{"id":111321,"date":"2026-10-27T18:49:22","date_gmt":"2026-10-27T18:49:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111321"},"modified":"2026-10-27T18:49:55","modified_gmt":"2026-10-27T18:49:55","slug":"min-max-varude-juhtimine","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/","title":{"rendered":"Min-max varude juhtimine: millal ja kui palju tellida?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Min-max varude juhtimine: millal ja kui palju tellida?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Min-max varude juhtimine: millal ja kui palju tellida?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Laokast hakkab t\u00fchjaks saama ja ostja tellib uue partii. Samal ajal t\u00e4idab tootmine juba sama kauba varude t\u00e4iendamise tellimust. Kumbki otsus tundub eraldi v\u00f5ttes m\u00f5istlik. Koos tekitavad need aga varu, mida tehas ei vajanud.<\/p>\n\n\n<p>Min-max varude juhtimine annab varude t\u00e4iendamiseks kindla reegli: alampiir n\u00e4itab, millal tegutseda, ja \u00fclempiir seda, millise sihttasemeni varu t\u00e4iendada. Et meetod tootmises h\u00e4sti toimiks, tuleb peale riiulil olevate t\u00fckkide arvesse v\u00f5tta ka juba teel olevaid koguseid ja kinnitatud vajadusi.<\/p>\n\n\n<p>Seej\u00e4rel tuleb otsustada tootmise \u00fcle. Kui valmistate varude t\u00e4ienduseks vajaliku koguse ise, tuleb selleks kliendit\u00f6\u00f6de k\u00f5rval leida masinate t\u00f6\u00f6aega. SkyPlanner APS lisab kinnitatud t\u00e4iendustellimuse samasse tootmisplaani, mis arvestab nii tootmisv\u00f5imsuse kui ka materjalidega. Nii n\u00e4ete, millal t\u00f6\u00f6 valmib, ilma et peaksite selle jaoks k\u00e4sitsi eraldi t\u00f6\u00f6j\u00e4rjekorda koostama.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mis on min-max varude juhtimine?<\/h2>\n\n\n<p>Min-max varude juhtimine on varude t\u00e4iendamise meetod, mille puhul m\u00e4\u00e4ratakse igale laos hoitavale kaubale kaks parameetrit:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Miinimum:<\/strong> l\u00e4vend, millest allapoole langemisel tuleb otsustada varude t\u00e4iendamise \u00fcle.<\/li><li><strong>Maksimum:<\/strong> varupositsiooni sihttase, milleni varu t\u00e4iendatakse.<\/li><\/ul>\n\n\n<p>Miinimum ei t\u00e4hista taset, mille juures peaks varu plaanip\u00e4raselt otsa saama. See peaks j\u00e4tma t\u00e4iendusele kohalej\u00f5udmiseks aega ka siis, kui n\u00f5udlus j\u00e4tkub. Maksimum ei ole igakordne tellimiskogus ega taga, et f\u00fc\u00fcsiline laovaru ei saa seda taset kunagi \u00fcletada.<\/p>\n\n\n<p>Min-max meetodi puhul s\u00f5ltub tellimiskogus sellest, kui palju j\u00e4\u00e4b sihttasemest puudu. Kui sihttase on 600 t\u00fckki ja arvestatav varupositsioon 230, on esialgne t\u00e4ienduskogus 370. Kui varupositsioon on 280, on kogus hoopis 320.<\/p>\n\n\n<p>Pange kirja, kas t\u00e4iendamise k\u00e4ivitab tase \u201ealla miinimumi\u201d v\u00f5i \u201emiinimumiga v\u00f5rdne v\u00f5i sellest madalam\u201d, sest s\u00fcsteemid ja ettev\u00f5tete reeglid v\u00f5ivad seda piiri erinevalt k\u00e4sitleda. Alltoodud n\u00e4idetes k\u00e4ivitub varude t\u00e4iendamine siis, kui varupositsioon on <strong>alla<\/strong> miinimumi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Arvestage varupositsiooni, mitte ainult laoj\u00e4\u00e4ki<\/h2>\n\n\n<p>Laoj\u00e4\u00e4k n\u00e4itab, kui palju kaupa on f\u00fc\u00fcsiliselt olemas. Varupositsioon aitab otsustada, kas uut t\u00e4iendustellimust on vaja, v\u00f5ttes arvesse juba ootel olevaid t\u00e4iendusi ja kohustusi.