{"id":110033,"date":"2026-10-25T16:06:25","date_gmt":"2026-10-25T16:06:25","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110033"},"modified":"2026-10-25T16:06:58","modified_gmt":"2026-10-25T16:06:58","slug":"tootmise-tooaja-arvestus","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/","title":{"rendered":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>K\u00f5igil on terve vahetuse tunnid kirjas, kuid planeerijad ei oska ikka selgitada, miks korduv t\u00f6\u00f6 v\u00f5tab hinnatust kauem aega. Osa tunde on kantud terve tellimuse, osa osakonna arvele ning katkestust m\u00e4letav operaator on juba koju l\u00e4inud.<\/p>\n\n\n<p>Tootmise t\u00f6\u00f6aja arvestus peaks selle ebaselguse k\u00f5rvaldama. Tegelik ajakulu registreeritakse selle tootmist\u00f6\u00f6 ja operatsiooni juurde, kus t\u00f6\u00f6 tehti, koos j\u00e4rgmise otsuse tegemiseks vajaliku taustaga. Eesm\u00e4rk pole lihtsalt eilseid t\u00f6\u00f6tunde kokku lugeda, vaid v\u00e4ltida vajadust selgitusi otsida ja m\u00e4\u00e4rata homsetele t\u00f6\u00f6dele usutavam kestus.<\/p>\n\n\n<p>SkyPlanner seob ajakulu registreerimise tootmisplaaniga. Operaatorid registreerivad aega t\u00f6\u00f6de kaupa, planeerijad saavad tegeliku ajakulu \u00fcle vaadata ning tootmisajalugu aitab operatsioonide kestust paremini hinnata. Seej\u00e4rel arvutab SkyPlanneri ajakava koostav tehisintellekt Arcturus, kuidas need t\u00f6\u00f6d mahuvad plaani koos teiste tellimustega, mis vajavad sama tootmisv\u00f5imsust.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mis on tootmise t\u00f6\u00f6aja arvestus?<\/h2>\n\n\n<p>Tootmise t\u00f6\u00f6aja arvestus t\u00e4hendab tootmist\u00f6\u00f6le kulunud aja registreerimist konkreetse t\u00f6\u00f6 v\u00f5i tellimuse operatsiooni juurde. Kasulikust ajakirjest selgub, mida ja kus tehti ning millisest algus- ja l\u00f5pphetkest aega arvestati. Kogused ja katkestuste \u00fcksikasjad aitavad m\u00f5ista, mida registreeritud aeg h\u00f5lmab.<\/p>\n\n\n<p>See vastab teisele k\u00fcsimusele kui kohaloleku arvestus. Teadmine, et inimene oli vahetuse ajal kohal, ei \u00fctle, kui kaua painutusoperatsioon kestis v\u00f5i kui palju aega j\u00e4rgmine partii vajab.<\/p>\n\n\n<p>Hoidke j\u00e4rgmised ajan\u00e4itajad lahus:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ajan\u00e4itaja<\/th><th>Mida see n\u00e4itab<\/th><th>Mida sellest \u00fcksi j\u00e4reldada ei saa<\/th><\/tr><\/thead><tbody><tr><td>Kohalolekuaeg<\/td><td>Kui kaua inimene oli kohal v\u00f5i kohalolijaks registreeritud<\/td><td>Millistele tootmisoperatsioonidele see aeg kulus<\/td><\/tr><tr><td>Registreeritud inimt\u00f6\u00f6aeg<\/td><td>T\u00f6\u00f6 v\u00f5i tegevuse arvele kantud inimtunnid<\/td><td>Kui kaua masin oli h\u00f5ivatud<\/td><\/tr><tr><td>Masina t\u00f6\u00f6aeg<\/td><td>Kui kaua seade t\u00f6\u00f6tas<\/td><td>Kogu t\u00f6\u00f6ga seotud laadimisele, seadistamisele v\u00f5i ootamisele kulunud aeg<\/td><\/tr><tr><td>Operatsiooni kogukestus<\/td><td>Ajavahemik m\u00e4\u00e4ratletud algus- ja l\u00f5pps\u00fcndmuse vahel, sealhulgas vahepealsed pausid<\/td><td>Kui suur osa sellest ajavahemikust kulus aktiivsele t\u00f6\u00f6le<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kui kaks inimest t\u00f6\u00f6tavad koos \u00fche tunni, teeb see kokku kaks inimtundi. Masin v\u00f5ib t\u00f6\u00f6tada ka siis, kui operaator teeb mujal muud t\u00f6\u00f6d. K\u00f5igi registreeritud tundide liitmine ja selle summa kasutamine j\u00e4rgmise t\u00f6\u00f6 jaoks masina aja broneerimisel ajaks inimt\u00f6\u00f6 mahu segamini t\u00f6\u00f6 tegeliku kestusega.