{"id":106438,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integratsioonid\/erp\/helios\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"helios","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/","title":{"rendered":"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS HELIOS-ele: <span class=\"hl\">tootmise planeerimine tegeliku v\u00f5imsuse piires<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS on HELIOS-e tootmise planeerimise lisalahendus, mis arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust ning koostab ajakava iga masina, operaatori, t\u00f6\u00f6riista ja materjali jaoks. N\u00e4ete, milline operatsioon toimub kus ja millal, ning Autopilot muudab tootmise muutudes ajakava automaatselt. Lahendus t\u00f6\u00f6tab Asseco Solutionsi toodetega HELIOS Nephrite ja HELIOS iNuvio ning ka tehastes, kus kasutatakse endiselt HELIOS Orange&#8217;i v\u00f5i HELIOS Greeni.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneerige demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajatelg t\u00f6\u00f6keskustele planeeritud t\u00f6\u00f6dega ja selle all olev tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanneri ja HELIOS-e liidestus on kahesuunaline: SkyPlannerisse liiguvad tootmistellimused, tootestruktuurid ja tehnoloogilised marsruudid, t\u00f6\u00f6kohad, masinad, ametialad, laoseisud ning ostutellimused. Tagasi liiguvad planeeritud kuup\u00e4evad ja registreeritud t\u00f6\u00f6d. Kasutuselev\u00f5tu k\u00e4igus seadistab SkyPlanneri meeskond liidestuse teie HELIOS-e seadistuse j\u00e4rgi.<\/p>\n\n\n<p>Hind algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Iga lisat\u00f6\u00f6keskus maksab 20 \u20ac kuus. Tasuta prooviperiood kestab 30 p\u00e4eva, h\u00f5lmab kuni 20 t\u00f6\u00f6keskust ega n\u00f5ua krediitkaarti.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mis teie tootmises muutub<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Igale masinale teostatav t\u00f6\u00f6j\u00e4rjekord.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner m\u00e4\u00e4rab iga tootmistellimuse iga operatsiooni konkreetsele masinale ja kindlale ajale. Tootmisv\u00f5imsuse m\u00e4\u00e4ravad tegelikud vahetused, puudumised ja \u00fcletunnid, nii et plaani saab teie tootmises ka p\u00e4riselt ellu viia.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00dcmberseadistamine maksab v\u00e4hem.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner talletab iga tootepaari vahelise \u00fcmberseadistusaja m\u00f5lemas suunas. Heledalt v\u00e4rvilt tumedale \u00fcleminekuks v\u00f5ib piisata l\u00fchikesest loputusest, tumedalt heledale \u00fcleminek n\u00f5uab aga t\u00e4ielikku puhastust. Planeerimismootor seab t\u00f6\u00f6d j\u00e4rjekorda, millega l\u00e4heb kaotsi k\u00f5ige v\u00e4hem aega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ka t\u00f6\u00f6tajaid ja t\u00f6\u00f6riistu on piiratud hulk.<\/p>\n\n\n<p class=\"fx-pain__b\">Kolme operaatorit n\u00f5udvale t\u00f6\u00f6le m\u00e4\u00e4ratakse kolm inimest, kelle vahetustes on vaba aega. \u00dchel masinal kasutuses olevat stantsi v\u00f5i vormi ei broneerita kunagi samaks ajaks teisele. Kui masin on h\u00f5ivatud, suunatakse t\u00f6\u00f6 teisele sobivale masinale v\u00f5i t\u00f6\u00f6tajale.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materjali hilinemine ei l\u00f6\u00f6 enam plaani segi.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner kontrollib iga materjali laoseisu ja saabuvaid ostutellimusi. Tarnet ootav tootmistellimus planeeritakse tarnekuup\u00e4eva j\u00e4rele, mitte ei alustata t\u00f6\u00f6d tootmissaalis, et see siis materjalipuuduse t\u00f5ttu katkestada.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kiirt\u00f6\u00f6de ja rikete korral muutub plaan automaatselt.