{"id":101151,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101151"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/","title":{"rendered":"SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP S\/4HANA liidestamise juhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-iga<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See juhend selgitab SAP partneritele, IT-meeskondadele ja tehnilistele ostjatele, kuidas SkyPlanner APS \u00fchendub SAP S\/4HANA-ga. SkyPlanner vahetab S\/4HANA-ga andmeid m\u00f5lemas suunas SAP avaldatud OData API-de kaudu:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmistellimused, operatsioonid, t\u00f6\u00f6keskuste v\u00f5imsus, laoseis ja avatud ostutellimused.<\/li>\n\n\n<li>Iga tootmistellimuse operatsiooni kohta saadetakse tagasi selle planeeritud alguskuup\u00e4ev.<\/li>\n\n\n<li>Operaatorite ajakirjed kantakse s\u00fcsteemi tootmistellimuse kinnitustena.<\/li>\n\n\n<li>SkyPlanneri veebihaagid edastavad ajakava muudatused kohe nende tekkimisel.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on ajastatud eri t\u00f6\u00f6keskustele ning all kuvatakse tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Materjalid, BOM-id, tehnoloogilised marsruudid, tootmistellimused, laoseis ja kuluarvestus j\u00e4\u00e4vad S\/4HANA-sse. SkyPlanneri meeskond seadistab juurutamise k\u00e4igus liidestuse teie S\/4HANA keskkonnale vastavaks ja pakub tuge ka p\u00e4rast kasutuselev\u00f5ttu. \u00c4rilise kasu kohta lugege <a href=\"\/et\/integratsioonid\/erp\/sap-s4hana\/\">SAP S\/4HANA tootmise ajakava koostamise lehelt<\/a>. S\/4HANA enda ajastamisv\u00f5imalusi tutvustab artikkel <a href=\"\/et\/integratsioonid\/erp\/sap-s4hana\/tootmise-planeerimine\/\">Kas SAP S\/4HANA v\u00f5imaldab tootmise planeerimist masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust arvestades?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA liidestamise v\u00f5imalused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA pakub liidestamiseks avaldatud OData teenuseid, mis on loetletud SAP Business Accelerator Hubis (api.sap.com). Ajakava koostamise liidestus kasutab OData V2 teenuseid. IDocid ja BAPI-d on endiselt olemas, kuid see juhend kasutab avaldatud OData API-sid.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentimine eri v\u00e4ljaannetes<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kohapealne paigaldus ja Private Edition.<\/strong> Teenused aktiveeritakse SAP Gateway keskkonnas tehinguga <code>\/IWFND\/MAINT_SERVICE<\/code>. Integratsioonikasutajal on vaja vastavaid autoriseerimisobjekte, n\u00e4iteks kinnituste jaoks <code>C_AFRU_AWK<\/code>, koos nendega kirjendatavate kaubaliikumise ridade jaoks <code>C_AFKO_AWK<\/code> ja plaaniliste tellimuste jaoks <code>M_PLAF_ORG<\/code>.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Teenused tehakse k\u00e4ttesaadavaks ainult sideseadistuste kaudu. Looge rakenduses <strong>Communication Arrangements<\/strong> sidekasutaja, sides\u00fcsteem ja sideseadistus, j\u00e4rgides <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">SAP-i sissetuleva side seadistamise juhendit<\/a>. Aluseks on SAP-i sidestsenaarium (<code>SAP_COM_xxxx<\/code>), mis m\u00e4\u00e4rab k\u00e4ttesaadavad teenused ja autentimismeetodid:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; t\u00f5endip\u00f5hine: OAuthi, SAMLi v\u00f5i OpenID Connecti bearer-autentimine koos identiteedi edastamisega \u00e4rikasutajale &#8211; kliendisertifikaat &#8211; Basic-autentimine tehnilise sidekasutajaga<\/p>\n\n\n<p>SAP soovitab t\u00f5endi- v\u00f5i sertifikaadip\u00f5hist autentimist.<\/p>\n\n\n<p>SkyPlanneri poolel on JWT-autentimisega REST API, mis on dokumenteeritud Swagger\/OpenAPI vormingus (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>). Seega haldab vahetarkvara \u00fchel pool SAP autentimist ja teisel pool JWT-d.