{"id":103651,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/","title":{"rendered":"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ Infor LN<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor LN-i liidestusjuhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-iga<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See Infor LN-i liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Infor LN SkyPlanner APS-iga. SkyPlanneri ja Infor LN-i vaheline andmevahetus on kahesuunaline:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmistellimused, tehnoloogiliste marsruutide operatsioonid, t\u00f6\u00f6keskused, masinad, artiklid, laoseisud ja ostutellimused.<\/li>\n\n\n<li>Iga operatsiooni kavandatud algus- ja l\u00f5ppkuup\u00e4evad saadetakse tagasi LN-i tootmistellimustele.<\/li>\n\n\n<li>Operaatorite ajakanded saadetakse tagasi masinatundide, t\u00f6\u00f6tundide ja valminud kogustena.<\/li>\n\n\n<li>SkyPlanneri veebihaagid edastavad ajakava muudatused kohe, kui need toimuvad.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on jaotatud t\u00f6\u00f6keskuste vahel ning all kuvatakse tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie LN-i keskkonnale vastavaks ning pakub tuge ka p\u00e4rast t\u00f6\u00f6lerakendamist. Partnerid ja arendajad v\u00f5ivad t\u00f6\u00f6s osaleda v\u00f5i luua liidestuse ise SkyPlanneri dokumenteeritud REST API abil (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloud-or-on-premises-what-shapes-every-ln-integr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pilves v\u00f5i kohapeal: millest s\u00f5ltub iga LN-i liidestus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>LN-il on kaks versiooniharu, mille liidestusviisid erinevad. SkyPlanner t\u00f6\u00f6tab m\u00f5lemal juhul pilves, seega LN-i sisse midagi ei paigaldata.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>LN pilves (2022.x kuni 2026.x, CloudSuites)<\/th><th>LN 10.x kohapealses keskkonnas<\/th><\/tr><\/thead><tbody><tr><td>Peamine liides<\/td><td>LN REST API (teenuser\u00fchm LN\/lnapi) ION API Gateway kaudu<\/td><td>ION koos BOD-s\u00f5numitega<\/td><\/tr><tr><td>Autentimine<\/td><td>OAuth 2.0, taustateenuse <code>.ionapi<\/code> autentimisandmed<\/td><td>ION-i \u00fchenduspunktid<\/td><\/tr><tr><td>Muudatustest teavitamine<\/td><td>ION-i avaldatud BOD-s\u00f5numid v\u00f5i ajastatud p\u00e4ringud<\/td><td>ION-i avaldatud BOD-s\u00f5numid<\/td><\/tr><tr><td>Andmete hulgiv\u00e4ljav\u00f5te<\/td><td>ION Data Lake v\u00f5i andmeeksport<\/td><td>Andmevahetusskeemid, andmebaasivaated v\u00f5i seansside andmeeksport<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"ln-interfaces-for-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">LN-i liidesed ajakava koostamiseks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. LN REST API.<\/strong> Infor avaldab LN-i teenused ION API Gateway kaudu: &#8220;You can review the available documentation for the public services that are part of LN API.&#8221; (Saate tutvuda LN API koosseisu kuuluvate avalike teenuste dokumentatsiooniga.) Ajakava koostamisel on keskne teenus <code>tiapi.sfcProductionOrder<\/code>. See h\u00f5lmab tootmistellimusi ja masinaoperatsioone ning pakub toiminguid Get Machine Operations, Register machine quantities, Register machine hours ja Finish Machine Operations. Muud <code>tiapi<\/code> ja <code>tcapi<\/code> teenused on l\u00fc\u00fcsis loetletud rentnikukeskkondade kaupa.<\/p>\n\n\n<p>Iga teenuse jaoks peab olema kasutus\u00f5igus ja teenus peab olema aktiveeritud. Infor m\u00e4rgib, et &#8220;Try it out&#8221; (Proovi j\u00e4rele) &#8220;only works if you are entitled for the service and the service has been activated.&#8221; (t\u00f6\u00f6tab ainult siis, kui teil on teenuse kasutus\u00f5igus ja teenus on aktiveeritud). Lisage see projekti kontrollnimekirja juba esimesel p\u00e4eval.