<\/p>\n\n\n<p>Enne uue ajakulu registreerimise s\u00fcsteemi kasutuselev\u00f5ttu otsustage, millisele k\u00fcsimusele peavad andmed vastama. Tootmise planeerimisel on p\u00f5hik\u00fcsimus tavaliselt see: kui palju aega kulub selle operatsiooni tegemiseks vajalikel ressurssidel?<\/p>\n\n\n<h2 class=\"wp-block-heading\">Siduge iga ajakirje t\u00f6\u00f6 ja operatsiooniga ning m\u00e4\u00e4ratlege selle sisu<\/h2>\n\n\n<p>Alustage \u00fchest korduvast operatsioonist, mille hinnanguline kestus tekitab sageli probleeme. J\u00e4lgige ajakirje liikumist t\u00f6\u00f6keskusest inimeseni, kes j\u00e4rgmist plaani uuendab. Millises etapis muutub kirje sisu ebaselgeks?<\/p>\n\n\n<p>Ainu\u00fcksi tellimuse numbrist ei pruugi piisata. Sama tellimus v\u00f5ib h\u00f5lmata l\u00f5ikamist, painutamist ja koostamist, mis k\u00f5ik vajavad eri ressursse ja erinevalt aega. Registreerige aeg operatsioonide kaupa, et koostamisel kulunud lisaaeg ei kaoks kogu tellimuse koondn\u00e4itaja sisse.<\/p>\n\n\n<p>Ajakulu registreerimisel peaksid s\u00e4ilima j\u00e4rgmised andmed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>T\u00f6\u00f6 v\u00f5i tellimuse viide ja konkreetne operatsioon.<\/li><li>T\u00f6\u00f6keskus ning t\u00f6\u00f6d tegev inimene v\u00f5i inimesed.<\/li><li>Vastavalt olukorrale t\u00f6\u00f6 alustamise, peatamise, j\u00e4tkamise ja l\u00f5petamise s\u00fcndmused.<\/li><li>Valminud kogus ning asjakohased andmed partii v\u00f5i toote kohta.<\/li><li>Katkestuse v\u00f5i paranduse selgitus, kui see muudab registreeritud aja t\u00f5lgendamist.<\/li><\/ul>\n\n\n<p>Leppige t\u00f6\u00f6 tegijatega kokku, mida need s\u00fcndmused t\u00e4hendavad. Kas t\u00f6\u00f6 alustamine h\u00f5lmab seadistamist v\u00f5i algab t\u00f6\u00f6tlemine alles p\u00e4rast ettevalmistust? Mis saab siis, kui t\u00f6\u00f6 j\u00e4\u00e4b puuduva komponendi t\u00f5ttu seisma? Kuidas antakse t\u00f6\u00f6 \u00fcle j\u00e4rgmisele vahetusele? Kui meeskonnad vastavad neile k\u00fcsimustele erinevalt, ei ole koondandmed v\u00f5rreldavad isegi siis, kui k\u00f5ik kirjed on t\u00e4ielikud.<\/p>\n\n\n<p>Kui partiide suurused erinevad, eristage seadistusaega muudest ajakuludest. V\u00e4ikese ja suure partii ettevalmistus v\u00f5ib v\u00f5tta sama palju aega, kuid t\u00f6\u00f6tlemisaeg v\u00f5ib oluliselt erineda. Kui liidate seadistus- ja t\u00f6\u00f6tlemisaja \u00fcheks keskmiseks ajaks t\u00fcki kohta, v\u00f5ib j\u00e4rgmine v\u00e4ike tellimus n\u00e4ida tegelikust m\u00e4rksa lihtsam.<\/p>\n\n\n<p>Sama hoolikalt tuleb arvestada mitme t\u00f6\u00f6 vahel jagatud aega ja \u00fchist\u00f6\u00f6d. Kui \u00fcks operaator teenindab mitut masinat, leppige kokku, kuidas tema aega jaotatakse, et sama inimtundi ei arvestataks mitu korda. Kui \u00fche operatsiooniga tegeleb mitu inimest, hoidke nende t\u00f6\u00f6panus lahus ajavahemikust, mil t\u00f6\u00f6keskus oli h\u00f5ivatud.