{"id":104442,"date":"2026-10-20T17:47:49","date_gmt":"2026-10-20T17:47:49","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104442"},"modified":"2026-10-20T17:48:25","modified_gmt":"2026-10-20T17:48:25","slug":"cantidad-economica-de-produccion","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/","title":{"rendered":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La cantidad econ\u00f3mica de producci\u00f3n (EPQ) es el tama\u00f1o de lote que minimiza la suma de los costes de preparaci\u00f3n y de mantenimiento del inventario en un modelo donde se produce de forma gradual mientras la demanda sigue consumiendo unidades. Ayuda a responder una pregunta habitual: <strong>\u00bfcu\u00e1nto debemos fabricar antes de parar y realizar una nueva preparaci\u00f3n?<\/strong><\/p>\n\n\n<p>Los lotes m\u00e1s grandes requieren menos preparaciones, pero obligan a mantener m\u00e1s existencias. Los lotes m\u00e1s peque\u00f1os reducen el inventario, pero exigen repetir la preparaci\u00f3n con m\u00e1s frecuencia. EPQ permite cuantificar ese equilibrio en condiciones estables y previsibles.<\/p>\n\n\n<p>La siguiente pregunta es si esa cantidad encaja en tu f\u00e1brica. Un lote econ\u00f3micamente \u00f3ptimo desde el punto de vista matem\u00e1tico puede retrasar la fabricaci\u00f3n de otro producto en una m\u00e1quina compartida. SkyPlanner APS relaciona las cantidades elegidas con los materiales, la capacidad y las prioridades de entrega, para que puedas evaluar las consecuencias sobre el programa sin rehacer a mano la cola de trabajo de cada m\u00e1quina.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfEn qu\u00e9 se diferencia EPQ de EOQ?<\/h2>\n\n\n<p>El modelo b\u00e1sico de cantidad econ\u00f3mica de pedido (EOQ) supone que toda la cantidad de reposici\u00f3n queda disponible de una sola vez. El inventario aumenta de golpe cuando llega una entrega y despu\u00e9s disminuye a medida que se consume.<\/p>\n\n\n<p>EPQ sustituye esa recepci\u00f3n instant\u00e1nea por una producci\u00f3n a ritmo finito. Mientras se fabrica el lote, ya se est\u00e1 consumiendo parte de lo producido. Por tanto, las existencias se acumulan al ritmo que marca la diferencia entre la tasa de producci\u00f3n y la de demanda, no a la tasa de producci\u00f3n completa. Cuando termina la fabricaci\u00f3n del lote, la demanda va agotando las existencias acumuladas hasta el siguiente ciclo de reposici\u00f3n.<\/p>\n\n\n<p>Por eso, EPQ resulta \u00fatil para un componente que se fabrica de forma recurrente y cuyas unidades pueden pasar progresivamente al almac\u00e9n o a una operaci\u00f3n posterior. En este contexto, tambi\u00e9n se habla de cantidad econ\u00f3mica de fabricaci\u00f3n o de lote econ\u00f3mico de producci\u00f3n. La diferencia decisiva respecto al EOQ b\u00e1sico es la disponibilidad gradual, no simplemente que el pedido se clasifique como interno o externo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">La f\u00f3rmula de la cantidad econ\u00f3mica de producci\u00f3n<\/h2>\n\n\n<p>Con la demanda y el coste de mantenimiento del inventario expresados en t\u00e9rminos anuales, el c\u00e1lculo es:<\/p>\n\n\n<p><strong>EPQ = \u221a[2 \u00d7 D \u00d7 S \/ (H \u00d7 (1 \u2212 d\/p))]<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>S\u00edmbolo<\/th><th>Significado<\/th><th>Unidades utilizadas aqu\u00ed<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Demanda total del a\u00f1o<\/td><td>Unidades\/a\u00f1o<\/td><\/tr><tr><td>S<\/td><td>Coste fijo de preparaci\u00f3n de un lote de producci\u00f3n<\/td><td>Unidades monetarias\/lote<\/td><\/tr><tr><td>H<\/td><td>Coste de mantener una unidad en inventario durante un a\u00f1o<\/td><td>Unidades monetarias\/unidad\/a\u00f1o<\/td><\/tr><tr><td>d<\/td><td>Tasa de demanda o consumo<\/td><td>Unidades\/d\u00eda laborable<\/td><\/tr><tr><td>p<\/td><td>Tasa de producci\u00f3n del art\u00edculo mientras se est\u00e1 fabricando<\/td><td>Unidades\/d\u00eda laborable<\/td><\/tr><tr><td>Q<\/td><td>Cantidad fabricada en un lote de producci\u00f3n<\/td><td>Unidades<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Usa bases temporales coherentes.