{"id":96586,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96586"},"modified":"2026-10-08T10:55:09","modified_gmt":"2026-10-08T10:55:09","slug":"produccion-bajo-pedido","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/","title":{"rendered":"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"\/es\/recursos\/\">Recursos<\/a> &raquo; Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La producci\u00f3n bajo pedido (MTO) es un enfoque en el que la fabricaci\u00f3n empieza cuando llega el pedido de un cliente. En lugar de enviar un producto terminado desde el almac\u00e9n, el fabricante lo produce para ese pedido. Por eso el cliente espera tanto la fabricaci\u00f3n como la entrega.<\/p>\n\n\n<p>Para un planificador de producci\u00f3n, el reto est\u00e1 en convertir la fecha de entrega solicitada en un plan realista. Tener los materiales a mano no basta si el trabajo debe pasar por recursos productivos ya comprometidos con otros pedidos. Antes de prometer una fecha, revise todo el recorrido por la producci\u00f3n y c\u00f3mo afecta a los compromisos existentes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es la producci\u00f3n bajo pedido?<\/h2>\n\n\n<p>En la producci\u00f3n bajo pedido, un pedido de cliente desencadena la fabricaci\u00f3n. Es posible que el producto ya est\u00e9 dise\u00f1ado y que sus pasos de producci\u00f3n ya est\u00e9n definidos. La MTO no exige que cada pedido sea un proyecto de ingenier\u00eda nuevo ni un producto \u00fanico.<\/p>\n\n\n<p>Tampoco significa que la f\u00e1brica no tenga inventario. Las materias primas, los componentes comprados y el trabajo en curso pueden mantenerse en stock. La diferencia es que el producto terminado se fabrica para un pedido, en lugar de producirse por adelantado a la espera de un comprador.<\/p>\n\n\n<p>El pedido es el motivo para fabricar, pero no garantiza que la fabricaci\u00f3n pueda empezar de inmediato. Puede que a\u00fan falte recibir materiales o que las estaciones de trabajo necesarias ya est\u00e9n ocupadas. Por eso el pedido necesita su lugar en la <a href=\"\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programaci\u00f3n de la producci\u00f3n<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Producci\u00f3n bajo pedido frente a fabricaci\u00f3n contra stock, montaje bajo pedido e ingenier\u00eda bajo pedido<\/h2>\n\n\n<p>Estos enfoques se distinguen por cu\u00e1nto trabajo se completa antes de que el cliente haga el pedido y qu\u00e9 parte queda dentro del tiempo de espera del cliente.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Enfoque<\/th><th>Antes del pedido del cliente<\/th><th>Qu\u00e9 desencadena el pedido<\/th><th>Qu\u00e9 espera el cliente<\/th><\/tr><\/thead><tbody><tr><td>Producci\u00f3n bajo pedido (MTO)<\/td><td>Puede que el dise\u00f1o del producto y la preparaci\u00f3n de la producci\u00f3n ya existan; los materiales o componentes pueden estar en stock<\/td><td>Fabricaci\u00f3n para el pedido<\/td><td>Disponibilidad de materiales cuando haga falta, producci\u00f3n y entrega<\/td><\/tr><tr><td>Fabricaci\u00f3n contra stock (MTS)<\/td><td>Los productos terminados se fabrican para una demanda prevista<\/td><td>Asignaci\u00f3n y expedici\u00f3n de un producto en stock<\/td><td>Preparaci\u00f3n del pedido y entrega, si hay stock disponible<\/td><\/tr><tr><td>Montaje bajo pedido (ATO)<\/td><td>Se preparan y almacenan componentes o m\u00f3dulos<\/td><td>Montaje final de la configuraci\u00f3n elegida<\/td><td>Montaje y entrega, m\u00e1s los componentes que falten<\/td><\/tr><tr><td>Ingenier\u00eda bajo pedido (ETO)<\/td><td>Pueden existir capacidades generales o elementos de dise\u00f1o<\/td><td>Trabajo de ingenier\u00eda considerable espec\u00edfico del pedido, adem\u00e1s de la fabricaci\u00f3n<\/td><td>Ingenier\u00eda, compras, producci\u00f3n y entrega<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Los l\u00edmites no siempre son r\u00edgidos. Un producto MTO puede requerir un peque\u00f1o cambio de dise\u00f1o sin convertirse en un proyecto ETO completo. Adem\u00e1s, un fabricante puede aplicar enfoques distintos a distintas familias de productos.