<\/p>\n\n\n<p>Kui teie reeglid n\u00e4evad ette kinnitatud vajaduste mahaarvamise, kasutage j\u00e4rgmist valemit:<\/p>\n\n\n<p><strong>Varupositsioon = kasutusk\u00f5lblik laoj\u00e4\u00e4k + veel saabumata t\u00e4ienduskogused \u2212 arvestusse kaasatud kinnitatud vajadused<\/strong><\/p>\n\n\n<p>Veel saabumata kogused v\u00f5ivad p\u00e4rineda t\u00e4itmata ostutellimustest, ladudevahelistest \u00fcleviimistest v\u00f5i ettev\u00f5ttesisestest t\u00e4iendustellimustest. V\u00f5tke iga allikas arvesse ainult \u00fcks kord. Osalise vastuv\u00f5tu j\u00e4rel arvestage veel saabumata kogust, mitte tellimuse algset kogust.<\/p>\n\n\n<p>Enne arvutamist m\u00e4\u00e4rake arvestuse ulatus: \u00fcks kaubaartikkel, \u00fcks asukoht v\u00f5i kokkulepitud asukohtade r\u00fchm, \u00fcks m\u00f5\u00f5t\u00fchik ning \u00fchtsed ajalised piirid saabuvate koguste ja vajaduste arvestamiseks. J\u00e4tke v\u00e4lja karantiinis olev v\u00f5i muul p\u00f5hjusel kasutusk\u00f5lbmatu varu. \u00c4rge lahutage sama kohustust kaks korda: kui algsaldost on broneeringud juba maha arvatud, \u00e4rge arvake neid uuesti maha.<\/p>\n\n\n<p>K\u00f5igis lahendustes ei arvata maha samu vajaduste liike. Oluline on teada, mida teie n\u00e4itaja sisaldab, ja kasutada samal alusel m\u00e4\u00e4ratud l\u00e4vendeid. \u00dche arvestusp\u00f5him\u00f5tte j\u00e4rgi arvutatud miinimum tuleb enne teise arvestusp\u00f5him\u00f5tte puhul kasutamist \u00fcle vaadata.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Min-max meetodi n\u00e4ide tootmises<\/h3>\n\n\n<p>Oletame, et tootja hoiab korduvtellimuste tarbeks laos standardset kinnitusklambrit. Miinimum on 300 t\u00fckki ja maksimumi sihttase 600. Kokkulepitud planeerimisperioodi kinnitatud vajadused arvatakse varupositsioonist maha.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>L\u00e4hteandmed<\/th><th>Kogus<\/th><th>Arvestamine<\/th><\/tr><\/thead><tbody><tr><td>Kasutusk\u00f5lblikud kinnitusklambrid laos<\/td><td>180<\/td><td>Arvestage olemasoleva laovaruna<\/td><\/tr><tr><td>Juba kinnitatud, kuid veel saabumata t\u00e4ienduskogus<\/td><td>200<\/td><td>Lisage \u00fcks kord veel saabumata kogusena<\/td><\/tr><tr><td>Sellesse arvestusse kaasatud kinnitatud vajadused<\/td><td>150<\/td><td>Lahutage \u00fcks kord<\/td><\/tr><tr><td>Varupositsioon<\/td><td>230<\/td><td>V\u00f5rrelge miinimumiga 300<\/td><\/tr><tr><td>Uus t\u00e4ienduskogus<\/td><td>370<\/td><td>T\u00f5stke varupositsioon 230 pealt 600 peale<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Arvutus on <strong>180 + 200 \u2212 150 = 230<\/strong>. Kuna 230 on alla 300, tuleb reegli j\u00e4rgi varu t\u00e4iendada. Esialgne tellimiskogus on <strong>600 \u2212 230 = 370 t\u00fckki<\/strong>.<\/p>\n\n\n<p>Kui j\u00e4tta olemasolev 200-t\u00fckine tellimus arvestamata, oleks soovitatav kogus 570 t\u00fckki. Nii telliksite sama vajaduse katteks 200 t\u00fckki kaks korda. Kinnitatud vajadusi eirates oleks aga varupositsioon 380 ja t\u00e4iendamise vajadus j\u00e4\u00e4ks \u00fcldse m\u00e4rkamata.<\/p>\n\n\n<p>Sihttase kirjeldab netopositsiooni p\u00e4rast uue tellimuse lisamist, mitte tingimata laoj\u00e4\u00e4ki selle saabumise hetkel. Tarbimine j\u00e4tkub ka siis, kui tellitud kaupa alles hangitakse v\u00f5i valmistatakse.