<\/p>\n\n\n<h3 class=\"wp-block-heading\">API-d tootmise ajakava koostamiseks<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Teenus<\/th><th>Kasutatavad olemid ja toimingud<\/th><th>Otstarve<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; toimingud <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Tellimused, operatsioonid, komponendid, tootmisressursid ja t\u00f6\u00f6riistad (PRT), olek, ajakava tagasikirjutamine<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>T\u00f6\u00f6keskused, v\u00f5imsuse kategooriad, ajavahemikud ja vahetused<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Standardsed tehnoloogilised marsruudid planeerimiseks enne tellimuste loomist<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Mitmetasandiline tootestruktuur<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Materjalid (API-s nimega Product). Enamiku tooteolemite jaoks soovitab SAP n\u00fc\u00fcd API-t Product (Version 2)<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>MRP Live\u2019i v\u00e4ljund enne teisendamist<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Laoseis tehase ja laokoha kaupa materjalide saadavuse hindamiseks<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Saabuva materjali avatud ostutellimused<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; toimingud <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Tootmissaalist p\u00e4rinevad kinnitused ja kaubaliikumised<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tootmistellimuste API-s on operatsioonide v\u00f5tmeteks <code>OrderInternalBillOfOperations<\/code> ja <code>OrderIntBillOfOperationsItem<\/code>, mitte planeerijale n\u00e4htav operatsiooni number. Kinnituste API toiming <code>GetConfProposal<\/code> viitab samale operatsioonile v\u00e4ljade <code>OrderID<\/code> ja <code>OrderOperation<\/code> kaudu. Salvestage sisemised v\u00f5tmed ja operatsiooni number SkyPlannerisse juba esimesel laadimisel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u00fcndmused<\/h3>\n\n\n<p>S\/4HANA genereerib <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">\u00e4ris\u00fcndmused<\/a> <strong>Production Order Created<\/strong> ja <strong>Production Order Changed<\/strong>, mille andmesisu sisaldab v\u00e4lju <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> ja <code>ProductionPlant<\/code>. Andmesisus on ainult v\u00f5tmed, seega loeb integratsioon tellimuse ja selle operatsioonid uuesti sisse. S\u00fcndmus Changed k\u00e4ivitub iga tellimuse muudatuse korral, seega koondage j\u00e4rjestikused s\u00fcndmused enne t\u00f6\u00f6tlemist. Vastassuunas edastavad SkyPlanneri veebihaagid teabe reaalajas, kui ajakava v\u00f5i t\u00f6\u00f6 olek muutub.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Alustamine failide abil<\/h3>\n\n\n<p>Prooviperioodiks eksportige tootmistellimused ja t\u00f6\u00f6keskused S\/4HANA loendiaruannetest Exceli v\u00f5i CSV-faili ning importige need SkyPlannerisse. Nii saate ajakava toimivust kontrollida enne Gateway v\u00f5i sidekorralduse seadistamist.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmete vastendamine: SAP S\/4HANA-st SkyPlannerisse<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>S\/4HANA olem \/ l\u00f5pp-punkt<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (materjal)<\/td><td>Toode v\u00f5i materjal<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste ajastatud laadimine<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Tootestruktuur, alamtooted<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel ajastatult<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>T\u00f6\u00f6keskus<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel muudatuste korral<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>V\u00f5imsus ja vahetused<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel ajastatult<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Protsessietapid ja normajad<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Esmane laadimine, seej\u00e4rel ajastatult<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (t\u00e4itmiseks vabastatud v\u00f5i loodud)<\/td><td>T\u00e4htajaga tellimus<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Peaaegu reaalajas s\u00fcndmuse Created\/Changed korral v\u00f5i ajastatud p\u00e4ringutega<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>T\u00f6\u00f6 (protsessietapp t\u00f6\u00f6keskuses)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Koos tellimusega<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (tootmisressursid\/t\u00f6\u00f6riistad)<\/td><td>T\u00f6\u00f6riistad, mida