{"id":101181,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101181"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"tootmise-planeerimine","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/","title":{"rendered":"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Integratsioonid<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Kas Odoo toetab tootmise planeerimist? <span class=\"hl\">Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Odoo toetab algtasemel tootmise planeerimist t\u00f6\u00f6keskuse kalendri vabade aegade alusel. Rakenduse Odoo Manufacturing nupp <strong>Plan<\/strong> paigutab iga tootmistellimuse t\u00f6\u00f6keskuse kalendri esimesse vabasse ajavahemikku. Nii ei kattu kaks planeeritud tootmistellimust samas t\u00f6\u00f6keskuses kunagi. Korraga planeerib see aga vaid \u00fche tootmisk\u00e4su, arvestades \u00fcht piirangut. See ei muuda eri tellimuste t\u00f6\u00f6de j\u00e4rjestust, ei optimeeri ega planeeri neid \u00fchiselt \u00fcmber. Tehased, mis vajavad tootmise planeerimist nii, et ajakava arvestaks masinate tegelikku vaba v\u00f5imsust ja t\u00f6\u00f6tajate saadavust ning k\u00f5ik tellimused oleksid j\u00e4rjestatud t\u00e4htaegade ja seadistuste j\u00e4rgi, kasutavad Odoo k\u00f5rval SkyPlanner APS-i.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneerige demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajatelg t\u00f6\u00f6keskustele planeeritud t\u00f6\u00f6dega ja selle all olev tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo enda turundusmaterjalides \u00f6eldakse, et saate &#8220;plan resources with finite capacity planning&#8221; (planeerida tootmisressursse nende tegelikku v\u00f5imsust arvestades) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). Allpool selgitame ametliku dokumentatsiooni ja l\u00e4htekoodi p\u00f5hjal, mida see Odoo 19.0 puhul t\u00e4hendab: kuidas Plan t\u00f6\u00f6tab, kus on selle piirid ja millal sellest piisab.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuidas Odoo tootmistellimusi planeerib: samm-sammult<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. L\u00fclitage tootmistellimused sisse ja seadistage t\u00f6\u00f6keskused<\/h3>\n\n\n<p>Avage <strong>Tootmine &gt; Seadistus &gt; Seaded<\/strong> ja lubage <strong>Tootmistellimused<\/strong>. Seej\u00e4rel ilmub men\u00fc\u00fcsse <strong>Seadistus<\/strong> valik <strong>T\u00f6\u00f6keskused<\/strong>. Igal t\u00f6\u00f6keskusel (<code>mrp.workcenter<\/code>) on v\u00e4ljad, mida planeerimisel kasutatakse:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>V\u00e4li<\/th><th>Roll planeerimisel<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>Ressursikalender, mille j\u00e4rgi t\u00f6\u00f6keskus t\u00f6\u00f6tab. Vaikimisi \u201eTavap\u00e4rane 40 tundi n\u00e4dalas\u201c, esmasp\u00e4evast reedeni<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Protsendim\u00e4\u00e4r, mis l\u00fchendab v\u00f5i pikendab iga selle t\u00f6\u00f6keskuse tootmistellimuse kestust<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Minutid, mis lisatakse enne ja p\u00e4rast iga tootmistellimust<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>Teised t\u00f6\u00f6keskused, mida funktsioon \u201ePlaneeri\u201c v\u00f5ib algse asemel kasutada<\/td><\/tr><tr><td>Vahekaart \u201eTootep\u00f5hised v\u00f5imsused\u201c<\/td><td>T\u00fckkide arv ts\u00fckli kohta ning tootep\u00f5hised seadistus- ja koristusajad minutites (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>Tulemuslikkuse sihtv\u00e4\u00e4rtus aruandluse jaoks, mitte planeerimise sisend<\/td><\/tr><tr><td>Allowed Employees<\/td><td>M\u00e4\u00e4rab, kes v\u00f5ivad siin t\u00f6\u00f6tada. See on filter, mitte v\u00f5imsus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. Operatsioonid materjaliloendis<\/h3>\n\n\n<p>\u00dchist tehnoloogiliste marsruutide p\u00f5hiandmestikku ei ole. Operatsioonid on iga toote koosseisus (BoM) eraldi, vahekaardil <strong>Operatsioonid<\/strong> (<code>mrp.routing.workcenter<\/code>). Igal operatsioonil on v\u00e4ljad <strong>Work Center<\/strong> ja <strong>Duration Computation<\/strong>: kestus on kas teie sisestatud fikseeritud aeg v\u00f5i