{"id":101062,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101062"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"tootmise-planeerimine","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/","title":{"rendered":"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/et\/integratsioonid\/\">Liidestused<\/a> \/ <a href=\"\/et\/integratsioonid\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Kas SAP Business One toetab tootmise planeerimist? <span class=\"hl\">Ressursid, MRP ja SkyPlanner APS-i roll<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Ei. SAP Business One&#8217;i standardlahenduses on MRP, p\u00e4evase v\u00f5imsusega ressursid ja aken Resource Capacity, mis n\u00e4itab ressursi \u00fclekoormust. Puudub aga planeerimismootor, mis seaks sama tootmisv\u00f5imsuse p\u00e4rast konkureerivad tootmistellimused j\u00e4rjekorda. Seet\u00f5ttu muudab planeerija tellimuste kuup\u00e4evi k\u00e4sitsi. Tootjad, kes vajavad kogu <a href=\"\/et\/ressursid\/piiratud-voimsusega-planeerimine\/\">tootmise planeerimist<\/a> nii, et ajakava arvestaks masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust, kasutavad SAP Business One&#8217;i k\u00f5rval SkyPlanner APS-i.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alustage tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneerige demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Tootmise ajakava koostamine<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS-i Gantti ajatelg t\u00f6\u00f6keskustele planeeritud t\u00f6\u00f6dega ja selle all olev tellimuste loend.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-sap-business-one-plans-production-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuidas SAP Business One tootmist planeerib: samm-sammult<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Artikli planeerimisandmed ja MRP Wizard<\/h3>\n\n\n<p>MRP seadistused asuvad artikli p\u00f5hiandmete akna Item Master Data vahekaardil <strong>Planning Data<\/strong>:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planeerimismeetod Planning Method (MRP v\u00f5i None) ja hankemeetod Procurement Method (Buy v\u00f5i Make)<\/li>\n\n\n<li>Tellimisintervall Order Interval, tellimiskoguse kordsus Order Multiple ja minimaalne tellimiskogus Minimum Order Quantity<\/li>\n\n\n<li>L\u00e4biminekuaeg Lead Time ja lubatud k\u00f5rvalekalle p\u00e4evades Tolerance Days<\/li>\n\n<\/ul>\n\n\n<p><strong>MRP Wizard<\/strong> l\u00e4bib kuus sammu: stsenaarium, planeerimishorisondi ja l\u00e4biminekuaja seadistused, artiklid, ettev\u00f5tte v\u00f5i lao tasand, andmeallikad ning soovitused. Tulemused kuvatakse akendes MRP Results ja <strong>Order Recommendations<\/strong>. Viimases saab soovitustest luua ostutellimused, tootmistellimused v\u00f5i laosiirdetaotlused.<\/p>\n\n\n<p>MRP arvutus kontrollib materjale. SAP-i koolitus kirjeldab seda nii: &#8220;the system checks if all the components are available for making the item&#8221; (s\u00fcsteem kontrollib, kas k\u00f5ik artikli valmistamiseks vajalikud komponendid on saadaval) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>). Dokumentatsiooni j\u00e4rgi on sisenditeks n\u00f5udlus, tarne, laoseis ja l\u00e4biminekuaeg. Ressursside v\u00f5imsust nende seas ei ole.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Ressursid ja p\u00e4evane v\u00f5imsus<\/h3>\n\n\n<p>Ressursid kuuluvad p\u00f5hiandmete hulka ning nende t\u00fc\u00fcp Resource Type on <strong>Machine<\/strong>, <strong>Labor<\/strong> v\u00f5i <strong>Other<\/strong>. Machine-t\u00fc\u00fcpi ressurss seotakse \u00fche v\u00f5i mitme p\u00f5hivaraga, Labor-t\u00fc\u00fcpi ressurss t\u00f6\u00f6tajatega. Ressursse hallatakse v\u00f5imsuse, mitte koguse alusel. Masinate sidumiseks p\u00f5hivaraga tuleb esmalt lubada funktsioon Fixed Assets.