{"id":107745,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/","title":{"rendered":"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business ByDesigni integreerimise juhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-iga<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See SAP Business ByDesigni integreerimise juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ByDesign SkyPlanner APS-iga. SkyPlanner vahetab ByDesigniga andmeid m\u00f5lemas suunas, kasutades SAP-i avaldatud veebiteenuseid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmisse lubatud tootmistellimused koos operatsioonidega, Production Models, Bills of Material ja Bills of Operations, seadme- ja t\u00f6\u00f6j\u00f5uressursid, materjalid, laoseisud ning ostutellimused.<\/li>\n\n\n<li>Iga tootmistellimuse planeeritud algus ja iga operatsiooni p\u00f5hiressurss saadetakse tagasi ByDesigni.<\/li>\n\n\n<li>Kinnitatud kogused, praagi ja l\u00f5petatud \u00fclesanded saab tagasi kanda tootmispartiide andmetesse.<\/li>\n\n\n<li>SkyPlanneri veebihaagid edastavad ajakava muudatused kohe, kui need toimuvad.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on ajastatud t\u00f6\u00f6keskuste kaupa ning all kuvatakse tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanneri meeskond seadistab kasutuselev\u00f5tu k\u00e4igus REST API kaudu integratsiooni teie ByDesigni keskkonnaga ja pakub sellele tuge ka p\u00e4rast k\u00e4ivitamist. See juhend on m\u00f5eldud partneritele ja arendajatele, kes soovivad t\u00f6\u00f6s osaleda v\u00f5i ise SkyPlanneri dokumenteeritud REST API p\u00f5hjal lahenduse luua (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesigni integratsiooniliidesed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ByDesign avaldab iga versiooni jaoks saadaolevad A2X SOAP veebiteenused <a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/IntegrationServices.html\">veebiteenuste API-de loendis<\/a>. Ajakava koostamise integratsioon kasutab j\u00e4rgmisi teenuseid:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manage Production Orders (ManageProductionOrderIn).<\/strong> READ_PROD_ORDER tagastab soovitud, varaseima ja hiliseima algus- ning l\u00f5puaja, ressursid koos planeeritud ja tegeliku kestusega, prioriteedi, t\u00e4itmisoleku ning ajastamisoleku. MAINTAIN_BUNDLE_V2 uuendab v\u00e4lja EarliestStartPeriod v\u00f5i LatestEndPeriod ning operatsiooni v\u00e4lja MainResourceID (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_ORDER_IN.html\">SAP-i abimaterjal<\/a>).<\/li>\n\n\n<li><strong>Manage Production Lots (ManageProductionLotsIn).<\/strong> MaintainBundle loob v\u00f5i uuendab tootmis\u00fclesandeid: kinnitatud kogust, praaki ja kinnitamise l\u00f5petamise tunnust iga aruandluspunkti kohta, \u00fclesande l\u00f5petamist koos selle teostanud t\u00f6\u00f6taja ja t\u00e4itmisajaga ning ressursikasutust (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_LOT_IN.html\">SAP-i abimaterjal<\/a>).<\/li>\n\n\n<li><strong>P\u00e4ringuteenused.<\/strong> Query Production Orders, Query Production Lots, Query Production Model, Query Production Bill of Materials, Query Production Bill of Operations (ka ressursi j\u00e4rgi), Query Materials, Read Equipment Resources, Query Labour Resource, Query Purchase Orders, Query Identified Stocks ja Determine Availability of Products.<\/li>\n\n\n<li><strong>OData.<\/strong> Kohandatud OData teenused \u00e4riobjektidele ning OData andmeallikatele ja anal\u00fc\u00fctilistele aruannetele. SAP m\u00e4rgib \u00e4riobjektide k\u00e4ttesaadavaks tegemise kohta: &#8220;companies are fully empowered to decide which business objects&#8221; (ettev\u00f5tetel on t\u00e4ielik \u00f5igus otsustada, millised \u00e4riobjektid k\u00e4ttesaadavaks teha) (<a href=\"https:\/\/help.sap.com\/doc\/7f6eeef4edc84312870d687b2ce0f3a1\/2608\/en-US\/IntegrationScenarios.html\">SAP-i integratsioonistsenaariumid<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Andmete lugemiseks kasutage p\u00e4ringuteenuseid v\u00f5i ODatat ja k\u00f5igi kirjutustoimingute jaoks kahte Manage-teenust.