{"id":97495,"date":"2026-10-11T21:45:19","date_gmt":"2026-10-11T21:45:19","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97495"},"modified":"2026-10-11T21:45:39","modified_gmt":"2026-10-11T21:45:39","slug":"erp-vs-aps","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/","title":{"rendered":"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Su ERP registra el pedido, la fecha de entrega y las necesidades de materiales. Sin embargo, cuando alguien pregunta \u00ab\u00bfTodav\u00eda podemos enviar este pedido el viernes?\u00bb, la respuesta puede depender de que un supervisor revise las colas de trabajo de las m\u00e1quinas y reorganice las tareas a mano.<\/p>\n\n\n<p>Puede que necesite mejorar la programaci\u00f3n de la producci\u00f3n, no cambiar de ERP. Si los pedidos y el inventario est\u00e1n bajo control, pero los planificadores siguen organizando a mano la cola diaria de cada m\u00e1quina, es probable que lo que falte sea una herramienta de programaci\u00f3n de la producci\u00f3n.<\/p>\n\n\n<p>El ERP \u2014planificaci\u00f3n de recursos empresariales\u2014 conecta procesos de negocio como la gesti\u00f3n de pedidos, las compras, el inventario y las finanzas. El APS \u2014planificaci\u00f3n y programaci\u00f3n avanzadas\u2014 se centra en planificar la producci\u00f3n seg\u00fan los recursos productivos disponibles y las restricciones. Para un fabricante cuyo ERP funciona bien, pero que tiene dificultades con la programaci\u00f3n diaria, el software APS suele complementar al ERP, no sustituirlo.<\/p>\n\n\n<p>SkyPlanner le ofrece una soluci\u00f3n centrada en esa necesidad: conserve su ERP, con\u00e9ctelo a la programaci\u00f3n a capacidad finita y deje que Arcturus, la IA de SkyPlanner para la programaci\u00f3n de la producci\u00f3n, calcule la secuencia de trabajo mientras usted controla las prioridades.<\/p>\n\n\n<h2 class=\"wp-block-heading\">ERP vs APS: las principales diferencias<\/h2>\n\n\n<p>El ERP gestiona los procesos de negocio de forma integrada; el APS se centra en planificar el trabajo. Sus funciones pueden solaparse: algunos ERP para fabricaci\u00f3n incluyen programaci\u00f3n detallada, mientras que algunos productos APS tambi\u00e9n abarcan la planificaci\u00f3n de la cadena de suministro a m\u00e1s largo plazo. Aqu\u00ed comparamos lo que aportan al programa de producci\u00f3n que su f\u00e1brica necesita cada d\u00eda.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Lo que importa a su equipo de producci\u00f3n<\/th><th>ERP<\/th><th>Software APS para fabricaci\u00f3n<\/th><\/tr><\/thead><tbody><tr><td>Objetivo principal<\/td><td>Conectar la gesti\u00f3n de pedidos, las compras, el inventario, las finanzas y otros procesos de negocio.<\/td><td>Asignar el trabajo de producci\u00f3n a los recursos productivos y situarlo en el tiempo.<\/td><\/tr><tr><td>Capacidad y secuenciaci\u00f3n<\/td><td>Puede ofrecer desde informes de carga hasta programaci\u00f3n a capacidad finita, seg\u00fan el sistema y su configuraci\u00f3n.<\/td><td>Una de sus funciones principales es la programaci\u00f3n detallada seg\u00fan la capacidad, las dependencias entre operaciones y otras restricciones de producci\u00f3n.<\/td><\/tr><tr><td>Respuesta ante un cambio<\/td><td>Depende de sus herramientas de programaci\u00f3n; las carencias se suplen con trabajo manual de planificaci\u00f3n.<\/td><td>Recalcular el programa seg\u00fan los cambios de disponibilidad y prioridades.<\/td><\/tr><tr><td>Motivo para invertir<\/td><td>Mejorar la gesti\u00f3n de los procesos y los datos de la empresa.<\/td><td>Reducir el trabajo manual de programaci\u00f3n y mantener la utilidad del plan de producci\u00f3n cuando cambian las condiciones.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Por tanto, al comparar ERP vs APS, la pregunta no es simplemente \u00ab\u00bfQu\u00e9 sistema es m\u00e1s avanzado?\u00bb, sino \u00ab\u00bfQu\u00e9 capacidad nos falta?