{"id":109299,"date":"2026-10-25T00:12:12","date_gmt":"2026-10-25T00:12:12","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=109299"},"modified":"2026-10-25T00:12:47","modified_gmt":"2026-10-25T00:12:47","slug":"tooriistade-haldus","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/","title":{"rendered":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Masin on vaba. Materjal on valmis. Operaatoril on t\u00f6\u00f6juhendid olemas. Rakis on aga endiselt teisel masinal, kus l\u00f5petatakse teist tellimust.<\/p>\n\n\n<p>T\u00f6\u00f6riistade loetelust ei puudu midagi. Puudu on vaba t\u00f6\u00f6riist just sel ajal, kui seda t\u00f6\u00f6 jaoks vaja l\u00e4heb.<\/p>\n\n\n<p>Hea <strong>t\u00f6\u00f6riistade haldus<\/strong> lahendab m\u00f5lemad k\u00fcsimused: annab \u00fclevaate olemasolevatest t\u00f6\u00f6riistadest ning tagab, et need on eelseisvaks t\u00f6\u00f6ks kasutusk\u00f5lblikud ja vajalikul ajal vabad. Tootmisjuhi jaoks t\u00e4hendab see v\u00e4hem otsimist, v\u00e4hem takistusi t\u00f6\u00f6de alustamisel ja v\u00e4hem lubadusi, mis p\u00f5hinevad masinate v\u00f5imsusel, mida tootmises tegelikult kasutada ei saa.<\/p>\n\n\n<p>SkyPlanner APS arvestab tootmisplaani koostamisel ka \u00fchiskasutuses olevate t\u00f6\u00f6riistadega. Selle asemel et masinate t\u00f6\u00f6j\u00e4rjekordade vahel kattuvaid broneeringuid k\u00e4sitsi lahendada, saate planeerida t\u00f6\u00f6d sama f\u00fc\u00fcsilise t\u00f6\u00f6riista kasutust arvestades ning n\u00e4ha m\u00f5ju \u00fclej\u00e4\u00e4nud tootmisele.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mida t\u00e4hendab t\u00f6\u00f6riistade haldus tootmises?<\/h2>\n\n\n<p>T\u00f6\u00f6riistade haldus t\u00e4hendab toodete valmistamiseks vajalike f\u00fc\u00fcsiliste t\u00f6\u00f6riistade ja seadmete kasutamise korraldamist ning kontrollimist. See h\u00f5lmab t\u00f6\u00f6riistade tuvastamist, hoiustamist ja v\u00e4ljastamist, nende kasutusk\u00f5lblikkuse s\u00e4ilitamist ning vajaliku operatsiooni jaoks k\u00e4ttesaadavaks tegemist. Olenevalt protsessist kuuluvad siia l\u00f5ikeriistad, t\u00f6\u00f6riistakoostud, vormid, stantsid ning juht- ja kinnitusrakised.<\/p>\n\n\n<p>Praktiline k\u00fcsimus on: <strong>kas j\u00e4rgmise t\u00f6\u00f6 alustamiseks on \u00f5igel ajal saadaval \u00f5iged ja n\u00f5utavas seisukorras t\u00f6\u00f6riistad?<\/strong><\/p>\n\n\n<p>Vastamiseks ei piisa \u00fcksnes laoseisu teadmisest. Rakis v\u00f5ib olla olemas, kuid kahjustatud. Vorm v\u00f5ib olla t\u00f6\u00f6korras, kuid teise tellimuse jaoks broneeritud. L\u00f5ikeriistakoost v\u00f5ib olla laos, kuid j\u00e4rgmiseks operatsiooniks ette valmistamata.<\/p>\n\n\n<p>Seet\u00f5ttu seob t\u00f6\u00f6riistade haldus omavahel t\u00f6\u00f6riistalao, tootmise planeerimise, operaatorid ja seadmete hoolduse eest vastutavad inimesed. Ka ostmine ja v\u00e4ljavahetamine kuuluvad sellesse protsessi, kuid n\u00e4ilise puuduse korral ei ole uue t\u00f6\u00f6riista ostmine alati esimene lahendus. Vaja v\u00f5ib olla hoopis selgemat tagastuskorda v\u00f5i paremat t\u00f6\u00f6de j\u00e4rjestust.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tagage iga t\u00f6\u00f6riista tuvastatavus ja usaldusv\u00e4\u00e4rne teave selle oleku kohta<\/h2>\n\n\n<p>Alustage sellest, et eristate t\u00f6\u00f6riista p\u00fcsiandmed teabest, mis selle tootmises liikumise k\u00e4igus muutub.