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentimine ja litsentsimine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Looge ByDesignis SkyPlanneri jaoks sides\u00fcsteem ja kasutatavate teenuste jaoks sideseadistused. Igal sideseadistusel on oma tehniline kasutaja. SAP-i turbejuhendi j\u00e4rgi kasutatakse rakendustevahelise integratsiooni autentimiseks &#8220;user ID plus password, and the X.509 client certificate&#8221; (kasutajatunnust koos parooliga ning nimetatud kliendisertifikaati) (<a href=\"https:\/\/help.sap.com\/doc\/e9674bba2e9f423da76f05c02c4a8554\/2608\/en-US\/Security_Guide_for_SAP_Business_ByDesign.pdf\">turbejuhend<\/a>). OData jaoks saab seadistada OAuth 2.0. Iga teenuse WSDL-i saate alla laadida sideseadistusest v\u00f5i Service Explorerist.<\/p>\n\n\n<p>SkyPlanneri poolel sisaldab iga p\u00e4ring p\u00e4ises <code>Authorization-Token<\/code> API p\u00e4\u00e4sut\u00f5endit. P\u00e4\u00e4sut\u00f5endi saate luua SkyPlanneris men\u00fc\u00fcs Settings &gt; API. Arendamise alustamiseks piisab API p\u00e4\u00e4sut\u00f5endist.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00fcndmused ja perioodilised p\u00e4ringud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner saadab iga ajakavamuudatuse korral veebikonksu teavituse, nii et muudatused kirjutatakse plaani muutudes kohe ByDesigni tagasi.<\/p>\n\n\n<p>ByDesigni muudatuste tuvastamiseks tehke p\u00e4ringuteenustele regulaarseid p\u00e4ringuid. Lugege tootmisse lubatud tootmistellimusi ja tootmispartiisid iga paari minuti j\u00e4rel ning materjale, laoseise ja ostutellimusi harvemini. P\u00e4ringutulemused jaotatakse lehek\u00fclgedeks parameetritega QueryHitsMaximumNumberValue ja LastReturnedObjectID; lehek\u00fclje vaikesuurus on kirjas SAP-i <a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/34de7a7c1a7e43178141074817068fb1\/37faab74f63049d7816184add8077065.html\">veebiteenuste lehel<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmete vastendamine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>ByDesigni objekt (liides)<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td>Materjalid (Query Materials)<\/td><td>Tooted ja materjalid<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel regulaarsed p\u00e4ringud<\/td><\/tr><tr><td>Production Bill of Material (Query Production Bill of Materials)<\/td><td>Toote struktuur, materjalid toote kohta<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Production Bill of Operations: operatsioonid ning tegevused Setup, Produce ja Tear down (Query Production Bill of Operations)<\/td><td>Protsessietapid koos kestuste ning seadistus- ja j\u00e4reltoimingute aegadega<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Production Model (Query Production Model)<\/td><td>Toote tehnoloogiline marsruut tootmis\u00fcksuse kaupa<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Seadmeressursid ja ressursir\u00fchmad (Read Equipment Resources)<\/td><td>T\u00f6\u00f6keskused, t\u00f6\u00f6keskuste r\u00fchmad, t\u00f6\u00f6riistad<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel harva<\/td><\/tr><tr><td>T\u00f6\u00f6j\u00f5uressursid, t\u00f6\u00f6ajad (Query Labour Resource)<\/td><td>T\u00f6\u00f6tajad ja vahetused<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Iga p\u00e4ev v\u00f5i vahetuste haldamine SkyPlanneris<\/td><\/tr><tr><td>Tootmisse lubatud tootmistellimused ja operatsioonid (Query Production Orders, READ_PROD_ORDER)<\/td><td>Tellimused ja t\u00f6\u00f6d koos t\u00e4htaegade ning materjalivajadustega<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>P\u00e4ringud iga paari minuti j\u00e4rel<\/td><\/tr><tr><td>Tootmispartiid ja \u00fclesanded (Query Production Lots)<\/td><td>T\u00f6\u00f6de edenemine<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>P\u00e4ringud iga paari minuti j\u00e4rel<\/td><\/tr><tr><td>Identifitseeritud laovarud, toodete saadavus (Query Identified Stocks, Determine Availability of Products)<\/td><td>Laoseisud<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>P\u00e4ringud kord tunnis v\u00f5i ajakava koostamisel<\/td><\/tr><tr><td>Ostutellimused (Query Purchase Orders)<\/td><td>Ostutellimused, saabuvad materjalid tarnekuup\u00e4eva j\u00e4rgi<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>P\u00e4ringud kord tunnis v\u00f5i ajakava koostamisel<\/td><\/tr><tr><td>EarliestStartPeriod, operatsiooni