viimaste tootmistellimuste p\u00f5hjal arvutatud aeg (vaikimisi 10 tellimust). Eeldatav kestus saadakse seadistusaja, koristusaja ja ts\u00fcklite arvu ning ts\u00fckliaja korrutise liitmisel, kusjuures ts\u00fcklitele kuluv aeg jagatakse v\u00e4lja Time Efficiency v\u00e4\u00e4rtusega (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>Kui <strong>Work Order Dependencies<\/strong> on sisse l\u00fclitatud, saab m\u00e4\u00e4rata, et \u00fcks operatsioon ootab teise j\u00e4rel, kasutades v\u00e4lja <strong>Blocked By<\/strong>. Odoo dokumentatsioon \u00fctleb: &#8220;A blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.&#8221; (Blokeeritud tootmistellimus ajastatakse sellele eelneva tootmistellimuse v\u00e4ljal Expected Duration m\u00e4\u00e4ratud ajavahemiku l\u00f5ppu.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">allikas<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Kinnitage tootmisk\u00e4sk (MO) ja vajutage nuppu Plan<\/h3>\n\n\n<p>Tootmise tellimuse (<code>mrp.production<\/code>) kinnitamisel luuakse selle tootmistellimused (<code>mrp.workorder<\/code>). Kui vajutate tootmise tellimusel nuppu <strong>Planeeri<\/strong>, alustab Odoo s\u00f5ltuvusahela l\u00f5pus olevatest tootmistellimustest ja planeerib rekursiivselt k\u00f5igepealt iga eelneva tootmistellimuse, millest j\u00e4rgmine s\u00f5ltub. Iga tootmistellimus paigutatakse ajas edasi, p\u00e4rast sellele eelnevaid tellimusi. Iga tootmistellimuse puhul Odoo:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>V\u00f5tab aluseks hiliseima j\u00e4rgmistest aegadest: tootmisk\u00e4su algus, praegune hetk v\u00f5i blokeerivate tootmistellimuste l\u00f5pp.<\/li>\n\n\n<li>Proovib peamist t\u00f6\u00f6keskust ja k\u00f5iki v\u00e4ljal Alternative Workcenter m\u00e4\u00e4ratud t\u00f6\u00f6keskusi.<\/li>\n\n\n<li>Otsib igas kalendris ajas edasi liikudes esimest vaba ajavahemikku, kuhu eeldatav kestus \u00e4ra mahub.<\/li>\n\n\n<li>Valib t\u00f6\u00f6keskuse, kus t\u00f6\u00f6 l\u00f5peb k\u00f5ige varem, ja broneerib ajavahemiku selle kalendris kirjena <code>resource.calendar.leaves<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>Versiooni 19.0 l\u00e4htekood s\u00f5nastab reegli selgelt: &#8220;The available interval is disjoinct with all other workorders planned on this workcenter&#8221; (Vaba ajavahemik ei kattu \u00fchegi teise sellesse t\u00f6\u00f6keskusse planeeritud tootmistellimusega) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Just selles seisnebki v\u00f5imsuse piiranguga arvestamine. Kui tootmistellimuse t\u00e4itmine j\u00f5uab t\u00f6\u00f6v\u00e4lise ajani, j\u00e4tkub see j\u00e4rgmises t\u00f6\u00f6ajavahemikus. Kui 700 p\u00e4eva ehk vaikimisi otsinguvahemiku jooksul sobivat aega ei leidu, peatub Plan teatega &#8220;Impossible to plan the workorder.&#8221; (Tootmistellimust ei saa planeerida.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. T\u00f6\u00f6katkestused ja alternatiivsed t\u00f6\u00f6keskused<\/h3>\n\n\n<p>Rakenduse <strong>Time Off<\/strong> ja arendajare\u017eiimi abil saate t\u00f6\u00f6keskuse hoolduse v\u00f5i p\u00fcha ajaks blokeerida. Plan suunab tootmistellimused siis alternatiivsetesse t\u00f6\u00f6keskustesse. Kui alternatiivi pole, \u00fctleb Odoo dokumentatsioon: &#8220;work orders begin to pile up at the work center until it is operational again&#8221; (tootmistellimused hakkavad t\u00f6\u00f6keskuse j\u00e4rjekorda kogunema, kuni see on taas t\u00f6\u00f6korras) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">allikas<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Vaadake \u00fcle ja kohandage<\/h3>\n\n\n<p>Men\u00fc\u00fcvalikud <strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> ja <strong>Planning by Workcenter<\/strong> avavad tootmistellimuste planeerimise vaated. Enterprise pakub Gantti diagrammi, kus saab t\u00f6id lohistada. Community pakub loendi-, kalendri-, risttabeli- ja graafikuvaateid. Dokumentatsiooni j\u00e4rgi tehakse muudatused k\u00e4sitsi: &#8220;Times and planned work centers can be changed by clicking to access the individual work order.&#8221; (Aegu ja planeeritud t\u00f6\u00f6keskusi saab muuta, avades kl\u00f5psuga konkreetse tootmistellimuse.