<\/strong> D y H corresponden al mismo horizonte anual; d y p deben expresarse en la misma unidad de tiempo. Si la producci\u00f3n se mide por d\u00eda laborable, divide la demanda anual entre los d\u00edas laborables, no entre los d\u00edas naturales, para obtener d.<\/p>\n\n\n<p>Para p, utiliza la tasa de producci\u00f3n del art\u00edculo mientras se est\u00e1 fabricando, no un promedio de su producci\u00f3n anual que incluya las semanas en las que la m\u00e1quina fabrica otros productos. El modelo exige que p sea mayor que d.<\/p>\n\n\n<p>S es un coste, no una duraci\u00f3n. Representa el coste fijo de preparar un lote, independientemente del n\u00famero de unidades que contenga. H es un importe monetario por unidad y a\u00f1o, no simplemente un porcentaje de mantenimiento del inventario. Si el dato del que dispones es un porcentaje, convi\u00e9rtelo en un importe monetario usando el valor unitario y la definici\u00f3n de coste que correspondan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Por qu\u00e9 importa el factor de producci\u00f3n a ritmo finito<\/h3>\n\n\n<p>Fabricar un lote de Q unidades requiere Q\/p d\u00edas laborables. La demanda contin\u00faa durante ese tiempo, de modo que el nivel m\u00e1ximo de existencias del ciclo es:<\/p>\n\n\n<p><strong>Inventario m\u00e1ximo = Q \u00d7 (1 \u2212 d\/p)<\/strong><\/p>\n\n\n<p>En el modelo b\u00e1sico, el inventario medio del ciclo es la mitad de ese m\u00e1ximo. Por tanto, los costes anuales que var\u00edan con el tama\u00f1o del lote son:<\/p>\n\n\n<p><strong>Coste anual de preparaci\u00f3n = (D\/Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Coste anual de mantenimiento del inventario = (Q\/2) \u00d7 (1 \u2212 d\/p) \u00d7 H<\/strong><\/p>\n\n\n<p>Su suma da el coste anual relevante para una cantidad Q que se est\u00e9 evaluando. EPQ minimiza esa suma. En el \u00f3ptimo calculado, ambos costes son iguales.<\/p>\n\n\n<p>Este no es el coste anual total de producci\u00f3n del fabricante. Si el coste unitario de producci\u00f3n no var\u00eda con la cantidad, no modifica la Q \u00f3ptima y puede excluirse de esta comparaci\u00f3n. Los descuentos por cantidad, los recargos por horas extra u otros costes que dependan de la cantidad cambiar\u00edan el problema.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ejemplo resuelto de EPQ: el tama\u00f1o del lote no es el inventario m\u00e1ximo<\/h2>\n\n\n<p>El <a href=\"https:\/\/biz.libretexts.org\/@go\/page\/129023\">ejemplo did\u00e1ctico de las cajas de cambios<\/a> de <em>Fundamentos de la gesti\u00f3n de operaciones<\/em>, de Azim Abbas y Seyed Goosheh, utiliza estos datos:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Demanda anual D: 48.000 cajas de cambios.<\/li><li>Tasa de producci\u00f3n p: 800 cajas de cambios por d\u00eda laborable.<\/li><li>D\u00edas laborables: 240 al a\u00f1o.<\/li><li>Coste de preparaci\u00f3n S: $45 por lote.<\/li><li>Coste anual de mantenimiento del inventario H: $1 por caja de cambios.<\/li><\/ul>\n\n\n<p>Son datos did\u00e1cticos, no valores de referencia de costes de fabricaci\u00f3n ni resultados de un cliente de SkyPlanner.<\/p>\n\n\n<p>La demanda diaria es 48.000 \u00f7 240 = <strong>200 cajas de cambios<\/strong>. El factor de producci\u00f3n a ritmo finito es 1 \u2212 200\/800 = <strong>0,75<\/strong>.<\/p>\n\n\n<p><strong>EPQ = \u221a[(2 \u00d7 48.000 \u00d7 45) \/ (1 \u00d7 0,75)] = 2.400 cajas de cambios<\/strong><\/p>\n\n\n<p>Con esa cantidad, el coste anual de preparaci\u00f3n es (48.000 \/ 2.400) \u00d7 $45 = <strong>$900<\/strong>. El coste anual de mantenimiento del inventario es (2.400 \/ 2) \u00d7 0,75 \u00d7 $1 = <strong>$900<\/strong>, lo que suma <strong>$1.800 al a\u00f1o<\/strong> en el modelo.<\/p>\n\n\n<p>Fabricar el lote requiere <strong>3 d\u00edas laborables<\/strong>, sin contar la preparaci\u00f3n: 2.400 \/ 800. El ciclo completo de reposici\u00f3n dura <strong>12 d\u00edas laborables<\/strong>: 2.400 \/ 200. Durante los nueve d\u00edas laborables restantes no se produce este art\u00edculo y la demanda se cubre con las existencias.<\/p>\n\n\n<p>El inventario m\u00e1ximo es de <strong>1.800 cajas de cambios<\/strong>, no de 2.400. Durante los tres d\u00edas de producci\u00f3n, la demanda ya ha consumido 600. El inventario medio del ciclo es de 900.