{"id":107890,"date":"2026-10-23T19:50:04","date_gmt":"2026-10-23T19:50:04","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107890"},"modified":"2026-10-23T19:50:37","modified_gmt":"2026-10-23T19:50:37","slug":"optimaalne-tellimiskogus","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/","title":{"rendered":"Optimaalne tellimiskogus: arvutage sobivam ostupartii"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Optimaalne tellimiskogus: arvutage sobivam ostupartii<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Optimaalne tellimiskogus: arvutage sobivam ostupartii<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Optimaalne tellimiskogus (EOQ) on varude t\u00e4iendamise kogus, mille korral on tellimis- ja varude hoidmise kulude summa EOQ baasmudelis v\u00e4ikseim.<\/strong> Korduvalt sama komponenti ostvale tootjale vastab see k\u00fcsimusele: kui palju peaksime iga kord tellima, arvestades oma tarbimist ja kulusid?<\/p>\n\n\n<p>Valem on <strong>EOQ = \u221a(2 \u00d7 D \u00d7 S \/ H)<\/strong>, kus D on aastane vajadus \u00fchikutes, S on \u00fche tellimuse p\u00fcsikulu ja H on \u00fche \u00fchiku aastane hoidmiskulu.<\/p>\n\n\n<p>Tulemus on kasulik l\u00e4htepunkt, mitte l\u00f5plik ostuotsus. Tarnija pakendi suurus v\u00f5i minimaalne tellimiskogus v\u00f5ib piirata seda, millist kogust saab tegelikult tellida. Ka majanduslikult soodne ost ei aita homset tootmist, kui kaup saabub alles j\u00e4rgmisel n\u00e4dalal. SkyPlanner APS seob materjalide eeldatavad saabumised neist s\u00f5ltuvate tootmistellimustega. Nii saavad ostu- ja tootmisosakond l\u00e4htuda samast ajakavast, selle asemel et eraldi loendeid omavahel koosk\u00f5lastada.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miks v\u00f5ib suurema koguse tellimine kallimaks minna?<\/h2>\n\n\n<p>Iga varude t\u00e4iendamisega kaasnevad lisaks komponentide hinnale muudki kulud: ostutellimuse koostamine, kauba vastuv\u00f5tu vormistamine ja saadetise k\u00e4itlemine. Suuremaid koguseid ostes tuleb tellimusi esitada harvem ning see kindel t\u00f6\u00f6maht kordub v\u00e4hem kordi.<\/p>\n\n\n<p>Suuremad tarned t\u00e4hendavad aga ka suuremat varu tarnete vahel. See seob raha ning toob kaasa ladustamise, kindlustamise ja vananemisega seotud kulud. Kaks korda suurema koguse ostmine ei ole automaatselt soodsam \u00fcksnes seet\u00f5ttu, et tellimuste arv v\u00e4heneb poole v\u00f5rra.<\/p>\n\n\n<p>EOQ tasakaalustab neid kahte m\u00f5ju. Baasmudelis muutub kogu saabunud partii korraga kasutatavaks ning seej\u00e4rel v\u00e4heneb varu \u00fchtlaselt, sedam\u00f6\u00f6da kuidas tootmine seda tarbib. Keskmine ts\u00fcklivaru on seega pool tellimiskogusest. Vajaduse korral lisandub sellele turvavaru, mida ei arvestata selle poole partii sisse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e4\u00e4rake kolm EOQ sisendit \u00f5igesti<\/h2>\n\n\n<p>Kasutage \u00fchtseid m\u00f5\u00f5t\u00fchikuid ja sama ajavahemikku. Aastase vajaduse korral tuleb kasutada aastast hoidmiskulu; kuukulu ei saa samasse arvutusse muutmata kujul lisada.