li><strong>Uus meetod:<\/strong> 120 \u00d7 1,5 minutit + 30 minutit = 210 minutit ehk kolm ja pool tundi.<\/li><\/ul>\n\n\n<p>Tellimus vajab selles t\u00f6\u00f6kohas \u00fche tunni v\u00f5rra v\u00e4hem aega. Nii vabaneb kasulikku tootmisv\u00f5imsust, kuid see ei t\u00e4henda automaatselt, et tellimuse saab tund varem v\u00e4lja saata. Koost v\u00f5ib endiselt oodata katsestendi vabanemist, j\u00e4rgmise operatsiooni jaoks vajalik ressurss v\u00f5ib olla h\u00f5ivatud teise tellimusega v\u00f5i vabanenud tund ei pruugi sobida ajavahemikuga, mil m\u00f5ni muu t\u00f6\u00f6 seda vajab.<\/p>\n\n\n<p>Seega ei ole j\u00e4rgmine samm tarneaega tunni v\u00f5rra varasemaks tuua. Selle asemel tuleb uuesti arvutada, kuidas see tellimus ja \u00fclej\u00e4\u00e4nud t\u00f6\u00f6d olemasolevate ressurssidega \u00e4ra teha. Selle arvutuse teeb teie eest SkyPlanner.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00f5tke heakskiidetud meetodite ajakulud SkyPlanneris kasutusele<\/h2>\n\n\n<p>SkyPlanneris saate m\u00e4\u00e4rata operatsiooni kestuse t\u00fcki kohta kuluva aja, tootmiskiiruse v\u00f5i fikseeritud ajana. Seadistusaeg ja t\u00f6\u00f6j\u00e4rgne mahav\u00f5tuaeg sisestatakse eraldi. Seega saab t\u00e4ielikult k\u00e4sitsi tehtava t\u00f6\u00f6 n\u00e4ites hoida heakskiidetud planeerimisaja t\u00fcki kohta ja partii seadistusaja eraldi ka siis, kui tellimuse kogus muutub.<\/p>\n\n\n<p>Esmalt kontrollige, millised ressursid ja kui kauaks tuleb selle kestuse alusel h\u00f5ivata. Inimt\u00f6\u00f6 maht, masina h\u00f5ivatus ja operatsiooni kogukestus on eri n\u00e4itajad. Kui masin t\u00f6\u00f6tab samal ajal, kui operaator valmistab ette j\u00e4rgmist detaili, v\u00f5ib k\u00f5igi tegevuste aegade liitmine masina h\u00f5iveaega \u00fcle hinnata. Ainult k\u00e4sit\u00f6\u00f6 ajaga arvestades v\u00f5ib aga v\u00e4lja j\u00e4\u00e4da aeg, mil seadet ei saa teise t\u00f6\u00f6 jaoks kasutada. Seostage t\u00f6\u00f6meetod nende ressurssidega, mida operatsioon tegelikult vajab.<\/p>\n\n\n<p>Viige ka kestuses arvestatud ajalisandid t\u00f6\u00f6kalendriga koosk\u00f5lla. Kui paus on vabast tootmisv\u00f5imsusest juba maha arvatud, ei tohi sama pausi ajalisandina teist korda arvesse v\u00f5tta. S\u00e4ilitage heakskiidetud uuringu dokumentatsioon ning kirjeldage, kuidas selle osadest saadakse planeerimise l\u00e4hteandmed.<\/p>\n\n\n<p>Arcturus ajastab nende kestustega operatsioonid, arvestades seadistatud t\u00f6\u00f6keskusi, vahetusi, s\u00f5ltuvusi ja prioriteete. Gantti ajajoon n\u00e4itab, kuidas t\u00f6\u00f6d omavahel kokku sobituvad. Heakskiidetud meetodimuudatuse kasutuselev\u00f5tul ajakohastage m\u00f5jutatud planeerimisandmed ja <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">arvutage tootmisplaan uuesti<\/a>, et n\u00e4ha muudatuse m\u00f5ju j\u00e4rgnevatele operatsioonidele ja samade ressursside p\u00e4rast konkureerivatele tellimustele.<\/p>\n\n\n<p>Nii ei pea te p\u00e4rast iga muudatust eraldi t\u00f6\u00f6j\u00e4rjekordi k\u00e4sitsi \u00fcmber koostama. Veelgi olulisem on v\u00f5imalus kasutada uue meetodi p\u00f5hjendatud ajakulu etteplaneerimisel juba enne seda, kui valminud t\u00f6\u00f6de kohta on kogunenud pikk ajalugu. Teie otsustate, milline meetod on heaks kiidetud ja milliste kohustuste t\u00e4itmine on esmat\u00e4htis; SkyPlanner arvutab tervikliku tootmisplaani.<\/p>\n\n\n<p>Hiljem annab tegelik tootmine teile lisateavet. SkyPlanner v\u00f5imaldab hinnata operatsioonide kestusi ka varasemate ajakirjete p\u00f5hjal. Hoidke see andmeallikas MTM-ist lahus: \u00fcks annab hinnangu registreeritud tootmisandmete alusel, teine hindab k\u00e4sitsi tehtava t\u00f6\u00f6 kindlaksm\u00e4\u00e4ratud meetodit etteantud ajaandmete abil.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miks on \u00fchine tootmisplaan oluline?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/utu\/\">Soome elektrikilpide ja jaotusseadmete tootja UTU<\/a> kasutas varem planeerimiseks osakondade eraldi arvutustabeleid. ERP-s\u00fcsteemis tehtud t\u00f6\u00f6j\u00e4rjekorra muudatused ei j\u00f5udnud alati tootmissaali ning tegelikust tootmisv\u00f5imsusest oli raske \u00fclevaadet saada.<\/p>\n\n\n<p>\u00dchendades SkyPlanneri Oracle NetSuite\u2019iga, koondas UTU Ulvila tehase liinid ja osakonnad \u00fchte s\u00fcsteemi. Meeskonna s\u00f5nul j\u00f5uab uuendatud t\u00f6\u00f6j\u00e4rjekord paigaldajateni sekunditega ning ka projektitarnete ajastamine on t\u00e4psem. See kogemus n\u00e4itab, kui v\u00e4\u00e4rtuslik on koondada kogu t\u00f6\u00f6koormus \u00fchisesse plaani, selle asemel et j\u00e4tta iga osakond oma t\u00f6\u00f6j\u00e4rjekorda eraldi koosk\u00f5lastama.