{"id":101091,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101091"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"liidestamise-juhend","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/","title":{"rendered":"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business One\u2019i liidestamise juhend <span class=\"hl\">tootmise ajakava koostamiseks SkyPlanner APS-is<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>See juhend n\u00e4itab SAP Business One\u2019i partneritele ja IT-meeskondadele, kuidas \u00fchendada B1 SkyPlanner APS-iga. Selgitame, milliseid API-sid kasutada, kuhu millised objektid liiguvad ja kus B1 projektides vigu tehakse. SkyPlanner vahetab SAP Business One\u2019iga andmeid m\u00f5lemas suunas Service Layeri kaudu:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlannerisse tuuakse tootmistellimused, tehnoloogilise marsruudi etapid, ressursid, artiklid ja ostutellimused.<\/li>\n\n\n<li>Planeeritud alguskuup\u00e4evad ja t\u00e4htajad kirjutatakse tagasi tootmistellimustele.<\/li>\n\n\n<li>Operaatorite ajakirjete p\u00f5hjal tehakse Receipt and Issue for Production kanded.<\/li>\n\n\n<li>SkyPlanneri veebihaagid edastavad ajakava muudatused kohe, kui need toimuvad.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajajoon, kus t\u00f6\u00f6d on jaotatud t\u00f6\u00f6keskuste vahel ning all kuvatakse tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Artiklid, BOM-id, tootmistellimused, laoseis ja finantsandmed j\u00e4\u00e4vad SAP Business One\u2019i hallata ning teie tootmismoodul j\u00e4\u00e4b muutmata. SkyPlanneri meeskond seadistab liidese kasutuselev\u00f5tu k\u00e4igus B1 standardobjektide p\u00f5hjal ja pakub tuge ka p\u00e4rast k\u00e4ivitamist. Iga ettev\u00f5tte andmebaasis on tehnoloogilise marsruudi etapid, ressursir\u00fchmad, kasutaja m\u00e4\u00e4ratud v\u00e4ljad ja lisamoodulid erinevad. Seadistamisel m\u00e4\u00e4rataksegi nende vastavused.<\/p>\n\n\n<p><a href=\"\/et\/customers\/laboratory-allied\/\">Laboratory &amp; Allied<\/a> kasutab SkyPlannerit koos HANA-l t\u00f6\u00f6tava SAP Business One\u2019iga. \u00c4rikasu kohta lugege <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/\">SAP Business One\u2019iga tootmise ajakava koostamise lehelt<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-business-one-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP Business One\u2019i liidestamise v\u00f5imalused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SAP Business One pakub liidestamiseks kolme v\u00f5imalust. Pilvep\u00f5hise ajakavarakenduse puhul on vaikevalik Service Layer.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Variant<\/th><th>Kirjeldus<\/th><th>Sobivus APS-iga integreerimiseks<\/th><\/tr><\/thead><tbody><tr><td><strong>Service Layer<\/strong><\/td><td>REST\/OData API. <code>\/b1s\/v1<\/code> kasutab OData versiooni v3, <code>\/b1s\/v2<\/code> versiooni v4. T\u00f6\u00f6tab SAP Business One&#8217;i SAP HANA versioonis ning alates versioonist 10.0 PL01 ka Microsoft SQL Serveriga.<\/td><td>Esmane valik. HTTP ja JSON, kasutatav pilveteenusest.<\/td><\/tr><tr><td><strong>DI API<\/strong><\/td><td>Windowsi COM-teek. Tootmistellimusi esindab objekt <code>ProductionOrders<\/code>, mille andmed salvestatakse tabelisse OWOR (objekti t\u00fc\u00fcp 202).<\/td><td>P\u00e4rands\u00fcsteemide v\u00f5i kohapealse vahevara jaoks. Vajab Windowsi hosti.<\/td><\/tr><tr><td><strong>Integration Framework (B1if)<\/strong><\/td><td>SAP-i vahevara dokumenditasandi integratsioonistsenaariumide jaoks.<\/td><td>Kasulik, kui partner juba kasutab B1if-i stsenaariume.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">Autentimine<\/h3>\n\n\n<p>Service Layer kasutab seansip\u00f5hist autentimist. Saatke p\u00e4ringuga <code>POST \/b1s\/v1\/Login<\/code> v\u00e4ljad <code>CompanyDB<\/code>, <code>UserName<\/code> ja <code>Password<\/code>. Vastuseks saate k\u00fcpsise <code>B1SESSION<\/code> ning koormuse tasakaalustamisega keskkonnas valikuliselt ka k\u00fcpsise <code>ROUTEID<\/code>. Vaikimisi aegub seanss p\u00e4rast 30 minutit tegevusetust, nagu m\u00e4\u00e4rab <code>SessionTimeout<\/code>. S\u00fcnkroonimise l\u00f5ppedes kutsuge alati v\u00e4lja <code>Logout<\/code>. Looge B1-s eraldi integratsioonikasutaja, et iga SkyPlannerist tehtud muudatus oleks muudatuste logis j\u00e4lgitav.