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sisend<\/th><th>T\u00e4hendus ostetava komponendi puhul<\/th><th>\u00dchik<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Komponendi eeldatav aastane tarbimine<\/td><td>\u00dchikut aastas<\/td><\/tr><tr><td>S<\/td><td>\u00dche t\u00e4iendustellimuse esitamise ja vastuv\u00f5tmise p\u00fcsikulu<\/td><td>Raha\u00fchikut tellimuse kohta<\/td><\/tr><tr><td>H<\/td><td>\u00dche \u00fchiku \u00fche aasta jooksul hoidmise kulu<\/td><td>Raha\u00fchikut \u00fchiku kohta aastas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">D: kasutage komponendi tarbimist, mitte m\u00fc\u00fcgitulu<\/h3>\n\n\n<p>Ostetavate laagrite puhul on D laagrite arv, mida tootmine eeldatavasti aasta jooksul tarbib. See ei ole neid laagreid kasutavate masinate m\u00fc\u00fcgiv\u00e4\u00e4rtus ega tingimata ka eelmise aasta ostukogus: ostetud koguste t\u00f5ttu v\u00f5is laovaru suureneda v\u00f5i v\u00e4heneda.<\/p>\n\n\n<p>Arvestage k\u00f5igi seda komponenti kasutavate toodete vajadusega ning lisage asjakohane varu eeldatavate protsessikadude katteks. Kontrollige, kas aastane kogus peegeldab piisavalt \u00fchtlast tarbimist. Kui komponenti kasutatakse ainult kahes suures kliendiprojektis, on vaja kuup\u00e4evadega ostuplaani, mitte aasta kogumahust tuletatud kunstlikult \u00fchtlast tarbimism\u00e4\u00e4ra.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S: eristage tellimise kulu ostuhinnast<\/h3>\n\n\n<p>S h\u00f5lmab iga varude t\u00e4iendamisega kaasnevat kindlat t\u00f6\u00f6mahtu v\u00f5i fikseeritud tasu, n\u00e4iteks tellimuse haldamist, fikseeritud tarnetasu ja kauba vastuv\u00f5tmise t\u00f6\u00f6d. See ei ole k\u00f5igi tellimuses olevate komponentide arvev\u00e4\u00e4rtus.<\/p>\n\n\n<p>Kasutage v\u00f5rreldava tellimise kohta p\u00f5hjendatud kuluhinnangut. Kui sama ostutellimus v\u00f5i veok h\u00f5lmab mitut artiklit, annab kogu saadetise kulu omistamine igale artiklile liiga suure S-i. Samuti ei saa kaalust s\u00f5ltuvat veotasu k\u00e4sitleda lihtsalt \u00fche tellimuse p\u00fcsikuluna. L\u00e4htuge hinnangus oma tarnija- ja vastuv\u00f5tukorraldusest.<\/p>\n\n\n<h3 class=\"wp-block-heading\">H: teisendage hoidmiskulu protsent rahasummaks<\/h3>\n\n\n<p>Kui komponent maksab $20 ja aastane hoidmiskulum\u00e4\u00e4r on 25%, on vastav hoidmiskulu:<\/p>\n\n\n<p><strong>H = $20 \u00d7 0,25 = $5 komponendi kohta aastas<\/strong><\/p>\n\n\n<p>Sisestage EOQ valemisse $5, mitte 25 ega 0,25. V\u00f5tke hoidmiskulu arvestamisel aluseks asjakohased kapitali-, ladustamis- ja varuriskiga seotud kulud, kuid \u00e4rge arvestage sama kulu kaks korda.<\/p>\n\n\n<p>Raamatupidamises jaotatud \u00fcldkulud ei muutu v\u00e4iksema partii ostmisel automaatselt rahaliseks s\u00e4\u00e4stuks. Arvutusest on k\u00f5ige rohkem kasu siis, kui ostu- ja finantsosakond lepivad kokku, millised kulud tellimiskoguse valikust tegelikult s\u00f5ltuvad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Arvutusn\u00e4ide: laagrite ostmine tootmisele<\/h2>\n\n\n<p>V\u00f5tame n\u00e4iteks tootja, kes ostab mitmes tootes kasutatavat standardlaagrit. Planeerimisel l\u00e4htub ta j\u00e4rgmistest eeldustest:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Aastane tarbimine D: <strong>12 000 laagrit<\/strong>.<\/li><li>Tellimise p\u00fcsikulu S: <strong>$75 iga varude t\u00e4iendamise kohta<\/strong>.<\/li><li>\u00dchiku ostuhind: <strong>$20<\/strong>.<\/li><li>Aastane hoidmiskulum\u00e4\u00e4r: <strong>25%<\/strong>, millest tulenevalt on H <strong>$5 laagri kohta<\/strong>.<\/li><\/ul>\n\n\n<p>Need on n\u00e4itlikud l\u00e4hteandmed, mitte tootmiskulude v\u00f5rdlusn\u00e4itajad ega SkyPlanner kliendi tulemused.