\u00bb. Sustituir un ERP que gestiona bien los pedidos y las compras es una medida de gran alcance para lo que quiz\u00e1 sea un problema concreto de programaci\u00f3n de la producci\u00f3n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Por qu\u00e9 una fecha de entrega no basta para tener un programa viable<\/h2>\n\n\n<p>Imagine un pedido que debe enviarse el viernes. Un componente tiene que pasar por acabado antes del montaje final. El equipo de montaje dispone de tiempo el viernes, pero el componente llega demasiado tarde para el hueco de acabado del jueves. El siguiente hueco disponible en acabado es el lunes.<\/p>\n\n\n<p>Hay capacidad de montaje y una fecha de entrega. Puede que incluso haya suficiente tiempo de producci\u00f3n en el conjunto de la semana. Pero las operaciones no encajan en la secuencia necesaria para entregar el pedido.<\/p>\n\n\n<p>Un programa \u00fatil relaciona todos esos datos. Asigna el trabajo a los recursos productivos adecuados, respeta el orden de las operaciones y tiene en cuenta cu\u00e1ndo est\u00e1n disponibles la capacidad y los materiales. Detectar con antelaci\u00f3n que no se podr\u00e1 cumplir el compromiso del viernes le permite tomar una decisi\u00f3n con fundamento: \u00bfpuede liberar un hueco anterior en acabado, a\u00f1adir capacidad o debe acordar una nueva fecha de entrega?<\/p>\n\n\n<p>La planificaci\u00f3n de necesidades de materiales, o MRP, sigue siendo importante: calcula qu\u00e9 materiales y componentes se necesitan, en qu\u00e9 cantidades y cu\u00e1ndo. Pero un plan de materiales por s\u00ed solo no resuelve la competencia entre tareas que necesitan la misma m\u00e1quina. La programaci\u00f3n detallada debe relacionar las fechas de disponibilidad de los materiales con la capacidad necesaria para realizar el trabajo.<\/p>\n\n\n<p>La ventaja del software APS no es ofrecer otro lugar donde registrar el compromiso del viernes, sino una base m\u00e1s s\u00f3lida para decidir si la secuencia de producci\u00f3n permite cumplirlo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfSu ERP actual ya cubre lo que necesita?<\/h2>\n\n\n<p>Antes de incorporar otro software, examine las funciones de programaci\u00f3n que ya tiene. Algunos ERP para fabricaci\u00f3n permiten trabajar con capacidad finita, tener en cuenta la disponibilidad de materiales y programar tareas por recurso productivo. Un calendario mal configurado o la falta de la duraci\u00f3n de una operaci\u00f3n pueden hacer que un sistema capaz parezca insuficiente.<\/p>\n\n\n<p>Pida a su planificador que gestione en el sistema actual un cambio reciente de producci\u00f3n. Compruebe si el sistema puede:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u00bfAsignar operaciones a las m\u00e1quinas adecuadas sin superar su capacidad disponible?<\/li><li>\u00bfRespetar las dependencias entre operaciones y las fechas de disponibilidad de materiales relevantes para su proceso?<\/li><li>\u00bfRecalcular el programa cuando hay cambios en la disponibilidad o en las prioridades, sin que alguien tenga que corregir cada cola de trabajo?<\/li><li>\u00bfMostrar qu\u00e9 compromisos de entrega existentes se ven afectados?<\/li><li>\u00bfMantener estable la secuencia de trabajo a corto plazo all\u00ed donde la planta necesita que permanezca fija?<\/li><\/ul>\n\n\n<p>Si su ERP permite realizar esas tareas, pero su equipo no utiliza esas funciones, revise primero la configuraci\u00f3n y la formaci\u00f3n. Si ya funcionan bien y el esfuerzo de planificaci\u00f3n es manejable, puede que no necesite un software APS independiente.<\/p>\n\n\n<p>Si el ERP gestiona bien las transacciones de negocio, pero su equipo sigue realizando manualmente esas tareas de programaci\u00f3n, merece la pena considerar un software APS especializado. La necesidad cobra m\u00e1s peso cuando cada cambio afecta a varios recursos productivos y los supervisores dedican m\u00e1s tiempo a rehacer el plan que a gestionar la producci\u00f3n.<\/p>\n\n\n<p>Si lo que falla son los propios procesos de gesti\u00f3n de pedidos, compras e inventario, tambi\u00e9n puede ser necesario renovar el ERP. El software APS no sustituye esas funciones de negocio. Distinga ambas necesidades para que una mejora de la programaci\u00f3n no se convierta en un proyecto innecesario de sustituci\u00f3n del sistema en toda la empresa, ni desv\u00ede la atenci\u00f3n de un cambio que realmente necesita.