{"id":102670,"date":"2026-10-20T15:26:38","date_gmt":"2026-10-20T15:26:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102670"},"modified":"2026-10-20T15:27:13","modified_gmt":"2026-10-20T15:27:13","slug":"produccion-push-y-pull","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/","title":{"rendered":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Producci\u00f3n push y pull: elija la se\u00f1al adecuada<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/es\/\">Inicio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/\">Recursos<\/a> &raquo; Producci\u00f3n push y pull: elija la se\u00f1al adecuada<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La diferencia entre la producci\u00f3n push y pull est\u00e1 en qu\u00e9 autoriza la producci\u00f3n. <strong>En push, el trabajo se lanza seg\u00fan un plan de producci\u00f3n. En pull, se autoriza en respuesta a una necesidad de una etapa posterior<\/strong>, como la retirada de piezas por parte de montaje. Un sistema h\u00edbrido utiliza distintas se\u00f1ales en diferentes puntos del flujo.<\/p>\n\n\n<p>Esta distinci\u00f3n importa m\u00e1s que definir la f\u00e1brica como de fabricaci\u00f3n contra stock o bajo pedido. Un art\u00edculo de stock puede reponerse mediante pull, mientras que un pedido espec\u00edfico de un cliente puede seguir avanzando por los departamentos mediante push, con fechas planificadas de forma centralizada.<\/p>\n\n\n<p>La pregunta pr\u00e1ctica es: \u00bfqu\u00e9 debe dar la se\u00f1al de inicio a esta operaci\u00f3n y puede el resto de la producci\u00f3n responder a esa necesidad? SkyPlanner APS ayuda con la segunda parte, convirtiendo las \u00f3rdenes resultantes en un programa compartido que tiene en cuenta los materiales, la capacidad y las prioridades. As\u00ed dedica menos tiempo a conciliar las colas de trabajo de cada m\u00e1quina y ve con mayor claridad c\u00f3mo afectan los cambios a las entregas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Push y pull de un vistazo<\/h2>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Decisi\u00f3n<\/th><th>Producci\u00f3n push<\/th><th>Producci\u00f3n pull<\/th><\/tr><\/thead><tbody><tr><td>\u00bfQu\u00e9 autoriza el trabajo?<\/td><td>Un lanzamiento planificado, a menudo calculado a partir de previsiones o de demanda en firme<\/td><td>Una solicitud de una etapa posterior o una se\u00f1al de reposici\u00f3n<\/td><\/tr><tr><td>\u00bfQu\u00e9 determina la cantidad?<\/td><td>La necesidad planificada y la decisi\u00f3n sobre el tama\u00f1o de lote<\/td><td>La necesidad indicada por la se\u00f1al y la regla de reposici\u00f3n acordada<\/td><\/tr><tr><td>\u00bfC\u00f3mo se gestionan las existencias?<\/td><td>Las existencias y los lanzamientos se planifican con antelaci\u00f3n; pueden acumularse excedentes si el plan supera el consumo<\/td><td>Puede haber existencias, pero la reposici\u00f3n sigue la demanda conforme a unas reglas de control definidas<\/td><\/tr><tr><td>\u00bfD\u00f3nde puede encajar?<\/td><td>Trabajos que requieren preparaci\u00f3n anticipada, campa\u00f1as planificadas o plazos largos<\/td><td>Flujos con se\u00f1ales de demanda claras y una reposici\u00f3n capaz de seguir su ritmo<\/td><\/tr><tr><td>\u00bfCu\u00e1l es el principal riesgo?<\/td><td>Producir demasiado pronto o enviar a la etapa siguiente m\u00e1s trabajo del que puede absorber<\/td><td>Que una se\u00f1al no atendida o una reposici\u00f3n lenta deje a la siguiente operaci\u00f3n sin material suficiente<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ninguno de los dos enfoques crea capacidad. Una se\u00f1al pull indica que hace falta producir; no a\u00f1ade un turno a una m\u00e1quina compartida. Un plan push fija fechas; no hace que aparezca el material que falta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo funciona la producci\u00f3n push<\/h2>\n\n\n<p>En la producci\u00f3n push, un plan determina cu\u00e1ndo se lanza el trabajo. Ese plan puede basarse en una previsi\u00f3n de ventas, pedidos confirmados, un plan maestro de producci\u00f3n o las necesidades de materiales calculadas mediante MRP. Los departamentos reciben las cantidades y fechas planificadas y, despu\u00e9s, pasan el trabajo a la siguiente operaci\u00f3n.