<\/p>\n\n\n<p><strong>2. ION BOD-s\u00f5numid.<\/strong> &#8220;Business object documents (BODs) are XML messages used to exchange data between enterprises or enterprise applications.&#8221; (BOD-dokumendid on XML-s\u00f5numid, mida kasutatakse andmevahetuseks ettev\u00f5tete v\u00f5i ettev\u00f5tterakenduste vahel.) LN saadab need Infor ION-i, mis suunab need tellijatele. <code>Process.ItemMaster<\/code> ja <code>Process.BillOfMaterials<\/code> on nimetatud LN 10.8 dokumentatsioonis, mis k\u00e4sitleb ka kohapealse LN-i liidestamist BOD-s\u00f5numite abil. Teie versiooni t\u00e4ielik BOD-s\u00f5numite loend on teie rentnikukeskkonnas.<\/p>\n\n\n<p><strong>3. Failieksport.<\/strong> Kohapealne LN v\u00f5imaldab tabeleid eksportida andmevahetusskeemide v\u00f5i andmebaasivaadete kaudu. See sobib andmete esmaseks laadimiseks ja tehastele, kus eelistatakse ajastatud failivahetust.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentimine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>LN-i pilveversioonis kasutage ION API Gatewayd koos OAuth 2.0-ga:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Looge ION API-s volitatud rakendus t\u00fc\u00fcbiga <strong>Backend Service<\/strong> ja laadige alla selle <code>.ionapi<\/code> fail.<\/li>\n\n\n<li>Fail sisaldab kliendi ID-d (<code>ci<\/code>), kliendisaladust (<code>cs<\/code>), l\u00fc\u00fcsi URL-i (<code>iu<\/code>), autentimisserverit (<code>pu<\/code>), p\u00e4\u00e4smiku teed (<code>ot<\/code>) ja rentnikukeskkonda (<code>ti<\/code>).<\/li>\n\n\n<li>Taotlege p\u00e4\u00e4smikke autoriseerimisvooga client credentials grant. P\u00e4ringud tehakse teenusekonto nimel.<\/li>\n\n\n<li>Andke teenusekontole ainult need LN-i rollid, mida liidestus vajab.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanneri REST API kasutab autentimiseks API p\u00e4\u00e4smikku (SkyPlanner Settings &gt; API) ning selle dokumentatsioon on Swagger\/OpenAPI vormingus. <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">Liidestamise \u00f5petus<\/a> juhendab esimeste p\u00e4ringute tegemist. Alustamiseks piisab API p\u00e4\u00e4smikust.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-webhooks-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00fcndmused, veebihaagid ja perioodilised p\u00e4ringud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00c4ris\u00fcndmuste korral avaldab LN Infor ION-is BOD-s\u00f5numeid ning ION suunab need tellijatele. Tellija s\u00fcnkroonib muudetud artikli v\u00f5i tellimuse. Kui sobivat BOD-s\u00f5numit pole, teeb liidestus LN-i REST-teenustele ajastatud p\u00e4ringuid, piirdudes avatud tellimustega.<\/p>\n\n\n<p>SkyPlanner saadab oleku v\u00f5i ajakava muutumisel veebihaake, seega toimub tagasikirjutamine s\u00fcndmusp\u00f5hiselt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmete vastendamine<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Infor LN-i objekt (seanss v\u00f5i teenus)<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td>Items &#8211; General (tcibd0501m000), Items &#8211; Planning (cprpd1100m000), <code>Process.ItemMaster<\/code><\/td><td>Tooted ja materjalid<\/td><td>LN \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Bill of Material (tibom1110m000), tootmise materjaliloendid, materjalide seosed tehnoloogiliste marsruutidega, <code>Process.BillOfMaterials<\/code><\/td><td>Tootestruktuur, alamtooted, materjalid operatsioonide kaupa<\/td><td>LN \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Routing Operations (tirou1102m000), Tasks (tirou0103m000)<\/td><td>Protsessietapid koos seadistus- ja t\u00f6\u00f6tlusaegadega<\/td><td>LN \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td>Work Centers (tirou0101m000), Machines (tirou0102m000)<\/td><td>T\u00f6\u00f6keskused, t\u00f6\u00f6keskuste r\u00fchmad, t\u00f5hususn\u00e4itajad<\/td><td>LN \u2192 