<\/p>\n\n\n<p>P\u00fcsiv tunnus annab k\u00f5igile selguse, millisest f\u00fc\u00fcsilisest esemest r\u00e4\u00e4gitakse. Ajakohane olek n\u00e4itab, kas seda saab kasutada. Kui kaks rakist n\u00e4evad v\u00e4lja \u00fchesugused, kuid on lubatud eri otstarbeks, ei piisa mitteametlikust nimetusest \u201esuur rakis\u201c.<\/p>\n\n\n<p>Pidage nende t\u00f6\u00f6riistade kohta, mille puudumine v\u00f5ib tellimuse t\u00e4itmist takistada, arvestust, mis vastab j\u00e4rgmistele k\u00fcsimustele:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Andmed<\/th><th>Mida meeskonnal on vaja teada<\/th><\/tr><\/thead><tbody><tr><td>Tunnus<\/td><td>Millise f\u00fc\u00fcsilise t\u00f6\u00f6riista, vormi v\u00f5i rakisega on tegemist?<\/td><\/tr><tr><td>Kasutusotstarve<\/td><td>Milliste toodete, operatsioonide ja masinate puhul on seda lubatud kasutada?<\/td><\/tr><tr><td>Asukoht v\u00f5i valdaja<\/td><td>Kas see on oma hoiukohas, ettevalmistamisel, masina juures v\u00f5i hoolduses?<\/td><\/tr><tr><td>Seisukord<\/td><td>Kas see on kasutusvalmis, ootab kontrolli, on kahjustatud v\u00f5i remondis?<\/td><\/tr><tr><td>Broneering<\/td><td>Milline t\u00f6\u00f6 vajab seda j\u00e4rgmisena ja millal see praegusest t\u00f6\u00f6st vabaneb?<\/td><\/tr><tr><td>Vastutus<\/td><td>Kes uuendab seisukorra andmeid ja kinnitab, et t\u00f6\u00f6riist on taas kasutusk\u00f5lblik?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>See on praktiline arvestus, mis tuleb oma s\u00fcsteemides sisse seada, mitte p\u00f5hjus koguda enne tootmise parandamist kokku k\u00f5ikv\u00f5imalikud andmed. Alustage teabest, mille leidmiseks peavad inimesed korduvalt kellegi teise poole p\u00f6\u00f6rduma.<\/p>\n\n\n<p>Hoidke \u00fchesuguse v\u00e4limusega esemed eristatavana, kui nende seisukord v\u00f5i broneeringud erinevad. Samas \u00e4rge looge samale \u00fchiskasutuses olevale rakisele eraldi kirjet iga masina alla, mis seda kasutada saab. Nii paistaks \u00fcks napp ressurss mitme vaba ressursina.<\/p>\n\n\n<p>M\u00e4rgistus v\u00f5i skannimine aitab inimestel leida \u00f5ige kirje. See \u00fcksi ei t\u00f5enda aga, et t\u00f6\u00f6riist on kasutusk\u00f5lblik v\u00f5i j\u00e4rgmise tellimuse jaoks vaba. Selle teabe usaldusv\u00e4\u00e4rsuse tagab kindel andmete uuendamise kord.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Korraldage t\u00f6\u00f6riistade k\u00e4itlemine ettevalmistusest tagastamiseni<\/h2>\n\n\n<p>Toimiv t\u00f6\u00f6riistade halduse protsess l\u00e4htub j\u00e4rgmise t\u00f6\u00f6 vajadustest ega piirdu \u00fcksnes laost v\u00e4ljastamisega.<\/p>\n\n\n<p>Enne \u00fcmberseadistust kontrollige vajaliku t\u00f6\u00f6riista tunnust, sobivust, seisukorda ja eeldatavat saadavust. Kui t\u00f6\u00f6meetod seda v\u00f5imaldab, valmistage kogu koost ja vajalikud juhendid ette juba eelmise t\u00f6\u00f6 ajal. Nii ei pikenda v\u00e4lditav otsimine masina seisakut.<\/p>\n\n\n<p>T\u00f6\u00f6riista v\u00e4ljastamisel peab olema selge, kuhu see l\u00e4heb v\u00f5i kelle valdusse j\u00e4\u00e4b. Plaani muutumisel uuendage ka broneeringut, et laol ja planeerijal ei tekiks erinevaid ootusi. J\u00e4rgmine operaator ei peaks tehases otsinguid tegema, et avastada, kuhu rakis on viidud.<\/p>\n\n\n<p>Leppige kokku, kes t\u00f6\u00f6riista p\u00e4rast kasutamist kontrollib, puhastab ja tagastab ning kes teatab kahjustustest v\u00f5i saadab selle hooldusse. Tagastatud t\u00f6\u00f6riist ei ole automaatselt kasutusvalmis. Kui hoiate kontrollimata esemed kasutusvalmis t\u00f6\u00f6riistadest eraldi, ei kandu eelmisele vahetusele juba teada olnud probleem j\u00e4rgmisele t\u00f6\u00f6le \u00fcle.