<\/p>\n\n\n<p>Planificar con antelaci\u00f3n resulta \u00fatil cuando el aprovisionamiento o la producci\u00f3n tardan m\u00e1s de lo que los clientes est\u00e1n dispuestos a esperar. Tambi\u00e9n ayuda a organizar campa\u00f1as teniendo en cuenta los cambios de serie costosos. Permite preparar art\u00edculos comunes antes de conocer con exactitud la demanda final, en lugar de intentar encajar todas las actividades en el plazo de entrega que acepta el cliente.<\/p>\n\n\n<p>El peligro est\u00e1 en considerar que un lanzamiento planificado justifica producir sin tener en cuenta lo que ocurre en las etapas posteriores. Si mecanizado sigue abasteciendo a un \u00e1rea de montaje que est\u00e1 parada, esa producci\u00f3n adicional se convierte en una cola, no en una entrega completada. Los errores de previsi\u00f3n tambi\u00e9n pueden dejar unas existencias cuya combinaci\u00f3n de art\u00edculos no se ajuste a la demanda.<\/p>\n\n\n<p>Por tanto, el enfoque push necesita algo m\u00e1s que un calendario de inicios. Requiere cantidades realistas, visibilidad de la capacidad de las etapas posteriores y una forma de revisar la secuencia cuando cambian las condiciones. Mantener todas las m\u00e1quinas ocupadas no equivale a completar lo que necesitan los clientes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo funciona la producci\u00f3n pull<\/h2>\n\n\n<p>En la producci\u00f3n pull, el proceso siguiente indica al anterior qu\u00e9 necesita. En el caso de piezas de uso recurrente, esto suele consistir en reponer un punto de stock controlado, a veces denominado supermercado de producci\u00f3n. Montaje retira piezas y una tarjeta, un contenedor vac\u00edo o una se\u00f1al electr\u00f3nica autoriza su reposici\u00f3n.<\/p>\n\n\n<p>El cambio importante est\u00e1 en la regla de autorizaci\u00f3n. Una operaci\u00f3n anterior no sigue fabricando existencias adicionales solo porque tenga tiempo disponible. La producci\u00f3n responde a la se\u00f1al de demanda acordada.<\/p>\n\n\n<p>Esto puede reducir la sobreproducci\u00f3n, las manipulaciones innecesarias y el capital inmovilizado en existencias. Tambi\u00e9n hace m\u00e1s dif\u00edcil ocultar un proceso lento o poco fiable tras grandes acumulaciones de material. Pero el stock de protecci\u00f3n y la respuesta de reposici\u00f3n deben dise\u00f1arse conjuntamente. Si reponer las piezas lleva m\u00e1s tiempo del que permiten cubrir las existencias disponibles, la siguiente operaci\u00f3n se quedar\u00e1 sin material suficiente.<\/p>\n\n\n<p>Pull no significa renunciar a la planificaci\u00f3n. Sigue siendo necesario planificar la capacidad, la cobertura del suministro, las cantidades y la respuesta a los picos de demanda. Los tiempos de preparaci\u00f3n largos, los procesos poco fiables o la existencia de muchas variantes de uso poco frecuente pueden dificultar el funcionamiento de un circuito sencillo de reposici\u00f3n de stock. Estas condiciones son motivos para elegir el control adecuado, no para aplicar la misma regla a todas las piezas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tres distinciones para evitar una elecci\u00f3n equivocada<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Push y pull no son sin\u00f3nimos de MTS y MTO<\/h3>\n\n\n<p>La fabricaci\u00f3n contra stock (MTS) y la fabricaci\u00f3n bajo pedido (MTO) describen la relaci\u00f3n de la producci\u00f3n con los pedidos de los clientes. Push y pull describen c\u00f3mo se autoriza el trabajo a lo largo del flujo.