{"id":4738,"date":"2022-04-21T17:29:20","date_gmt":"2022-04-21T17:29:20","guid":{"rendered":"https:\/\/skyplanner.ai\/omadused\/"},"modified":"2026-09-22T12:39:04","modified_gmt":"2026-09-22T12:39:04","slug":"funktsioonid","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/funktsioonid\/","title":{"rendered":"Funktsioonid"},"content":{"rendered":"\n<div class=\"wp-block-group sp-features-v2 sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\" data-screen-label=\"Hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-hero__grid\">\n      <div class=\"fx-hero__copy sp-min0\">\n<p class=\"fx-eyebrow\">Tehisintellektil p\u00f5hinev tootmise ajakava koostamine tootjatele<\/p>\n<h1 class=\"wp-block-heading fx-hero__title\">Ajakava valmis sekunditega. <span class=\"hl\">Kontroll j\u00e4\u00e4b teile.<\/span><\/h1>\n<p class=\"fx-hero__sub\">SkyPlanner APS muudab teie tellimused, tootmisv\u00f5imsuse, materjalid ja prioriteedid realistlikuks piiratud tootmisv\u00f5imsusega ajakavaks. Arcturus, meie ettev\u00f5ttesisene tehisintellekti mootor, arvutab selle sekunditega ja hoiab seda tootmise muutudes ajakohasena. Teie otsustate, mis lukustatakse, mis liigutatakse ja mis vastu v\u00f5etakse.<\/p>\n\n        <div class=\"fx-hero__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Alustage tasuta prooviperioodi<\/a>\n          <a class=\"sp-btn sp-btn--outline sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige live-demo<\/a>\n        <\/div>\n      <\/div>\n\n      <div class=\"fx-hero__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner Gantt ajajoon, mis n\u00e4itab ajastatud tootmist\u00f6id t\u00f6\u00f6piste radadel, s\u00f5ltuvusnooled \u00fchendavad protsessietappe ja all on tellimuste loend.\">\n        <\/figure>\n        <div class=\"fx-hero__badge\">\n          <span class=\"ico ico--crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n          <div><b>\u00dcks kl\u00f5ps ajastab k\u00f5ik \u00fcmber<\/b><small>King button, mille taga on Arcturus<\/small><\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n    <div class=\"fxv-herometa\">\n<p class=\"fxv-heromicro\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Tasuta 30 p\u00e4eva. Krediitkaarti pole vaja.<\/p>\n<p class=\"fx-hero__devices\">\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M9 20h6M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"4\" y=\"2.5\" width=\"16\" height=\"19\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"7\" y=\"2.5\" width=\"10\" height=\"19\" rx=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        Lauaarvuti, tahvelarvuti ja telefon.\n      <\/p>\n    <\/div>\n<ul class=\"wp-block-list fx-micro\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Tehisintellektil p\u00f5hinev piiratud v\u00f5imsusega planeerimine<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Gantt-ajajoon<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>ERP integratsioonid &amp; REST API<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>29 toetatud keelt<\/li>\n    <\/ul>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group fxv-proof\" data-screen-label=\"Proof strip\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-proof__row\">\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"90\" data-suffix=\"%\">90%<\/span><\/span><span class=\"fxv-proof__lab\">t\u00f5husam tootmine, Laboratory &amp; Allied<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"99.2\" data-suffix=\"%\">99.2%<\/span><\/span><span class=\"fxv-proof__lab\">tarnekindlus, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"4\" data-prefix=\"\" data-suffix=\" hours\">4 tundi<\/span><\/span><span class=\"fxv-proof__lab\">planeerimist\u00f6\u00f6d hoitakse iga p\u00e4ev kokku, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\">Sekunditega<\/span><span class=\"fxv-proof__lab\">kiired \u00fcmberplaneerimised, mis varem v\u00f5tsid tunni, Fredman Operations<\/span><\/div>\n    <\/div>\n<p class=\"fxv-proof__note\">Tulemused, millest on teatanud SkyPlanner kliendid Laboratory &amp; Allied, Piristeel ja Fredman Operations. Iga tehas on erinev.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<div class=\"wp-block-group fx-subnav\" role=\"navigation\" aria-label=\"On this page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-subnav__row\">\n      <a href=\"#why\" data-target=\"why\">Miks APS<\/a>\n      <a href=\"#how\" data-target=\"how\">Kuidas see toimib<\/a>\n      <a href=\"#visibility\" data-target=\"visibility\">N\u00e4htavus<\/a>\n      <a href=\"#autopilot\" data-target=\"autopilot\">Autopilot<\/a>\n      <a href=\"#priorities\" data-target=\"priorities\">Prioriteedid<\/a>\n      <a href=\"#similar-jobs\" data-target=\"similar-jobs\">Sarnased t\u00f6\u00f6d<\/a>\n      <a href=\"#routing\" data-target=\"routing\">Marsruudiredaktor<\/a>\n      <a href=\"#mobile\" data-target=\"mobile\">Tsehh<\/a>\n      <a href=\"#dashboards\" data-target=\"dashboards\">Aruanded<\/a>\n      <a href=\"#capacity\" data-target=\"capacity\">V\u00f5imsus &amp; materjalid<\/a>\n      <a href=\"#delivery\" data-target=\"delivery\">Tarnekuup\u00e4evad<\/a>\n      <a href=\"#roles\" data-target=\"roles\">Teie meeskonnale<\/a>\n      <a href=\"#assistant\" data-target=\"assistant\">Tehisintellekti agent<\/a>\n      <a href=\"#integrations\" data-target=\"integrations\">Integratsioonid<\/a>\n      <a href=\"#compare\" data-target=\"compare\">V\u00f5rdlus<\/a>\n      <a href=\"#allfeatures\" data-target=\"allfeatures\">K\u00f5ik funktsioonid<\/a>\n      <a href=\"#faq\" data-target=\"faq\">KKK<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/div>\n\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"why\" data-screen-label=\"Why planning breaks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Miks tootmise planeerimine laguneb<\/p>\n<h2 class=\"wp-block-heading\">P\u00e4ris tehased ei j\u00e4rgi fikseeritud plaani<\/h2>\n<p>Ajakava, mis tundus eile \u00f5ige, v\u00f5ib t\u00e4na olla vale. Enamik planeerimist\u00f6\u00f6riistu ei suuda tootmise muutudes piisavalt kiiresti reageerida.<\/p>\n    <\/div>\n    <div class=\"fx-pain\">\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M13 2L4.5 13.5H11l-1 8.5L19.5 10H13z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Kiirtellimused saabuvad<\/p>\n<p class=\"fx-pain__b\">N\u00e4dala keskel saabub prioriteetne tellimus ja iga hilisem tootmist\u00f6\u00f6 peab selle \u00fcmber liikuma.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 8l9-5 9 5v8l-9 5-9-5z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M3 8l9 5 9-5M12 13v8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Materjalid l\u00e4hevad kaduma<\/p>\n<p class=\"fx-pain__b\">Tootmist\u00f6\u00f6 on ajastatud, kuid materjal v\u00f5i ostutellimus ei ole veel saabunud, seega ei saa seda tegelikult k\u00e4ivitada.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 21V3m0 0l11 3.5L6 10\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Prioriteedid muutuvad pidevalt<\/p>\n<p class=\"fx-pain__b\">Kliendi-, t\u00e4htaja- ja l\u00e4bimisaja surve muutub pidevalt, seega peab plaan koos nendega prioriteete \u00fcmber kaaluma.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 17h4v4H3zm7-6h4v10h-4zm7-7h4v17h-4z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">T\u00f6\u00f6keskused on \u00fclekoormatud<\/p>\n<p class=\"fx-pain__b\">Kaks tootmist\u00f6\u00f6d vajavad korraga sama masinat ja keegi ei m\u00e4rka konflikti enne, kui tootmine on juba ajakavast maas.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"3\" width=\"18\" height=\"18\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 9h18M9 3v18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Excel &amp; ERP j\u00f5uavad oma piirini<\/p>\n<p class=\"fx-pain__b\">Arvutustabelid ei suuda planeerida piiratud tootmisv\u00f5imsuse alusel. ERP ja MES j\u00e4lgivad tellimusi, kuid ajastavad neid harva tegelike piirangute j\u00e4rgi.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">S\u00f5ltuvused l\u00e4hevad kaotsi<\/p>\n<p class=\"fx-pain__b\">Protsessietappidel, seadistusaegadel ja marsruutidel on kindel j\u00e4rjekord. Kui seda rikkuda, hilineb kogu tootmist\u00f6\u00f6.<\/p>\n<\/article>\n    <\/div>\n    <div class=\"fx-pain__foot\">\n      <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a10 10 0 100 20 10 10 0 000-20zm0 6v5m0 3h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg>\n<p><b>SkyPlanner on loodud just selleks.<\/b> Arcturus arvutab piiratud tootmisv\u00f5imsusega ajakava materjalide, tootmisv\u00f5imsuse ja prioriteetide alusel \u00fcmber hetkel, kui tegelikkus muutub, ning planeerija otsustab, mida vastu v\u00f5tta.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"how\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"How it works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Kuidas see t\u00f6\u00f6tab<\/p>\n<h2 class=\"wp-block-heading\">Kolm sammu ajakohase ajakavani<\/h2>\n<p>V\u00e4\u00e4rtuse saamiseks ei ole vaja suurt projekti. Kirjeldage oma tootmist \u00fcks kord, lisage tellimusi jooksvalt ja laske Arcturusel ajakava koostada.<\/p>\n    <\/div>\n\n    <div class=\"fxv-how\">\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">1<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Kirjeldage oma tootmist \u00fcks kord<\/h3>\n<p class=\"fxv-how__b\">Teie t\u00f6\u00f6keskused, vahetused ja tooted koos protsessietappidega. Just siin aitavad teid k\u00f5ige rohkem meie visuaalne redaktor, \u00f5ppevideod ja sisseehitatud tehisintellekti agent. Enamik tehaseid alustab \u00fche tootesarjaga, mitte kogu tehasega.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1280\" height=\"586\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/21-5c990f2c-7c1f-4d7d-9980-ad09b5003c75.png\" alt=\"SkyPlanner visuaalne marsruudiredaktor: keevituse ja pakkimise protsessietappide kaardid kolmele alamtootele, mis on \u00fchendatud nooltega, mis \u00fchinevad saagimise etapis ja seej\u00e4rel t\u00f6\u00f6tlemises, n\u00e4idates, kuidas alamtooted liiguvad valmistootesse.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">2<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Lisage tellimusi jooksvalt<\/h3>\n<p class=\"fxv-how__b\">Sisestage need k\u00e4sitsi, importige CSV v\u00f5i \u00fchendage oma ERP hiljem. Iga tellimus teab oma toodet, kogust ja t\u00e4htaega. See on k\u00f5ik, mida Arcturus vajab.