{"id":111227,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111227"},"modified":"2026-10-27T16:31:53","modified_gmt":"2026-10-27T16:31:53","slug":"cobertura-de-inventario","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/","title":{"rendered":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>El informe de existencias indica que hay componentes suficientes para siete d\u00edas laborables. La pr\u00f3xima entrega est\u00e1 prevista para el viernes. Sin embargo, la orden de producci\u00f3n del jueves no dispone de la cantidad necesaria para empezar.<\/p>\n\n\n<p>No hay contradicci\u00f3n: disponer de material para siete d\u00edas seg\u00fan el consumo medio no equivale a cubrir las \u00f3rdenes que realmente van a pasar por la f\u00e1brica. Un lote grande, material bloqueado por calidad o existencias ya comprometidas para otros trabajos pueden cambiar el resultado.<\/p>\n\n\n<p>La cobertura de inventario ayuda a detectar ese desfase antes de que provoque una parada. En fabricaci\u00f3n, la pregunta \u00fatil es concreta: <strong>\u00bfcu\u00e1l es la primera necesidad que ya no podemos cubrir y llegar\u00e1 material de reposici\u00f3n utilizable antes de esa fecha?<\/strong> SkyPlanner APS vincula la disponibilidad de materiales con el programa de producci\u00f3n, para que la respuesta tenga en cuenta la capacidad de las m\u00e1quinas y los compromisos de entrega, adem\u00e1s de las existencias.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es la cobertura de inventario en fabricaci\u00f3n?<\/h2>\n\n\n<p>La cobertura de inventario es el tiempo durante el cual una cantidad determinada de existencias puede satisfacer la demanda. Suele expresarse en d\u00edas o semanas. En fabricaci\u00f3n, esa demanda puede corresponder a los componentes o las materias primas que necesitan las pr\u00f3ximas tareas de producci\u00f3n, y no a los productos terminados que se venden a los clientes.<\/p>\n\n\n<p>La cifra debe tener una base de c\u00e1lculo clara. La cobertura de un componente en una f\u00e1brica no es lo mismo que una medida de las existencias de toda la empresa. Tampoco es igual calcular la cobertura solo con el stock ya disponible que incluir las entradas previstas.<\/p>\n\n\n<p>Para obtener una estimaci\u00f3n r\u00e1pida con un consumo estable, utilice esta f\u00f3rmula:<\/p>\n\n\n<p><strong>Cobertura de inventario = cantidad de stock utilizable \u00f7 cantidad consumida al d\u00eda<\/strong><\/p>\n\n\n<p>Mantenga la coherencia entre las unidades y la base temporal. Si hay 420 componentes utilizables y el consumo medio es de 60 componentes por d\u00eda laborable, la cobertura estimada es de siete d\u00edas laborables. No la compare directamente con un lead time del proveedor expresado en d\u00edas naturales sin ajustar antes ambos calendarios.<\/p>\n\n\n<p>Esta estimaci\u00f3n permite identificar los materiales que requieren atenci\u00f3n. Cuando el consumo var\u00eda seg\u00fan la orden, conviene calcular la cobertura futura a partir de las necesidades y sus fechas. Un componente que se consume en grandes lotes no sale del almac\u00e9n al ritmo diario uniforme que sugiere la media.<\/p>\n\n\n<h3 class=\"wp-block-heading\">La cobertura no es la rotaci\u00f3n de inventarios ni el DIO<\/h3>\n\n\n<p>La <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/rotacion-de-inventarios\/\">rotaci\u00f3n de inventarios<\/a> y los d\u00edas de inventario, o DIO, describen el movimiento de las existencias o su tiempo de permanencia a partir de los datos financieros de un periodo. Ayudan a evaluar la gesti\u00f3n del inventario, pero no indican al planificador si un componente concreto estar\u00e1 disponible para la tarea del jueves.<\/p>\n\n\n<p>Para tomar esa decisi\u00f3n, utilice cantidades del mismo art\u00edculo y las fechas en que se necesitan. No divida una cantidad de componentes entre el coste de los productos vendidos ni d\u00e9 por hecho que un indicador hist\u00f3rico de d\u00edas de inventario demuestra que habr\u00e1 material disponible en el futuro.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Parta de las existencias que producci\u00f3n puede utilizar realmente<\/h2>\n\n\n<p>Antes de calcular la cobertura, compruebe y ajuste el saldo inicial. El recuento f\u00edsico puede incluir material presente en el almac\u00e9n que no est\u00e1 disponible para las tareas que se est\u00e1n evaluando.