planeeritakse piiratud saadavusega \u00fchiskasutatavate ressurssidena<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Koos tellimusega<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Materjalivajadus ja laoseis<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Ajastatult, intervall lepitakse kokku ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): tarnimata kogus ja tarnegraafiku rea tarnekuup\u00e4ev<\/td><td>Ostutellimused \/ saabuv materjal koos eeldatava tarnekuup\u00e4evaga<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Ajastatult, intervall lepitakse kokku ulatuse m\u00e4\u00e4ramisel<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (valikuline)<\/td><td>Enne teisendamist planeeritud tellimused<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>P\u00e4rast iga MRP Live\u2019i k\u00e4ivitust<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (operatsiooni algus, edasisuunas planeerimine)<\/td><td>Ajakava<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Ajakava muutumisel veebihaagi kaudu<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (n\u00f5uetekohane toodang, praak, tegevused)<\/td><td>T\u00f6\u00f6aja kirjed ja kogused<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>T\u00f6\u00f6aja kirjetega seotud s\u00fcndmuste kaupa v\u00f5i pakettidena<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Liidestuslahendused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete laadimine.<\/strong> Laadige materjalid, BOM-id, t\u00f6\u00f6keskused koos v\u00f5imsusintervallide ja vahetustega ning tehnoloogilised marsruudid. Otsustage selles etapis, milline s\u00fcsteem haldab vahetusi. Toimiv t\u00f6\u00f6jaotus on j\u00e4rgmine: tehase kalender j\u00e4\u00e4b S\/4HANA-sse, \u00fcksikasjalikud vahetusegraafikud, puudumised ja \u00fcletunnid aga SkyPlannerisse, kus planeerijad neid iga p\u00e4ev muudavad.<\/p>\n\n\n<p><strong>2. Tellimuste s\u00fcnkroonimine.<\/strong> Tellige s\u00fcndmused Production Order Created\/Changed v\u00f5i tehke p\u00e4ringuid olemile <code>A_ProductionOrder_2<\/code> muudatuse ajatempli alusel, kui \u00e4ris\u00fcndmused pole seadistatud. Filtreerige tehase, tellimuse t\u00fc\u00fcbi ja oleku j\u00e4rgi. Saatke tellimused kohe loomisel, et SkyPlanner saaks ette planeerida, ning vabastage need S\/4HANA-s t\u00e4itmiseks (<code>ReleaseOrder<\/code> v\u00f5i <code>ReleaseOperation<\/code>), kui SkyPlanner on need ajakavasse paigutanud.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> Kui SkyPlanneri veebihaak teatab ajakava muutusest, kutsub integratsioon iga muudetud operatsiooni jaoks API-s <code>API_PRODUCTION_ORDER_2_SRV<\/code> v\u00e4lja toimingu <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a>. See saadab j\u00e4rgmised andmed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>v\u00f5tmetena <code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> ja <code>OrderIntBillOfOperationsItem<\/code><\/li>\n\n\n<li><code>OpSchedulingMode<\/code> v\u00e4\u00e4rtusega F (edasisuunas), kus SkyPlanneri m\u00e4\u00e4ratud alguskuup\u00e4ev ja -kellaaeg on v\u00e4ljadel <code>OpSchedldStartDate<\/code> ja <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> v\u00e4\u00e4rtusega DISP (t\u00e4itmiseks suunamine) ja kohustuslik <code>OpSchedulingStrategy<\/code> v\u00e4\u00e4rtusega M<\/li>\n\n\n<li>ETag p\u00e4ises <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>\u00dche tellimuse k\u00f5ik operatsioonid saadetakse \u00fche muudatuste komplektina SkyPlanneris m\u00e4\u00e4ratud j\u00e4rjekorras, nii et S\/4HANA ajastab kogu tellimuse plaani \u00fche p\u00e4ringuga. Re\u017eiimi K ei kasutata kunagi: see j\u00e4tab alles operatsioonide algsed kuup\u00e4evad ja eirab saadetud kuup\u00e4evi.<\/p>\n\n\n<p>SkyPlanner tuletab operatsioonide kestused samadest tehnoloogilise marsruudi standardv\u00e4\u00e4rtustest ja t\u00f6\u00f6keskuse v\u00f5imsuse valemitest, mida kasutab S\/4HANA. Seet\u00f5ttu vastab S\/4HANA-s saadetud algusaja p\u00f5hjal arvutatud l\u00f5ppkuup\u00e4ev SkyPlanneri plaanile. P\u00e4rast iga muudatuste komplekti loeb liidestus operatsioonid uuesti sisse ja m\u00e4rgib k\u00f5ik erinevad kuup\u00e4evad, et planeerija n\u00e4eks neid enne j\u00e4rgmist vahetust.