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 aporta SkyPlanner junto a su ERP<\/h2>\n\n\n<p>SkyPlanner APS se encarga de asignar cada tarea mientras usted decide qu\u00e9 es lo m\u00e1s importante. Sus estaciones de trabajo, turnos y operarios definen la capacidad disponible. Las etapas de producci\u00f3n definen los tiempos de procesamiento y preparaci\u00f3n, los recursos productivos adecuados y las dependencias entre operaciones. Cuando se activa la programaci\u00f3n que tiene en cuenta los materiales, el inventario y las entregas de materiales previstas tambi\u00e9n entran en el c\u00e1lculo.<\/p>\n\n\n<p>Arcturus programa las operaciones seg\u00fan la capacidad y las reglas configuradas. El diagrama de Gantt resultante muestra el trabajo asignado a las distintas estaciones de trabajo, para que pueda revisar la secuencia y ver c\u00f3mo un cambio afecta a las operaciones posteriores. En lugar de mantener usted mismo cada cola de m\u00e1quina, puede centrarse en los compromisos que requieren atenci\u00f3n.<\/p>\n\n\n<p>Volvamos al ejemplo de acabado y montaje. Actualice la llegada prevista del componente y recalcule con la programaci\u00f3n que tiene en cuenta los materiales activada. Arcturus programa el acabado seg\u00fan esa disponibilidad y el montaje seg\u00fan su dependencia del acabado. El diagrama de Gantt muestra d\u00f3nde encajan ahora las operaciones. Si cambia una prioridad para adelantar el pedido, revise c\u00f3mo se desplazan los dem\u00e1s trabajos antes de asumir un nuevo compromiso.<\/p>\n\n\n<p>Usted decide qu\u00e9 compromisos tienen prioridad; Arcturus calcula su lugar en el programa. Las reglas y los bloqueos protegen el trabajo que no debe moverse, incluido el de una ventana de programaci\u00f3n a corto plazo. Revisar el plan no deber\u00eda implicar alterar el trabajo que la planta ya est\u00e1 preparando para ejecutar.<\/p>\n\n\n<p>Una herramienta de programaci\u00f3n tampoco crea horas de m\u00e1quina adicionales. Su valor est\u00e1 en mostrar las consecuencias y encargarse de la asignaci\u00f3n del trabajo, para que usted pueda actuar ante una falta de capacidad en vez de ocultarla en un plan demasiado optimista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">KJH-Comp conserv\u00f3 su ERP y cambi\u00f3 la programaci\u00f3n diaria<\/h2>\n\n\n<p>KJH-Comp, un fabricante finland\u00e9s de piezas de chapa met\u00e1lica por contrato, se enfrent\u00f3 precisamente a esta decisi\u00f3n. Su ERP C9000 y las hojas de c\u00e1lculo permit\u00edan planificar la carga semanal, pero la asignaci\u00f3n diaria a m\u00e1quinas segu\u00eda siendo manual. Dos supervisores dedicaban cada uno al menos la mitad de su tiempo a programar el trabajo seg\u00fan la capacidad.<\/p>\n\n\n<p>La empresa valor\u00f3 sustituir su ERP, pero finalmente eligi\u00f3 SkyPlanner para abordar la programaci\u00f3n a capacidad finita sin dejar de utilizar C9000. Los pedidos siguen entrando en el ERP; SkyPlanner se encarga de la programaci\u00f3n y la asignaci\u00f3n a m\u00e1quinas. La implantaci\u00f3n se realiz\u00f3 por fases, en paralelo con los procesos existentes, de septiembre de 2023 a abril de 2024.<\/p>\n\n\n<p>Seg\u00fan KJH-Comp, el cumplimiento de plazos de entrega pas\u00f3 de alrededor del 50% a alcanzar hasta el 98% en 2026. La responsabilidad de la programaci\u00f3n pas\u00f3 de dos supervisores a uno, y el otro fue reasignado a otras tareas.<\/p>\n\n\n<p>Estos resultados corresponden a la implantaci\u00f3n por fases de KJH-Comp. Para una f\u00e1brica que se plantea sustituir su ERP, la lecci\u00f3n es pr\u00e1ctica: los pedidos siguieron en el sistema conocido, mientras que la asignaci\u00f3n diaria a m\u00e1quinas dej\u00f3 de depender de que los supervisores rehicieran las colas de trabajo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/kjh-comp\/\">Lea el caso completo de KJH-Comp<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo trabajan juntos SkyPlanner y el ERP<\/h2>\n\n\n<p>SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su REST API abierta. Su ERP actual puede seguir gestionando los pedidos de clientes, las compras, el inventario y las finanzas, mientras SkyPlanner se encarga de la programaci\u00f3n detallada de la producci\u00f3n.