{"id":111506,"date":"2026-10-27T22:44:45","date_gmt":"2026-10-27T22:44:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111506"},"modified":"2026-10-27T22:45:13","modified_gmt":"2026-10-27T22:45:13","slug":"gestion-de-faltantes-de-materiales","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/","title":{"rendered":"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Un proveedor promete acelerar el env\u00edo de un componente que falta. Compras tiene un plan para resolver la situaci\u00f3n. Pero Producci\u00f3n a\u00fan necesita saber si el componente llegar\u00e1 a tiempo para cumplir el pedido y qu\u00e9 trabajo conviene ejecutar mientras tanto.<\/p>\n\n\n<p>Esa es la verdadera funci\u00f3n de la gesti\u00f3n de faltantes de materiales. Dedicar el mismo esfuerzo a conseguir cada pieza que falta dispersa la atenci\u00f3n entre problemas con consecuencias muy distintas. La medida m\u00e1s \u00fatil es la que permite cumplir una entrega acordada o evitar una parada cuando todav\u00eda hay margen para actuar.<\/p>\n\n\n<p>SkyPlanner APS vincula la disponibilidad de materiales con la capacidad de producci\u00f3n y las prioridades. Una vez confirmado el faltante y decidida la respuesta, convierte esos datos en un programa de producci\u00f3n compartido. As\u00ed, dedica menos tiempo a rehacer las colas de trabajo de las m\u00e1quinas y m\u00e1s a resolver la incidencia que realmente importa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es la gesti\u00f3n de faltantes de materiales en la fabricaci\u00f3n?<\/h2>\n\n\n<p>La gesti\u00f3n de faltantes de materiales consiste en identificar, verificar, priorizar y resolver las carencias de materiales o componentes que ponen en riesgo la producci\u00f3n. Vincula un problema de suministro con el trabajo afectado, el compromiso con el cliente y una medida concreta para recuperar el cumplimiento del pedido.<\/p>\n\n\n<p>Un faltante no siempre significa que las existencias sean cero. Puede haber material en almac\u00e9n, pero no suficiente para todos los pedidos que lo necesitan antes de la pr\u00f3xima recepci\u00f3n. Tambi\u00e9n puede haber existencias que no est\u00e9n disponibles por estar reservadas para otros pedidos, pendientes de inspecci\u00f3n o en una ubicaci\u00f3n que no permite iniciar el trabajo seg\u00fan lo previsto.<\/p>\n\n\n<p>Tampoco todos los faltantes se deben a un incumplimiento del proveedor. Los retrasos en las recepciones, los registros de inventario inexactos, los consumos no registrados, las mermas, los errores en la preparaci\u00f3n de materiales y los cambios en las necesidades de los pedidos pueden dejar una tarea sin el material necesario. Una interrupci\u00f3n general de la cadena de suministro puede provocar faltantes, pero la decisi\u00f3n inmediata en f\u00e1brica sigue siendo concreta: \u00bfqu\u00e9 trabajo est\u00e1 afectado y qu\u00e9 podemos hacer al respecto?<\/p>\n\n\n<p>El <a href=\"\/es\/recursos\/guia-breve-mrp\/\">MRP<\/a> identifica las necesidades de materiales y los d\u00e9ficits de suministro. La <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/\">cobertura de inventario<\/a> ayuda a evaluar hasta cu\u00e1ndo alcanzar\u00e1n las existencias y el suministro previsto. La gesti\u00f3n de faltantes da el siguiente paso: decidir qu\u00e9 d\u00e9ficit confirmado abordar primero y convertir la respuesta en trabajo que Producci\u00f3n pueda ejecutar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Verifique el faltante antes de escalar el problema<\/h2>\n\n\n<p>Empiece por la operaci\u00f3n afectada, no solo por la referencia del material. Un registro de faltantes resulta \u00fatil cuando indica qu\u00e9 falta, d\u00f3nde se necesita y cu\u00e1ndo debe estar en condiciones de uso.<\/p>\n\n\n<p>Re\u00fana estos datos:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>La especificaci\u00f3n y la cantidad del material necesario, incluida la unidad de medida.<\/li><li>La cantidad f\u00edsica utilizable y los compromisos existentes sobre esas existencias.<\/li><li>Los pedidos y las operaciones afectados, con sus compromisos de entrega.<\/li><li>La cantidad pendiente de recibir y una fecha de disponibilidad fiable que contemple, cuando corresponda, la recepci\u00f3n, la inspecci\u00f3n y los traslados internos.<\/li><li>Cualquier otro material que falte o restricci\u00f3n de capacidad que siga impidiendo completar el trabajo.<\/li><li>La persona responsable de la siguiente acci\u00f3n y el momento en que se volver\u00e1 a revisar la situaci\u00f3n.