<\/p>\n\n\n<p>Con esos mismos datos, podemos comparar distintas cantidades:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Cantidad por lote<\/th><th>Coste anual de preparaci\u00f3n<\/th><th>Coste anual de mantenimiento del inventario<\/th><th>Suma de los costes anuales<\/th><\/tr><\/thead><tbody><tr><td>1.200<\/td><td>$1.800<\/td><td>$450<\/td><td>$2.250<\/td><\/tr><tr><td>2.400<\/td><td>$900<\/td><td>$900<\/td><td>$1.800<\/td><\/tr><tr><td>4.800<\/td><td>$450<\/td><td>$1.800<\/td><td>$2.250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>La tabla explica por qu\u00e9 no basta con reducir el n\u00famero de preparaciones. Duplicar el tama\u00f1o de lote econ\u00f3mico reduce a la mitad el coste de preparaci\u00f3n, pero duplica el de mantenimiento del inventario. Tambi\u00e9n muestra qu\u00e9 compara el planificador cuando necesita un lote m\u00e1s peque\u00f1o para atender otra entrega: un equilibrio entre costes calculado con el modelo, no una regla que obligue a todas las f\u00e1bricas a producir siempre 2.400 unidades.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfCu\u00e1ndo resulta \u00fatil el modelo b\u00e1sico de EPQ?<\/h2>\n\n\n<p>EPQ es una referencia \u00fatil cuando el art\u00edculo tiene una demanda recurrente, la reposici\u00f3n se realiza de forma gradual y la decisi\u00f3n sobre la cantidad depende principalmente del equilibrio entre el coste fijo de preparaci\u00f3n y el coste de mantener el inventario del ciclo.<\/p>\n\n\n<p>Comprueba estas condiciones antes de utilizar el resultado:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>La demanda es conocida y razonablemente constante.<\/strong> Un total anual puede ocultar picos estacionales o necesidades de proyectos concretos. Un promedio anual uniforme no indica cu\u00e1ndo deben entregarse esos pedidos.<\/li><li><strong>La producci\u00f3n es estable y m\u00e1s r\u00e1pida que el consumo.<\/strong> Si p no es mayor que d, este modelo no permite acumular las existencias necesarias para cubrir la demanda entre lotes.<\/li><li><strong>Los costes de preparaci\u00f3n y de mantenimiento del inventario son estables.<\/strong> Utilice criterios coherentes para definir los costes. Si los cambios de formato dependen de la secuencia o los costes de producci\u00f3n var\u00edan con la cantidad, no basta con un \u00fanico coste fijo de preparaci\u00f3n.<\/li><li><strong>Las unidades producidas est\u00e1n disponibles de forma progresiva.<\/strong> Si todo el lote debe completar el curado, la inspecci\u00f3n o la liberaci\u00f3n por calidad antes de poder utilizar ninguna unidad, la acumulaci\u00f3n de inventario que supone el modelo no describe esa forma de reposici\u00f3n.<\/li><li><strong>No hay faltantes durante el ciclo b\u00e1sico.<\/strong> La f\u00f3rmula anterior no calcula el coste de los pedidos pendientes por falta de existencias ni el stock de seguridad necesario ante la incertidumbre de la demanda y el suministro.<\/li><li><strong>No hay restricciones pr\u00e1cticas que limiten la cantidad propuesta.<\/strong> La capacidad de almacenamiento, la vida \u00fatil, el tama\u00f1o de los contenedores, las cargas m\u00ednimas de proceso y los equipos compartidos pueden hacer inviable el resultado obtenido sin restricciones.<\/li><\/ul>\n\n\n<p>Que el modelo contemple una tasa de producci\u00f3n finita no significa que haya programado la capacidad finita de su f\u00e1brica. Solo considera el ciclo de reposici\u00f3n de un art\u00edculo. No asigna los lotes, las preparaciones y las operaciones posteriores de todos los productos a un mismo calendario de m\u00e1quinas.<\/p>\n\n\n<p>Si la demanda es irregular o el trabajo es espec\u00edfico de cada cliente, parta de las necesidades reales y sus fechas, en lugar de imponerles un ciclo EPQ. Cuando el modelo sea adecuado, utilice el resultado como referencia y eval\u00fae cantidades cercanas que sean viables teniendo en cuenta las restricciones reales.