<\/p>\n\n\n<p>Korduskasutatavad t\u00f6\u00f6riistad ja kulutarvikud vajavad samuti erinevat arvestust. \u00dchiskasutuses olev vorm broneeritakse \u00fchele t\u00f6\u00f6le ja vabastatakse j\u00e4rgmise jaoks. L\u00f5ikeplaat kulub \u00e4ra ning selle varu tuleb l\u00f5puks t\u00e4iendada. Varuplaatide loendamine ei takista kahel masinal sama rakist vajamast; rakise broneerimine ei asenda kulunud l\u00f5ikeservi. Iga probleemi jaoks on vaja sobivat arvestust ja t\u00f6\u00f6korda.<\/p>\n\n\n<p>Need t\u00f6\u00f6v\u00f5tted muudavad f\u00fc\u00fcsilise ettevalmistuse usaldusv\u00e4\u00e4rsemaks. J\u00e4\u00e4b veel otsustada, milline t\u00f6\u00f6 saab \u00fchiskasutuses oleva t\u00f6\u00f6riista esimesena.<\/p>\n\n\n<h2 class=\"wp-block-heading\">T\u00f6\u00f6riist v\u00f5ib olla tehases olemas, kuid siiski mitte saadaval<\/h2>\n\n\n<p>Kujutage ette kaht t\u00f6\u00f6tluskeskust, millel on vahetuse alguses vaba v\u00f5imsust. Tellimust A ja tellimust B saab t\u00e4ita eri masinatel, kuid m\u00f5lemad vajavad \u00fcht ja sama f\u00fc\u00fcsilist rakist. Seda t\u00fc\u00fcpi rakistest on kasutamiseks heaks kiidetud ainult \u00fcks.<\/p>\n\n\n<p>Ainult masinate v\u00f5imsust vaadates annab planeerija m\u00f5lemad t\u00f6\u00f6d tootmisse. Tellimus B j\u00e4\u00e4b aga ootama, kuni rakist kasutatakse tellimuse A t\u00e4itmiseks. Selle kavandatud algusaeg ei olnudki teostatav, kuigi kumbki masin ei olnud \u00fcle koormatud.<\/p>\n\n\n<p>\u00d5ige plaan broneerib \u00fchiskasutuses oleva rakise korraga ainult \u00fchele operatsioonile. Kui rakis tellimuse A alt vabaneb ja vajalik ettevalmistus on tehtud, saab seda kasutada tellimuse B jaoks. Seni v\u00f5ib olla otstarbekam teha teisel masinal m\u00f5nd muud t\u00f6\u00f6d, mille alustamiseks on k\u00f5ik valmis.<\/p>\n\n\n<p>Kujutage n\u00fc\u00fcd ette, et rakis vajab enne j\u00e4rgmist kasutamist ka plaanilist hooldust. Hoolduse ajal ei saa rakist kasutada ja see muudab t\u00f6\u00f6de j\u00e4rjestust uuesti. Tellimuse B viimine teisele masinale ei lahenda probleemi, kui ka seal on vaja sama rakist.<\/p>\n\n\n<p>Selles seisnebki erinevus <strong>t\u00f6\u00f6riistade laoseisu<\/strong> ja <strong>t\u00f6\u00f6riistade saadavuse vahel tootmisplaanis<\/strong>. Laoseis n\u00e4itab, et rakis on olemas. Plaan peab aga arvestama, et seda ei saa kasutada korraga kahe t\u00f6\u00f6 jaoks ega hoolduse ajal.<\/p>\n\n\n<p>See erineb ka seadistusaja v\u00e4hendamisest. <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/smed\/\">SMED<\/a> aitab meeskonnal l\u00fchendada f\u00fc\u00fcsilist \u00fcmberseadistust. <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/piiratud-voimsusega-planeerimine\/\">\u00dchiste ressursside kasutuse planeerimine<\/a> m\u00e4\u00e4rab, millal konkureerivad t\u00f6\u00f6d \u00fcldse vajalikud t\u00f6\u00f6riistad enda kasutusse saavad. Kiirem \u00fcmberseadistus on v\u00e4\u00e4rtuslik, kuid teist rakist see juurde ei tekita.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Seadke \u00fchiskasutuses t\u00f6\u00f6riistade saadavus SkyPlanneris planeerimispiiranguks<\/h2>\n\n\n<p>Kui \u00fchiskasutuses olevate t\u00f6\u00f6riistade t\u00f5ttu peavad t\u00f6\u00f6dejuhid pidevalt masinate t\u00f6\u00f6j\u00e4rjekordi omavahel koosk\u00f5lastama, pakub SkyPlanner praktilist v\u00f5imalust koondada need otsused \u00fchte tootmisplaani.