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Service Layeri olemid tootmise ajakava koostamiseks<\/h3>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Andmed<\/th><th>Service Layeri olem<\/th><\/tr><\/thead><tbody><tr><td>Artiklid ja planeerimisandmed<\/td><td><code>Items<\/code><\/td><\/tr><tr><td>Materjaliloendid ja tehnoloogilise marsruudi etapid<\/td><td><code>ProductTrees<\/code> (Lines, Stages)<\/td><\/tr><tr><td>Masinad, t\u00f6\u00f6j\u00f5ud ja muud ressursid<\/td><td><code>Resources<\/code>, <code>ResourceGroups<\/code><\/td><\/tr><tr><td>Tootmistellimused<\/td><td><code>ProductionOrders<\/code> (Lines, Stages)<\/td><\/tr><tr><td>Laoseis ladude kaupa<\/td><td><code>Items<\/code> laoandmed, <code>Warehouses<\/code><\/td><\/tr><tr><td>Avatud ostutellimused ja tarnekuup\u00e4evad<\/td><td><code>PurchaseOrders<\/code> (DocumentLines: laekumata kogus, <code>ShipDate<\/code>)<\/td><\/tr><tr><td>Kauba vastuv\u00f5tt ostutellimuste alusel<\/td><td><code>PurchaseDeliveryNotes<\/code> (Goods Receipt PO, objekti t\u00fc\u00fcp 20)<\/td><\/tr><tr><td>Tootmisse v\u00e4ljastamine<\/td><td><code>InventoryGenExits<\/code><\/td><\/tr><tr><td>Toodangu lattu vastuv\u00f5tt<\/td><td><code>InventoryGenEntries<\/code><\/td><\/tr><tr><td>Veebihaakide seadistamine<\/td><td><code>EventSubscriptions<\/code>, <code>EventNotifications<\/code><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vaikimisi on lehel 20 kirjet. Suurendage seda p\u00e4isega <code>Prefer: odata.maxpagesize<\/code> v\u00f5i m\u00e4\u00e4rake <code>PageSize<\/code> failis <code>b1s.conf<\/code> ning j\u00e4rgige viita <code>odata.nextLink<\/code>. Kasutage parameetrit <code>$expand<\/code>, et lugeda tootmistellimuse read ja etapid \u00fche p\u00e4ringuga, ning koondage suuremahulisel tagasikirjutamisel p\u00e4ringud pakettidesse.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u00fcndmused ja veebihaagid<\/h3>\n\n\n<p>Alates SAP Business One&#8217;i versioonist 10.0 FP 2602 toetab Service Layer veebihaake. Vaikimisi on need v\u00e4lja l\u00fclitatud. Lubage need iga ettev\u00f5tte jaoks eraldi kutsega <code>CompanyService_UpdateAdminInfo<\/code> (<code>EnableWebhook = tYES<\/code>). Seej\u00e4rel saatke <code>POST EventSubscriptions<\/code> kolme osaga:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>WebhookURL<\/code><\/li>\n\n\n<li><code>AuthenticationType<\/code>: None, Basic, HMAC v\u00f5i OAuth; vaikev\u00e4\u00e4rtus on HMAC<\/li>\n\n\n<li><code>EventCollection<\/code>, mis sisaldab \u00e4riobjekte ja tehingut\u00fc\u00fcpe<\/li>\n\n<\/ul>\n\n\n<p><code>WebhookURL<\/code> peab kasutama HTTPS-i ning hostinimele vastavat sertifikaati. <code>EventSubscriptionsService_GetEventCatalog<\/code> loetleb s\u00fcndmused, mida saab tellida. Webhook Messenger Service peab t\u00f6\u00f6tama.<\/p>\n\n\n<p>Vanemates versioonides kasutage ajastatud perioodilisi p\u00e4ringuid (vt allpool v\u00e4lja <code>UpdateDate<\/code> puudutavat kitsaskohta). <code>SBO_SP_TransactionNotification<\/code> on andmebaasitasandi valideerimishaak, mitte andmeedastuskanal.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-business-one-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Andmev\u00e4ljade vastendamine: SAP Business One\u2019ist SkyPlannerisse<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>SAP Business One (Service Layer)<\/th><th>SkyPlanneri objekt<\/th><th>Suund<\/th><th>Sagedus<\/th><\/tr><\/thead><tbody><tr><td><code>Items<\/code> (toodetavad artiklid, Procurement Method)<\/td><td>Tooted<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Esialgne laadimine, seej\u00e4rel ajastatult<\/td><\/tr><tr><td><code>ProductTrees<\/code> Lines (artikliread)<\/td><td>Toote materjalid<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Esialgne laadimine, seej\u00e4rel muudatuse korral<\/td><\/tr><tr><td><code>ProductTrees<\/code> Stages ja ressursiread<\/td><td>Protsessietapid ja t\u00f6\u00f6tlemisajad<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Esialgne laadimine, seej\u00e4rel muudatuse korral<\/td><\/tr><tr><td><code>Resources<\/code> (Machine, Labor, Other)<\/td><td>T\u00f6\u00f6keskused ja personal<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Esialgne laadimine, muudatusi harva<\/td><\/tr><tr><td><code>ResourceGroups<\/code><\/td><td>T\u00f6\u00f6keskuste r\u00fchmad<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Esialgne laadimine<\/td><\/tr><tr><td><code>ProductionOrders<\/code> (Planned, Released)<\/td><td>Tellimused ja t\u00f6\u00f6d<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Veebihaak (FP 2602+) v\u00f5i p\u00e4ringud iga paari minuti j\u00e4rel<\/td><\/tr><tr><td><code>ProductionOrders<\/code> Stages<\/td><td>T\u00f6\u00f6 etapid koos