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Reducir el coste de preparaci\u00f3n cambia el tama\u00f1o econ\u00f3mico del lote<\/h2>\n\n\n<p>Aumentar el lote no es la \u00fanica forma de repartir el esfuerzo de preparaci\u00f3n. En este modelo, reducir el coste fijo de preparaci\u00f3n hace que resulte econ\u00f3mico producir lotes m\u00e1s peque\u00f1os con mayor frecuencia. Como EPQ depende de la ra\u00edz cuadrada de S, reducir S a la mitad disminuye la cantidad calculada hasta aproximadamente el 71% de su valor anterior, si los dem\u00e1s datos no cambian.<\/p>\n\n\n<p>Por eso, la reducci\u00f3n de las preparaciones y la pol\u00edtica de tama\u00f1os de lote deben analizarse conjuntamente. <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/smed\/\">SMED<\/a> ayuda a mejorar el propio cambio de formato; EPQ ayuda a interpretar el equilibrio resultante entre los costes de preparaci\u00f3n y de inventario. Si una mejora reduce el tiempo de preparaci\u00f3n, pero no todos los costes asociados, actualice el coste introducido en el c\u00e1lculo en consecuencia, en lugar de suponer que ambos disminuyen en el mismo porcentaje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lleve a la pr\u00e1ctica el tama\u00f1o de lote elegido con SkyPlanner<\/h2>\n\n\n<p>Imagine que el lote de cajas de cambios comparte m\u00e1quina con otro componente que se necesita con urgencia en montaje. El c\u00e1lculo EPQ puede justificar un lote mayor, pero no ha comprobado la fecha l\u00edmite del otro componente ni si est\u00e1n disponibles los materiales para la siguiente operaci\u00f3n. Es necesario ver c\u00f3mo compiten esos trabajos por la m\u00e1quina antes de asignarla.<\/p>\n\n\n<p>SkyPlanner re\u00fane esas interdependencias en un <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programa de producci\u00f3n com\u00fan<\/a>. Defina una sola vez las etapas del proceso de un producto, sus duraciones, los puestos de trabajo aptos para realizarlas, los materiales y la lista de materiales. A partir de ah\u00ed, las \u00f3rdenes incorporan el producto, la cantidad y la fecha de entrega. Arcturus, la IA de programaci\u00f3n de SkyPlanner, programa las \u00f3rdenes de forma conjunta, en lugar de obligarle a conciliar un plan independiente para cada art\u00edculo.<\/p>\n\n\n<p>Cuando se activa la programaci\u00f3n que tiene en cuenta los materiales, su disponibilidad tambi\u00e9n influye en ese c\u00e1lculo. El diagrama de Gantt muestra la distribuci\u00f3n temporal resultante en los distintos puestos de trabajo, lo que facilita ver c\u00f3mo afecta la cantidad seleccionada a otros trabajos y a los compromisos de entrega. Usted establece las prioridades; Arcturus calcula la programaci\u00f3n siguiendo esas instrucciones.<\/p>\n\n\n<p>As\u00ed resulta m\u00e1s f\u00e1cil decidir las cantidades y se reduce el trabajo manual de mantener las colas de producci\u00f3n actualizadas. Si el lote elegido interfiere con otro compromiso, puede decidir si cambia su cantidad, ajusta las prioridades o aporta m\u00e1s capacidad y, despu\u00e9s, recalcular el programa conforme a esa decisi\u00f3n. SkyPlanner se integra con cualquier ERP o MES mediante su REST API abierta, de modo que la programaci\u00f3n puede partir de sus \u00f3rdenes y datos de producci\u00f3n existentes.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/kjh-comp\/\">La experiencia de KJH-Comp<\/a> demuestra la importancia de contar con una visi\u00f3n compartida. Este fabricante de piezas de chapa por encargo trabajaba antes con cargas semanales poco detalladas y asignaba manualmente los trabajos a las m\u00e1quinas para cada d\u00eda. Con SkyPlanner, el supervisor puede detectar la sobrecarga de una plegadora compartida y reaccionar. La empresa tambi\u00e9n explica que agrupa en la secuencia los trabajos que utilizan el mismo utillaje y espesor de material, sin que los de entrega m\u00e1s lejana desplacen a los que vencen antes. As\u00ed, la eficiencia de las preparaciones y las prioridades de entrega se pueden tener en cuenta en un mismo plan, en lugar de gestionarse en listas que compiten entre s\u00ed.<\/p>\n\n\n<p>Para conocer los detalles pr\u00e1cticos de la coordinaci\u00f3n de lotes de producci\u00f3n y lotes de transferencia, consulte la <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-por-lotes\/\">gu\u00eda de producci\u00f3n por lotes<\/a>. Aqu\u00ed, la distinci\u00f3n fundamental es m\u00e1s sencilla: <strong>EPQ estima una cantidad econ\u00f3mica bajo unos supuestos definidos; el programa de producci\u00f3n muestra c\u00f3mo encaja la cantidad elegida con los trabajos que se ha comprometido a entregar.