<\/p>\n\n\n<p class=\"fx-pain__b\">Kui masin seiskub, operaator haigestub v\u00f5i saabub kiirtellimus, koostab Autopilot ajakava \u00fcmber. Teie m\u00e4\u00e4ratud lukustused ja prioriteedid j\u00e4\u00e4vad kehtima.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operaatorid n\u00e4evad oma t\u00f6\u00f6j\u00e4rjekorda.<\/p>\n\n\n<p class=\"fx-pain__b\">Iga operaator n\u00e4eb telefonis v\u00f5i tahvelarvutis oma j\u00e4rgmisi t\u00f6id ning registreerib t\u00f6\u00f6 edenemise jooksvalt. Kontoris on edenemine reaalajas n\u00e4ha ja teie otsustate, kas tegelikud t\u00f6\u00f6ajad saadetakse tagasi HELIOS-esse.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete tagasiside SkyPlannerile<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvilas elektrikilpide tootmissaalis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest tootmise reaalajas optimeerimiseni.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja l\u00fclitusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Lugege UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumi kaitseriietuses operaatorid pudelite t\u00e4iteliinil Laboratory &amp; Alliedi ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise efektiivsus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise efektiivsus on kasvanud 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise efektiivsus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolmekuulise plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Lugege Laboratory &amp; Alliedi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Compi keevitaja lihvib Alah\u00e4rm\u00e4 tehases keevitatud teraskonstruktsiooni\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>tarnekindlus varasema ligikaudu 50% asemel<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneril on meie tarnekindluse hoidmisel otsustav roll.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, tegevjuht<\/b><br>KJH-Comp \u00b7 Lehtmetallit\u00f6\u00f6d ja lepinguline tootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus t\u00f5usis ligikaudu 50%-lt koguni 98%-ni ning ajakava koostamiseks on n\u00fc\u00fcd kahe t\u00f6\u00f6juhi asemel vaja \u00fcht.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/kjh-comp\/\">Lugege KJH-Compi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u00d5huvaade Piristeeli katuse turvatoodete tehasele Kauhavas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>tarnekindlus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on aidanud kitsaskohti paremini m\u00e4rgata ja muutnud tootmise juhtimise selgemaks.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, tootmisjuht<\/b><br>Piristeel \u00b7 Katuse turvatooted ja vihmavees\u00fcsteemid<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus j\u00f5udis t\u00e4navu 99,2%-ni ning tootmise ajakava koostamine s\u00e4\u00e4stab kuni neli tundi t\u00f6\u00f6aega p\u00e4evas.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/piristeel\/\">Lugege Piristeeli kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-helios-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuidas HELIOS-e liidestus t\u00f6\u00f6tab<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>HELIOS saadab t\u00f6\u00f6d.<\/strong> SkyPlannerisse liiguvad tootmistellimused (v\u00fdrobn\u00ed p\u0159\u00edkazy) koos operatsioonidega, tootestruktuurid (kusovn\u00edky), tehnoloogilised marsruudid (technologick\u00e9 postupy), t\u00f6\u00f6kohad, masinad, ametialad, laoseisud ja ostutellimused.<\/li>\n\n\n<li><strong>SkyPlanner koostab ajakava ja hoiab selle ajakohasena.<\/strong> Planeerimismootor Arcturus planeerib k\u00f5ik operatsioonid sekunditega ja muudab plaani, kui tootmises midagi muutub.