<\/p>\n        <div class=\"fxv-how__slot\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n          <div class=\"fxv-src\" role=\"img\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n            <div class=\"fxv-src__in\">\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h9l3 3v11H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M7 9h6M7 12h6\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linecap=\"round\"><\/path><\/svg><b>K\u00e4sitsi<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h8l4 4v10H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M6.5 13.5l1.5-3 1.5 2 1.3-2.5 1.7 3.5\" stroke=\"currentColor\" stroke-width=\"1.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><b>CSV<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><rect x=\"3\" y=\"11\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><path d=\"M6 6.5h.01M6 13.5h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><b>ERP \/ API<\/b><\/span>\n            <\/div>\n            <svg class=\"fxv-src__merge\" width=\"20\" height=\"18\" viewBox=\"0 0 20 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M10 1v12m0 0l-5-5m5 5l5-5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n            <div class=\"fxv-src__out\">\n              <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3.5 7.5L12 3l8.5 4.5M3.5 7.5L12 12m-8.5-4.5v9L12 21m0-9l8.5-4.5M12 12v9m8.5-13.5v9L12 21\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><\/svg>\n              <b>Tellimused<\/b>\n            <\/div>\n          <\/div>\n        <\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">3<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Arcturus koostab ajakava, teie juhite<\/h3>\n<p class=\"fxv-how__b\">Mootor koostab hetkega piiratud tootmisv\u00f5imsusega plaani teie tegelike piiride sees: tootmisv\u00f5imsus, vahetused, materjalid, seadistusajad, t\u00f6\u00f6riistad ja s\u00f5ltuvused. Te kohandate prioriteete, lukustate selle, mis ei tohi liikuda, ja kinnitate plaani. Kui midagi muutub, planeerib see \u00fcmber.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1204\" height=\"674\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/22-be3a6ec5-5d91-47ee-9dde-f5e8c10e9461.png\" alt=\"SkyPlanner Gantt ajaskaala l\u00e4hivaade: v\u00e4rvikoodidega tootmist\u00f6\u00f6de ribad (hilinenud tootmist\u00f6\u00f6d punasega, valitud tootmist\u00f6\u00f6 oran\u017eiga, ajastatud tootmist\u00f6\u00f6d tumesinisega) koos s\u00f5ltuvusnoolega, mis seob tootmist\u00f6\u00f6 selle j\u00e4rgmise protsessietapiga, n\u00e4idates ajakohast tootmise ajakava.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n    <\/div>\n\n<p class=\"fxv-howline\">\n      <svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      Alustamiseks pole ERP-i vaja. Tehisintellekti mudeleid teie andmetel ei treenita. Esimese ajakava saate demoandmetega valmis m\u00f5ne minutiga.\n    <\/p>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Tootmise efektiivsus on t\u00f5usnud 90%. Varude kontroll on paranenud ning m\u00fc\u00fcgitarned, kaupade \u00f5igeaegne k\u00e4ttesaamine ja kliendile \u00f5igeaegne aruandlus on tegelikult t\u00f5usnud 50%.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Abdul Rucyinga<\/b>, IT juht, Laboratory &amp; Allied Limited<span class=\"fxv-quote__ctx\">Keenia suurim ravimitootja, ~1000 t\u00f6\u00f6tajat, Nairobi<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"visibility\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Production visibility\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">N\u00e4ete tootmist ega pea oletama<\/p>\n<h2 class=\"wp-block-heading\">Kogu tootmine \u00fches vaates<\/h2>\n<p>Mis on t\u00f6\u00f6s, kus on pudelikaelad, mis hilineb ja milline v\u00f5imsus on vaba. \u00dcks vaade n\u00e4itab seda k\u00f5ike, sealhulgas seda, kuidas muudatus plaanis edasi kandub, et saaksite reageerida kohe, mitte liiga hilja teada saada.<\/p>\n    <\/div>\n\n    <div class=\"fx-vis\">\n      <div class=\"fx-vis__copy sp-min0\">\n<ul class=\"wp-block-list fx-vis__list\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12a9 9 0 1018 0 9 9 0 00-18 0zm9-5v5l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Mis on t\u00f6\u00f6s<\/b><span class=\"t\">Iga k\u00e4imasolev tootmist\u00f6\u00f6 ja selle protsessietapp reaalajas kogu tehases.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 18V9m5 9V5m5 13v-6m5 6V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Kus on pudelikaelad<\/b><span class=\"t\">\u00dclekoormatud t\u00f6\u00f6keskused paistavad silma enne, kui need viivitusi p\u00f5hjustavad.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3a9 9 0 109 9\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><path d=\"M12 7v5l4 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Mis hilineb<\/b><span class=\"t\">Tootmist\u00f6\u00f6d, millel on oht t\u00e4htajast maha j\u00e4\u00e4da, on m\u00e4rgistatud, mitte peidetud.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"18\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 10h18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n            <span><b>Milline v\u00f5imsus on vaba<\/b><span class=\"t\">Vaba aeg igas t\u00f6\u00f6keskuses, et teaksite, mida saate veel vastu v\u00f5tta.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 7h11m0 0l-4-4m4 4l-4 4M21 17H10m0 0l4-4m-4 4l4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Kuidas muudatus edasi kandub<\/b><span class=\"t\">Liigutage \u00fcht tootmist\u00f6\u00f6d ja n\u00e4ete kohe m\u00f5ju kogu plaanile.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-vis__media sp-min0\">\n<figure class=\"fx-vis__frame\">\n          <img fetchpriority=\"high\" decoding=\"sync\" loading=\"eager\" width=\"2182\" height=\"1310\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/23-ad101a05-aabc-4460-81fe-4472d2f225ba.png\" alt=\"SkyPlanner tootmise ajakava koostamise vaade: t\u00e4ielik rakendus vasakpoolse navigeerimisribaga, t\u00f6\u00f6piste radadega (Saw, CNC Machine, Welding and Packing) ja v\u00e4rvikoodidega tootmist\u00f6\u00f6 ribadega, s\u00f5ltuvusnooltega, mis n\u00e4itavad, kuidas \u00fcmber ajastatud tootmist\u00f6\u00f6 t\u00f6\u00f6pistete vahel liigub, ning allosas olevate Reschedule all ja Autopilot juhtnuppudega, kogu tootmisplaan \u00fches vaates.\">\n        <\/figure>\n<p class=\"fx-cap\">\u00dcks vaade: t\u00f6\u00f6keskuste koormus, tootmist\u00f6\u00f6 olek ja kuidas t\u00f6\u00f6 liigub etapist etappi.<\/p>\n      <\/div>\n\n<p class=\"fx-vis__note fx-vis__note--full\">Enam ei pea tootmise olekut \u00e4ra arvama. <b>Te n\u00e4ete seda ja saate reageerida.<\/b><\/p>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner annab teile kogu plaani aluse. K\u00f5ik ettev\u00f5ttes n\u00e4evad, kus asjad parasjagu on: milline v\u00f5imsus on olemas, kui palju on saavutatud ja milline on kasutusm\u00e4\u00e4r.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Anu J\u00e4rvinen<\/b>, tootmisjuht, Fredman Operations Oy<span class=\"fxv-quote__ctx\">Toidupakendite tootja, Rauma, Soome<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"autopilot\" data-screen-label=\"Reschedule all &amp; Autopilot\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-king\">\n      <div class=\"fx-king__copy sp-min0\">\n<p class=\"fx-eyebrow\">Reschedule all &amp; Autopilot<\/p>\n<h2 class=\"wp-block-heading\">Planeerige k\u00f5ik \u00fcmber \u00fche kl\u00f5psuga. V\u00f5i kasutage Autopilotit.<\/h2>\n<p class=\"fx-king__lead\">Kui midagi muutub, vajutage <b>Reschedule all<\/b>. Arcturus arvutab kogu plaani sekunditega \u00fcmber, joondab selle taas teie prioriteetidega ja iga operaator n\u00e4eb, mida j\u00e4rgmisena teha.<\/p>\n<ul class=\"wp-block-list fx-king__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>\u00dcks vajutus ja kogu plaan on ajakohane<\/b><span class=\"t\">Muudatus kandub l\u00e4bi iga t\u00f6\u00f6keskuse; Arcturus tasakaalustab ajakava sekunditega \u00fcmber.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2l2.4 5 5.5.5-4.2 3.6 1.3 5.4L10 18.6 4.9 16l1.3-5.4L2 7l5.5-.5z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Autopilot hoiab plaani teie eest ajakohasena<\/b><span class=\"t\">L\u00fclitage see sisse ja Arcturus vaatab olukorra \u00fcle iga olulise muudatuse korral: uued tellimused, valmis saanud t\u00f6\u00f6d, katkestused v\u00f5imsuses, materjalide hilinemine. Kui midagi ei muutunud, ei liigu miski. Kui midagi muutus, tehakse sihitud \u00fcmberplaneerimine, kas v\u00f5i kell 2 \u00f6\u00f6sel, kui te magate.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6v2H3v8h14v-8h-1V8a6 6 0 0 0-6-6zm-4 8V8a4 4 0 0 1 8 0v2H6z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Teie piirid, teie kontroll<\/b><span class=\"t\">Lukustage j\u00e4rgmine vahetus v\u00f5i kaitske kindlaid tellimusi. Teie lukustused ja reeglid kehtivad alati, isegi kui Autopilot on sisse l\u00fclitatud.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-king__fact\">Laboratory &amp; Alliedis on umbes 50 t\u00f6\u00f6keskuse kolme kuu plaan valmis v\u00e4hem kui poole tunniga, alates tellimuste sisestamisest kuni valmis optimeeritud ajakavani.<\/p>\n      <\/div>\n\n      <div class=\"fx-king__visual sp-min0\">\n        <div class=\"apx-card\">\n          <div class=\"apx-card__glow\"><\/div>\n          <span class=\"apx-tag\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg>King button<\/span>\n\n          <div class=\"apx-stage\">\n            <div class=\"kbtn\" role=\"img\" aria-label=\"Reschedule all button on the Gantt timeline\">\n              <span class=\"kbtn__main\">\n                <span class=\"kbtn__crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n                <span class=\"kbtn__label\">Reschedule all<\/span>\n              <\/span>\n              <span class=\"kbtn__sep\"><\/span>\n              <span class=\"kbtn__time\">\n                <span class=\"kbtn__clock\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n                <span class=\"kbtn__spin\"><svg viewBox=\"0 0 13 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M3 6l3.5-3.5L10 6M3 12l3.5 3.5L10 12\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n              <\/span>\n            <\/div>\n          <\/div>\n<p class=\"apx-hint\">\u00dcks vajutus ja Arcturus arvutab <b>kogu plaani sekunditega<\/b> \u00fcmber.