{"id":107337,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/","title":{"rendered":"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Cegidi integreerimise juhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-iga<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Cegidi tootmise ERP-s\u00fcsteemid SkyPlanner APS-iga. Esmalt k\u00e4sitleme Cegid PMI-d, seej\u00e4rel Cegid Primaverat ja Cegid Ekoni. SkyPlanner vahetab Cegidiga andmeid m\u00f5lemas suunas, kasutades Cegidi enda liideseid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmistellimused ehk OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n) koos operatsioonidega, tehnoloogilised marsruudid (gammes), tootestruktuurid (nomenclatures), koormuskeskused (postes de charge) ja masinad, artiklid, laoseisud ning ostutellimused.<\/li>\n\n\n<li>Iga OF operatsiooni planeeritud algus- ja l\u00f5ppkuup\u00e4evad kirjutatakse tagasi Cegidisse.<\/li>\n\n\n<li>Soovi korral saab operaatorite t\u00f6\u00f6aja tagasi kirjutada kirjetena pointages (PMI), Di\u00e1rios de Trabalho (Primavera) v\u00f5i imputaciones (Ekon).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on paigutatud t\u00f6\u00f6keskuste ajakavadesse ja all on tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegidi integratsiooniliidesed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> Cegid pakub PMI jaoks Web API-t: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (Cegidi tootmisjuhtimise Web API v\u00f5imaldab turvalist andmevahetust v\u00e4liste rakendustega.) Web API tagab, et Manufacturing PMI \u00e4rireeglid kehtivad ka v\u00e4listes rakendustes (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). PMI pakub ka EDI-t, standardseid XML-faile CAD-ist p\u00e4rit tehniliste andmete jaoks ning aruandegeneraatorit, mis v\u00f5imaldab eksportida Excelisse. Exceli eksport on kiireim viis prooviandmete saamiseks.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> PRIMAVERA ERP V10 API &#8220;allows third party applications to perform both data query and writing operations&#8221; (v\u00f5imaldab kolmandate osapoolte rakendustel nii andmeid p\u00e4rida kui ka kirjutada) ning h\u00f5lmab k\u00f5iki toote mooduleid (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API dokumentatsioon<\/a>). Web API on moodulite kaupa dokumenteeritud ja Swaggeri kaudu v\u00e4ljakutsutav (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Moodul Produ\u00e7\u00e3o (GPR) h\u00f5lmab tehnilisi kaarte (fichas t\u00e9cnicas), netovajadusi, OF k\u00e4ivitamist, Planeamento funktsioone, tootmiskirjeid ja Di\u00e1rios de Trabalho kirjeid (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">Produ\u00e7\u00e3o viitedokumentatsioon<\/a>). Peamised teenused ajakava koostamiseks:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> loeb tootmistellimusi (ordens de fabrico) ja nende operatsioone (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> laadib OF-id planeerimiseks ja uuendab planeeritud operatsioone meetodiga <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> ja <strong>IGprBSRoteiros<\/strong> loevad vastavalt t\u00f6\u00f6keskusi (centros de trabalho), t\u00f6\u00f6kohti (postos), operaatoreid (operadores) ja tehnoloogilisi marsruute (roteiros).<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> registreerib t\u00f6\u00f6d meetoditega <strong>IniciaPicagem<\/strong> ja <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> Cegidi s\u00f5nul \u00fchendub Ekon ettev\u00f5tte teiste juhtimiss\u00fcsteemidega (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). SkyPlanneri meeskond m\u00e4\u00e4rab teie Ekoni paigaldusele sobiva liidese projekti ulatuse m\u00e4\u00e4ramise k\u00e4igus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentimine ja litsentsid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> Integratsiooniks vajalik Web API ligip\u00e4\u00e4s aktiveeritakse teie PMI paigalduses projekti ulatuse m\u00e4\u00e4ramise k\u00e4igus koos teie Cegidi partneriga.