<\/p>\n\n\n<p>Una pieza fabricada contra stock puede reponerse mediante pull: su retirada del stock de productos terminados activa la reposici\u00f3n. En cambio, una f\u00e1brica que trabaja bajo pedido puede lanzar todas las operaciones seg\u00fan un programa central, enviando trabajo al siguiente departamento incluso cuando ya est\u00e1 saturado.<\/p>\n\n\n<p>Recibir un pedido de un cliente establece una demanda. Para entender el control dentro de la f\u00e1brica, tambi\u00e9n hay que preguntar qu\u00e9 autoriza cada transferencia posterior entre etapas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pull no significa tener cero existencias<\/h3>\n\n\n<p>Un sistema pull con supermercado de producci\u00f3n mantiene existencias de forma deliberada. El objetivo es que cumplan una funci\u00f3n definida y reponer lo que se consume, en lugar de acumular producci\u00f3n sin que exista una necesidad en las etapas posteriores.<\/p>\n\n\n<p>Las materias primas, el stock de reposici\u00f3n y la producci\u00f3n en curso siguen necesitando un control adecuado. Eliminar un stock de protecci\u00f3n antes de que la reposici\u00f3n sea fiable puede convertir un problema de existencias en un problema de entregas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Programar hacia atr\u00e1s no es lo mismo que aplicar pull<\/h3>\n\n\n<p>La programaci\u00f3n hacia atr\u00e1s parte de la fecha de finalizaci\u00f3n requerida y retrocede para determinar cu\u00e1ndo deben realizarse las operaciones. Pull determina qu\u00e9 autoriza la producci\u00f3n. Responden a preguntas distintas.<\/p>\n\n\n<p>Una tarea puede programarse cerca de la fecha de entrega y, aun as\u00ed, lanzarse desde un plan central. Del mismo modo, una tarea de reposici\u00f3n pull necesita un hueco en el programa una vez recibida su se\u00f1al. Elegir la se\u00f1al de inicio y decidir cu\u00e1ndo ejecutar el trabajo son decisiones relacionadas, pero no intercambiables.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Un ejemplo h\u00edbrido: piezas comunes, necesidades espec\u00edficas de cada cliente<\/h2>\n\n\n<p>Imagine un fabricante que produce una familia de bombas industriales. Varios modelos comparten una carcasa mecanizada, pero las juntas y las configuraciones finales var\u00edan.<\/p>\n\n\n<p>La empresa planifica con antelaci\u00f3n la producci\u00f3n de carcasas porque el mecanizado y los equipos compartidos que utiliza requieren preparaci\u00f3n. Esas carcasas se fabrican mediante push, seg\u00fan un plan de producci\u00f3n acordado. En montaje, los kits de juntas de uso habitual se almacenan en una zona de reposici\u00f3n controlada. Retirar un contenedor genera la se\u00f1al para reponer esa cantidad: ese circuito es pull, aunque mantenga existencias.<\/p>\n\n\n<p>Los pedidos de los clientes determinan la configuraci\u00f3n final de las bombas. El equipo puede preparar las carcasas comunes sin tener que prever cada variante terminada y configurar el producto final para una necesidad real. Aun as\u00ed, debe definir c\u00f3mo se autoriza y secuencia el trabajo de montaje, en lugar de dar por hecho que un pedido por s\u00ed solo controla todas las transferencias entre etapas.<\/p>\n\n\n<p>La separaci\u00f3n debe quedar clara: \u00bfqu\u00e9 cantidades de carcasas proceden del plan, qu\u00e9 cantidades de kits responden a las se\u00f1ales de retirada y qui\u00e9n gestiona las excepciones? Un sistema h\u00edbrido es \u00fatil cuando cada se\u00f1al tiene una funci\u00f3n definida. La confusi\u00f3n aparece cuando el lanzamiento del planificador y una se\u00f1al de reposici\u00f3n generan trabajo para cubrir la misma necesidad.<\/p>\n\n\n<p>Supongamos ahora que un lote de carcasas y una tarea urgente de reposici\u00f3n necesitan el mismo recurso productivo. Ambos pueden estar autorizados, pero no pueden ocuparlo a la vez. Es ah\u00ed donde la elecci\u00f3n del m\u00e9todo de control se convierte en un problema de programaci\u00f3n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo elegir la se\u00f1al de producci\u00f3n adecuada<\/h2>\n\n\n<p>Empiece por una familia de productos y siga su ruta de fabricaci\u00f3n. Una regla clara en cada transferencia importante entre etapas es m\u00e1s \u00fatil que una etiqueta para toda la f\u00e1brica.