<\/p>\n\n\n<p><strong>EOQ = \u221a[(2 \u00d7 12 000 \u00d7 75) \/ 5] = \u221a360 000 = 600 laagrit<\/strong><\/p>\n\n\n<p>Kui tellida korraga 600 laagrit, annab mudel tellimuste arvuks 12 000 \/ 600 = <strong>20 tellimust aastas<\/strong> ja keskmiseks ts\u00fcklivaruks 600 \/ 2 = <strong>300 laagrit<\/strong>.<\/p>\n\n\n<p>Et n\u00e4ha, miks 600 on majanduslikult soodne kogus, v\u00f5rrelge aastaseid kulusid, mis s\u00f5ltuvad tellimiskogusest Q:<\/p>\n\n\n<p><strong>Aastane tellimiskulu = (D \/ Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Aastane ts\u00fcklivaru hoidmiskulu = (Q \/ 2) \u00d7 H<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tellimiskogus<\/th><th>Aastane tellimiskulu<\/th><th>Aastane ts\u00fcklivaru hoidmiskulu<\/th><th>Aastased kulud kokku<\/th><\/tr><\/thead><tbody><tr><td>300 laagrit<\/td><td>$3 000<\/td><td>$750<\/td><td>$3 750<\/td><\/tr><tr><td>600 laagrit<\/td><td>$1 500<\/td><td>$1 500<\/td><td>$3 000<\/td><\/tr><tr><td>900 laagrit<\/td><td>$1 000<\/td><td>$2 250<\/td><td>$3 250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Piiranguteta optimumi korral v\u00f5rdub tellimiskulu ts\u00fcklivaru hoidmiskuluga. Koguse suurendamine 900-ni v\u00e4hendab tellimisega seotud t\u00f6\u00f6d, kuid lisanduv hoidmiskulu on suurem kui saavutatud s\u00e4\u00e4st.<\/p>\n\n\n<p>Need $3 000 <strong>ei ole laagrite ostmise aastane kogukulu<\/strong>. Laagrite ostuhind t\u00e4hendab endiselt kulu 12 000 \u00d7 $20 = $240 000 aastas. Selles n\u00e4ites ei s\u00f5ltu see summa tellimiskogusest ega muuda seega parimat Q v\u00e4\u00e4rtust. Kui \u00fchikuhind s\u00f5ltub kogusest, tuleb see v\u00f5rdlusse tagasi tuua.<\/p>\n\n\n<p>Need on pika perioodi p\u00f5hjal hinnatud aastased kulud. N\u00e4iteks 900 \u00fchikuga partii puhul saadud 13,33 tellimust aastas kirjeldab keskmist tellimissagedust, mitte vajadust esitada murdosa ostutellimusest.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kohandage arvutatud kogus tarnijalt tellitavaks koguseks<\/h2>\n\n\n<p>EOQ baasmudel eeldab \u00fchtlast ja teadaolevat vajadust, stabiilseid tellimis- ja hoidmiskulusid ning muutumatut varude t\u00e4iendamise l\u00e4biminekuaega. Samuti eeldab see, et iga tarne muutub t\u00e4ies mahus korraga kasutatavaks ning puuduj\u00e4\u00e4ke ei teki. Mudelis ei ole ka koguseallahindlusi ega siduvaid kogusepiiranguid. K\u00f5ige kindlam on seda kasutada korduvalt vajatavate artiklite puhul, mille ostumuster vastab ligikaudu neile tingimustele.<\/p>\n\n\n<p>Seej\u00e4rel v\u00f5rrelge koguseid, mida saate tegelikult osta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pakendi suurus ja minimaalsed tellimiskogused<\/h3>\n\n\n<p>Oletame, et tarnija m\u00fc\u00fcb laagreid 250 kaupa pakendis. Sel juhul ei saa tellida 600 laagrit. V\u00f5rrelge sama kuluvalemi abil l\u00e4himaid t\u00e4ispakenditele vastavaid koguseid:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>500 laagrit:<\/strong> tellimiskulu $1 800 + hoidmiskulu $1 250 = <strong>$3 050 aastas<\/strong>.<\/li><li><strong>750 laagrit:<\/strong> tellimiskulu $1 200 + hoidmiskulu $1 875 = <strong>$3 075 aastas<\/strong>.<\/li><\/ul>\n\n\n<p>Kui muid piiranguid pole, on 500 laagri tellimine selles mudelis odavam. Automaatselt \u00fclespoole \u00fcmardades j\u00e4\u00e4ks see tulemus m\u00e4rkamata.