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Igal Web API olemil on Login-meetod, mis tagastab seansiv\u00f5tmega Bearer-tokeni. Tokenit uuendatakse tokeni l\u00f5pp-punkti kaudu (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Integratsiooni kasutajal peavad olema Produ\u00e7\u00e3o litsentsid nende valdkondade jaoks, mille teenuseid ta v\u00e4lja kutsub.<\/li>\n\n\n<li><strong>SkyPlanneri pool.<\/strong> REST API kasutab autentimiseks API-tokenit p\u00e4ises Authorization-Token (SkyPlanner Settings &gt; API) ning on dokumenteeritud Swagger\/OpenAPI kaudu. <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">Integreerimise \u00f5petus<\/a> juhendab esimeste p\u00e4ringute tegemist.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00fcndmused ja pollimine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Cegidi poolelt p\u00e4ritakse andmeid perioodiliselt ehk pollitakse. Uued t\u00f6\u00f6d leitakse p\u00e4ringutega, mis on filtreeritud avatud OF-ide ja hiljutiste muudatuste j\u00e4rgi. P\u00e4ringusagedus m\u00e4\u00e4ratakse iga tehase jaoks eraldi: OF-ide puhul iga paari minuti j\u00e4rel, laoseisude puhul kord tunnis.<\/p>\n\n\n<p>SkyPlanner saadab oleku v\u00f5i ajakava muutumisel veebikonkse, seega toimub tagasikirjutamine s\u00fcndmusp\u00f5hiselt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmete vastendamine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Cegidi objekt (PMI \/ Primavera)<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td>Articles \/ artigos<\/td><td>Tooted ja materjalid<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel pollimine<\/td><\/tr><tr><td>Nomenclatures \/ fichas t\u00e9cnicas, componentes<\/td><td>Tootestruktuur, alamtooted, tootep\u00f5hised materjalid<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Gammes ja operatsioonid \/ roteiros, opera\u00e7\u00f5es<\/td><td>Protsessietapid koos kestuse ning ettevalmistus- ja l\u00f5petust\u00f6\u00f6de aegadega<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Postes de charge ja masinad \/ centros de trabalho, postos de trabalho<\/td><td>T\u00f6\u00f6keskused, t\u00f6\u00f6keskuste r\u00fchmad, efektiivsusn\u00e4itajad<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, edaspidi harva<\/td><\/tr><tr><td>Salari\u00e9s \/ operadores<\/td><td>T\u00f6\u00f6tajad<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Kalendrid \/ exce\u00e7\u00f5es de capacidade<\/td><td>Vahetused ja t\u00f6\u00f6vabad p\u00e4evad<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Iga p\u00e4ev v\u00f5i vahetuste haldamine SkyPlanneris<\/td><\/tr><tr><td>Ferramentas e moldes (Primavera)<\/td><td>T\u00f6\u00f6riistad piiratud saadavusega ressurssidena<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>OF fermes ja pr\u00e9visionnels \/ ordens de fabrico koos operatsioonidega<\/td><td>Tellimused ja t\u00f6\u00f6d koos t\u00e4htaegade ja materjalivajadustega<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pollimine iga paari minuti j\u00e4rel<\/td><\/tr><tr><td>Laoseis artikli ja lao kaupa<\/td><td>Laosaldod<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pollimine kord tunnis v\u00f5i ajakava koostamisel<\/td><\/tr><tr><td>Ostutellimused koos tarnekuup\u00e4evadega<\/td><td>Ostutellimused, saabuv materjal tarnekuup\u00e4eva j\u00e4rgi<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pollimine kord tunnis v\u00f5i ajakava koostamisel<\/td><\/tr><tr><td>OF operatsiooni planeeritud algus ja l\u00f5pp \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista meetodi ActualizaPlaneamentoOperacao kaudu<\/td><td>Iga etapi planeeritud algus ja l\u00f5pp, m\u00e4\u00e4ratud t\u00f6\u00f6keskus<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Ajakava muutumisel SkyPlanneri veebikonksu kaudu<\/td><\/tr><tr><td>Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>T\u00f6\u00f6ajakirjed ja operaatorite kinnitused<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Soovi korral iga kinnituse v\u00f5i vahetuse j\u00e4rel<\/td><\/tr><tr><td>Cegidis puudub<\/td><td>Seadistusaegade maatriks, t\u00f6\u00f6riistad piiratud saadavusega ressurssidena (PMI), alternatiivsed masinad ja t\u00f6\u00f6tajad<\/td><td>Hallatakse SkyPlanneris<\/td><td>Seadistatakse kasutuselev\u00f5tu k\u00e4igus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integratsiooni t\u00f6\u00f6vood<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete esmane laadimine.