<\/p>\n\n\n<p>1. <strong>Identifique la necesidad que se est\u00e1 cubriendo.<\/strong> \u00bfEsta operaci\u00f3n prepara art\u00edculos comunes antes de que llegue la demanda, repone existencias consumidas o atiende un pedido espec\u00edfico? Registre el evento que realmente la autoriza.<\/p>\n\n\n<p>2. <strong>Compare el plazo de reposici\u00f3n con el tiempo disponible.<\/strong> Incluya las esperas en cola, las preparaciones, el procesamiento y los retrasos de suministro. Si los clientes no pueden esperar a que se complete toda la ruta, decida qu\u00e9 materiales o piezas comunes deben estar disponibles antes.<\/p>\n\n\n<p>3. <strong>Compruebe si la se\u00f1al es fiable.<\/strong> Un circuito pull necesita una solicitud visible, una cantidad acordada y una persona responsable. El trabajo guiado por el plan necesita que los requisitos y las fechas de lanzamiento est\u00e9n actualizados. Evite las autorizaciones duplicadas.<\/p>\n\n\n<p>4. <strong>Compruebe si la capacidad compartida permite realizar el trabajo.<\/strong> Incluya las dem\u00e1s familias que utilizan las mismas m\u00e1quinas y el mismo personal. Una regla local de reposici\u00f3n debe ser compatible con las prioridades de entrega de la f\u00e1brica.<\/p>\n\n\n<p>5. <strong>Revise qu\u00e9 ocurre cuando cambia la realidad.<\/strong> Un retraso en la entrega de materiales, una aver\u00eda o un pico de demanda deben dar lugar a una decisi\u00f3n clara, no a una segunda cola de trabajo al margen del sistema.<\/p>\n\n\n<p>Elija push cuando est\u00e9 justificado preparar la producci\u00f3n con antelaci\u00f3n; pull cuando las necesidades de las etapas posteriores puedan regir la reposici\u00f3n de forma fiable; y un modelo h\u00edbrido cuando las condiciones var\u00eden entre etapas. Despu\u00e9s, mantenga la coherencia entre el trabajo autorizado y un programa de producci\u00f3n que se pueda ejecutar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lleve a la pr\u00e1ctica el enfoque elegido con SkyPlanner<\/h2>\n\n\n<p>SkyPlanner re\u00fane las \u00f3rdenes de producci\u00f3n resultantes, las rutas de fabricaci\u00f3n, los puestos de trabajo, los turnos y las prioridades en <a href=\"https:\/\/skyplanner.ai\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">un \u00fanico entorno de programaci\u00f3n<\/a>. Arcturus, su IA de programaci\u00f3n, calcula la secuencia teniendo en cuenta la capacidad definida de los recursos productivos y las dependencias entre operaciones. La programaci\u00f3n incorpora tambi\u00e9n la disponibilidad de materiales a ese c\u00e1lculo, de modo que la falta de un componente se refleje en el plan en lugar de descubrirse por sorpresa al pie de la m\u00e1quina.<\/p>\n\n\n<p>El diagrama de Gantt muestra d\u00f3nde se ha asignado el trabajo y c\u00f3mo encajan las distintas operaciones. En lugar de corregir una y otra vez las listas de cada departamento, puede centrarse en qu\u00e9 compromiso de entrega debe tener prioridad y ver el programa resultante a lo largo de toda la ruta de fabricaci\u00f3n.<\/p>\n\n\n<p>Los criterios para fijar las fechas tambi\u00e9n pueden variar seg\u00fan el pedido. <strong>SkyPlanner permite tanto la programaci\u00f3n ASAP, para producir lo antes posible, como la programaci\u00f3n JIT, para producir cerca de la fecha de entrega del pedido<\/strong>, y tambi\u00e9n permite combinar ambas. As\u00ed, puede programar de forma distinta el trabajo que necesita empezar pronto y el pedido que conviene terminar m\u00e1s cerca de su expedici\u00f3n. Esto ayuda a evitar la producci\u00f3n anticipada innecesaria y a mantener la preparaci\u00f3n con antelaci\u00f3n all\u00ed donde resulta \u00fatil.