SkyPlanner<\/td><td>Esmane laadimine, hiljem harva<\/td><\/tr><tr><td>Kalendrid, Working Time Schedule (tcppl1100m000)<\/td><td>Vahetused ja t\u00f6\u00f6aeg<\/td><td>LN \u2192 SkyPlanner<\/td><td>Iga p\u00e4ev v\u00f5i hallatakse vahetusi SkyPlanneris<\/td><\/tr><tr><td>Production Orders (tisfc0501m000), masinaoperatsioonid (<code>tiapi.sfcProductionOrder<\/code>)<\/td><td>Tellimused ja t\u00f6\u00f6d koos t\u00e4htaegade ning materjalivajadustega<\/td><td>LN \u2192 SkyPlanner<\/td><td>BOD-s\u00fcndmus v\u00f5i p\u00e4ringud iga m\u00f5ne minuti j\u00e4rel<\/td><\/tr><tr><td>Olemasolevad laovarud<\/td><td>Laoseisud<\/td><td>LN \u2192 SkyPlanner<\/td><td>Iga tund v\u00f5i enne iga ajakava koostamist<\/td><\/tr><tr><td>Ostutellimuste read koos eeldatavate saabumiskuup\u00e4evadega<\/td><td>Saabuv materjal; laoseis uueneb, kui ostutellimuse olekuks m\u00e4rgitakse Delivered<\/td><td>LN \u2192 SkyPlanner<\/td><td>Iga tund v\u00f5i enne iga ajakava koostamist<\/td><\/tr><tr><td>Tootmistellimuse operatsioonid: kavandatud algus, l\u00f5pp ja masin<\/td><td>Ajakavasse paigutatud operatsioonid<\/td><td>SkyPlanner \u2192 LN<\/td><td>Ajakava muutumisel SkyPlanneri veebihaagi kaudu<\/td><\/tr><tr><td>Register machine hours and quantities, Finish Machine Operations; Production Order Hours (bptmm1120m000), Report Operations Completed (tisfc0130m000)<\/td><td>Ajakanded, kogused, l\u00f5petatud operatsioonid<\/td><td>SkyPlanner \u2192 LN<\/td><td>Iga kinnituse v\u00f5i vahetuse j\u00e4rel<\/td><\/tr><tr><td>LN-is puudub<\/td><td>Seadistusaegade maatriks, t\u00f6\u00f6riistad piiratud ressurssidena, operaatorite arv, alternatiivsed t\u00f6\u00f6keskused<\/td><td>Hallatakse SkyPlanneris<\/td><td>Seadistatakse kasutuselev\u00f5tu k\u00e4igus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Liidestuslahendused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete esmane laadimine.<\/strong> Laadige artiklid, materjaliloendid, tehnoloogiliste marsruutide operatsioonid, t\u00f6\u00f6\u00fclesanded, t\u00f6\u00f6keskused, masinad ja kalendrid. Otsustage, kuidas vastendada LN-i t\u00f6\u00f6keskuste ja masinate tasandid SkyPlanneriga: nelja masinaga t\u00f6\u00f6keskusest v\u00f5ib saada \u00fcks nelja t\u00f6\u00f6keskusega r\u00fchm.<\/p>\n\n\n<p><strong>2. Tellimuste s\u00fcnkroonimine.<\/strong> Lugege tootmistellimused koos operatsioonide ja materjaliridadega ning laoseisud ja avatud ostutellimuste read. SkyPlanner loeb tellitud materjali k\u00e4ttesaadavaks ostutellimuse tarnekuup\u00e4eval, seega kontrollitakse ajakava koostamisel nii laoseisu kui ka saabuvaid tarneid.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> Iga operatsiooni puhul, mille mootor ajakavasse paigutas v\u00f5i \u00fcmber t\u00f5stis, saadab SkyPlanner kavandatud alguse, l\u00f5pu ja masina tagasi LN-i tootmistellimuse operatsioonile. Koguseid, olekut ja kuluarvestust haldab endiselt LN.<\/p>\n\n\n<p><strong>4. Tootmist\u00f6\u00f6 kinnitamine.<\/strong> Operaatorid registreerivad t\u00f6\u00f6 funktsioonidega Mobile Confirmations, Production Timer v\u00f5i Quick Log Mode. Ajakanded hoiavad ajakava ajakohasena ning saadetakse LN-i tagasi masinatundide, koguste ja l\u00f5petatud operatsioonidena. Valige kannete tegemiseks \u00fcks kanal, kas SkyPlanner v\u00f5i LN-i seansid, et tunde ei registreeritaks kunagi topelt.<\/p>\n\n\n<p><strong>5. Andmete haldamise ja vastuolude lahendamise reeglid.<\/strong> Leppige need kokku enne t\u00f6\u00f6lerakendamist:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Andmed<\/th><th>Haldav s\u00fcsteem<\/th><\/tr><\/thead><tbody><tr><td>Artiklid, materjaliloendid, tehnoloogilised marsruudid, tellimuste kogused ja olekud, laoseisud, kanded<\/td><td>Infor LN<\/td><\/tr><tr><td>Operatsioonide j\u00e4rjekord, kavandatud algus ja l\u00f5pp, masina m\u00e4\u00e4ramine<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Seadistusaegade maatriks, t\u00f6\u00f6riistad, operaatorite arv, alternatiivsed t\u00f6\u00f6keskused<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Vahetused ja puudumised<\/td><td>\u00dcks s\u00fcsteem, mis valitakse ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>6. Koost\u00f6\u00f6 Infori enda planeerimist\u00f6\u00f6riistadega.