<\/p>\n\n\n<p><strong>4. Tootmissaali kinnitused.<\/strong> Iga Mobile Confirmationsi v\u00f5i Production Timeri t\u00f6\u00f6aja kirje muutub S\/4HANA kinnituseks. SkyPlanneri veebihaak k\u00e4ivitab <code>ProdnOrdConf2<\/code> postituse, mis sisaldab n\u00f5uetekohase toodangu ja praagi koguseid ning tegevuste kestusi. Esmalt kutsub integratsioon v\u00e4lja toimingu <code>GetConfProposal<\/code>, et S\/4HANA pakuks v\u00e4lja kogused, tegevused, kuup\u00e4evad ja personaliandmed. Kaubaliikumised pakub v\u00e4lja <code>GetGdsMvtProposal<\/code>.<\/p>\n\n\n<p><strong>Saabuvad materjalid.<\/strong> S\u00fcnkroonimisel tuuakse SkyPlannerisse ka avatud ostutellimused. SkyPlanner k\u00e4sitleb tellitud materjali k\u00e4ttesaadavana ostutellimuse eeldataval tarnekuup\u00e4eval. Ostetud komponente ootavad t\u00f6\u00f6d ajastatakse materjali saabumise p\u00e4evale, mitte ei j\u00e4eta praeguse laoseisu t\u00f5ttu ootele.<\/p>\n\n\n<p>Kauba vastuv\u00f5tu puhul j\u00e4\u00e4b aluseks S\/4HANA: kauba vastuv\u00f5tu kirjendamisel suureneb laoseis ja v\u00e4heneb ostutellimuse rea laekumata kogus. J\u00e4rgmine s\u00fcnkroonimine uuendab SkyPlanneri laoseisu ning m\u00e4rgib t\u00e4ielikult laekunud ostutellimuse olekuks Delivered. Osalise laekumise korral j\u00e4\u00e4b \u00fclej\u00e4\u00e4nud kogus saabuvaks tarnegraafiku real m\u00e4\u00e4ratud kuup\u00e4eval. SkyPlanneri ostutellimuste k\u00e4sitlust kirjeldab <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsioon<\/a>.<\/p>\n\n\n<p><strong>5. Andmete haldamise reeglid.<\/strong> S\/4HANA haldab koguseid, BOM-i, tehnoloogilist marsruuti, kuluarvestust ja olekut. SkyPlanner haldab j\u00e4rjekorda, t\u00f6\u00f6keskuste m\u00e4\u00e4ramist ja operatsioonide kuup\u00e4evi. \u00c4rge lubage m\u00f5lemal s\u00fcsteemil samale v\u00e4ljale kirjutada. Kui planeerijad liigutavad operatsioone endiselt Capacity Scheduling Boardis, otsustage, kumma s\u00fcsteemi muudatus j\u00e4\u00e4b kehtima. Kas j\u00e4rgmine tellimuste s\u00fcnkroonimine toob nende muudatuse SkyPlannerisse v\u00f5i j\u00e4\u00e4b see t\u00f6\u00f6keskus SkyPlanneri ulatusest v\u00e4lja.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mida projekt h\u00f5lmab<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Juurutamine j\u00f5uab tavaliselt l\u00f5pule m\u00f5ne n\u00e4dala jooksul p\u00e4rast alustamist, ka suurtes ettev\u00f5tetes. Enamik tehaseid alustab 30-p\u00e4evase tasuta prooviperioodiga, kasutades CSV- v\u00f5i Exceli eksporte. Nii kontrollitakse ajakava toimivust oma andmetega juba enne API-t\u00f6\u00f6de algust. Seej\u00e4rel h\u00f5lmab S\/4HANA projekt j\u00e4rgmist:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Ulatuse m\u00e4\u00e4ramine:<\/strong> tehased, tellimuste t\u00fc\u00fcbid, v\u00e4ljaanne ja autentimismudel ning iga v\u00e4lja eest vastutav s\u00fcsteem.<\/li>\n\n\n<li><strong>Juurdep\u00e4\u00e4s SAP-le:<\/strong> Gateway teenuse aktiveerimine v\u00f5i sidekorralduse seadistamine, samuti tehnilised kasutajad ja autoriseerimisobjektid.<\/li>\n\n\n<li><strong>P\u00f5hiandmete vastendamine:<\/strong> t\u00f6\u00f6keskuste v\u00f5imsuskategooriad, intervallid ja vahetused, tehnoloogilise marsruudi standardv\u00e4\u00e4rtuste vastendamine SkyPlanneri kestustele ning m\u00f5\u00f5t\u00fchikud.<\/li>\n\n\n<li><strong>Esmane laadimine:<\/strong> materjalid, BOM-id, tehnoloogilised marsruudid ja t\u00f6\u00f6keskused koos nende v\u00f5imsustega.<\/li>\n\n\n<li><strong>Tootmis- ja ostutellimuste s\u00fcnkroonimine:<\/strong> tootmistellimused ja operatsioonid s\u00fcndmuste Created\/Changed v\u00f5i perioodiliste p\u00e4ringute alusel, laoseis ja avatud ostutellimused kindla ajakava j\u00e4rgi.<\/li>\n\n\n<li><strong>Ajakava tagasikirjutamine:<\/strong> <code>ScheduleProductionOrderOperation<\/code> koos ETagi k\u00e4sitluse ja korduskatsete j\u00e4rjekorraga.<\/li>\n\n\n<li><strong>Tootmissaali kinnitused:<\/strong> t\u00f6\u00f6aja kirjed postitatakse <code>ProdnOrdConf2<\/code> kinnitustena.<\/li>\n\n\n<li><strong>Testimine paralleelselt praeguse plaaniga:<\/strong> SkyPlanneri ajakava kasutatakse olemasoleva koormuse tasandamise k\u00f5rval, kuni planeerijad seda usaldavad.<\/li>\n\n\n<li><strong>Kasutuselev\u00f5tt.