<\/p>\n\n\n<p>SkyPlanner k\u00e4sitleb f\u00fc\u00fcsilisi t\u00f6\u00f6riistu ja vorme ressurssidena ning seob t\u00f6\u00f6riistavajaduse vastavate tootmist\u00f6\u00f6dega. T\u00f6\u00f6riistu saab siduda protsessietappide ja t\u00f6\u00f6kohtadega. Planeerimiss\u00fcsteem v\u00e4listab sama \u00fchiskasutuses oleva t\u00f6\u00f6riista topeltbroneerimise, nii et kaks vaba masinat ei t\u00e4henda enam kaht vastuolulist lubadust \u00fche rakise kasutamiseks.<\/p>\n\n\n<p>See muudab planeerija t\u00f6\u00f6d. Selle asemel et avastada konflikt p\u00e4rast m\u00f5lema t\u00f6\u00f6 tootmisse andmist, l\u00e4htute j\u00e4rjestusest, mis arvestab \u00fchise ressursiga. Nii v\u00e4heneb v\u00f5imatute kattuvate broneeringute arv ja vajadus nende lahendamiseks t\u00f6\u00f6j\u00e4rjekordi k\u00e4sitsi muuta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Looge f\u00fc\u00fcsilise ressursi kohta ainult \u00fcks kirje<\/h3>\n\n\n<p>Andke \u00fchiskasutuses olevale t\u00f6\u00f6riistale selge tunnus ja siduge see t\u00f6\u00f6dega, mis seda vajavad. Hoidke andmed lubatud masinate ja operatsioonide seoste kohta t\u00e4psed. Kui t\u00f6\u00f6le ei ole t\u00f6\u00f6riistavajadust m\u00e4\u00e4ratud, ei saa seda kaitsta konflikti eest, millest tootmisplaan midagi ei tea.<\/p>\n\n\n<p>Kahe masina n\u00e4ites ei ole oluline seos see, et m\u00f5lemad t\u00f6\u00f6d kasutavad rakist kui t\u00f6\u00f6riistat\u00fc\u00fcpi. Oluline on, et m\u00f5lemad vajavad sama f\u00fc\u00fcsilist rakist. Just seet\u00f5ttu on selle saadavus tegelik piirang m\u00f5lema masina t\u00f6\u00f6 planeerimisel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00c4rge planeerige rikkis t\u00f6\u00f6riistade kasutamist ega t\u00f6\u00f6riistade kasutamist hoolduse ajal<\/h3>\n\n\n<p>SkyPlanneris ei saa rikkis t\u00f6\u00f6riistaks m\u00e4rgitud ressurssi kasutada t\u00f6\u00f6deks, mis seda vajavad. T\u00f6\u00f6riistale m\u00e4\u00e4ratud erandiga saab selle kasutamise kindlaks ajavahemikuks, n\u00e4iteks planeeritud hoolduse ajaks, blokeerida. Need on erinevad olukorrad: kui rike on k\u00f5rvaldamata, ei tohiks t\u00f6\u00f6riistale m\u00e4\u00e4rata v\u00e4ljam\u00f5eldud kasutusse naasmise kuup\u00e4eva pelgalt selleks, et plaan n\u00e4iks terviklik.<\/p>\n\n\n<p>Kui saadavuse muudatused on kirja pandud, saab SkyPlanneri ajastamiseks m\u00f5eldud tehisintellekt Arcturus <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">tootmisplaani<\/a> neid arvestades \u00fcmber arvutada. Nii saate plaani, mis kajastab t\u00f6\u00f6riista tegelikku saadavust, mitte masina t\u00f6\u00f6j\u00e4rjekorda, mis eeldab, et probleem on juba lahendatud.<\/p>\n\n\n<p>T\u00f6\u00f6riista uuesti kasutusse lubamine peab siiski p\u00f5hinema selle tegelikul seisukorral. Laske vastutaval isikul kinnitada, et t\u00f6\u00f6riist on kasutusk\u00f5lblik, ja alles seej\u00e4rel uuendage planeerimisandmeid. Kirje sulgemine ei asenda t\u00f6\u00f6riista kontrollimist.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vaadake m\u00f5ju kogu tellimusele, mitte ainult j\u00e4rgmisele operatsioonile<\/h3>\n\n\n<p>Vaadake Gantti diagrammil \u00fcle muudetud t\u00f6\u00f6j\u00e4rjekord ja sellest m\u00f5jutatud t\u00f6\u00f6d. Kui kinnitusseadise viibimine nihutab mehaanilise t\u00f6\u00f6tlemise aega, kontrollige, mida see t\u00e4hendab j\u00e4rgnevatele operatsioonidele ja kliendi n\u00f5utud valmimist\u00e4htajale.<\/p>\n\n\n<p>Teie m\u00e4\u00e4rate prioriteedid ning kaitsete olulisi ajastamisotsuseid reeglite ja lukustustega. Arcturus teeb arvutused nende juhiste piires. Tellimuse B prioriteedi t\u00f5stmine v\u00f5ib muuta seda, kumb t\u00f6\u00f6 saab kinnitusseadist esimesena kasutada, kuid ei v\u00f5imalda m\u00f5lemal t\u00f6\u00f6l seda samal ajal kasutada.