{"id":77515,"date":"2025-05-13T09:37:46","date_gmt":"2025-05-13T09:37:46","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/tellige-esemeid\/"},"modified":"2025-10-08T07:29:53","modified_gmt":"2025-10-08T07:29:53","password":"","slug":"tellige-esemeid","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/","title":{"rendered":"Tellige esemeid"},"content":{"rendered":"\n<p>Siin k\u00e4sitleme \u00fcksikasjalikult tellimusartiklite hankimist, loomist, uuendamist ja kustutamist.<\/p>\n\n<p>Tellimuse elementidele p\u00e4\u00e4seb juurde <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> l\u00f5pp-punktist.<\/p>\n\n<h4 class=\"wp-block-heading\" id=\"h-fetching-order-items\">Tellimuse esemete otsimine<\/h4>\n\n<p>Tellimuse elemendid saadetakse GET-p\u00e4ringuga <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> l\u00f5pp-punktile:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"825\" height=\"995\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" alt=\"\" class=\"wp-image-69594\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png 825w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-249x300.png 249w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-768x926.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-360x434.png 360w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 1.<\/strong>  Tellimuse esemete otsimine<\/figcaption><\/figure>\n\n<p>Saate otsida tellimuse objekte erinevate parameetrite j\u00e4rgi:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id  <\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanneri sisemise <strong>tellimuse <\/strong>id, saab leida <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-orders-endpoint<\/mark>&#8217;ist.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje v\u00e4line identifikaator<\/li>\n\n\n\n<li>N\u00e4iteks unikaalne identifikaator teie v\u00e4liss\u00fcsteemist (ERP jne).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanneri sisemine tootetunnus<\/li>\n\n\n\n<li>Saab leida <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/products-endpoint<\/mark>&#8217;ist<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kui tellimuse objektil on alamobjektid (nt alltooted), siis on alamobjektidel nende vanemtellimuse objekti id v\u00e4ljal parent_id.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje indeksinumber<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"278\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png\" alt=\"\" class=\"wp-image-69624\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-300x81.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-768x208.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-360x98.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6.png 1238w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 2.<\/strong>  Tellimuselemendi rea indeksid<\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>t\u00f6\u00f6number<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje t\u00f6\u00f6arvu v\u00e4\u00e4rtus<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>staatus<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimusartikli staatus<\/li>\n\n\n\n<li>Lubatud v\u00e4\u00e4rtused: <strong>uus<\/strong>, <strong>alustatud<\/strong> v\u00f5i <strong>l\u00f5petatud<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>positsioon<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje positsiooniv\u00e4\u00e4rtus<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"252\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png\" alt=\"\" class=\"wp-image-69653\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-300x74.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-768x189.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-360x89.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7.png 1225w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Joonis 3. Tellimusartikli positsiooni v\u00e4\u00e4rtused <\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse eseme tarnekuup\u00e4ev<\/li>\n\n\n\n<li>Formaat: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date_condition<\/strong>\n<ul class=\"wp-block-list\">\n<li>Vabatahtlik tarnekuup\u00e4eva otsingu tingimus<\/li>\n\n\n\n<li>Valikud: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>Kui v\u00e4\u00e4rtust ei ole antud, kasutatakse <strong>&gt;= tingimust.<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tagastage ainult tellimuse esemed, mis on v\u00e4ljavaated<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>include_archived<\/strong>\n<ul class=\"wp-block-list\">\n<li>Arhiveeritud (pehme kustutatud) tellimuse objektide kaasamine otsingusse<\/li>\n\n\n\n<li>T\u00e4histatakse v\u00e4\u00e4rtusega <strong>is_archive<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>muudetud<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tagastab tellimuse elemendid, mida on muudetud p\u00e4rast antud kuup\u00e4eva.<\/li>\n\n\n\n<li>Formaat: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>modifiedCondition<\/strong>\n<ul class=\"wp-block-list\">\n<li>Muudetud v\u00e4\u00e4rtuse otsingu vabatahtlik tingimus<\/li>\n\n\n\n<li>Valikud: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>Kui v\u00e4\u00e4rtust ei ole antud, kasutatakse <strong>&gt;= tingimust.