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA v\u00f5imalikud veakohad<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tagasikirjutamiseks tuleb v\u00e4lja kutsuda toiming koos ETagiga.<\/strong> Dokumentatsiooni j\u00e4rgi koostatakse operatsiooni ajakava toiminguga <code>ScheduleProductionOrderOperation<\/code>, mitte olemi <code>A_ProductionOrderOperation_2<\/code> PATCH-p\u00e4ringuga. Re\u017eiim F planeerib algusajast edasi ja B l\u00f5puajast tagasi, K ja S aga s\u00e4ilitavad olemasolevad kuup\u00e4evad ning eiravad teie saadetud kuup\u00e4evi. P\u00e4ises <code>if-match<\/code> olev ETag koostatakse tellimuse v\u00e4lja <code>LastChangeDateTime<\/code> p\u00f5hjal (YYYYMMDDHHMMSS), seega muudab iga tellimuse muudatus selle aegunuks. Lugege andmed enne kirjutamist uuesti sisse ja looge korduskatsete j\u00e4rjekord.<\/li>\n\n\n<li><strong>V\u00f5imsuse andmed ei asu t\u00f6\u00f6keskuse p\u00e4ises.<\/strong> Saadaolev v\u00f5imsus tuleneb v\u00f5imsuse kategooriast (001 masinad, 002 t\u00f6\u00f6j\u00f5ud), tehasekalendrist ning seda \u00fclekirjutavatest ajavahemikest ja vahetustest. V\u00f5imsuse valemid teisendavad tehnoloogilise marsruudi normv\u00e4\u00e4rtused seadistamise, t\u00f6\u00f6tlemise ja l\u00f5petamise ressursivajaduseks. Lugege sisse <code>A_WorkCenterCapacityInterval_2<\/code> ja vahetuste olemid ning leppige kokku, kuidas teisendada valemid SkyPlanneri kestusteks.<\/li>\n\n\n<li><strong>Standardv\u00e4\u00e4rtused vajavad korrastamist.<\/strong> Kuluarvestuse jaoks hallatavad tehnoloogilised marsruudid sisaldavad sageli keskmistatud seadistusaegu v\u00f5i on seadistamine kirjendatud vale v\u00f5imsuskategooria alla.<\/li>\n\n\n<li><strong>Kinnitamise reeglid on ranged.<\/strong> Masspostituseks soovitab SAP pakettp\u00e4ringuid. Muudatuskomplekt rakendub kas tervikuna v\u00f5i \u00fcldse mitte, seega blokeerib \u00fcks vigane t\u00f6\u00f6aja kinnitus kogu \u00fclej\u00e4\u00e4nud komplekti. Paketis olevad t\u00fchistamised tuleb teha v\u00e4lja <code>ConfirmationCount<\/code> j\u00e4rgi vastupidises j\u00e4rjekorras. \u00dche tellimuse puhul ei saa kasutada eri kinnitust\u00fc\u00fcpe, postitada kaubaliikumisi ilma kinnituseta ega kinnitada operatsioone, mille k\u00e4ivituspunktid n\u00f5uavad dialoogiakent.<\/li>\n\n\n<li><strong>Kontrollige, kas PP\/DS on aktiivne.<\/strong> Sisseehitatud PP\/DS n\u00f5uab Customizingu tegevust <strong>Activate Advanced Planning and Scheduling<\/strong> ja SAP HANA integreeritud liveCache&#8217;i. SAP m\u00fc\u00fcb seda eraldi tootena <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Kui see on aktiivne, otsustage iga materjali puhul, milline s\u00fcsteem ajakava koostab: t\u00e4iustatud planeerimiseks m\u00e4rgitud materjalid kuuluvad PP\/DS-i vastutusalasse. SAP m\u00e4rgib ka planeeritud tellimuste API kohta: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (See API ei v\u00f5imalda automaatset liidestamist selle s\u00fcsteemiga.)<\/li>\n\n\n<li><strong>M\u00f5\u00f5t\u00fchikud.<\/strong> Operatsioonide koguste, tehnoloogilise marsruudi baaskoguste ja kinnituste \u00fchikud v\u00f5ivad erineda. Teisendage need alati operatsiooni \u00fchiku, mitte materjali baas\u00fchiku j\u00e4rgi.<\/li>\n\n\n<li><strong>V\u00e4ljaannete erinevused.<\/strong> <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> n\u00e4itab, et klassikaline CM21\/CM22 planeerimistabel asendatakse rakendustega Manage Work Center Capacity, Capacity Scheduling Table ja Capacity Scheduling Board. Public Edition pakub API-sid ainult sidestsenaariumide kaudu ning selle teenuseversioonid v\u00f5ivad erineda kohapealse paigalduse omadest. Tehnoloogiliste marsruutide API ei v\u00f5imalda marsruute kustutada ega materjalide seoseid uuendada. SkyPlanneri meeskond fikseerib ulatuse m\u00e4\u00e4ramise k\u00e4igus iga kliendis\u00fcsteemi teenuseversioonid, l\u00e4htudes API Business Accelerator Hubi vastava versiooni kirjest.<\/li>\n\n\n<li><strong>Piirangud, mida tehnoloogilised marsruudid ei sisalda.