MainResourceID (Manage Production Orders, MAINTAIN_BUNDLE_V2)<\/td><td>Planeeritud algus, m\u00e4\u00e4ratud t\u00f6\u00f6keskus<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>Ajakava muutumisel SkyPlanneri veebikonksu kaudu<\/td><\/tr><tr><td>Kinnitatud kogus, praak, \u00fclesande l\u00f5petamine (Manage Production Lots, MaintainBundle)<\/td><td>Ajakirjed ja operaatorite kinnitused<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>Iga kinnituse v\u00f5i vahetuse j\u00e4rel, kui see on valitud<\/td><\/tr><tr><td>ByDesignis puudub<\/td><td>Seadistusaegade maatriks, mitme operaatori vajadus, alternatiivsed masinad ja t\u00f6\u00f6tajad<\/td><td>Hallatakse SkyPlanneris<\/td><td>Seadistatakse kasutuselev\u00f5tu k\u00e4igus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Liidestuse t\u00f6\u00f6vood<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete esmane laadimine.<\/strong> Lugege materjalid, Production Models, Bills of Material ja Bills of Operations ning seadme- ja t\u00f6\u00f6j\u00f5uressursid. Vastendage ressursid l\u00e4bim\u00f5eldult: neljast masinast koosnev ressursir\u00fchm muutub \u00fcheks t\u00f6\u00f6keskuste r\u00fchmaks v\u00f5i neljaks t\u00f6\u00f6keskuseks. T\u00f6\u00f6riistu t\u00e4histavad seadmeressursid muutuvad SkyPlanneris piiratud saadavusega t\u00f6\u00f6riistadeks.<\/p>\n\n\n<p><strong>2. Tootmistellimuste s\u00fcnkroonimine.<\/strong> Lugege tootmisse lubatud tootmistellimused koos operatsioonide ja materjalidega ning avatud ostutellimused. SkyPlanner k\u00e4sitleb tellitud materjali ostutellimuse tarnekuup\u00e4eval saadavana ja uuendab laoseisu, kui ostutellimus m\u00e4rgitakse olekusse Delivered. Tootmisettepanekud j\u00e4\u00e4vad ByDesign Supply Planningusse seni, kuni neist saavad tootmistellimused.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> Kui planeerimismootor paigutab tellimuse ajakavasse v\u00f5i muudab selle aega, k\u00e4ivitab SkyPlanneri veebikonks teenuse Manage Production Orders toimingu MAINTAIN_BUNDLE_V2. See m\u00e4\u00e4rab v\u00e4lja EarliestStartPeriod ja SkyPlanneri valitud operatsiooni v\u00e4lja MainResourceID.<\/p>\n\n\n<p><strong>4. Tootmise kinnitused.<\/strong> Operaatorid registreerivad t\u00f6\u00f6d SkyPlanner Mobile Confirmationsi v\u00f5i Production Timeri abil ning ajakirjed hoiavad ajakava ajakohasena. Teie otsustate, kas tegelikud tulemused kirjutatakse tagasi. Kui jah, edastab teenuse Manage Production Lots toiming MaintainBundle kinnitatud koguse, praagi ja l\u00f5petatud \u00fclesande koos selle teostanud t\u00f6\u00f6tajaga. Kui ei, sisestatakse kinnitused ByDesignis nagu varem.<\/p>\n\n\n<p><strong>5. Andmete haldamise ja vastuolude lahendamise reeglid.<\/strong> Pange need enne t\u00f6\u00f6lerakendamist kirja:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Andmed<\/th><th>Vastutav s\u00fcsteem<\/th><\/tr><\/thead><tbody><tr><td>Materjalid, Production Models, kogused, tellimuste ja partiide olekud<\/td><td>ByDesign<\/td><\/tr><tr><td>Operatsioonide j\u00e4rjekord, algus- ja l\u00f5puajad, ressursside m\u00e4\u00e4ramine<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00dcmberseadistusaegade maatriks, n\u00f5uded t\u00f6\u00f6riistadele ja operaatoritele, alternatiivsed ressursid<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Vahetused ja t\u00f6\u00f6vabad p\u00e4evad<\/td><td>\u00dcks s\u00fcsteem, mis valitakse ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><tr><td>Kinnitused, kaubaliikumised, kuluarvestus<\/td><td>ByDesign; sisestatakse seal v\u00f5i edastatakse SkyPlanneri ajakirjetest<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Valige \u00fcks s\u00fcsteem, mis m\u00e4\u00e4rab tellimuste kuup\u00e4evad. \u00c4rge k\u00e4ivitage Load Levelingut ressurssidel, mille ajakava koostab SkyPlanner, ning kontrollige, et planeerimise k\u00e4ivitamine ei muudaks SkyPlanneri hallatavate tootmisse lubatud tellimuste aega.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekti tavap\u00e4rased etapid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Juurutamine valmib tavaliselt n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Enne seda kontrollige ajakava 30-p\u00e4evase tasuta prooviperioodi jooksul, kasutades ByDesignist CSV- v\u00f5i Exceli failina eksporditud ressursse, Bills of Operationsi andmeid ja avatud tootmistellimusi.