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Registreerige aega t\u00f6\u00f6 k\u00e4igus, mitte tagantj\u00e4rele n\u00e4dala l\u00f5pus<\/h2>\n\n\n<p>Paberlehed ja tagantj\u00e4rele t\u00e4idetavad t\u00f6\u00f6ajatabelid v\u00f5ivad olla l\u00e4htepunkt, kuid need eeldavad, et inimesed meenutavad \u00fcksikasju siis, kui need pole enam selgelt meeles. Reedel sisestatud \u00fcmardatud koguaeg selgitab harva teisip\u00e4evast l\u00fchikest katkestust.<\/p>\n\n\n<p>Selle asemel registreerige t\u00f6\u00f6 s\u00fcndmused lihtsa korra j\u00e4rgi kohe t\u00f6\u00f6 juures. SkyPlanneri taimer v\u00f5imaldab tootmist\u00f6\u00f6tajatel registreerida oma t\u00f6\u00f6de alustamise, peatamise, j\u00e4tkamise ja l\u00f5petamise. Nii seotakse aeg operatsiooniga ning t\u00f6\u00f6juhil pole vaja hiljem tuvastamata t\u00f6\u00f6tunde tellimustega kokku viia.<\/p>\n\n\n<p>Praktiline t\u00f6\u00f6j\u00e4rjekord on lihtne: valige \u00f5ige t\u00f6\u00f6, k\u00e4ivitage ajaarvestus kokkulepitud t\u00f6\u00f6 alguses, peatage see siis, kui registreerimisreeglid seda n\u00f5uavad, j\u00e4tkake t\u00f6\u00f6 j\u00e4tkudes ja l\u00f5petage, kui operatsioon on valmis. Selgitage reeglit t\u00f6\u00f6keskuses tegeliku t\u00f6\u00f6 n\u00e4itel, k\u00e4sitledes ka katkestust ja vahetuse \u00fcleandmist. Ainult katkestusteta t\u00f6\u00f6 n\u00e4itamine j\u00e4tab keerulised olukorrad lahendamata.<\/p>\n\n\n<p>P\u00f6\u00f6rake erilist t\u00e4helepanu \u00f5ige operatsiooni valimisele. Ka t\u00e4pselt m\u00f5\u00f5detud aeg moonutab m\u00f5lema t\u00f6\u00f6 kestuse hinnangut, kui see kantakse vale t\u00f6\u00f6 juurde. Veenduge, et t\u00f6\u00f6tajad tunnevad valitava t\u00f6\u00f6 \u00e4ra ja teavad, kellelt k\u00fcsida, kui t\u00f6\u00f6 viide on ebaselge.<\/p>\n\n\n<p>Just siin s\u00e4\u00e4stab t\u00f6\u00f6p\u00f5hine digitaalne ajakulu registreerimine haldust\u00f6\u00f6d. Kirje on juba seotud t\u00f6\u00f6ga, mida see kirjeldab, mist\u00f5ttu kulub v\u00e4hem aega lehtede kogumisele, k\u00e4ekirja de\u0161ifreerimisele ja uurimisele, millise tellimuse juurde teatud tunnid kuuluvad. J\u00e4rjepidev kasutamine on olulisem kui k\u00f5igi v\u00f5imalike andmev\u00e4ljade t\u00e4itmine.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Enne hinnangu muutmist uurige ajakirjet<\/h2>\n\n\n<p>Kujutage ette korduvat koostamisoperatsiooni, mille jaoks on kindlaksm\u00e4\u00e4ratud partii puhul planeeritud pool tundi seadistamist ja kaks tundi t\u00f6\u00f6tlemist. \u00dcks operaator alustab kell 08:00, l\u00f5petab seadistamise kell 08:30 ja t\u00f6\u00f6tab kuni kella 10:00-ni. Seej\u00e4rel peatub t\u00f6\u00f6 puuduva komponendi t\u00f5ttu pooleks tunniks. Operaator j\u00e4tkab kell 10:30 ja l\u00f5petab partii kell 11:00.<\/p>\n\n\n<p>Kui ajaarvestus on katkestuse ajaks peatatud ja seadistusaeg eraldi tuvastatav, annab kirje kolm erinevat vaadet:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vaade operatsioonile<\/th><th>Aeg<\/th><th>T\u00e4hendus planeerimisel<\/th><\/tr><\/thead><tbody><tr><td>Algusest l\u00f5puni<\/td><td>Kolm tundi<\/td><td>Partii valmis kolm tundi p\u00e4rast t\u00f6\u00f6 algust<\/td><\/tr><tr><td>Registreeritud t\u00f6\u00f6aeg koos seadistamisega<\/td><td>Kaks ja pool tundi<\/td><td>Registreeritud t\u00f6\u00f6aeg vastas planeeritud seadistus- ja t\u00f6\u00f6tlemisaja summale<\/td><\/tr><tr><td>Katkestus puuduva komponendi t\u00f5ttu<\/td><td>Pool tundi<\/td><td>Uurige t\u00f6\u00f6 alustamise valmisolekut ja seda, kas t\u00f6\u00f6keskus j\u00e4i katkestuse ajal h\u00f5ivatuks<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kui arvestada kogu kolmetunnine ajavahemik t\u00f6\u00f6tlemisajaks, muutuks kordust\u00f6\u00f6 eeldatav kestus p\u00f5hjendamatult pikaks. Katkestuse t\u00e4ielik eiramine aga varjaks p\u00f5hjust, miks partii j\u00f5udis j\u00e4rgmisse operatsiooni oodatust hiljem.