<\/p>\n\n          <div class=\"apx-or\"><span>v\u00f5i seadistage ja unustage<\/span><\/div>\n\n          <div class=\"apx-auto\">\n            <span class=\"apx-auto__ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <div class=\"apx-auto__txt\">\n              <b>Autopilot<\/b>\n              <span>L\u00fclitage see sisse Reschedule&nbsp;all taimeriikoonilt. Seej\u00e4rel planeerib see automaatselt \u00fcmber, teie piiride piires.<\/span>\n            <\/div>\n            <span class=\"apx-switch\" role=\"img\" aria-label=\"Autopilot on sisse l\u00fclitatud\"><span class=\"apx-switch__knob\"><\/span><\/span>\n          <\/div>\n<p class=\"apx-card__cap\"><span class=\"apx-on\">Sees.<\/span> Arcturus hoiab teie tootmise optimeerituna ka siis, kui olete eemal.<\/p>\n        <\/div>\n      <\/div>\n    <\/div>\n<p class=\"fx-king__tag fx-king__tag--below\">Tootmise ajakava koostamine on nauditav ainult siis, kui te ei pea seda k\u00e4sitsi tegema.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"priorities\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Priority weighting\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-prio\">\n      <div class=\"fx-prio__copy sp-min0\">\n<p class=\"fx-eyebrow\">Prioriteedid, mis juhivad tehisintellekti<\/p>\n<h2 class=\"wp-block-heading\">Te m\u00e4\u00e4rate prioriteedid, Arcturus koostab plaani nende j\u00e4rgi.<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">SkyPlanner kasutab mitmetasandilist prioriteedis\u00fcsteemi, kus isegi prioriteetidel on prioriteedid. Te m\u00e4\u00e4rate, mis on oluline: l\u00e4bimisaeg, valmimiskuup\u00e4evad, kliendi prioriteet, tootmist\u00f6\u00f6 prioriteet, <a href=\"#similar-jobs\">sarnaste t\u00f6\u00f6de koos hoidmine<\/a>. Seej\u00e4rel otsib Arcturus plaani, mis vastab k\u00f5ige paremini teie seatud tasakaalule.<\/p>\n<ul class=\"wp-block-list fx-prio__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 14V8m6 6V4m6 12v-8\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Kaalutud, mitte lihtsalt sisse v\u00f5i v\u00e4lja<\/b><span class=\"t\">Igal reeglil on tugevus, nii et saate funktsioonide sisse- ja v\u00e4ljal\u00fclitamise asemel h\u00e4\u00e4lestada kompromisse.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2v9m0 0l3.5-3.5M10 11L6.5 7.5M4 16h12\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Planeerija juhib, tehisintellekt j\u00e4rgib<\/b><span class=\"t\">Teie prioriteedid suunavad seda, kuidas Arcturus ajakava koostab, mitte vastupidi.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Muutke prioriteeti, planeerige kohe \u00fcmber<\/b><span class=\"t\">Kohandage kaale ja Arcturus arvutab ajakava teie eest \u00fcmber.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-prio__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>Globaalsed reeglid \u00b7 ajakava koostamise prioriteedid<\/span><\/div>\n          <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/24-a92f8f0b-9f2d-43d3-a50a-d2d6cccaab86.png\" alt=\"SkyPlanner globaalsete reeglite paneel: ajakava koostamise prioriteetide loend, l\u00e4bimisaeg, valmimiskuup\u00e4eva j\u00e4rgi j\u00e4rjestatud t\u00f6\u00f6d, iga t\u00f6\u00f6 \u00f5igeaegne valmimine, kliendiprioriteedid, t\u00f6\u00f6de prioriteedid, sarnased t\u00f6\u00f6d j\u00e4rjestikku, iga\u00fchel oma kaaluliugur eri tugevusega.\">\n        <\/figure>\n<p class=\"fx-cap\">Igal ajakava koostamise prioriteedil on oma kaaluliugur. T\u00f5stke v\u00f5i langetage \u00fcht neist ja j\u00e4rgmine plaan peegeldab uut tasakaalu.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"CTA band\" style=\"padding-block:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-ctaband\">\n      <div class=\"fxv-ctaband__lead\">\n<p class=\"fxv-ctaband__t\">Vaadake, kuidas teie enda tellimused niimoodi ajakavasse pannakse. <span>Alustage demoandmetega m\u00f5ne minutiga.<\/span><\/p>\n<p class=\"fxv-ctaband__micro\">30 p\u00e4eva tasuta. Krediitkaarti pole vaja. Alustage lauaarvutis.<\/p>\n      <\/div>\n      <div class=\"fxv-ctaband__actions\">\n        <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Alustage tasuta prooviperioodi<\/a>\n        <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige demo<\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"similar-jobs\" data-screen-label=\"Similar jobs in succession\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Sarnased t\u00f6\u00f6d j\u00e4rjestikku<\/p>\n<h2 class=\"wp-block-heading\">Seadistusaeg ei tooda midagi. V\u00e4hendage seda ajakavas.<\/h2>\n<p>Iga pesu, v\u00e4rvivahetus ja t\u00f6\u00f6riistavahetus on tasustatud aeg ilma v\u00e4ljundita. M\u00e4rgistage oma tooted omadustega, nagu v\u00e4rv, materjal, t\u00f6\u00f6riist v\u00f5i m\u00f5\u00f5de, ja Arcturus paneb \u00fchise omadusega t\u00f6\u00f6d \u00fcksteise j\u00e4rele. V\u00e4rviliin teeb sinise j\u00e4rel sinist, selle asemel et iga t\u00f6\u00f6 vahel pesta, ning press hoiab sama t\u00f6\u00f6riista sees kogu r\u00fchma v\u00e4ltel.<\/p>\n    <\/div>\n\n    <div class=\"fx-shift__points\" style=\"margin-bottom:38px\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12.5V5a2 2 0 0 1 2-2h7.5L21 11.5a2 2 0 0 1 0 2.8l-6.7 6.7a2 2 0 0 1-2.8 0L3 12.5z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><circle cx=\"8\" cy=\"8\" r=\"1.6\" fill=\"currentColor\"><\/circle><\/svg><\/span>\n        <b>Teie m\u00e4\u00e4ratlete, mida sarnane t\u00e4hendab<\/b>\n        <span>Lisage oma toodetele omadusi: v\u00e4rv, materjal, t\u00f6\u00f6riist, vorm, m\u00f5\u00f5de. Iga t\u00f6\u00f6keskus r\u00fchmitab t\u00f6\u00f6d selle omaduse j\u00e4rgi, mis on just seal oluline, ning erinevate t\u00f6\u00f6de vahel kehtib oma \u00fcmberseadistusaeg.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3v18M5 7h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><path d=\"M5 7l-2.5 5.5a3 3 0 0 0 5 0L5 7zm14 0l-2.5 5.5a3 3 0 0 0 5 0L19 7z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M9 21h6\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Kaalutud teie t\u00e4htaegade suhtes<\/b>\n        <span>Sarnased t\u00f6\u00f6d j\u00e4rjestikku on \u00fcks d\u00fcnaamilistest prioriteetidest, mitte j\u00e4ik partiidesse koondamise reegel. Arcturus kaalub s\u00e4\u00e4stetud seadistusaja t\u00e4htaegade, kliendiprioriteetide ja k\u00f5ige muu vastu, mille olete m\u00e4\u00e4ranud, nii et r\u00fchmitamine ei v\u00f5ta plaani vaikselt \u00fcle.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 20V10m5 10V4m5 16v-7m5 7V8\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Rohkem v\u00f5imsust samadest masinatest<\/b>\n        <span>Iga \u00e4raj\u00e4\u00e4nud \u00fcmberseadistus annab minutid tootmisele tagasi. N\u00e4dala jooksul annavad tegemata j\u00e4\u00e4nud pesud ja t\u00f6\u00f6riistavahetused kokku arvestatava lisav\u00f5imsuse, ilma et peaksite ostma \u00fchtegi uut masinat.<\/span>\n      <\/div>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 T\u00f6\u00f6keskuse ajajoon<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/25-dd3d0a31-f2d8-4ba9-98fe-1e65ad7efacd.png\" alt=\"SkyPlanner Gantt ajajoon, mis n\u00e4itab t\u00f6\u00f6pistel j\u00e4rjestikku ajakavastatud sarnaseid t\u00f6id, r\u00fchmitatuna \u00fchise omaduse j\u00e4rgi.\">\n    <\/figure>\n    <div class=\"fxv-capwrap\">\n<p class=\"fx-cap\" style=\"display:inline-flex\">Sama v\u00e4rv, sama t\u00f6\u00f6riist, sama materjal: Arcturus paneb need ritta nii, et t\u00f6\u00f6keskus seadistatakse \u00fcmber \u00fcks kord, mitte viis korda.<\/p>\n      <div>\n        <a class=\"fxv-watchlink\" href=\"https:\/\/www.youtube.com\/watch?v=rW8g5D3ALs4\" target=\"_blank\" rel=\"noopener\">\n          <svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"8\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M8 6.5l5 3.5-5 3.5z\" fill=\"currentColor\"><\/path><\/svg>\n          Vaadake: Sarnased t\u00f6\u00f6d j\u00e4rjestikku (5 min)\n        <\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"routing\" data-screen-label=\"Visual routing editor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-routing__head\">\n<p class=\"fx-eyebrow\">Visuaalne toote- ja projektimodelleerimine<\/p>\n<h2 class=\"wp-block-heading\">Ehitage tooteid ja projekte nii, nagu neid ette kujutate<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">SkyPlanneri visuaalne redaktor v\u00f5imaldab kaardistada, kuidas toode tegelikult valmib (alamtooted, protsessietapid ja nende j\u00e4rgnevus) \u00fchendatud voona. See, mida joonistate, muutub protsessimarsruudiks, mille alusel Arcturus ajakava koostab. Sama redaktor planeerib terveid projekte, mitte ainult \u00fcksiktellimusi, nii et mitmeetapiline t\u00f6\u00f6 paljude s\u00f5ltuvustega p\u00fcsib selge ja seda on lihtne kujundada.<\/p>\n      <div class=\"fx-routing__chips\">\n        <span class=\"fx-chip\">Tooted &amp; terved projektid<\/span>\n        <span class=\"fx-chip\">Alamtooted &amp; koostud<\/span>\n        <span class=\"fx-chip\">Protsessietapid j\u00e4rjestuses<\/span>\n        <span class=\"fx-chip\">Etappide kestused &amp; seadistusajad<\/span>\n        <span class=\"fx-chip\">Etappidevahelised s\u00f5ltuvused<\/span>\n        <span class=\"fx-chip\">\u00dclevaatus enne planeerimist<\/span>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-routing__shot\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n        <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Visuaalne redaktor \u00b7 projekti marsruut<\/span><\/div>\n        <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/26-a17c38a6-0df3-418d-805d-3c293086ebaf.png\" alt=\"SkyPlanneri visuaalne redaktor Project 1001 jaoks: palju protsessietappide kaarte, nagu Sawing, Machining, Welding ja Packing, nooltega \u00fchendatud, vasakul alamtooted, mis \u00fchinevad mitme etapi kaudu paremal olevaks valmis projektiks. Igal kaardil on n\u00e4ha etapi number ja plaanitud kestus.\">\n      <\/figure>\n<p class=\"fx-cap\">Terve projekt \u00fches vaates: iga kaart on protsessietapp ning nooled m\u00e4\u00e4ravad j\u00e4rjekorra, mida alamtooted ja etapid peavad j\u00e4rgima enne projekti valmimist.<\/p>\n    <\/div>\n\n    <div class=\"fx-routing__legend\">\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Selle joonistab teie tiim, mitte tehisintellekt.<\/b> Marsruudid kajastavad seda, kuidas teie tehas toodet tegelikult valmistab, ning mudel j\u00e4\u00e4b teie kontrolli alla.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Alamtooted liiguvad p\u00f5hitootesse.