<\/li><\/ul>\n\n\n<p>As\u00ed se evita gastar dinero en resolver el problema equivocado. Si el componente correcto ya est\u00e1 en las instalaciones, pero a\u00fan no ha llegado a la estaci\u00f3n de trabajo, otra compra no permitir\u00e1 iniciar el trabajo de hoy. Si un material recibido est\u00e1 en cuarentena, su presencia en el almac\u00e9n no significa que pueda utilizarse en producci\u00f3n.<\/p>\n\n\n<p>Distinga entre una recepci\u00f3n prevista y una confirmada. Pregunte al proveedor qu\u00e9 se ha terminado o expedido realmente, no solo si mantiene su compromiso inicial. Producci\u00f3n necesita una fecha fiable para planificar; copiar una fecha optimista del pedido de compra de la semana pasada puede ocultar el problema hasta que vuelva a incumplirse un inicio previsto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00e9 prioridad a la entrega que a\u00fan puede cumplir<\/h2>\n\n\n<p>El faltante que afecta a la mayor cantidad de material no es autom\u00e1ticamente el m\u00e1s prioritario. Tampoco lo es el componente m\u00e1s caro ni el pedido de quien m\u00e1s insiste por tel\u00e9fono.<\/p>\n\n\n<p>Ante cada faltante confirmado, preg\u00fantese: <strong>\u00bfqu\u00e9 cambiar\u00eda para la entrega si resolvi\u00e9ramos este faltante?<\/strong> Revise todas las operaciones que le quedan al pedido afectado. Adelantar la llegada del material solo sirve si a\u00fan hay tiempo para el mecanizado, el acabado, el montaje, la inspecci\u00f3n y la expedici\u00f3n, seg\u00fan corresponda.<\/p>\n\n\n<p>Por tanto, la fecha l\u00edmite importante no es solo la de entrega al cliente. Es el \u00faltimo momento en que el material puede estar en condiciones de uso y a\u00fan dejar tiempo para completar la ruta de fabricaci\u00f3n pendiente. Un componente que llega el mi\u00e9rcoles puede permitir cumplir una expedici\u00f3n del jueves, pero llegar demasiado tarde para otra que todav\u00eda requiere una operaci\u00f3n de acabado externa.<\/p>\n\n\n<p>Compare los faltantes con tres preguntas pr\u00e1cticas:<\/p>\n\n\n<p>1. <strong>\u00bfQu\u00e9 est\u00e1 en riesgo?<\/strong> Identifique el compromiso con el cliente, la posible parada de producci\u00f3n o el conjunto de pedidos afectados. Aplique las prioridades de negocio que haya acordado su equipo.<\/p>\n\n\n<p>2. <strong>\u00bfLa medida propuesta permite cumplir el compromiso?<\/strong> Compruebe los dem\u00e1s materiales, las operaciones pendientes y la capacidad disponible. No pague por acelerar el suministro de un componente si otro impide cumplir esa misma entrega.<\/p>\n\n\n<p>3. <strong>\u00bfCu\u00e1nto tiempo queda para actuar?<\/strong> Puede perderse la posibilidad de entregar un pedido a tiempo mientras todos se ocupan de una incidencia menos urgente.<\/p>\n\n\n<p>Algunos faltantes deben escalarse de inmediato porque ponen en riesgo varios pedidos o una ventana de producci\u00f3n cr\u00edtica. Otros pueden esperar a una recepci\u00f3n ordinaria confirmada sin alterar ninguna entrega. Haga visible esa diferencia para que Compras, Producci\u00f3n y Ventas trabajen con las mismas prioridades.<\/p>\n\n\n<p>Cuando no haya una forma viable de cumplir el compromiso, avise al cliente con antelaci\u00f3n y acuerde uno nuevo. Seguir calificando de \u00aburgente\u00bb una fecha imposible no crea el tiempo de producci\u00f3n que falta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Elija una medida que cambie el resultado<\/h2>\n\n\n<p>Acelerar el suministro resulta \u00fatil cuando disponer antes de material utilizable cambia lo que se puede completar. Solicite la cantidad y la fecha de llegada que permitan conseguirlo. Un env\u00edo parcial confirmado puede ser m\u00e1s valioso que una promesa sin confirmar de servir todo el pedido de compra.<\/p>\n\n\n<p>Antes de contratar un transporte urgente m\u00e1s caro, compruebe si Recepci\u00f3n e Inspecci\u00f3n pueden procesar el material a su llegada y si despu\u00e9s estar\u00e1n disponibles los recursos productivos necesarios. Ahorrar tiempo de transporte sirve de poco si luego el material queda esperando una m\u00e1quina hasta despu\u00e9s de la fecha de expedici\u00f3n.<\/p>\n\n\n<p>Las existencias disponibles en otra ubicaci\u00f3n pueden ofrecer una alternativa. Confirme la especificaci\u00f3n, el estado, el tiempo de traslado y los compromisos existentes antes de autorizar su uso. Trasladar un faltante de un cliente a otro es una decisi\u00f3n de negocio, no una correcci\u00f3n de inventario.