<\/p>\n\n\n<p>V\u00f5imsus m\u00e4\u00e4ratakse p\u00e4eva kaupa. Ressursi vahekaardil Planning Data m\u00e4\u00e4ratakse igale n\u00e4dalap\u00e4evale neli v\u00f5imsustegurit, n\u00e4iteks t\u00f6\u00f6tunnid vahetuses, vahetuste arv p\u00e4evas ja masinate arv. B1 korrutab need omavahel ning saab p\u00e4evase v\u00f5imsuse Daily Capacity. Seej\u00e4rel genereeritakse aknas <strong>Set Daily Internal Capacities<\/strong> valitud perioodi v\u00f5imsused. V\u00f5imsusi on kahte t\u00fc\u00fcpi: <strong>Daily Internal Capacity<\/strong> ja <strong>Single Run Capacity<\/strong>. Teine neist lubatakse m\u00e4rkeruuduga Relevant for Single Run Capacity. SAP \u00fctleb t\u00e4psuse kohta selgelt: &#8220;These capacities are defined on a daily basis&#8221; (need v\u00f5imsused m\u00e4\u00e4ratakse p\u00e4eva kaupa) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Tehnoloogiline marsruut BOM-i Route Stage&#8217;i ridadena<\/h3>\n\n\n<p>SAP Business One&#8217;is puuduvad eraldi tehnoloogiliste marsruutide p\u00f5hiandmed. Tehnoloogiline marsruut koosneb materjaliloendis Bill of Materials (Product Tree) olevatest <strong>Route Stage<\/strong>&#8217;i ridadest. Igal real on j\u00e4rjekorranumber Route Sequence ja k\u00e4sitsi sisestatav ooteaeg <strong>Waiting Days<\/strong>. Ressursiread asuvad etappide all. Tehnoloogilise marsruudiga tootmistellimustel arvutab s\u00fcsteem iga etapi jaoks vajaliku p\u00e4evade arvu <strong>Required Days<\/strong> ja p\u00e4evade koguarvu <strong>Total Days<\/strong>, kus Total Days = Required Days + Waiting Days.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Tootmistellimused ja ressursiaja jaotamine<\/h3>\n\n\n<p>Igale tootmistellimuse ressursireale m\u00e4\u00e4ratakse \u00fcks neljast jaotusmeetodist:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Jaotusmeetod<\/th><th>Kuidas see toimib<\/th><\/tr><\/thead><tbody><tr><td>Alguskuup\u00e4eval<\/td><td>M\u00e4\u00e4rab kogu ressursiaja alguskuup\u00e4evale<\/td><\/tr><tr><td>L\u00f5ppkuup\u00e4eval<\/td><td>M\u00e4\u00e4rab kogu ressursiaja l\u00f5ppkuup\u00e4evale<\/td><\/tr><tr><td>Alguskuup\u00e4evast edasi<\/td><td>T\u00e4idab p\u00e4evad alguskuup\u00e4evast edasi kuni Single Run Capacity piirini<\/td><\/tr><tr><td>L\u00f5ppkuup\u00e4evast tagasi<\/td><td>T\u00e4idab p\u00e4evad l\u00f5ppkuup\u00e4evast tagasi kuni Single Run Capacity piirini<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Iga meetod jaotab \u00fche tellimuse ressursiaja. Edasi- ja tagasijaotust piirab Single Run Capacity ehk tundide arv, mida \u00fcks tootmistellimus v\u00f5ib p\u00e4evas kasutada. Piirang ei arvesta aega, mille teised tellimused on samal ressursil juba h\u00f5ivanud.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Aken Resource Capacity<\/h3>\n\n\n<p>Aknas <strong>Resource Capacity<\/strong> on vaated Internal, Available ja Single Run. Vahekaardil Capacity Data kehtib valem Available = Internal &#8211; Committed &#8211; Consumed. Committed t\u00e4histab tootmistellimustele eraldatud, kuid veel tootmisse kandmata v\u00f5imsust. Consumed on juba tootmisse kantud v\u00f5imsus. Kui tellimustele eraldatakse rohkem v\u00f5imsust, kui ressursil on, langeb Available alla nulli.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. \u00dclekoormuse k\u00f5rvaldamine k\u00e4sitsi<\/h3>\n\n\n<p>Negatiivne Available&#8217;i v\u00e4\u00e4rtus annab m\u00e4rku probleemist, kuid ei paranda seda. SAP-i versiooni 9.1 koolitusmaterjal tutvustab ressursimoodulit kui vahendit, millega planeerijad saavad kontrollida, kas tootmine saab plaanip\u00e4raselt j\u00e4tkuda. Alternatiivi kirjeldab materjal nii: &#8220;manual scheduling adjustments need to be made to meet deadlines&#8221; (t\u00e4htaegadest kinnipidamiseks tuleb ajakava k\u00e4sitsi kohandada) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">SAP B1 9.1 tootmisfunktsioonide t\u00e4iendused<\/a>). Kohandamine j\u00e4\u00e4b planeerija \u00fclesandeks: muuta tellimuse kuup\u00e4evi v\u00f5i ressursiaja jaotust ning seej\u00e4rel akent uuesti kontrollida.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-sap-business-one-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kus SAP Business One&#8217;i v\u00f5imalused l\u00f5pevad<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Piirang<\/th><th>Mida \u00fctleb SAP-i dokumentatsioon<\/th><th>Mida see tootmissaalis t\u00e4hendab<\/th><\/tr><\/thead><tbody><tr><td>Automaatset \u00fcmberplaneerimist pole<\/td><td>Moodul n\u00e4itab: &#8220;if manual scheduling adjustments need to be made&#8221; (kas ajakava tuleb k\u00e4sitsi kohandada) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">PDF<\/a>)<\/td><td>Iga \u00fclekoormuse lahendab inimene kuup\u00e4evi muutes<\/td><\/tr><tr><td>\u00dcks tellimus, \u00fcks masin<\/td><td>&#8220;The calculation algorithm of Required Days is set up based on the assumption that a single production order can be produced on a single machine.