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ka juba tellitud kaup v\u00f5ib saabuda liiga hilja<\/h3>\n\n\n<p>Varupositsioon vastab koguse k\u00fcsimusele, kuid ei t\u00f5enda iseenesest, et iga vajadus on n\u00f5utud kuup\u00e4eval kaetud.<\/p>\n\n\n<p>Oletame kinnitusklambrite n\u00e4ites, et teisip\u00e4eval on vaja 120 t\u00fckki ja kolmap\u00e4eval veel 30. Olemasolevad 180 kasutusk\u00f5lblikku t\u00fckki katavad m\u00f5lemad vajadused. Kui aga k\u00f5ik olemasoleva t\u00e4iendustellimuse 200 t\u00fckki hilinevad ja saabuvad alles p\u00e4rast m\u00f5ne uue vajaduse t\u00e4htaega, v\u00f5ib see hilisem vajadus j\u00e4\u00e4da katmata, kuigi tellimus on \u00fcldises varupositsioonis arvesse v\u00f5etud.<\/p>\n\n\n<p>Kontrollige koguste k\u00f5rval ka kuup\u00e4evi. Olemasoleva tellimuse kiirendamine v\u00f5i \u00fcmberajastamine v\u00f5ib olla m\u00f5istlikum lahendus kui veel \u00fche t\u00e4ismahus t\u00e4iendustellimuse loomine. Kuup\u00e4evap\u00f5hine <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/varude-katvus\/\">varude katvuse kontroll<\/a> t\u00e4iendab min-max meetodit, kuid ei asenda selle t\u00e4iendamisl\u00e4vendit ega sihttaset.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kuidas m\u00e4\u00e4rata varude miinimum- ja maksimumtase?<\/h2>\n\n\n<p>Alustage kaubaartiklist, mida tarbitakse regulaarselt ning mille kasutuse ja varude t\u00e4iendamise kohta on usaldusv\u00e4\u00e4rsed andmed. M\u00e4\u00e4rake tasemed koos, kuid andke kummalegi oma \u00fclesanne.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e4\u00e4rake miinimum, mis katab t\u00e4ienduse ooteaja<\/h3>\n\n\n<p>Suhteliselt stabiilse n\u00f5udluse korral sobib praktiliseks l\u00e4htepunktiks:<\/p>\n\n\n<p><strong>Miinimum = eeldatav n\u00f5udlus t\u00e4iendamise l\u00e4biminekuaja jooksul + turvavaru<\/strong><\/p>\n\n\n<p>Arvestage aega hetkeni, mil varu saab kasutada, mitte ainult tarnija veoaega v\u00f5i masina t\u00f6\u00f6tlemisaega. Ooteaega v\u00f5ivad pikendada ka kinnitamine, ostmine, tootmisv\u00f5imsuse vabanemise ootamine ja kauba vastuv\u00f5tt.<\/p>\n\n\n<p>Oletame, et kaubaartiklit kulub 40 t\u00fckki t\u00f6\u00f6p\u00e4evas. Varu t\u00e4iendamine v\u00f5tab viis t\u00f6\u00f6p\u00e4eva ja ettev\u00f5te on valinud turvavaruks 80 t\u00fckki. Eeldatav vajadus l\u00e4biminekuaja jooksul on 200 t\u00fckki, seega on esialgne miinimum <strong>280 t\u00fckki<\/strong>.<\/p>\n\n\n<p>80-t\u00fckine puhver on selle n\u00e4ite eeldus, mitte soovituslik teenindustase. Valige turvavaru k\u00f5ikumiste ja puuduj\u00e4\u00e4gi tagaj\u00e4rgede j\u00e4rgi. Odav komponent, mille puudumine peatab l\u00f5ppkoostamise, v\u00f5ib v\u00e4\u00e4rida rohkem t\u00e4helepanu, kui selle ostuhind esmapilgul n\u00e4itab.<\/p>\n\n\n<p>Oluline on ka kontrollimise sagedus. Pidev l\u00e4vendi j\u00e4lgimine ei ole sama mis kord n\u00e4dalas aruande vaatamine. Kui varu v\u00f5ib langeda alla l\u00e4vendi kohe p\u00e4rast kontrolli, arvestage ka lisaajaga, mis kulub enne tellimuse esitamist. Vastasel juhul v\u00f5ib n\u00e4iliselt piisav miinimum anda t\u00f5uke tegutsemiseks liiga hilja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e4\u00e4rake maksimum soovitud t\u00e4iendusts\u00fckli j\u00e4rgi<\/h3>\n\n\n<p>Maksimum m\u00e4\u00e4rab, millise tasemeni varupositsioon taastatakse, kui see langeb alla l\u00e4vendi. Maksimumi t\u00f5stmine t\u00e4hendab \u00fcldjuhul suuremaid t\u00e4ienduskoguseid ja suuremat varudega seotud riski. Selle langetamine t\u00e4hendab tavaliselt sagedasemat t\u00e4iendamist ning rohkem tellimis- v\u00f5i seadistust\u00f6\u00f6d.