j\u00e4rjekorraga<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Koos tellimusega<\/td><\/tr><tr><td><code>Items<\/code> laoseis <code>Warehouses<\/code> kaupa<\/td><td>Materjalide laoseis<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Ajastatult, nt kord tunnis<\/td><\/tr><tr><td><code>PurchaseOrders<\/code> (objekti t\u00fc\u00fcp 22) avatud read koos tarnekuup\u00e4evaga<\/td><td>Ostutellimused \/ saabuv materjal koos eeldatava tarnekuup\u00e4evaga<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Ajastatult, nt kord tunnis<\/td><\/tr><tr><td><code>PurchaseDeliveryNotes<\/code> (Goods Receipt PO) read, mille <code>BaseType<\/code> on 22<\/td><td>Ostutellimuse real vastuv\u00f5etud kogus, uuendatud laoseis<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Ajastatult, nt kord tunnis<\/td><\/tr><tr><td>Ajastatud algus ja l\u00f5pp<\/td><td><code>PATCH ProductionOrders({DocEntry})<\/code>: <code>StartDate<\/code>, <code>DueDate<\/code>, ressursirea <code>StartDate<\/code> ja <code>EndDate<\/code><\/td><td>SkyPlanner \u2192 B1<\/td><td>SkyPlanneri veebihaak ajakava muutumisel<\/td><\/tr><tr><td>Registreeritud kogused<\/td><td><code>InventoryGenEntries<\/code> (Receipt from Production)<\/td><td>SkyPlanner \u2192 B1<\/td><td>Kinnitamisel v\u00f5i pakettidena<\/td><\/tr><tr><td>Registreeritud t\u00f6\u00f6tunnid ja materjalikulu<\/td><td><code>InventoryGenExits<\/code> (Issue for Production)<\/td><td>SkyPlanner \u2192 B1<\/td><td>Kinnitamisel v\u00f5i pakettidena<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vahetuste kalendreid, personali ja puudumisi hallatakse SkyPlanneris. B1 p\u00e4evase tootmisv\u00f5imsuse n\u00e4itajaid ei edastata (vt esimest ohukohta allpool).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Liidestuslahendused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. P\u00f5hiandmete esialgne laadimine.<\/strong> Lugege sisse <code>Resources<\/code>, <code>ResourceGroups<\/code>, need <code>Items<\/code>, mille Procurement Method on Make, ning nende <code>ProductTrees<\/code> koos etappidega. Seostage iga masinaressurss SkyPlanneri t\u00f6\u00f6keskusega. Enne tellimuste esimest s\u00fcnkroonimist vaadake loend koos planeerijatega \u00fcle.<\/p>\n\n\n<p><strong>2. Tellimuste s\u00fcnkroonimine.<\/strong> Lugege olekus Planned ja Released <code>ProductionOrders<\/code>, kasutades ridade ja etappide kaasamiseks parameetrit <code>$expand<\/code>. B1 tootmistellimused sisaldavad materjaliloendist (BOM) v\u00f5etud tehnoloogilise marsruudi etappe ning planeerijad saavad tellimust p\u00e4rast loomist muuta. Kasutage tellimuse, mitte materjaliloendi etappe. \u00dche tootmistellimusega valmistatakse \u00fcks toode, seega on mitmetasandilise toote iga tasandi jaoks eraldi tootmistellimus. Siduge need omavahel, et SkyPlanner ajastaks alamtooted enne \u00fclemtoodet.<\/p>\n\n\n<p>S\u00fcnkroonige SkyPlanneri ostutellimuste l\u00f5pp-punktidesse ka avatud <code>PurchaseOrders<\/code> read koos laekumata koguse ja tarnekuup\u00e4evaga. SkyPlanner k\u00e4sitleb tellitud materjali ostutellimuse tarnekuup\u00e4eval k\u00e4ttesaadavana. B1-s muutub laoseis siis, kui kirjendatakse Goods Receipt PO (<code>PurchaseDeliveryNotes<\/code>). Integratsioon loeb neid vastuv\u00f5tudokumente, m\u00e4rgib vastuv\u00f5etud koguse SkyPlanneris tarnituks ning j\u00e4tab \u00fclej\u00e4\u00e4nud koguse avatuks. Osalisi tarneid arvestatakse \u00fcks kord ning materjalide saadavuse kontroll h\u00f5lmab nii laoseisu kui ka saabuvaid tarneid.<\/p>\n\n\n<p><strong>3. Ajakava tagasikirjutamine.<\/strong> SkyPlanneri veebihaagid k\u00e4ivituvad ajakava muutumisel. Integratsioon saadab p\u00e4ringu <code>PATCH \/b1s\/v1\/ProductionOrders({DocEntry})<\/code> tellimuse uute <code>StartDate<\/code> ja <code>DueDate<\/code> v\u00e4\u00e4rtustega ning v\u00e4ljade <code>StartDate<\/code> ja <code>EndDate<\/code> v\u00e4\u00e4rtustega tellimuse ressursiridadel (<code>ProductionOrderLines<\/code>), et igal etapil oleks ajakavas m\u00e4\u00e4ratud ajavahemik. P\u00e4ringu keha sisaldab ainult neid v\u00e4lju, mida haldab SkyPlanner, ning mitu tellimust saadetakse \u00fche <code>$batch<\/code>-p\u00e4ringuga. B1 kasutajad n\u00e4evad seej\u00e4rel ajakavas m\u00e4\u00e4ratud kuup\u00e4evi tootmistellimusel ja aknas Resource Capacity. Paigaldustes, kus Service Layer pole saadaval, teeb sama uuenduse kohapealne teenus DI API objekti <code>ProductionOrders<\/code> kaudu (<code>GetByKey<\/code>, kuup\u00e4evade m\u00e4\u00e4ramine, <code>Update<\/code>).<\/p>\n\n\n<p><strong>4. Tootmist\u00f6\u00f6de kinnitamine.