<\/li>\n\n\n<li><strong>Kuup\u00e4evad ja registreeritud t\u00f6\u00f6d liiguvad tagasi.<\/strong> Planeeritud algus- ja l\u00f5ppkuup\u00e4evad saadetakse tagasi HELIOS-e tootmistellimustele ning registreeritud t\u00f6\u00f6d saab edastada operatsioonide kirjetena (evidence v\u00fdrobn\u00edch operac\u00ed).<\/li>\n\n<\/ol>\n\n\n<p>HELIOS j\u00e4\u00e4b teie peamiseks andmes\u00fcsteemiks. Artiklid, tootmise tehniline ettevalmistus (TPV), MRP, ostud, laohaldus, kuluarvestus ja finantsid j\u00e4\u00e4vad sinna, kus need on. SkyPlanner vastutab \u00fche asja eest: iga operatsiooni j\u00e4rjekorra ja ajastuse eest igal ressursil.<\/p>\n\n\n<p>HELIOS iNuvio puhul loeb SkyPlanner andmeid Helios Inuvio Serveris asuva Inuvio REST API kaudu ning kirjutab need tagasi teie tootmismoodulite jaoks seadistatud REST-toimingutega. HELIOS Nephrite&#8217;i puhul m\u00e4\u00e4rab SkyPlanneri meeskond kasutuselev\u00f5tu ulatuse m\u00e4\u00e4ramise k\u00e4igus koos teie ja teie HELIOS-e partneriga teie paigaldusele sobiva REST-\u00fchenduse. M\u00f5lemas suunas liiguvad samad objektid. SkyPlanneri veebihaagid edastavad iga ajakava muudatuse kohe ning HELIOS-e s\u00fcnkroonimise sagedus m\u00e4\u00e4ratakse iga tehase jaoks eraldi.<\/p>\n\n\n<p>Iga tehas kasutab HELIOS-t omamoodi, seega seadistab SkyPlanneri meeskond liidestuse kasutuselev\u00f5tu k\u00e4igus teie lahenduse j\u00e4rgi ja pakub tuge ka p\u00e4rast k\u00e4ivitamist. Teie protsessile ja vajadustele vastav liidestuse hinnapakkumine koostatakse ette. Teie HELIOS-e partner v\u00f5i oma arendajad saavad samuti luua lahendusi SkyPlanneri dokumenteeritud API abil (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>).<\/p>\n\n\n<p>REST-ressursse, andmev\u00e4ljade vastendamist ja tagasikirjutamise reegleid kirjeldab <a href=\"\/et\/integratsioonid\/erp\/helios\/liidestamise-juhend\/\">HELIOS-e liidestusjuhend tootmise ajakava koostamiseks<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-helios-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mida planeerib HELIOS ja mida lisab SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>HELIOS-el on oma planeerimisv\u00f5imalused. HELIOS Nephrite sisaldab APS-i, mis <a href=\"https:\/\/www.helios.eu\/vyroba-nephrite\">optimeerib operatsioonidevahelisi aegu ja partiide j\u00e4rjekorda igal t\u00f6\u00f6kohal<\/a>, ning tootmisplaani jaoks on olemas planeerimistahvel. HELIOS iNuvio pakub Gantti vaatega tootmisv\u00f5imsuse p\u00f5hiplaneerimist (Z\u00e1kladn\u00ed kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed) ja t\u00e4iustatud tootmise planeerimist (Pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby). <a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Pokro%C4%8Dil%C3%A9_pl%C3%A1nov%C3%A1n%C3%AD_v%C3%BDroby_-_V%C3%BDroba\">iNuvio abimaterjalid<\/a> selgitavad, kuidas see t\u00f6\u00f6tab:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Esmalt planeeritakse tagasisuunas, seej\u00e4rel optimeeritakse.<\/strong> Aluseks on tagasisuunaline planeerimine tellimuse l\u00f5ppkuup\u00e4evast, millele lisandub poolelioleva tootmise optimeerimine (*Z\u00e1kladem je tedy zp\u011btn\u00e9 pl\u00e1nov\u00e1n\u00ed*).<\/li>\n\n\n<li><strong>V\u00f5imsuse saab muuta piiramatuks.<\/strong> \u00dcks seadistus lubab planeerida piiramatu v\u00f5imsusega, kui t\u00e4htaegadest ei suudeta kinni pidada (*Pl\u00e1novat do neomezen\u00fdch kapacit p\u0159i nedodr\u017een\u00ed limitn\u00edch term\u00edn\u016f*). Ressursse, mis on seadistatud v\u00f5imsust mitte h\u00f5ivama, planeeritakse kalendri t\u00f6\u00f6aja piires samuti piiramatult.<\/li>\n\n\n<li><strong>\u00dcks aktiivne plaan, eraldi arvutuskorrad.