<\/p>\n\n\n<p>Oletame, et valite 40 t\u00fckki p\u00e4evas tarbiva kaubaartikli n\u00e4ites maksimumiks 600. Vahe 280-t\u00fckise miinimumiga on 320 t\u00fckki, mis vastab selle keskmise tarbimise juures kaheksale t\u00f6\u00f6p\u00e4evale. See aitab kavandatavat ts\u00fcklit m\u00f5ista, kuid ei t\u00f5esta, et 600 oleks k\u00f5ige soodsam v\u00f5i parim sihttase.<\/p>\n\n\n<p>Kontrollige sihttaseme sobivust, arvestades laoruumi, s\u00e4ilivusaega, vananemisriski, k\u00e4ibekapitali ning tootmis- v\u00f5i tarnijapartiide suurust. Kui aeglaselt liikuva kauba s\u00e4ilivusaeg on l\u00fchike, v\u00f5ib ka pealtn\u00e4ha sobiv min\u2013max-vahemik tekitada kulukat raiskamist.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Arvestage tellimispiirangutega enne tellimuse t\u00f6\u00f6sse andmist<\/h3>\n\n\n<p>Arvutatud vahe on tellimiskoguse l\u00e4htepunkt. Tarnija miinimumkogused, pakendi suurusest tulenev tellimissamm ja tootmispartiide piirangud v\u00f5ivad muuta kogust, mida tegelikult tellida saate.<\/p>\n\n\n<p>Kui kinnitusklambrite soovituslik tellimiskogus on 370 t\u00fckki, kuid neid tarnitakse ainult 50 kaupa pakendis, tuleb \u00fclespoole \u00fcmardades tellida 400. Nii \u00fcletab varupositsioon esialgset sihttaset 30 t\u00fcki v\u00f5rra. Otsustage, kas n\u00f5ustuda selle erinevusega, muuta tarnekorraldust v\u00f5i vaadata \u00fcle varude t\u00e4iendamise reeglid. \u00c4rge k\u00e4sitlege \u201evarude maksimaalset sihttaset\u201c ja \u201emaksimaalset tellimiskogust\u201c vaikimisi sama seadistusena: esimene kirjeldab soovitud varupositsiooni, teine piirab \u00fcksiktellimuse kogust.<\/p>\n\n\n<p>Kajastage kinnitatud t\u00e4iendus kohe ootel tarnena. See v\u00e4ldib olukorda, kus j\u00e4rgmisel \u00fclevaatusel tellitakse sama puuduj\u00e4\u00e4gi katteks uuesti v\u00f5i teeb seda teine ostja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Millal min\u2013max-meetod toimib ja millal pelgalt piirm\u00e4\u00e4radest ei piisa<\/h2>\n\n\n<p>Min\u2013max varude juhtimine sobib laokaupadele, mida tarbitakse korduvalt ja mille t\u00e4iendusprotsessi saab j\u00e4lgida: n\u00e4iteks levinud komponentidele, standardsetele alakoostudele v\u00f5i sageli kasutatavatele kulumaterjalidele. Meetodi eelis on j\u00e4rjekindlus. K\u00f5igile on n\u00e4htav, miks varu on vaja t\u00e4iendada ja kuidas kogus valiti.<\/p>\n\n\n<p>Meetod muutub v\u00e4hem usaldusv\u00e4\u00e4rseks, kui keskmise tarbimise taha peituvad suured, kindlateks kuup\u00e4evadeks vajalikud kogused. Ainult \u00fcksikutes kliendipartiides kasutatava komponendi puhul v\u00f5ib p\u00fcsiva varuvahemiku asemel olla vaja materjalivajadust ajaliselt planeerida. Ka harva vajatava varuosa laos hoidmise otsus v\u00f5ib vajada hinnangut selle kriitilisusele: v\u00e4ike keskmine tarbimine ei n\u00e4ita, kui kulukaks v\u00f5ib varuosa puudumine osutuda.<\/p>\n\n\n<p>Eristage min\u2013max-meetodit teistest seotud m\u00f5istetest ja meetoditest:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/turvavaru\/\">Turvavaru<\/a><\/strong> on puhver ebakindluse vastu. See v\u00f5ib aidata m\u00e4\u00e4rata miinimumtaset, kuid ei m\u00e4\u00e4ra kogu min\u2013max varude juhtimise reeglistikku.