&#8221; (Required Days arvutamise algoritm eeldab, et \u00fche tootmistellimuse saab t\u00e4ita \u00fchel masinal.) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Kasutusjuhend<\/a>)<\/td><td>Sama ressursi p\u00e4rast konkureerivaid tellimusi ei seata j\u00e4rjekorda ega jagata mitme masina vahel<\/td><\/tr><tr><td>P\u00e4evap\u00f5hine arvestus<\/td><td>&#8220;These capacities are defined on a daily basis.&#8221; (Need v\u00f5imsused m\u00e4\u00e4ratakse p\u00e4eva kaupa.) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>)<\/td><td>Vahetused on vaid \u00fcks p\u00e4evase koguv\u00f5imsuse arvutamise tegur, seega koostatakse plaan p\u00e4evade, mitte tundide t\u00e4psusega<\/td><\/tr><tr><td>MRP kontrollib materjale<\/td><td>MRP arvutus &#8220;checks if all the components are available&#8221; (kontrollib, kas k\u00f5ik komponendid on saadaval) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>)<\/td><td>Soovitatud kuup\u00e4evad l\u00e4htuvad l\u00e4biminekuajast, mitte masinate koormusest<\/td><\/tr><tr><td>K\u00e4sitsi sisestatud ooteajad<\/td><td>Waiting Days sisestatakse iga Route Stage&#8217;i jaoks k\u00e4sitsi<\/td><td>J\u00e4rjekorras ootamise aeg on fikseeritud hinnang, mitte tegeliku koormuse p\u00f5hjal arvutatud tulemus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Seadistusaega saab arvestada \u00fchel viisil: BOM-i ressursirea v\u00e4ljal <strong>Additional Quantity<\/strong>. SAP lisab selle planeeritud ajale &#8220;regardless of the quantity of the parent item produced&#8221; (olenemata toodetava p\u00f5hiartikli kogusest) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Kasutusjuhend<\/a>). See on fikseeritud aeg tellimuse kohta. See ei s\u00f5ltu eelmisena valmistatud tootest, mist\u00f5ttu j\u00e4\u00e4b \u00fcmberseadistusi v\u00e4hendava t\u00f6\u00f6j\u00e4rjekorra valik endiselt planeerija otsustada. T\u00f6\u00f6riistu saab seadistada Other-t\u00fc\u00fcpi ressurssidena, millele m\u00e4\u00e4ratakse p\u00e4evane v\u00f5imsus. S\u00fcsteem ei kontrolli, kas stants v\u00f5i rakis on konkreetsel tunnil vaba. Ressursirida ei l\u00fclitu alternatiivsele masinale, kui esimene on t\u00e4ielikult koormatud.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sap-business-one-s-native-planning-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millal piisab SAP Business One&#8217;i enda planeerimisv\u00f5imalustest<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>B1 standardsetest planeerimisv\u00f5imalustest piisab j\u00e4rgmistel juhtudel:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00e4he masinaid ja v\u00e4ike tootevalik.<\/strong> Kui ressursse on vaid m\u00f5ni ning igal tootel \u00fcks v\u00f5i kaks tehnoloogilist marsruuti, vaatab planeerija igal hommikul akent Resource Capacity. Aeg-ajalt tekkiva negatiivse n\u00e4idu k\u00f5rvaldamiseks kulub m\u00f5ni minut.<\/li>\n\n\n<li><strong>Stabiilne lattutootmine.<\/strong> Kui n\u00f5udlus on \u00fchtlane, MRP l\u00e4biminekuajad vastavad tegelikkusele ja kitsaskoht p\u00fcsib samas kohas, peavad l\u00e4biminekuajal p\u00f5hinevad kuup\u00e4evad paika.<\/li>\n\n\n<li><strong>Piisab p\u00e4evat\u00e4psusest.<\/strong> Kui klientidele on t\u00e4htis p\u00e4ev, mitte kellaaeg, on p\u00e4evap\u00f5hine v\u00f5imsuse arvestus piisavalt t\u00e4pne.<\/li>\n\n\n<li><strong>\u00dcmberseadistused on l\u00fchikesed ja t\u00f6\u00f6riistu ei jagata.<\/strong> Kui seadistusaeg ei s\u00f5ltu eelmisest t\u00f6\u00f6st ning igal masinal on oma t\u00f6\u00f6riistad, annab Additional Quantity kaudu m\u00e4\u00e4ratud fikseeritud aeg tellimuse kohta piisavalt t\u00e4pse tulemuse.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Millal on vaja tootmise planeerimise tarkvara<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Vajadusest annavad m\u00e4rku konkreetsed olukorrad:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Available muutub igal n\u00e4dalal mitmel ressursil negatiivseks ning olukorra parandamine v\u00f5tab tunde.<\/li>\n\n\n<li>Mitu tellimust konkureerib sama masina kasutusaja p\u00e4rast ning nende t\u00e4itmise j\u00e4rjekord m\u00e4\u00e4rab, millised tellimused \u00f5igel ajal teele l\u00e4hevad.