{"id":105424,"date":"2026-10-21T23:26:46","date_gmt":"2026-10-21T23:26:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105424"},"modified":"2026-10-21T23:27:31","modified_gmt":"2026-10-21T23:27:31","slug":"kanban-tootmises","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/","title":{"rendered":"Kanban tootmises: signaalid, ringid ja kaartide arv"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kanban tootmises: signaalid, ringid ja kaartide arv<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/et\/\">Avaleht<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/\">Ressursid<\/a> &raquo; Kanban tootmises: signaalid, ringid ja kaartide arv<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Hinnanguline lugemisaeg: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kanban on tootmises kasutatav <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/touke-ja-tombepohine-tootmine\/\">t\u00f5mbep\u00f5hise juhtimise meetod<\/a>, mille puhul signaal annab loa toota v\u00f5i teisaldada kindla koguse detaile. Vajadus tekib j\u00e4rgmises protsessietapis tarbimisest; signaal \u00fctleb tarnivale protsessile, mida on vaja asendada. Selle juhise v\u00f5ib edastada kaart, t\u00fchi konteiner v\u00f5i elektrooniline s\u00f5num.<\/p>\n\n\n<p>Meetodi eelis on selge piir varude t\u00e4iendamisele. Selle asemel et teha uus partii lihtsalt seet\u00f5ttu, et masin on vaba, asendad koguse, mille j\u00e4rgmine protsess on tegelikult v\u00f5tnud. Nii v\u00e4heneb tarbetu varu ja tegemata j\u00e4\u00e4nud t\u00e4iendusi on lihtsam m\u00e4rgata.<\/p>\n\n\n<p>Signaal aga masinaaega juurde ei loo. Kui korduvalt toodetavate detailide valmistamiseks kasutatakse klienditellimustega sama pressi, t\u00f6\u00f6tluskeskust v\u00f5i painutuspinki, tuleb ka varude t\u00e4iendamiseks vajalik t\u00f6\u00f6 ajakavasse mahutada. Kasuta kanbanit tootmiskoguse lubamiseks ning SkyPlanner APS-i, et ajastada vastu v\u00f5etud t\u00f6\u00f6d tehase vaba tootmisv\u00f5imsust ja materjalide saadavust arvestades. Nii kulub v\u00e4hem aega eri t\u00f6\u00f6j\u00e4rjekordade koosk\u00f5lastamisele ning vastuolud tulevad n\u00e4htavale enne, kui need p\u00f5hjustavad koostamisel detailipuuduse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tootmis- ja transpordikanban annavad loa eri tegevusteks<\/h2>\n\n\n<p>Tootmises on kanban enamat kui kaart, mida liigutatakse tahvlil veergude \u201eTegemata\u201c, \u201eT\u00f6\u00f6s\u201c ja \u201eValmis\u201c vahel. See annab loa konkreetseks varude t\u00e4iendamise tegevuseks. Tavaliselt kasutatakse koos kaht signaali:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Signaal<\/th><th>Milleks see loa annab<\/th><th>Milleks see luba ei anna<\/th><\/tr><\/thead><tbody><tr><td>Tootmiskanban<\/td><td>Tarniv protsess toodab \u00e4rav\u00f5etud koguse asendamiseks m\u00e4\u00e4ratud detaili etten\u00e4htud koguses.<\/td><td>Lisakonteinerite jagu detailide tootmiseks \u00fcksnes masina t\u00f6\u00f6s hoidmise nimel.<\/td><\/tr><tr><td>V\u00e4ljav\u00f5tukanban ehk transpordi- v\u00f5i teisalduskanban<\/td><td>Materjalik\u00e4itleja viib m\u00e4\u00e4ratud koguse tarnekohast tarbimiskohta.<\/td><td>Uue partii tootmiseks \u00fcksnes seet\u00f5ttu, et on esitatud transpordisoov.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Supermarket ehk juhitav vaheladu<\/strong> on protsessidevaheline varude hoiukoht. Igal detailil on kindel koht ja m\u00e4\u00e4ratud t\u00e4ienduskogus. J\u00e4rgnev protsess v\u00f5tab vajaliku koguse ning eelnev protsess toodab selle asemele.