<\/p>\n\n\n<p>Selles seisnebki t\u00f6\u00f6riistade ajastamisse kaasamise \u00e4riline v\u00e4\u00e4rtus: eraldi t\u00f6\u00f6j\u00e4rjekordade koosk\u00f5lastamisele kulub v\u00e4hem aega ning on selgem, milline t\u00f6\u00f6 k\u00e4iku anda, millise lubatud t\u00e4htajaga tuleb tegeleda ja kas lisat\u00f6\u00f6riistadest oleks abi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Valige t\u00f6\u00f6riistade halduse tarkvara selle j\u00e4rgi, millist probleemi peate lahendama<\/h2>\n\n\n<p>\u201eT\u00f6\u00f6riistade halduse tarkvara\u201d v\u00f5ib t\u00e4hendada mitme eri \u00fclesande lahendamist. \u00dchel tootjal on vaja hallata l\u00f5ikeriistade geomeetriat, koostusid ja eelseadistusandmeid. Teine vajab usaldusv\u00e4\u00e4rset arvestust v\u00e4ljastamise ja tagastamise kohta. Kolmas teab t\u00e4pselt, kus tema vormid asuvad, kuid ei suuda \u00fchiskasutuses olevate t\u00f6\u00f6riistade broneeringuid klienditellimustega koosk\u00f5las hoida.<\/p>\n\n\n<p>Hinnake t\u00f5rkuvat t\u00f6\u00f6protsessi, selle asemel et valida pikima funktsiooniloendi j\u00e4rgi.<\/p>\n\n\n<p>Kui p\u00f5hiprobleem on see, et keegi ei tea, kus t\u00f6\u00f6riistad asuvad, katsetage nende tuvastamise ja liikumiste registreerimise protsessi koos inimestega, kes neid v\u00e4ljastavad ja tagastavad. Kui probleem on seisukorras, kontrollige, kuidas t\u00f6\u00f6riist kasutusest k\u00f5rvaldatakse ja uuesti kasutusse lubatakse. Kui probleem on konkureerivates tootmisvajadustes, katsetage, kas \u00fcks t\u00f6\u00f6riist saab samas plaanis piirata eri masinatel tehtavaid t\u00f6id.<\/p>\n\n\n<p>Viimase probleemi lahendamiseks valige SkyPlanner APS. T\u00f6\u00f6riistade k\u00e4sitlemine ressurssidena, saadavuse erandid ja \u00fcmberajastamine seovad t\u00f6\u00f6riistad neist s\u00f5ltuvate tootmisotsustega. Eraldi laonimekiri ei suuda seda teha pelgalt sellega, et n\u00e4itab koguseks \u00fcht.<\/p>\n\n\n<p>Saate alles j\u00e4tta ettev\u00f5tte s\u00fcsteemid, mis juba h\u00e4sti toimivad. <strong><a href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/\">SkyPlanner liidestub avatud REST API kaudu iga ERP- v\u00f5i MES-s\u00fcsteemiga<\/a><\/strong>, sidudes olemasolevad tellimus- ja tootmisandmed ajastamisega. Leppige kokku, milline s\u00fcsteem on iga kirje p\u00f5hiandmete allikas ja kes uuendab t\u00f6\u00f6riistade seisukorra muutumisel vastavaid andmeid. Nii toetab liidestus \u00fchtset usaldusv\u00e4\u00e4rset \u00fclevaadet, selle asemel et ebakindlaid andmeid dubleerida.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Alustage t\u00f6\u00f6riistadest, mille t\u00f5ttu tellimused tegelikult seisavad<\/h2>\n\n\n<p>Et hinnata, millist kasu sellest oleks, ei pea te k\u00f5igepealt iga sahtlit korda tegema. Valige t\u00f6\u00f6riistar\u00fchm, mille t\u00f5ttu on m\u00f5ni t\u00f6\u00f6 hiljuti viibinud, eelistatult selline, mida kasutatakse mitmel masinal.<\/p>\n\n\n<p>Vaadake koos operaatori, planeerija ning t\u00f6\u00f6riistalao v\u00f5i hoolduse eest vastutava inimesega l\u00e4bi hiljutine juhtum, kus t\u00f6\u00f6 ei saanud alata. Selgitage v\u00e4lja tegelik takistus: vale t\u00f6\u00f6riist, teadmata asukoht, kahjustus, l\u00f5petamata ettevalmistus v\u00f5i kattuv broneering. Iga p\u00f5hjus n\u00f5uab erinevat parendust.<\/p>\n\n\n<p>Seej\u00e4rel m\u00e4\u00e4rake kindlaks t\u00f6\u00f6riistade tunnused ja lubatud kasutusalad, registreerige nende praegune saadavus ning siduge vajalikud t\u00f6\u00f6riistan\u00f5uded SkyPlanneris esindusliku t\u00f6\u00f6de valimiga. Kaasake ka teadaolev hooldusperiood. Vaadake koos t\u00f6\u00f6de tegijatega \u00fcle, kas saadud t\u00f6\u00f6j\u00e4rjekord on nende hinnangul m\u00f5istlik.