---
title: Kuidas lisada materjal olemasolevale tootele
description: "[Material Management: Check your inventory in advance](https://www.youtube.com/embed/C2QxeuRFfbI?feature=oembed) Tootele materjali lisamine: - Minge Laos ja valige **Toode**. - Kui olete seal, otsige toode, millele soovite materjali lisada. Klõpsake sellel. - Klõpsake **paneelil \"Toode**\" **vahekaardil \"Materjalid**\". Seejärel klõpsake nuppu **+ Add Material**.…"
url: "https://skyplanner.ai/et/docs/kuidas-lisada-materjal-olemasolevale-tootele/"
updated: "2025-10-08"
category: Ladu / Materjalid
---

# Kuidas lisada materjal olemasolevale tootele

[Material Management: Check your inventory in advance](https://www.youtube.com/embed/C2QxeuRFfbI?feature=oembed)

Tootele materjali lisamine:

- Minge Laos ja valige **Toode**.
- Kui olete seal, otsige toode, millele soovite materjali lisada. Klõpsake sellel.
- Klõpsake **paneelil "Toode**" **vahekaardil "Materjalid**". Seejärel klõpsake nuppu **+ Add Material**.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Add-materials-to-a-product-1024x589.png)

- Avaneb uus aken.

![](https://skyplanner.ai/wp-content/uploads/2025/04/Add-material-panel.png)

- Valige materjal ja määrake ühe toote valmistamiseks vajalik kogus. Kui olete valmis, klõpsake nuppu **Save (Salvesta**).
- Võite lisada nii palju materjale, kui on vaja selle eseme valmistamiseks, kordades samu samme.

Nüüd, kui loote uue Tellimuse ja valite selle toote Tellimuse elemendiks, ilmuvad need materjalid tootega seotud.

Lisateavet saate dokumendis "**[Materjalid](https://skyplanner.ai/et/docs/materjalid/)**"