<\/strong> <\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>V\u00f5ite ka otsinguparameetreid segada ja sobitada, n\u00e4iteks nii:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"784\" height=\"777\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png\" alt=\"\" class=\"wp-image-69732\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png 784w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-300x297.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-150x150.png 150w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-768x761.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-360x357.png 360w\" sizes=\"(max-width: 784px) 100vw, 784px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 4. <\/strong>Tellimuse kirjete otsimine <strong>phaser_order_id <\/strong>ja <strong>row_index<\/strong> j\u00e4rgi<\/figcaption><\/figure>\n\n<p>Konkreetse tellimusartikli ja selle Skyplanneri sisemise id-i saamiseks saate teha sellise p\u00e4ringu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"621\" height=\"664\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png\" alt=\"\" class=\"wp-image-70681\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png 621w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-281x300.png 281w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-360x385.png 360w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 5.<\/strong>  Skyplanneri id-ga tellimuse eseme otsimine 4<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-creating-order-items\">Tellimuste loomine<\/h4>\n\n<p>Pange t\u00e4hele, et enne tellimusartikli loomist peate looma <strong>tellimuse<\/strong>!<\/p>\n\n<p>Tellimuse kirje loomiseks saatke POST p\u00e4ring <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> l\u00f5pp-punkti:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"669\" height=\"1024\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png\" alt=\"\" class=\"wp-image-69818\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png 669w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-196x300.png 196w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-768x1175.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-335x512.png 335w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10.png 815w\" sizes=\"(max-width: 669px) 100vw, 669px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis<\/strong> <strong>6.<\/strong> Tellimuse kirje loomine<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png\" alt=\"\" class=\"wp-image-69909\" style=\"width:1024px;height:auto\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1536x803.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13.png 1807w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 7.<\/strong>  Loodud tellimuse kirje<\/figcaption><\/figure>\n\n<p>Siin on \u00fclevaade v\u00e4ljadest, mida saate kasutada tellimusartikli loomisel:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id<\/strong>\n<ul class=\"wp-block-list\">\n<li><strong>Tellimuse<\/strong> sisemine Skyplanner id, millega tellimusartikkel on seotud.<\/li>\n\n\n\n<li><strong>Kohustuslik v\u00e4li<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_order_row_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>P\u00e4rast tellimuse eksportimist Skyplanneri tootmise planeerimise moodulisse luuakse eraldi \u00fcksus nimega <strong>tootmise planeerimise tellimuse rida<\/strong> ja selle id m\u00e4\u00e4ratakse sellesse v\u00e4ljale<\/li>\n\n\n\n<li><strong>Ei soovitata kasutada <\/strong>(j\u00e4ta nulliks v\u00f5i \u00e4ra saadeta seda v\u00e4lja \u00fcldse taotluse v\u00e4ljal).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanner toote id, mida tellimuse objekt toodab.<\/li>\n\n\n\n<li>Vajalik, kui soovite tuua vaikimisi protsessisammud tootest<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje unikaalne identifikaator<\/li>\n\n\n\n<li>Kasutage seda, et siduda Skyplanneri tellimusartiklit oma tellimuse objektiga v\u00e4liss\u00fcsteemist (ERP jne).<\/li>\n\n\n\n<li><strong>Peab olema ainulaadne<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kui tellimusartikkel on teise tellimusartikli alamartikkel, siis tuleb siin esitada vanema id v\u00e4\u00e4rtus.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kus asub see kirje tellimuse kirjete loetelus.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>t\u00f6\u00f6number<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kasutatakse ainult informatiivse t\u00f6\u00f6numbri v\u00e4\u00e4rtusena tellimusartikli jaoks.<\/li>\n\n\n\n<li>Skyplanneri kasutajaliideses ei ole n\u00e4htav<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>staatus<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimuse kirje staatus<\/li>\n\n\n\n<li>Lubatud v\u00e4\u00e4rtused: <strong>uus, alustatud, valmis, j\u00e4rkj\u00e4rguline<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_archive<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kas tellimuse kirje on arhiveeritud (kustutatud).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>positsioon<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimusartikli identifikaatori v\u00e4\u00e4rtus (vt joonis 3.)