<\/strong> Operaatorid registreerivad t\u00f6\u00f6 SkyPlanneris, kasutades <a href=\"\/et\/funktsioonid\/\">Mobile Confirmations v\u00f5i Production Timeri funktsiooni<\/a>. Iga ajakirje p\u00f5hjal saadetakse valmis koguse jaoks <code>POST \/b1s\/v1\/InventoryGenEntries<\/code> (Receipt from Production) ning komponentide ja ressursiaja jaoks <code>POST \/b1s\/v1\/InventoryGenExits<\/code> (Issue for Production).<\/p>\n\n\n<p>Iga dokumendirea <code>BaseType<\/code> on 202 ja <code>BaseEntry<\/code> v\u00e4\u00e4rtuseks m\u00e4\u00e4ratakse tootmistellimuse <code>DocEntry<\/code>; v\u00e4ljastusridadele lisatakse komponendi- v\u00f5i ressursirea <code>BaseLine<\/code>. Osalised kogused kirjendatakse nende registreerimisel. Partii- v\u00f5i seerianumbrite alusel hallatavatele artiklitele lisatakse vastavad numbrid ning tellimus peab olema olekus Released.<\/p>\n\n\n<p>SkyPlanneri ajakirje ID salvestatakse B1 dokumendile, nii et s\u00fcndmuse korduv t\u00f6\u00f6tlemine ei tekita kunagi topeltkannet. Eba\u00f5nnestunud kannet proovitakse uuesti ja veast teavitatakse, mitte ei j\u00e4eta kannet k\u00f5rvale.<\/p>\n\n\n<p><strong>5. Andmete haldamise ja vastuolude lahendamise reeglid.<\/strong> Leppige need kokku enne programmeerimist:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>B1 haldab artikleid, BOM-e, koguseid ja ladusid ning seal luuakse tellimused.<\/li>\n\n\n<li>SkyPlanner m\u00e4\u00e4rab t\u00f6\u00f6de j\u00e4rjekorra, algus- ja l\u00f5puajad ning t\u00f6\u00f6keskused.<\/li>\n\n\n<li>Kui tellimuse kuup\u00e4evi muudetakse m\u00f5lemas s\u00fcsteemis, j\u00e4\u00e4b kehtima SkyPlanneri j\u00e4rgmise planeerimiskorra tulemus, v\u00e4lja arvatud juhul, kui planeerijad on t\u00f6\u00f6 SkyPlanneris lukustanud.<\/li>\n\n\n<li>B1-s olekusse Closed v\u00f5i Cancelled viidud tellimuse t\u00f6\u00f6 eemaldatakse ajakavast.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mida projekt h\u00f5lmab<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Rakendamine j\u00f5uab tavaliselt l\u00f5pule m\u00f5ne n\u00e4dala jooksul p\u00e4rast kasutuselev\u00f5tu alustamist. Enne seda saate kasutada 30-p\u00e4evast tasuta prooviperioodi oma andmetega. Eksportige B1-st artiklid, ressursid ja avatud tootmistellimused CSV- v\u00f5i Exceli faili ning laadige need SkyPlanneri andmeimpordiga sisse. Planeerijad n\u00e4evad tegelikku ajakava juba enne, kui keegi liidestuskoodi kirjutama hakkab.<\/p>\n\n\n<p>T\u00fc\u00fcpiline SAP Business One\u2019i projekt h\u00f5lmab j\u00e4rgmist:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u00f5hiandmete vastendamine.<\/strong> B1 ressursid ja ressursir\u00fchmad seotakse t\u00f6\u00f6keskustega, tehnoloogilise marsruudi etapid protsessietappidega ning Make-t\u00fc\u00fcpi artiklid toodetega.<\/li>\n\n\n<li><strong>Esmane andmete laadimine.<\/strong> Artiklid, Product Trees koos etappide ja artikliridadega, ressursid ning laoseis ladude kaupa.<\/li>\n\n\n<li><strong>Tootmis- ja ostutellimuste s\u00fcnkroonimine.<\/strong> Avatud tootmistellimused koos ridade ja etappidega ning avatud ostutellimused koos tarnekuup\u00e4evadega.<\/li>\n\n\n<li><strong>Ajakava tagasikirjutamine.<\/strong> Ajastatud algus- ja t\u00e4htajakuup\u00e4evade kirjutamine objekti <code>ProductionOrders<\/code>.<\/li>\n\n\n<li><strong>Tootmises tehtud t\u00f6\u00f6 kinnitused.<\/strong> SkyPlanneri ajakirjete p\u00f5hjal tehakse Receipt and Issue for Production kanded.<\/li>\n\n\n<li><strong>Testimine paralleelselt senise plaaniga.<\/strong> Planeerijad v\u00f5rdlevad SkyPlanneri ajakava oma praeguse planeerimisviisiga.<\/li>\n\n\n<li><strong>K\u00e4ivitamine.<\/strong> SkyPlanneri ajakava saab tootmise ametlikuks plaaniks.<\/li>\n\n<\/ul>\n\n\n<p>Kui ressursid ja tehnoloogilise marsruudi etapid on B1-s korras, kulub vastendamisele v\u00e4he aega. Laboratory &amp; Alliedi projektis oli liidestamine \u00fcks lihtsamaid osi. Ettev\u00f5tte IT-meeskond tegi HANA-l t\u00f6\u00f6tava SAP Business One\u2019i liidestuse suuresti iseseisvalt. SkyPlanneri meeskond aitas keerukamate juhtumite puhul, n\u00e4iteks toodetega, mis mitmeetapilistes protsessides omavahel \u00fchendatakse.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-business-one-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP Business One\u2019i ohukohad<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">P\u00e4evane tootmisv\u00f5imsus ei ole vahetuste mudel.