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vastendamine.<\/strong> Leppige kokku vastendustabel, andmete haldamise reeglid, s\u00fcnkroonimissagedused ja see, kas kinnitused kirjutatakse tagasi.<\/li>\n\n\n<li><strong>Juurdep\u00e4\u00e4s ByDesignile.<\/strong> Looge sides\u00fcsteem ja sideseadistused ning laadige alla WSDL-id. Testige esmalt oma ByDesigni testkeskkonnas.<\/li>\n\n\n<li><strong>Esmane laadimine.<\/strong> Materjalid, Production Models, Bills of Material ja Bills of Operations, ressursid ning t\u00f6\u00f6ajad.<\/li>\n\n\n<li><strong>Tootmis- ja ostutellimuste s\u00fcnkroonimine.<\/strong> Regulaarsed p\u00e4ringud koos lehek\u00fclgjaotuse, filtrite ja korduskatsetega.<\/li>\n\n\n<li><strong>Piirangute seadistamine SkyPlanneris.<\/strong> Seadistusaegade maatriks, t\u00f6\u00f6riistad, iga t\u00f6\u00f6 jaoks vajalik operaatorite arv ning alternatiivsed masinad v\u00f5i t\u00f6\u00f6tajad.<\/li>\n\n\n<li><strong>Ajakava tagasikirjutamine.<\/strong> MAINTAIN_BUNDLE_V2 v\u00e4ljakutsed SkyPlanneri veebikonksudest ning soovi korral partiide kinnitused.<\/li>\n\n\n<li><strong>Paralleeltestimine.<\/strong> Kasutage SkyPlannerit praeguse plaani k\u00f5rval, v\u00f5rrelge kuup\u00e4evi ja parandage p\u00f5hiandmeid.<\/li>\n\n\n<li><strong>Kasutuselev\u00f5tt.<\/strong> L\u00fclitage tagasikirjutamine sisse, kui andmed \u00fchtivad.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-sap-bydesign-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millega SAP ByDesigni integratsiooni kavandamisel arvestada<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00dcks kuup\u00e4ev p\u00e4ringu kohta.<\/strong> &#8220;The EarliestStartPeriod and the LatestEndPeriod cannot be updated together.&#8221; (V\u00e4lju EarliestStartPeriod ja LatestEndPeriod ei saa korraga uuendada.) L\u00e4htuge tagasikirjutamisel alguskuup\u00e4evast.<\/li>\n\n\n<li><strong>Lukustamine puudub.<\/strong> A2X-teenused on olekuta, mist\u00f5ttu ei saa SAP-i s\u00f5nul rakendada tehingup\u00f5hist ega loogilist lukustamist. Lugege tellimus enne iga kirjutamist uuesti sisse ja lahendage konfliktid.<\/li>\n\n\n<li><strong>L\u00f5petatuks m\u00e4rkimine on l\u00f5plik.<\/strong> &#8220;Confirmation Finished Indicator cannot be unchecked once it is set.&#8221; (Kui Confirmation Finished Indicator on m\u00e4rgitud, ei saa m\u00e4rget enam eemaldada.) Saatke l\u00f5petamiskinnitus alles siis, kui operaator \u00fclesande sulgeb.<\/li>\n\n\n<li><strong>P\u00f5hi- ja lisaressursid.<\/strong> ByDesign arvestab ajakava koostamisel p\u00f5hiressurssidega. Modelleerige lisaressursside hulka kuuluvad operaatorid ja t\u00f6\u00f6riistad SkyPlanneris piiratud saadavusega ressurssidena, et ajakava koostamisel kontrollitaks ka nende saadavust.<\/li>\n\n\n<li><strong>Seadistus ja lahtiv\u00f5tmine.<\/strong> Bills of Operations sisaldab seadistust ja lahtiv\u00f5tmist tegevustena. Viige t\u00f6\u00f6de j\u00e4rjekorrast s\u00f5ltuvad \u00fcmberseadistusajad seadistusaegade maatriksisse.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-sap-bydesign-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes SAP ByDesigni integratsiooni seadistab ja toetab<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab integratsiooni juurutamisel ja pakub tuge p\u00e4rast kasutuselev\u00f5ttu.<\/strong> Seadistus ja tugi h\u00f5lmavad kokkulepitud veebiteenuseid ja OData p\u00e4ringuid. Iga ettev\u00f5te kasutab ByDesigni omal moel ning just siin rakendatakse seda oskusteavet.<\/li>\n\n\n<li><strong>Ka teie SAP ByDesigni partner saab osaleda.<\/strong> Partner tunneb teie keskkonda, ulatuse m\u00e4\u00e4ramist ja laiendusi ning saab koos SkyPlanneri meeskonnaga teha Communication Arrangement seadistused.