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">allikas<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kus on Odoo piirid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kes ees, see mees.<\/strong> Plan planeerib tootmisk\u00e4ske \u00fckshaaval ning esimesena planeeritud k\u00e4sk saab k\u00f5ige varasemad ajad. Mitme tootmisk\u00e4su valimisel planeeritakse need Odoo vaikej\u00e4rjestuses: esmalt prioriteedi, seej\u00e4rel alguskuup\u00e4eva j\u00e4rgi. S\u00fcsteem ei v\u00f5rdle t\u00e4htaegadest kinnipidamise ja \u00fcmberseadistuste v\u00e4hendamise vajadust ega nihuta planeeritud tootmisk\u00e4sku kiireloomulisema eest k\u00f5rvale.<\/li>\n\n\n<li><strong>Seadistusi j\u00e4rjestamisel ei arvestata.<\/strong> Setup Time lisab igale tootmistellimusele kindla aja: minutite arv on sama olenemata eelmisest t\u00f6\u00f6st. Odool pole \u00fcmberseadistusmaatriksit ning see ei koonda sarnaseid t\u00f6id \u00fcmberseadistuste v\u00e4ltimiseks.<\/li>\n\n\n<li><strong>\u00dcks piirang.<\/strong> Plaani piirab ainult t\u00f6\u00f6keskuse kalender. Operaatoreid arvestatakse \u00fcksnes filtri Allowed Employees kaudu. Plan ei kontrolli ajavahemikku broneerides t\u00f6\u00f6riistu ega materjalide saadavust. Komponentide reserveeringuid ja ostutellimuste kuup\u00e4evi kasutatakse ainult varude t\u00e4iendamisel.<\/li>\n\n\n<li><strong>MRP ei arvesta tootmisv\u00f5imsust.<\/strong> Taastellimisreeglid ja MTO loovad tootmisk\u00e4sud materjaliloendi v\u00e4lja <strong>Manuf. Lead Time<\/strong> alusel kalendrip\u00e4evades. Dokumentatsioon \u00fctleb: &#8220;Lead times do not consider weekends, holidays, or work center capacity&#8221; (L\u00e4biminekuajad ei arvesta n\u00e4dalavahetusi, p\u00fchi ega t\u00f6\u00f6keskuse v\u00f5imsust) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">allikas<\/a>). Tootmisk\u00e4skude t\u00e4htajad ja lubatud tarnekuup\u00e4evad l\u00e4htuvad kalendrip\u00e4evadest, mitte tegelikust t\u00f6\u00f6j\u00e4rjekorrast.<\/li>\n\n\n<li><strong>MPS on soovituste loend.<\/strong> Ka tootmise p\u00f5hiplaan ehk Master Production Schedule (Enterprise) ei arvesta koormust. &#8220;The MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.&#8221; (MPS soovitab ainult toote kogust, millega varusid t\u00e4iendada; vastavad ostutellimused v\u00f5i tootmisk\u00e4sud peab kasutaja ise looma.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">allikas<\/a>)<\/li>\n\n\n<li><strong>Automaatset \u00fcmberplaneerimist pole.<\/strong> Rike ega kiirtellimus ei nihuta iseenesest midagi. Kui tootmistellimuse t\u00e4itmine on alanud, ei luba Odoo tootmisk\u00e4su planeeringut t\u00fchistada: &#8220;Some work orders have already started, so you cannot unplan this manufacturing order.&#8221; (M\u00f5ne tootmistellimuse t\u00e4itmine on juba alanud, seega ei saa selle tootmisk\u00e4su planeeringut t\u00fchistada.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>Alamkoostud planeeritakse eraldi.<\/strong> Mitmetasemelised materjaliloendid loovad eraldi alamtootmisk\u00e4sud, millest iga\u00fcks planeeritakse omaette. Planeerija peab need \u00f5iges j\u00e4rjekorras planeerima, et alamkoost oleks valmis ajaks, mil \u00fclemise taseme operatsioon seda vajab.<\/li>\n\n\n<li><strong>Gantt ja MPS on saadaval Enterprise&#8217;is.<\/strong> V\u00e4ljaannete v\u00f5rdluslehel on tootmise funktsioonid &#8220;Scheduling&#8221; (ajakava koostamine) ja &#8220;Shopfloor&#8221; (tootmissaal) m\u00e4rgitud ainult Enterprise&#8217;i v\u00f5imalusteks (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). Communityt kasutavad planeerijad t\u00f6\u00f6tavad loendite ja kalendriga.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millal piisab Odoo enda planeerimisest<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo nupust Plan piisab, kui:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Iga operatsiooni jaoks on \u00fcks kindel t\u00f6\u00f6keskus ja mahud on m\u00f5\u00f5dukad.<\/li>\n\n\n<li>Sama kitsaskohta vajavad vaid v\u00e4hesed tellimused, nii et saabumisj\u00e4rjekorras planeerimine annab vastuv\u00f5etavad kuup\u00e4evad.