<\/p>\n\n\n<p>Oletame n\u00fc\u00fcd, et tarnija n\u00f5uab lisaks v\u00e4hemalt 750 laagri tellimist. Siis ei saa enam valida 500 \u00fchiku varianti. Koguse 750 valimine maksab aastas $75 rohkem kui piiranguteta optimum ehk on mudeli j\u00e4rgi 2,5% kallim. See annab selge aluse otsustada, kas v\u00e4iksema miinimumkoguse \u00fcle tasub l\u00e4bir\u00e4\u00e4kimisi pidada.<\/p>\n\n\n<p>MOQ on tarnija m\u00e4\u00e4ratud alampiir. EOQ on ostja arvutatud kulude seisukohalt optimaalne kogus. Need vastavad eri k\u00fcsimustele.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Koguseallahindlused ja tarnekokkulepped<\/h3>\n\n\n<p>Madalam \u00fchikuhind v\u00f5ib muuta suurema tellimuse tasuvaks, kuid v\u00f5rrelge kogum\u00f5ju: aastast ostukulu, tellimiskulu, hoidmiskulu ja v\u00f5imalikke kogusest s\u00f5ltuvaid veokulusid. L\u00e4htuge tegelikust allahindluse korrast: k\u00f5igile \u00fchikutele kehtiv soodushind ei ole sama mis allahindlus ainult kindlat piirm\u00e4\u00e4ra \u00fcletavatele \u00fchikutele.<\/p>\n\n\n<p>Mitme eraldi tarnekorraldusega raamtellimus muudab ka seda, mida loetakse \u00fcheks tellimiskorraks ja kui suurt varu te tegelikult hoiate. \u00c4rge k\u00e4sitlege kogu lepingulist kogust \u00fche korraga kohe saabuva tarnena, kui tarned ja tasud jagunevad eri kordade vahel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Laoruum, s\u00e4ilivusaeg ja eba\u00fchtlane n\u00f5udlus<\/h3>\n\n\n<p>Kontrollige, kas partii mahub kasutatavasse laoruumi ja j\u00f5utakse \u00e4ra tarbida enne s\u00e4ilivusaja l\u00f5ppu, konstruktsioonimuudatust v\u00f5i kliendi vajaduse l\u00f5ppemist. Kogus, mida ei saa \u00e4ra kasutada, ei ole \u00f6konoomne pelgalt seet\u00f5ttu, et see annab lihtsustatud kuluk\u00f5veral miinimumi.<\/p>\n\n\n<p>Kui n\u00f5udlus on hooajaline v\u00f5i materjali v\u00f5etakse laost suurtes ja ebaregulaarsetes kogustes, l\u00e4htuge ajaliselt jaotatud vajadustest ning valige sobiv varude t\u00e4iendamise p\u00f5him\u00f5te. Kui n\u00f5udlus v\u00f5i tarnete ajastus on ebakindel, hinnake turvavaru vajadust eraldi. EOQ suurendamine ei asenda puuduj\u00e4\u00e4giriski m\u00f5istmist.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EOQ n\u00e4itab, kui palju tellida, mitte millal tellida<\/h2>\n\n\n<p>Laagrite n\u00e4ites tarbitakse 250 t\u00f6\u00f6p\u00e4eva jooksul 12 000 laagrit ehk <strong>48 laagrit t\u00f6\u00f6p\u00e4evas<\/strong>. Sellise tarbimise juures j\u00e4tkub 600 laagriga partiist <strong>12,5 t\u00f6\u00f6p\u00e4evaks<\/strong>. See on partii tarbimists\u00fckkel, mitte tarnija l\u00e4biminekuaeg.<\/p>\n\n\n<p>Varude pideval j\u00e4lgimisel p\u00f5hineva t\u00e4iendamise korral m\u00e4\u00e4ratakse tellimispunkt tavaliselt j\u00e4rgmiselt:<\/p>\n\n\n<p><strong>Tellimispunkt = eeldatav n\u00f5udlus varude t\u00e4iendamise l\u00e4biminekuajal + turvavaru<\/strong><\/p>\n\n\n<p>Kui tellimisest kasutusvalmis varu saamiseni kulub kaheksa t\u00f6\u00f6p\u00e4eva ja valite n\u00e4ite jaoks eraldi 96 laagri suuruse puhvervaru:<\/p>\n\n\n<p><strong>Tellimispunkt = (48 \u00d7 8) + 96 = 480 laagrit<\/strong><\/p>\n\n\n<p>N\u00fc\u00fcd on kaks otsust selgelt lahus: tellitav kogus on <strong>600<\/strong> ja selle p\u00f5him\u00f5tte j\u00e4rgi k\u00e4ivitub tellimine tasemel <strong>480<\/strong>. Puhvervaru 96 laagrit on n\u00e4ite jaoks eeldatud, mitte EOQ abil arvutatud. Ebakindluse katmiseks vajaliku varu hindamisel kasutage <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/turvavaru\/\">turvavaru juhendit<\/a>.