<\/li>\n\n\n<li><strong>Teie enda arendajad saavad integratsiooni edasi arendada,<\/strong> kasutades SkyPlanneri REST API-t ja p\u00e4ises <code>Authorization-Token<\/code> edastatavat API p\u00e4\u00e4sut\u00f5endit. SkyPlanneri meeskond aitab vajaduse korral. Juhised leiate <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri integratsioonidokumentatsioonist<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanneri hind algab 199 \u20ac kuus ning sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub iga kuu. Integratsiooni hinnapakkumine koostatakse enne t\u00f6\u00f6de algust teie protsessi ja vajaduste p\u00f5hjal koos paketi hinnapakkumisega. Vaadake <a href=\"\/et\/hinnakujundus\/\">hinnakirja<\/a>, <a href=\"\/et\/integratsioonid\/erp\/sap-business-bydesign\/tootmise-planeerimine\/\">SAP ByDesigni tootmise planeerimist masinate ja t\u00f6\u00f6tajate tegeliku v\u00f5imsuse piires<\/a>, <a href=\"\/et\/integratsioonid\/erp\/sap-business-bydesign\/\">SAP Business ByDesigni lehte<\/a> ja <a href=\"\/et\/integratsioonid\/erp\/\">ERP-integratsioonide \u00fclevaadet<\/a>. Teiste SAP-i s\u00fcsteemide jaoks on eraldi juhendid: <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/\">SAP Business One<\/a> ja <a href=\"\/et\/integratsioonid\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri esitlus<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete tagasiside SkyPlanneri kohta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila elektrikilpide tootmistsehhis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest tootmise reaalajas optimeerimiseni.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ja uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Loe UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumiriietuses operaatorid pudelite t\u00e4iteliinil ettev\u00f5tte Laboratory &amp; Allied ravimitootmistehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise t\u00f5husus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise t\u00f5husus on kasvanud 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise t\u00f5husus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava kolme kuu optimeeritud plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Loe ettev\u00f5tte Laboratory &amp; Allied kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>tarnekindlus alates 2021. aastast<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner annab meile \u00fclevaate tootmisv\u00f5imsusest ja muudab planeerimise prognoositavaks.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Keemia- ja toiduainet\u00f6\u00f6stus<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus on olnud 100% kogu SkyPlanneri kasutusaja jooksul, alates 2021. aastast.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/opes-corporation\/\">Loe Opes Corporationi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>V\u00e4hem<\/b><span>materjalipuudusest tingitud seisakuid<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneri v\u00e4\u00e4rtus meie jaoks seisneb selles, et see on igap\u00e4evat\u00f6\u00f6s toimiv t\u00f6\u00f6riist, eriti tarnekuup\u00e4evade m\u00e4\u00e4ramisel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, tootmise planeerimise juht<\/b><br>Eskomatic \u00b7 Allhankeline mehaaniline t\u00f6\u00f6tlemine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmiskoormuse automaatne ajastamine annab t\u00e4psemad tarnekuup\u00e4evad ning materjalipuudusest tingitud tootmisseisakud on j\u00e4rsult v\u00e4henenud.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/eskomatic\/\">Loe Eskomaticu kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Milliseid SAP ByDesigni API-sid SkyPlanner kasutab?<\/summary>\n<p class=\"sp-faq__a\">SAP-i avaldatud A2X-veebiteenuseid. Andmete lugemiseks kasutatakse Query teenuseid, n\u00e4iteks Query Production Orders ja Query Purchase Orders, v\u00f5i kohandatud OData-t. Kirjutamiseks kasutatakse teenuseid Manage Production Orders ja Manage Production Lots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mida SkyPlanner ByDesigni tagasi kirjutab?<\/summary>\n<p class=\"sp-faq__a\">Iga tootmistellimuse EarliestStartPeriod ja operatsiooni MainResourceID v\u00e4\u00e4rtused. Soovi korral kantakse tootmispartiile ka kinnitatud kogused, praak ja l\u00f5petatud \u00fclesanded.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas ByDesign saadab SkyPlannerile s\u00fcndmusi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner p\u00e4rib ByDesigni Query teenustest iga paari minuti j\u00e4rel tellimuste ja partiide andmeid. SkyPlanner ise saadab iga ajakavamuudatuse korral veebikonksuteateid, mis k\u00e4ivitavad tagasikirjutamise.