<\/p>\n\n\n<p>Selgitage v\u00e4lja, mis toimus t\u00f6\u00f6keskuses pausi ajal. Kas seal sai teha m\u00f5nda muud t\u00f6\u00f6d v\u00f5i takistas seda pooleliolev koost? Vastus m\u00f5jutab saadaolevat tootmisv\u00f5imsust, kuigi operaator ei t\u00f6\u00f6tanud kogu pausi v\u00e4ltel selle partiiga.<\/p>\n\n\n<p>Pikem aeg algusest l\u00f5puni ei t\u00f5enda, et operaator t\u00f6\u00f6tas ebat\u00f5husalt. See annab p\u00f5hjust uurida ajakirjet ja tootmistingimusi. Selgitage asjaolud v\u00e4lja enne kestuse muutmist v\u00f5i t\u00f6\u00f6 tulemuslikkuse hindamist.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kasutage kontrollitud tegelikke aegu kordust\u00f6\u00f6de kestuse t\u00e4psustamiseks<\/h2>\n\n\n<p>Vaadake erandid \u00fcle seni, kuni asjaosalised oskavad neid veel selgitada. Kontrollige puuduvaid l\u00f5petamiskandeid, kattuvaid ajakirjeid, ebausutavaid kestusi ja vale operatsiooniga seotud kirjeid. Nende probleemide lahendamise eest vastutav inimene on kasulikum kui igan\u00e4dalane aruanne, mis on t\u00e4is selgitamata k\u00f5rvalekaldeid.<\/p>\n\n\n<p>SkyPlanner v\u00f5imaldab andmeid \u00fcle vaadata mitmel detailsusastmel. Job Report n\u00e4itab t\u00f6\u00f6, inimese ja t\u00f6\u00f6keskuse kaupa registreeritud tegelikku ajakulu ning aitab v\u00f5rrelda operatsioonide kavandatud ja tegelikku kestust. All Timelogs Report n\u00e4itab koondaja aluseks olevaid ajatempliga s\u00fcndmusi. Order Item Report lisab \u00fclevaate sellest, kuidas tellimusrida tootmises edenes.<\/p>\n\n\n<p>Selgitage erinevuse p\u00f5hjus \u00fcksikasjalike kirjete abil v\u00e4lja ning v\u00f5rrelge seej\u00e4rel kordust\u00f6id samadel alustel. Kontrollige operatsiooni, partii kogust, ressurssi, t\u00f6\u00f6meetodit ning seda, kuidas on arvestatud seadistust ja katkestusi. Muutunud tootevalik ei t\u00e4henda automaatselt, et protsess on aeglasem.<\/p>\n\n\n<p>SkyPlanneri protsessietapi ajav\u00e4ljal on funktsioon Graph, mis hindab kestust ajalooliste andmete p\u00f5hjal. Selleks on vaja varasemate tellimuste andmeid. Nii saavad planeerijad kasutada kogunenud tootmiskogemust, selle asemel et \u00fcha uuesti kopeerida algset optimistlikku ajahinnangut.<\/p>\n\n\n<p>Varasemad andmed on v\u00e4\u00e4rtuslikumad, kui kirjed kirjeldavad v\u00f5rreldavaid t\u00f6id. Kasutage ajahinnangut kavandatava operatsiooni kontekstis; \u00e4rge v\u00f5tke eri t\u00f6\u00f6de ajakirjeid vaikimisi ametliku ajanormi aluseks. <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooaja-normeerimine\/\">T\u00f6\u00f6aja normeerimisel<\/a> on eraldi eesm\u00e4rk: kehtestada t\u00e4pselt m\u00e4\u00e4ratletud t\u00f6\u00f6le ajanorm.