{"id":105329,"date":"2026-10-21T21:17:22","date_gmt":"2026-10-21T21:17:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105329"},"modified":"2026-10-21T21:17:59","modified_gmt":"2026-10-21T21:17:59","slug":"analisis-abc-de-inventarios","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/","title":{"rendered":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>El an\u00e1lisis ABC de inventarios agrupa los art\u00edculos seg\u00fan su valor de consumo anual: la cantidad utilizada en un a\u00f1o multiplicada por el coste unitario. Los art\u00edculos A representan la mayor parte de ese valor; los B, la siguiente, y los C, el resto. El objetivo es concentrar los esfuerzos de control del inventario donde tengan mayor impacto econ\u00f3mico.<\/p>\n\n\n<p>Para un fabricante, hay otra pregunta importante: \u00bfqu\u00e9 art\u00edculo podr\u00eda paralizar una orden si faltara? Un tornillo barato puede pertenecer a la clase C y, aun as\u00ed, bloquear todo un montaje. El an\u00e1lisis ABC indica en qu\u00e9 se gasta el dinero, pero no qu\u00e9 tareas pueden iniciarse sin riesgo de que falten materiales.<\/p>\n\n\n<p>Utilice la clasificaci\u00f3n para establecer pol\u00edticas de compras y control de existencias adecuadas. Despu\u00e9s, vincule la disponibilidad de materiales con el programa de producci\u00f3n mediante SkyPlanner APS. As\u00ed, la falta de un componente barato recibir\u00e1 atenci\u00f3n cuando ponga en riesgo la entrega, no solo cuando su gasto anual sea elevado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 significan realmente A, B y C<\/h2>\n\n\n<p>En un an\u00e1lisis del valor de consumo, las clases describen c\u00f3mo se concentra el gasto, no la calidad, el margen de beneficio ni la prioridad de producci\u00f3n.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Los art\u00edculos A<\/strong> constituyen el primer grupo y concentran la mayor parte del valor de consumo anual. Requieren un seguimiento estrecho de la exactitud del inventario, los compromisos de compra y el exceso de existencias.<\/li><li><strong>Los art\u00edculos B<\/strong> representan la siguiente parte del valor. Suele ser m\u00e1s razonable aplicar controles est\u00e1ndar y revisiones peri\u00f3dicas que gestionar cada art\u00edculo como una excepci\u00f3n.<\/li><li><strong>Los art\u00edculos C<\/strong> representan la parte restante, de menor peso en el valor de consumo. A menudo, la oportunidad est\u00e1 en simplificar la reposici\u00f3n habitual y la gesti\u00f3n administrativa sin exponer la producci\u00f3n a faltantes evitables.<\/li><\/ul>\n\n\n<p>Un punto de partida habitual es asignar aproximadamente el 80% del valor de consumo a la clase A, el siguiente 15% a la B y el 5% restante a la C. Estos l\u00edmites responden a una pol\u00edtica de gesti\u00f3n; no son reglas universales. La distribuci\u00f3n real de sus art\u00edculos puede ser distinta.<\/p>\n\n\n<p>La conocida idea del 80\/20 describe c\u00f3mo el valor puede concentrarse en un grupo relativamente peque\u00f1o de art\u00edculos. No exige que exactamente el 20% de las referencias pertenezca a la clase A. Calcule primero la distribuci\u00f3n, en lugar de forzar el n\u00famero de art\u00edculos para ajustarlo a un patr\u00f3n predeterminado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo calcular las clases ABC del inventario<\/h2>\n\n\n<p>Empiece por un conjunto bien definido, por ejemplo, los materiales y componentes comprados que utiliza una planta. Use el mismo periodo de doce meses y un \u00fanico criterio de coste. No mezcle en una misma clasificaci\u00f3n el consumo de materias primas y el valor \u00edntegro de los productos terminados sin tener en cuenta el solapamiento: podr\u00eda contabilizar dos veces el valor del mismo material.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Recopile el consumo y el coste unitario<\/h3>\n\n\n<p>Para cada referencia, registre la cantidad consumida durante el periodo y su coste unitario. Aseg\u00farese de que las unidades coincidan: una cantidad expresada en piezas requiere un coste por pieza, no por caja. Utilice la misma moneda y un criterio de valoraci\u00f3n uniforme en toda la lista.<\/p>\n\n\n<p>El consumo hist\u00f3rico es un punto de partida pr\u00e1ctico, pero compruebe si refleja el trabajo previsto. Un producto descatalogado, un nuevo contrato o un periodo en el que la falta de materiales limit\u00f3 el consumo pueden hacer que los datos del \u00faltimo a\u00f1o resulten enga\u00f1osos. Si opta por utilizar el consumo anual previsto, ind\u00edquelo claramente y aplique ese criterio de forma uniforme.