<\/strong> Aktiivne saab olla ainult \u00fcks tootmisv\u00f5imsuse plaan, teised on testplaanid. Iga plaani juures kuvatakse selle viimase arvutuse kuup\u00e4ev (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">tootmisv\u00f5imsuse p\u00f5hiplaneerimise abimaterjalid<\/a>).<\/li>\n\n\n<li><strong>Planeerija lahendab vastuolud.<\/strong> P\u00e4rast arvutust kuvab HELIOS planeerijale lahendamiseks vastuolud, n\u00e4iteks ressursside \u00fclekoormuse ja operatsioonide vale j\u00e4rjekorra.<\/li>\n\n<\/ul>\n\n\n<p>Tehnoloogilise marsruudi igal operatsioonil on oma masina ja operaatori ettevalmistusaeg (*p\u0159\u00edpravn\u00fd \u010das strojn\u00ed, p\u0159\u00edpravn\u00fd \u010das obsluhy*). SkyPlanner lisab ajakava, mis arvestab alati iga masina, inimese ja t\u00f6\u00f6riista tegelikke piiranguid, planeerib \u00fcmberseadistused t\u00f6\u00f6de j\u00e4rjekorra j\u00e4rgi, kontrollib saabuvaid materjale ning muudab tootmise muutudes plaani iseseisvalt.<\/p>\n\n\n<p>K\u00f5iki samme ja piiranguid selgitab artikkel <a href=\"\/et\/integratsioonid\/erp\/helios\/tootmise-planeerimine\/\">Kas HELIOS v\u00f5imaldab tootmist planeerida tegeliku v\u00f5imsuse piires?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">HELIOS praegu ja koos SkyPlanneriga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>HELIOS-e tootmisv\u00f5imsuse planeerimine<\/th><th>HELIOS koos SkyPlanner APS-iga<\/th><\/tr><\/thead><tbody><tr><td>Tootmisv\u00f5imsus<\/td><td>Ressursi kaupa piiratud v\u00f5i piiramatu; t\u00e4htaegade \u00fcletamisel saab \u00fcle minna piiramatule v\u00f5imsusele<\/td><td>Iga masina, inimese ja t\u00f6\u00f6riista tegelikud piirangud koos tegelike vahetustega<\/td><\/tr><tr><td>Ajakava<\/td><td>Tootmispartiid iga operatsiooni eeldatavate kuup\u00e4evadega<\/td><td>K\u00f5igi operatsioonide \u00fcksikasjalik j\u00e4rjekord sekunditega<\/td><\/tr><tr><td>Plaanid<\/td><td>\u00dcks aktiivne plaan, teised plaanid testimiseks<\/td><td>\u00dcks jooksev plaan, mida Autopilot hoiab ajakohasena<\/td><\/tr><tr><td>\u00dcmberseadistused<\/td><td>Ettevalmistusaeg on m\u00e4\u00e4ratud tehnoloogilise marsruudi iga operatsiooni jaoks<\/td><td>Seadistusaegade maatriks: v\u00e4ikseim summaarne seadistusaeg<\/td><\/tr><tr><td>T\u00f6\u00f6tajad<\/td><td>T\u00f6\u00f6tajad valitakse n\u00f5utava ametiala j\u00e4rgi<\/td><td>Konkreetsed operaatorid koos vahetustega; mitut operaatorit n\u00f5udvatele t\u00f6\u00f6dele m\u00e4\u00e4ratakse vajalikud t\u00f6\u00f6tajad<\/td><\/tr><tr><td>T\u00f6\u00f6riistad<\/td><td>T\u00f6\u00f6riistade seoseid hallatakse tehnilise ettevalmistuse andmetes<\/td><td>T\u00f6\u00f6riistad on piiratud saadavusega \u00fchiskasutatavad ressursid<\/td><\/tr><tr><td>Materjalid<\/td><td>MRP loob ostu- ja tootmistaotlused<\/td><td>T\u00f6\u00f6d algavad, kui materjal on laos olemas v\u00f5i ostutellimusega saabunud<\/td><\/tr><tr><td>Muudatused<\/td><td>Plaan arvutatakse \u00fcmber ja loetletud vastuolud lahendatakse<\/td><td>Autopilot planeerib kogu tehase t\u00f6\u00f6 \u00fcmber teie prioriteete j\u00e4rgides<\/td><\/tr><tr><td>Planeerija vaade<\/td><td>Tellimused Gantti vaates koos ressursside v\u00f5imsusega<\/td><td>Interaktiivne Gantti vaade: liigutage t\u00f6id, plaan j\u00e4\u00e4b koosk\u00f5laliseks<\/td><\/tr><tr><td>Tootmissaal<\/td><td>Operatsioonide registreerimine HELIOS-es terminalide v\u00f5i v\u00f6\u00f6tkoodide abil<\/td><td>Operaatorid n\u00e4evad t\u00f6\u00f6j\u00e4rjekorda ning registreerivad t\u00f6\u00f6d telefonis v\u00f5i tahvelarvutis<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Eelistage SkyPlannerit HELIOS APS-ile ja iNuvio t\u00e4iustatud planeerimisele, kui:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Plaan muutub mitu korda n\u00e4dalas.