<\/p>\n\n\n<p>V\u00f5rrelge tellimispunktiga varupositsiooni: kasutusk\u00f5lblik laovaru pluss saabumata tellitud kogused, millest on lahutatud teie laoarvestuse reeglite j\u00e4rgi t\u00e4itmata v\u00f5i juba reserveeritud vajadused. \u00c4rge arvestage sama kohustust kaks korda. Ainult f\u00fc\u00fcsilist laoj\u00e4\u00e4ki vaadates v\u00f5ite teha kordustellimuse, kuigi vajalik kaup on juba teel.<\/p>\n\n\n<p>Tellitud materjal ei ole aga veel kasutatav materjal. Ostutellimus v\u00f5ib hoida varupositsiooni tellimispunktist k\u00f5rgemal ka siis, kui eeldatav tarne saabub klienditellimuse jaoks liiga hilja. Kogust ja saabumise aega tuleb kontrollida koos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mis siis, kui toodate t\u00e4iendava partii ise?<\/h2>\n\n\n<p>Kasutage <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/okonoomne-tootmispartii-suurus\/\">\u00f6konoomse tootmispartii suuruse<\/a> (EPQ) mudelit, kui varu t\u00e4ieneb j\u00e4rk-j\u00e4rgult ja samal ajal j\u00e4tkub tarbimine. Nii on see n\u00e4iteks korduvalt toodetava komponendi puhul, mis antakse lattu osade kaupa. EPQ arvestab tootmis- ja tarbimiskiiruse suhet; EOQ p\u00f5himudel eeldab, et kogu partii muutub kasutatavaks korraga.<\/p>\n\n\n<p>Otsustav on see, kuidas varu kasutatavaks muutub, mitte lihtsalt tellimuse liigitamine sise- v\u00f5i v\u00e4listellimuseks. Tarnija osatarnete v\u00f5i kuni l\u00f5pliku kvaliteediheakskiiduni kinni peetava tootmispartii puhul v\u00f5ib vaja minna teistsugust mudelit, kui tellimuse nimetus esmapilgul eeldaks.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner: siduge kavandatud tarne tootmisega<\/h2>\n\n\n<p>Oletame, et 600 laagrit peaksid saabuma esmasp\u00e4eval. Neid vajavad kaks klienditellimust, mis konkureerivad teiste t\u00f6\u00f6dega ka t\u00f6\u00f6tlus- ja koostev\u00f5imsuse p\u00e4rast. Tarnija l\u00fckkab tarne neljap\u00e4evale. Ostukogus j\u00e4\u00e4b samaks, kuid esmasp\u00e4eva tootmisplaan ei ole enam realistlik.<\/p>\n\n\n<p>Kui uuendate ainult ostunimekirja, j\u00e4\u00e4vad masinate t\u00f6\u00f6j\u00e4rjekorrad ja klientidele lubatud tarnet\u00e4htajad muudatusega koosk\u00f5lla viimata. SkyPlanner toob need seosed <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">\u00fchisesse tootmisgraafikusse<\/a>.<\/p>\n\n\n<p>Ostutellimustes on kirjas materjalikogused ja tarnekuup\u00e4evad. Tarnekuup\u00e4ev n\u00e4itab materjali eeldatavat k\u00e4ttesaadavust; kui kinnitate saabumise olekuga \u201eTarnitud\u201c, uuendatakse laoseisu. Kui materjalide saadavust arvestav ajastamine on sisse l\u00fclitatud, arvestab SkyPlanner ajastamise tehisintellekt Arcturus materjalide saadavust ning ajastab t\u00f6\u00f6d seadistatud v\u00f5imsuse, operatsioonidevaheliste s\u00f5ltuvuste ja prioriteetide alusel.<\/p>\n\n\n<p>Sisestage uus tarnekuup\u00e4ev ja arvutage graafik \u00fcmber. Nii saab m\u00f5jutatud t\u00f6\u00f6k\u00e4sud viia koosk\u00f5lla tarnija kuup\u00e4evaga ning Gantt-vaates on n\u00e4ha nende ajastus koos teiste tootmist\u00f6\u00f6dega. Selle asemel, et iga s\u00f5ltuvat operatsiooni eri t\u00f6\u00f6j\u00e4rjekordades k\u00e4sitsi \u00fcmber t\u00f5sta, saab planeerija keskenduda otsusele: kiirendada komponendi tarnet, muuta prioriteete, leida alternatiivne tarneallikas v\u00f5i muuta kliendile lubatud tarnet\u00e4htaega.