<\/strong> Enterprise Planning j\u00e4tkab tarneettepanekute tegemist ning SkyPlanner koostab tootmistellimuste ajakava tegeliku tootmisv\u00f5imsuse alusel. LN 2026 versioonides on selleks s\u00e4te <strong>External Planner<\/strong>: &#8220;The organization can integrate an external planning solution with Infor LN.&#8221; (Organisatsioon saab integreerida v\u00e4lise planeerimislahenduse Infor LN-iga.) Kui Scheduler+ on aktiivne, leppige esmalt kokku, kumb s\u00fcsteem kuup\u00e4evi haldab: see lisab oleku Scheduled ja n\u00f5uab ajakava koostamist enne tootmisse lubamist.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekti tavap\u00e4rased etapid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Juurutamine viiakse tavaliselt l\u00f5pule n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Enne seda saate 30-p\u00e4evase tasuta prooviperioodi jooksul kasutada oma andmeid. Eksportige LN-i seanssidest Excelisse t\u00f6\u00f6keskused, masinad, tehnoloogiliste marsruutide operatsioonid ja avatud tootmistellimused, importige need SkyPlannerisse ning kontrollige ajakava.<\/p>\n\n\n<p>Projekt h\u00f5lmab j\u00e4rgmisi etappe:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Ulatuse m\u00e4\u00e4ramine.<\/strong> Versiooniharu, liidestusviis, vastendustabel, andmete haldamise reeglid ja kirjendamiskanal.<\/li>\n\n\n<li><strong>Juurdep\u00e4\u00e4s.<\/strong> Andke LN-i REST-teenustele kasutus\u00f5igused ja aktiveerige need, looge <code>.ionapi<\/code> taustateenus ja teenusekonto v\u00f5i seadistage ION-is BOD-tellimused. Alustage testimiseks m\u00f5eldud rentnikukeskkonnast.<\/li>\n\n\n<li><strong>Esmane andmete laadimine.<\/strong> Artiklid, tootestruktuurid, tehnoloogiliste marsruutide operatsioonid, t\u00f6\u00f6keskused, masinad ja kalendrid.<\/li>\n\n\n<li><strong>Tellimuste s\u00fcnkroonimine.<\/strong> Tootmistellimused, laoseis ja ostutellimuste read BOD-s\u00fcndmuste v\u00f5i perioodiliste p\u00e4ringute kaudu.<\/li>\n\n\n<li><strong>Piirangute seadistamine SkyPlanneris.<\/strong> Seadistusaegade maatriks, t\u00f6\u00f6riistad, operaatorite arv ja alternatiivsed t\u00f6\u00f6keskused.<\/li>\n\n\n<li><strong>Tagasikirjutamine.<\/strong> Operatsioonide kavandatud kuup\u00e4evad, seej\u00e4rel t\u00f6\u00f6tunnid ja kogused.<\/li>\n\n\n<li><strong>Paralleelne kasutamine.<\/strong> Kasutage SkyPlannerit senise tootmisplaani k\u00f5rval, v\u00f5rrelge kuup\u00e4evi ja parandage p\u00f5hiandmeid.<\/li>\n\n\n<li><strong>T\u00f6\u00f6sse rakendamine.<\/strong> L\u00fclitage tagasikirjutamine sisse, kui andmed \u00fchtivad.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-an-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millega Infor LN-i integratsiooni kavandamisel arvestada<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vale versiooni dokumentatsioon.<\/strong> LN 10.x ja iga-aastased pilveversioonid erinevad. Planner+ ja Scheduler+ on dokumenteeritud ainult 2026 versioonide dokumentatsioonis ning Job Shop Scheduler on saadaval alates versioonist 10.8. Kontrollige iga lehe puhul, kas see k\u00e4ib teie versiooni kohta.<\/li>\n\n\n<li><strong>Vale Infori toode.<\/strong> Infor LN ei ole CloudSuite Industrial (SyteLine) ega M3. Nende BOD-id ja API-d erinevad, seega kasutage ainult LN-i dokumentatsiooni.<\/li>\n\n\n<li><strong>Teenus pole aktiveeritud.<\/strong> LN-i REST-p\u00e4ringud eba\u00f5nnestuvad seni, kuni teenusele on rentniku keskkonnas antud kasutus\u00f5igus ja see on aktiveeritud.