{"id":107571,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/","title":{"rendered":"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Integratsioonid<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ Senior ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Senior ERP liidestusjuhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-iga<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See Senior ERP liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ettev\u00f5tte Senior Sistemas loodud Senior ERP (Gest\u00e3o Empresarial | ERP XT koos Senior X-iga) SkyPlanner APS-iga. SkyPlanner vahetab Senior ERP-ga andmeid m\u00f5lemas suunas, kasutades Seniori enda liideseid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmistellimused (OP) koos etappidega, tehnoloogilised marsruudid (roteiros), ressursid ja ressursikeskused, SKU-d, tootestruktuurid, laoseis ja ostutellimused.<\/li>\n\n\n<li>OP-sse kirjutatakse tagasi iga etapi planeeritud algus ja l\u00f5pp ning selleks valitud ressurss.<\/li>\n\n\n<li>Soovi korral saadetakse operaatorite ajakirjed tagasi apontamentos de produ\u00e7\u00e3o kirjetena.<\/li>\n\n\n<li>Senior X Events Hub teatab SkyPlannerile OP etapi oleku muutumisest ning SkyPlanneri veebihaagid edastavad ajakava muudatused kohe nende tegemisel.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on ajastatud t\u00f6\u00f6keskuste kaupa ning all kuvatakse tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie Senior ERP keskkonna j\u00e4rgi ja pakub tuge ka p\u00e4rast t\u00f6\u00f6sseviimist. See juhend on m\u00f5eldud partneritele ja arendajatele, kes soovivad t\u00f6\u00f6s osaleda v\u00f5i ise SkyPlanneri dokumenteeritud REST API p\u00f5hjal lahendusi luua (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"senior-erp-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP liidesed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ERP XT on h\u00fcbriids\u00fcsteem. Seniori dokumentatsioon kirjeldab Gest\u00e3o Empresarial XT-d nii: &#8220;becomes a hybrid system: an on-premises (local) system with integration of cloud solutions&#8221; (muutub h\u00fcbriids\u00fcsteemiks: kohapealseks s\u00fcsteemiks, mis on \u00fchendatud pilvelahendustega) (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/xtended.htm\">Seniori dokumentatsioon, t\u00f5lgitud<\/a>). Ajakava koostamise tarkvara kasutab kolme Seniori liidest:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>G5 veebiteenused (SOAP).<\/strong> Teie Seniori serveris t\u00f6\u00f6tavad teenused, mille nimed l\u00e4htuvad moodulist (com.senior.g5.co.&lt;module&gt;&#8230;). Iga teenus avaldatakse kolmes WSDL-variandis: sapiens_Sync, sapiens_Async ja sapiens_Scheduled. Tootmisteenuste hulka kuulub <strong>com.senior.g5.co.mpr.pcp.ordemproducao<\/strong>, mis &#8220;calls the same production order generation routine&#8221; (kutsub v\u00e4lja sama tootmistellimuse loomise rutiini) nagu ERP kasutajaliides (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/webservices\/com_senior_g5_co_mpr_pcp_ordemproducao.htm\">Seniori dokumentatsioon, t\u00f5lgitud<\/a>), samuti toodete (com.senior.g5.co.ger.cad.produto) ja tootmisaruandluse teenused.<\/li>\n\n\n<li><strong>Senior X Platform REST API-d<\/strong> aadressil api.senior.com.br annavad ligip\u00e4\u00e4su neile ERP andmevaldkondadele, mille Senior on Senior X-is k\u00e4ttesaadavaks teinud, n\u00e4iteks toodetele ja m\u00fc\u00fcgitellimustele (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/mercado\/vendas\/integracao-pedido-venda-api.htm\">Seniori dokumentatsioon<\/a>).<\/li>\n\n\n<li><strong>Events Hub veebihaagid.