<\/strong> Lugege sisse artiklid, tootestruktuurid (nomenclatures), tehnoloogilised marsruudid (gammes), koormuskeskused (postes de charge), masinad, operaatorid ja kalendrid. Vastendage koormuskeskused l\u00e4bim\u00f5eldult: nelja masinaga poste de charge muutub \u00fcheks t\u00f6\u00f6keskuste r\u00fchmaks, milles on neli t\u00f6\u00f6keskust.<\/p>\n\n\n<p><strong>2. OF-ide s\u00fcnkroonimine.<\/strong> Lugege sisse kinnitatud OF-id koos operatsioonide ja komponentidega ning avatud ostutellimused. SkyPlanner k\u00e4sitleb tellitud materjali saadavana ostutellimuse tarnekuup\u00e4eval ning uuendab laoseisu, kui ostutellimus m\u00e4rgitakse olekusse Delivered. Otsustage projekti ulatuse m\u00e4\u00e4ramisel, kas ajakavasse lisatakse ka kavandatud OF-id (OF pr\u00e9visionnels) v\u00f5i ainult kinnitatud OF-id.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> Kui planeerimismootor paigutab t\u00f6\u00f6 ajakavasse v\u00f5i muudab selle asukohta, k\u00e4ivitab SkyPlanneri veebikonks andmete kirjutamise Cegidisse. PMI-s kirjutatakse planeeritud algus- ja l\u00f5ppkuup\u00e4evad OF operatsioonidele Web API kaudu, j\u00e4rgides PMI \u00e4rireegleid. Primaveras kutsub integratsioon v\u00e4lja meetodi IGprBSPlaneamento.ActualizaPlaneamentoOperacao, edastades operatsiooni, t\u00f6\u00f6keskuse (centro de trabalho) ning planeeritud alguse ja l\u00f5pu. Sellega uuendatakse tootmistellimuse operatsiooni v\u00e4lju DataIniPrevista ja DataFimPrevista.<\/p>\n\n\n<p><strong>4. T\u00f6\u00f6de kinnitamine tootmises.<\/strong> Operaatorid registreerivad t\u00f6\u00f6d SkyPlanner Mobile Confirmationsi v\u00f5i Production Timeri abil ning t\u00f6\u00f6ajakirjed hoiavad ajakava ajakohasena. Teie valite, kas t\u00f6\u00f6aeg kirjutatakse tagasi Cegidisse. Kui jah, edastatakse see PMI-sse pointages-kirjetena v\u00f5i Primavera Di\u00e1rios de Trabalho kirjetesse meetoditega IniciaPicagem ja TerminaPicagem. Kui ei, registreeritakse t\u00f6\u00f6aeg Cegidis v\u00f6\u00f6tkoodiga nagu varem.<\/p>\n\n\n<p><strong>5. Andmete haldamise ja konfliktide lahendamise reeglid.<\/strong> Pange need enne kasutuselev\u00f5ttu kirja:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Andmed<\/th><th>Vastutav s\u00fcsteem<\/th><\/tr><\/thead><tbody><tr><td>Artiklid, tootestruktuurid, tehnoloogilised marsruudid, OF-ide kogused ja olek<\/td><td>Cegid<\/td><\/tr><tr><td>Operatsioonide j\u00e4rjekord, algus- ja l\u00f5puajad, masinate m\u00e4\u00e4ramine<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Seadistusaegade maatriks, n\u00f5uded t\u00f6\u00f6riistadele ja operaatoritele, alternatiivsed ressursid<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Vahetused ja t\u00f6\u00f6vabad p\u00e4evad<\/td><td>\u00dcks s\u00fcsteem, mis valitakse projekti ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><tr><td>T\u00f6\u00f6aeg, materjalikulu ja t\u00f6\u00f6de l\u00f5petamine<\/td><td>Cegid; sisestatakse seal v\u00f5i edastatakse SkyPlanneri t\u00f6\u00f6ajakirjetest<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Valige OF-ide kuup\u00e4evade kirjutamiseks \u00fcks s\u00fcsteem. Planeeritud kuup\u00e4evad m\u00e4\u00e4rab edaspidi SkyPlanner, mitte PMI planeerimisfunktsioon ega Primavera planeerimisalgoritm. \u00c4rge kasutage neid OF-ide planeerimiseks, mille ajakava koostab SkyPlanner, et s\u00fcsteemid ei kirjutaks teineteise andmeid \u00fcle.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekti tavap\u00e4rased etapid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Juurutamine l\u00f5peb tavaliselt m\u00f5ne n\u00e4dala jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Enne seda kontrollige ajakava 30-p\u00e4evase tasuta prooviperioodi jooksul, kasutades Cegidist CSV- v\u00f5i Exceli failina eksporditud koormuskeskuste (postes), tehnoloogiliste marsruutide (gammes) ja avatud OF-ide andmeid.