<\/li>\n\n\n<li>Seadistused v\u00f5i \u00fcmberseadistused v\u00f5tavad olulise osa v\u00f5imsusest ning sarnaste t\u00f6\u00f6de j\u00e4rjest tegemine s\u00e4\u00e4staks tunde.<\/li>\n\n\n<li>Plaanis tuleb arvestada vahetuste, \u00fcletundide, puudumiste v\u00f5i operaatorite saadavusega, mitte \u00fcksnes p\u00e4evase v\u00f5imsusn\u00e4iduga.<\/li>\n\n\n<li>Saabub kiirtellimus ja keegi ei oska \u00f6elda, millised t\u00f6\u00f6d see edasi l\u00fckkab.<\/li>\n\n\n<li>Tegelik plaan on B1 k\u00f5rval Excelis ning kolmap\u00e4evaks on need kaks juba lahknenud.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mida valikul j\u00e4lgida<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Loeb B1 standardobjekte.<\/strong> Tootmistellimused, Product Trees koos Route Stages&#8217;i etappidega, Resources ja Items \u2013 nii saab tootmismooduli j\u00e4tta muutmata.<\/li>\n\n\n<li><strong>Tootmise planeerimine tegeliku v\u00f5imsuse j\u00e4rgi.<\/strong> Iga t\u00f6\u00f6keskuse puhul arvestatakse vahetuste, personali ja puudumistega, mitte \u00fcksnes p\u00e4evase koguv\u00f5imsusega.<\/li>\n\n\n<li><strong>T\u00f6\u00f6de j\u00e4rjekord ja seadistused.<\/strong> Arvestatakse toodete vahetamise j\u00e4rjekorrast s\u00f5ltuvaid \u00fcmberseadistusaegu, mitte \u00fcksnes fikseeritud seadistusaega tellimuse kohta.<\/li>\n\n\n<li><strong>Jagatud ressursid.<\/strong> T\u00f6\u00f6riistad kui piiratud ressursid, mida ei saa kasutada korraga kahel masinal. T\u00f6\u00f6d, mis vajavad korraga mitut operaatorit. Alternatiivsed masinad v\u00f5i t\u00f6\u00f6tajad juhuks, kui esmane valik on h\u00f5ivatud.<\/li>\n\n\n<li><strong>Materjalide saadavuse arvestamine.<\/strong> T\u00f6\u00f6 ei tohiks alata enne, kui selle komponendid on saadaval. Arvesse tuleb v\u00f5tta nii laoseisu kui ka avatud ostutellimustega saabuvaid koguseid.<\/li>\n\n\n<li><strong>Ajakava uuendamine muutuste korral.<\/strong> Plaan uueneb tootmise edenedes v\u00f5i tellimuste muutudes, ilma et planeerija peaks selle uuesti koostama.<\/li>\n\n\n<li><strong>Kahesuunaline andmevahetus.<\/strong> Planeeritud kuup\u00e4evad kirjutatakse tagasi objekti <code>ProductionOrders<\/code> ning tootmissaalis valminud toodang kantakse B1-sse dokumentidena Receipt and Issue for Production.<\/li>\n\n\n<li><strong>Proovimine oma andmetega.<\/strong> Peaksite n\u00e4gema oma tellimusi ajakavas juba enne, kui keegi hakkab liidestust looma.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">Neli t\u00fc\u00fcpi ajakavalahendusi B1 jaoks<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>B1 enda planeerimisv\u00f5imalused.<\/strong> MRP Wizard, Resource Capacity ja neli jaotusmeetodit. Neist piisab seni, kuni \u00fclekoormusi tekib harva.<\/li>\n\n\n<li><strong>Planeerimistahvlid ja tootmislisad B1 kliendirakenduses.<\/strong> Planeerimistahvel kuvab tellimused visuaalsel tahvlil, kus planeerija neid juhib. Tootmislisa toob kaasa oma t\u00f6\u00f6k\u00e4suobjektid, mist\u00f5ttu hakatakse tootmist juhtima uue andmemudeli alusel.<\/li>\n\n\n<li><strong>Suurettev\u00f5tete APS-tarkvarakomplektid.<\/strong> M\u00f5eldud eraldi planeerimismeeskonnale, kes s\u00fcsteemi modelleerib ja h\u00e4\u00e4lestab. Kasutuselev\u00f5tt toimub konsultatsiooniprojekti k\u00e4igus.<\/li>\n\n\n<li><strong>Pilvep\u00f5hine APS koos tootmissaali t\u00f6\u00f6de haldusega.<\/strong> Koostab B1 standardsete tootmistellimuste ajakava tegelikku tootmisv\u00f5imsust arvestades ning kuvab operaatoritele t\u00f6\u00f6j\u00e4rjekorra telefonis v\u00f5i tahvelarvutis. Selline lahendus on SkyPlanner.<\/li>\n\n<\/ul>\n\n\n<p>Kui puudu on standardsete tootmistellimuste ajakava koostamine, n\u00f5uab pilvep\u00f5hine APS k\u00f5ige v\u00e4hem muudatusi, sest B1 j\u00e4\u00e4b senisel kujul alles.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuhu sobib SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS on pilvep\u00f5hine tootmise planeerimise lahendus B1 kasutavatele tootjatele, kes soovivad s\u00e4ilitada standardsed tootmistellimused ja l\u00f5petada negatiivsete Available-v\u00e4\u00e4rtuste k\u00e4sitsi parandamise. Ajakava arvestab masinate ja t\u00f6\u00f6tajate tegelikku v\u00f5imsust. See k\u00f5rvaldab k\u00f5ik eespool kirjeldatud puudused:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u00e4evaste koondmahtude asemel tegelik v\u00f5imsusmudel.