<\/p>\n\n\n<p class=\"fx-pain__b\">B1 talletab iga ressursi kohta p\u00e4evap\u00f5hised Daily Internal Capacity ja Single Run Capacity v\u00e4\u00e4rtused. <a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a> selgitab: &#8220;These capacities are defined on a daily basis,&#8221; (need v\u00f5imsused m\u00e4\u00e4ratakse p\u00e4eva kaupa). SAP juhendi j\u00e4rgi eeldab Required Days arvutus, et &#8220;a single production order can be produced on a single machine&#8221; (\u00fche tootmistellimuse saab t\u00e4ita \u00fchel masinal) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">SAP kasutusjuhend<\/a>). \u00c4rge kasutage neid n\u00e4itajaid tootmise planeerimisel masinate ja t\u00f6\u00f6tajate tegeliku tootmisv\u00f5imsusena. M\u00e4\u00e4rake vahetused, personal ja t\u00f6\u00f6keskuste efektiivsus SkyPlanneris.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tehnoloogiline marsruut on BOM-i osa.<\/p>\n\n\n<p class=\"fx-pain__b\">Eraldi tehnoloogiliste marsruutide p\u00f5hiandmeid ei ole. J\u00e4rjekorra m\u00e4\u00e4ravad Product Tree read Route Stage ning Waiting Days sisestatakse k\u00e4sitsi. Lugege <code>ProductTrees<\/code> Stages ja <code>ProductionOrders<\/code> Stages ning kontrollige, et iga ressursirida kuuluks m\u00f5ne etapi juurde. Etappideta tellimused ei anna ajakava koostajale operatsioonide j\u00e4rjekorda.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ressursiridade kogused tuleb \u00fcmber arvutada.<\/p>\n\n\n<p class=\"fx-pain__b\">BOM-i rea Quantity n\u00e4itab kogust, mida on vaja BOM-i p\u00e4ises m\u00e4\u00e4ratud koguse, mitte \u00fche \u00fchiku tootmiseks. Additional Quantity lisatakse planeeritud ajale &#8220;regardless of the quantity of the parent item produced&#8221; (olenemata toodetud p\u00f5hiartikli kogusest) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">SAP kasutusjuhend<\/a>). K\u00e4sitlege seda tellimusep\u00f5hise fikseeritud ajana, nagu seadistusaeg. Enne \u00fchiku tootmisaja arvutamist jagage p\u00e4ises oleva kogusega, muidu on iga t\u00f6\u00f6 kestus vastava kordaja v\u00f5rra vale.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ressursside p\u00f5hiandmed on harva korras.<\/p>\n\n\n<p class=\"fx-pain__b\">Ressursside t\u00fc\u00fcbid on Machine, Labor ja Other. Masinaid saab siduda p\u00f5hivaraga ja t\u00f6\u00f6j\u00f5udu t\u00f6\u00f6tajatega ning ressursiga v\u00f5ib olla seotud laov\u00e4line artikkel selle ostmiseks v\u00f5i m\u00fc\u00fcmiseks. \u00dckski neist seostest ei n\u00e4ita, millised ressursid on tegelikud masinad, millele saab t\u00f6id ajastada. Korrastage ressursir\u00fchmad ja eemaldage dubleerivad ressursid enne, kui neist saab teie t\u00f6\u00f6keskuste loend.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Laoreeglid v\u00f5ivad takistada kinnituste kirjendamist.<\/p>\n\n\n<p class=\"fx-pain__b\">Vastuv\u00f5tud ja v\u00e4ljastused on laodokumendid. Levinud vead on <code>InventoryGenEntries<\/code> ja <code>InventoryGenExits<\/code> segiajamine, puuduvad partii- v\u00f5i seerianumbrid nende alusel hallatavatel artiklitel ning kirjendamine seoses tellimusega, mis on olekus Planned.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Seansid ja lehek\u00fclgedeks jaotamine.<\/p>\n\n\n<p class=\"fx-pain__b\">Aegunud seansi korral tagastatakse \u201eInvalid session or session already timeout.\u201d (Seanss on kehtetu v\u00f5i juba aegunud.) Selle vea korral logige uuesti sisse. Vaikimisi tagastatakse lehel 20 kirjet. Kui s\u00fcnkroonimine eirab viita <code>odata.nextLink<\/code>, j\u00e4\u00e4b osa andmeid ilma hoiatuseta lugemata.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\"><code>UpdateDate<\/code> ei sisalda kellaaega.<\/p>\n\n\n<p class=\"fx-pain__b\">Tabelis OWOR on <code>UpdateDate<\/code> kuup\u00e4evav\u00e4li; uuendamise kellaaeg on eraldi v\u00e4ljal <code>UpdateTS<\/code>. Kui perioodiline p\u00e4ring filtreerib ainult v\u00e4lja <code>UpdateDate<\/code> j\u00e4rgi, loetakse igal k\u00e4ivitusel uuesti k\u00f5ik t\u00e4na muudetud tellimused. Kasutage m\u00f5lemat v\u00e4lja koos v\u00f5i eemaldage korduvad kirjed integratsiooni poolel.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Veebihaakide edastus j\u00e4rgib v\u00e4hemalt \u00fchekordse kohaletoimetamise p\u00f5him\u00f5tet.<\/p>\n\n\n<p class=\"fx-pain__b\">Webhook Messenger proovib eba\u00f5nnestunud edastust uuesti kuni viis korda (2, 4, 8, 16 ja 32 sekundi j\u00e4rel), seej\u00e4rel m\u00e4rgib selle eba\u00f5nnestunuks. Korduskatsed v\u00f5ivad tekitada duplikaate ning j\u00e4rjekord on tagatud ainult \u00fche ettev\u00f5tte piires. Muutke s\u00fcndmuste t\u00f6\u00f6tlejad s\u00fcndmuse ID alusel idempotentseks ja kasutage andmete koosk\u00f5la kontrollimiseks iga\u00f6ist p\u00e4ringut.