<\/p>\n\n\n<p>Un job shop es un concepto distinto. Describe c\u00f3mo trabajos muy variados pasan por recursos compartidos. La producci\u00f3n bajo pedido, en cambio, describe la relaci\u00f3n entre el pedido del cliente y el inicio de la fabricaci\u00f3n. Un job shop puede fabricar bajo pedido, pero los dos t\u00e9rminos no son sin\u00f3nimos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ventajas y contrapartidas de la producci\u00f3n bajo pedido<\/h2>\n\n\n<p>La MTO puede reducir el riesgo de mantener en stock variantes de producto terminado que los clientes no compran. Tambi\u00e9n permite que la producci\u00f3n siga el pedido real, en lugar de depender por completo de una previsi\u00f3n del mix de productos terminados.<\/p>\n\n\n<p>La contrapartida es que el cliente espera mientras se fabrica. Un colch\u00f3n de producto terminado no puede absorber un retraso igual que cuando el producto MTS necesario ya est\u00e1 en stock. La disponibilidad de materiales, la carga de los recursos y la llegada de otros pedidos influyen en la fecha prometida.<\/p>\n\n\n<p>Los vol\u00famenes de pedidos y el mix de productos pueden variar, as\u00ed que el lead time de ayer no es necesariamente una estimaci\u00f3n fiable para el pedido de hoy. La MTO no es m\u00e1s barata por naturaleza ni elimina los costes de inventario. Que resulte adecuada depende en parte de cu\u00e1nta variedad necesitan los clientes y cu\u00e1nto tiempo pueden esperar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo planificar una fecha de entrega antes de lanzar el pedido<\/h2>\n\n\n<p>Separe la fecha que pide el cliente de la fecha que el plan de producci\u00f3n actual puede respaldar. Despu\u00e9s realice las siguientes comprobaciones antes de lanzar la tarea o de confirmar el compromiso comercial de entrega.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Confirmar qu\u00e9 hay que fabricar<\/h3>\n\n\n<p>Compruebe el producto, la cantidad, la configuraci\u00f3n y las operaciones de producci\u00f3n necesarias. Resuelva las especificaciones que falten antes de considerar que <a href=\"\/es\/recursos\/orden-de-fabricacion\/\">el pedido est\u00e1 listo para programarse<\/a>. Anote la fecha de entrega solicitada, pero no la tome como prueba de que el trabajo cabe en ese plazo.<\/p>\n\n\n<p>Un cambio de cantidad o de configuraci\u00f3n puede modificar el trabajo necesario. Planifique el pedido real, no el lead time que se recuerda de una tarea parecida.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Comprobar materiales y componentes comprados<\/h3>\n\n\n<p>Identifique qu\u00e9 hay disponible y qu\u00e9 debe comprarse o reponerse. Para los art\u00edculos que faltan, compruebe cu\u00e1ndo se espera poder usarlos en el paso de producci\u00f3n correspondiente. Un pedido no debe parecer listo para empezar solo porque se haya emitido una orden de compra.<\/p>\n\n\n<p>Distinga la disponibilidad confirmada de una suposici\u00f3n que a\u00fan hay que verificar. Si la fecha de llegada de un material cr\u00edtico es incierta, haga visible esa incertidumbre antes de comprometerse con el cliente.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Comprobar la ruta y los recursos productivos disponibles<\/h3>\n\n\n<p>Confirme la secuencia de operaciones, las estaciones de trabajo aptas, los turnos y los horarios de trabajo. Incluya los tiempos de preparaci\u00f3n cuando afecten al programa. Cada operaci\u00f3n necesita que est\u00e9n disponibles tanto el trabajo previo como los recursos que requiere.<\/p>\n\n\n<p>Que haya una estaci\u00f3n de trabajo libre al principio de la ruta no determina la fecha de finalizaci\u00f3n. La tarea a\u00fan puede quedar esperando a un recurso compartido m\u00e1s adelante en el proceso.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Encajar la tarea en la carga de trabajo existente<\/h3>\n\n\n<p>Sit\u00fae el pedido junto al trabajo que ya est\u00e1 programado, incluida la carga de cualquier <a href=\"\/es\/recursos\/cuello-de-botella\/\">cuello de botella<\/a>. No estime su finalizaci\u00f3n como si la f\u00e1brica estuviera vac\u00eda.