<\/strong> Planeerimisel arvestatakse iga t\u00f6\u00f6keskuse tegelikku v\u00f5imsust, vahetusi, t\u00f6\u00f6tajaid, puhkusi, puudumisi ja \u00fcletunnivahetusi.<\/li>\n\n\n<li><strong>\u00dche tellimuse ja \u00fche masina asemel k\u00f5igi t\u00f6\u00f6de j\u00e4rjestamine.<\/strong> Arcturus j\u00e4rjestab sekunditega k\u00f5ik t\u00f6\u00f6d k\u00f5igis t\u00f6\u00f6keskustes, arvestades alternatiivseid t\u00f6\u00f6keskusi ja t\u00f6\u00f6de jagamist masinate vahel. Planeerijad muudavad ajakava interaktiivsel Gantti ajajoonel ning mootor hoiab selle koosk\u00f5lalisena.<\/li>\n\n\n<li><strong>P\u00fcsiva seadistusaja asemel \u00fcmberseadistuste maatriks.<\/strong> Seadistusaegade maatriks sisaldab toodete vahetamise aegu vastavalt j\u00e4rjekorrale (siniselt punasele 30 minutit, punaselt sinisele 60) ning mootor valib v\u00e4hima seadistusajaga j\u00e4rjekorra. Seadistamiseks ja t\u00f6\u00f6j\u00e4rgseks demonteerimiseks kuluv aeg modelleeritakse iga t\u00f6\u00f6 kohta eraldi.<\/li>\n\n\n<li><strong>T\u00f6\u00f6riistu ja meeskondi arvestatakse piiratud ressurssidena.<\/strong> T\u00f6\u00f6riistu ei saa planeerida korraga kahte t\u00f6\u00f6keskusse. \u00dcks t\u00f6\u00f6 v\u00f5ib vajada korraga mitut operaatorit. Kui esmane ressurss pole saadaval, suunab mootor t\u00f6\u00f6 alternatiivsetele masinatele v\u00f5i t\u00f6\u00f6tajatele.<\/li>\n\n\n<li><strong>L\u00e4biminekuaegadel p\u00f5hinevate kuup\u00e4evade asemel materjalide saadavusest l\u00e4htuvad kuup\u00e4evad.<\/strong> Iga t\u00f6\u00f6 puhul kontrollitakse laoseisu ja B1 saabuvate ostutellimuste andmeid. Avatud ostutellimuse kogus loetakse saadavaks tellimuserea tarnekuup\u00e4eval. B1 dokument Goods Receipt PO kannab selle SkyPlanneris laoseisu, sealhulgas osaliste vastuv\u00f5ttude korral.<\/li>\n\n\n<li><strong>T\u00e4htajad muutuvad tegelikeks prioriteetideks.<\/strong> T\u00f6\u00f6 prioriteet, l\u00f5petamiskuup\u00e4eva alusel eelistamine, kliendi prioriteet, Fast Track ja Dynamic Priorities m\u00e4\u00e4ravad, milline t\u00f6\u00f6 l\u00e4heb esimesena.<\/li>\n\n\n<li><strong>K\u00e4sitsi parandamise asemel automaatsed muudatused.<\/strong> Autopilot uuendab ajakava tootmise muutudes automaatselt, j\u00e4rgides teie m\u00e4\u00e4ratud lukustusi ja prioriteete.<\/li>\n\n\n<li><strong>Ajakava koostamine ja tootmissaali t\u00f6\u00f6de haldus \u00fches t\u00f6\u00f6riistas.<\/strong> Operaatorid n\u00e4evad oma t\u00f6\u00f6j\u00e4rjekorda ja registreerivad t\u00f6\u00f6d telefonis v\u00f5i tahvelarvutis funktsioonidega Mobile Confirmations, Production Timer ja Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> Resource Capacity aken n\u00e4itab igal n\u00e4dalal \u00fclekoormusi ja nende k\u00f5rvaldamine v\u00f5tab tunde.<\/p>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> \u00fcmberseadistused s\u00f5ltuvad j\u00e4rjekorrast v\u00f5i jagatud t\u00f6\u00f6riistad ja mitut operaatorit vajavad t\u00f6\u00f6d m\u00e4\u00e4ravad, mida saab j\u00e4rgmisena teha.<\/p>\n\n\n<p><strong>Valige SkyPlanner, kui<\/strong> soovite B1 standardsete tootmistellimuste jaoks tegelikku tootmisv\u00f5imsust arvestavat tootmise planeerimist, mitte uut tootmismoodulit.<\/p>\n\n\n<p>K\u00f5ik v\u00f5imalused leiate <a href=\"\/et\/funktsioonid\/\">funktsioonide lehelt<\/a>.<\/p>\n\n\n<p>SkyPlanneri ja SAP Business One\u2019i vaheline andmevahetus on kahesuunaline. Tootmistellimused, tehnoloogilise marsruudi etapid, ressursid ja avatud ostutellimused imporditakse liidese Service Layer kaudu. Planeeritud kuup\u00e4evad kirjutatakse tagasi objekti <code>ProductionOrders<\/code> ning registreeritud toodang ja t\u00f6\u00f6tunnid kantakse B1-sse dokumentidena Receipt and Issue for Production. SkyPlanneri veebihaagid edastavad iga ajakavamuudatuse kohe, kui see toimub.<\/p>\n\n\n<p>Iga tehas kasutab B1 omamoodi, alates BOM-is m\u00e4\u00e4ratud tehnoloogilise marsruudi etappidest kuni ressursir\u00fchmade ja lisadeni. SkyPlanneri meeskond seadistab liidestuse kasutuselev\u00f5tu k\u00e4igus teie lahenduse j\u00e4rgi ning pakub tuge ka p\u00e4rast k\u00e4ivitamist. Teie B1 partner v\u00f5i arendajad saavad liidestuse luua ka SkyPlanneri dokumenteeritud REST API abil (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API teatmik<\/a>); alustamiseks piisab API-v\u00f5tmest. Toote ja API dokumentatsioon on avalikult k\u00e4ttesaadav <a href=\"\/et\/docs\/integratsiooni-juhendaja\/\">SkyPlanneri dokumentatsiooni lehel<\/a>.