<\/p>\n\n\n<p>T\u00e4psem kestus tuleb arvesse v\u00f5tta ka <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">kogu tootmisplaanis<\/a>. SkyPlanneris m\u00e4\u00e4rate protsessietapid, nende kestused, sobivad t\u00f6\u00f6keskused ja s\u00f5ltuvused. Arcturus koostab t\u00f6\u00f6de ajakava seadistatud tootmisv\u00f5imsuse ja prioriteetide alusel ning tulemus on n\u00e4ha Gantti ajateljel. Teie m\u00e4\u00e4rate prioriteedid ning kaitsete tehtud otsuseid reeglite ja lukustustega.<\/p>\n\n\n<p>Kasu ei piirdu \u00fclevaadatava operatsiooniga. Realistlikum kestus muudab seda, kui palju aega j\u00e4\u00e4b samal ressursil teistele t\u00f6\u00f6dele ja millal saavad alata j\u00e4rgnevad operatsioonid. SkyPlanner arvutab need omavahel seotud muudatused ajakavasse, v\u00e4hendades vajadust t\u00f6\u00f6j\u00e4rjekordi p\u00e4rast iga parandust k\u00e4sitsi \u00fcmber teha.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katsetage uut t\u00f6\u00f6korraldust esmalt piiratud ulatuses tootmises<\/h2>\n\n\n<p>Alustage \u00fchest korduvast t\u00f6\u00f6st, selle tavap\u00e4rasest t\u00f6\u00f6keskusest ning inimestest, kes t\u00f6\u00f6aega registreerivad ja neid andmeid kasutavad. Kaasake planeerija, kes ajahinnangut ajakohastab, ja t\u00f6\u00f6juht, kes saab puuduliku kirje asjaolud v\u00e4lja selgitada. Selgitage eesm\u00e4rki selgelt: v\u00e4hem p\u00e4ringuid p\u00e4rast vahetust, \u00f5iglasemad v\u00f5rdlused ja tegelikule t\u00f6\u00f6le vastav plaan.<\/p>\n\n\n<p>J\u00e4lgige piloodi k\u00e4igus mitut t\u00fc\u00fcpilist tootmiskorda, sealhulgas tavap\u00e4rast katkestust v\u00f5i t\u00f6\u00f6 \u00fcleandmist. Kontrollige kogu ahelat:<\/p>\n\n\n<p>1. Kas operaator leiab \u00f5ige operatsiooni ja saab selle aja registreerida, ilma et talle peaks iga kord eraldi selgitusi jagama?<\/p>\n\n\n<p>2. Kas registreeritud s\u00fcndmused, kogus ja seadistusaja arvestus kajastavad tegelikult toimunut?<\/p>\n\n\n<p>3. Kas t\u00f6\u00f6juht saab k\u00fcsitava kirje asjaolud v\u00e4lja selgitada seni, kuni \u00fcksikasjad on veel teada?<\/p>\n\n\n<p>4. Kas planeerija saab v\u00f5rrelda sarnaseid tootmiskordi ja selgitada, mida tuleks j\u00e4rgmises ajahinnangus muuta?<\/p>\n\n\n<p>5. Kas parandatud kestuse p\u00f5hjal valmib ajakava, mis on teostatav ka teisi tellimusi arvestades?<\/p>\n\n\n<p>J\u00e4lgige, kas kirjete tagaajamisele kulub v\u00e4hem aega ning kas selgitamata v\u00f5i valesti seostatud kirjeid j\u00e4\u00e4b v\u00e4hemaks. Kontrollige ka seda, ega uus t\u00f6\u00f6korraldus lisa t\u00f6\u00f6keskuses tarbetuid samme. Tehke segadust tekitav viide v\u00f5i registreerimisreegel korda enne lahenduse laiendamist teistesse osakondadesse.<\/p>\n\n\n<p>Tootmise t\u00f6\u00f6aja arvestus v\u00f5idab usalduse siis, kui meeskond n\u00e4eb, et andmeid kasutatakse m\u00f5istlikult. Kui iga pikk ajakirje toob kaasa s\u00fc\u00fcdistuse, tekib inimestel p\u00f5hjus katkestusi varjata. Kui kirjed aitavad komponendid \u00f5igeks ajaks valmis saada ja homset t\u00f6\u00f6koormust realistlikult planeerida, on nende v\u00e4\u00e4rtust lihtsam m\u00f5ista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Valige t\u00f6\u00f6aja arvestus, mis aitab teha j\u00e4rgmise tootmisotsuse paremini<\/h2>\n\n\n<p>Tootmise t\u00f6\u00f6aja arvestuse tarkvara hinnates katsetage enamat kui t\u00f6\u00f6le saabumise registreerimist. Paluge pakkujal \u00fche tegeliku operatsiooni n\u00e4itel n\u00e4idata, kuidas j\u00f5utakse aja registreerimise s\u00fcndmustest kavandatud ja tegeliku aja v\u00f5rdluseni ning kuidas neid andmeid kasutatakse j\u00e4rgmise ajakava koostamisel. Kaasake n\u00e4itesse paus, teistsugune partii suurus ja teine tellimus, mis ootab sama ressurssi.