<\/li>\n\n\n<li><strong>Loendt\u00fc\u00fcbi filtrid.<\/strong> OrderStatus on loendt\u00fc\u00fcp, mist\u00f5ttu oleku filtreerimine OData <code>$filter<\/code> abil n\u00f5uab loendt\u00fc\u00fcbi s\u00fcntaksit, nagu m\u00e4rgivad Infori kogukonna kasutajad.<\/li>\n\n\n<li><strong>L\u00e4biminekuaeg ja tehnoloogiline marsruut.<\/strong> Seansi Items &#8211; Planning s\u00e4te Operations Horizon m\u00e4\u00e4rab, kas planeeritud tellimustes kasutatakse tehnoloogilise marsruudi andmeid v\u00f5i fikseeritud Order Lead Time v\u00e4\u00e4rtust. Lugege kestused tehnoloogilise marsruudi operatsioonidest, mitte tellimuste l\u00e4biminekuajast.<\/li>\n\n\n<li><strong>T\u00f6\u00f6keskuste seansid.<\/strong> Kui Job Shop by Site on aktiivne, kasutab LN seanssi Work Center (tirou0601m000), mitte Work Centers (tirou0101m000). L\u00e4htuge vastendamisel teie ettev\u00f5ttes kasutatavast seansist.<\/li>\n\n\n<li><strong>Masintunnid ja inimt\u00f6\u00f6tunnid.<\/strong> Seansis Production Order Hours on masintundide ridadel v\u00e4li Employee t\u00fchi. Vastendage SkyPlanneri masina- ja operaatoriaeg \u00f5igete ridadega.<\/li>\n\n\n<li><strong>Ettev\u00f5tte\u00fcksuste kalendrid.<\/strong> Laadige iga t\u00f6\u00f6keskuse ettev\u00f5tte\u00fcksusele kuuluv kalender, mitte \u00fcks \u00fchine tehasekalender.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes seadistab Infor LN-i integratsiooni<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab integratsiooni kasutuselev\u00f5tu k\u00e4igus ja pakub tuge ka p\u00e4rast t\u00f6\u00f6sse rakendamist.<\/strong> Iga tehas kasutab LN-i erinevalt: erinevad on planeerimis\u00fcksused, t\u00f6\u00f6keskuste struktuurid, tootmisse lubamise protsess ja kirjendamistavad. Oskusteavet on vaja just nende vastendamiseks.<\/li>\n\n\n<li><strong>Teie Infor LN-i partner saab projektis osaleda.<\/strong> Partner tunneb teie rentnikukeskkonda, kasutus\u00f5igusi ja ION-i seadistust ning v\u00f5ib vastutada LN-i poole eest. SkyPlanner pakub REST API-t, Swagger\/OpenAPI dokumentatsiooni ja veebihaake.<\/li>\n\n\n<li><strong>Integratsiooni saavad luua ka teie enda arendajad,<\/strong> kasutades sama dokumenteeritud REST API-t ja API p\u00e4\u00e4smikku. Alustamiseks piisab API p\u00e4\u00e4smikust ning SkyPlanneri meeskond aitab vajaduse korral. Toote dokumentatsioon on avalikult k\u00e4ttesaadav lehel <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsioon<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanneri hind algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub kord kuus. Teie protsessidele ja vajadustele vastava integratsiooni hinnapakkumise saate enne alustamist koos paketi hinnaga, nii et kogukulu on kohe teada. LN-i enda planeerimise v\u00f5rdluse leiate lehelt <a href=\"\/et\/integratsioonid\/erp\/infor-ln\/tootmise-planeerimine\/\">tootmise planeerimine Infor LN-is tegeliku tootmisv\u00f5imsuse alusel<\/a>, \u00fclevaate <a href=\"\/et\/integratsioonid\/erp\/infor-ln\/\">Infor LN-i lehelt<\/a> ja teised s\u00fcsteemid <a href=\"\/et\/integratsioonid\/erp\/\">ERP-integratsioonide koondlehelt<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete kogemused SkyPlanneriga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila elektrikilpide tootmistsehhis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest tootmise reaalajas optimeerimiseni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ja uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Loe UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumi kaitseriietuses operaatorid pudelite t\u00e4iteliinil ettev\u00f5tte Laboratory &amp; Allied ravimtehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise efektiivsus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise efektiivsus on kasvanud 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise efektiivsus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolme kuu plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Loe ettev\u00f5tte Laboratory &amp; Allied kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u00d5huvaade Piristeeli katuse turvatoodete tehasele Kauhavas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>tarnekindlus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on aidanud kitsaskohti paremini m\u00e4rgata ja muutnud tootmise juhtimise selgemaks.