<\/p>\n\n\n<p>Nairobis tegutsev ravimitootja Laboratory &amp; Allied kasutab HANA-l t\u00f6\u00f6tavat SAP Business One\u2019i koos Power BI-ga. Ettev\u00f5ttes t\u00f6\u00f6tab ligikaudu 1 000 inimest, neist umbes 800 tootmises, ning SkyPlanner on kasutusel alates 2025. aastast. Ettev\u00f5tte enda IT-meeskond tegi SAP-i liidestuse SkyPlanneri abiga suuresti iseseisvalt. Ettev\u00f5tte teatel paranesid \u00f5igeaegne tarne ja klientidele \u00f5igeaegne aruandlus 50%.<\/p>\n\n\n<p>Alustage B1-st eksporditud CSV- v\u00f5i Exceli failiga <a href=\"\/et\/prooviperiood\/\">30-p\u00e4evast tasuta prooviperioodi<\/a>: kasutada saab kuni 20 t\u00f6\u00f6keskust ja krediitkaarti pole vaja. N\u00e4ete oma tellimusi ajakavas enne liidestust\u00f6\u00f6de algust. Seej\u00e4rel on <a href=\"\/et\/hinnakujundus\/\">hind<\/a> alates 199 \u20ac kuus ja paketis sisaldub 5 t\u00f6\u00f6keskust. Arveldamine on igakuine ja loobuda saab igal ajal. Liidestuse hinnapakkumine koostatakse teie protsessi ja vajaduste j\u00e4rgi ette koos paketi pakkumisega, nii et teate kogukulu enne alustamist. Juurutamine saab tavaliselt valmis m\u00f5ne n\u00e4dala jooksul p\u00e4rast kasutuselev\u00f5tu alustamist.<\/p>\n\n\n<p>Lugege \u00fclevaadet lehelt <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/\">SkyPlanner SAP Business One\u2019i jaoks<\/a> v\u00f5i vaadake <a href=\"\/et\/integratsioonid\/erp\/sap-business-one\/liidestamise-juhend\/\">SAP Business One\u2019i liidestusjuhendist<\/a>, millised andmed s\u00fcsteemide vahel liiguvad. Teised ERP-s\u00fcsteemid leiate <a href=\"\/et\/integratsioonid\/erp\/\">ERP-liidestuste lehelt<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/prooviperiood\/\">Alusta tasuta prooviperioodi<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/et\/kontakt-muugiga\/\">Broneeri demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tootjate kogemused SkyPlanneriga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Puhtaruumi kaitseriietuses operaatorid pudelite t\u00e4iteliinil Laboratory &amp; Alliedi ravimitehases Nairobis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>tootmise t\u00f5husus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eTootmise t\u00f5husus on kasvanud 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-juht<\/b><br>Laboratory &amp; Allied \u00b7 Ravimitootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise t\u00f5husus on kasvanud 90% ning k\u00f5iki t\u00f6\u00f6keskusi h\u00f5lmava optimeeritud kolme kuu plaani koostamine v\u00f5tab alla 30 minuti.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/laboratory-allied\/\">Loe Laboratory &amp; Alliedi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"UTU tarneahelaspetsialist Kalle Kalliom\u00e4ki Ulvila elektrikilpide tootmissaalis\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ajas\u00e4\u00e4stu igal n\u00e4dalal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneriga oleme liikunud tootmise planeerimisel Exceli tabelitelt tootmise reaalajas optimeerimisele.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tarneahelaspetsialist<\/b><br>UTU \u00b7 Elektrikilbid ja jaotusseadmed<\/p>\n\n\n<p class=\"ind-cust__result\">Tootmise planeerimisel s\u00e4\u00e4stetakse igal n\u00e4dalal 2 tundi t\u00f6\u00f6aega ning uus t\u00f6\u00f6j\u00e4rjekord j\u00f5uab tootmisliinile sekunditega.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/utu\/\">Loe UTU kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Compi keevitaja lihvib Alah\u00e4rm\u00e4 tehases keevitatud teraskonstruktsiooni\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>tarnekindlus varasema ligikaudu 50% asemel<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanneril on meie tarnekindluse hoidmisel otsustav roll.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, tegevjuht<\/b><br>KJH-Comp \u00b7 Lehtmetallit\u00f6\u00f6d ja lepinguline tootmine<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus t\u00f5usis ligikaudu 50% tasemelt koguni 98%-ni ning ajakava koostamiseks on n\u00fc\u00fcd kahe t\u00f6\u00f6juhi asemel vaja \u00fcht.