<\/p>\n\n\n<p>Distinga estos cuatro conceptos:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Existencias f\u00edsicas:<\/strong> la cantidad registrada como presente en la ubicaci\u00f3n correspondiente.<\/li><li><strong>Stock no disponible:<\/strong> material bloqueado por calidad, existencias da\u00f1adas, material caducado o material cuyas especificaciones no sirven para la tarea.<\/li><li><strong>Stock comprometido:<\/strong> material asignado a otros trabajos, cuya asignaci\u00f3n debe respetarse en el c\u00e1lculo.<\/li><li><strong>Entradas previstas:<\/strong> cantidades que pueden estar disponibles m\u00e1s adelante, no existencias que ya est\u00e9n en el almac\u00e9n.<\/li><\/ul>\n\n\n<p>Lo fundamental es que el saldo inicial y la lista de necesidades sean coherentes. Si una cantidad asignada ya se ha descontado del saldo inicial, no vuelva a restar esa misma necesidad m\u00e1s adelante. En cambio, si parte del stock utilizable antes de descontar las asignaciones, incluya las necesidades pendientes que lo consumir\u00e1n.<\/p>\n\n\n<p>Por ejemplo, cuando un sistema muestra \u00abstock libre\u00bb, compruebe qu\u00e9 se ha descontado para obtener esa cifra. Restar todas las \u00f3rdenes abiertas de un saldo que ya las excluye generar\u00e1 una falta de material ficticia.<\/p>\n\n\n<p>Distinga tambi\u00e9n entre una alerta de <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/stock-de-seguridad\/\">stock de seguridad<\/a> y una falta f\u00edsica de material. Caer por debajo de esa reserva puede exigir medidas antes de que quede alguna tarea sin cubrir. Indique qu\u00e9 l\u00edmite utiliza la cifra de cobertura: alcanzar el stock de seguridad o dejar de cubrir una necesidad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Calcule la cobertura futura seg\u00fan las pr\u00f3ximas tareas<\/h2>\n\n\n<p>Si la demanda de producci\u00f3n de un material es variable, revise las necesidades en orden cronol\u00f3gico. Parta del saldo utilizable ya comprobado, reste cada necesidad incluida en la fecha en que se requiera el material y sume cada entrada solo cuando se prevea que esa cantidad estar\u00e1 disponible para su uso.<\/p>\n\n\n<p>El saldo previsto en cada momento se calcula as\u00ed:<\/p>\n\n\n<p><strong>Saldo previsto = stock utilizable inicial + entradas utilizables hasta ese momento \u2212 necesidades incluidas hasta ese momento<\/strong><\/p>\n\n\n<p>Identifique la primera necesidad que la cantidad disponible no pueda cubrir por completo. Ese es el momento clave para evitar una falta de material, aunque una entrada posterior haga que el saldo al final de la semana parezca suficiente.<\/p>\n\n\n<p>Utilice la fecha en que se necesita el material, no d\u00e9 por hecho que corresponde a la fecha de expedici\u00f3n de la orden terminada. Una pieza en bruto comprada que se necesita para mecanizar el martes no puede esperar hasta que el conjunto se expida el viernes.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ejemplo: siete d\u00edas de cobertura media, pero falta material el jueves<\/h3>\n\n\n<p>Imagine que el lunes por la ma\u00f1ana un fabricante revisa las existencias de un componente que adquiere a un proveedor. Hay 600 piezas f\u00edsicamente en el almac\u00e9n. De ellas, 100 est\u00e1n bloqueadas por calidad y 80 est\u00e1n asignadas a otros trabajos ajenos a este ejemplo. Por tanto, el saldo inicial utilizable para las tareas siguientes es de 420 piezas.<\/p>\n\n\n<p>Las tareas incluidas necesitan 120 piezas el lunes, 180 el martes y 160 el jueves. Estas necesidades a\u00fan no se han descontado del saldo inicial de 420 piezas. Se espera que una entrada de compra de 200 piezas est\u00e9 disponible para su uso el viernes por la ma\u00f1ana.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Momento del programa<\/th><th>Necesidad o entrada utilizable<\/th><th>Saldo previsto<\/th><\/tr><\/thead><tbody><tr><td>Inicio del lunes<\/td><td>Stock utilizable inicial<\/td><td>420 piezas<\/td><\/tr><tr><td>Tarea del lunes<\/td><td>Se necesitan 120 piezas<\/td><td>300 piezas<\/td><\/tr><tr><td>Tarea del martes<\/td><td>Se necesitan 180 piezas<\/td><td>120 piezas<\/td><\/tr><tr><td>Tarea del jueves<\/td><td>Se necesitan 160 piezas<\/td><td>Faltan 40 piezas<\/td><\/tr><tr><td>Entrada del viernes<\/td><td>200 piezas pasan a estar disponibles para su uso<\/td><td>160 piezas tras cubrir todas las necesidades indicadas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Con el consumo medio reciente de 60 piezas por d\u00eda laborable, el stock inicial parece ofrecer siete d\u00edas laborables de cobertura. Sin embargo, las tareas reales revelan algo m\u00e1s urgente: faltan 40 piezas para cubrir la necesidad del jueves. La entrada del viernes no llega a tiempo para cubrirla.