<\/strong> Autopilot muudab plaani automaatselt iga olulise muudatuse korral, ilma eraldi \u00fcmberarvutuse v\u00f5i vastuolude loendita, ning uued kuup\u00e4evad liiguvad tagasi HELIOS-esse.<\/li>\n\n\n<li><strong>Tegelikku tootmisv\u00f5imsust ei tohi \u00fcletada.<\/strong> SkyPlanner ei l\u00e4he t\u00e4htaja saavutamiseks kunagi \u00fcle piiramatule v\u00f5imsusele. See n\u00e4itab tegelikku l\u00f5ppkuup\u00e4eva ning v\u00f5imaldab teil selle p\u00f5hjal tegutseda: muuta prioriteete, lisada \u00fcletunde v\u00f5i kasutada teist masinat.<\/li>\n\n\n<li><strong>\u00dcmberseadistused m\u00e4\u00e4ravad teie toodangu mahu.<\/strong> Seadistusaegade maatriks sisaldab \u00fclemineku suunast s\u00f5ltuvaid \u00fcmberseadistusaegu ning j\u00e4rjestab v\u00e4rvid, maitsed v\u00f5i materjalid nii, et summaarne seadistusaeg oleks v\u00e4ikseim.<\/li>\n\n\n<li><strong>Operaatorid, t\u00f6\u00f6riistad ja saabuvad materjalid seavad plaanile piirid.<\/strong> Planeerimisel arvestatakse iga masina, inimese, t\u00f6\u00f6riista ja materjali tegelikke piiranguid. Mitut operaatorit n\u00f5udvatele t\u00f6\u00f6dele m\u00e4\u00e4ratakse vajalikud t\u00f6\u00f6tajad, kasutatakse alternatiivseid t\u00f6\u00f6keskusi ning t\u00f6\u00f6d algavad siis, kui materjal on laos olemas v\u00f5i ostutellimusega saabunud.<\/li>\n\n\n<li><strong>Iga operaator peaks t\u00f6\u00f6tama plaani j\u00e4rgi.<\/strong> Mobile Confirmations toob ajakohase t\u00f6\u00f6j\u00e4rjekorra telefoni v\u00f5i tahvelarvutisse. Kasutajate arv ei ole piiratud: hind s\u00f5ltub t\u00f6\u00f6keskuste, mitte kasutajate arvust.<\/li>\n\n\n<li><strong>Soovite toimivat ajakava n\u00e4dalatega.<\/strong> SkyPlanner on HELIOS-e k\u00f5rval t\u00f6\u00f6tav pilvetarkvara. Saate seda 30-p\u00e4evase prooviperioodi jooksul oma tootmistellimustega testida ning juurutamine l\u00f5peb tavaliselt n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuidas alustada<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Alustage tasuta prooviperioodi.<\/strong> 30 p\u00e4eva, kuni 20 t\u00f6\u00f6keskust, k\u00f5ik Basic-paketi funktsioonid, krediitkaarti pole vaja.<\/li>\n\n\n<li><strong>Looge oma tootmise mudel.<\/strong> Lisage SkyPlannerisse masinad, t\u00f6\u00f6tajad ja vahetused v\u00f5i importige HELIOS-est t\u00f6\u00f6kohad ja masinad. Kasutuselev\u00f5tul saab abi.<\/li>\n\n\n<li><strong>Laadige tellimused sisse.<\/strong> Eksportige HELIOS-e \u00fclevaatest avatud tootmistellimused ja nende operatsioonid Excelisse, importige need SkyPlannerisse ning v\u00f5rrelge SkyPlanneri ajakava oma praeguse plaaniga.<\/li>\n\n\n<li><strong>\u00dchendage HELIOS.<\/strong> SkyPlanneri meeskond seadistab kahesuunalise liidestuse ja pakub tuge ka p\u00e4rast k\u00e4ivitamist.<\/li>\n\n<\/ol>\n\n\n<p><strong>Hinnad.<\/strong> Pakettide eest tasutakse iga kuu t\u00f6\u00f6keskuste arvu j\u00e4rgi. T\u00f6\u00f6keskusi saab igal ajal lisada v\u00f5i eemaldada ning tellimuse saab igal ajal l\u00f5petada. Vaadake \u00fcksikasju <a href=\"\/et\/hinnakujundus\/\">hinnakirjast<\/a> v\u00f5i tutvuge <a href=\"\/et\/integratsioonid\/erp\/\">k\u00f5igi ERP-liidestustega<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">V\u00f5tke \u00fchendust m\u00fc\u00fcgiga<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Milline on parim tootmise ajakava koostamise lisalahendus HELIOS-ele?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS on tootmise planeerimise lisalahendus, mis arvestab masinate ja t\u00f6\u00f6tajate tegeliku v\u00f5imsusega ning vahetab HELIOS-ega andmeid m\u00f5lemas suunas. HELIOS-est tuuakse sisse tootmistellimused, tootestruktuurid, tehnoloogilised marsruudid, t\u00f6\u00f6kohad, masinad, laoseisud ja ostutellimused ning tagasi saadetakse planeeritud kuup\u00e4evad ja registreeritud t\u00f6\u00f6d. Iga masina, operaatori ja t\u00f6\u00f6riista v\u00f5imsus ning materjali kogus on piiratud. T\u00f6\u00f6de j\u00e4rjestamisel kasutatakse \u00fclemineku suunda arvestavat seadistusaegade maatriksit, et seadistamisele kuluks v\u00f5imalikult v\u00e4he aega. Autopilot koostab tootmises toimuvate muutuste korral ajakava automaatselt \u00fcmber. Hind algab 199 \u20ac kuus ja tasuta prooviperiood kestab 30 p\u00e4eva.