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Andmete vastendamine.<\/strong> Leppige kokku vastendustabel, andmete haldamise vastutus, s\u00fcnkroonimise sagedus ja see, kas ajakanded saadetakse tagasi.<\/li>\n\n\n<li><strong>Juurdep\u00e4\u00e4s Cegidile.<\/strong> Looge integratsiooni kasutaja ning kontrollige tootmisobjektide \u00f5igusi ja litsentse. Katsetage esmalt testettev\u00f5ttes.<\/li>\n\n\n<li><strong>Andmete esmane laadimine.<\/strong> Articles, nomenclatures, gammes, postes de charge, masinad, operaatorid ja kalendrid.<\/li>\n\n\n<li><strong>OF ja tarnijatellimuste s\u00fcnkroonimine.<\/strong> Perioodilised p\u00e4ringud koos filtrite, lehek\u00fclgedeks jaotamise ja korduskatsetega.<\/li>\n\n\n<li><strong>Piirangute seadistamine SkyPlanneris.<\/strong> Seadistusaegade maatriks, t\u00f6\u00f6riistad, operaatorite arv iga t\u00f6\u00f6 kohta ning alternatiivsed masinad v\u00f5i t\u00f6\u00f6tajad.<\/li>\n\n\n<li><strong>Ajakava tagasikirjutamine.<\/strong> Operatsioonide planeeritud kuup\u00e4evad SkyPlanneri veebihaakide kaudu ning soovi korral ka ajakanded.<\/li>\n\n\n<li><strong>Paralleelne testimine.<\/strong> Kasutage SkyPlannerit senise plaani k\u00f5rval, v\u00f5rrelge kuup\u00e4evi ja parandage p\u00f5hiandmeid.<\/li>\n\n\n<li><strong>T\u00f6\u00f6sse rakendamine.<\/strong> L\u00fclitage tagasikirjutamine sisse, kui andmed \u00fchtivad.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millega Cegidi integratsiooni kavandamisel arvestada<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kinnitatud ja planeeritud OF.<\/strong> PMI loob m\u00f5lemad CBN-i alusel. Planeeritud OF ajastamine n\u00e4itab tulevast koormust, kuid kuup\u00e4evad kirjutage tagasi ainult kinnitatud OF-idele.<\/li>\n\n\n<li><strong>Planeerimisest v\u00e4lja j\u00e4etud operatsioonid.<\/strong> Primaveras saab operatsiooni m\u00e4rkida planeerimisele mittekuuluvaks (NaoSujeitaPlaneamento). J\u00e4tke need tagasikirjutamisel vahele.<\/li>\n\n\n<li><strong>Masina- ja operaatoriaeg.<\/strong> Primavera hoiab iga operatsiooni masina- ja operaatoriaega eraldi. Vastendage m\u00f5lemad, et mitme operaatoriga t\u00f6\u00f6dele m\u00e4\u00e4rataks \u00f5ige meeskond.<\/li>\n\n\n<li><strong>Kattuvad operatsioonid.<\/strong> Primavera operatsioonidel on kattumistegur. Siduge see SkyPlanneri t\u00f6\u00f6etappide ajastusega, muidu tekivad ajakavas pikemad ooteajad kui tegelikus tootmises.<\/li>\n\n\n<li><strong>Milline Cegidi ERP?<\/strong> PMI, Primavera ja Ekon kasutavad erinevaid liideseid. Tehke esmalt kindlaks toode ja versioon. Cegid XRP Flexi puhul kasutage <a href=\"\/et\/integratsioonid\/erp\/acumatica\/liidestamise-juhend\/\">Acumatica integratsioonijuhendit<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes seadistab Cegidi integratsiooni ja pakub tuge<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab integratsiooni kasutuselev\u00f5tu k\u00e4igus ja pakub tuge ka p\u00e4rast t\u00f6\u00f6sse rakendamist<\/strong> kokkulepitud Cegidi API p\u00e4ringute ulatuses. Iga tehas kasutab Cegidit omamoodi ning just siin rakendatakse neid teadmisi.<\/li>\n\n\n<li><strong>Teie Cegidi partner saab kaasa l\u00fc\u00fca.<\/strong> Partner tunneb teie seadistust, kohandusi ja litsentse ning saab koos SkyPlanneri meeskonnaga luua integratsiooni kasutaja ja seadistada API juurdep\u00e4\u00e4su.