<\/p>\n\n\n<p>Seega ei n\u00f5ua kanban nullvaru. Vahelaos olev varu tagab detailide k\u00e4ttesaadavuse ajal, mil seda t\u00e4iendatakse. Oluline on hoida varu kontrolli all, mitte seda pidevalt kasvatada.<\/p>\n\n\n<h2 class=\"wp-block-heading\">J\u00e4lgi \u00fche konteineri teekonda kahe kaardiga s\u00fcsteemis<\/h2>\n\n\n<p>Kujutleme koosteliini, kus kasutatakse korduvalt sama kronsteini, mida valmistatakse teiste t\u00f6\u00f6dega \u00fchisel painutuspingil. Kronsteinid saabuvad 20 kaupa konteinerites. Valmis detailidega konteinerid ootavad painutuspingi l\u00e4hedal vahelaos ning koosteliinil on oma kasutuskohavaru.<\/p>\n\n\n<p>Selles n\u00e4ites antakse transpordisignaal siis, kui koostamisel avatakse uus konteiner, mitte siis, kui viimane kronstein on \u00e4ra kasutatud. Nii j\u00e4\u00e4b materjalik\u00e4itlejale aega j\u00e4rgmise konteineri toomiseks, samal ajal kui koostamisel kasutatakse avatud konteineri sisu.<\/p>\n\n\n<p>1. <strong>Koostamisel v\u00f5etakse konteiner kasutusele.<\/strong> Operaator eemaldab sellelt transpordikaardi ja paneb kogumiskohta. Kaart annab teada, et vahelaost on vaja j\u00e4rgmist konteinerit 20 kronsteiniga.<\/p>\n\n\n<p>2. <strong>Materjalik\u00e4itleja v\u00f5tab tellimuse kogumiskohast.<\/strong> Vahelaost v\u00f5tab ta konteineri, mis on t\u00e4is \u00f5iget t\u00fc\u00fcpi kronsteine. Selle tootmiskaart eemaldatakse ja pannakse tootmiskaartide kogumiskohta. Transpordikaart kinnitatakse koosteliinile viidavale konteinerile.<\/p>\n\n\n<p>3. <strong>Painutusse j\u00f5uab tootmissignaal.<\/strong> Tagastatud tootmiskaart annab loa valmistada asenduseks \u00fcks konteinerit\u00e4is ehk 20 kronsteini. See ei anna luba piiramatuks tootmiseks.<\/p>\n\n\n<p>4. <strong>Asenduskogus valmistatakse ja kontrollitakse.<\/strong> Kui \u00f5ige kogus kasutusk\u00f5lblikke kronsteine on valmis, liigub tootmiskaart koos konteineriga tagasi selle kohale vahelaos.<\/p>\n\n\n<p>5. <strong>Ring kordub vastavalt sellele, kuidas koostamisel detaile tarbitakse.<\/strong> Kui rohkem tootmiskaarte tagasi ei tule, ei ole luba sellesse ringi detaile juurde toota.<\/p>\n\n\n<p>Kaartidel on detaili kood, kogus, tarne- ja tarbimiskoht ning tunnus, mis eristab \u00fcht luba teisest. Sama selge peab olema ka elektrooniline signaal: ebaselge juhise digiteerimine ei tee sellest usaldusv\u00e4\u00e4rset varude t\u00e4iendamise reeglit.<\/p>\n\n\n<p>M\u00f5nes lahenduses k\u00e4ivitab t\u00e4iendamise t\u00fchi kast. Ka see v\u00f5ib toimida, kui allesj\u00e4\u00e4nud varu katab kogu reageerimisaja. Otsusta, milline s\u00fcndmus signaali k\u00e4ivitab, ja \u00f5peta k\u00f5iki seda reeglit j\u00e4rjepidevalt j\u00e4rgima. \u201eKonteiner avatud\u201c ja \u201ekonteiner t\u00fchi\u201c l\u00e4bisegi kasutamine muudab ringile reageerimiseks j\u00e4\u00e4vat aega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vali detailid, mille varu saab usaldusv\u00e4\u00e4rselt t\u00e4iendada<\/h2>\n\n\n<p>Alustada tasub korduvalt toodetavast detailist, mille tarbimine on regulaarne, tehnilised n\u00f5uded p\u00fcsivad ja varude t\u00e4iendamise teekond piisavalt prognoositav. Mitmes koostus kasutatav \u00fchine kronstein v\u00f5ib sobida paremini kui kliendip\u00f5hine detail, mida tellitakse kord aastas.<\/p>\n\n\n<p>Enne kaartide kasutuselev\u00f5ttu veendu, et tarniv protsess suudab keskmise n\u00f5udlusega sammu pidada. Kui koostamisel tarbitakse detaile pidevalt kiiremini, kui painutuses neid valmistada j\u00f5utakse, l\u00fckkab suurem kaartide arv puuduse \u00fcksnes edasi. Vaja on otsust tootmisv\u00f5imsuse v\u00f5i n\u00f5udluse kohta, mitte suuremat hulka tootmislube.