<\/li>\n\n\n<li>Alternatiivsed masinad on identsed, nii et Alternative Workcenters ja rakendus Time Off v\u00f5imaldavad enamiku h\u00e4iretega toime tulla.<\/li>\n\n\n<li>Seadistusajad on l\u00fchikesed v\u00f5i ei s\u00f5ltu eelmisest t\u00f6\u00f6st.<\/li>\n\n\n<li>Planeerija saab korra p\u00e4evas vaate Planning by Workcenter \u00fcle vaadata ja \u00fcksikud konfliktid k\u00e4sitsi lahendada.<\/li>\n\n<\/ul>\n\n\n<p>Kui see kirjeldab teie tehast, keskenduge andmete korrastamisele. M\u00e4\u00e4rake igale t\u00f6\u00f6keskusele kalender ning sisestage v\u00e4ljadele Setup Time ja Cleanup Time realistlikud ajad. Kui ajaloolised andmed on eba\u00fchtlased, kasutage fikseeritud kestusi. L\u00fclitage s\u00f5ltuvused sisse ja planeerige tootmisk\u00e4sud prioriteetide j\u00e4rjekorras.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millal vajate tootmise planeerimise tarkvara<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Planist enam ei piisa, kui kehtib mitu j\u00e4rgmist tingimust:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Paljud tellimused vajavad kaht v\u00f5i enamat kitsaskohta ning t\u00f6\u00f6j\u00e4rjestuse peavad m\u00e4\u00e4rama t\u00e4htajad.<\/li>\n\n\n<li>Seadistus s\u00f5ltub eelmisest t\u00f6\u00f6st, mist\u00f5ttu t\u00f6\u00f6de j\u00e4rjestus m\u00f5jutab toodangu mahtu.<\/li>\n\n\n<li>T\u00f6\u00f6tajad ja vahetused piiravad plaani sama palju kui masinad.<\/li>\n\n\n<li>Materjali saabumine m\u00e4\u00e4rab, millal t\u00f6\u00f6 saab alata.<\/li>\n\n\n<li>Kiirtellimused, rikked ja hilinenud tarned sunnivad mitu korda n\u00e4dalas \u00fcmber planeerima.<\/li>\n\n\n<li>M\u00fc\u00fcgimeeskond vajab tarnekuup\u00e4evi, mis p\u00f5hinevad tegelikul t\u00f6\u00f6j\u00e4rjekorral, mitte v\u00e4ljal Manuf. Lead Time.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mida lahenduse valikul otsida<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>K\u00f5igi t\u00f6\u00f6keskuste tegeliku v\u00f5imsuse samaaegne arvestamine<\/strong>, v\u00f5ttes arvesse ka vahetusi, t\u00f6\u00f6tajaid ja puudumisi.<\/li>\n\n\n<li><strong>K\u00f5igi tellimuste \u00fchine j\u00e4rjestamine<\/strong> t\u00e4htaja ja prioriteedi j\u00e4rgi, mitte tootmisk\u00e4skude kaupa.<\/li>\n\n\n<li><strong>Seadistusaegade maatriks<\/strong> j\u00e4rjestusest s\u00f5ltuvate \u00fcmberseadistuste jaoks, et planeerimismootor valiks v\u00e4himat seadistusaega n\u00f5udva t\u00f6\u00f6j\u00e4rjestuse.<\/li>\n\n\n<li><strong>T\u00f6\u00f6riistade ja meeskondade arvestamine piirangutena:<\/strong> \u00fchel masinal kasutatav \u00fchine t\u00f6\u00f6riist pole teisele saadaval ning t\u00f6\u00f6 v\u00f5ib vajada korraga mitut operaatorit.<\/li>\n\n\n<li><strong>Materjalide saadavust arvestav ajakava koostamine<\/strong>, mis kontrollib laoseisu ja saabuvaid ostutellimusi.<\/li>\n\n\n<li><strong>Alternatiivsed t\u00f6\u00f6keskused<\/strong>, mille planeerimismootor valib kogu plaani arvestades, mitte \u00fche tootmistellimuse kaupa.<\/li>\n\n\n<li><strong>Mitmetasemeliste toodete planeerimine<\/strong> nii, et alamkoostud valmiksid enne, kui \u00fclemine koost neid vajab.<\/li>\n\n\n<li><strong>Automaatne ajakava uuendamine<\/strong> tootmise edenemisel v\u00f5i tellimuste muutumisel.<\/li>\n\n\n<li><strong>Gantti diagramm planeerijatele ja t\u00f6\u00f6j\u00e4rjekord operaatoritele<\/strong>, ka Community kasutamisel.<\/li>\n\n\n<li><strong>Selge kokkulepe, milline s\u00fcsteem juhib ajakava.<\/strong> Odoo arvutab tootmistellimuste kuup\u00e4evad kalendribroneeringu p\u00f5hjal ning nupu \u201ePlaneeri\u201c uuesti vajutamine kirjutab need \u00fcle. Leppige kokku, et t\u00f6\u00f6de j\u00e4rjekorra m\u00e4\u00e4rab ajakava koostav s\u00fcsteem. Kirjutage kuup\u00e4evad ja t\u00f6\u00f6keskused tagasi <code>mrp.workorder<\/code> kaudu ning j\u00e4tke juba t\u00f6\u00f6s olevad tootmistellimused vahele.<\/li>\n\n\n<li><strong>Teie versiooni ja paketiga sobiv API.