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/\">Optimaalse tellimiskoguse (EOQ)<\/a><\/strong> arvutamisel leitakse partii suurus tellimis- ja hoiukulude eelduste p\u00f5hjal. Min\u2013max-meetodi puhul t\u00e4iendatakse seevastu varu muutuva vahe v\u00f5rra kuni \u00fclemise sihttasemeni.<\/li><li><strong>Lattu tootmine<\/strong> t\u00e4hendab otsust toota enne klienditellimuste saabumist. Min\u2013max on \u00fcks v\u00f5imalik viis selle strateegia raames varude t\u00e4iendamist juhtida.<\/li><\/ul>\n\n\n<p>Vaadake tasemed \u00fcle, kui muutuvad tarbimine, tarnija tulemuslikkus, tootmise l\u00e4biminekuaeg v\u00f5i toote eluiga. Enne vahemiku laiendamist uurige korduvaid varupuudusi ja \u00fcleliigse varu p\u00f5hjuseid: hilinenud saabumised, ebat\u00e4psed laoseisud ja topelttellimused vajavad erinevaid lahendusi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sobitage kinnitatud varut\u00e4iendus tootmisplaani<\/h2>\n\n\n<p>Ettev\u00f5ttes endas valmistatava detaili puhul on \u201etellida 370\u201c vaid pool otsusest. See ei \u00fctle, kas kinnitusklambrid valmivad enne varu l\u00f5ppemist ega milliseid kliendit\u00f6id tuleks neile ruumi tegemiseks \u00fcmber t\u00f5sta.<\/p>\n\n\n<p>Oletame, et kinnitatud varut\u00e4ienduse tootmiseks on vaja sama t\u00f6\u00f6tluskeskust, mida vajab sel n\u00e4dalal t\u00e4itmisele kuuluv klienditellimus. Kui t\u00f5state varut\u00e4ienduse eraldi nimekirja etteotsa, j\u00e4\u00e4b see vastuolu varju. \u00dchisesse tootmisplaani paigutamine toob valiku tagaj\u00e4rjed n\u00e4htavale ajal, mil otsustamiseks on veel aega.<\/p>\n\n\n<p>Valige <strong>SkyPlanner APS<\/strong>, et <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">\u00fchist tootmisplaani oleks lihtsam hallata<\/a>. Selle tehisintellektil p\u00f5hinev planeerimismootor Arcturus arvutab t\u00f6\u00f6de ajastuse, v\u00f5ttes arvesse seadistatud t\u00f6\u00f6kohti, vahetusi, prioriteete, operatsioonidevahelisi s\u00f5ltuvusi ja materjale. Gantti diagramm n\u00e4itab, kuhu varut\u00e4ienduse tootmine teiste tellimuste k\u00f5rval sobitub ja millal see peaks l\u00f5ppema. Kulutate v\u00e4hem aega varude t\u00e4iendamise nimekirja ja \u00fcksikute masinate t\u00f6\u00f6j\u00e4rjekordade koosk\u00f5lastamisele ning saate selgema aluse tarnet\u00e4htaegadest kinnipidamiseks.<\/p>\n\n\n<p>SkyPlanner v\u00f5imaldab kasutada v\u00e4ikese laokoguse hoiatust, mis annab teile m\u00e4rku vajadusest luua varude t\u00e4iendamise tellimus. Leppige min\u2013max-sihttasemed, t\u00e4ienduskogus ja kinnitamise kord kokku vastutava planeerijaga v\u00f5i m\u00e4\u00e4rake need oma ERP\/MRP-s\u00fcsteemis. Seej\u00e4rel ajastage kinnitatud t\u00f6\u00f6 SkyPlanneris koos klienditellimustega, nii et varude t\u00e4iendamise otsus saaks tehase \u00fchise tootmisplaani osaks.<\/p>\n\n\n<p>Kui materjalide saadavust arvestav planeerimine on sisse l\u00fclitatud ja asjakohaste materjalide andmed korras, v\u00f5tab arvutus arvesse ka nende saadavust neid kasutava t\u00f6\u00f6 tegemise ajal. Sisseostetavate materjalide ajastamisel l\u00e4htutakse ostutellimuste saabumiskuup\u00e4evadest. Kui saabumiskuup\u00e4ev v\u00f5i prioriteet muutub, arvutage \u00fchine plaan uuesti, et n\u00e4ha selle m\u00f5ju, selle asemel et k\u00f5iki m\u00f5jutatud t\u00f6id k\u00e4sitsi \u00fcmber t\u00f5sta.<\/p>\n\n\n<p><strong>SkyPlanner on oma avatud REST API kaudu liidestatav mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga.<\/strong> Saate alles j\u00e4tta s\u00fcsteemi, milles haldate varude t\u00e4iendamise reegleid, ning siduda selles kinnitatud tellimused tootmisplaaniga, mis arvestab tegelikku tootmisv\u00f5imsust.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuidas see lattu tootmises toimib<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/opes-corporation\/\">Opes Corporation<\/a> toodab lattu, l\u00e4htudes prognoositavatest klientide ees v\u00f5etud kohustustest. Enne SkyPlanneri kasutuselev\u00f5ttu kasutas ettev\u00f5te Excelit ja eraldi laorakendust ning andmed paiknesid eri kohtades. Etapiviisiline liidestamine Visma Novaga sidus selle teabe tootmise planeerimisega.<\/p>\n\n\n<p>Ettev\u00f5tte s\u00f5nul annab SkyPlanner meeskonnale selge \u00fclevaate tootmisv\u00f5imsusest. Kui lisanduvad kiireloomulised v\u00e4iketellimused v\u00f5i tootearenduspartiid, n\u00e4itab uuendatud tootmisplaan nende m\u00f5ju tarneaegadele. Muudatusi saab teha kiiremini ning planeerijad n\u00e4evad, kuidas t\u00f6\u00f6d omavahel kokku sobituvad.<\/p>\n\n\n<p>Varude t\u00e4iendamise seisukohalt on \u00f5ppetund j\u00e4rgmine: stabiilne n\u00f5udlus laotoodetele ei kaota vajadust eranditega tegeleda. \u00dchine tootmisplaan v\u00f5imaldab meeskonnal hinnata lisat\u00f6\u00f6d juba v\u00f5etud kohustuste taustal, selle asemel et iga t\u00f6\u00f6j\u00e4rjekorda eraldi hallata.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katsetage reegleid \u00fche tegeliku varut\u00e4iendusega<\/h2>\n\n\n<p>Valige \u00fcks korduvalt kasutatav kaubaartikkel. Kontrollige selle kasutatavat laoseisu, ootel tarneid, arvestusse kaasatud kinnitatud n\u00f5udlust ja l\u00e4biminekuaega. M\u00e4\u00e4rake selle p\u00f5hjal t\u00e4iendamise k\u00e4ivituspiir ja sihttase, arvutage puuduj\u00e4\u00e4k ning kontrollige, millal seda kogust tegelikult vaja on.<\/p>\n\n\n<p>Seej\u00e4rel v\u00f5tke SkyPlanneri esitlusele kaasa kinnitatud varut\u00e4iendus ja sellega sama tootmisv\u00f5imsust vajav klienditellimus. Paluge n\u00e4idata, kuidas nende operatsioonide jadad tootmisv\u00f5imsust jagavad, millal varut\u00e4iendus valmib ja mis juhtub, kui materjali saabumine hilineb. Nii n\u00e4ete, mida on lisaks varuarvutusele vaja selleks, et t\u00e4iendamise otsuse saaks tootmises ellu viia.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri esitlus<\/a>, et vaadata l\u00e4bi oma tehase olukord, v\u00f5i <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige esmalt SkyPlannerit demoandmetega<\/a>. Eesm\u00e4rk on lihtne: t\u00e4iendada varu vajalikus koguses, v\u00e4ltida topelttellimist ja anda t\u00f6\u00f6dele ajakava, mida teie tehas suudab j\u00e4rgida.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Min-max varude juhtimine: millal ja kui palju tellida? Avaleht &raquo; Ressursid &raquo; Min-max varude juhtimine: millal ja kui palju tellida? Laokast hakkab t\u00fchjaks saama ja ostja tellib uue partii. Samal ajal t\u00e4idab tootmine juba sama kauba varude t\u00e4iendamise tellimust. Kumbki otsus tundub eraldi v\u00f5ttes m\u00f5istlik. Koos tekitavad need aga varu, mida tehas ei vajanud. Min-max &#8230; <a title=\"Min-max varude juhtimine: millal ja kui palju tellida?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/\" aria-label=\"Read more about Min-max varude juhtimine: millal ja kui palju tellida?