<\/strong> Need luuakse Senior X-is jaotises Tecnologia &gt; Customiza\u00e7\u00e3o &gt; Events Hub &gt; Webhooks. Manufacturing avaldab OP etapi oleku muutumisel s\u00fcndmuse <strong>erp_man\/pcp_programacaocontrole\/orderProductionStageChangeStatus<\/strong> (<a href=\"https:\/\/documentacao.senior.com.br\/fabrica-ao-vivo-x\/manual-do-usuario\/fabrica-ao-vivo-x\/cadastros\/\">Seniori dokumentatsioon<\/a>).<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentimine ja juurdep\u00e4\u00e4s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Senior X Platform.<\/strong> Liidestus logib sisse, saates POST-p\u00e4ringu aadressil platform.senior.com.br l\u00f5pp-punkti \/t\/senior.com.br\/bridge\/1.0\/rest\/platform\/authentication\/actions\/Login ja kasutades kasutajanime kujul user@tenant. Vastus sisaldab Bearer-p\u00e4\u00e4sut\u00f5endit ja v\u00e4rskendust\u00f5endit. Rakenduse v\u00f5tmetega saab sisse logida toimingu loginWithKey kaudu (access key, secret, tenant). REST-p\u00e4ringud sisaldavad p\u00e4ist authorization ja p\u00e4ist client_id. Viimane tuvastab \u00fchenduva rakenduse, mis on registreeritud Seniori API-portaalis ja seotud ERP rolliga.<\/li>\n\n\n<li><strong>G5 veebiteenused.<\/strong> P\u00e4ringutega edastatakse parameetrid user, password ja encryption. Senior X-i t\u00f5endi kasutamisel asendab see parooli (<a href=\"https:\/\/documentacao.senior.com.br\/tecnologia-senior-x\/manual-do-usuario\/integracoes\/web-services.htm\">Seniori dokumentatsioon<\/a>).<\/li>\n\n\n<li><strong>\u00d5igused.<\/strong> Looge liidestusele eraldi Seniori kasutaja, kellel on juurdep\u00e4\u00e4s PCP, tootearenduse, lao ja ostude andmetele, mida liidestus loeb ja kirjutab.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanneri REST API kasutab autentimiseks API-t\u00f5endit p\u00e4ises Authorization-Token (SkyPlanner Settings &gt; API) ning selle dokumentatsioon on vormingus Swagger\/OpenAPI. <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">Liidestamise \u00f5petus<\/a> juhendab esimeste p\u00e4ringute tegemist.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00fcndmused ja perioodilised p\u00e4ringud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Events Hub edastab tootmises toimuvad muutused: kui OP etapi olek muutub, j\u00f5uab veebihaak SkyPlannerisse ja ajakava uueneb. Muid andmeid p\u00e4ritakse perioodiliselt. Uued t\u00f6\u00f6d leitakse p\u00e4ringutega, mis on filtreeritud kinnitatud ja tootmisse lubatud OP-de ning hiljutiste muudatuste j\u00e4rgi. P\u00e4ringusagedus m\u00e4\u00e4ratakse iga tehase jaoks eraldi: OP-sid p\u00e4ritakse iga m\u00f5ne minuti j\u00e4rel, laoseisu kord tunnis.<\/p>\n\n\n<p>SkyPlanner saadab oleku v\u00f5i ajakava muutumisel veebihaake, seega on tagasikirjutamine s\u00fcndmusp\u00f5hine.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmete vastendamine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Senior ERP objekt (liides)<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td>SKU: produto ja deriva\u00e7\u00e3o, m\u00f5\u00f5t\u00fchikud (G5 veebiteenused v\u00f5i Senior X-i olemid)<\/td><td>Tooted ja materjalid<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel perioodilised p\u00e4ringud<\/td><\/tr><tr><td>Tootestruktuur (engenharia do SKU)<\/td><td>Toote struktuur, alamtooted ja materjalid toote kohta<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Roteiro koos etappidega (est\u00e1gios): j\u00e4rjestus ja s\u00f5ltuvus eelmisest etapist<\/td><td>Protsessietapid \u00f5iges j\u00e4rjekorras<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Recurso: Tempo processo, Tempo setup, Tempo carga e descarga, Tempo transfer\u00eancia, Fator de carga<\/td><td>T\u00f6\u00f6keskused, kestused, seadistus- ja