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>summa<\/strong>\n<ul class=\"wp-block-list\">\n<li>Toodangu toodetud \u00fcldkogus<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>tellitud_summa<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellitud toote kogus<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>hind<\/strong>\n<ul class=\"wp-block-list\">\n<li>Toote \u00fchikuhind<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kui te ei soovi kasutada vaikimisi materjali seadistust tooteandmetest, siis seadke see v\u00e4\u00e4rtus true.<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials_calculated<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimusmaterjalide kogused arvutatakse valmistatud toodete koguse alusel.<\/li>\n\n\n\n<li>Kui see on seatud v\u00e4\u00e4rtuseks false, on materjali kogused fikseeritud<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>get_default_steps<\/strong>\n<ul class=\"wp-block-list\">\n<li>Looge protsessi sammud, et tellida toode, mis p\u00f5hineb toote vaikimisi protsessietappidel.<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_calculated_job_durations<\/strong>\n<ul class=\"wp-block-list\">\n<li>Protsessi etappide kestuse arvutamine varasemate ajaregistri andmete p\u00f5hjal<\/li>\n\n\n\n<li>Kui arvutamiseks ei ole piisavalt andmeid, kasutatakse vaikimisi kestust.<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>sub_items<\/strong>\n<ul class=\"wp-block-list\">\n<li>Looge ka toote alamartiklid, kui need on saadaval<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Formaat: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>start_eligibility_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Formaat: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>drawing_identifier<\/strong>\n<ul class=\"wp-block-list\">\n<li>Joonis\/blueprint\/juhiste identifikaator<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>kirjeldus<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tellimusartikli kirjeldus<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>additional_description<\/strong>\n<ul class=\"wp-block-list\">\n<li>T\u00e4iendav kirjeldus tellimuse kirje jaoks<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kas tellimuse kirje on v\u00e4ljavaade<\/li>\n\n\n\n<li>Vaikimisi: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\" id=\"h-updating-order-items\">Tellimuse kirjete uuendamine<\/h4>\n\n<p>Tellimuste andmete uuendamiseks saate saata PUT p\u00e4ringu aadressile <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows (\/phaser-order-rows<\/mark> ):<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"802\" height=\"1000\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png\" alt=\"\" class=\"wp-image-70065\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png 802w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-241x300.png 241w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-768x958.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-360x449.png 360w\" sizes=\"(max-width: 802px) 100vw, 802px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 8.  <\/strong>Tellimuse kirje uuendamine<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png\" alt=\"\" class=\"wp-image-70003\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15.png 1816w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 9.  <\/strong>Uuendatud tellimuse kirje<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-deleting-order-items\">Tellimuste kustutamine<\/h4>\n\n<p>Tellimuste kustutamine toimub &#8220;pehme kustutamise&#8221; meetodil. Tellimuse elemendi kustutamine muudab selle <strong>is_archive<\/strong> v\u00e4\u00e4rtuse true&#8217;ks. See t\u00e4hendab, et kustutatud tellimuse elemendid saab taastada, uuendades is_archive v\u00e4\u00e4rtust false&#8217;ks.  <\/p>\n\n<p>Tellimuse kirje kustutamisel kustutab s\u00fcsteem ka sellega seotud protsessietapid.<\/p>\n\n<p>Tellimuse elemendid kustutatakse, saates DELETE p\u00e4ringu <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> l\u00f5pp-punktile:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"675\" height=\"633\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png\" alt=\"\" class=\"wp-image-70149\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png 675w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-300x281.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-360x338.png 360w\" sizes=\"(max-width: 675px) 100vw, 675px\" \/><figcaption class=\"wp-element-caption\"><strong>Joonis 10.  <\/strong>Tellimuste kustutamine<\/figcaption><\/figure>\n\n<p>Saate kustutada tellimuse objekte, andes Skyplanneri sisemised id-d massiivi <strong>&#8220;ids<\/strong> &#8221; v\u00f5i v\u00e4lised_id-d massiivi <strong>&#8220;external_ids<\/strong> &#8220;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siin k\u00e4sitleme \u00fcksikasjalikult tellimusartiklite hankimist, loomist, uuendamist ja kustutamist. Tellimuse elementidele p\u00e4\u00e4seb juurde \/phaser-order-rows l\u00f5pp-punktist. Tellimuse esemete otsimine Tellimuse elemendid saadetakse GET-p\u00e4ringuga \/phaser-order-rows l\u00f5pp-punktile: Saate otsida tellimuse objekte erinevate parameetrite j\u00e4rgi: V\u00f5ite ka otsinguparameetreid segada ja sobitada, n\u00e4iteks nii: Konkreetse tellimusartikli ja selle Skyplanneri sisemise id-i saamiseks saate teha sellise p\u00e4ringu: Tellimuste loomine Pange t\u00e4hele, &#8230; <a title=\"Tellige esemeid\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/\" aria-label=\"Read more about Tellige esemeid\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[627],"doc_tag":[628,1514],"class_list":["post-77515","docs","type-docs","status-publish","hentry","doc_category-integratsioonid","doc_tag-api-et","doc_tag-integratsioon"],"acf":[],"year_month":"2026-11","word_count":722,"total_views":"198","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/et\/author\/sami\/"},"doc_category_info":[{"term_name":"Integratsioonid","term_url":"https:\/\/skyplanner.ai\/et\/docs-category\/integratsioonid\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/et\/docs-tag\/api-et\/"},{"term_name":"Integratsioon","term_url":"https:\/\/skyplanner.ai\/et\/docs-tag\/integratsioon\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tellige esemeid &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tellige esemeid\" \/>\n<meta property=\"og:description\" content=\"Siin k\u00e4sitleme \u00fcksikasjalikult tellimusartiklite hankimist, loomist, uuendamist ja kustutamist. Tellimuse elementidele p\u00e4\u00e4seb juurde \/phaser-order-rows l\u00f5pp-punktist. Tellimuse esemete otsimine Tellimuse elemendid saadetakse GET-p\u00e4ringuga \/phaser-order-rows l\u00f5pp-punktile: Saate otsida tellimuse objekte erinevate parameetrite j\u00e4rgi: V\u00f5ite ka otsinguparameetreid segada ja sobitada, n\u00e4iteks nii: Konkreetse tellimusartikli ja selle Skyplanneri sisemise id-i saamiseks saate teha sellise p\u00e4ringu: Tellimuste loomine Pange t\u00e4hele, ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:29:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"825\" \/>\n\t<meta property=\"og:image:height\" content=\"995\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/\",\"name\":\"Tellige esemeid &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"datePublished\":\"2025-05-13T09:37:46+00:00\",\"dateModified\":\"2025-10-08T07:29:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/tellige-esemeid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tellige esemeid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/et\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tellige esemeid &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/","og_locale":"et_EE","og_type":"article","og_title":"Tellige esemeid","og_description":"Siin k\u00e4sitleme \u00fcksikasjalikult tellimusartiklite hankimist, loomist, uuendamist ja kustutamist. Tellimuse elementidele p\u00e4\u00e4seb juurde \/phaser-order-rows l\u00f5pp-punktist. Tellimuse esemete otsimine Tellimuse elemendid saadetakse GET-p\u00e4ringuga \/phaser-order-rows l\u00f5pp-punktile: Saate otsida tellimuse objekte erinevate parameetrite j\u00e4rgi: V\u00f5ite ka otsinguparameetreid segada ja sobitada, n\u00e4iteks nii: Konkreetse tellimusartikli ja selle Skyplanneri sisemise id-i saamiseks saate teha sellise p\u00e4ringu: Tellimuste loomine Pange t\u00e4hele, ... Read more","og_url":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:29:53+00:00","og_image":[{"width":825,"height":995,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/","url":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/","name":"Tellige esemeid &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","datePublished":"2025-05-13T09:37:46+00:00","dateModified":"2025-10-08T07:29:53+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/et\/docs\/tellige-esemeid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/et\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/et\/docs\/"},{"@type":"ListItem","position":3,"name":"Tellige esemeid"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/et\/#website","url":"https:\/\/skyplanner.ai\/et\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/et\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/et\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/et\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"Siin k\u00e4sitleme \u00fcksikasjalikult tellimusartiklite hankimist, loomist, uuendamist ja kustutamist. Tellimuse elementidele p\u00e4\u00e4seb juurde \/phaser-order-rows l\u00f5pp-punktist. Tellimuse esemete otsimine Tellimuse elemendid saadetakse GET-p\u00e4ringuga \/phaser-order-rows l\u00f5pp-punktile: Saate otsida tellimuse objekte erinevate parameetrite j\u00e4rgi: V\u00f5ite ka otsinguparameetreid segada ja sobitada, n\u00e4iteks nii: Konkreetse tellimusartikli ja selle Skyplanneri sisemise id-i saamiseks saate teha sellise p\u00e4ringu: Tellimuste loomine Pange t\u00e4hele,&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/docs\/77515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/comments?post=77515"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/docs\/77515\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/media?parent=77515"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/doc_category?post=77515"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/et\/wp-json\/wp\/v2\/doc_tag?post=77515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}