<\/p>\n\n\n<p>La \u00faltima fila es una proyecci\u00f3n para planificar; no significa que producci\u00f3n pueda retirar material que no hay en existencias. Se da por hecho que la necesidad del jueves que ha quedado sin cubrir sigue pendiente. Al reprogramar la tarea, tambi\u00e9n deben desplazarse la fecha en que realmente se necesita el material y la fecha de finalizaci\u00f3n.<\/p>\n\n\n<p>Ahora el mensaje para compras es preciso y permite actuar: conseguir al menos las 40 piezas utilizables que faltan antes de la operaci\u00f3n del jueves que las consume, o acordar otro plan de producci\u00f3n. Decir \u00abtenemos existencias para siete d\u00edas\u00bb no transmitir\u00eda esa urgencia.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cuente con la reposici\u00f3n cuando el material pueda utilizarse<\/h2>\n\n\n<p>Una orden de compra puede aportar la cantidad de material que faltar\u00e1 m\u00e1s adelante, pero no necesariamente a tiempo. Compruebe si la fecha prevista corresponde a la llegada a las instalaciones, a la recepci\u00f3n completada o a la liberaci\u00f3n del material para producci\u00f3n. La recepci\u00f3n, la inspecci\u00f3n y los movimientos internos pueden hacer que transcurra un tiempo entre esos momentos.<\/p>\n\n\n<p>Para una tarea cr\u00edtica, planificar por d\u00edas puede no ofrecer suficiente precisi\u00f3n. Una entrega prevista para \u00faltima hora del jueves no permite realizar una operaci\u00f3n el jueves por la ma\u00f1ana. Utilice una escala temporal m\u00e1s detallada cuando esa diferencia cambie la decisi\u00f3n.<\/p>\n\n\n<p>Mantenga claras dos perspectivas: qu\u00e9 necesidades cubren por s\u00ed solas las existencias utilizables actuales y cu\u00e1les cubre el plan al incluir las recepciones previstas que sean fiables. As\u00ed podr\u00e1 ver tanto la dependencia de la reposici\u00f3n como las consecuencias de un retraso.<\/p>\n\n\n<p>Si las necesidades est\u00e1n cubiertas durante todo el periodo analizado, indique \u00abnecesidades cubiertas hasta el final del horizonte de planificaci\u00f3n\u00bb. Esto no significa que las existencias vayan a durar indefinidamente. Si no hay consumo previsto, dividir entre cero tampoco permite tomar una decisi\u00f3n de reposici\u00f3n con sentido.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00bfCu\u00e1nta cobertura es suficiente?<\/h3>\n\n\n<p>No existe un \u00fanico objetivo v\u00e1lido para todos los materiales de fabricaci\u00f3n. El margen de protecci\u00f3n adecuado depende del tiempo de reposici\u00f3n, la variabilidad, la criticidad, la vida \u00fatil y las consecuencias de una falta de material.<\/p>\n\n\n<p>Una primera comprobaci\u00f3n razonable es determinar si el suministro utilizable cubre la demanda hasta que pueda usarse la siguiente reposici\u00f3n fiable, con el margen de protecci\u00f3n que exige su pol\u00edtica de inventario. Un componente de bajo coste capaz de detener todo un montaje puede merecer m\u00e1s atenci\u00f3n que un art\u00edculo mucho m\u00e1s caro pero f\u00e1cil de sustituir.<\/p>\n\n\n<p>No compre m\u00e1s de todos los art\u00edculos solo para mejorar una cifra de cobertura. Investigue si el riesgo aparente se debe a una falta real de suministro, a datos de inventario incorrectos, a necesidades desactualizadas o a una fecha de recepci\u00f3n poco realista.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Elija una respuesta que proteja la producci\u00f3n y las entregas<\/h2>\n\n\n<p>Una vez identificada la primera necesidad sin cubrir, decida qu\u00e9 cambio permite resolverla. En el ejemplo, adelantar una entrega parcial podr\u00eda cubrir las 40 piezas que faltan. En otros casos, puede ser necesario recurrir a un material alternativo aprobado, cambiar la cantidad del lote o modificar la secuencia de tareas.<\/p>\n\n\n<p>Cada opci\u00f3n tiene consecuencias para la producci\u00f3n. Un material alternativo necesita la aprobaci\u00f3n t\u00e9cnica correspondiente. Un lote m\u00e1s peque\u00f1o puede requerir m\u00e1s trabajo de preparaci\u00f3n. Adelantar otro pedido puede mantener una m\u00e1quina ocupada, pero retrasar la entrega al cliente cuyo material estaba previsto procesar en esa franja.