<\/li>\n\n\n<li><strong>Teie arendajad saavad integratsiooni edasi arendada,<\/strong> kasutades SkyPlanneri REST API-t ja API-tokenit. Alustamiseks piisab API-tokenist ning SkyPlanneri meeskond aitab vajaduse korral. Juhised leiate <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri integratsiooni dokumentatsioonist<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanneri hind algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub iga kuu. Integratsiooni hinnapakkumine koostatakse ette teie protsessi ja vajaduste p\u00f5hjal koos paketiga. Vaadake <a href=\"\/et\/hinnakujundus\/\">hinnakirja<\/a>, <a href=\"\/et\/integratsioonid\/erp\/cegid\/tootmise-planeerimine\/\">Cegidiga tootmise planeerimist, mis arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust<\/a>, <a href=\"\/et\/integratsioonid\/erp\/cegid\/\">Cegidi lehte<\/a> ja <a href=\"\/et\/integratsioonid\/erp\/\">ERP integratsioonide \u00fclevaadet<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete tagasiside SkyPlanneri kohta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahela spetsialist Kalle Kalliom\u00e4ki Ulvila elektrikilpide tootmistsehhis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest tootmise reaalajas optimeerimiseni.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahela spetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab liinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Loe UTU tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumi kaitseriietuses operaatorid pudelite t\u00e4itmisliinil Laboratory &amp; Alliedi ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise t\u00f5husus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise t\u00f5husus on kasvanud 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise t\u00f5husus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmiva optimeeritud kolmekuulise plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Loe Laboratory &amp; Alliedi tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operationsi tootmisjuht Anu J\u00e4rvinen Raumas t\u00f6\u00f6ala k\u00f5rval, kus robot laob kaupa kaubaalustele\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 kuud<\/b><span>ette n\u00e4eb m\u00fc\u00fcgimeeskond vaba tootmisv\u00f5imsust<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner loob kogu tootmise planeerimisele kindla ja usaldusv\u00e4\u00e4rse aluse.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, tootmisjuht<\/b><br>Fredman Operations \u00b7 Toiduohutud pakkepaberid<\/p>\n\n\n<p class=\"ind-cust__result\">M\u00fc\u00fcgimeeskond n\u00e4eb vaba tootmisv\u00f5imsust kuus kuud ette ning ajakava muutmise p\u00e4ringutele, millele vastamine v\u00f5ttis varem tunni v\u00f5i rohkem, saab n\u00fc\u00fcd vastuse sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/fredman-operations\/\">Loe Fredman Operationsi tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>tarnekindlus alates 2021. aastast<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner annab meile \u00fclevaate tootmisv\u00f5imsusest ja muudab planeerimise prognoositavaks.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Keemia- ja toiduainet\u00f6\u00f6stus<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus on olnud 100% kogu SkyPlanneri kasutusaja jooksul, alates 2021. aastast.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/opes-corporation\/\">Loe Opes Corporationi tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Cegid PMI-l on API?<\/summary>\n<p class=\"sp-faq__a\">Jah. Cegid pakub PMI jaoks Web API-t, mis v\u00f5imaldab turvalist andmevahetust v\u00e4liste rakendustega, s\u00e4ilitades Manufacturing PMI \u00e4rireeglid. SkyPlanner kasutab seda OF-ide lugemiseks ning planeeritud kuup\u00e4evade ja pointages-kirjete kirjutamiseks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Cegid Primaveral on tootmistellimuste API?<\/summary>\n<p class=\"sp-faq__a\">Jah. PRIMAVERA V10 API toetab lugemist ja kirjutamist k\u00f5igis moodulites. Mooduli Produ\u00e7\u00e3o kaudu on k\u00e4ttesaadavad ordens de fabrico, Planeamento koos ActualizaPlaneamentoOperacao meetodiga ning Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas kirjutatakse planeeritud kuup\u00e4evad Cegidisse tagasi?<\/summary>\n<p class=\"sp-faq__a\">PMI-s kirjutatakse need Web API kaudu igale OF-operatsioonile. Primaveras kasutatakse meetodit IGprBSPlaneamento.ActualizaPlaneamentoOperacao, mis m\u00e4\u00e4rab ordem de fabrico operatsiooni planeeritud alguse ja l\u00f5pu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Cegid toetab veebihaake?