l\u00f5petamisajad, t\u00f5hususn\u00e4itajad<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Esmane laadimine, hiljem harva<\/td><\/tr><tr><td>Centro de recurso<\/td><td>T\u00f6\u00f6keskuste r\u00fchmad<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Esmane laadimine, hiljem harva<\/td><\/tr><tr><td>Calend\u00e1rio: Feriados, tootmiskalender vahetuste kaupa<\/td><td>Vahetused ja t\u00f6\u00f6vabad p\u00e4evad<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Iga p\u00e4ev v\u00f5i eraldi vahetused SkyPlanneris<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Firme, Liberada) koos etappide ja materjalidega<\/td><td>Tellimused ja t\u00f6\u00f6d koos t\u00e4htaegade ja materjalivajadustega<\/td><td>Senior \u2192 SkyPlanner<\/td><td>P\u00e4ringud iga m\u00f5ne minuti j\u00e4rel<\/td><\/tr><tr><td>OP etapi olek (Events Hub orderProductionStageChangeStatus)<\/td><td>T\u00f6\u00f6 edenemine<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Reaalajas veebihaagi kaudu<\/td><\/tr><tr><td>Estoque SKU kaupa<\/td><td>Laoseisud<\/td><td>Senior \u2192 SkyPlanner<\/td><td>P\u00e4ringud kord tunnis v\u00f5i ajakava koostamisel<\/td><\/tr><tr><td>Ordens de compra koos tarnekuup\u00e4evadega<\/td><td>Ostutellimused, saabuvad materjalid tarnekuup\u00e4eva j\u00e4rgi<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Perioodilised p\u00e4ringud kord tunnis v\u00f5i ajakava koostamise k\u00e4ivitamisel<\/td><\/tr><tr><td>OP etapp: planeeritud algus ja l\u00f5pp, ressurss<\/td><td>Iga t\u00f6\u00f6 planeeritud algus ja l\u00f5pp, m\u00e4\u00e4ratud t\u00f6\u00f6keskus<\/td><td>SkyPlanner \u2192 Senior<\/td><td>Ajakava muutumisel SkyPlanneri veebihaagi kaudu<\/td><\/tr><tr><td>Apontamento de produ\u00e7\u00e3o: numOrp, codEtg, seqRot, qtdRel, qtdRfg, alguse ja l\u00f5pu kuup\u00e4ev ning kellaaeg<\/td><td>Ajakirjed ja operaatorite kinnitused<\/td><td>SkyPlanner \u2192 Senior<\/td><td>Soovi korral iga kinnituse v\u00f5i vahetuse kohta<\/td><\/tr><tr><td>Senior ERP-s puudub<\/td><td>Seadistusaegade maatriks, piiratud saadavusega t\u00f6\u00f6riistad, mitme operaatoriga t\u00f6\u00f6d, alternatiivsed masinad ja t\u00f6\u00f6tajad<\/td><td>Hallatakse SkyPlanneris<\/td><td>Seadistatakse kasutuselev\u00f5tu k\u00e4igus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Liidestuse t\u00f6\u00f6vood<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete esmane laadimine.<\/strong> Lugege sisse SKU-d, struktuurid, roteiros, recursos, centros de recurso ja tootmiskalender. M\u00f5elge ressursikeskuste vastendamine l\u00e4bi: nelja masinaga centro de recurso muutub \u00fcheks t\u00f6\u00f6keskuste r\u00fchmaks v\u00f5i neljaks t\u00f6\u00f6keskuseks. Teisendage Fator de carga kas SkyPlanneri t\u00f6\u00f6keskuse t\u00f5hususeks v\u00f5i vahetusteks, mitte m\u00f5lemaks.<\/p>\n\n\n<p><strong>2. OP-de s\u00fcnkroonimine.<\/strong> Lugege sisse olekus Firme ja Liberada OP-d koos etappide ja materjalidega ning avatud ostutellimused. MRP v\u00f5ib olekus Planejada OP-sid veel muuta v\u00f5i kustutada, seega lisage need ajakavasse ainult siis, kui soovite tulevikku ette vaadata. SkyPlanner loeb tellitud materjali ostutellimuse tarnekuup\u00e4eval k\u00e4ttesaadavaks ja uuendab laoseisu, kui ostutellimus m\u00e4rgitakse olekusse Delivered.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> Kui planeerimismootor paigutab etapi ajakavasse v\u00f5i muudab selle aega, k\u00e4ivitab SkyPlanneri veebihaak tagasikirjutamise. Sellega m\u00e4\u00e4ratakse iga OP etapi planeeritud algus ja l\u00f5pp ning valitud ressurss \u2013 samad v\u00e4ljad, mida planeerija muudab moodulis Programa\u00e7\u00e3o de produ\u00e7\u00e3o. SkyPlanneri meeskond lepib t\u00e4pse veebiteenuse teie ja teie Seniori partneriga kokku projekti ulatuse m\u00e4\u00e4ramisel.