<\/p>\n\n\n<p>Veamos un ejemplo hipot\u00e9tico: el material de un pedido nuevo est\u00e1 listo y su primera operaci\u00f3n tiene hueco. Sin embargo, el recurso de acabado compartido est\u00e1 comprometido con otro pedido. Iniciar la tarea nueva de inmediato no elimina esa cola en acabado. La estimaci\u00f3n de entrega debe tenerla en cuenta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Comprobar por separado la finalizaci\u00f3n y la entrega<\/h3>\n\n\n<p>Revise cu\u00e1ndo puede terminar toda la ruta de producci\u00f3n, no solo la primera o la \u00faltima operaci\u00f3n por separado. Despu\u00e9s tenga en cuenta el trabajo independiente de inspecci\u00f3n, embalaje, expedici\u00f3n o transporte que requiera ese pedido.<\/p>\n\n\n<p>La fecha de finalizaci\u00f3n en f\u00e1brica y la fecha de llegada al cliente son hitos distintos. Confirme cu\u00e1l espera el cliente antes de comunicar un compromiso de entrega.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Decidir qu\u00e9 cambiar si la fecha solicitada no encaja<\/h3>\n\n\n<p>Puede que el planificador tenga que cambiar la prioridad, valorar un recurso alternativo disponible o negociar otra fecha de entrega. Compruebe el efecto sobre los dem\u00e1s pedidos antes de decidir un cambio. Adelantar una tarea urgente puede retrasar la de otro cliente.<\/p>\n\n\n<p>El resultado \u00fatil es un plan de producci\u00f3n factible, una visi\u00f3n clara de las incertidumbres pendientes y una decisi\u00f3n de entrega fundamentada. Una fecha solicitada, por s\u00ed sola, no es ninguna de esas cosas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 cambia cuando llega un pedido urgente o un retraso?<\/h2>\n\n\n<p>Un pedido urgente, una entrega de material tard\u00eda o un cambio de capacidad pueden afectar a varios pedidos que comparten los mismos recursos. Vuelva a revisar las rutas de producci\u00f3n afectadas en lugar de mover \u00fanicamente la \u00faltima operaci\u00f3n en el programa.<\/p>\n\n\n<p>Empiece por lo que ha cambiado. Si un material se retrasa, identifique qu\u00e9 operaciones dependen de \u00e9l. Si no hay capacidad disponible, revise el trabajo asignado a ese recurso y las consecuencias para los pasos posteriores. En el caso de un pedido urgente, decida su prioridad y analice qu\u00e9 compromisos existentes desplaza.<\/p>\n\n\n<p>El planificador decide las prioridades; la programaci\u00f3n con IA sigue esas decisiones. Un programa actualizado ayuda a ver las consecuencias, pero modificar la promesa hecha al cliente sigue siendo una decisi\u00f3n de negocio. Mantenga alineados el plan de producci\u00f3n y los compromisos de entrega comunicados a medida que cambien las condiciones.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo apoya SkyPlanner la programaci\u00f3n de la producci\u00f3n bajo pedido<\/h2>\n\n\n<p><a href=\"\/es\/\">SkyPlanner APS<\/a> genera un programa de producci\u00f3n a partir de pedidos, pasos de proceso y recursos disponibles. Su motor de programaci\u00f3n con IA, Arcturus, asigna el trabajo a las estaciones de trabajo teniendo en cuenta la disponibilidad de materiales, los turnos, las prioridades y las fechas de entrega. La l\u00ednea de tiempo Gantt muestra el plan resultante para que el planificador vea c\u00f3mo comparten capacidad las tareas.<\/p>\n\n\n<p>SkyPlanner se integra con cualquier sistema ERP o MES mediante su REST API abierta. Los pedidos, los materiales y los datos de producci\u00f3n permiten conectar el sistema de gesti\u00f3n existente con la programaci\u00f3n. SkyPlanner no sustituye al ERP, y la integraci\u00f3n mediante la API no debe confundirse con un conector nativo ya preparado para cada sistema.<\/p>\n\n\n<p>Con Autopilot activado, SkyPlanner puede actualizar el programa cuando entran pedidos nuevos, se registran trabajos terminados o cambia la capacidad. Los planificadores conservan el control mediante prioridades y bloqueos. Generar un programa no equivale a confirmar autom\u00e1ticamente una promesa de entrega al cliente.<\/p>\n\n\n<p>Para evaluar c\u00f3mo gestiona la programaci\u00f3n los pedidos que compiten entre s\u00ed, <a href=\"\/es\/prueba\/\">empiece su prueba gratuita<\/a>. Explore el producto con datos de demostraci\u00f3n o siga la ruta de primeros pasos con apoyo de IA en SkyPlanner Assistant. F\u00edjese en si el plan deja claras las dependencias de materiales, la carga de los recursos compartidos y las consecuencias de sus prioridades.