<\/p>\n\n\n<p>Oluline on ka seadistusaeg. \u00dcks kaart v\u00f5ib t\u00e4histada \u00fcht konteinerit, ilma et masinat peaks iga konteinerit\u00e4ie jaoks eraldi seadistama. Kui mitu tagastatud kaarti koondatakse \u00fcheks tootmispartiiks, m\u00e4\u00e4ra kindlaks partii k\u00e4ivitamise tingimus ning arvesta ooteaeg varude t\u00e4iendamise l\u00e4biminekuaega. \u00c4ra t\u00e4ida partiid m\u00e4rkamatult kogustega, mida pole k\u00fcsitud.<\/p>\n\n\n<p>Leppige t\u00f6\u00f6reeglites kokku enne katseprojekti algust:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Tooda v\u00f5i teisalda ainult vastava kehtiva signaali alusel ja selles m\u00e4\u00e4ratud koguses.<\/li><li>Taga loa j\u00e4lgitavus nii selle ooteloleku ja t\u00e4itmise ajal kui ka siis, kui see liigub koos valmisdetailidega.<\/li><li>\u00c4ra saada j\u00e4rgmisse etappi defektseid detaile ega arvesta karantiinis olevat varu kasutusk\u00f5lbliku t\u00e4ienduskogusena.<\/li><li>M\u00e4\u00e4ra konkreetne vastutaja puuduj\u00e4\u00e4kide, kadunud kaartide ja kiireloomuliste erandite k\u00e4sitlemiseks. Enne asendusloa v\u00e4ljastamist kontrolli algse loa seisu, et \u00fchest vajadusest ei tekiks kaht tellimust.<\/li><li>Muuda kaartide arvu l\u00e4bim\u00f5eldult. \u00c4ra lisa mitteametlikke kaarte iga kord, kui ringis tekib t\u00f5rge.<\/li><\/ul>\n\n\n<p>Need reeglid annavad piirangule sisu. Ilma nendeta saab kanbanist lihtsalt veel \u00fcks kohalik nimekiri olemasoleva tootmisplaani k\u00f5rval.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Arvuta kaartide arv t\u00e4iendamisaja n\u00f5udluse p\u00f5hjal<\/h2>\n\n\n<p>Kui tootmisringis on igas konteineris kindel kogus detaile, saab esialgse kaartide arvu arvutada nii:<\/p>\n\n\n<p><strong>Tootmiskaartide arv = \u00fcmarda \u00fcles [(D \u00d7 L + S) \u00f7 C]<\/strong><\/p>\n\n\n<p>Siin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>D<\/strong> on keskmine n\u00f5udlus ringi v\u00e4ljav\u00f5tukohas, v\u00e4ljendatuna detailide arvuna aja\u00fchikus.<\/li><li><strong>L<\/strong> on varude t\u00e4iendamise l\u00e4biminekuaeg samas aja\u00fchikus: alates tootmissignaali k\u00e4ivitavast v\u00e4ljav\u00f5tust kuni hetkeni, mil kasutusk\u00f5lblik asenduskogus on selles vahelaos saadaval.<\/li><li><strong>S<\/strong> on t\u00e4iendav turvavaru detailides, millega soovid k\u00f5ikumist katta.<\/li><li><strong>C<\/strong> on \u00fche kaardi v\u00f5i konteineri kohta arvestatav kasutusk\u00f5lblike detailide arv.<\/li><\/ul>\n\n\n<p>Loogika on lihtne: kata eeldatav tarbimine asenduskoguse valmimise ajal, lisa valitud turvavaru ja teisenda tulemus t\u00e4iskonteinerite arvuks. \u00dcmarda \u00fcles, sest murdosa kaardist ei anna luba terve konteinerit\u00e4ie tootmiseks.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tootmiskaartide arvu arvutusn\u00e4ide<\/h3>\n\n\n<p>V\u00f5tame kronsteini tootmisringi planeerimiseks j\u00e4rgmised n\u00e4itlikud l\u00e4hteandmed:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>L\u00e4hteandmed<\/th><th>N\u00e4itlik v\u00e4\u00e4rtus<\/th><\/tr><\/thead><tbody><tr><td>Keskmine v\u00e4ljav\u00f5tt painutuse vahelaost<\/td><td>40 kronsteini t\u00f6\u00f6tunnis<\/td><\/tr><tr><td>L\u00e4biminekuaeg v\u00e4ljav\u00f5tust kasutusk\u00f5lbliku asenduskoguse valmimiseni<\/td><td>3 t\u00f6\u00f6tundi<\/td><\/tr><tr><td>T\u00e4iendav turvavaru<\/td><td>30 kronsteini<\/td><\/tr><tr><td>Kogus konteineris<\/td><td>20 kronsteini<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Eeldatav n\u00f5udlus t\u00e4iendamise ajal on <strong>40 \u00d7 3 = 120 kronsteini<\/strong>. Lisades 30 kronsteini turvavaru, saame 150. Jagame selle 20-ga ja \u00fcmardame <strong>7,5 \u00fcles 8 tootmiskaardini<\/strong>.