<\/p>\n\n\n<p>La distinci\u00f3n tiene una aplicaci\u00f3n pr\u00e1ctica: la regla de lanzamiento o reposici\u00f3n determina qu\u00e9 trabajo es necesario; SkyPlanner programa las \u00f3rdenes resultantes. Su programaci\u00f3n JIT no sustituye la definici\u00f3n de la se\u00f1al procedente de las etapas posteriores.<\/p>\n\n\n<p>Cuando cambian las prioridades, la capacidad o las condiciones de disponibilidad de los materiales, Arcturus puede recalcular el programa respetando las reglas y los bloqueos que haya establecido. As\u00ed obtiene un plan que puede mantener actualizado, sin tener que volver a mover trabajo manualmente entre colas. SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su REST API abierta, incorporando los datos existentes de pedidos y producci\u00f3n al c\u00e1lculo del programa.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mejore la ejecuci\u00f3n sin cambiar toda la filosof\u00eda de producci\u00f3n<\/h3>\n\n\n<p>Eskomatic, una empresa finlandesa de mecanizado por contrato, ilustra el valor de mejorar la propia programaci\u00f3n. Con su antiguo sistema, las colas de trabajo se gestionaban en gran medida de forma manual, y la escasa visibilidad de los materiales dificultaba anticipar su falta.<\/p>\n\n\n<p>Con SkyPlanner, el equipo pas\u00f3 a disponer de una cola de trabajo visual en Gantt, programaci\u00f3n autom\u00e1tica de la carga y una visi\u00f3n m\u00e1s clara de los materiales que faltaban. <a href=\"https:\/\/skyplanner.ai\/es\/casos-de-clientes\/eskomatic\/\">Eskomatic se\u00f1ala<\/a> que ahora fija las fechas de entrega con mayor precisi\u00f3n y sufre menos paradas de producci\u00f3n por falta de material. Las bases de su planificaci\u00f3n no cambiaron; la ejecuci\u00f3n diaria se volvi\u00f3 m\u00e1s clara y controlada.<\/p>\n\n\n<p>Es una buena raz\u00f3n para elegir SkyPlanner, tanto si mantiene el lanzamiento de \u00f3rdenes seg\u00fan el plan como si introduce pull en puntos concretos: sigue siendo necesario programar de forma fiable el trabajo autorizado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ponga a prueba la se\u00f1al y el programa de producci\u00f3n juntos<\/h2>\n\n\n<p>Elija una familia de productos, identifique qu\u00e9 debe autorizar su producci\u00f3n y plantee una incidencia reciente para analizarla. Una demostraci\u00f3n de SkyPlanner puede servir para seguir las \u00f3rdenes resultantes teniendo en cuenta sus necesidades de materiales, los recursos productivos compartidos y las fechas de entrega, y para ver qu\u00e9 ocurre cuando cambia una prioridad o un recurso productivo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/es\/contacto-con-ventas\/\">Reserve una demostraci\u00f3n de SkyPlanner<\/a> para ver c\u00f3mo funcionar\u00eda en su f\u00e1brica. Si prefiere explorarlo primero por su cuenta, <a href=\"https:\/\/skyplanner.ai\/es\/prueba\/\">pruebe SkyPlanner con datos de demostraci\u00f3n<\/a>. El objetivo no es ajustarse a una versi\u00f3n m\u00e1s pura de push o pull, sino reducir el trabajo que se adelanta sin necesidad, dedicar menos esfuerzo a mantener las colas manualmente y disponer de un camino m\u00e1s claro para cumplir las entregas comprometidas.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Producci\u00f3n push y pull: elija la se\u00f1al adecuada Inicio &raquo; Recursos &raquo; Producci\u00f3n push y pull: elija la se\u00f1al adecuada La diferencia entre la producci\u00f3n push y pull est\u00e1 en qu\u00e9 autoriza la producci\u00f3n. En push, el trabajo se lanza seg\u00fan un plan de producci\u00f3n. En pull, se autoriza en respuesta a una necesidad de &#8230; <a title=\"Producci\u00f3n push y pull: elija la se\u00f1al adecuada\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/\" aria-label=\"Leer m\u00e1s sobre Producci\u00f3n push y pull: elija la se\u00f1al