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preguntas frecuentes<\/h2>\n\n\n<h3 class=\"wp-block-heading\">\u00bfQu\u00e9 significa fabricaci\u00f3n bajo pedido?<\/h3>\n\n\n<p>En la fabricaci\u00f3n bajo pedido, la producci\u00f3n empieza cuando llega el pedido del cliente. El producto terminado se fabrica para ese pedido, en lugar de salir de un stock de productos fabricados con antelaci\u00f3n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfFabricaci\u00f3n bajo pedido significa que no hay inventario?<\/h3>\n\n\n<p>No. Un fabricante MTO puede tener materiales, componentes y producto en curso. La diferencia principal afecta a los productos terminados: se fabrican para pedidos de clientes en lugar de almacenarse a la espera de esos pedidos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfCu\u00e1l es la diferencia entre fabricaci\u00f3n bajo pedido y fabricaci\u00f3n contra stock?<\/h3>\n\n\n<p>MTO inicia la fabricaci\u00f3n como respuesta a un pedido, de modo que el cliente espera a que se produzca. MTS fabrica los productos terminados antes de recibir pedidos, lo que permite servirlos desde el stock cuando el producto necesario est\u00e1 disponible.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfLa fabricaci\u00f3n bajo pedido es lo mismo que la ingenier\u00eda bajo pedido?<\/h3>\n\n\n<p>No. ETO implica un trabajo de ingenier\u00eda considerable para cada pedido, antes de la fabricaci\u00f3n o a la vez que ella. En MTO se puede partir de un dise\u00f1o de producto existente, aunque son posibles cambios menores espec\u00edficos del pedido.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfLa fabricaci\u00f3n bajo pedido es lo mismo que un job shop?<\/h3>\n\n\n<p>No. MTO describe en qu\u00e9 momento empieza la fabricaci\u00f3n respecto al pedido del cliente. Un job shop describe el flujo de tareas variadas a trav\u00e9s de recursos compartidos. Una f\u00e1brica puede aplicar ambos, pero se refieren a aspectos distintos de la producci\u00f3n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfC\u00f3mo se planifica la fecha de entrega de un pedido en fabricaci\u00f3n bajo pedido?<\/h3>\n\n\n<p>Compruebe la disponibilidad de materiales, la secuencia de operaciones, los recursos productivos aptos y su carga de trabajo actual. Revise cu\u00e1ndo se completa toda la ruta de producci\u00f3n y tenga en cuenta por separado la expedici\u00f3n y el transporte. Si cambian las prioridades, compruebe c\u00f3mo afecta a otros pedidos antes de prometer la fecha.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfPuede SkyPlanner funcionar con nuestro ERP actual?<\/h3>\n\n\n<p>S\u00ed. SkyPlanner se integra con cualquier sistema ERP o MES mediante su REST API abierta. La conexi\u00f3n debe implementarse para el sistema y el flujo de datos concretos; no significa que todos los ERP dispongan del mismo conector nativo ya preparado.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does make to order mean?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Make to order means manufacturing starts after a customer order arrives. The finished product is made for that order rather than shipped from a stock of products manufactured in advance.\"}},{\"@type\":\"Question\",\"name\":\"Does make to order mean there is no inventory?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO manufacturer can hold materials, components and work in progress. The main distinction concerns finished products: they are manufactured for customer orders rather than stocked in anticipation of those orders.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between make to order and make to stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"MTO starts manufacturing in response to an order, so the customer waits for production. MTS manufactures finished products ahead of orders, allowing fulfilment from stock when the required product is available.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as engineer to order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. ETO includes substantial engineering for the individual order before or alongside manufacturing. MTO can use an existing product design, although smaller order-specific changes are possible.