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, tootmisjuht<\/b><br>Piristeel \u00b7 Katuse turvatooted ja vihmavees\u00fcsteemid<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus j\u00f5udis sel aastal 99,2%-ni ning tootmise ajakava koostamisel s\u00e4\u00e4stetakse kuni neli tundi t\u00f6\u00f6aega p\u00e4evas.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/piristeel\/\">Loe Piristeeli kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>V\u00e4hem<\/b><span>materjalipuudusest tingitud seisakuid<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneri v\u00e4\u00e4rtus meie jaoks seisneb selles, et see on igap\u00e4evat\u00f6\u00f6s toimiv t\u00f6\u00f6riist, eriti tarnekuup\u00e4evade m\u00e4\u00e4ramisel.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, tootmise planeerimise juht<\/b><br>Eskomatic \u00b7 Allhanke korras mehaaniline t\u00f6\u00f6tlemine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmiskoormuse automaatne ajastamine annab t\u00e4psemad tarnekuup\u00e4evad ning materjalipuudusest tingitud tootmisseisakud on j\u00e4rsult v\u00e4henenud.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/eskomatic\/\">Loe Eskomaticu kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas \u00fchendada APS Infor LN-iga?<\/summary>\n<p class=\"sp-faq__a\">LN-i pilveversioonis toimub \u00fchendus ION API Gateway kaudu LN REST API-ga, kasutades OAuth 2.0 autentimist ning muudatuste s\u00fcndmustena ION BOD-e. Kohapealses LN 10.x versioonis kasutatakse ION BOD-e v\u00f5i failieksporti. SkyPlanneri ja Infor LN-i integratsioon on m\u00f5lema variandi korral kahesuunaline.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Milline LN-i API v\u00f5imaldab tootmistellimustega t\u00f6\u00f6tada?<\/summary>\n<p class=\"sp-faq__a\">LN REST API teenus <code>tiapi.sfcProductionOrder<\/code>. See loeb tootmistellimusi ja masinaoperatsioone ning registreerib masintunde, koguseid ja l\u00f5petatud operatsioone. Teised teenused on ION API Gateways loetletud rentnikup\u00f5hiselt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kes loob Infor LN-i integratsiooni?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanneri meeskond seadistab kasutuselev\u00f5tu k\u00e4igus kahesuunalise integratsiooni teie LN-i seadistuse j\u00e4rgi ja pakub tuge ka p\u00e4rast t\u00f6\u00f6sse rakendamist. Integratsiooni saavad SkyPlanneri dokumenteeritud REST API abil luua ka teie Infor LN-i partner v\u00f5i teie enda arendajad. Alustamiseks piisab API p\u00e4\u00e4smikust.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SkyPlanneri kasutamiseks on vaja Scheduler+ v\u00f5i Planner+ moodulit?<\/summary>\n<p class=\"sp-faq__a\">Ei. SkyPlanner koostab LN-i tootmistellimuste ajakava oma mootoriga, olenemata LN-i versioonist. LN 2026 versioonides on s\u00e4te External Planner dokumenteeritud viis v\u00e4lise planeerimislahenduse kasutamiseks LN-i k\u00f5rval.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Miks \u00fchendada SkyPlanner, selle asemel et v\u00f5tta kasutusele Scheduler+?