<\/b> Harud \u00fchinevad \u00f5iges j\u00e4rjekorras, nii et koostud ja s\u00f5ltuvused on selgelt m\u00e4\u00e4ratletud.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Enne planeerimist \u00fcle vaadatud.<\/b> Kontrollige marsruuti visuaalselt ja laske seej\u00e4rel Arcturusel selle p\u00f5hjal plaan koostada.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Suurep\u00e4rane projektide, mitte ainult tellimuste jaoks.<\/b> Planeerige mitmeetapilist projektit\u00f6\u00f6d samal visuaalsel viisil ning kui \u00fcks etapp muutub, ajastab Arcturus s\u00f5ltuvuste p\u00f5hjal \u00fcmber, nii et m\u00f5ju kogu projektile j\u00e4\u00e4b n\u00e4htavaks.<\/span><\/div>\n    <\/div>\n\n<p class=\"fx-model__note\" style=\"margin-top:30px\">See on etapp, mille p\u00e4rast uued kasutajad k\u00f5ige rohkem muretsevad. Praktikas joonistate selle: kaardid on protsessietapid, nooled n\u00e4itavad nende j\u00e4rjekorda. Tehisintellekti agent ja meie \u00f5ppevideod juhendavad teid esimese toote loomisel ning soovi korral on saadaval abistatud juurutus, kui soovite seda teha koos eksperdiga.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"mobile\" style=\"background:var(--sp-surface-blue)\" data-screen-label=\"Shop-floor devices\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-dev\">\n      <div class=\"fx-dev__copy sp-min0\">\n<p class=\"fx-eyebrow\">Tsehhis<\/p>\n<h2 class=\"wp-block-heading\">Operaatorid kasutavad seda telefonist v\u00f5i tahvelarvutist<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">Time Logs vaade annab igale operaatorile oma t\u00f6\u00f6j\u00e4rjekorra ja \u00fche puudutusega taimeri, nii et nad saavad t\u00f6\u00f6 k\u00e4ivitada, peatada ja kinnitada otse masina juures, \u00fcksk\u00f5ik millisel tsehhis oleval ekraanil.<\/p>\n<ul class=\"wp-block-list fx-dev__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 5h14M3 10h10M3 15h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>T\u00f6\u00f6j\u00e4rjekord iga t\u00f6\u00f6keskuse kohta<\/b><span class=\"t\">Iga operaator n\u00e4eb ainult oma t\u00f6\u00f6keskuse t\u00f6id planeeritud j\u00e4rjekorras.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"11\" r=\"6.5\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M10 8v3M8 2.5h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>\u00dche puudutusega taimer &amp; kiire logimine<\/b><span class=\"t\">K\u00e4ivitage, peatage ja kinnitage kogused otse masina juures.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Olek liigub tagasi planeerimisse<\/b><span class=\"t\">Iga logi uuendab edenemist ja ajakava reaalajas.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 16l4-4 3 3 6-7\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><path d=\"M3 19h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Logitud tunnid \u00f5petavad s\u00fcsteemi<\/b><span class=\"t\">SkyPlanner prognoosib protsessietappide kestusi teie enda ajaloo p\u00f5hjal, nii et hinnangud muutuvad aja jooksul realistlikumaks.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-dev__media sp-min0\">\n        <div class=\"fx-dev__stage\">\n          <div class=\"fx-phone\">\n            <span class=\"fx-phone__island\"><\/span>\n            <div class=\"fx-phone__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/27-39dbe9c1-81b6-4bc8-ad9c-4ad9e35e26c8.png\" alt=\"SkyPlanner Time Logs telefonis: saagimise t\u00f6\u00f6j\u00e4rjekord suure k\u00e4ivitustaimeri nupuga ja t\u00f6\u00f6kaartidega, mis n\u00e4itavad klienti, t\u00f6\u00f6numbrit, ajastatud tunde ja koguseid.\">\n            <\/div>\n          <\/div>\n          <div class=\"fx-tablet\">\n            <span class=\"fx-tablet__cam\"><\/span>\n            <div class=\"fx-tablet__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/28-f84ab9ff-d5c6-40a2-bb24-0241eda4a6a8.png\" alt=\"SkyPlanner Time Logs tahvelarvutis: kaheveeruline t\u00f6\u00f6kaartide ruudustik, kus iga kaart n\u00e4itab protsessietappi, klienti, t\u00f6\u00f6numbrit ja k\u00e4ivitustaimeri nuppu.\">\n            <\/div>\n          <\/div>\n        <\/div>\n<p class=\"fx-dev__cap fx-cap\" style=\"justify-content:center\">Sama Time Logs vaade, kohandatuna ekraanile, mis igal operaatoril k\u00e4ep\u00e4rast on.<\/p>\n      <\/div>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner on parandanud reaalajas n\u00e4htavust tootmisesse ning v\u00e4hendanud suurel m\u00e4\u00e4ral t\u00f6\u00f6aega, mis tsehhis kaob t\u00f6\u00f6de logimisele ja aruandlusele. Samuti on see m\u00e4rkimisv\u00e4\u00e4rselt parandanud meie laot\u00e4psust ja k\u00f5rvaldanud inimliku vea v\u00f5imaluse tootmise juhtimises.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Jussi Yli-Renko<\/b>, tootmisplaneerimise juht, Piristeel Oy<span class=\"fxv-quote__ctx\">Katuseohutustoodete tootja, Kauhava, Soome<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"dashboards\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Reports &amp; dashboards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Aruanded &amp; juhtpaneelid<\/p>\n<h2 class=\"wp-block-heading\">Looge tootmisvaated, mida te tegelikult soovite<\/h2>\n<p>Lohistamisega koostatav juhtpaneel muudab SkyPlanneri andmed tootmisaruanneteks, mis on teile olulised (koormus, viivitused, t\u00f5husus, tarnekindlus ja muu), paigutatuna nii, nagu teie tiim neid loeb.<\/p>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0 0 28px\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Aruandluse juhtpaneel<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/29-431a8fa8-41b2-437c-9428-38233a3c2dda.png\" alt=\"SkyPlanneri aruandluse juhtpaneel filtrijuhtnuppude ja vidinatega: Capacity ja Load tunnikaardid, Load factor n\u00e4idik, alustatud\/l\u00f5petatud t\u00f6\u00f6d, logitud aja vs capacity ja aktiivsete t\u00f6\u00f6de n\u00e4idikud ning Load factor tulpdiagramm kuup\u00e4eva j\u00e4rgi.\">\n    <\/figure>\n\n    <div class=\"fx-chips\" style=\"margin-bottom:8px\">\n      <span class=\"fx-chip\">Koormus &amp; v\u00f5imsus<\/span><span class=\"fx-chip\">Hilinenud t\u00f6\u00f6d<\/span><span class=\"fx-chip\">T\u00f5husus: planeeritud vs tegelik<\/span><span class=\"fx-chip\">Tarnekindlus<\/span><span class=\"fx-chip\">Pooleliolevad t\u00f6\u00f6d<\/span><span class=\"fx-chip\">OEE<\/span><span class=\"fx-chip\">Kvaliteediaruanded<\/span>\n    <\/div>\n\n    <div class=\"fx-shift__points\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"3.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"3.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"11.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"3.5\" y=\"15.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><\/svg><\/span>\n        <b>Lohistatavad vidinad<\/b>\n        <span>Valige laiast vidinate kogust ja paigutage iga juhtpaneel lohistades, mis tahes kuup\u00e4evavahemiku jaoks.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Juhtpaneel iga inimese jaoks<\/b>\n        <span>Igal kasutajal on oma ning saate luua nii palju erinevaid juhtpaneele, kui vajate.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.8\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M8 20h8M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Kuvage see tootmisekraanil<\/b>\n        <span>K\u00e4ivitage juhtpaneel tsehhi teleris, et jagada tootmise olekut reaalajas.<\/span>\n      <\/div>\n    <\/div>\n\n<p class=\"fx-shift__note\">Kohandatud aruanded, teie kuup\u00e4evavahemikud, teie paigutus. <b>Tootmise n\u00e4htavus, mille seadistate ise<\/b>, ootamata, et keegi teile aruande koostaks.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"capacity\" data-screen-label=\"Model your factory\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">V\u00f5imsus &amp; materjalid<\/p>\n<h2 class=\"wp-block-heading\">Piirid, mille raames Arcturus plaanib<\/h2>\n<p>Tegelikud vahetused ja tegelikud materjalid m\u00e4\u00e4ravad, mida saate p\u00e4riselt toota. Modelleerige m\u00f5lemad \u00fcks kord ning neist saavad piirangud, mida iga ajakava j\u00e4rgib.<\/p>\n    <\/div>\n\n    <div class=\"fx-model\">\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 T\u00f6\u00f6keskuste planeerimine<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/30-6ad607aa-dea2-49ba-b035-25d3a4545b66.png\" alt=\"SkyPlanner t\u00f6\u00f6piste ajastamise kalender: n\u00e4dalavaade ridadega sae, CNC, keevituse ja pakkimise t\u00f6\u00f6piste jaoks, igal p\u00e4eval kuvatakse hommikuse ja \u00f5htuse vahetuse plokk.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"5\" width=\"17\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M3.5 9h17M8 3v4m8-4v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Vahetused &amp; v\u00f5imsus<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Korduvad vahetused, seadistatud \u00fcks kord:<\/b> hommikused ja \u00f5htused vahetused korduvad n\u00e4dalats\u00fcklis, vaikev\u00e4\u00e4rtusi pole vaja uuesti luua.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Erandid kalendris:<\/b> lisage, muutke v\u00f5i eemaldage vahetusi p\u00fchade, \u00fclet\u00f6\u00f6 v\u00f5i rikke jaoks.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>M\u00e4\u00e4rake inimesed, saage graafikud:<\/b> valige, kes igas vahetuses t\u00f6\u00f6tab, ning inimeste ja masinate graafikud luuakse automaatselt.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ladu<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/31-d5ae0129-5aed-432b-afeb-e7c30c7842c1.png\" alt=\"SkyPlanner lao toodete ja materjalide loend, kus laoveerus kuvatakse kumulatiivsed saldod, enamik ridu on rohelised ja kaks negatiivset rida on punasega esile t\u00f5stetud.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 7l8-4 8 4v10l-8 4-8-4z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M4 7l8 4 8-4M12 11v10\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Materjalid &amp; laoseis<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Saldod, piirm\u00e4\u00e4rad ja ostmine:<\/b> kumulatiivne laoseis, hoiatuspiirm\u00e4\u00e4rad ja ostutellimused \u00fches kohas.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Tulevane laoseis, simuleeritud:<\/b> planeerimine arvutab tulevased laotasemed ette laoseisu, ostutellimuste, reserveeringute ja tarbimise p\u00f5hjal.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Reageerib materjalide viivitustele:<\/b> kui tarne hilineb, liigutab Arcturus tootmist\u00f6\u00f6 ajale, mil materjalid on saadaval.