<\/strong> Hallake j\u00e4rjestusest s\u00f5ltuvaid \u00fcmberseadistusi, t\u00f6\u00f6riistade kasutuskonflikte ja mitut operaatorit vajavaid operatsioone SkyPlanneris, mitte tehnoloogilise marsruudi standardv\u00e4\u00e4rtustes. Seadistusaegade maatriks sisaldab iga tootepaari \u00fcmberseadistusaegu. Tellimuse PRT-des m\u00e4\u00e4ratud t\u00f6\u00f6riistad on piiratud ressursid ja neid saab korraga kasutada ainult \u00fches t\u00f6\u00f6keskuses. \u00dcks operatsioon v\u00f5ib vajada korraga mitut inimest.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes liidestuse seadistab<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Eespool kirjeldatud veakohtade t\u00f5ttu moodustab seadistamine p\u00f5hilise osa t\u00f6\u00f6st. Iga tehas kasutab S\/4HANA-t erinevalt: tellimuste t\u00fc\u00fcbid, v\u00f5imsuskategooriad, tehnoloogilise marsruudi standardv\u00e4\u00e4rtused, user exits ja v\u00e4ljaanne m\u00f5jutavad k\u00f5ik andmete vastendamist.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab liidestuse<\/strong> juurutamise k\u00e4igus teie S\/4HANA keskkonnale vastavaks, kasutades avaldatud S\/4HANA API-sid ning SkyPlanneri REST API-t ja veebihaake. Meeskond pakub liidestusele tuge ka p\u00e4rast kasutuselev\u00f5ttu. See on tavap\u00e4rane lahendus, mille puhul vastutab nii ajakava koostamise tarkvara kui ka S\/4HANA \u00fchenduse eest \u00fcks osapool.<\/li>\n\n\n<li><strong>Teie SAP partner<\/strong> v\u00f5ib liidestuse ka ise luua, l\u00e4htudes SkyPlanneri Swagger\/OpenAPI dokumentatsioonist ning tundes teie tellimuste t\u00fc\u00fcpe ja Basise seadistust.<\/li>\n\n\n<li><strong>Teie enda arendajad<\/strong> saavad luua liidestuse otse v\u00f5i SAP Integration Suite&#8217;i v\u00f5i SAP BTP kaudu, kasutades dokumenteeritud REST API-t, JWT-autentimist ja veebihaake (<a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">liidestamise juhend<\/a>). Alustamiseks piisab API-v\u00f5tmest ja SkyPlanneri meeskond aitab, kui arendajad abi vajavad.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner t\u00f6\u00f6tab juba SAP k\u00f5rval: Laboratory &amp; Alliedi ettev\u00f5ttesisene IT-meeskond \u00fchendas SAP Business One on HANA SkyPlanneriga, kasutades SkyPlanneri abi. Funktsioonide dokumentatsioon on avalikult k\u00e4ttesaadav <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsioonis<\/a>.<\/p>\n\n\n<p>\u00dcksk\u00f5ik millise lahenduse valite, kontrollige esmalt ajakava toimivust 30-p\u00e4evase tasuta prooviperioodi jooksul (kuni 20 t\u00f6\u00f6keskust, krediitkaarti pole vaja). Seej\u00e4rel luuakse liidestus, mis toetab teie planeerijate jaoks juba usaldusv\u00e4\u00e4rset plaani. P\u00e4rast prooviperioodi algavad hinnad 199 \u20ac kuus ning hind sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub kord kuus. Liidestuse hinnapakkumine koostatakse teie protsessi ja vajaduste j\u00e4rgi ette koos paketi pakkumisega, nii et n\u00e4ete kogukulu juba enne alustamist.<\/p>\n\n\n<p>Tervikpildi saamiseks tutvuge <a href=\"\/et\/hinnakujundus\/\">hindadega<\/a>, <a href=\"\/et\/funktsioonid\/\">funktsioonidega<\/a> ja <a href=\"\/et\/klientide-lood\/\">klientide tagasisidega<\/a>.<\/p>\n\n\n<p><a href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a> <a href=\"\/et\/kontakt-muugiga\/\">V\u00f5ta \u00fchendust m\u00fc\u00fcgiga<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete tagasiside SkyPlanneri kohta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"UTU tarneahela spetsialist Kalle Kalliom\u00e4ki elektrikilpide tootmises Ulvilas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>kokkuhoidu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest reaalajas tootmise optimeerimiseni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahela spetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel hoitakse igal n\u00e4dalal kokku 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/utu\/\">Loe UTU tagasisidet<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumiriietuses operaatorid pudelite t\u00e4iteliinil Laboratory &amp; Alliedi ravimitootmises Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise t\u00f5husus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise t\u00f5husus on kasvanud 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise t\u00f5husus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolme kuu plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/laboratory-allied\/\">Loe Laboratory &amp; Alliedi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u00d5huvaade Piristeeli katuse turvatoodete tehasele Kauhavas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>tarnekindlus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on aidanud kitsaskohad n\u00e4htavale tuua ja muutnud tootmise juhtimise selgemaks.