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas HELIOS v\u00f5imaldab tootmist planeerida tegeliku v\u00f5imsuse piires?<\/summary>\n<p class=\"sp-faq__a\">Osaliselt. HELIOS Nephrite sisaldab oma APS-i ning HELIOS iNuvio pakub tootmisv\u00f5imsuse planeerimise p\u00f5hi- ja t\u00e4iustatud v\u00f5imalusi, millega saab planeerida piiratud v\u00f5imsuse piires. Plaanid koostatakse arvutusk\u00e4ikudega \u00fches aktiivses plaanis. Kui t\u00e4htaegadest ei suudeta kinni pidada, v\u00f5idakse minna \u00fcle piiramatu v\u00f5imsusega planeerimisele. Vastuolude lahendamine j\u00e4\u00e4b planeerijale. HELIOS-e k\u00f5rval t\u00f6\u00f6tav SkyPlanner APS arvestab alati iga masina, inimese ja t\u00f6\u00f6riista piiratud v\u00f5imsuse ning materjali piiratud kogusega ja planeerib automaatselt \u00fcmber.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Millist tootmise ajakava koostamise tarkvara saab HELIOS-ega liidestada?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS vahetab HELIOS-ega andmeid m\u00f5lemas suunas. HELIOS iNuvio puhul loeb see tootmistellimused, tehnoloogilised marsruudid, laoseisud ja ostutellimused Inuvio REST API kaudu ning kirjutab planeeritud kuup\u00e4evad ja registreeritud t\u00f6\u00f6d REST-toimingutega tagasi. HELIOS Nephrite puhul liiguvad samad objektid m\u00f5lemas suunas. SkyPlanneri meeskond m\u00e4\u00e4rab teie paigaldusele sobiva \u00fchendusviisi kasutuselev\u00f5tu ulatuse m\u00e4\u00e4ramise k\u00e4igus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SkyPlanner asendab HELIOS-e tootmismooduleid?<\/summary>\n<p class=\"sp-faq__a\">Ei, see t\u00e4iendab neid. Tootmise tehniline ettevalmistus (TPV), tootmise juhtimine, MRP, ostud, laohaldus, kuluarvestus ja finantsarvestus j\u00e4\u00e4vad HELIOS-esse. SkyPlanner koostab teie tootmistellimustele ajakava tegeliku v\u00f5imsuse piires ja saadab kuup\u00e4evad tagasi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas valida HELIOS APS v\u00f5i SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, kui plaan muutub sageli ja planeerimisel tuleb alati arvestada piiratud v\u00f5imsusega. HELIOS planeerib arvutusk\u00e4ikudega \u00fche aktiivse plaani alusel, v\u00f5ib t\u00e4htaegadest kinnipidamiseks minna \u00fcle piiramatule v\u00f5imsusele ja j\u00e4tab vastuolude loendi planeerija lahendada. SkyPlanner planeerib iga muudatuse korral automaatselt \u00fcmber, kavandab \u00fcmberseadistusi, t\u00f6\u00f6riistade, meeskondade ja materjali kasutust ning n\u00e4itab igale operaatorile telefonis tema t\u00f6\u00f6j\u00e4rjekorda. Kasutajate arv ei ole piiratud. Tasuta prooviperioodil saate selles oma HELIOS-e tellimustega ise veenduda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SkyPlanner t\u00f6\u00f6tab koos HELIOS Orange&#8217;i ja HELIOS Greeniga?<\/summary>\n<p class=\"sp-faq__a\">Jah. SkyPlanneri meeskond m\u00e4\u00e4rab kasutuselev\u00f5tu k\u00e4igus teie HELIOS-e tootesarjale ja versioonile sobiva liidestuse ulatuse. Ajakava koostamine toimib k\u00f5igi tootesarjade puhul \u00fchtemoodi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SkyPlanner on saadaval t\u0161ehhi keeles?<\/summary>\n<p class=\"sp-faq__a\">Jah. Iga kasutaja saab valida SkyPlanneri kasutajaliidese keeleks t\u0161ehhi keele, et planeerijad ja operaatorid saaksid t\u00f6\u00f6tada oma keeles.