<\/strong> Odoo 19 pakub External JSON-2 API-t. XML-RPC ja JSON-RPC <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">on kavas eemaldada<\/a> versioonis Odoo 22 (Odoo Online 21.1). V\u00e4lise API kasutus\u00f5igus on ainult Custom-pakettides, mitte pakettides One App Free ega Standard (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">v\u00e4lise API dokumentatsioon<\/a>). Kohandatud moodulid vajavad majutust Odoo.sh-s v\u00f5i oma serveris (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">Odoo hinnad<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Lahendused jagunevad nelja r\u00fchma:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Odoo enda planeerimine<\/strong> h\u00f5lmab nuppu Plan ja Enterprise&#8217;is ka Gantti vaadet.<\/li>\n\n\n<li><strong>Odoo kliendis t\u00f6\u00f6tavad lisamoodulid<\/strong> t\u00e4iustavad planeerimistahvlit v\u00f5i vabade ajavahemike leidmise loogikat. Neid hooldab Odoo partner.<\/li>\n\n\n<li><strong>Tarneahela planeerimismootorid ja suurte ettev\u00f5tete APS-lahendused<\/strong> \u00fchendatakse juurutusprojekti k\u00e4igus ning nendega t\u00f6\u00f6tab spetsiaalne planeerimismeeskond.<\/li>\n\n\n<li><strong>Pilvep\u00f5hine APS, millega saab hallata ka t\u00f6\u00f6de t\u00e4itmist tootmissaalis,<\/strong> koostab Odoo k\u00f5rval automaatselt ajakava k\u00f5igile ressurssidele. Sellesse r\u00fchma kuulub SkyPlanner. Lahendus planeerib tootmise muutudes pidevalt \u00fcmber ja teeb ajakava operaatoritele k\u00e4ttesaadavaks.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuhu sobitub SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS lahendab k\u00f5ik eespool loetletud piirangud:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Saabumisj\u00e4rjekorra asemel l\u00e4bim\u00f5eldud t\u00f6\u00f6j\u00e4rjestus.<\/strong> Arcturus AI planeerib k\u00f5ik avatud tellimused \u00fchiselt sekunditega, arvestades tegelikku tootmisv\u00f5imsust. J\u00e4rjestamisel v\u00f5etakse aluseks valmimiskuup\u00e4ev, prioriteet, kliendi prioriteet, Fast Track ja Dynamic Priorities.<\/li>\n\n\n<li><strong>Fikseeritud seadistusaegade asemel l\u00fchemad seadistused.<\/strong> Seadistusaegade maatriks sisaldab iga tootepaari vahelist \u00fcmberseadistusaega, mis v\u00f5ib suunast s\u00f5ltuvalt erineda: siniselt punasele 30 minutit, punaselt sinisele 60. Planeerimistarkvara valib v\u00e4himat seadistusaega n\u00f5udva j\u00e4rjestuse ja paigutab sarnased t\u00f6\u00f6d \u00fcksteise j\u00e4rele.<\/li>\n\n\n<li><strong>\u00dche piirangu asemel arvestatakse k\u00f5igiga.<\/strong> T\u00f6\u00f6keskusi, vahetusi, t\u00f6\u00f6tajaid, puudumisi, t\u00f6\u00f6riistu ja materjale kontrollitakse samas ajakavas. T\u00f6\u00f6riistade arv on piiratud, seega ei broneerita \u00fchel masinal kasutatavat rakist samaks ajaks teisele masinale. \u00dcks t\u00f6\u00f6 v\u00f5ib vajada korraga mitut operaatorit ning kui peamine ressurss pole saadaval, kasutab planeerimismootor alternatiivseid masinaid v\u00f5i t\u00f6\u00f6tajaid. Sama mudel h\u00f5lmab t\u00f6\u00f6keskuste r\u00fchmi, t\u00f5hususn\u00e4itajaid ja \u00fche t\u00f6\u00f6 jagamist mitme t\u00f6\u00f6keskuse vahel. Materjalide kontroll h\u00f5lmab laovaru ja avatud <code>purchase.order<\/code> ridu: tellitud komponendid loetakse saadavaks ostutellimuse tarnekuup\u00e4eval ning laoseis uueneb, kui ostutellimus m\u00e4rgitakse tarnituks.<\/li>\n\n\n<li><strong>Alamkoostud valmivad \u00f5igel ajal.<\/strong> Alamtoodete ja mitmetasandilise struktuuriga toodete ajakava koostatakse nii, et osad oleksid valmis siis, kui koostamine neid vajab.<\/li>\n\n\n<li><strong>K\u00e4sitsi \u00fcmberplaneerimise v\u00f5tab \u00fcle Autopilot.<\/strong> Kui tootmises midagi muutub, koostab Autopilot ajakava automaatselt \u00fcmber, j\u00e4rgides teie lukustusi, funktsiooni Running Time Lock ja prioriteete.<\/li>\n\n\n<li><strong>Community saab Gantti vaate ja tootmissaali t\u00f6\u00f6vahendid.<\/strong> Planeerijad muudavad ajakava interaktiivsel Gantti ajateljel. Operaatorid n\u00e4evad oma t\u00f6\u00f6j\u00e4rjekorda ning registreerivad t\u00f6\u00f6d telefonis v\u00f5i tahvelarvutis funktsioonidega Mobile Confirmations, Production Timer ja Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p>Odoo j\u00e4\u00e4b toodete, tootestruktuuride, laoseisu, ostude ja raamatupidamise p\u00f5his\u00fcsteemiks. SkyPlanner vahetab sellega andmeid m\u00f5lemas suunas External JSON-2 API kaudu v\u00f5i vanemate versioonide puhul XML-RPC ja JSON-RPC kaudu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sisend:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> ja avatud <code>purchase.order<\/code> read.