<\/p>\n\n\n<p>J\u00e4lgige juhtumeid, kus t\u00f6\u00f6 ei saa alata, ning t\u00f6\u00f6riistade otsimisele ja ettevalmistamisele kuluvat aega. Eristage otsimisest ja ettevalmistamisest tingitud ajakadu broneeringukonfliktide lahendamisele kuluvast ajast. Muidu v\u00f5ib korrastatud ladu n\u00e4ida ajastamise paranemisena v\u00f5i parem t\u00f6\u00f6j\u00e4rjekord varjata tagastamisrutiini, mis vajab endiselt parandamist.<\/p>\n\n\n<p>Enne varut\u00f6\u00f6riistade ostmist l\u00e4htuge kogutud teadmistest. Lisakinnitusseadis v\u00f5ib end \u00e4ra tasuda, kui samaaegne n\u00f5udlus piirab korduvalt oluliste tellimuste t\u00e4itmist. Investeering on v\u00e4hem p\u00f5hjendatud, kui olemasolevat kinnitusseadist on lihtsalt raske leida. Selgem \u00fchiskasutuses ressursside plaan aitab n\u00e4ha, millise probleemi lahendamise eest te maksate.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vaadake, mida \u00fcks \u00fchiskasutuses t\u00f6\u00f6riist teie tootmisplaanis muudab<\/h2>\n\n\n<p>Hea t\u00f6\u00f6riistade halduse esitlus peaks algama teie meeskonnale tuttavast olukorrast: kaks t\u00f6\u00f6d, eri masinad ja \u00fcks m\u00f5lema jaoks vajalik vorm v\u00f5i kinnitusseadis. Paluge n\u00e4idata, kuidas t\u00f6\u00f6d ajastatakse nii, et seda ei broneeritaks topelt. Seej\u00e4rel lisage hooldusperiood ja vaadake, mis m\u00f5lema tellimuse jaoks muutub.<\/p>\n\n\n<p>Nii saab SkyPlanneri rollist selge pildi. T\u00f6\u00f6riistade f\u00fc\u00fcsilise haldusega tagate, et t\u00f6\u00f6riist on tuvastatav ja kasutusvalmis; SkyPlanner arvestab selle saadavust plaanis, mida saab j\u00e4rgida kogu tootmine.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri esitlus<\/a>, et vaadata seda olukorda teie enda tootmisvajaduste p\u00f5hjal. Kui soovite esmalt planeerimiskeskkonnaga tutvuda, <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlannerit demoandmetega<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks Avaleht &raquo; Ressursid &raquo; T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks Masin on vaba. Materjal on valmis. Operaatoril on t\u00f6\u00f6juhendid olemas. Rakis on aga endiselt teisel masinal, kus l\u00f5petatakse teist tellimust. T\u00f6\u00f6riistade loetelust ei puudu midagi. Puudu on vaba t\u00f6\u00f6riist just sel ajal, kui seda t\u00f6\u00f6 jaoks vaja l\u00e4heb. Hea t\u00f6\u00f6riistade haldus &#8230; <a title=\"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/\" aria-label=\"Read more about T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":109322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2521,313],"tags":[],"class_list":["post-109299","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-planeerimine","category-ressursid","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks<\/title>\n<meta name=\"description\" content=\"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\" \/>\n<meta property=\"og:description\" content=\"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T00:12:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T00:12:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1983\" \/>\n\t<meta property=\"og:image:height\" content=\"1115\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\",\"datePublished\":\"2026-10-25T00:12:12+00:00\",\"dateModified\":\"2026-10-25T00:12:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/\"},\"wordCount\":2201,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/tooling-management-hero.png\",\"articleSection\":[\"APS