<\/p>\n\n\n<p>Seep\u00e4rast on SkyPlanner hea valik tootjatele, kes vajavad nii t\u00f6\u00f6p\u00f5hiseid tegelikke ajakulusid kui ka tootmise ajakava koostamist. Taimer, aruanded ja varasematel andmetel p\u00f5hinev kestuse hindamine teenivad \u00fchist eesm\u00e4rki: usaldusv\u00e4\u00e4rsed ajaandmed, mis aitavad t\u00f6\u00f6d planeerida ning v\u00e4hendavad vajadust eraldiseisvaid kirjeid omavahel kokku viia.<\/p>\n\n\n<p>Alles v\u00f5ivad j\u00e4\u00e4da ka s\u00fcsteemid, millega oma ettev\u00f5tet juba juhite. SkyPlannerit saab avatud REST API kaudu liidestada mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga ning API kaudu saab edastada ka ajakirjete andmeid. \u00dchendage vajalikud tootmisandmed, selle asemel et muuta k\u00e4sitsi andmeedastus j\u00e4rjekordseks p\u00fcsivaks \u00fclesandeks.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/piristeel\/\">Piristeeli kogemus<\/a> n\u00e4itab lahenduse praktilist v\u00e4\u00e4rtust. Katuse turvatooteid valmistav ettev\u00f5te kasutas varem arvutustabeleid ja paberile tr\u00fckitud t\u00f6\u00f6k\u00e4ske ning j\u00e4relkalkulatsiooniks oli andmeid napilt. SkyPlanneri etapiviisiline kasutuselev\u00f5tt koos ERP-s\u00fcsteemi arendamise ja Visma Nova liidestusega t\u00f5i tootmisinfo ja \u00fcksikasjaliku ajakava koostamise kokku. Piristeeli s\u00f5nul kulub tootmissaalis n\u00fc\u00fcd v\u00e4hem t\u00f6\u00f6aega t\u00f6\u00f6de registreerimisele ja aruandlusele. Muutus ei piirdunud t\u00e4ielikuma t\u00f6\u00f6ajatabeliga: tootmisinfot sai igap\u00e4evases juhtimises lihtsamini kasutada.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri demo<\/a> ning v\u00f5tke kaasa \u00fcks korduv operatsioon, selle praegune ajahinnang ja m\u00f5ned hiljutised ajakirjed. Kaasake ka teised samas t\u00f6\u00f6keskuses tehtavad t\u00f6\u00f6d. Nii n\u00e4ete konkreetse n\u00e4ite p\u00f5hjal, kuidas selgemad tegelikud ajaandmed saavad parandada nii j\u00e4rgmist ajahinnangut kui ka tootmisplaani, milles selle operatsiooniga arvestatakse. Kui eelistate esmalt ise tutvuda, <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlannerit demoandmetega<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks Avaleht &raquo; Ressursid &raquo; Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks K\u00f5igil on terve vahetuse tunnid kirjas, kuid planeerijad ei oska ikka selgitada, miks korduv t\u00f6\u00f6 v\u00f5tab hinnatust kauem aega. Osa tunde on kantud terve tellimuse, osa osakonna arvele ning katkestust m\u00e4letav operaator on juba koju l\u00e4inud. Tootmise &#8230; <a title=\"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/\" aria-label=\"Read more about Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110056,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-110033","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tootmise t\u00f6\u00f6aja arvestus: tegelikud tunnid planeerimise toeks<\/title>\n<meta name=\"description\" content=\"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks\" \/>\n<meta