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Calcule el valor de consumo anual<\/h3>\n\n\n<p><strong>Valor de consumo anual = cantidad anual consumida \u00d7 coste unitario<\/strong><\/p>\n\n\n<p>Este valor corresponde al consumo a lo largo de un a\u00f1o, no a las existencias actuales. Un art\u00edculo puede tener pocas unidades en almac\u00e9n y, aun as\u00ed, representar un gasto anual elevado porque se repone con frecuencia.<\/p>\n\n\n<p>Tampoco se trata del precio de venta ni de los ingresos por ventas. En este an\u00e1lisis de materiales de fabricaci\u00f3n, los art\u00edculos se ordenan seg\u00fan el coste de lo que consume la producci\u00f3n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Ordene de mayor a menor valor<\/h3>\n\n\n<p>Sume los valores de consumo anual para obtener el total y, despu\u00e9s, ordene las filas de los art\u00edculos de mayor a menor valor. No los ordene solo por el precio unitario. Un material barato que se utiliza en grandes cantidades puede quedar por encima de una pieza costosa que se usa de forma ocasional.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Calcule el porcentaje de cada art\u00edculo y el porcentaje acumulado<\/h3>\n\n\n<p><strong>Porcentaje del valor del art\u00edculo = valor de consumo anual del art\u00edculo \u00f7 valor de consumo anual total \u00d7 100%<\/strong><\/p>\n\n\n<p>El porcentaje acumulado se obtiene sumando los porcentajes a medida que se avanza por la lista ordenada. Ese acumulado indica d\u00f3nde establecer los l\u00edmites entre clases.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Asigne las clases seg\u00fan un criterio de corte expl\u00edcito<\/h3>\n\n\n<p>Con una pol\u00edtica 80\/15\/5, asigne art\u00edculos a la clase A hasta que el valor acumulado alcance o supere el 80%. Despu\u00e9s, contin\u00fae con la B hasta alcanzar o superar el 95%. Los art\u00edculos restantes pertenecen a la C. Mantenga cada referencia \u00edntegramente en una sola clase.<\/p>\n\n\n<p>Con este criterio, el art\u00edculo que hace superar un l\u00edmite se incluye en la clase que se est\u00e1 completando. Si al a\u00f1adir el siguiente art\u00edculo la clase A pasa del 79% al 83%, ese art\u00edculo sigue siendo A y la B comienza en la fila siguiente. Tambi\u00e9n puede utilizar otro criterio coherente; deje constancia del elegido para que otro analista pueda reproducir el resultado. Aplique asimismo un criterio uniforme a los art\u00edculos con el mismo valor, para que un cambio en el orden no provoque cambios de clase sin explicaci\u00f3n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ejemplo pr\u00e1ctico: un art\u00edculo C puede utilizarse miles de veces<\/h2>\n\n\n<p>Imagine que un fabricante analiza seis materiales comprados. Las cifras siguientes son ilustrativas, no resultados de clientes. El valor de consumo anual suma <strong>$100.000<\/strong>. Las filas est\u00e1n ordenadas por ese valor; las dos filas con el mismo valor conservan el orden de la lista original de art\u00edculos.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Material<\/th><th>Consumo anual<\/th><th>Coste unitario<\/th><th>Valor de consumo anual<\/th><th>Porcentaje del total<\/th><th>Porcentaje acumulado<\/th><th>Clase<\/th><\/tr><\/thead><tbody><tr><td>Motores<\/td><td>200<\/td><td>$300,00<\/td><td>$60.000<\/td><td>60%<\/td><td>60%<\/td><td>A<\/td><\/tr><tr><td>Carcasas<\/td><td>400<\/td><td>$50,00<\/td><td>$20.000<\/td><td>20%<\/td><td>80%<\/td><td>A<\/td><\/tr><tr><td>Ejes<\/td><td>600<\/td><td>$20,00<\/td><td>$12.000<\/td><td>12%<\/td><td>92%<\/td><td>B<\/td><\/tr><tr><td>Juntas<\/td><td>6.000<\/td><td>$0,50<\/td><td>$3.000<\/td><td>3%<\/td><td>95%<\/td><td>B<\/td><\/tr><tr><td>Tornillos<\/td><td>30.000<\/td><td>$0,10<\/td><td>$3.000<\/td><td>3%<\/td><td>98%<\/td><td>C<\/td><\/tr><tr><td>Etiquetas<\/td><td>100.000<\/td><td>$0,02<\/td><td>$2.000<\/td><td>2%<\/td><td>100%<\/td><td>C<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Para las carcasas, el c\u00e1lculo es 400 \u00d7 $50 = $20.000. Al dividirlo entre $100.000, se obtiene un 20% del total. Sumado al 60% de los motores, el porcentaje acumulado alcanza el 80% y se completa la clase A.<\/p>\n\n\n<p>Los ejes y las juntas suman un 15%, con lo que la clase B se completa al llegar al 95% acumulado. Los tornillos y las etiquetas representan el 5% final, por lo que pertenecen a la clase C seg\u00fan esta pol\u00edtica.