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/kjh-comp\/\">Loe KJH-Compi kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u00d5huvaade Piristeeli katuse turvatoodete tehasele Kauhavas\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>tarnekindlus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner on aidanud kitsaskohad n\u00e4htavale tuua ja muutnud tootmise juhtimise selgemaks.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, tootmisjuht<\/b><br>Piristeel \u00b7 Katuse turvatooted ja vihmavees\u00fcsteemid<\/p>\n\n\n<p class=\"ind-cust__result\">Tarnekindlus j\u00f5udis sel aastal 99,2%-ni ning ajakava koostamisel s\u00e4\u00e4stetakse kuni neli tundi t\u00f6\u00f6aega p\u00e4evas.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/et\/customers\/piristeel\/\">Loe Piristeeli kogemuslugu<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Korduma kippuvad k\u00fcsimused<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SAP Business One\u2019is on tootmise ajakava koostamise t\u00f6\u00f6riist?<\/summary>\n<p class=\"sp-faq__a\">Selles on tootmistellimused nelja ressursijaotusmeetodiga ja Resource Capacity aken, mis n\u00e4itab \u00fclekoormust. See ei j\u00e4rjesta tellimusi tegelikku tootmisv\u00f5imsust arvestades. \u00dclekoormused k\u00f5rvaldatakse tootmistellimuste kuup\u00e4evi k\u00e4sitsi muutes.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SAP Business One\u2019i MRP arvestab ressursside v\u00f5imsusega?<\/summary>\n<p class=\"sp-faq__a\">SAP-i dokumentatsiooni j\u00e4rgi mitte. Selle kohaselt kontrollib MRP arvutus n\u00f5udlust, pakkumist, laoseisu, komponentide saadavust ja l\u00e4biminekuaegu. Ressursside v\u00f5imsus nende sisendite hulka ei kuulu, seega ei kajasta MRP soovitused masinate koormust.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mis vahe on v\u00e4ljadel Daily Internal Capacity ja Single Run Capacity?<\/summary>\n<p class=\"sp-faq__a\">Daily Internal Capacity n\u00e4itab ressursi kogu saadaolevat aega p\u00e4evas. Single Run Capacity n\u00e4itab, kui palju sellest ajast saab \u00fcks tootmistellimus p\u00e4evas kasutada. Selle p\u00f5hjal arvutatakse tehnoloogilise marsruudiga tellimuste Required Days, l\u00e4htudes SAP-i eeldusest, et \u00fcks tellimus t\u00e4idetakse \u00fchel masinal.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas SAP Business One arvestab j\u00e4rjekorrast s\u00f5ltuvaid seadistusaegu?<\/summary>\n<p class=\"sp-faq__a\">Ei. BOM-i ressursirea Additional Quantity lisab igale tellimusele kindla ajakulu, s\u00f5ltumata sellest, mida enne toodeti. SkyPlanneri seadistusaegade maatriks sisaldab toodetevahelisi \u00fcmberseadistusaegu m\u00f5lemas suunas ning t\u00f6\u00f6d j\u00e4rjestatakse nii, et seadistuste koguaeg p\u00fcsiks v\u00e4ike.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas tootmise planeerimiseks on vaja B1-sisest tootmise lisamoodulit?<\/summary>\n<p class=\"sp-faq__a\">Ei. SkyPlanner koostab B1 standardsete tootmistellimuste ajakava tegelikku tootmisv\u00f5imsust arvestades ja lisab tootmissaali t\u00f6\u00f6aja registreerimise, ilma et BOM-e v\u00f5i tellimusi tuleks uude andmemudelisse \u00fcle viia.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuidas \u00fchendatakse SkyPlanner APS SAP Business One\u2019iga?<\/summary>\n<p class=\"sp-faq__a\">Andmevahetus on kahesuunaline ning toimub B1 Service Layeri ning SkyPlanneri REST API ja veebihaakide kaudu. B1-st tuuakse \u00fcle tootmistellimused, tootestruktuurid, ressursid ja ostutellimused. Tagasi saadetakse ajakavasse planeeritud kuup\u00e4evad ning registreeritud toodang ja t\u00f6\u00f6tunnid. SkyPlanneri meeskond seadistab liidestuse juurutamise k\u00e4igus teie B1 seadistusele vastavaks ja pakub tuge ka p\u00e4rast kasutuselev\u00f5ttu. Liidestuse saab dokumenteeritud REST API abil luua ka teie B1 partner v\u00f5i teie enda arendusmeeskond. Alustamiseks piisab API-v\u00f5tmest.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas saame SkyPlannerit enne SAP Business One\u2019iga liidestamist proovida?