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n<p class=\"fx-model__note\">Koos moodustavad v\u00f5imsus ja materjalid piirid, <b>mille raames Arcturus ajastab<\/b>, nii et \u00fcks l\u00fchike vahetus v\u00f5i \u00fcks hilinenud tarne ei k\u00e4ivita kogu plaanis doominoefekti.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"delivery\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Delivery dates\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">M\u00fc\u00fck ja tootmine, \u00fcks ajakava<\/p>\n<h2 class=\"wp-block-heading\">Lubage tarnekuup\u00e4evi, millest saate kinni pidada<\/h2>\n<p>Lisage m\u00fc\u00fcgiv\u00f5imalus simuleeritud tellimusena ja Arcturus planeerib selle teie tegeliku koormuse, tootmisv\u00f5imsuse ja materjalide alusel ajakavasse. M\u00fc\u00fck n\u00e4eb realistlikku tarnekuup\u00e4eva enne millegi lubamist ning saab soovi korral selle jaoks tootmisv\u00f5imsust reserveerida. Kui tehing teoks saab, saab m\u00fc\u00fcgiv\u00f5imalusest \u00fche olekumuudatusega tootmistellimus. Fredman Operationsis lubab m\u00fc\u00fck n\u00fc\u00fcd tarnekuup\u00e4evi, n\u00e4hes tootmisv\u00f5imsust kuus kuud ette, ning uus hinnapakkumine, mis varem n\u00f5udis tund aega k\u00e4sitsi arvutamist, tuleb s\u00fcsteemist sekunditega.<\/p>\n    <\/div>\n    <div class=\"fxv-deliver\">\n      <div class=\"fxv-deliver__copy sp-min0\">\n<ul class=\"wp-block-list fxv-deliver__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Pakkuge kuup\u00e4evi tegeliku ajakava, mitte oletuste p\u00f5hjal.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Vaadake, mida kiirtellimuse vastuv\u00f5tmine teeb k\u00f5igi teiste lubadustega.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Tarnekindlus on tulemus, mida kliendid esimesena m\u00e4rkavad.<\/span><\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fxv-deliver__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 M\u00fc\u00fcgiv\u00f5imaluste ajastamine<\/span><\/div>\n          <img decoding=\"sync\" loading=\"lazy\" width=\"2056\" height=\"890\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/32-08986976-4342-44ff-a97f-fa730beb26c8.png\" alt=\"SkyPlanner Gantt ajatelg, kus m\u00fc\u00fcgiv\u00f5imalus on ajastatud simuleeritud tellimusena: sae, CNC, keevituse ja pakkimise t\u00f6\u00f6piste read n\u00e4itavad ajastatud tootmist\u00f6\u00f6de ribasid, hilinenud t\u00f6\u00f6d on m\u00e4rgitud punasega ning sinisega esile t\u00f5stetud simuleeritud t\u00f6\u00f6 n\u00e4itab, kuhu see plaanis paigutuks.\">\n        <\/figure>\n      <\/div>\n    <\/div>\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">V\u00e4\u00e4rtus, mida SkyPlanner meile toob, seisneb selles, et see on t\u00f6\u00f6riist, mis toimib igap\u00e4evases kasutuses, eriti tarnekuup\u00e4evade m\u00e4\u00e4ramisel.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, tootmise planeerimise juht, Eskomatic Oy<span class=\"fxv-quote__ctx\">Lepinguline mehaaniline t\u00f6\u00f6tlemine, Turku, Soome<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"roles\" data-screen-label=\"Role value\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Loodud igale ajakavas osalevale meeskonnale<\/p>\n<h2 class=\"wp-block-heading\">\u00dcks ajakava k\u00f5igile kaasatud meeskondadele<\/h2>\n<p>Neli meeskonda nelja erineva eesm\u00e4rgiga (planeerimine, j\u00e4relevalve, teostus ja integratsioon), kes t\u00f6\u00f6tavad sama ajakava alusel.<\/p>\n    <\/div>\n    <div class=\"fx-roles\">\n\n      <article class=\"fx-role\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 5h18M3 12h12M3 19h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><circle cx=\"19\" cy=\"17\" r=\"3\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><\/svg><\/span>\n<p class=\"fx-role__role\">Tootmise planeerija<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Koostage realistlik plaan, ajastage \u00fcmber, kui tegelikkus muutub, ning hoidke kontrolli prioriteetide ja lukustuste \u00fcle.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Gantt-vaate kohandamine lohistades<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>D\u00fcnaamilised prioriteedid &amp; \u00fclesannete lukustused<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>V\u00f5rrelge ja kinnitage uusi plaane<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Vaadake planeerija t\u00f6\u00f6voogu <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--green\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 20V10m6 10V4m6 16v-7m6 7V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Tootmisjuht<\/p>\n        <\/div>\n<p class=\"fx-role__out\">N\u00e4ete koormust, viivitusi, pudelikaelu ja plaanimuudatusi enne, kui need probleeme tekitavad.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>V\u00f5imsuse ja kasutusm\u00e4\u00e4ra n\u00e4htavus<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Hilinenud \/ ajastatud \/ ajastamata olek<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Kiirem reageerimine h\u00e4iretele<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Vaadake \u00fclevaadet tootmisest <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--orange\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"12\" cy=\"12\" r=\"8\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M12 8v4l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Tsehhi meeskond<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Teadke, mida j\u00e4rgmisena teha, k\u00e4ivitage ja peatage t\u00f6\u00f6 ning hoidke olek ajakohasena.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Selge j\u00e4rgmise \u00fclesande t\u00f6\u00f6j\u00e4rjekord<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Tootmise taimer ja kiire logimine<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Reaalajas edenemise tagasiside<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#mobile\">Vaadake tsehhi t\u00f6\u00f6voogu <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--purple\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M9 6a3 3 0 11-6 0 3 3 0 016 0zm12 12a3 3 0 11-6 0 3 3 0 016 0zM6 9v3a3 3 0 003 3h6\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">IT \/ ERP vastutaja<\/p>\n        <\/div>\n<p class=\"fx-role__out\">\u00dchendage ajastamine olemasolevate s\u00fcsteemidega, et SkyPlanner ei muutuks planeerimissiloks.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>REST API ja webhook\u2019id<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>CSV \/ andmete import<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Projektip\u00f5hised integratsiooniteenused<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#integrations\">Vaadake integratsioonivoogu <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Tarnekindlus, nii sisemine kui ka v\u00e4line, on p\u00e4rast SkyPlanneri kasutuselev\u00f5ttu m\u00e4rkimisv\u00e4\u00e4rselt paranenud. SkyPlanner on kogu tootmise praktiliselt igas m\u00f5ttes selgemaks muutnud.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Mikko Jokitalo<\/b>, tootmise planeerija, Piristeel Oy<span class=\"fxv-quote__ctx\">Katuseohutuse tootja, Kauhava, Soome<\/span><\/figcaption>\n    <\/figure>\n\n    <div class=\"sp-btn-toolbar\" style=\"margin-top:36px\">\n      <a class=\"sp-btn sp-btn--green\" href=\"#start\">Alustage tasuta prooviperioodi<\/a>\n      <a class=\"sp-btn sp-btn--outline\" href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige live-demo<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"cases\" data-screen-label=\"In daily use\" style=\"padding-block:var(--sp-space-20)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Igap\u00e4evases kasutuses<\/p>\n<h2 class=\"wp-block-heading\">Tootjad, kes t\u00f6\u00f6tavad SkyPlanneri abil<\/h2>\n<p>Pereettev\u00f5tetest masinat\u00f6\u00f6kodadest Soomes kuni Keenia suurima ravimitootjani.<\/p>\n    <\/div>\n    <div class=\"fxv-cases__grid fxv-cases__grid--four\">\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Laboratory &amp; Allied Limited<\/p>\n<p class=\"fxv-case__meta\">Ravimit\u00f6\u00f6stus \u00b7 ~1000 t\u00f6\u00f6tajat \u00b7 SkyPlanner alates 2025<\/p>\n<p class=\"fxv-case__body\">90% t\u00f5husam tootmine ja 50% parem \u00f5igeaegne tarne.<\/p>\n        <span class=\"fxv-vh\">Lugege lugu<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Piristeel Oy<\/p>\n<p class=\"fxv-case__meta\">Katuseohutustooted \u00b7 ~100 t\u00f6\u00f6tajat \u00b7 SkyPlanner alates 2023<\/p>\n<p class=\"fxv-case__body\">99,2% tarnekindlus ja kuni neli tundi planeerimist\u00f6\u00f6d kokku hoitud iga p\u00e4ev.<\/p>\n        <span class=\"fxv-vh\">Lugege lugu<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Eskomatic Oy<\/p>\n<p class=\"fxv-case__meta\">Lepinguline mehaaniline t\u00f6\u00f6tlus \u00b7 88 t\u00f6\u00f6tajat \u00b7 SkyPlanner alates 2021<\/p>\n<p class=\"fxv-case__body\">V\u00e4hem materjalipuudusest tingitud seisakuid ja t\u00e4psemad tarnekuup\u00e4evad klientidele.<\/p>\n        <span class=\"fxv-vh\">Lugege lugu<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Fredman Operations Oy<\/p>\n<p class=\"fxv-case__meta\">Toidupakendid \u00b7 ~70 t\u00f6\u00f6tajat \u00b7 SkyPlanner alates 2025<\/p>\n<p class=\"fxv-case__body\">M\u00fc\u00fck lubab tarnekuup\u00e4evi kuus kuud ette n\u00e4htava tootmisv\u00f5imsuse p\u00f5hjal.<\/p>\n        <span class=\"fxv-vh\">Lugege lugu<\/span>\n      <\/article>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"assistant\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"SkyPlanner Agent\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-assist\">\n      <div class=\"fx-assist__copy sp-min0\">\n<p class=\"fx-eyebrow\">SkyPlanner Agent<span class=\"fx-assist__beta\">BETA<\/span><\/p>\n<h2 class=\"wp-block-heading\">Juhtige SkyPlannerit lihtsalt k\u00fcsides<\/h2>\n<p class=\"fx-head__lead\" style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0 0 24px\">Paluge agendil lihtsate s\u00f5nadega luua tellimus, kontrollida tootmise olekut v\u00f5i ajastada ajastamata tootmist\u00f6id. See teeb \u00fclesande \u00e4ra ja n\u00e4itab teile t\u00e4pselt, mida ta tegi. Samuti selgitab see, kuidas SkyPlanner t\u00f6\u00f6tab, ja aitab seda seadistada, et saaksite tarkvara kasutada k\u00fcsides, mitte men\u00fc\u00fcdes otsides.