adecuada\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":102723,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2568,306],"tags":[],"class_list":["post-102670","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-en-fabricacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Producci\u00f3n push y pull: elija la se\u00f1al adecuada<\/title>\n<meta name=\"description\" content=\"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Producci\u00f3n push y pull: elija la se\u00f1al adecuada\" \/>\n<meta property=\"og:description\" content=\"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T15:26:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T15:27:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Producci\u00f3n push y pull: elija la se\u00f1al adecuada\",\"datePublished\":\"2026-10-20T15:26:38+00:00\",\"dateModified\":\"2026-10-20T15:27:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/\"},\"wordCount\":2620,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"articleSection\":[\"Eficiencia en fabricaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/\",\"name\":\"Producci\u00f3n push y pull: elija la se\u00f1al adecuada\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"datePublished\":\"2026-10-20T15:26:38+00:00\",\"dateModified\":\"2026-10-20T15:27:13+00:00\",\"description\":\"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Planned batches and a downstream replenishment request illustrate push and pull manufacturing signals.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/produccion-push-y-pull\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Producci\u00f3n push y pull: elija la se\u00f1al adecuada\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada","description":"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/","og_locale":"es_ES","og_type":"article","og_title":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada","og_description":"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T15:26:38+00:00","article_modified_time":"2026-10-20T15:27:13+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada","datePublished":"2026-10-20T15:26:38+00:00","dateModified":"2026-10-20T15:27:13+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/"},"wordCount":2620,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","articleSection":["Eficiencia en fabricaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/","name":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","datePublished":"2026-10-20T15:26:38+00:00","dateModified":"2026-10-20T15:27:13+00:00","description":"Elija cu\u00e1ndo usar push, pull o ambos en producci\u00f3n. Con SkyPlanner, conecte la se\u00f1al adecuada con materiales, capacidad y fechas de entrega.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","width":1672,"height":941,"caption":"Planned batches and a downstream replenishment request illustrate push and pull manufacturing signals."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/produccion-push-y-pull\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Producci\u00f3n push y pull: elija la se\u00f1al adecuada Inicio &raquo; Recursos &raquo; Producci\u00f3n push y pull: elija la se\u00f1al adecuada La diferencia entre la producci\u00f3n push y pull est\u00e1 en qu\u00e9 autoriza la producci\u00f3n. En push, el trabajo se lanza seg\u00fan un plan de producci\u00f3n. En pull, se autoriza en respuesta a una necesidad de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=102670"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102670\/revisions"}],"predecessor-version":[{"id":103245,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102670\/revisions\/103245"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/102723"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=102670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=102670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=102670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}