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas SkyPlanner end ByDesignis autendib?<\/summary>\n<p class=\"sp-faq__a\">Autentimine toimub seadistuste Communication System ja Communication Arrangement ning tehnilise kasutaja kaudu, nagu on kirjeldatud SAP-i turbejuhendis. SkyPlanneri enda API kasutab p\u00e4ises <code>Authorization-Token<\/code> edastatavat API p\u00e4\u00e4sut\u00f5endit.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas tootmisettepanekud j\u00f5uavad SkyPlannerisse?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner koostab ajakava vabastatud tootmistellimustele. Ettepanekud j\u00e4\u00e4vad ByDesigni moodulisse Supply Planning, kuni neist saavad tootmistellimused.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kes integratsiooni loob?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanneri meeskond seadistab integratsiooni juurutamisel ja pakub tuge p\u00e4rast kasutuselev\u00f5ttu. Teie SAP ByDesigni partner v\u00f5i teie enda arendajad saavad seda ka ise edasi arendada, kasutades SkyPlanneri REST API-t koos API p\u00e4\u00e4sut\u00f5endiga.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ SAP Business ByDesign SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See SAP Business ByDesigni integreerimise juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ByDesign SkyPlanner APS-iga. SkyPlanner vahetab ByDesigniga andmeid m\u00f5lemas suunas, kasutades SAP-i avaldatud veebiteenuseid: skyplanner.ai \u00b7 Tootmise ajakava koostamine SkyPlanneri meeskond seadistab kasutuselev\u00f5tu k\u00e4igus REST API kaudu &#8230; <a title=\"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/\" aria-label=\"Read more about SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106583,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107745","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP ByDesigni APS-liidestuse juhend tootmise ajakava koostamiseks<\/title>\n<meta name=\"description\" content=\"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" \/>\n<meta property=\"og:description\" content=\"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/liidestamise-juhend\\\/\",\"name\":\"SAP ByDesigni APS-liidestuse juhend tootmise ajakava koostamiseks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS SAP Business ByDesignile: tootmise planeerimine masinate ja t\u00f6\u00f6tajate tegeliku v\u00f5imsuse piires\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-bydesign\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP ByDesigni APS-liidestuse juhend tootmise ajakava koostamiseks","description":"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga","og_description":"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/","name":"SAP ByDesigni APS-liidestuse juhend tootmise ajakava koostamiseks","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u00dchenda SAP Business ByDesign SkyPlanner APS-iga: A2X-veebiteenused, OData, tagasikirjutus (Manage Production Orders ja Manage Production Lots), andmete vastendus.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS SAP Business ByDesignile: tootmise planeerimine masinate ja t\u00f6\u00f6tajate tegeliku v\u00f5imsuse piires","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-bydesign\/"},{"@type":"ListItem","position":5,"name":"SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ SAP Business ByDesign SAP Business ByDesigni integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See SAP Business ByDesigni integreerimise juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ByDesign SkyPlanner APS-iga. SkyPlanner vahetab ByDesigniga andmeid m\u00f5lemas suunas, kasutades SAP-i avaldatud veebiteenuseid: skyplanner.ai \u00b7 Tootmise ajakava koostamine SkyPlanneri meeskond seadistab kasutuselev\u00f5tu k\u00e4igus REST API kaudu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107745","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=107745"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107745\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/106583"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=107745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}