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kui palju maksab SkyPlanner HELIOS-t kasutavale tehasele?<\/summary>\n<p class=\"sp-faq__a\">Hind algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Iga lisat\u00f6\u00f6keskus maksab 20 \u20ac kuus. T\u00f6\u00f6keskus on tootmisressurss, millel on oma ajakavasse paigutatud t\u00f6\u00f6de j\u00e4rjekord. Saate liidestuse hinnapakkumise ette koos paketi hinnapakkumisega. Liidestuse hind l\u00e4htub teie protsessist ja vajadustest, nii et n\u00e4ete kogukulu enne alustamist.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne HELIOS-ega liidestamist katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evase prooviperioodi ajal kasutatakse teie HELIOS-e avatud tootmistellimuste Exceli eksporti. N\u00e4ete oma tootmise <a href=\"\/et\/ressursid\/piiratud-voimsusega-planeerimine\/\">tegelikku v\u00f5imsust arvestavat ajakava<\/a> juba enne liidestust\u00f6\u00f6de algust.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ HELIOS SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires SkyPlanner APS on HELIOS-e tootmise planeerimise lisalahendus, mis arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust ning koostab ajakava iga masina, operaatori, t\u00f6\u00f6riista ja materjali jaoks. N\u00e4ete, milline operatsioon toimub kus ja millal, ning Autopilot muudab tootmise muutudes ajakava automaatselt. Lahendus t\u00f6\u00f6tab Asseco Solutionsi &#8230; <a title=\"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/\" aria-label=\"Read more about SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100675,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106438","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>HELIOS-e APS-liidestus: tootmise planeerimine v\u00f5imsuse piires<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/helios\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/helios\\\/\",\"name\":\"HELIOS-e APS-liidestus: tootmise planeerimine v\u00f5imsuse piires\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/helios\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/helios\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/helios\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"HELIOS-e APS-liidestus: tootmise planeerimine v\u00f5imsuse piires","description":"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/","og_locale":"et_EE","og_type":"article","og_title":"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires","og_description":"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/","name":"HELIOS-e APS-liidestus: tootmise planeerimine v\u00f5imsuse piires","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: HELIOS-e tootmise planeerimise lisalahendus, kahesuunaline liidestus. Iga masina, operaatori, t\u00f6\u00f6riista ja materjali piirangud. Alates 199 \u20ac kuus.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/helios\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ HELIOS SkyPlanner APS HELIOS-ele: tootmise planeerimine tegeliku v\u00f5imsuse piires SkyPlanner APS on HELIOS-e tootmise planeerimise lisalahendus, mis arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust ning koostab ajakava iga masina, operaatori, t\u00f6\u00f6riista ja materjali jaoks. N\u00e4ete, milline operatsioon toimub kus ja millal, ning Autopilot muudab tootmise muutudes ajakava automaatselt. Lahendus t\u00f6\u00f6tab Asseco Solutionsi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/106438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=106438"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/106438\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/100675"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=106438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}