<\/p>\n\n\n<p>Mantener dos sistemas no tiene por qu\u00e9 significar introducir cada pedido dos veces. La integraci\u00f3n requiere acordar el flujo de datos: qu\u00e9 registros proceden del ERP, qu\u00e9 sistema los mantiene y qu\u00e9 informaci\u00f3n de programaci\u00f3n se devuelve. La API de SkyPlanner permite intercambiar datos, incluidos los horarios de las operaciones programadas y las asignaciones a estaciones de trabajo. Definir las correspondencias entre registros y mantenerlos sincronizados forma parte del proyecto de integraci\u00f3n; no es algo que la API haga por s\u00ed sola.<\/p>\n\n\n<p>Los cambios en la cantidad de un pedido, en la fecha de disponibilidad de un material o en el estado de producci\u00f3n deben llegar al modelo de planificaci\u00f3n antes del siguiente c\u00e1lculo. Acuerde desde el principio c\u00f3mo se actualizar\u00e1n esos datos para que su equipo no sustituya la programaci\u00f3n manual por la conciliaci\u00f3n manual de datos.<\/p>\n\n\n<p>Prepare tambi\u00e9n los datos de producci\u00f3n: las rutas de fabricaci\u00f3n, unos tiempos de procesamiento y preparaci\u00f3n realistas, la disponibilidad de los recursos productivos y la informaci\u00f3n sobre materiales que quiera tener en cuenta en la programaci\u00f3n. Empiece por un flujo de producci\u00f3n representativo y sus principales restricciones. Un modelo peque\u00f1o y preciso es un punto de partida m\u00e1s \u00fatil que uno grande que d\u00e9 por hecho que todas las m\u00e1quinas y todos los materiales est\u00e1n siempre disponibles.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/integraciones\/\">Conozca c\u00f3mo aborda SkyPlanner la integraci\u00f3n con ERP<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Eval\u00fae las carencias de su programaci\u00f3n, no solo el software<\/h2>\n\n\n<p>El siguiente paso m\u00e1s \u00fatil es llevar un problema real de planificaci\u00f3n a una demostraci\u00f3n. Elija la ruta de fabricaci\u00f3n de un pedido habitual, el recurso productivo que m\u00e1s suele limitarla y una incidencia reciente que su equipo haya tenido que resolver manualmente.<\/p>\n\n\n<p>F\u00edjese en tres aspectos: d\u00f3nde encaja el trabajo, qu\u00e9 otros pedidos se desplazan cuando cambia el plan y c\u00f3mo mantiene el control de las prioridades y del trabajo previsto a corto plazo. Despu\u00e9s, pregunte cu\u00e1les de las tareas de programaci\u00f3n que su planificador realiza hoy manualmente ya no tendr\u00eda que hacer. Esas respuestas le dicen m\u00e1s que un programa impecable elaborado con pedidos de ejemplo sin complicaciones.<\/p>\n\n\n<p>Para decidir sobre la inversi\u00f3n, compare ese cambio en el trabajo diario con el coste de la suscripci\u00f3n y el esfuerzo de integraci\u00f3n y configuraci\u00f3n. Incorporar un software APS tiene sentido cuando el valor de resolver una carencia de programaci\u00f3n supera para su empresa el coste de utilizarlo, no simplemente porque ofrezca m\u00e1s funciones.<\/p>\n\n\n<p>Si su ERP permite gestionar el negocio, pero sus supervisores siguen teniendo que rehacer el plan de producci\u00f3n, SkyPlanner es una forma pr\u00e1ctica de cubrir esa carencia sin empezar de cero.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">Reserve una demostraci\u00f3n de SkyPlanner<\/a> para hablar sobre su flujo de producci\u00f3n y sus necesidades de integraci\u00f3n. Si prefiere explorar primero el entorno de programaci\u00f3n, <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema? Inicio &raquo; Recursos &raquo; ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema? Su ERP registra el pedido, la fecha de entrega y las necesidades de materiales. Sin embargo, cuando alguien pregunta \u00ab\u00bfTodav\u00eda podemos enviar este &#8230; <a title=\"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/\" aria-label=\"Leer m\u00e1s sobre ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":82448,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2540,306],"tags":[],"class_list":["post-97495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP vs APS: cu\u00e1ndo mejorar la programaci\u00f3n | SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?