<\/summary>\n<p class=\"sp-faq__a\">Jah. 30-p\u00e4evane tasuta prooviperiood h\u00f5lmab kuni 20 t\u00f6\u00f6keskust ja krediitkaarti pole vaja. Eksportige B1-st tootmistellimused ja ressursid, importige need CSV- v\u00f5i Exceli failina ning vaadake esmalt oma tootmise ajakava. <a href=\"\/et\/prooviperiood\/\">Alustage prooviperioodi<\/a> v\u00f5i <a href=\"\/et\/kontakt-muugiga\/\">v\u00f5tke \u00fchendust m\u00fc\u00fcgimeeskonnaga<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Liidestused \/ ERP \/ SAP Business One Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll Ei. SAP Business One&#8217;i standardlahenduses on MRP, p\u00e4evase v\u00f5imsusega ressursid ja aken Resource Capacity, mis n\u00e4itab ressursi \u00fclekoormust. Puudub aga planeerimismootor, mis seaks sama tootmisv\u00f5imsuse p\u00e4rast konkureerivad tootmistellimused j\u00e4rjekorda. Seet\u00f5ttu muudab planeerija tellimuste kuup\u00e4evi k\u00e4sitsi. &#8230; <a title=\"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/\" aria-label=\"Read more about Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100764,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101062","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kas SAP Business One toetab tootmise planeerimist?<\/title>\n<meta name=\"description\" content=\"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll\" \/>\n<meta property=\"og:description\" content=\"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/tootmise-planeerimine\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/tootmise-planeerimine\\\/\",\"name\":\"Kas SAP Business One toetab tootmise planeerimist?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/tootmise-planeerimine\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/tootmise-planeerimine\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/tootmise-planeerimine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS teie ERP jaoks\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS SAP Business One\u2019i jaoks: tootmise planeerimine\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/integratsioonid\\\/erp\\\/sap-business-one\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kas SAP Business One toetab tootmise planeerimist?","description":"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/","og_locale":"et_EE","og_type":"article","og_title":"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll","og_description":"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?","og_url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/","url":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/","name":"Kas SAP Business One toetab tootmise planeerimist?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SAP Business One: MRP, p\u00e4evav\u00f5imsus ja neli jaotusmeetodit, ent tegelikku v\u00f5imsust arvestavat planeerijat pole. Mida see teeb, kus on piirid ja millal piisab?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/tootmise-planeerimine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"ERP- ja MES-tarkvara integratsioonid SkyPlanneriga","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS teie ERP jaoks","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS SAP Business One\u2019i jaoks: tootmise planeerimine","item":"https:\/\/skyplanner.ai\/et\/integratsioonid\/erp\/sap-business-one\/"},{"@type":"ListItem","position":5,"name":"Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/et\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Liidestused \/ ERP \/ SAP Business One Kas SAP Business One toetab tootmise planeerimist? Ressursid, MRP ja SkyPlanner APS-i roll Ei. SAP Business One&#8217;i standardlahenduses on MRP, p\u00e4evase v\u00f5imsusega ressursid ja aken Resource Capacity, mis n\u00e4itab ressursi \u00fclekoormust. Puudub aga planeerimismootor, mis seaks sama tootmisv\u00f5imsuse p\u00e4rast konkureerivad tootmistellimused j\u00e4rjekorda. Seet\u00f5ttu muudab planeerija tellimuste kuup\u00e4evi k\u00e4sitsi.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101062","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=101062"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/101062\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/pages\/100764"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=101062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}