<\/p>\n\n\n<p><strong>4. Tootmist\u00f6\u00f6de kinnitused.<\/strong> Operaatorid registreerivad t\u00f6\u00f6d SkyPlanner Mobile Confirmationsi v\u00f5i Production Timeri abil ning ajakirjed hoiavad ajakava ajakohasena. Teie otsustate, kas tegelikud ajad saadetakse Seniorisse tagasi. Kui jah, luuakse igast kinnitusest OP etapile apontamento de produ\u00e7\u00e3o kirje, mis sisaldab toodetud kogust, praaki ning algus- ja l\u00f5puaega. Senior v\u00f5tab tootmisaruandeid vastu ainult OP-de kohta, mille olek on Liberada v\u00f5i Andamento. Kui kasutate aruandluseks F\u00e1brica ao Vivot, loeb SkyPlanner edenemise andmeid hoopis Events Hubi kaudu.<\/p>\n\n\n<p><strong>5. Andmete haldamise ja konfliktide lahendamise reeglid.<\/strong> Pange need enne kasutuselev\u00f5ttu kirja:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Andmed<\/th><th>Vastutav s\u00fcsteem<\/th><\/tr><\/thead><tbody><tr><td>SKU-d, struktuurid, roteiros, OP-de kogused ja olek<\/td><td>Senior ERP<\/td><\/tr><tr><td>Etappide j\u00e4rjestus, algus- ja l\u00f5puajad, ressursside m\u00e4\u00e4ramine<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Seadistusaegade maatriks, t\u00f6\u00f6riistade ja operaatorite vajadus, alternatiivsed ressursid<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Tootmiskalender ja vahetused<\/td><td>\u00dcks s\u00fcsteem, mis valitakse ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><tr><td>Apontamentos, laoliikumised, kuluarvestus<\/td><td>Senior ERP; andmed sisestatakse seal v\u00f5i saadetakse SkyPlanneri ajakirjetest<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Valige \u00fcks s\u00fcsteem, mis kirjutab etappide kuup\u00e4evi. Kui planeerijad j\u00e4rjestavad samu OP-sid endiselt moodulis Programa\u00e7\u00e3o de produ\u00e7\u00e3o v\u00f5i Gantti diagrammil, leppige kokku, milliseid OP-sid haldab SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekti tavap\u00e4rased etapid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Juurutamine viiakse tavaliselt l\u00f5pule n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Enne seda kontrollige ajakava 30-p\u00e4evase tasuta prooviperioodi jooksul, kasutades Seniorist CSV- v\u00f5i Exceli failina eksporditud ressursse, roteiros-andmeid ja avatud OP-sid.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Andmete vastendamine.<\/strong> Kinnitage vastendustabel, andmete haldusvastutuse reeglid ja s\u00fcnkroonimissagedused ning otsustage, kas apontamentos saadetakse tagasi.<\/li>\n\n\n<li><strong>Juurdep\u00e4\u00e4s Seniorile.<\/strong> Looge liidestuse kasutaja, registreerige rakendus Seniori API-portaalis ning lubage G5 veebiteenused ja Events Hubi veebihaak. Testige esmalt testandmebaasis.<\/li>\n\n\n<li><strong>Esmane laadimine.<\/strong> SKU-d, struktuurid, roteiros, recursos, centros de recurso, kalender.<\/li>\n\n\n<li><strong>OP-de ja ostutellimuste s\u00fcnkroonimine.<\/strong> Perioodilised p\u00e4ringud koos filtrite ja korduskatsetega ning etapi oleku veebihaak.<\/li>\n\n\n<li><strong>Piirangute seadistamine SkyPlanneris.<\/strong> Seadistusaegade maatriks, t\u00f6\u00f6vahendid, operaatorite arv t\u00f6\u00f6 kohta ning alternatiivsed masinad v\u00f5i t\u00f6\u00f6tajad.<\/li>\n\n\n<li><strong>Ajakava tagasikirjutamine.<\/strong> Etappide kuup\u00e4evad ja ressursid SkyPlanneri veebihaakidest ning soovi korral apontamentos.<\/li>\n\n\n<li><strong>Paralleeltestimine.<\/strong> Kasutage SkyPlannerit senise plaani k\u00f5rval, v\u00f5rrelge kuup\u00e4evi ja parandage p\u00f5hiandmed.<\/li>\n\n\n<li><strong>Kasutuselev\u00f5tt.<\/strong> L\u00fclitage tagasikirjutamine sisse, kui andmed \u00fchtivad.