ja planeerimine\",\"ressursid\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/\",\"name\":\"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/tooling-management-hero.png\",\"datePublished\":\"2026-10-25T00:12:12+00:00\",\"dateModified\":\"2026-10-25T00:12:47+00:00\",\"description\":\"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/tooling-management-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/tooling-management-hero.png\",\"width\":1983,\"height\":1115,\"caption\":\"One shared fixture is in use at a machining center while a second machine waits for it\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/tooriistade-haldus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks","description":"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/","og_locale":"et_EE","og_type":"article","og_title":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks","og_description":"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T00:12:12+00:00","article_modified_time":"2026-10-25T00:12:47+00:00","og_image":[{"width":1983,"height":1115,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks","datePublished":"2026-10-25T00:12:12+00:00","dateModified":"2026-10-25T00:12:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/"},"wordCount":2201,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png","articleSection":["APS ja planeerimine","ressursid"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/","name":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png","datePublished":"2026-10-25T00:12:12+00:00","dateModified":"2026-10-25T00:12:47+00:00","description":"Vaba masin vajab t\u00f6\u00f6korras t\u00f6\u00f6riistu. Hallake t\u00f6\u00f6riistu, vorme ja rakiseid, v\u00e4ltige \u00fchiskasutuse konflikte ning koostage tootmises teostatav plaan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png","width":1983,"height":1115,"caption":"One shared fixture is in use at a machining center while a second machine waits for it"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/tooriistade-haldus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png",1983,1115,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero.png",1983,1115,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/tooling-management-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks Avaleht &raquo; Ressursid &raquo; T\u00f6\u00f6riistade haldus: valmistuge j\u00e4rgmiseks t\u00f6\u00f6ks Masin on vaba. Materjal on valmis. Operaatoril on t\u00f6\u00f6juhendid olemas. Rakis on aga endiselt teisel masinal, kus l\u00f5petatakse teist tellimust. T\u00f6\u00f6riistade loetelust ei puudu midagi. Puudu on vaba t\u00f6\u00f6riist just sel ajal, kui seda t\u00f6\u00f6 jaoks vaja l\u00e4heb. Hea t\u00f6\u00f6riistade haldus&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/109299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=109299"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/109299\/revisions"}],"predecessor-version":[{"id":109362,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/109299\/revisions\/109362"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/109322"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=109299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=109299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=109299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}