<\/summary>\n<p class=\"sp-faq__a\">Scheduler+ on lisamoodul, mis &#8220;may require a commercial component&#8221; (v\u00f5ib n\u00f5uda kommertskomponenti) (<a href=\"https:\/\/docs.infor.com\/ln\/2026.10\/en-us\/lnolh\/plschug\/plom005.html\">allikas<\/a>). See on dokumenteeritud alates LN 2026 versioonidest ning planeerija laadib ajakava, k\u00e4ivitab ajakava koostamise ja seej\u00e4rel kinnitab tulemuse (<a href=\"https:\/\/docs.infor.com\/lncs\/2026.x\/en-us\/lncslib\/lncspov\/ijr1757604049666.html\">allikas<\/a>). SkyPlanner \u00fchendub teie praeguse LN-iga ja on t\u00f6\u00f6s n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Autopilot koostab iga olulise muudatuse korral ajakava automaatselt \u00fcmber. SkyPlanneri meeskond seadistab kahesuunalise integratsiooni ja pakub sellele tuge ning teie LN-i partner v\u00f5ib vastutada LN-i poole eest.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne integratsiooni loomist katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evase tasuta prooviperioodi jooksul saate kasutada kuni 20 t\u00f6\u00f6keskust ja LN-ist CSV- v\u00f5i Exceli vormingus eksporditud andmeid. Krediitkaarti pole vaja. <a href=\"\/et\/prooviperiood\/\">Alustage prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a>, et m\u00e4\u00e4rata integratsiooni ulatus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ Infor LN Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga See Infor LN-i liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Infor LN SkyPlanner APS-iga. SkyPlanneri ja Infor LN-i vaheline andmevahetus on kahesuunaline: skyplanner.ai \u00b7 Tootmise ajakava koostamine SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie LN-i keskkonnale vastavaks ning pakub tuge ka &#8230; <a title=\"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/\" aria-label=\"Read more about Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102907,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103651","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor LN APS-i liidestusjuhend tootmise ajakava koostamiseks<\/title>\n<meta name=\"description\" content=\"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" \/>\n<meta property=\"og:description\" content=\"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/liidestamise-juhend\\\/\",\"name\":\"Infor LN APS-i liidestusjuhend tootmise ajakava koostamiseks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Infor LN-ile: tootmise planeerimine tegeliku v\u00f5imsuse piires\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/infor-ln\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor LN APS-i liidestusjuhend tootmise ajakava koostamiseks","description":"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga","og_description":"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/","name":"Infor LN APS-i liidestusjuhend tootmise ajakava koostamiseks","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor LN ja SkyPlanner APS: LN REST API ION API Gateway kaudu, OAuth 2.0, ION BODs, tootmistellimuste vastendus, ajakava tagasikirjutus ja projektin\u00f5uanded.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Infor LN-ile: tootmise planeerimine tegeliku v\u00f5imsuse piires","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/infor-ln\/"},{"@type":"ListItem","position":5,"name":"Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ Infor LN Infor LN-i liidestusjuhend tootmise ajakava koostamiseks SkyPlanner APS-iga See Infor LN-i liidestusjuhend n\u00e4itab partneritele ja IT-meeskondadele, kuidas \u00fchendada Infor LN SkyPlanner APS-iga. SkyPlanneri ja Infor LN-i vaheline andmevahetus on kahesuunaline: skyplanner.ai \u00b7 Tootmise ajakava koostamine SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie LN-i keskkonnale vastavaks ning pakub tuge ka&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/103651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=103651"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/103651\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/102907"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=103651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}