<\/strong><\/p>\n\n\n<p>Para ver esa relaci\u00f3n en su propia producci\u00f3n, <a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">reserve una demostraci\u00f3n de SkyPlanner<\/a> y aporte un producto que fabrique de forma recurrente, un posible tama\u00f1o de lote y la m\u00e1quina que comparte con otros trabajos. Revise c\u00f3mo encajan esas necesidades antes de asumir el siguiente compromiso de entrega. Si prefiere explorar primero, <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites Inicio &raquo; Recursos &raquo; Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites La cantidad econ\u00f3mica de producci\u00f3n (EPQ) es el tama\u00f1o de lote que minimiza la suma de los costes de preparaci\u00f3n y de mantenimiento del inventario en un modelo donde se produce de forma gradual mientras &#8230; <a title=\"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/\" aria-label=\"Leer m\u00e1s sobre Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":104472,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2568,306],"tags":[],"class_list":["post-104442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-en-fabricacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites<\/title>\n<meta name=\"description\" content=\"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\" \/>\n<meta property=\"og:description\" content=\"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T17:47:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T17:48:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:48:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/\"},\"wordCount\":2379,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"articleSection\":[\"Eficiencia en fabricaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/\",\"name\":\"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:48:25+00:00\",\"description\":\"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/cantidad-economica-de-produccion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites","description":"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/","og_locale":"es_ES","og_type":"article","og_title":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites","og_description":"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T17:47:49+00:00","article_modified_time":"2026-10-20T17:48:25+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"12 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:48:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/"},"wordCount":2379,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","articleSection":["Eficiencia en fabricaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/","name":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:48:25+00:00","description":"Calcula el lote con EPQ, comprueba cu\u00e1ndo se cumplen sus supuestos y usa SkyPlanner para ver c\u00f3mo afecta la cantidad elegida a otros pedidos.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","width":1672,"height":941,"caption":"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/cantidad-economica-de-produccion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites Inicio &raquo; Recursos &raquo; Cantidad econ\u00f3mica de producci\u00f3n: f\u00f3rmula, ejemplo y l\u00edmites La cantidad econ\u00f3mica de producci\u00f3n (EPQ) es el tama\u00f1o de lote que minimiza la suma de los costes de preparaci\u00f3n y de mantenimiento del inventario en un modelo donde se produce de forma gradual mientras&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/104442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=104442"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/104442\/revisions"}],"predecessor-version":[{"id":104536,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/104442\/revisions\/104536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/104472"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=104442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=104442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=104442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}