<\/p>\n\n\n<p>Just seet\u00f5ttu tasub ostup\u00f5him\u00f5tete rakendamisel kasutada SkyPlanneri tarkvara: <strong>materjaliplaani ja tootmisgraafiku k\u00e4sitsi koosk\u00f5lastamist on v\u00e4hem ning tarneaja muutuse m\u00f5ju klienditellimustele on varem n\u00e4ha.<\/strong> Ostmisel m\u00e4\u00e4ratakse \u00f6konoomne ja lepingutingimustele vastav partiisuurus. \u00dchine graafik teeb n\u00e4htavaks selle m\u00f5ju tootmisele.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/eskomatic\/\">Eskomaticu kogemus SkyPlanneri tarkvaraga<\/a> n\u00e4itab, miks selline \u00fclevaade on oluline. Allhanke korras mehaanilist t\u00f6\u00f6tlust pakkuv ettev\u00f5te tugines varem suuresti k\u00e4sitsi hallatavatele t\u00f6\u00f6j\u00e4rjekordadele ning materjalipuudus selgus m\u00f5nikord alles vahetult enne kavandatud t\u00f6\u00f6 algust. Ettev\u00f5tte s\u00f5nul on ERP-ga \u00fchendatud Gantt-p\u00f5hine ajastamine ja parem \u00fclevaade materjalidest v\u00e4hendanud puuduvatest materjalidest tingitud tootmisseisakuid ning muutnud tarnet\u00e4htaegade m\u00e4\u00e4ramise t\u00e4psemaks. Parem \u00fclevaade materjalide saadavusest annab meeskonnale igap\u00e4evase plaani koostamiseks kindlama aluse.<\/p>\n\n\n<p>SkyPlanner liidestub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga, nii et teie olemasolevate s\u00fcsteemide ostu- ja tellimusandmeid saab kasutada \u00fchise graafiku alusena.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rakendage valitud tellimiskogus praktikas<\/h2>\n\n\n<p>Sisseostetavate varude t\u00e4iendamisel alustage EOQ-st, v\u00f5rrelge tarnija v\u00f5imaldatud tellimiskoguseid ja m\u00e4\u00e4rake tellimispunkt eraldi. Seej\u00e4rel hoidke kavandatud tarne seotuna tellimustega, mis seda materjali tarbivad. <a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri esitlus<\/a> ning v\u00f5tke n\u00e4iteks \u00fcks sisseostetav komponent, selle eeldatav saabumisaeg ja kaks sellest s\u00f5ltuvat klienditellimust, et n\u00e4ha, kuidas see seos tootmisplaani muudab. Kui eelistate esmalt ise tutvuda, <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlanneri tarkvara demoandmetega<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Optimaalne tellimiskogus: arvutage sobivam ostupartii Avaleht &raquo; Ressursid &raquo; Optimaalne tellimiskogus: arvutage sobivam ostupartii Optimaalne tellimiskogus (EOQ) on varude t\u00e4iendamise kogus, mille korral on tellimis- ja varude hoidmise kulude summa EOQ baasmudelis v\u00e4ikseim. Korduvalt sama komponenti ostvale tootjale vastab see k\u00fcsimusele: kui palju peaksime iga kord tellima, arvestades oma tarbimist ja kulusid? Valem on EOQ &#8230; <a title=\"Optimaalne tellimiskogus: arvutage sobivam ostupartii\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/\" aria-label=\"Read more about Optimaalne tellimiskogus: arvutage sobivam ostupartii\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":107916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[313,2549],"tags":[],"class_list":["post-107890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressursid","category-tootmise-tohusus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Optimaalne tellimiskogus: arvutage sobivam ostupartii<\/title>\n<meta name=\"description\" content=\"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Optimaalne tellimiskogus: arvutage sobivam ostupartii\" \/>\n<meta