<\/li>\n\n\n<li><strong>Tagasi Odoosse:<\/strong> planeeritud algus, l\u00f5pp ja valitud t\u00f6\u00f6keskus kirjutatakse k\u00e4suga <code>write<\/code> igale <code>mrp.workorder<\/code> kirjele (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). See nihutab Odoo enda kalendribroneeringut, mist\u00f5ttu kuvatakse Odoo planeerimisvaadetes SkyPlanneri kuup\u00e4evi.<\/li>\n\n\n<li><strong>Tootmissaal:<\/strong> operaatorite kinnitused salvestatakse Time Logs ajakirjetena mudelisse <code>mrp.workcenter.productivity<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanneri veebihaagid edastavad ajakava muudatused kohe nende tekkimisel. Iga tehas kasutab Odoot erinevalt, oma operatsioonide, kalendrite ja kohandatud moodulitega. SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie lahendusele vastavaks ja pakub tuge ka p\u00e4rast k\u00e4ivitamist. Teie Odoo partner v\u00f5i teie enda arendajad saavad samuti luua lahendusi SkyPlanneri dokumenteeritud REST API abil (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API teatmik<\/a>). Alustamiseks piisab API v\u00f5tmest. API ja funktsioonide \u00fcksikasjad leiate <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsioonist<\/a>.<\/p>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> paljud tellimused konkureerivad samade kitsaskohtade p\u00e4rast ja t\u00e4htajad peavad m\u00e4\u00e4rama nende k\u00f5igi t\u00f6\u00f6j\u00e4rjekorra.<\/p>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> \u00fcmberseadistused s\u00f5ltuvad t\u00f6\u00f6de j\u00e4rjekorrast v\u00f5i kui \u00fchiskasutuses t\u00f6\u00f6riistad ja mitut operaatorit n\u00f5udvad t\u00f6\u00f6d m\u00e4\u00e4ravad, mida saab j\u00e4rgmisena k\u00e4ivitada.<\/p>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> planeerite mitu korda n\u00e4dalas \u00fcmber ning soovite oma tootmisele toimivat ajakava n\u00e4dalatega, mitte alles pika projekti l\u00f5pus.<\/p>\n\n\n<p>Alustage CSV- v\u00f5i XLSX-ekspordiga <a href=\"\/et\/prooviperiood\/\">30-p\u00e4evast tasuta prooviperioodi<\/a> (kuni 20 t\u00f6\u00f6keskust, krediitkaarti pole vaja) ning v\u00f5rrelge SkyPlanneri ajakava nupu Plan tulemustega. P\u00e4rast seda algab hind 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub iga kuu ning tellimuse saab igal ajal l\u00f5petada. Liidestuse hinnapakkumine koostatakse teie protsessi ja vajaduste j\u00e4rgi ette koos paketiga, nii et n\u00e4ete kogukulu enne alustamist. Juurutamine l\u00f5peb tavaliselt n\u00e4dalate jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Vaadake <a href=\"\/et\/hinnakujundus\/\">hindu<\/a> ja <a href=\"\/et\/funktsioonid\/\">funktsioone<\/a>.<\/p>\n\n\n<p>Lisateavet leiate lehelt <a href=\"\/et\/integratsioonid\/erp\/odoo\/\">SkyPlanner Odoo jaoks<\/a>, <a href=\"\/et\/integratsioonid\/erp\/odoo\/liidestamise-juhend\/\">Odooga liidestamise juhendist<\/a> ja teiste <a href=\"\/et\/integratsioonid\/erp\/\">ERP-liidestuste<\/a> \u00fclevaatest.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneerige demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete kogemused SkyPlanneriga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila tehase elektrikilpide tootmissaalis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>kokkuhoidu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest reaalajas tootmise optimeerimiseni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimine s\u00e4\u00e4stab igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ja uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/utu\/\">Lugege UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhtaruumi r\u00f5ivastuses operaatorid pudelite t\u00e4itmisliinil ettev\u00f5tte Laboratory &amp; Allied ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise efektiivsust<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise efektiivsus on kasvanud 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise efektiivsus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolmekuulise plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/laboratory-allied\/\">Lugege ettev\u00f5tte Laboratory &amp; Allied kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operationsi tootmisjuht Anu J\u00e4rvinen Raumas robotiseeritud t\u00f6\u00f6jaama k\u00f5rval, kus kaup laotakse kaubaalustele\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 kuud<\/b><span>ette n\u00e4eb m\u00fc\u00fcgimeeskond vaba tootmisv\u00f5imsust<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner loob kogu tootmise planeerimisele kindla ja usaldusv\u00e4\u00e4rse aluse.