<\/p>\n\n\n<p>Un material o componente alternativo requiere la aprobaci\u00f3n correspondiente de Ingenier\u00eda y Calidad, adem\u00e1s de la del cliente si el cambio la exige. Una descripci\u00f3n o unas dimensiones similares no autorizan su uso. Tenga en cuenta el tiempo de aprobaci\u00f3n al decidir c\u00f3mo recuperar el cumplimiento del pedido.<\/p>\n\n\n<p>Cambiar la secuencia de trabajo puede mantener la producci\u00f3n en marcha mientras una tarea sigue bloqueada. Elija trabajos que dispongan de los materiales necesarios y cumplan los requisitos previos; despu\u00e9s, compruebe qu\u00e9 recursos compartidos utilizar\u00e1n. Ocupar ahora una m\u00e1quina libre puede ser una mala decisi\u00f3n si con ello se ocupa el hueco de acabado que necesitar\u00e1 el pedido prioritario cuando llegue su material.<\/p>\n\n\n<p>La producci\u00f3n o la entrega parcial tambi\u00e9n pueden ayudar cuando el proceso y lo acordado con el cliente lo permiten. Especifique las cantidades y el compromiso pendiente. De lo contrario, varios pedidos a medio completar pueden consumir un material escaso sin que ninguno quede listo para expedir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ejemplo: un mismo componente, distintas decisiones para cumplir los pedidos<\/h2>\n\n\n<p>Imagine dos pedidos que necesitan 40 unidades cada uno del mismo componente. Solo hay 40 unidades utilizables disponibles. Hay otras 40 confirmadas para el viernes.<\/p>\n\n\n<p>El pedido A debe expedirse el jueves. Los dem\u00e1s materiales est\u00e1n listos y, si recibe los componentes disponibles, queda tiempo para completar las operaciones pendientes antes de la expedici\u00f3n. El pedido B debe entregarse el martes siguiente, pero otro componente que necesita no podr\u00e1 utilizarse hasta el lunes.<\/p>\n\n\n<p><strong>Pedido A.<\/strong> Necesita 40 componentes; los dem\u00e1s materiales est\u00e1n listos y es posible terminarlo el jueves si se reserva la capacidad necesaria para las operaciones pendientes. Autorice el uso de la cantidad disponible para A y reserve capacidad para el resto de su ruta de fabricaci\u00f3n.<\/p>\n\n\n<p><strong>Pedido B.<\/strong> Necesita 40 componentes, pero otro material impide avanzar hasta el lunes. Compruebe si la recepci\u00f3n del viernes permite tener todo listo el lunes y completar las operaciones pendientes para entregar el martes.<\/p>\n\n\n<p><strong>Pedido C, listo para producir.<\/strong> No necesita el componente escaso, pero compite por el mismo recurso de acabado. Progr\u00e1melo \u00fanicamente en un hueco que mantenga libre la capacidad de acabado que necesita A.<\/p>\n\n\n<p>En este caso, asignar la cantidad disponible a A se justifica por el conjunto de condiciones para producir y entregar, no simplemente porque su fecha de entrega sea anterior. Acelerar el suministro de m\u00e1s unidades del componente compartido para B no resolver\u00eda la falta del otro componente, que lo bloquea hasta el lunes.<\/p>\n\n\n<p>Este mismo razonamiento explica por qu\u00e9 \u00abproducir todo lo que est\u00e9 listo\u00bb es una recomendaci\u00f3n incompleta. Fabricar C puede ser \u00fatil, pero no debe ocupar la capacidad que permite recuperar el plazo de A.<\/p>\n\n\n<p>Si el segundo componente previsto para el lunes se retrasa, habr\u00e1 que tomar una nueva decisi\u00f3n sobre B. La lista de faltantes, las cantidades de material comprometidas y el programa de producci\u00f3n deben reflejar ese cambio de forma coherente.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lleve la decisi\u00f3n de recuperaci\u00f3n al programa de producci\u00f3n de SkyPlanner<\/h2>\n\n\n<p>Una lista de faltantes permite identificar qu\u00e9 requiere atenci\u00f3n. Pero, por s\u00ed sola, no permite encajar el trabajo pendiente con todos los dem\u00e1s pedidos de la f\u00e1brica. Ah\u00ed es donde SkyPlanner aporta una ventaja pr\u00e1ctica.<\/p>\n\n\n<p>Cuando est\u00e1 activada la programaci\u00f3n que tiene en cuenta los materiales, SkyPlanner calcula el programa a partir de los materiales vinculados a la producci\u00f3n y los datos actualizados de su disponibilidad. Las fechas de llegada de los pedidos de compra permiten tener en cuenta el suministro previsto al programar las tareas que lo necesitan. Al actualizar una llegada retrasada y recalcular el programa, el cambio se incorpora a la planificaci\u00f3n de la producci\u00f3n en lugar de quedarse en una nota de compras.