<\/p>\n\n\n<p>Need kaheksa kaarti t\u00e4histavad <strong>tootmisringis kokku lubatud kogust 160 kronsteini<\/strong>. Osa sellest kogusest on valmis kujul vahelaos, \u00fclej\u00e4\u00e4nu ootab t\u00e4iendamist v\u00f5i on parajasti tootmises. See ei t\u00e4henda 160 kronsteini riiulil ja veel 160 tootmises. Kui t\u00e4is konteiner vahelaost lahkub, l\u00e4heb selle tootmiskaart tagasi ja annab loa asenduskoguse valmistamiseks; uut p\u00fcsivat kaarti juurde ei tehta.<\/p>\n\n\n<p>See arvutus h\u00f5lmab ainult painutuse tootmisringi. Koostamist teenindaval transpordiringil on oma transpordiaeg ja kasutuskohavaru vajadus. \u00c4ra eelda, et samad kaheksa kaarti m\u00e4\u00e4ravad ka k\u00f5igi j\u00e4rgnevate asukohtade varud v\u00f5i kogu tehase l\u00f5petamata toodangu mahu.<\/p>\n\n\n<p>30 kronsteini suurune turvavaru on n\u00e4itlik valik, mitte universaalne protsent ega garanteeritud teenindustase. M\u00e4\u00e4ra turvavaru tegeliku n\u00f5udluse ja t\u00e4iendamisaja k\u00f5ikumise, puuduj\u00e4\u00e4gi tagaj\u00e4rgede ning vajaliku teenindustaseme p\u00f5hjal. Vaata see \u00fcle, kui protsess muutub t\u00f6\u00f6kindlamaks.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00f5\u00f5da kogu reageerimisaega, mitte ainult l\u00f5ikamis- v\u00f5i painutusaega<\/h3>\n\n\n<p>Kolmetunnine eeldatav t\u00e4iendamisaeg peab h\u00f5lmama enamat kui masina juures kuluvad minutid. Arvesta sisse signaalide kogumine, tellimuse k\u00e4sitlemine, partii v\u00f5i ressursi ootamine, seadistamine, t\u00f6\u00f6tlemine, kontroll ja tagasivedu vahelattu. Lisa ka k\u00f5ik transpordi- ja vastuv\u00f5tutegevused, mis j\u00e4\u00e4vad sinu valitud arvestuspiiridesse.<\/p>\n\n\n<p>Kasutage \u00fchtset aja arvestamise alust. Kui n\u00f5udlus on v\u00e4ljendatud t\u00f6\u00f6tunni kohta, tuleb l\u00e4biminekuajas arvestada t\u00e4iendamist m\u00f5jutavaid t\u00f6\u00f6perioode ja vahetustevahelisi pause. Tarnija kaht kalendrip\u00e4eva ja koostamise tunnip\u00f5hist tarbimist ei saa ilma vastava teisenduseta \u00fches arvutuses kasutada.<\/p>\n\n\n<p>Valem annab esialgse piirm\u00e4\u00e4ra. M\u00f5\u00f5tke tegelikke v\u00e4ljav\u00f5tteid, t\u00e4iendusaegu ja varude l\u00f5ppemist, et selgitada v\u00e4lja, kas see piirm\u00e4\u00e4r toimib. Korrektne arvutus ei korva kogumisringil m\u00e4rkamata j\u00e4\u00e4nud signaale ega masina t\u00f6\u00f6j\u00e4rjekorda, mis eeldatud reageerimisaega pidevalt kahekordistab.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tagage realistlik varude t\u00e4iendamise aeg ka eri t\u00f6\u00f6deks kasutatavatel masinatel<\/h2>\n\n\n<p>Tuleme tagasi kronsteinide n\u00e4ite juurde. Ringi suurus arvutati kolmetunnise reageerimisaja alusel, kuid painutusmasinal tuleb t\u00e4ita ka klienditellimusi. Kui need t\u00f6\u00f6d pikendavad t\u00e4iendamise aja viie tunnini, ei kirjelda algne arvutus enam tegelikku protsessi.<\/p>\n\n\n<p>Sama n\u00f5udluse ja turvavaru korral oleks viietunnise aja puhul esialgu vaja <strong>12 kaarti<\/strong>, mitte kaheksat. Kaartide lisamine v\u00f5ib aidata varustatust tagada, kuid see t\u00e4hendab ka suurema varu hoidmist probleemi t\u00f5ttu, mille p\u00f5hjus v\u00f5ib olla liigne ootamine. K\u00f5igepealt selgitage v\u00e4lja, kas lisaaeg tuleneb v\u00e4ltimatutest v\u00f5imsuspiirangutest, v\u00e4lditavast j\u00e4rjekorras ootamisest v\u00f5i ebausaldusv\u00e4\u00e4rsest t\u00f6\u00f6de t\u00e4itmisest.