<\/p>\n\n\n<p>Por eso, el an\u00e1lisis de cobertura debe trasladarse a la <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programaci\u00f3n de la producci\u00f3n<\/a>, no quedarse en una actuaci\u00f3n de compras. Aunque el proveedor adelante el env\u00edo de las piezas que faltan, puede que la franja reservada en la m\u00e1quina ya no est\u00e9 disponible y que el trabajo posterior ya no pueda completarse antes de la expedici\u00f3n.<\/p>\n\n\n<p>Eval\u00fae ambas cuestiones a la vez: <strong>\u00bfestar\u00e1 disponible el material y se podr\u00e1 completar a tiempo el trabajo restante?<\/strong> As\u00ed evitar\u00e1 que una decisi\u00f3n de inventario razonable por s\u00ed sola genere, sin advertirlo, otro problema de entrega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Convierta la disponibilidad de materiales en un programa viable con SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS incluye los materiales y las recepciones de pedidos de compra en el mismo c\u00e1lculo de programaci\u00f3n que los recursos de producci\u00f3n, los turnos, las prioridades y las dependencias entre operaciones. Al activar la programaci\u00f3n que tiene en cuenta los materiales mediante la regla Considerar los materiales, SkyPlanner comprueba la disponibilidad de los materiales definidos para el trabajo al programar las tareas que los utilizan.<\/p>\n\n\n<p>La ventaja es que las decisiones sobre materiales no se quedan en una lista de inventario independiente. Arcturus, la IA de SkyPlanner para la programaci\u00f3n, calcula el programa de producci\u00f3n a partir de los datos de disponibilidad que se mantienen en el sistema y de la capacidad configurada. El diagrama de Gantt muestra la secuencia de trabajo resultante y permite ver el impacto en las entregas sin rehacer manualmente la cola de trabajo de cada m\u00e1quina.<\/p>\n\n\n<p>Las fechas de las compras tienen una funci\u00f3n pr\u00e1ctica en ese plan. SkyPlanner interpreta la fecha de entrega introducida en una orden de compra como la fecha prevista de disponibilidad del material. Al confirmar la orden de compra como Entregada cuando llega el material, se actualizan las existencias. De este modo, el suministro previsto y las existencias recibidas siguen diferenciados.<\/p>\n\n\n<p>Volvamos a la falta de material del jueves. Con la recepci\u00f3n prevista para el viernes, mantenga actualizada esa informaci\u00f3n de llegada y recalcule el programa. Revise d\u00f3nde encaja ahora el trabajo afectado junto con los dem\u00e1s pedidos, incluidas las operaciones posteriores. Si compras consigue adelantar la entrega, utilice la nueva disponibilidad para evaluar el programa resultante, en lugar de dar por hecho que ya se puede volver a cumplir la fecha de entrega prometida originalmente.<\/p>\n\n\n<p>Usted fija las prioridades; Arcturus se encarga del c\u00e1lculo de la programaci\u00f3n. As\u00ed, planificaci\u00f3n y compras disponen de una base com\u00fan para elegir c\u00f3mo actuar y dedican menos tiempo a conciliar listas de existencias y planes de m\u00e1quinas separados.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Qu\u00e9 cambi\u00f3 para Eskomatic<\/h3>\n\n\n<p>La empresa de mecanizado por contrato Eskomatic trabajaba con colas de tareas gestionadas en gran medida de forma manual y ten\u00eda poca visibilidad de la disponibilidad de materiales en su antiguo entorno de control de producci\u00f3n. Una falta de material pod\u00eda detectarse demasiado cerca del inicio previsto de una tarea, cuando apenas quedaba margen de reacci\u00f3n.<\/p>\n\n\n<p>Con la implantaci\u00f3n de SkyPlanner, una cola de trabajo visual en Gantt, la programaci\u00f3n automatizada de la carga y una mayor visibilidad de la falta de materiales aportaron claridad a la planificaci\u00f3n diaria. <a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/eskomatic\/\">Eskomatic se\u00f1ala<\/a> que se han reducido las paradas de producci\u00f3n por falta de material y que las fechas de entrega se fijan con mayor precisi\u00f3n.<\/p>\n\n\n<p>Esta experiencia demuestra por qu\u00e9 es importante vincular los materiales con el plan de producci\u00f3n: los planificadores pueden gestionar el impacto en el trabajo y en los compromisos con los clientes, en lugar de descubrir la falta de material a pie de m\u00e1quina.