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-sap-business-one-integration-who-sets-it-up\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kes seadistab SAP Business One\u2019i liidese<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00f6\u00f6 h\u00f5lmab teie tehnoloogilise marsruudi etappide, ressursside ja B1 seadistuse vastendamist. Lisaks m\u00e4\u00e4ratakse piirangud, mida B1 ajakava koostamisel ei arvesta: seadistusaegade maatriks, t\u00f6\u00f6riistad, operaatorite arv ja alternatiivsed ressursid.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanneri meeskond seadistab liidese kasutuselev\u00f5tu k\u00e4igus ja pakub tuge p\u00e4rast k\u00e4ivitamist.<\/strong> Iga ettev\u00f5te kasutab B1-te erinevalt ning seadistamisel rakendatakse teadmisi neist erip\u00e4radest. See on tavap\u00e4rane lahendus.<\/li>\n\n\n<li><strong>Teie SAP Business One\u2019i partner saab projektis osaleda.<\/strong> Partnerid, kes tunnevad teie ettev\u00f5tte andmebaasi, lisamooduleid ja kasutaja m\u00e4\u00e4ratud v\u00e4lju, saavad liidestuse luua Service Layeri ja SkyPlanneri REST API abil (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentatsioon<\/a>).<\/li>\n\n\n<li><strong>Liidestuse saavad luua ka teie enda arendajad.<\/strong> SkyPlanneri REST API v\u00f5imaldab lugeda ja kirjutada tellimusi, tooteid, materjale, protsessietappe, ostutellimusi ja ajakirjeid. Autentimiseks kasutatakse JWT bearer token\u2019it ning API on dokumenteeritud Swagger\/OpenAPI vormingus. Avalikud juhendid leiate <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsioonist<\/a>. Veebihaagid edastavad ajakava ja olekute muudatused reaalajas. Arenduse alustamiseks on vaja vaid SkyPlanneri API v\u00f5tit (<a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">liidestamise juhend<\/a>) ning SkyPlanneri meeskond aitab vajaduse korral. Selle tee valis Laboratory &amp; Alliedi IT-meeskond.<\/li>\n\n<\/ol>\n\n\n<p>Kontrollige esmalt ajakava sobivust 30-p\u00e4evase tasuta prooviperioodi jooksul, et liidestamise l\u00e4htekohaks oleks teie tehasele juba sobiv ajakava.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miks tehnilised meeskonnad valivad B1 k\u00f5rvale SkyPlanneri<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Valige SkyPlanner, kui soovite v\u00e4ikese mahuga ja selgelt piiritletud liidestust.<\/strong> Sisse tulevad B1 standardobjektid (tootmistellimused, Product Trees, Resources, Items), v\u00e4lja l\u00e4hevad kuup\u00e4evad ning Issue and Receipt from Production kanded. B1 tootmismoodulit ei muudeta ja andmeid ei migreerita.<\/li>\n\n\n<li><strong>Valige SkyPlanner, kui projekt peab oma v\u00e4\u00e4rtust varakult t\u00f5estama.<\/strong> 30-p\u00e4evase tasuta prooviperioodi jooksul saate kasutada CSV-ekspordi andmeid ja kuni 20 t\u00f6\u00f6keskust. Krediitkaarti pole vaja. Ettev\u00f5te n\u00e4eb oma ajakava juba enne liidestamise algust.<\/li>\n\n\n<li><strong>Valige SkyPlanner, kui ajakava peab arvestama tegelikke piiranguid.<\/strong> SkyPlanneris modelleeritakse \u00fcmberseadistusaegu, \u00fchiskasutatavaid t\u00f6\u00f6riistu, mitut operaatorit n\u00f5udvaid t\u00f6id, alternatiivseid ressursse, laoseisu ja avatud ostutellimusi. Liidese \u00fclesanne on \u00fcksnes B1 andmed kohale tuua.<\/li>\n\n\n<li><strong>Valige SkyPlanner, kui soovite planeerijatele ja operaatoritele \u00fchist s\u00fcsteemi.<\/strong> Arcturus koostab ajakava sekunditega ning Autopilot ajastab t\u00f6\u00f6d automaatselt \u00fcmber, kui tootmises midagi muutub. Operaatorid registreerivad t\u00f6\u00f6d telefonis v\u00f5i tahvelarvutis ning liides kirjutab need kinnitused tagasi B1-te.<\/li>\n\n\n<li><strong>Valige SkyPlanner, kui kulud peavad olema ette teada.<\/strong> <a href=\"\/et\/hinnakujundus\/\">Hind<\/a> algab 199 \u20ac kuus ja sisaldab 5 t\u00f6\u00f6keskust. Arveldamine toimub kord kuus ning tellimuse saab igal ajal l\u00f5petada. Liidestuse hinnapakkumine l\u00e4htub teie protsessist ja vajadustest ning esitatakse koos paketi pakkumisega enne alustamist, et n\u00e4eksite kogukulu.