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Usaldusv\u00e4\u00e4rsest meetodi ajakulust usaldusv\u00e4\u00e4rse tootmisplaanini<\/h2>\n\n\n<p>Kasutage MTM-meetodit, kui peate k\u00e4sit\u00f6\u00f6d kavandama ja p\u00f5hjendama enne, kui varasemad tootmisandmed saavad vastuse anda. Valige SkyPlanner siis, kui heakskiidetud ajakulu tuleb realistlikult tellimuste t\u00e4itmise plaani sobitada. L\u00e4bim\u00f5eldud t\u00f6\u00f6meetod \u00fctleb, mida t\u00f6\u00f6 tegemiseks vaja on; piiratud tootmisv\u00f5imsust arvestav ajastamine n\u00e4itab, kus ja millal saab selle \u00e4ra teha.<\/p>\n\n\n<p>SkyPlanner liidestub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga, nii et parem ajastamine saab toetuda teie olemasolevatele tootmisandmetele.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri esitlus<\/a> ning v\u00f5tke kaasa \u00fche t\u00f6\u00f6meetodi heakskiidetud ajakulu, selle operatsioonide j\u00e4rjestus ja teave teiste sama tootmisv\u00f5imsust vajavate tellimuste kohta. Vaadake, kuidas meetodimuudatus m\u00f5jutab tootmisplaani ja tarnekuup\u00e4evi, mitte ainult \u00fche operatsiooni kestust. Kui eelistate esmalt ise tutvuda, <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlannerit demoandmetega<\/a> v\u00f5i kasutage Assistantis tehisintellekti toega alustamisjuhendit.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust Avaleht &raquo; Ressursid &raquo; MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust Uue koostu tootmist saab hakata planeerima, kuid seda pole veel piisavalt valmistatud, et leida usaldusv\u00e4\u00e4rne keskmine ajakulu. Ometi tuleb v\u00f5rrelda t\u00f6\u00f6keskuste paigutusvariante, hinnata t\u00f6\u00f6koormust ja otsustada, kas esimesed tellimused mahuvad tootmisplaani. MTM-meetod v\u00f5imaldab anal\u00fc\u00fcsida k\u00e4sitsi tehtava t\u00f6\u00f6 meetodit enne &#8230; <a title=\"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/\" aria-label=\"Read more about MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[313,2549],"tags":[],"class_list":["post-111600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressursid","category-tootmise-tohusus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust<\/title>\n<meta name=\"description\" content=\"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\" \/>\n<meta property=\"og:description\" content=\"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:43:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:43:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/\"},\"wordCount\":2096,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"ressursid\",\"Tootmise t\u00f5husus\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/\",\"name\":\"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:43:48+00:00\",\"description\":\"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/mtm-meetod\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust","description":"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/","og_locale":"et_EE","og_type":"article","og_title":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust","og_description":"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:43:48+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:43:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/"},"wordCount":2096,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["ressursid","Tootmise t\u00f5husus"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/","name":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:43:48+00:00","description":"Vajate uue k\u00e4sitsi tehtava t\u00f6\u00f6 ajakulu? Vaadake, kuidas MTM m\u00e4\u00e4rab selle enne tootmist ja SkyPlanner loob kinnitatud aegadest teostatava tootmisplaani.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/mtm-meetod\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust Avaleht &raquo; Ressursid &raquo; MTM-meetod: planeerige t\u00f6\u00f6 enne tootmise algust Uue koostu tootmist saab hakata planeerima, kuid seda pole veel piisavalt valmistatud, et leida usaldusv\u00e4\u00e4rne keskmine ajakulu. Ometi tuleb v\u00f5rrelda t\u00f6\u00f6keskuste paigutusvariante, hinnata t\u00f6\u00f6koormust ja otsustada, kas esimesed tellimused mahuvad tootmisplaani. MTM-meetod v\u00f5imaldab anal\u00fc\u00fcsida k\u00e4sitsi tehtava t\u00f6\u00f6 meetodit enne&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=111600"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111600\/revisions"}],"predecessor-version":[{"id":111664,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111600\/revisions\/111664"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=111600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=111600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=111600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}