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, tootmisjuht<\/b><br>Piristeel \u00b7 Katuse turvatooted ja vihmavees\u00fcsteemid<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus j\u00f5udis t\u00e4navu 99,2%-ni ning ajakava koostamine s\u00e4\u00e4stab kuni neli tundi t\u00f6\u00f6aega p\u00e4evas.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/piristeel\/\">Loe Piristeeli kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Compi keevitaja lihvib Alah\u00e4rm\u00e4 tehases keevitatud teraskonstruktsiooni\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>tarnekindlus varasema ligikaudu 50% asemel<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneril on meie tarnekindluse hoidmisel otsustav roll.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, tegevjuht<\/b><br>KJH-Comp \u00b7 Lehtmetallit\u00f6\u00f6tlus ja lepinguline tootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus kasvas ligikaudu 50%-lt koguni 98%-ni ning ajakava koostamisega tegeleb n\u00fc\u00fcd kahe t\u00f6\u00f6dejuhataja asemel \u00fcks.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/kjh-comp\/\">Loe KJH-Compi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas \u00fchendatakse SkyPlanner APS SAP S\/4HANA-ga?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS-i ja SAP S\/4HANA vaheline integratsioon on kahesuunaline. Tootmistellimused, operatsioonid, tehnoloogilised marsruudid, t\u00f6\u00f6keskused, laoseis ja ostutellimused loetakse sisse SAP-i avaldatud OData API-de kaudu. Operatsioonide kuup\u00e4evad saadetakse tagasi toiminguga <code>ScheduleProductionOrderOperation<\/code> ja registreeritud t\u00f6\u00f6tunnid <code>ProdnOrdConf2<\/code> kinnitustena. Saatmise k\u00e4ivitavad SkyPlanneri veebihaagid.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kes integratsiooni loob ja haldab?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanneri meeskond seadistab integratsiooni kasutuselev\u00f5tu k\u00e4igus teie S\/4HANA keskkonnale vastavaks ja pakub tuge ka p\u00e4rast k\u00e4ivitamist. Teie protsessi ja vajaduste p\u00f5hjal tehakse integratsioonile hinnapakkumine enne t\u00f6\u00f6de algust. Kui integratsiooni loob REST API kaudu teie SAP partner v\u00f5i teie enda arendajad, vastutavad selle eest nemad ning SkyPlanneri meeskond aitab vajaduse korral.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas kirjutatakse operatsioonide kuup\u00e4evad tagasi ja kas S\/4HANA s\u00e4ilitab nende j\u00e4rjekorra?<\/summary>\n<p class=\"sp-faq__a\">Toimingu <code>ScheduleProductionOrderOperation<\/code> kaudu API-s <code>API_PRODUCTION_ORDER_2_SRV<\/code>, kasutades edasisuunas planeerimist, t\u00e4itmiseks suunamise olekut ning SkyPlanneri m\u00e4\u00e4ratud alguskuup\u00e4eva ja -kellaaega. Iga tellimuse operatsioonid saadetakse \u00fche muudatuskomplektina SkyPlanneri m\u00e4\u00e4ratud j\u00e4rjekorras. Kestused arvutatakse samade tehnoloogilise marsruudi normv\u00e4\u00e4rtuste p\u00f5hjal, mida kasutab S\/4HANA. Integratsioon loeb iga operatsiooni uuesti sisse ja m\u00e4rgib k\u00f5ik erinevused.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas j\u00f5uavad kinnitused S\/4HANA-sse?<\/summary>\n<p class=\"sp-faq__a\">Operaatorid registreerivad t\u00f6\u00f6 SkyPlanneris ja see k\u00e4ivitab veebihaagi. Seej\u00e4rel postitab integratsioon API <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> kaudu kinnituse, mis sisaldab n\u00f5uetekohase toodangu ja praagi koguseid ning tegevuste kestusi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas integratsioon t\u00f6\u00f6tab ka S\/4HANA Cloud Public Editioniga?<\/summary>\n<p class=\"sp-faq__a\">Jah. Juurdep\u00e4\u00e4s toimub vastavate sidestsenaariumide jaoks seadistatud sidekorralduse kaudu. Ulatuse m\u00e4\u00e4ramisel valib SkyPlanneri meeskond tootmistellimuste API versiooni, mis vastab teie Public Editioni v\u00e4ljalaskele. Kohapealses keskkonnas ja Private Editionis aktiveeritakse selle asemel Gateway teenus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Meil on PP\/DS juba olemas. Kas vajame SkyPlannerit?