<\/li>\n\n<\/ul>\n\n\n<p>Planeerimise puuduj\u00e4\u00e4kide kohta lugege <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/\">SAP Business One\u2019i tootmise planeerimist selgitavat artiklit<\/a>. Siin t\u00e4hendab tootmise planeerimine ajakava koostamist masinate tegelikult saadaolevat tootmisv\u00f5imsust ja t\u00f6\u00f6tajate kasutada olevat t\u00f6\u00f6aega arvestades. Teiste ERP-s\u00fcsteemide kohta leiate teavet <a href=\"\/et\/integratsioonid\/erp\/\">ERP-liidestuste \u00fclevaatelehelt<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootmisettev\u00f5tete tagasiside SkyPlanneri kohta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhasruumiriietuses operaatorid pudelite t\u00e4itmisliinil Laboratory &amp; Alliedi ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise efektiivsus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise efektiivsus on kasvanud 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise efektiivsus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolme kuu plaani koostamiseks kulub alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/laboratory-allied\/\">Loe Laboratory &amp; Alliedi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila elektrikilpide tootmistsehhis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on viinud meie tootmise planeerimise Exceli tabelitest tootmise reaalajas optimeerimiseni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6de j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/utu\/\">Loe UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operationsi tootmisjuht Anu J\u00e4rvinen Raumas kaubaalustele laduva roboti t\u00f6\u00f6raku k\u00f5rval\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 kuud<\/b><span>ette n\u00e4eb m\u00fc\u00fcgimeeskond vaba tootmisv\u00f5imsust<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner loob kogu tootmise planeerimisele kindla ja usaldusv\u00e4\u00e4rse aluse.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, tootmisjuht<\/b><br>Fredman Operations \u00b7 Toiduohutud pakkepaberid<\/p>\n\n\n<p class=\"ind-cust__result\">M\u00fc\u00fcgimeeskond n\u00e4eb vaba tootmisv\u00f5imsust kuus kuud ette. Ajakava muutmise p\u00e4ringutele, millele vastamine v\u00f5ttis varem tunni v\u00f5i kauem, vastatakse n\u00fc\u00fcd sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/fredman-operations\/\">Loe Fredman Operationsi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u00d5huvaade Piristeeli katuse turvatoodete tehasele Kauhavas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>tarnekindlus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on muutnud kitsaskohad n\u00e4htavaks ja tootmise juhtimise selgemaks.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, tootmisjuht<\/b><br>Piristeel \u00b7 Katuse turvatooted ja vihmavees\u00fcsteemid<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus j\u00f5udis t\u00e4navu 99,2%-ni ning tootmise ajakava koostamine s\u00e4\u00e4stab kuni neli tundi t\u00f6\u00f6aega p\u00e4evas.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/piristeel\/\">Loe Piristeeli kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kes loob SAP Business One\u2019i integratsiooni?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanneri meeskond seadistab juurutamise k\u00e4igus kahesuunalise integratsiooni ja pakub sellele tuge ka p\u00e4rast kasutuselev\u00f5ttu. SkyPlannerisse tuuakse tootmistellimused, tehnoloogilise marsruudi etapid, ressursid, ostutellimused ja kauba vastuv\u00f5tud. Tagasi saadetakse ajakavas m\u00e4\u00e4ratud kuup\u00e4evad ning Issue and Receipt from Production. Integratsiooni saab luua ka teie B1 partner v\u00f5i teie enda arendusmeeskond, kasutades Service Layerit ja SkyPlanneri REST API-t. Alustamiseks piisab API-v\u00f5tmest.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kui kaua v\u00f5tab SkyPlanneri ja SAP Business One\u2019i juurutamine aega?<\/summary>\n<p class=\"sp-faq__a\">Juurutamine saab tavaliselt valmis m\u00f5ne n\u00e4dala jooksul p\u00e4rast selle alustamist. Meeskond kaardistab ressursid ja tehnoloogilise marsruudi etapid, \u00fchendab tootmis- ja ostutellimused ning kontrollib enne kasutuselev\u00f5ttu ajakava teie praeguse plaani alusel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas Service Layer v\u00f5i DI API?<\/summary>\n<p class=\"sp-faq__a\">Uute arenduste jaoks valige Service Layer. See on HTTP-p\u00f5hine, t\u00f6\u00f6tab nii HANA kui ka SQL Serveriga ning sobib pilvep\u00f5hisele ajakava koostamise lahendusele. Kasutage DI API-t ainult siis, kui olemasolev vahetarkvara sellest juba s\u00f5ltub.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas vajan versiooni SAP Business One 10.0 FP 2602?<\/summary>\n<p class=\"sp-faq__a\">Ainult veebihaakide jaoks. Varasemate 10.0 versioonide puhul toimib integratsioon ajastatud p\u00e4ringute kaudu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas kirjutatakse ajakavas m\u00e4\u00e4ratud kuup\u00e4evad tagasi SAP Business One\u2019i?