<\/p>\n\n\n<p>Conviene fijarse en lo que el c\u00e1lculo no indica. El fabricante consume 30.000 tornillos y, aun as\u00ed, siguen siendo C porque su coste anual es relativamente peque\u00f1o. La clase C no significa que se utilicen poco, que sean obsoletos ni que se pueda agotar su stock sin consecuencias. Del mismo modo, pertenecer a la clase A no implica que los motores deban recibir prioridad autom\u00e1tica en la cola de trabajo de las m\u00e1quinas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Aplique controles distintos a cada clase<\/h2>\n\n\n<p>La clasificaci\u00f3n aporta valor cuando cambia la forma de trabajar. Asigne a cada clase una pol\u00edtica de control, un responsable y una rutina de revisi\u00f3n, en lugar de limitarse a a\u00f1adir una letra al maestro de art\u00edculos.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Clase<\/th><th>Qu\u00e9 controlar en la pr\u00e1ctica<\/th><th>Qu\u00e9 evitar<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>Revisar de cerca los compromisos de compra y el exceso de existencias; comprobar con frecuencia la exactitud del inventario cuando los errores supongan un riesgo econ\u00f3mico importante; vigilar los cambios en la demanda y los costes.<\/td><td>Comprar existencias adicionales solo porque un art\u00edculo sea de clase A, o reducirlas tanto que se comprometa la fiabilidad del suministro.<\/td><\/tr><tr><td>B<\/td><td>Aplicar una pol\u00edtica est\u00e1ndar de reposici\u00f3n y revisar peri\u00f3dicamente las excepciones; analizar los art\u00edculos cuyo valor o comportamiento de suministro est\u00e9 cambiando.<\/td><td>Dejar el grupo intermedio sin gestionar, entre los controles estrictos de la clase A y las rutinas sencillas de la clase C.<\/td><\/tr><tr><td>C<\/td><td>Reducir el trabajo de gesti\u00f3n con tama\u00f1os de envase adecuados, reposici\u00f3n mediante un sistema de dos contenedores o acuerdos con proveedores; mantener una protecci\u00f3n suficiente frente al riesgo real de suministro.<\/td><td>Considerar que un gasto anual reducido permite ignorar las faltas de material, la vida \u00fatil o hasta qu\u00e9 punto la producci\u00f3n depende de ese art\u00edculo.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>La frecuencia adecuada de los recuentos y de las revisiones de compras depende de c\u00f3mo trabaje su empresa. Un art\u00edculo estable con registros fiables requiere una atenci\u00f3n distinta de otro con discrepancias de inventario recurrentes, aunque ambos pertenezcan a la misma clase.<\/p>\n\n\n<p>Del mismo modo, un pedido de mayor tama\u00f1o de un art\u00edculo C puede resultar econ\u00f3mico si evita repetir tareas de compra y manipulaci\u00f3n, pero no si el material caduca o queda obsoleto. El an\u00e1lisis ABC ayuda a decidir d\u00f3nde centrar la atenci\u00f3n; no calcula la cantidad \u00f3ptima de pedido ni el stock de seguridad necesario.<\/p>\n\n\n<p>Tome por separado la <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/stock-de-seguridad\/\">decisi\u00f3n sobre el stock de seguridad<\/a>. Defina esa reserva en funci\u00f3n de la incertidumbre, el plazo de reposici\u00f3n y las consecuencias de una falta de material, en lugar de aplicar el mismo porcentaje de existencias a todos los art\u00edculos A, B o C.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Valore la criticidad para la producci\u00f3n antes de cambiar la pol\u00edtica de inventario<\/h2>\n\n\n<p>Antes de reducir el control de los art\u00edculos C, preg\u00fantese qu\u00e9 ocurre cuando falta cada uno de ellos. Compruebe si existe un sustituto aprobado, cu\u00e1nto tardar\u00eda en llegar un nuevo suministro y qu\u00e9 pedidos de clientes dependen de ese art\u00edculo.<\/p>\n\n\n<p>Mantenga visible la criticidad junto a la clase ABC. La falta de un tornillo de clase C sin sustituto aprobado puede requerir atenci\u00f3n urgente, aunque su compra no necesite el mismo nivel de supervisi\u00f3n que la de un motor de clase A. No hace falta reclasificarlo como A para reconocer ese riesgo.<\/p>\n\n\n<p>La variabilidad de la demanda es otro factor que debe analizarse por separado. Dos art\u00edculos con el mismo valor de consumo anual pueden comportarse de forma muy distinta: uno se consume de manera constante y el otro se necesita en grandes cantidades de forma puntual. Compruebe ese patr\u00f3n antes de aplicarles la misma rutina de reposici\u00f3n.<\/p>\n\n\n<p>Imagine que dispone de los motores y las carcasas para una orden de montaje, pero falta el tornillo necesario. Desde el punto de vista econ\u00f3mico, la orden parece estar bien cubierta. Sin embargo, el montaje no puede terminarse sin ese componente. Empezar antes de tiempo quiz\u00e1 solo genere conjuntos sin terminar, manipulaciones adicionales y otra cola de trabajo que supervisar.