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-111321","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Min-max varude juhtimine: millal ja kui palju tellida?<\/title>\n<meta name=\"description\" content=\"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Min-max varude juhtimine: millal ja kui palju tellida?\" \/>\n<meta property=\"og:description\" content=\"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T18:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T18:49:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Min-max varude juhtimine: millal ja kui palju tellida?\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:49:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/\"},\"wordCount\":2133,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/\",\"name\":\"Min-max varude juhtimine: millal ja kui palju tellida?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:49:55+00:00\",\"description\":\"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/min-max-varude-juhtimine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Min-max varude juhtimine: millal ja kui palju tellida?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Min-max varude juhtimine: millal ja kui palju tellida?","description":"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/","og_locale":"et_EE","og_type":"article","og_title":"Min-max varude juhtimine: millal ja kui palju tellida?","og_description":"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T18:49:22+00:00","article_modified_time":"2026-10-27T18:49:55+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Min-max varude juhtimine: millal ja kui palju tellida?","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:49:55+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/"},"wordCount":2133,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/","name":"Min-max varude juhtimine: millal ja kui palju tellida?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:49:55+00:00","description":"Min-max varude juhtimine topelttellimusteta: mida arvestada ja kui palju tellida? Kuidas SkyPlanner kinnitatud t\u00f6\u00f6d ajastab?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","width":1672,"height":941,"caption":"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/min-max-varude-juhtimine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Min-max varude juhtimine: millal ja kui palju tellida?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Min-max varude juhtimine: millal ja kui palju tellida? Avaleht &raquo; Ressursid &raquo; Min-max varude juhtimine: millal ja kui palju tellida? Laokast hakkab t\u00fchjaks saama ja ostja tellib uue partii. Samal ajal t\u00e4idab tootmine juba sama kauba varude t\u00e4iendamise tellimust. Kumbki otsus tundub eraldi v\u00f5ttes m\u00f5istlik. Koos tekitavad need aga varu, mida tehas ei vajanud. Min-max&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=111321"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111321\/revisions"}],"predecessor-version":[{"id":111386,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/111321\/revisions\/111386"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/111344"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=111321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=111321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=111321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}