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as a job shop?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. MTO describes when manufacturing starts in relation to the customer order. A job shop describes the flow of varied jobs through shared resources. A factory can use both, but they describe different aspects of production.\"}},{\"@type\":\"Question\",\"name\":\"How do you plan a delivery date for a make-to-order job?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Check material availability, the sequence of operations, eligible resources and their existing workload. Review completion of the whole production route, then account separately for dispatch and transport. If priorities change, check the effect on other orders before promising the date.\"}},{\"@type\":\"Question\",\"name\":\"Can SkyPlanner work with our existing ERP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES system through its open REST API. The connection needs to be implemented for the relevant system and data flow; this does not mean every ERP has the same ready-made native connector.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega Inicio &raquo; Recursos &raquo; Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega La producci\u00f3n bajo pedido (MTO) es un enfoque en el que la fabricaci\u00f3n empieza cuando llega el pedido de un cliente. En lugar de enviar un producto terminado desde el almac\u00e9n, el fabricante &#8230; <a title=\"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/\" aria-label=\"Leer m\u00e1s sobre Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2540,306],"tags":[],"class_list":["post-96586","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Producci\u00f3n bajo pedido: planificar fechas de entrega &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega\" \/>\n<meta property=\"og:description\" content=\"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/\"},\"wordCount\":2159,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/\",\"name\":\"Producci\u00f3n bajo pedido: planificar fechas de entrega &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"description\":\"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-bajo-pedido\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Producci\u00f3n bajo pedido: planificar fechas de entrega &#8211; SkyPlanner","description":"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/","og_locale":"es_ES","og_type":"article","og_title":"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega","og_description":"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-08T10:55:09+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"11 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/"},"wordCount":2159,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS &amp; Scheduling","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/","name":"Producci\u00f3n bajo pedido: planificar fechas de entrega &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","description":"La producci\u00f3n bajo pedido arranca al recibir el pedido. Descubra c\u00f3mo comprobar materiales, capacidad y prioridades antes de prometer una fecha de entrega.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-bajo-pedido\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega Inicio &raquo; Recursos &raquo; Producci\u00f3n bajo pedido: c\u00f3mo planificar las fechas de entrega La producci\u00f3n bajo pedido (MTO) es un enfoque en el que la fabricaci\u00f3n empieza cuando llega el pedido de un cliente. En lugar de enviar un producto terminado desde el almac\u00e9n, el fabricante&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/96586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=96586"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/96586\/revisions"}],"predecessor-version":[{"id":96880,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/96586\/revisions\/96880"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=96586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=96586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=96586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}