<\/p>\n\n\n<p>La siguiente pregunta \u00fatil no es \u00ab\u00bfDe qu\u00e9 clase es el tornillo?\u00bb, sino \u00ab\u00bfCu\u00e1ndo se puede ejecutar realmente esta orden y qu\u00e9 puede hacer el equipo mientras tanto?\u00bb.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vincule todas las clases de materiales al programa de producci\u00f3n con SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS incorpora la disponibilidad de materiales al c\u00e1lculo del programa de producci\u00f3n, junto con los puestos de trabajo, los turnos, las dependencias entre operaciones y las prioridades. Cuando est\u00e1 activada la programaci\u00f3n que tiene en cuenta los materiales, Arcturus considera los materiales disponibles y las entregas previstas al calcular el inicio de las tareas. Con estas reglas, ninguna tarea se programa para comenzar antes de que est\u00e9n disponibles los materiales que necesita.<\/p>\n\n\n<p>As\u00ed, el tornillo que falta se convierte en una restricci\u00f3n para la programaci\u00f3n, no solo en una l\u00ednea de poco valor en un informe de inventario. Puede revisar las operaciones previstas y su finalizaci\u00f3n en la vista Gantt, en lugar de comparar manualmente los saldos de existencias con las colas de trabajo de cada m\u00e1quina. Esto reduce los inicios programados para los que no hay materiales suficientes y permite detectar antes los problemas de entrega.<\/p>\n\n\n<p>Las fechas de entrega de los pedidos de compra indican cu\u00e1ndo se prev\u00e9 disponer del material. Al confirmar que un pedido de compra se ha entregado, se actualizan las existencias; una recepci\u00f3n prevista no equivale a material ya disponible en almac\u00e9n. Si el proveedor cambia la fecha prevista, actualice la informaci\u00f3n y recalcule el programa para ver c\u00f3mo afecta al trabajo.<\/p>\n\n\n<p>Usted sigue decidiendo las prioridades. Arcturus calcula la secuencia respetando las reglas y la capacidad que usted define, para que pueda evaluar los compromisos afectados sin tener que mover cada operaci\u00f3n manualmente. Por eso SkyPlanner es un complemento \u00fatil del control ABC: la atenci\u00f3n econ\u00f3mica se mantiene donde corresponde, mientras que la preparaci\u00f3n de la producci\u00f3n tiene en cuenta los componentes que necesita realmente cada tarea.<\/p>\n\n\n<p>SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su <a href=\"https:\/\/skyplanner.ai\/es\/integraciones\/\">REST API abierta<\/a>. Puede conservar el sistema que contiene sus datos de compras y art\u00edculos y conectarlo a un <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programa de producci\u00f3n que refleje la disponibilidad de materiales<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Qu\u00e9 cambi\u00f3 en Eskomatic al mejorar la visibilidad de los materiales<\/h3>\n\n\n<p>Eskomatic, empresa de mecanizado por encargo, trabajaba antes con colas de trabajo gestionadas en gran medida de forma manual, en un entorno de ERP y control de producci\u00f3n antiguo. Obtener una visi\u00f3n de conjunto requer\u00eda esfuerzo y, al no tener suficiente visibilidad de la disponibilidad de materiales, una falta pod\u00eda detectarse demasiado cerca del inicio previsto de una tarea.<\/p>\n\n\n<p>Al conectar SkyPlanner con su ERP existente, el equipo obtuvo una cola de trabajo visual en Gantt, la programaci\u00f3n autom\u00e1tica de la carga y una visi\u00f3n m\u00e1s clara de las faltas de material. En su <a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/eskomatic\/\">testimonio como cliente de SkyPlanner<\/a>, Eskomatic se\u00f1ala que se producen menos paradas de producci\u00f3n por falta de materiales y que las fechas de entrega se fijan con mayor precisi\u00f3n.<\/p>\n\n\n<p>Esta experiencia muestra una mejora operativa que va m\u00e1s all\u00e1 de clasificar art\u00edculos: el planificador puede ver el problema de materiales en el contexto del trabajo al que afecta. Es una raz\u00f3n para conectar el control de existencias con la programaci\u00f3n, en lugar de esperar que una etiqueta ABC baste por s\u00ed sola para asegurar las entregas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Empiece con un grupo de materiales y una falta de material real<\/h2>\n\n\n<p>Elija un grupo de materiales claramente definido, calcule los valores de consumo y acuerde los l\u00edmites entre clases. Aplique las pol\u00edticas de control resultantes y, antes de simplificar la reposici\u00f3n de los art\u00edculos C, revise su criticidad para la producci\u00f3n. Revise la clasificaci\u00f3n cuando cambien la demanda, los costes o la combinaci\u00f3n de productos, y eval\u00fae expresamente los art\u00edculos nuevos y los de consumo nulo, en lugar de dar por hecho que el consumo hist\u00f3rico lo explica todo.