<\/p>\n\n\n<p>Arcturus, la IA de SkyPlanner para la programaci\u00f3n de la producci\u00f3n, programa las tareas seg\u00fan la capacidad, los turnos, las dependencias entre operaciones y las prioridades configuradas. El resultado se muestra en el <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programa de producci\u00f3n en Gantt<\/a>. Puede revisar cu\u00e1ndo est\u00e1n programadas las tareas afectadas, c\u00f3mo encajan las operaciones pendientes y qu\u00e9 ha cambiado para los dem\u00e1s pedidos.<\/p>\n\n\n<p>En el ejemplo anterior, el planificador primero confirma la cantidad utilizable y autoriza la asignaci\u00f3n del material. Los datos actualizados de materiales y las prioridades elegidas sirven despu\u00e9s de base para recalcular el programa de producci\u00f3n. El planificador revisa la ruta de A, el hecho de que B estar\u00e1 listo para producir m\u00e1s adelante y la posici\u00f3n de C en el programa del recurso compartido. No hace falta reconstruir por separado la cola de trabajo de cada m\u00e1quina para comprender el efecto conjunto sobre la producci\u00f3n.<\/p>\n\n\n<p><strong>Usted decide qu\u00e9 compromisos proteger; SkyPlanner calcula el programa de producci\u00f3n a partir de esas decisiones.<\/strong> Cuando los recursos productivos son limitados, las prioridades de los clientes pueden influir en la secuencia de programaci\u00f3n. As\u00ed se ahorra trabajo de planificaci\u00f3n, mientras que las decisiones comerciales siguen en manos de quienes gestionan la relaci\u00f3n con el cliente.<\/p>\n\n\n<p>SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su API REST abierta. Puede conectar los datos existentes de pedidos y materiales con la programaci\u00f3n de la producci\u00f3n a capacidad finita, sin sustituir un ERP que funciona solo para coordinar el plan de recuperaci\u00f3n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 cambi\u00f3 en Eskomatic al tener mayor visibilidad de los materiales<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/eskomatic\/\">Eskomatic, empresa de mecanizado por encargo<\/a>, organizaba antes las colas de trabajo de forma mayormente manual en un antiguo sistema ERP y de control de producci\u00f3n. La escasa visibilidad de la disponibilidad de materiales hac\u00eda que los faltantes pudieran detectarse muy poco antes del inicio previsto de una tarea.<\/p>\n\n\n<p>Con SkyPlanner, Eskomatic obtuvo una visi\u00f3n m\u00e1s clara de la cola de trabajo en Gantt y de los faltantes de materiales junto con la pr\u00f3xima carga de producci\u00f3n. La empresa se\u00f1ala que se han reducido las paradas de producci\u00f3n por falta de materiales y que la programaci\u00f3n autom\u00e1tica de la carga le permite fijar fechas de entrega m\u00e1s precisas.<\/p>\n\n\n<p>Para un planificador que gestiona faltantes, ese es el cambio \u00fatil: dedicar menos tiempo a averiguar por qu\u00e9 no puede empezar una tarea y contar con una base m\u00e1s clara para decidir qu\u00e9 pedidos a\u00fan pueden entregarse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Complete la acci\u00f3n, no se limite a cerrar la fila de faltantes<\/h2>\n\n\n<p>Asigne a cada acci\u00f3n de recuperaci\u00f3n un responsable y un pr\u00f3ximo punto de revisi\u00f3n. Compras confirma c\u00f3mo se resolver\u00e1 el suministro; los equipos de almac\u00e9n y calidad confirman la disponibilidad de material utilizable; planificaci\u00f3n de la producci\u00f3n actualiza la secuencia; y ventas comunica cualquier cambio en el compromiso de entrega. En una f\u00e1brica peque\u00f1a, una persona puede asumir varias funciones, pero la informaci\u00f3n debe seguir pasando de una funci\u00f3n a otra.<\/p>\n\n\n<p>No d\u00e9 por cerrada una incidencia solo porque el proveedor indique que ha enviado la mercanc\u00eda. Confirme que la cantidad necesaria puede utilizarse, que las tareas afectadas tienen un hueco viable en el programa y que quienes las ejecutan disponen del plan actualizado.<\/p>\n\n\n<p>Despu\u00e9s, aprenda de los problemas que se repiten. Registre el tiempo de parada por falta de materiales, la fiabilidad de los compromisos de recuperaci\u00f3n y qu\u00e9 compromisos de entrega lograron proteger realmente las acciones. Investigue el origen de los errores recurrentes en los registros, los consumos no previstos o las recepciones poco fiables. Reducir el n\u00famero de filas de faltantes abiertas no es un \u00e9xito si los pedidos sin terminar simplemente est\u00e1n esperando en otro lugar.<\/p>\n\n\n<p>Para las f\u00e1bricas que lidian habitualmente con retrasos de materiales y m\u00e1quinas compartidas, SkyPlanner APS ofrece una forma pr\u00e1ctica de convertir las decisiones de recuperaci\u00f3n en un plan de producci\u00f3n viable. Reduce el trabajo manual de conciliar las listas de materiales con las colas de trabajo de las m\u00e1quinas, para que el equipo pueda centrarse en proteger las entregas.