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-senior-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millega Senior ERP liidestamisel arvestada<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Neli ressursi ajaliiki.<\/strong> Recurso sisaldab t\u00f6\u00f6tlemis-, seadistus-, laadimis- ja mahalaadimis- ning teisaldusaega. Laadimis- ja teisaldusaeg v\u00f5ib t\u00e4hendada k\u00e4itlemisaega, mitte masina t\u00f6\u00f6aega. Otsustage iga ressursi puhul, kuidas ajad vastendada, muidu on k\u00f5ik kestused valed.<\/li>\n\n\n<li><strong>\u00dcks seadistusaeg ressursi kohta.<\/strong> Seniori Tempo setup sisaldab \u00fcht v\u00e4\u00e4rtust. Koostage SkyPlanneris kasutuselev\u00f5tu k\u00e4igus seadistusaegade maatriks oma tegelike \u00fcmberseadistuste p\u00f5hjal.<\/li>\n\n\n<li><strong>Tootevariandid.<\/strong> Senioris koosneb SKU tootest ja deriva\u00e7\u00e3o-variandist ning roteiros v\u00f5ivad varianditi erineda. Lisage variandi kood SkyPlanneri tootev\u00f5tmetesse.<\/li>\n\n\n<li><strong>OP-de olekud.<\/strong> Tootmisaruandeid saab lisada ainult olekus Liberada ja Andamento OP-dele. Muutke olekuid Senioris ja laske SkyPlanneril neid muutusi Events Hubi kaudu j\u00e4lgida.<\/li>\n\n\n<li><strong>H\u00fcbriidpaigaldus.<\/strong> G5 veebiteenused t\u00f6\u00f6tavad teie Seniori serveris ja Events Hub t\u00f6\u00f6tab Senior X-is. Kavandage v\u00f5rgujuurdep\u00e4\u00e4s m\u00f5lemale.<\/li>\n\n\n<li><strong>Arvuvorming.<\/strong> Seniori veebiteenused ei aktsepteeri tuhandeliste eraldajaga arve ja n\u00f5uavad k\u00fcmnendkoma. Saatke arvud selles vormingus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-senior-erp-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes seadistab Senior ERP integratsiooni ja pakub sellele tuge?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab integratsiooni kasutuselev\u00f5tu k\u00e4igus ja pakub tuge ka p\u00e4rast k\u00e4ivitamist.<\/strong> Tugi h\u00f5lmab kokkulepitud veebiteenuseid, Senior X API-sid ja Events Hubi veebihaake. Iga tehas kasutab Senior ERP-d omal viisil ning just siin l\u00e4hevad need teadmised k\u00e4iku.<\/li>\n\n\n<li><strong>Ka teie Seniori partner saab osaleda.<\/strong> Partner tunneb teie seadistust, kohandusi ja litsentsitingimusi ning saab koos SkyPlanneri meeskonnaga luua integratsioonikasutaja, teha registreeringu API-portaalis ja seadistada veebiteenused.<\/li>\n\n\n<li><strong>Teie arendajad saavad integratsiooni edasi arendada,<\/strong> kasutades SkyPlanneri REST API-t ja API p\u00e4\u00e4sut\u00f5endit. Alustamiseks piisab API p\u00e4\u00e4sut\u00f5endist ning SkyPlanneri meeskond aitab vajaduse korral. Juhised leiate <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri integratsioonidokumentatsioonist<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanneri hind algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub iga kuu. Integratsiooni hinnapakkumine esitatakse ette koos teie paketi pakkumisega, l\u00e4htudes teie protsessist ja vajadustest. Vaadake <a href=\"\/et\/hinnakujundus\/\">hindu<\/a>, lugege <a href=\"\/et\/integratsioonid\/erp\/senior-erp\/tootmise-planeerimine\/\">Senior ERP-ga tootmise planeerimisest masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust arvestades<\/a> ning tutvuge <a href=\"\/et\/integratsioonid\/erp\/senior-erp\/\">Senior ERP lehe<\/a> ja <a href=\"\/et\/integratsioonid\/erp\/\">ERP integratsioonide \u00fclevaatega<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri esitlus<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootjate kogemused SkyPlanneriga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila tehase elektrikilpide tootmistsehhis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest reaalajas tootmise optimeerimiseni.