<\/p>\n\n\n<p>Siin on SkyPlanner abiks. Lisage kinnitatud t\u00e4iendustellimused <a href=\"https:\/\/skyplanner.ai\/et\/ressursid\/mis-on-tootmise-planeerimine\/\">samasse piiratud v\u00f5imsust arvestavasse tootmisgraafikusse<\/a> teiste t\u00f6\u00f6dega, mis vajavad sama masinat. M\u00e4\u00e4rake nende n\u00f5utavad valmimisajad, tehnoloogilised marsruudid, kogused ja prioriteedid. SkyPlanneri ajastamise tehisintellekt Arcturus arvutab t\u00f6\u00f6de jaotuse masinatele ning operatsioonide ajastuse, arvestades seadistatud v\u00f5imsust, vahetusi ja s\u00f5ltuvusi. Gantti vaates on see t\u00f6\u00f6j\u00e4rjestus n\u00e4htav.<\/p>\n\n\n<p>Kui materjalide saadavust arvestav ajastamine on sisse l\u00fclitatud, v\u00f5tab Arcturus arvesse ka materjalide olemasolu ja saabuvaid tarneid. Kronsteinide t\u00e4ienduspartii ei tohiks paista alustamiseks valmis, kui selleks vajalik lehtmaterjal puudub. SkyPlanner liidestub avatud REST API kaudu mis tahes ERP- v\u00f5i MES-s\u00fcsteemiga, sidudes olemasolevad tellimus- ja tootmisandmed tootmisgraafikuga, selle asemel et n\u00f5uda eraldiseisva planeerimiss\u00fcsteemi haldamist.<\/p>\n\n\n<p>Teie m\u00e4\u00e4rate prioriteedid, Arcturus teeb ajastusarvutused. Olukorra muutudes aitab \u00fcmberarvutus n\u00e4ha, kuidas t\u00e4iendustellimused ja muud tellimused graafikusse sobituvad. Nii tuleb t\u00f6\u00f6j\u00e4rjestust v\u00e4hem k\u00e4sitsi s\u00e4ttida ning saate vastuolud lahendada ilma, et m\u00f5ni teine tarne m\u00e4rkamatult kannataks.<\/p>\n\n\n<p>SkyPlanneri ajastamissuunad ASAP ja JIT toetavad seda ajastusotsust. ASAP otsib varast vaba aega, JIT ajastab t\u00f6\u00f6 t\u00e4htajale l\u00e4hemale. Kumbki seadistus ei ole tarbimissignaal. Kanbani reeglid m\u00e4\u00e4ravad, millisteks t\u00f6\u00f6deks on luba antud; ajastamine m\u00e4\u00e4rab, millal saab need kinnitatud t\u00f6\u00f6d teha.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mida igap\u00e4evane ajastamine KJH-Compis muutis<\/h3>\n\n\n<p>Lehtmetallist toodete allhanketootja <a href=\"https:\/\/skyplanner.ai\/et\/klientide-lood\/kjh-comp\/\">KJH-Comp<\/a> kasutas varem n\u00e4dalakoormuse ligikaudseks planeerimiseks C9000 ja arvutustabeleid. T\u00f6\u00f6de igap\u00e4evane jaotamine masinatele j\u00e4i k\u00e4sit\u00f6\u00f6ks ning kaks t\u00f6\u00f6juhti kulutasid kumbki ajastamisele v\u00e4hemalt poole oma t\u00f6\u00f6ajast.<\/p>\n\n\n<p>Ettev\u00f5te j\u00e4ttis oma ERP-s\u00fcsteemi alles ning v\u00f5ttis SkyPlanneri kasutusele piiratud v\u00f5imsust arvestavaks ajastamiseks ja t\u00f6\u00f6de automaatseks jaotamiseks masinatele. Ettev\u00f5tte s\u00f5nul on n\u00fc\u00fcd selgemalt n\u00e4ha, millal neljameetrisele painutusmasinale koormus koguneb, ning hilisema t\u00e4htajaga t\u00f6\u00f6d t\u00f5rjuvad harvem k\u00f5rvale varem l\u00e4hetamist vajavaid t\u00f6id. Ajastamise eest vastutab kahe t\u00f6\u00f6juhi asemel \u00fcks; teine suundus muude \u00fclesannete juurde.<\/p>\n\n\n<p>See kogemus toob esile t\u00e4iendust\u00e4htaja lubamisega seotud ajastusprobleemi: n\u00e4dala kogukoormusest ei piisa, et otsustada, milline t\u00f6\u00f6 peaks mitut t\u00f6\u00f6d teenindaval masinal j\u00e4rgmisena k\u00e4iku minema. SkyPlanner aitab igap\u00e4evast t\u00f6\u00f6j\u00e4rjestust hallata ka siis, kui t\u00f6\u00f6de valik laieneb.