<\/p>\n<ul class=\"wp-block-list fx-assist__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>See teeb p\u00e4ris t\u00f6\u00f6d teie p\u00e4ringu peale<\/b><span class=\"t\">Looge tellimusi, kontrollige olekut, ajastage tootmist\u00f6id. Agent tegutseb ja annab seej\u00e4rel teada, mida ta muutis.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 10a3 3 0 1 0 0-6 3 3 0 0 0 0 6zM3 17a7 7 0 0 1 14 0\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>K\u00f5igile, mitte ainult igap\u00e4evastele kasutajatele<\/b><span class=\"t\">Juhid ja tippjuhid saavad k\u00fcsida otse, selle asemel et \u00f5ppida selgeks iga men\u00fc\u00fc ja seadistus.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6c0 4 6 10 6 10s6-6 6-10a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/path><circle cx=\"10\" cy=\"8\" r=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><\/svg><\/span>\n            <span><b>See \u00f5petab ja seadistab t\u00f6\u00f6 k\u00e4igus<\/b><span class=\"t\">Ekspert, kes selgitab SkyPlannerit, aitab seda seadistada ja teeb uute kasutajate kasutuselev\u00f5tu lihtsamaks.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"7.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><path d=\"M10 6v4l2.5 2\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Saadaval \u00f6\u00f6p\u00e4evaringselt, teie keeles<\/b><span class=\"t\">See m\u00e4letab teie tootmiskonteksti ja vastab keeles, mida teie tiim r\u00e4\u00e4gib, 24\/7.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-assist__guard\">Agent tegutseb teie p\u00e4ringu alusel ja n\u00e4itab, mida ta tegi, nii et kontroll j\u00e4\u00e4b teie k\u00e4tte. See toetab teie tiimi. See ei juhi tehast iseseisvalt.<\/p>\n      <\/div>\n\n      <div class=\"fx-assist__panel-wrap sp-min0\">\n        <div class=\"fx-assist__shot\">\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/33-0298ed80-92e8-41bf-aaf2-843615249f53.png\" alt=\"SkyPlanner Agent vestluspaneel. Kasutaja k\u00fcsib: \u201eKas saad luua uue tellimuse tootele P-2 kliendile ACME Ltd tarneajaga kaks n\u00e4dalat?\u201d Agent vastab, et l\u00f5i tellimuse, loetledes tellimuse numbri, kliendi, toote, tarnekuup\u00e4eva ning selle, et protsessietapid ja alam\u00fcksused lisati automaatselt, seej\u00e4rel pakub tellimuse \u00fcksikasju kontrollida v\u00f5i selle ajakavastamiseks ette valmistada.\">\n        <\/div>\n<p class=\"fx-cap\" style=\"text-align:center;max-width:384px;margin-left:auto;margin-right:auto\">K\u00fcsige lihtsate s\u00f5nadega. Siin loob agent uue tellimuse ja loetleb t\u00e4pselt, mida ta seadistas.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"integrations\" data-screen-label=\"Integration dataflow\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Integratsiooni andmevoog<\/p>\n<h2 class=\"wp-block-heading\">Mitte enam \u00fchtegi planeerimissilot<\/h2>\n<p>Kasutage seda eraldiseisvalt, imporditud andmetega v\u00f5i \u00fchendatuna olemasolevate s\u00fcsteemidega REST API, webhook\u2019ide, andmeimpordi ja projektip\u00f5histe integratsiooniteenuste kaudu. Laboratory &amp; Allied \u00fchendas SkyPlanneri <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/\">SAP Business One<\/a> on HANA ja Power BI-ga suuresti iseseisvalt; andmevoogude kaardistamine oli nende IT-tiimile kiire t\u00f6\u00f6.<\/p>\n    <\/div>\n\n    <div class=\"fx-data\">\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">Andmed sisse<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 MES \u00b7 CSV \u00b7 K\u00e4sitsi<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Tellimused &amp; n\u00f5udlus<\/li>\n<li>Tooted &amp; struktuurid<\/li>\n<li>Materjalid &amp; laoseis<\/li>\n<li>Kliendid &amp; t\u00e4htajad<\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fx-data__col fx-data__col--mid\">\n<p class=\"fx-data__lab\">SkyPlanner APS<\/p>\n<h3 class=\"wp-block-heading\">Koostab tootmise ajakava<\/h3>\n        <div class=\"fx-data__chips\">\n          <span>Tellimused<\/span><span>Tooted<\/span><span>Materjalid<\/span><span>T\u00f6\u00f6keskused<\/span><span>Protsessietapid<\/span><span>Tootmisv\u00f5imsus<\/span><span>Prioriteedid<\/span><span>Ajakava<\/span>\n        <\/div>\n      <\/div>\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">\u00dclevaade v\u00e4lja<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 Aruanded \u00b7 Juhtkond<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Planeeritud algus- ja l\u00f5puajad<\/li>\n<li>Ajalogid<\/li>\n<li>Edenemine ja olek<\/li>\n<li>Ajakava uuendused ja aruandlus<\/li>\n        <\/ul>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-data__methods\">\n      <span>REST API<\/span><span>Webhook\u2019id<\/span><span>CSV \/ andmete import<\/span><span>Projektip\u00f5hised integratsiooniteenused<\/span>\n    <\/div>\n\n    <div class=\"fx-logos\">\n<p class=\"fx-logos__lab\">N\u00e4ited s\u00fcsteemidest, mida tootjad kasutavad koos SkyPlanneriga. Integratsioon tarnitakse projektip\u00f5hiselt ega ole iga s\u00fcsteemi jaoks sertifitseeritud natiivne \u00fchendus.<\/p>\n      <div class=\"fx-logos__row\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/03-7588ca1b-9f98-41a8-afd1-d0ff541ae494.png\" alt=\"SAP\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/04-feb7074e-04ff-4289-8ddc-738277a8e35a.png\" alt=\"Microsoft Dynamics 365\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/08-f0ebc421-8270-403b-95ef-baaf46819cc2.png\" alt=\"Odoo\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/06-3fd1befa-779f-4179-9c01-91c641a429ec.png\" alt=\"Epicor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/05-6211607b-8b7f-45d4-b974-3ee857676e36.png\" alt=\"Infor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/07-e69be7b0-1bb8-4540-836f-b148c41d60db.png\" alt=\"Sage\">\n      <\/div>\n<p class=\"fx-logos__note\">Kolmandate osapoolte nimed ja logod on n\u00e4idatud ainult faktilise integratsiooni \/ \u00fchilduvuse kontekstina. Need ei t\u00e4henda partnerlust, sertifitseerimist ega heakskiitu.<\/p>\n    <\/div>\n\n    <div style=\"text-align:center;margin-top:36px\">\n      <a class=\"sp-btn sp-btn--blue\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/\">Tutvuge integratsioonidega<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"compare\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Comparison\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Miks mitte lihtsalt planeerida Excelis, ERP-s v\u00f5i projektit\u00f6\u00f6riistas?<\/p>\n<h2 class=\"wp-block-heading\">Loodud ajakava koostamiseks, mitte ainult j\u00e4lgimiseks<\/h2>\n<p>Arvutustabelid, ERP\/MES ja projektit\u00f6\u00f6riistad teevad iga\u00fcks oma osa. SkyPlanner on loodud just piiratud v\u00f5imsusega ja materjalidega arvestavaks planeerimiseks, milleks need t\u00f6\u00f6riistad pole m\u00f5eldud.<\/p>\n    <\/div>\n\n    <div class=\"fx-compare-wrap\">\n<table class=\"fx-compare\">\n<thead>\n<tr>\n            <th><\/th>\n            <th>Excel \/ tabelid<\/th>\n            <th>ERP \/ MES<\/th>\n            <th>Projektit\u00f6\u00f6riistad<\/th>\n            <th class=\"fx-compare__sp\"><span class=\"fx-compare__sp-name\">SkyPlanner APS<\/span><span class=\"fx-compare__sp-tag\">Eriotstarbeline ajakava koostamine<\/span><\/th>\n          <\/tr>\n        <\/thead>\n<tbody>\n<tr>\n            <th>Piiratud v\u00f5imsusega planeerimine <span style=\"font-weight:400;color:var(--sp-text-muted)\">(v\u00f5imsust ei planeerita kunagi \u00fcle)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Piiratud<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Reageerib muutustele <span style=\"font-weight:400;color:var(--sp-text-muted)\">(\u00fcmberplaneerimine sekunditega, mitte k\u00e4sitsi \u00fcmbertegemine)<\/span><\/th>\n            <td><span class=\"fx-part\">K\u00e4sitsi<\/span><\/td>\n            <td><span class=\"fx-part\">Pakkt\u00f6\u00f6tlus<\/span><\/td>\n            <td><span class=\"fx-part\">K\u00e4sitsi<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Materjalidega arvestav ajakava koostamine <span style=\"font-weight:400;color:var(--sp-text-muted)\">(laoseis, ostutellimused, tulevased saldod)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Ainult laoseis<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Tsehhi tagasiside uuendab plaani reaalajas<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Oleneb<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Kaalutud prioriteedid ja kompromissid<\/th>\n            <td><span class=\"fx-part\">K\u00e4sitsi<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">P\u00f5hitasemel<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Seadistusajad, t\u00f6\u00f6riistad, allt\u00f6\u00f6v\u00f5tjad ja partiit\u00f6\u00f6d modelleeritud<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Osaline<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Tarnekuup\u00e4eva simulatsioon m\u00fc\u00fcgiv\u00f5imaluste jaoks<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Aeg esimese ajakavani <span style=\"font-weight:400;color:var(--sp-text-muted)\">(minutid demoandmetega, mitte kuudepikkune projekt)<\/span><\/th>\n            <td><span class=\"fx-part\">Kiire, k\u00e4sitsi<\/span><\/td>\n            <td><span class=\"fx-part\">Kuud<\/span><\/td>\n            <td><span class=\"fx-part\">P\u00e4evad<\/span><\/td>\n            <td class=\"fx-compare__sp\"><span style=\"font-family:var(--sp-font-medium)\">Minutid<\/span><\/td>\n          <\/tr>\n        <\/tbody>\n      <\/table>\n    <\/div>\n<p class=\"fx-compare__hint\">V\u00e4ikestel ekraanidel kerige tabelit k\u00fclgsuunas. V\u00f5rdlus kajastab t\u00fc\u00fcpilist kasutust, mitte \u00fchtki konkreetset toodet.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"allfeatures\" data-screen-label=\"Every capability\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<h2 class=\"wp-block-heading\">Mida SkyPlanner teeb<\/h2>\n<p>L\u00fchike nimekiri. Kui te ei leia, mida vajate, k\u00fcsige meilt. K\u00f5ik ei mahu \u00fchele lehele.<\/p>\n    <\/div>\n    <div class=\"fxv-az\">\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Alternatiivsed t\u00f6\u00f6keskused.<\/b><span class=\"az-d\">Tootmist\u00f6\u00f6 v\u00f5ib toimuda igas sobivas t\u00f6\u00f6keskuses, nii et Arcturus kasutab seda, mis vabaneb esimesena.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>\u00dcmberplaneerimine Autopilotiga.<\/b><span class=\"az-d\">Plaan uuendab end iga olulise muudatuse korral, teie seatud piirides.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Partiit\u00f6\u00f6de ajastamine.