<\/p>\n\n\n<p>Utilice el an\u00e1lisis ABC para centrar la atenci\u00f3n econ\u00f3mica donde corresponde. Con SkyPlanner, convierta la disponibilidad de materiales y la capacidad en un plan que se pueda seguir en planta.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">Reserve una demo de SkyPlanner<\/a> y utilice como ejemplo una orden de montaje reciente que se haya retrasado por la falta de un componente. Traiga los requerimientos de materiales, la recepci\u00f3n prevista y la ruta de fabricaci\u00f3n para ver c\u00f3mo esa falta modifica el inicio y la finalizaci\u00f3n previstos junto con el resto del trabajo. Si prefiere explorar primero, <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles Inicio &raquo; Recursos &raquo; An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles El an\u00e1lisis ABC de inventarios agrupa los art\u00edculos seg\u00fan su valor de consumo anual: la cantidad utilizada en un a\u00f1o multiplicada por el coste unitario. Los art\u00edculos A representan la mayor parte de ese valor; los B, &#8230; <a title=\"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/\" aria-label=\"Leer m\u00e1s sobre An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":105353,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2568,306],"tags":[],"class_list":["post-105329","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-en-fabricacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles<\/title>\n<meta name=\"description\" content=\"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\" \/>\n<meta property=\"og:description\" content=\"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T21:17:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T21:17:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:17:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/\"},\"wordCount\":2671,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"articleSection\":[\"Eficiencia en fabricaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/\",\"name\":\"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:17:59+00:00\",\"description\":\"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/analisis-abc-de-inventarios\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles","description":"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/","og_locale":"es_ES","og_type":"article","og_title":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles","og_description":"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T21:17:22+00:00","article_modified_time":"2026-10-21T21:17:59+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:17:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/"},"wordCount":2671,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","articleSection":["Eficiencia en fabricaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/","name":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:17:59+00:00","description":"Centre el control donde m\u00e1s gasta sin que una pieza barata pare la producci\u00f3n. Calcule las clases ABC y aplique controles pr\u00e1cticos.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","width":1774,"height":887,"caption":"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/analisis-abc-de-inventarios\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles Inicio &raquo; Recursos &raquo; An\u00e1lisis ABC de inventarios: calcule clases \u00fatiles El an\u00e1lisis ABC de inventarios agrupa los art\u00edculos seg\u00fan su valor de consumo anual: la cantidad utilizada en un a\u00f1o multiplicada por el coste unitario. Los art\u00edculos A representan la mayor parte de ese valor; los B,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/105329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=105329"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/105329\/revisions"}],"predecessor-version":[{"id":105394,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/105329\/revisions\/105394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/105353"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=105329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=105329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=105329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}