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vea qu\u00e9 cambiar\u00eda en su f\u00e1brica si se retrasara un material<\/h2>\n\n\n<p>SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su API REST abierta. Puede conectar sus datos actuales de pedidos y materiales con la programaci\u00f3n de la producci\u00f3n a capacidad finita, en lugar de mantener colas de trabajo separadas que deban conciliarse manualmente.<\/p>\n\n\n<p>Para centrar la demostraci\u00f3n de SkyPlanner en un caso concreto, aporte un componente importante, las tareas que lo consumen y un retraso reciente en su reposici\u00f3n. Pida que le muestren c\u00f3mo afecta la fecha de llegada registrada al programa compartido y a las fechas de entrega. Es una forma pr\u00e1ctica de evaluar el valor m\u00e1s all\u00e1 de una cifra de cobertura de inventario.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">Reserve una demostraci\u00f3n de SkyPlanner<\/a> para analizar su situaci\u00f3n de producci\u00f3n, o <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a> si prefiere conocer primero el flujo de programaci\u00f3n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock? Inicio &raquo; Recursos &raquo; Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock? El informe de existencias indica que hay componentes suficientes para siete d\u00edas laborables. La pr\u00f3xima entrega est\u00e1 prevista para el viernes. Sin embargo, la orden de producci\u00f3n del jueves no dispone de la cantidad necesaria &#8230; <a title=\"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/\" aria-label=\"Leer m\u00e1s sobre Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2540,306],"tags":[],"class_list":["post-111227","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-y-programacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?<\/title>\n<meta name=\"description\" content=\"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\" \/>\n<meta property=\"og:description\" content=\"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:31:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:31:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/\"},\"wordCount\":2628,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS y programaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/\",\"name\":\"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:31:53+00:00\",\"description\":\"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cobertura-de-inventario\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?","description":"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/","og_locale":"es_ES","og_type":"article","og_title":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?","og_description":"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:31:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:31:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/"},"wordCount":2628,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS y programaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/","name":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:31:53+00:00","description":"Detecte el primer faltante antes de parar la producci\u00f3n. Calcule la cobertura de inventario para pr\u00f3ximas tareas y conecte disponibilidad y programa de SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cobertura-de-inventario\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock? Inicio &raquo; Recursos &raquo; Cobertura de inventario en fabricaci\u00f3n: \u00bfbastar\u00e1 el stock? El informe de existencias indica que hay componentes suficientes para siete d\u00edas laborables. La pr\u00f3xima entrega est\u00e1 prevista para el viernes. Sin embargo, la orden de producci\u00f3n del jueves no dispone de la cantidad necesaria&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=111227"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111227\/revisions"}],"predecessor-version":[{"id":111291,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/111227\/revisions\/111291"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=111227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=111227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=111227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}