<\/b><span class=\"az-d\">Mitme tellimuse osad, mida t\u00f6\u00f6deldakse koos, ajastatakse \u00fche tootmist\u00f6\u00f6na.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Bulldozer.<\/b><span class=\"az-d\">Hoiab alustamata t\u00f6\u00f6 minevikust eemal, l\u00fckates selle edasi praegusesse hetke.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>V\u00f5imsuse planeerimine ja korduvad vahetused.<\/b><span class=\"az-d\">Vahetused korduvad n\u00e4dalase ts\u00fcklina ja m\u00e4\u00e4ravad, kui palju saate toota.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Ajakavade v\u00f5rdlus.<\/b><span class=\"az-d\">Vaadake pakutud plaan enne kinnitamist praeguse plaaniga k\u00f5rvuti \u00fcle.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>CSV ja andmete import.<\/b><span class=\"az-d\">Tooge tellimused, tooted ja materjalid sisse ilma integratsiooniprojektita.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Kohandatud juhtpaneelid ja aruanded.<\/b><span class=\"az-d\">Looge soovitud tootmisvaated lohistatavate vidinatega.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Lohistatav Gantt-ajajoon.<\/b><span class=\"az-d\">Liigutage, lukustage ja kohandage tootmist\u00f6id k\u00e4sitsi otse ajateljel.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Kestuse prognoosimine ajalogi p\u00f5hjal.<\/b><span class=\"az-d\">Hinnangulised etappide ajad muutuvad teie enda ajaloo p\u00f5hjal realistlikumaks.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>D\u00fcnaamilised mitmetasandilised prioriteedid.<\/b><span class=\"az-d\">Kaaluge l\u00e4bimisaega, t\u00e4htaegu, kliente ja tootmist\u00f6id, et plaani suunata.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>T\u00f5hususkoefitsiendid.<\/b><span class=\"az-d\">M\u00e4\u00e4rake tempo t\u00f6\u00f6keskuse, t\u00f6\u00f6taja v\u00f5i vahetuse kohta, et plaan vastaks tegelikkusele.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Materjalidega arvestav ajakava koostamine.<\/b><span class=\"az-d\">Laoseis, ostutellimused ja tulevased saldod kujundavad seda, millal tootmist\u00f6\u00f6 saab toimuda.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Mobiilne aja registreerimine.<\/b><span class=\"az-d\">Operaatorid k\u00e4ivitavad, peatavad ja kinnitavad t\u00f6\u00f6 telefonist v\u00f5i tahvelarvutist.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Tellimuste planeerimise suunad.<\/b><span class=\"az-d\">Planeerige edasi t\u00e4nasest v\u00f5i tagasi t\u00e4htajast.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Protsessietapi valmidusaste.<\/b><span class=\"az-d\">Alustage j\u00e4rgmist etappi n\u00e4iteks siis, kui eelmisest on valmis 10%.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>REST API ja webhook\u2019id.<\/b><span class=\"az-d\">\u00dchendage SkyPlanner oma s\u00fcsteemidega m\u00f5lemas suunas.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Jooksva aja lukustus.<\/b><span class=\"az-d\">Lukustage plaani j\u00e4rgmised tunnid, et need p\u00fcsiksid paigal.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>M\u00fc\u00fcgiv\u00f5imaluste ajastamine.<\/b><span class=\"az-d\">Simuleerige hinnapakkumist tegeliku koormuse suhtes, et lubada kuup\u00e4ev, millest saate kinni pidada.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Seadistus- ja mahav\u00f5tuaja optimeerimine.<\/b><span class=\"az-d\">J\u00e4rjestage tootmist\u00f6\u00f6d nii, et \u00fcmberseadistusaeg nende vahel v\u00e4heneks.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Sarnased t\u00f6\u00f6d j\u00e4rjestikku.<\/b><span class=\"az-d\">R\u00fchmitage tootmist\u00f6\u00f6d, millel on \u00fchine v\u00e4rv, t\u00f6\u00f6riist v\u00f5i materjal, et \u00fcmberseadistusi oleks v\u00e4hem.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>SkyPlanner Agent (BETA).<\/b><span class=\"az-d\">K\u00fcsige lihtsas keeles, et k\u00e4ivitada \u00fclesandeid, kontrollida olekut ja \u00f5ppida tarkvara kasutama.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Allt\u00f6\u00f6v\u00f5tjate ajastamine.<\/b><span class=\"az-d\">V\u00e4line t\u00f6\u00f6 planeeritakse voos nagu iga teine t\u00f6\u00f6keskus.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>\u00dclesannete ja tellimuste lukustused.<\/b><span class=\"az-d\">Kinnitage k\u00f5ik, mis ei tohi liikuda, ja plaan arvestab sellega.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>T\u00f6\u00f6riistade ja vormide haldus.<\/b><span class=\"az-d\">Jagatud t\u00f6\u00f6riist v\u00f5i vorm ei saa olla kahes kohas korraga.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Kasutajarollid ja \u00f5igused.<\/b><span class=\"az-d\">Andke igale inimesele ligip\u00e4\u00e4s, mida tema t\u00f6\u00f6 vajab.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>29 keelt.<\/b><span class=\"az-d\">Teie tiim t\u00f6\u00f6tab keeles, mida nad r\u00e4\u00e4givad.<\/span><\/div><\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"start\" data-screen-label=\"Implementation ladder\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Alustage lihtsalt ja laiendage, kui v\u00e4\u00e4rtus on end t\u00f5estanud<\/p>\n<h2 class=\"wp-block-heading\">Alustage v\u00e4ikeselt, \u00fchendage siis, kui olete valmis<\/h2>\n<p>SkyPlanner saab alustada eraldiseisva planeerimiskeskkonnana ja kasvada \u00fchendatud tootmise ajakava koostamise t\u00f6\u00f6vooks.<\/p>\n    <\/div>\n\n    <div class=\"fx-ladder\">\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">1<\/div>\n<p class=\"fx-rung__t\">Proovige demoandmetega<\/p>\n<p class=\"fx-rung__b\">Vaadake Gantt-ajajoont n\u00e4idistellimustega.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">2<\/div>\n<p class=\"fx-rung__t\">Modelleerige t\u00f6\u00f6keskusi &amp; etappe<\/p>\n<p class=\"fx-rung__b\">Kirjeldage oma tegelikke t\u00f6\u00f6keskusi ja protsessivoogu.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">3<\/div>\n<p class=\"fx-rung__t\">Looge v\u00f5i importige tellimusi<\/p>\n<p class=\"fx-rung__b\">Lisage k\u00e4sitsi v\u00f5i importige CSV-st.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">4<\/div>\n<p class=\"fx-rung__t\">Ajastage &amp; vaadake \u00fcle<\/p>\n<p class=\"fx-rung__b\">K\u00e4ivitage Arcturus, vaadake plaan \u00fcle ja kohandage seda.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">5<\/div>\n<p class=\"fx-rung__t\">Lisage s\u00fcgavust<\/p>\n<p class=\"fx-rung__b\">Materjalid, t\u00f6\u00f6riistad, prioriteedid ja t\u00f6\u00f6logimine tsehhis.<\/p>\n<\/div>\n      <div class=\"fx-rung fx-rung--last\"><div class=\"fx-rung__dot\">6<\/div>\n<p class=\"fx-rung__t\">\u00dchendage ERP \/ MES<\/p>\n<p class=\"fx-rung__b\">Integreerige siis, kui olete valmis, mitte varem.<\/p>\n<\/div>\n    <\/div>\n\n    <div class=\"fxv-paths\">\n      <div class=\"fxv-path fxv-path--primary\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3l8 4.5v9L12 21l-8-4.5v-9L12 3z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><path d=\"M12 12l8-4.5M12 12v9M12 12L4 7.5\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Tehke seda ise<\/h3>\n<p class=\"fxv-path__b\">Tasuta 30-p\u00e4evane prooviperiood iseseisva kasutuselev\u00f5tuga kuni 20 t\u00f6\u00f6keskusele. Demoandmed, videod ja tehisintellekti agent on kaasas.<\/p>\n        <a class=\"sp-btn sp-btn--green fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Tehke seda koos meiega<\/h3>\n<p class=\"fxv-path__b\">Toega kasutuselev\u00f5tt: ekspert kavandab seadistuse koos teiega, impordib andmed ja koolitab teie meeskonda. K\u00f5ige levinum valik suuremate tootmiste puhul.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/et\/toetatud-kasutuselevotu-teenused\/\">Vaadake toega kasutuselev\u00f5ttu<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a6 6 0 0 0-6 6c0 4.5 6 12 6 12s6-7.5 6-12a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><circle cx=\"12\" cy=\"8\" r=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Tehke seda kohaliku partneriga<\/h3>\n<p class=\"fxv-path__b\">SkyPlanneri partnerid ja eksperdid on saadaval enam kui 30 riigis.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">K\u00fcsi kohalikku partnerit<\/a>\n      <\/div>\n    <\/div>\n<p class=\"fxv-pathnote\">30 p\u00e4eva tasuta. Krediitkaarti pole vaja. Alustage lauaarvutis. Iseseisev kasutuselev\u00f5tt katab kuni 20 t\u00f6\u00f6keskust; suuremad tootmised l\u00e4bivad toega kasutuselev\u00f5tu.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\" data-screen-label=\"FAQ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">K\u00fcsimused, mida ostjad k\u00fcsivad<\/p>\n<h2 class=\"wp-block-heading\">K\u00fcsimused, millele tasub varakult vastata<\/h2>\n    <\/div>\n    <div class=\"sp-faq fx-faq\">\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kas vajame alustamiseks ERP-integratsiooni?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ei. SkyPlanner t\u00f6\u00f6tab eraldiseisvalt. Saate tellimused sisestada v\u00f5i importida need CSV-st ning \u00fchendada oma ERP hiljem REST API, webhook\u2019ide v\u00f5i integratsiooniprojekti kaudu. Paljud kliendid t\u00f6\u00f6tavad esimestel kuudel ilma \u00fchegi integratsioonita.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kui kaua l\u00e4heb, kuni n\u00e4eme oma tootmist ajakavas?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Demoandmetega m\u00f5ne minutiga. Oma andmete puhul tuleb kirjeldada t\u00f6\u00f6keskused, vahetused ja tooted koos protsessietappidega. Lihtne tootmine mahub \u00fchte p\u00e4eva, keerukamad seadistused v\u00f5tavad kauem aega. Sisseehitatud tehisintellekti agent, \u00f5ppevideod ja alustamisjuhend aitavad teid samm-sammult ning toega kasutuselev\u00f5tt on saadaval, kui eelistate teha seda koos eksperdiga.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kas tehisintellekt muudab minu plaani k\u00fcsimata?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ainult teie seatud piirides. Saate lukustada mis tahes \u00fclesande v\u00f5i tellimuse, k\u00fclmutada j\u00e4rgmised tunnid v\u00f5i vahetused jooksva aja lukustusega ning v\u00f5rrelda uut plaani enne selle kinnitamist. Autopilot on valikuline ja isegi siis, kui see on sisse l\u00fclitatud, j\u00e4\u00e4vad teie lukud ja reeglid alati kehtima.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kuidas Arcturus teab, mida meie tootmine saab ja ei saa teha?