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Loe UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumiriietuses operaatorid pudelite t\u00e4itmisliinil Laboratory &amp; Alliedi ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise t\u00f5husus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise t\u00f5husus on kasvanud 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise t\u00f5husus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmav optimeeritud kolme kuu plaan valmib v\u00e4hem kui 30 minutiga.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Loe Laboratory &amp; Alliedi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mameci tegevjuht Hannu Ryyn\u00e4nen ettev\u00f5tte tootmishallis Lohjas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-d<\/b><span>automaatselt ajakavasse paigutatud t\u00f6\u00f6k\u00e4sud<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmine on hoopis teistmoodi kontrolli all ja meie arusaam tootmisv\u00f5imsusest on t\u00e4iesti teisel tasemel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, tegevjuht<\/b><br>Mamec \u00b7 T\u00f6\u00f6stuslikud segistid, pumbad ja k\u00f5rgtehnoloogiline allhanketootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tuhandete t\u00f6\u00f6k\u00e4skude ajakava koostatakse automaatselt ja kogu organisatsioonil on tootmisest reaalajas \u00fclevaade.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/mamec\/\">Loe Mameci tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>V\u00e4hem<\/b><span>materjalipuudusest tingitud seisakuid<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneri v\u00e4\u00e4rtus meie jaoks seisneb selles, et see on igap\u00e4evat\u00f6\u00f6s toimiv t\u00f6\u00f6riist, eriti tarnet\u00e4htaegade m\u00e4\u00e4ramisel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, tootmise planeerimise juht<\/b><br>Eskomatic \u00b7 Allhankeline mehaaniline t\u00f6\u00f6tlemine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmiskoormuse automaatne ajastamine v\u00f5imaldab m\u00e4\u00e4rata t\u00e4psemaid tarnet\u00e4htaegu ning materjalipuudusest tingitud tootmisseisakud on m\u00e4rgatavalt v\u00e4henenud.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/eskomatic\/\">Loe Eskomaticu kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Senior ERP-l on tootmistellimuste jaoks API?<\/summary>\n<p class=\"sp-faq__a\">Jah. G5 veebiteenus com.senior.g5.co.mpr.pcp.ordemproducao loob tootmistellimusi (OP) sama protseduuri abil nagu ERP kasutajaliides. Teised G5 teenused h\u00f5lmavad tooteid ja tootmisaruandlust. Senior X Platform lisab REST API-d, kus sisselogimiseks kasutatakse Bearer-p\u00e4\u00e4sut\u00f5endit, ning Events Hubi veebihaagid.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Senior ERP toetab veebihaake?<\/summary>\n<p class=\"sp-faq__a\">Jah. Senior X Events Hub saadab veebihaake, sealhulgas orderProductionStageChangeStatus, kui tootmistellimuse etapi olek muutub. SkyPlanner kasutab seda tootmise edenemise j\u00e4lgimiseks reaalajas ning saadab ajakava muudatused oma veebihaakide kaudu tagasi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas kirjutatakse planeeritud kuup\u00e4evad tagasi Senior ERP-sse?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner m\u00e4\u00e4rab iga tootmistellimuse etapi planeeritud alguse ja l\u00f5pu ning selle jaoks valitud ressursi. Need on samad v\u00e4ljad, mida planeerija muudab vaates Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Iga ajakavamuudatuse korral k\u00e4ivitab SkyPlanneri veebihaak tagasikirjutuse. Selleks kasutatakse \u00fchendusviisi, mille SkyPlanneri meeskond m\u00e4\u00e4rab teie Seniori paigalduse jaoks kasutuselev\u00f5tul integratsiooni ulatuse m\u00e4\u00e4ramise k\u00e4igus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas integratsioon t\u00f6\u00f6tab Senior X-i ja ERP XT-ga?