<\/summary>\n<p class=\"sp-faq__a\">Integratsioon teeb Cegidisse perioodilisi p\u00e4ringuid iga tehase jaoks m\u00e4\u00e4ratud sagedusega. SkyPlanneri enda veebihaagid edastavad ajakava muudatused kohe nende tekkimisel, nii et kuup\u00e4evad j\u00f5uavad Cegidisse vahetult p\u00e4rast iga \u00fcmberplaneerimist.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Cegidi partner peaks soovitama Cegidi sisseehitatud planeerimist v\u00f5i SkyPlannerit?<\/summary>\n<p class=\"sp-faq__a\">SkyPlannerit, kui kliendi piirangud ei puuduta \u00fcksnes masinaid ja laovarusid. Cegid ise soovitab t\u00e4iendavate piirangute arvestamiseks liidestada t\u00e4iustatud planeerimist\u00f6\u00f6riistad (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner planeerib operaatorite, t\u00f6\u00f6riistade ja materjalide kasutust ning seadistusi, teeb automaatselt \u00fcmberplaneerimist ja v\u00f5imaldab piiramatul arvul kasutajaid, hinnaga alates 199 \u20ac kuus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne integratsiooni loomist katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evane tasuta prooviperiood v\u00f5imaldab kasutada kuni 20 t\u00f6\u00f6keskust ning importida Cegidi andmeid CSV- v\u00f5i Exceli failidest. Krediitkaarti pole vaja. <a href=\"\/et\/prooviperiood\/\">Alustage prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a>, et m\u00e4\u00e4rata integratsiooni ulatus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ Cegid Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Cegidi tootmise ERP-s\u00fcsteemid SkyPlanner APS-iga. Esmalt k\u00e4sitleme Cegid PMI-d, seej\u00e4rel Cegid Primaverat ja Cegid Ekoni. SkyPlanner vahetab Cegidiga andmeid m\u00f5lemas suunas, kasutades Cegidi enda liideseid: skyplanner.ai \u00b7 Tootmise ajakava koostamine Cegidi integratsiooniliidesed Cegid PMI. &#8230; <a title=\"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/\" aria-label=\"Read more about Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106380,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107337","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegidi APS-integratsiooni juhend tootmise ajakava koostamiseks<\/title>\n<meta name=\"description\" content=\"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" \/>\n<meta property=\"og:description\" content=\"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/liidestamise-juhend\\\/\",\"name\":\"Cegidi APS-integratsiooni juhend tootmise ajakava koostamiseks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Cegidile: tootmise planeerimine tegeliku tootmisv\u00f5imsuse j\u00e4rgi\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegidi APS-integratsiooni juhend tootmise ajakava koostamiseks","description":"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga","og_description":"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/","name":"Cegidi APS-integratsiooni juhend tootmise ajakava koostamiseks","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u00dchenda Cegid PMI ja Cegid Primavera SkyPlanner APS-iga: PMI Web API, PRIMAVERA V10 API, Planeamento tagasikirjutus, andmeseosed, pollimine ja projektin\u00f5uanded.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Cegidile: tootmise planeerimine tegeliku tootmisv\u00f5imsuse j\u00e4rgi","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ Cegid Cegidi integreerimise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See juhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Cegidi tootmise ERP-s\u00fcsteemid SkyPlanner APS-iga. Esmalt k\u00e4sitleme Cegid PMI-d, seej\u00e4rel Cegid Primaverat ja Cegid Ekoni. SkyPlanner vahetab Cegidiga andmeid m\u00f5lemas suunas, kasutades Cegidi enda liideseid: skyplanner.ai \u00b7 Tootmise ajakava koostamine Cegidi integratsiooniliidesed Cegid PMI.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=107337"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/107337\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/106380"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=107337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}