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Alustage \u00fchest ringist ja kontrollige reageerimisaega praktikas<\/h2>\n\n\n<p>Katsetage \u00fche korduvalt toodetava detailiga, kaasates inimesed, kes seda tarbivad, teisaldavad ja valmistavad. M\u00e4rgistage kontrollitud vahevaru asukoht, m\u00e4\u00e4rake standardne kogus konteineri kohta, v\u00e4ljastage kokkulepitud kaardid ja m\u00e4\u00e4ratlege \u00fcheselt, milline s\u00fcndmus annab loa t\u00f6\u00f6 k\u00e4ivitamiseks. Kontrollige algvaru ja pooleliolevaid t\u00e4iendust\u00f6id, et ringi k\u00e4ivitamisel oleks arvestus tegeliku seisuga koosk\u00f5las.<\/p>\n\n\n<p>J\u00e4lgige tegelikku aega signaalist t\u00e4ienduspartii tagasij\u00f5udmiseni, puuduj\u00e4\u00e4ke, kasutusk\u00f5lblikku varu, t\u00e4htaja \u00fcletanud t\u00e4iendamislube ja erakorralisi sekkumisi. T\u00f5rke korral k\u00e4ige ring sammhaaval l\u00e4bi: kas signaal koguti kokku, kas t\u00e4iendust\u00f6\u00f6 ajastati, kas materjalid olid valmis ja kas n\u00f5uetele vastavad detailid j\u00f5udsid \u00f5igesse kohta?<\/p>\n\n\n<p>Kui varu p\u00fcsib pidevalt vajalikust suurem, katsetage kaartide arvu kontrollitud v\u00e4hendamist ja j\u00e4lgige tulemust. Kui puuduj\u00e4\u00e4gid korduvad, uurige enne varude suurendamist ajastuse ja v\u00f5imsuse kohta tehtud eeldusi. Vaadake ring uuesti \u00fcle, kui muutub n\u00f5udlus, konteineri suurus, seadistamise korraldus v\u00f5i vahetused.<\/p>\n\n\n<p>Kui teie tehases kasutatakse samu ressursse eri t\u00f6\u00f6de jaoks, valige SkyPlanner, et hoida lubatud t\u00e4iendust\u00f6\u00f6d ja klienditellimused \u00fches tootmisgraafikus. V\u00f5tke demole kaasa \u00fche korduvalt toodetava detaili andmed: tarbimiskiirus, kogus konteineri kohta, tehnoloogiline marsruut ja muud samadele masinatele kavandatud t\u00f6\u00f6d. Nii saate uurida k\u00fcsimust, millest s\u00f5ltub ringi toimimine: <strong>kas t\u00e4ienduspartii saab valmis enne, kui tarbimist kattev varu otsa saab?<\/strong><\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige SkyPlanneri demo<\/a>, et vaadata seda detaili teie tootmise kontekstis, v\u00f5i <a href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">proovige SkyPlannerit demoandmetega<\/a>, et n\u00e4ha, kuidas ajastamine t\u00f6\u00f6tab.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kanban tootmises: signaalid, ringid ja kaartide arv Avaleht &raquo; Ressursid &raquo; Kanban tootmises: signaalid, ringid ja kaartide arv Kanban on tootmises kasutatav t\u00f5mbep\u00f5hise juhtimise meetod, mille puhul signaal annab loa toota v\u00f5i teisaldada kindla koguse detaile. Vajadus tekib j\u00e4rgmises protsessietapis tarbimisest; signaal \u00fctleb tarnivale protsessile, mida on vaja asendada. Selle juhise v\u00f5ib edastada kaart, t\u00fchi &#8230; <a title=\"Kanban tootmises: signaalid, ringid ja kaartide arv\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/\" aria-label=\"Read more about Kanban tootmises: signaalid, ringid ja kaartide arv\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[313,2549],"tags":[],"class_list":["post-105424","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressursid","category-tootmise-tohusus","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kanban tootmises: signaalid, ringid ja kaartide arv<\/title>\n<meta name=\"description\" content=\"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kanban tootmises: signaalid, ringid ja kaartide arv\" \/>\n<meta property=\"og:description\" content=\"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T23:26:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T23:27:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kanban