property=\"og:description\" content=\"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T16:06:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T16:06:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks\",\"datePublished\":\"2026-10-25T16:06:25+00:00\",\"dateModified\":\"2026-10-25T16:06:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/\"},\"wordCount\":2115,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/\",\"name\":\"Tootmise t\u00f6\u00f6aja arvestus: tegelikud tunnid planeerimise toeks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"datePublished\":\"2026-10-25T16:06:25+00:00\",\"dateModified\":\"2026-10-25T16:06:58+00:00\",\"description\":\"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A stopwatch beside a tagged assembly job links recorded time to specific production work\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tootmise-tooaja-arvestus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud tunnid planeerimise toeks","description":"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/","og_locale":"et_EE","og_type":"article","og_title":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks","og_description":"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T16:06:25+00:00","article_modified_time":"2026-10-25T16:06:58+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks","datePublished":"2026-10-25T16:06:25+00:00","dateModified":"2026-10-25T16:06:58+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/"},"wordCount":2115,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/","name":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud tunnid planeerimise toeks","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","datePublished":"2026-10-25T16:06:25+00:00","dateModified":"2026-10-25T16:06:58+00:00","description":"T\u00f6\u00f6de ajakirjed tootmisplaani toeks: v\u00e4hem ajakulu andmete otsimisele, v\u00f5rreldavad tegelikud ajad ja realistlikumad kestused korduvatele t\u00f6\u00f6dele.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","width":1672,"height":941,"caption":"A stopwatch beside a tagged assembly job links recorded time to specific production work"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tootmise-tooaja-arvestus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks Avaleht &raquo; Ressursid &raquo; Tootmise t\u00f6\u00f6aja arvestus: tegelikud t\u00f6\u00f6tunnid planeerimise toeks K\u00f5igil on terve vahetuse tunnid kirjas, kuid planeerijad ei oska ikka selgitada, miks korduv t\u00f6\u00f6 v\u00f5tab hinnatust kauem aega. Osa tunde on kantud terve tellimuse, osa osakonna arvele ning katkestust m\u00e4letav operaator on juba koju l\u00e4inud. Tootmise&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/110033","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=110033"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/110033\/revisions"}],"predecessor-version":[{"id":110095,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/110033\/revisions\/110095"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/110056"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=110033"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=110033"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=110033"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}