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, tootmisjuht<\/b><br>Fredman Operations \u00b7 Toiduga kokkupuuteks sobivad pakkepaberid<\/p>\n\n\n<p class=\"ind-cust__result\">M\u00fc\u00fcgimeeskond n\u00e4eb vaba tootmisv\u00f5imsust kuus kuud ette. Ajakava muutmise p\u00e4ringutele, millele vastamine v\u00f5ttis varem tunni v\u00f5i rohkem, vastatakse n\u00fc\u00fcd sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/fredman-operations\/\">Lugege Fredman Operationsi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Compi keevitaja lihvib Alah\u00e4rm\u00e4 tehases keevitatud teraskonstruktsiooni\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>tarnekindlus varasema ligikaudu 50% asemel<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneril on meie tarnekindluse hoidmisel otsustav roll.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, tegevjuht<\/b><br>KJH-Comp \u00b7 Lehtmetallit\u00f6\u00f6d ja lepinguline tootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus t\u00f5usis ligikaudu 50% pealt koguni 98%-ni ning ajakava koostamiseks on n\u00fc\u00fcd kahe t\u00f6\u00f6juhi asemel vaja \u00fcht.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/klientide-lood\/kjh-comp\/\">Lugege KJH-Compi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Odoo Community v\u00f5imaldab tootmise ajakava koostada?<\/summary>\n<p class=\"sp-faq__a\">Jah, p\u00f5hitasemel. Community sisaldab tootmisk\u00e4ske, tootmistellimusi, t\u00f6\u00f6keskusi ja nuppu Plan. Andmeid saab vaadata loendi, kalendri, risttabeli ja graafikuna. Gantti ajakavavaade, Shop Floor ja Master Production Schedule on Enterprise\u2019i funktsioonid. SkyPlanner annab Communityt kasutavatele tehastele Gantti vaate ja operaatorite t\u00f6\u00f6j\u00e4rjekorra.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Odoo MRP arvestab t\u00f6\u00f6keskuse v\u00f5imsusega?<\/summary>\n<p class=\"sp-faq__a\">Ei. Varude t\u00e4iendamisel kasutatakse kalendrip\u00e4evades v\u00e4ljendatud l\u00e4biminekuaegu. Odoo dokumentatsiooni kohaselt need &#8220;do not consider weekends, holidays, or work center capacity&#8221; (ei arvesta n\u00e4dalavahetuste, p\u00fchade ega t\u00f6\u00f6keskuse v\u00f5imsusega). V\u00f5imsust arvestatakse alles siis, kui vajutate tootmisk\u00e4sul nuppu Plan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Odoo v\u00f5imaldab \u00fches t\u00f6\u00f6keskuses korraga mitut t\u00f6\u00f6d teha?<\/summary>\n<p class=\"sp-faq__a\">Ajakava koostamisel mitte. Versiooni 19.0 kood broneerib igale tootmistellimusele ajavahemiku, mis ei kattu \u00fchegi teise sama t\u00f6\u00f6keskuse tootmistellimusega. Vahekaardil Product Capacities m\u00e4\u00e4ratakse \u00fche tootmistellimuse ts\u00fckli jooksul valmistatavate t\u00fckkide arv, mitte paralleelsed tootmistellimused.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Odoo arvestab t\u00f6\u00f6de j\u00e4rjekorrast s\u00f5ltuvate seadistusaegadega?<\/summary>\n<p class=\"sp-faq__a\">Ei. Setup Time ja Cleanup Time on fikseeritud ajad, mis m\u00e4\u00e4ratakse minutites iga t\u00f6\u00f6keskuse kohta v\u00f5i vahekaardil Product Capacities iga toote kohta. Odoo lisab need igale tootmistellimusele, olenemata sellest, milline t\u00f6\u00f6 enne tehti. SkyPlanneri seadistusaegade maatriksis on \u00fcmberseadistusajad m\u00e4\u00e4ratud tootepaaride ja \u00fclemineku suuna j\u00e4rgi ning t\u00f6\u00f6d j\u00e4rjestatakse nii, et \u00fcmberseadistustele kuluks v\u00f5imalikult v\u00e4he aega.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas SkyPlanner APS Odooga \u00fchendatakse?