\" \/>\n<meta property=\"og:description\" content=\"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-11T21:45:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-11T21:45:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"948\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?\",\"datePublished\":\"2026-10-11T21:45:19+00:00\",\"dateModified\":\"2026-10-11T21:45:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/\"},\"wordCount\":2321,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/SkyPlanner-friendly-User-Interface-scaled.webp\",\"articleSection\":[\"APS &amp; Scheduling\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/\",\"name\":\"ERP vs APS: cu\u00e1ndo mejorar la programaci\u00f3n | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/SkyPlanner-friendly-User-Interface-scaled.webp\",\"datePublished\":\"2026-10-11T21:45:19+00:00\",\"dateModified\":\"2026-10-11T21:45:39+00:00\",\"description\":\"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/SkyPlanner-friendly-User-Interface-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/SkyPlanner-friendly-User-Interface-scaled.webp\",\"width\":2560,\"height\":948},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/erp-vs-aps\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP vs APS: cu\u00e1ndo mejorar la programaci\u00f3n | SkyPlanner","description":"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/","og_locale":"es_ES","og_type":"article","og_title":"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?","og_description":"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-11T21:45:19+00:00","article_modified_time":"2026-10-11T21:45:39+00:00","og_image":[{"width":2560,"height":948,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp","type":"image\/webp"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"11 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?","datePublished":"2026-10-11T21:45:19+00:00","dateModified":"2026-10-11T21:45:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/"},"wordCount":2321,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp","articleSection":["APS &amp; Scheduling","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/","name":"ERP vs APS: cu\u00e1ndo mejorar la programaci\u00f3n | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp","datePublished":"2026-10-11T21:45:19+00:00","dateModified":"2026-10-11T21:45:39+00:00","description":"\u00bfTiene ERP y reprograma a mano? ERP vs APS: vea c\u00f3mo SkyPlanner a\u00f1ade programaci\u00f3n a capacidad finita sin sustituir su ERP.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp","width":2560,"height":948},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/erp-vs-aps\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-scaled.webp",2560,948,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-150x150.webp",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-300x111.webp",300,111,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-768x284.webp",768,284,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-1024x379.webp",1024,379,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-1536x569.webp",1536,569,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-2048x759.webp",2048,759,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/12\/SkyPlanner-friendly-User-Interface-360x133.webp",360,133,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema? Inicio &raquo; Recursos &raquo; ERP vs APS: \u00bfnecesita mejorar la programaci\u00f3n de la producci\u00f3n o cambiar de sistema? Su ERP registra el pedido, la fecha de entrega y las necesidades de materiales. Sin embargo, cuando alguien pregunta \u00ab\u00bfTodav\u00eda podemos enviar este&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/97495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=97495"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/97495\/revisions"}],"predecessor-version":[{"id":97552,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/97495\/revisions\/97552"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/82448"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=97495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=97495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=97495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}