tootmises: signaalid, ringid ja kaartide arv\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:27:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/\"},\"wordCount\":2118,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"articleSection\":[\"ressursid\",\"Tootmise t\u00f5husus\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/\",\"name\":\"Kanban tootmises: signaalid, ringid ja kaartide arv\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:27:31+00:00\",\"description\":\"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"width\":1536,\"height\":1024,\"caption\":\"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/ressursid\\\/kanban-tootmises\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kanban tootmises: signaalid, ringid ja kaartide arv\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kanban tootmises: signaalid, ringid ja kaartide arv","description":"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/","og_locale":"et_EE","og_type":"article","og_title":"Kanban tootmises: signaalid, ringid ja kaartide arv","og_description":"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.","og_url":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T23:26:46+00:00","article_modified_time":"2026-10-21T23:27:31+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kanban tootmises: signaalid, ringid ja kaartide arv","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:27:31+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/"},"wordCount":2118,"publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","articleSection":["ressursid","Tootmise t\u00f5husus"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/","url":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/","name":"Kanban tootmises: signaalid, ringid ja kaartide arv","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:27:31+00:00","description":"Kanban tootmises: pane varude t\u00e4iendamine toimima. Uuri, mis lubab toota v\u00f5i teisaldada, arvuta kanban-kaartide arv ja planeeri vajalik masinaaeg.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","width":1536,"height":1024,"caption":"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/ressursid\/kanban-tootmises\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Kanban tootmises: signaalid, ringid ja kaartide arv"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-360x240.png",360,240,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kanban tootmises: signaalid, ringid ja kaartide arv Avaleht &raquo; Ressursid &raquo; Kanban tootmises: signaalid, ringid ja kaartide arv Kanban on tootmises kasutatav t\u00f5mbep\u00f5hise juhtimise meetod, mille puhul signaal annab loa toota v\u00f5i teisaldada kindla koguse detaile. Vajadus tekib j\u00e4rgmises protsessietapis tarbimisest; signaal \u00fctleb tarnivale protsessile, mida on vaja asendada. Selle juhise v\u00f5ib edastada kaart, t\u00fchi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/105424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=105424"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/105424\/revisions"}],"predecessor-version":[{"id":105486,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/posts\/105424\/revisions\/105486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/105447"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=105424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/categories?post=105424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/tags?post=105424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}