<\/summary>\n<p class=\"sp-faq__a\">P\u00e4ringuga <code>PATCH \/b1s\/v1\/ProductionOrders({DocEntry})<\/code>, mille k\u00e4ivitab SkyPlanneri ajakava muutumise veebihaak. Tellimusel m\u00e4\u00e4ratakse <code>StartDate<\/code> ja <code>DueDate<\/code> ning selle ressursiridadel <code>StartDate<\/code> ja <code>EndDate<\/code>. Toodang ja ajakulu saadetakse tagasi dokumentidena <code>InventoryGenEntries<\/code> ja <code>InventoryGenExits<\/code>, mis seotakse tellimusega v\u00e4ljade <code>BaseType<\/code> ja <code>BaseEntry<\/code> kaudu, kusjuures esimese v\u00e4lja v\u00e4\u00e4rtus on 202.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas vajame B1 jaoks tootmise lisamoodulit?<\/summary>\n<p class=\"sp-faq__a\">Ei. Integratsioon kasutab ainult B1 standardobjekte: tootmistellimusi, objekte Product Trees, Resources ja Items, ostutellimusi ning laodokumente. Uude tootmisandmete mudelisse ei viida midagi \u00fcle.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne integreerimist oma B1 andmetega katsetada?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evane prooviperiood h\u00f5lmab kuni 20 t\u00f6\u00f6keskust ning andmeid saab importida CSV- v\u00f5i Exceli failist. Krediitkaarti pole vaja. <a href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">r\u00e4\u00e4gi m\u00fc\u00fcgimeeskonnaga<\/a> oma B1 seadistusest.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ SAP Business One SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is See juhend n\u00e4itab SAP Business One\u2019i partneritele ja IT-meeskondadele, kuidas \u00fchendada B1 SkyPlanner APS-iga. Selgitame, milliseid API-sid kasutada, kuhu millised objektid liiguvad ja kus B1 projektides vigu tehakse. SkyPlanner vahetab SAP Business One\u2019iga andmeid m\u00f5lemas suunas Service Layeri &#8230; <a title=\"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/\" aria-label=\"Read more about SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100764,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101091","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP Business One\u2019i liidestamine APS-iga | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/liidestamise-juhend\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/liidestamise-juhend\\\/\",\"name\":\"SAP Business One\u2019i liidestamine APS-iga | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/liidestamise-juhend\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/liidestamise-juhend\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/liidestamise-juhend\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS teie ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS SAP Business One\u2019i jaoks: tootmise planeerimine\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP Business One\u2019i liidestamine APS-iga | SkyPlanner","description":"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/","og_locale":"et_EE","og_type":"article","og_title":"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is","og_description":"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/","name":"SAP Business One\u2019i liidestamine APS-iga | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS + SAP Business One: Service Layeri olemid, autentimine, veebihaagid, andmevastendus ja tootmise planeerimise ohukohad.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS teie ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS SAP Business One\u2019i jaoks: tootmise planeerimine","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/"},{"@type":"ListItem","position":5,"name":"SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ SAP Business One SAP Business One\u2019i liidestamise juhend tootmise ajakava koostamiseks SkyPlanner APS-is See juhend n\u00e4itab SAP Business One\u2019i partneritele ja IT-meeskondadele, kuidas \u00fchendada B1 SkyPlanner APS-iga. Selgitame, milliseid API-sid kasutada, kuhu millised objektid liiguvad ja kus B1 projektides vigu tehakse. SkyPlanner vahetab SAP Business One\u2019iga andmeid m\u00f5lemas suunas Service Layeri&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101091","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=101091"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101091\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/100764"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=101091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}