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner sobib tehastele ja tootmis\u00fcksustele, kus puudub PP\/DS-i litsents v\u00f5i selle kasutamiseks vajalik personal. See ei vaja Customizing-l\u00fclitit, liveCache&#8217;i ega optimeerimisserverit, vaid ainult ametlikult avaldatud OData API-sid SAP poolel. Mootor Arcturus koostab tootmise planeerimisel sekunditega ajakava, mis arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust, ning Autopilot muudab ajakava automaatselt, kui tootmises midagi muutub.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame enne integreerimist\u00f6id katsetada ja kui kaua projekt kestab?<\/summary>\n<p class=\"sp-faq__a\">Jah. Importige 30-p\u00e4evase tasuta prooviperioodi jooksul tootmistellimused ja t\u00f6\u00f6keskused S\/4HANA ekspordifailidest. Kui ajakava toimib, saate luua API-integratsiooni. Tavaliselt saab juurutus valmis m\u00f5ne n\u00e4dala jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Teie s\u00fcsteemikeskkonna ulatuse m\u00e4\u00e4ramiseks <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a> v\u00f5i <a href=\"\/et\/prooviperiood\/\">alustage tasuta prooviperioodi<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ SAP S\/4HANA SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See juhend selgitab SAP partneritele, IT-meeskondadele ja tehnilistele ostjatele, kuidas SkyPlanner APS \u00fchendub SAP S\/4HANA-ga. SkyPlanner vahetab S\/4HANA-ga andmeid m\u00f5lemas suunas SAP avaldatud OData API-de kaudu: skyplanner.ai \u00b7 Tootmise ajakava koostamine Materjalid, BOM-id, tehnoloogilised marsruudid, tootmistellimused, laoseis ja kuluarvestus j\u00e4\u00e4vad &#8230; <a title=\"SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/\" aria-label=\"Read more about SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100794,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101151","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP S\/4HANA liidestus APS-ajastamiseks | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS ja SAP S\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS ja SAP S\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/liidestamise-juhend\\\/\",\"name\":\"SAP S\\\/4HANA liidestus APS-ajastamiseks | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS ja SAP S\\\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS teie ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS SAP S\\\/4HANA jaoks: tootmise planeerimine\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP S\\\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP S\/4HANA liidestus APS-ajastamiseks | SkyPlanner","description":"SkyPlanner APS ja SAP S\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga","og_description":"SkyPlanner APS ja SAP S\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/","name":"SAP S\/4HANA liidestus APS-ajastamiseks | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS ja SAP S\/4HANA: OData API-d, sidekorraldus, ScheduleProductionOrderOperation tagasikirjutus, andmete vastendamine ja veakohad.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS teie ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS SAP S\/4HANA jaoks: tootmise planeerimine","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ SAP S\/4HANA SAP S\/4HANA liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-iga See juhend selgitab SAP partneritele, IT-meeskondadele ja tehnilistele ostjatele, kuidas SkyPlanner APS \u00fchendub SAP S\/4HANA-ga. SkyPlanner vahetab S\/4HANA-ga andmeid m\u00f5lemas suunas SAP avaldatud OData API-de kaudu: skyplanner.ai \u00b7 Tootmise ajakava koostamine Materjalid, BOM-id, tehnoloogilised marsruudid, tootmistellimused, laoseis ja kuluarvestus j\u00e4\u00e4vad&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=101151"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101151\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/100794"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=101151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}