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">Reserve una demostraci\u00f3n de SkyPlanner<\/a> y aporte un caso real de falta de material, los pedidos que lo consumen y una fecha de llegada confirmada. El caso servir\u00e1 para analizar qu\u00e9 se puede producir ahora, qu\u00e9 debe esperar y c\u00f3mo afecta la decisi\u00f3n al resto de la producci\u00f3n. Si prefiere explorar primero, <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a> o utilice el proceso de primeros pasos con ayuda de IA del Asistente de SkyPlanner.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha Inicio &raquo; Recursos &raquo; Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha Un proveedor promete acelerar el env\u00edo de un componente que falta. Compras tiene un plan para resolver la situaci\u00f3n. Pero Producci\u00f3n a\u00fan necesita saber si el componente llegar\u00e1 a tiempo para &#8230; <a title=\"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/\" aria-label=\"Leer m\u00e1s sobre Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":111530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2540,306],"tags":[],"class_list":["post-111506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-y-programacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gesti\u00f3n de faltantes de materiales: pedidos en marcha<\/title>\n<meta name=\"description\" content=\"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha\" \/>\n<meta property=\"og:description\" content=\"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T22:44:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T22:45:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/\"},\"wordCount\":2713,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"articleSection\":[\"APS y programaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/\",\"name\":\"Gesti\u00f3n de faltantes de materiales: pedidos en marcha\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:13+00:00\",\"description\":\"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"An assembly waits for a missing component while available parts keep another assembly moving.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/gestion-de-faltantes-de-materiales\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gesti\u00f3n de faltantes de materiales: pedidos en marcha","description":"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/","og_locale":"es_ES","og_type":"article","og_title":"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha","og_description":"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T22:44:45+00:00","article_modified_time":"2026-10-27T22:45:13+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:13+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/"},"wordCount":2713,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","articleSection":["APS y programaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/","name":"Gesti\u00f3n de faltantes de materiales: pedidos en marcha","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:13+00:00","description":"Priorice los faltantes, proteja las entregas y use SkyPlanner para crear un programa de producci\u00f3n viable con los materiales disponibles.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","width":1774,"height":887,"caption":"An assembly waits for a missing component while available parts keep another assembly moving."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/gestion-de-faltantes-de-materiales\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha Inicio &raquo; Recursos &raquo; Gesti\u00f3n de faltantes de materiales: mantenga los pedidos en marcha Un proveedor promete acelerar el env\u00edo de un componente que falta. Compras tiene un plan para resolver la situaci\u00f3n. Pero Producci\u00f3n a\u00fan necesita saber si el componente llegar\u00e1 a tiempo para&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=111506"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111506\/revisions"}],"predecessor-version":[{"id":111570,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111506\/revisions\/111570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/111530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=111506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=111506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=111506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}