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Kirjeldate seda \u00fcks kord: t\u00f6\u00f6keskusi, vahetusi, protsessietappe ja nende j\u00e4rjekorda, seadistus- ja mahav\u00f5tuaegu, materjale, t\u00f6\u00f6riistu ja allt\u00f6\u00f6v\u00f5tjaid. Arcturus k\u00e4sitleb k\u00f5ike seda rangete piirangutena ja planeerib nende sees.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kui palju SkyPlanner maksab?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Paketid algavad 199&nbsp;\u20ac kuus ja sisaldavad 5 t\u00f6\u00f6keskust. Praegused paketid, nende sisu ja lisat\u00f6\u00f6keskuste hinna leiate hinnakirja lehelt.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kas meie tootmisandmeid kasutatakse tehisintellekti mudelite treenimiseks?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ei. Arcturus ei vaja teie andmetel treenimist ja seda ei treenita t\u00f6\u00f6 k\u00e4igus \u00fcmber kliendiandmetel. Ajastamine t\u00f6\u00f6tab teie enda tootmismudeli ja reeglite alusel.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Meie tootmine on keeruline. Allt\u00f6\u00f6v\u00f5tjad, jagatud vormid, partiit\u00f6\u00f6d. Kas SkyPlanner saab sellega hakkama?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Jah, need on nimetatud funktsioonid, mitte ajutised lahendused. Allt\u00f6\u00f6v\u00f5tjaid ajastatakse nagu t\u00f6\u00f6pisteid, t\u00f6\u00f6riistad ja vormid ei saa olla korraga kahes kohas ning partiit\u00f6\u00f6d, mis \u00fchendavad osi mitmest tellimusest, ajastatakse \u00fchena.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Mida tasuta prooviperiood sisaldab?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">30 p\u00e4eva, tasuta, krediitkaarti pole vaja. Iseseisev kasutuselev\u00f5tt katab kuni 20 t\u00f6\u00f6keskust. Kui teie tootmine vajab rohkemat, soovitame toega kasutuselev\u00f5ttu, et seadistus oleks esimesest p\u00e4evast peale \u00f5igesti tehtud.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kes SkyPlannerit arendab?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Skycode Oy, Soome tarkvaraettev\u00f5te Vaasas, on arendanud SkyPlannerit alates 2018. aastast. SkyPlannerit m\u00fc\u00fcakse ja kasutavad tootjad \u00fcle maailma, see toetab 29 keelt ning sellel on partnerid ja eksperdid enam kui 30 riigis.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kas SkyPlanner aitab v\u00e4hendada seadistus- ja \u00fcmberseadistusaegu?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Jah. Annate toodetele omadused, nagu v\u00e4rv, materjal v\u00f5i t\u00f6\u00f6riist, ning iga t\u00f6\u00f6keskus saab r\u00fchmitada sama omadusega t\u00f6\u00f6d, nii et \u00fcmberseadistus toimub \u00fcks kord r\u00fchma kohta, mitte iga t\u00f6\u00f6 vahel. See on kaalutud prioriteet: Arcturus tasakaalustab s\u00e4\u00e4stetud seadistusaja t\u00e4htaegade ja teie teiste prioriteetidega. Paljud tehased kasutavad seda v\u00e4rviliinide, t\u00f6\u00f6riista- ja vormivahetuste ning materjalit\u00fc\u00fcpide vaheliste pesude puhul.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Mis juhtub, kui prooviperiood l\u00f5peb?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Midagi ei v\u00f5eta arvelt maha, sest me ei k\u00fcsinud kunagi kaarti. Kui soovite j\u00e4tkata, valige hinnakirja lehel pakett. Kui mitte, l\u00f5peb prooviperiood lihtsalt \u00e4ra.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Closing quote\" style=\"padding-bottom:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n<figure class=\"fxv-closequote\">\n<blockquote>\u201eSkyPlanneri t\u00f5husus tuleneb sellest, et s\u00fcsteem lihtsalt t\u00f6\u00f6tab. Ei ole t\u00f5rkeid, mille lahendamine aega kulutaks.\u201d<\/blockquote>\n<figcaption>\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, tootmise planeerimise juht, Eskomatic Oy<\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Final CTA\" style=\"padding-bottom:var(--sp-space-30)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-final\">\n      <div class=\"fx-final__body\">\n<h2 class=\"wp-block-heading\">Vaadake oma tootmist ajakavas<\/h2>\n<p>Tooge oma tegelikud ajakava koostamise probleemid live-demole ja n\u00e4itame, kuidas tellimustest, tootmisv\u00f5imsusest, materjalidest ja prioriteetidest saab \u00fcks ajakava, mida teie kontrollite. V\u00f5i j\u00e4tke k\u00f5ne vahele ja proovige seda ise juba t\u00e4na.<\/p>\n        <div class=\"fx-final__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Alustage tasuta prooviperioodi<\/a>\n          <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/et\/kontakt-muugiga\/\">Broneerige demo<\/a>\n          <a class=\"sp-btn sp-btn--ghost-onblue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/et\/videod\/#fulldemo\">Vaadake k\u00f5igepealt 50 min tootetutvustust<\/a>\n        <\/div>\n<p class=\"fxv-heromicro\" style=\"color:rgba(255,255,255,0.72)\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Tasuta 30 p\u00e4eva. Krediitkaarti pole vaja. Alustage lauaarvutis.<\/p>\n      <\/div>\n      <div class=\"fx-final__media\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/34-5e9142a1-876e-46ad-a3e8-eb31a25e2093.png\" alt=\"SkyPlanneri tootmise ajakava koostamise ajajoon koos tellimuste loendiga, mis kujutab tegelikku kliendiplaani.\">\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n<\/div><\/div>\n\n\n","protected":false},"excerpt":{"rendered":"<p>Tehisintellektil p\u00f5hinev tootmise ajakava koostamine tootjatele Ajakava valmis sekunditega. Kontroll j\u00e4\u00e4b teile. SkyPlanner APS muudab teie tellimused, tootmisv\u00f5imsuse, materjalid ja prioriteedid realistlikuks piiratud tootmisv\u00f5imsusega ajakavaks. Arcturus, meie ettev\u00f5ttesisene tehisintellekti mootor, arvutab selle sekunditega ja hoiab seda tootmise muutudes ajakohasena. Teie otsustate, mis lukustatakse, mis liigutatakse ja mis vastu v\u00f5etakse. Alustage tasuta prooviperioodi Broneerige live-demo skyplanner.ai &#8230; <a title=\"Funktsioonid\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/funktsioonid\/\" aria-label=\"Read more about Funktsioonid\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":4660,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-4738","page","type-page","status-publish","has-post-thumbnail"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SkyPlanner APS funktsioonid: tehisintellektil p\u00f5hinev tootmise ajakava koostamine, Gantt, Autopilot ja muud<\/title>\n<meta name=\"description\" content=\"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/funktsioonid\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Funktsioonid\" \/>\n<meta property=\"og:description\" content=\"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/funktsioonid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-22T12:39:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png\" \/>\n\t<meta property=\"og:image:width\" content=\"956\" \/>\n\t<meta property=\"og:image:height\" content=\"653\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/\",\"name\":\"SkyPlanner APS funktsioonid: tehisintellektil p\u00f5hinev tootmise ajakava koostamine, Gantt, Autopilot ja muud\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"datePublished\":\"2022-04-21T17:29:20+00:00\",\"dateModified\":\"2026-09-22T12:39:04+00:00\",\"description\":\"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"width\":956,\"height\":653},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/funktsioonid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Funktsioonid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SkyPlanner APS funktsioonid: tehisintellektil p\u00f5hinev tootmise ajakava koostamine, Gantt, Autopilot ja muud","description":"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/funktsioonid\/","og_locale":"et_EE","og_type":"article","og_title":"Funktsioonid","og_description":"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.","og_url":"https:\/\/skyplanner.ai\/et\/funktsioonid\/","og_site_name":"SkyPlanner","article_modified_time":"2026-09-22T12:39:04+00:00","og_image":[{"width":956,"height":653,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/","url":"https:\/\/skyplanner.ai\/et\/funktsioonid\/","name":"SkyPlanner APS funktsioonid: tehisintellektil p\u00f5hinev tootmise ajakava koostamine, Gantt, Autopilot ja muud","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","datePublished":"2022-04-21T17:29:20+00:00","dateModified":"2026-09-22T12:39:04+00:00","description":"Vaadake k\u00f5iki SkyPlanner APS funktsioone: tehisintellektil p\u00f5hinev planeerimine reaalse v\u00f5imsuse piires Arcturuse abil, reaalajas Gantt ajajoon, Autopilot \u00fcmberajastamine, materjale arvestav planeerimine, tootmisp\u00f5randa logimine ja ERP integratsioonid. Tasuta 30-p\u00e4evane prooviperiood.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/funktsioonid\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","width":956,"height":653},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/funktsioonid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Funktsioonid"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-300x205.png",300,205,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-768x525.png",768,525,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",360,246,false]},"uagb_author_info":{"display_name":"skyplanner","author_link":"https:\/\/skyplanner.ai\/et\/author\/skyplanner\/"},"uagb_comment_info":0,"uagb_excerpt":"Tehisintellektil p\u00f5hinev tootmise ajakava koostamine tootjatele Ajakava valmis sekunditega. Kontroll j\u00e4\u00e4b teile. SkyPlanner APS muudab teie tellimused, tootmisv\u00f5imsuse, materjalid ja prioriteedid realistlikuks piiratud tootmisv\u00f5imsusega ajakavaks. Arcturus, meie ettev\u00f5ttesisene tehisintellekti mootor, arvutab selle sekunditega ja hoiab seda tootmise muutudes ajakohasena. Teie otsustate, mis lukustatakse, mis liigutatakse ja mis vastu v\u00f5etakse. Alustage tasuta prooviperioodi Broneerige live-demo skyplanner.ai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/4738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=4738"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/4738\/revisions"}],"predecessor-version":[{"id":95808,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/4738\/revisions\/95808"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media\/4660"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=4738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}