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner vahetab Odooga andmeid m\u00f5lemas suunas v\u00e4lise JSON-2 API kaudu v\u00f5i versioonides 16.0 kuni 18.0 XML-RPC v\u00f5i JSON-RPC kaudu, kasutades meetodit <code>execute_kw<\/code>. Planeeritud kuup\u00e4evad ja t\u00f6\u00f6keskused kirjutatakse igale <code>mrp.workorder<\/code> kirjele ning registreeritud aeg salvestatakse Odoo Time Logs ajakirjetena. SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus ja pakub tuge ka p\u00e4rast k\u00e4ivitamist. \u00dcksikasjad leiate <a href=\"\/et\/integratsioonid\/erp\/odoo\/liidestamise-juhend\/\">Odoo liidestusjuhendist<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saan SkyPlannerit enne Odooga liidestamist katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evasel prooviperioodil saate kasutada Odoo loendivaadetest eksporditud CSV- v\u00f5i XLSX-faile ja kuni 20 t\u00f6\u00f6keskust. Krediitkaarti pole vaja. Saate v\u00f5rrelda SkyPlanneri ajakava nupu Plan tulemustega enne, kui midagi \u00fchendate. <a href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integratsioonid \/ ERP \/ Odoo Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS Odoo toetab algtasemel tootmise planeerimist t\u00f6\u00f6keskuse kalendri vabade aegade alusel. Rakenduse Odoo Manufacturing nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse kalendri esimesse vabasse ajavahemikku. Nii ei kattu kaks planeeritud tootmistellimust samas t\u00f6\u00f6keskuses kunagi. Korraga planeerib see aga &#8230; <a title=\"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/\" aria-label=\"Read more about Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100824,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101181","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kas Odoo toetab tootmise planeerimist? Nupp Plan<\/title>\n<meta name=\"description\" content=\"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/tootmise-planeerimine\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/tootmise-planeerimine\\\/\",\"name\":\"Kas Odoo toetab tootmise planeerimist? Nupp Plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/tootmise-planeerimine\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/tootmise-planeerimine\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/tootmise-planeerimine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS sinu ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Odoo jaoks: v\u00f5imsuspiire arvestav tootmise ajakava koostamine ja integratsioon\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kas Odoo toetab tootmise planeerimist? Nupp Plan","description":"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/","og_locale":"et_EE","og_type":"article","og_title":"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS","og_description":"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/","name":"Kas Odoo toetab tootmise planeerimist? Nupp Plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Odoo nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse esimesse vabasse ajavahemikku. Mida see teeb, kus on piirid ja millal on vaja APS-i?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/tootmise-planeerimine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS sinu ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Odoo jaoks: v\u00f5imsuspiire arvestav tootmise ajakava koostamine ja integratsioon","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integratsioonid \/ ERP \/ Odoo Kas Odoo toetab tootmise planeerimist? Kuidas t\u00f6\u00f6tab nupp Plan ja millal lisada SkyPlanner APS Odoo toetab algtasemel tootmise planeerimist t\u00f6\u00f6keskuse kalendri vabade aegade alusel. Rakenduse Odoo Manufacturing nupp Plan paigutab iga tootmistellimuse t\u00f6\u00f6keskuse kalendri esimesse vabasse ajavahemikku. Nii ei kattu kaks planeeritud tootmistellimust samas t\u00f6\u00f6keskuses kunagi. Korraga planeerib see aga&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=101181"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101181\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/100824"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=101181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}