property=\"og:description\" content=\"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T19:50:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T19:50:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Optimaalne tellimiskogus: arvutage sobivam ostupartii\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:50:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/\"},\"wordCount\":1931,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"articleSection\":[\"ressursid\",\"Tootmise t\u00f5husus\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/\",\"name\":\"Optimaalne tellimiskogus: arvutage sobivam ostupartii\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:50:37+00:00\",\"description\":\"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/optimaalne-tellimiskogus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Optimaalne tellimiskogus: arvutage sobivam ostupartii\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Optimaalne tellimiskogus: arvutage sobivam ostupartii","description":"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/","og_locale":"et_EE","og_type":"article","og_title":"Optimaalne tellimiskogus: arvutage sobivam ostupartii","og_description":"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T19:50:04+00:00","article_modified_time":"2026-10-23T19:50:37+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Optimaalne tellimiskogus: arvutage sobivam ostupartii","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:50:37+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/"},"wordCount":1931,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","articleSection":["ressursid","Tootmise t\u00f5husus"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/","name":"Optimaalne tellimiskogus: arvutage sobivam ostupartii","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:50:37+00:00","description":"Leidke korduvalt vajatava komponendi optimaalne tellimiskogus, kontrollige tarnija piiranguid ja siduge saabumine seda vajavate tootmistellimustega.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","width":1776,"height":999,"caption":"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/optimaalne-tellimiskogus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Optimaalne tellimiskogus: arvutage sobivam ostupartii"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Optimaalne tellimiskogus: arvutage sobivam ostupartii Avaleht &raquo; Ressursid &raquo; Optimaalne tellimiskogus: arvutage sobivam ostupartii Optimaalne tellimiskogus (EOQ) on varude t\u00e4iendamise kogus, mille korral on tellimis- ja varude hoidmise kulude summa EOQ baasmudelis v\u00e4ikseim. Korduvalt sama komponenti ostvale tootjale vastab see k\u00fcsimusele: kui palju peaksime iga kord tellima, arvestades oma tarbimist ja kulusid? Valem on EOQ&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/107890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=107890"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/107890\/revisions"}],"predecessor-version":[{"id":107953,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/107890\/revisions\/107953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/107916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=107890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=107890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=107890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}