<\/summary>\n<p class=\"sp-faq__a\">Jah. ERP XT t\u00f6\u00f6tab teie serveris ning pilveteenused Senior X-is. Integratsioon kasutab serveris G5 veebiteenuseid ning pilves Senior X API-sid ja Events Hubi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne integratsiooni loomist katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evasel tasuta prooviperioodil saab kasutada kuni 20 t\u00f6\u00f6keskust ning importida Seniorist andmeid CSV- v\u00f5i Exceli failidega. Krediitkaarti pole vaja. <a href=\"\/et\/prooviperiood\/\">Alustage prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a>, et m\u00e4\u00e4rata integratsiooni ulatus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integratsioonid \/ ERP \/ Senior ERP Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga See Senior ERP liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ettev\u00f5tte Senior Sistemas loodud Senior ERP (Gest\u00e3o Empresarial | ERP XT koos Senior X-iga) SkyPlanner APS-iga. SkyPlanner vahetab Senior ERP-ga andmeid m\u00f5lemas suunas, kasutades Seniori enda liideseid: skyplanner.ai \u00b7 Tootmise ajakava &#8230; <a title=\"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/\" aria-label=\"Read more about Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106496,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107571","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Senior ERP ja APS-i liidestusjuhend: tootmise ajakava koostamine<\/title>\n<meta name=\"description\" content=\"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" \/>\n<meta property=\"og:description\" content=\"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/liidestamise-juhend\\\/\",\"name\":\"Senior ERP ja APS-i liidestusjuhend: tootmise ajakava koostamine\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Senior ERP jaoks: tootmise planeerimine tegeliku v\u00f5imsuse piires\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/senior-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Senior ERP ja APS-i liidestusjuhend: tootmise ajakava koostamine","description":"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga","og_description":"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/","name":"Senior ERP ja APS-i liidestusjuhend: tootmise ajakava koostamine","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u00dchenda Senior ERP SkyPlanner APS-iga: Senior X Platform API-d, G5 veebiteenused, Events Hub veebihaagid, OP-etapi tagasikirjutus, andmevastendus ja projektin\u00f5uanded.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Senior ERP jaoks: tootmise planeerimine tegeliku v\u00f5imsuse piires","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/senior-erp\/"},{"@type":"ListItem","position":5,"name":"Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integratsioonid \/ ERP \/ Senior ERP Senior ERP liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga See Senior ERP liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada ettev\u00f5tte Senior Sistemas loodud Senior ERP (Gest\u00e3o Empresarial | ERP XT koos Senior X-iga) SkyPlanner APS-iga. SkyPlanner vahetab Senior ERP-ga andmeid m\u00f5lemas suunas, kasutades Seniori enda liideseid: skyplanner.ai \u00b7 Tootmise ajakava&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=107571"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107571\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/106496"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=107571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}