{"id":102219,"date":"2026-10-20T08:15:33","date_gmt":"2026-10-20T08:15:33","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102219"},"modified":"2026-10-21T03:23:08","modified_gmt":"2026-10-21T03:23:08","slug":"dashboard-de-produccion","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/","title":{"rendered":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tiempo de lectura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La producci\u00f3n de la f\u00e1brica supera el objetivo, pero un pedido que debe entregarse ma\u00f1ana est\u00e1 esperando en una m\u00e1quina parada. En la reuni\u00f3n de la ma\u00f1ana, un total en verde indica que la producci\u00f3n va bien. El cliente est\u00e1 a punto de recibir un mensaje muy distinto.<\/p>\n\n\n<p>Un dashboard de producci\u00f3n \u00fatil pone de manifiesto ese desajuste cuando todav\u00eda puedes hacer algo al respecto. Ayuda al equipo a identificar qu\u00e9 trabajo requiere atenci\u00f3n, entender por qu\u00e9 y decidir qu\u00e9 debe cambiar a continuaci\u00f3n.<\/p>\n\n\n<p>SkyPlanner APS conecta esa visibilidad con la programaci\u00f3n de la producci\u00f3n a capacidad finita. Puedes reunir la informaci\u00f3n de producci\u00f3n relevante en un dashboard personalizable y despu\u00e9s utilizar Arcturus y el programa en Gantt para analizar las consecuencias de un cambio. En lugar de rehacer un informe y reorganizar por separado las colas de trabajo de las m\u00e1quinas, gestionas la incidencia y el plan en el mismo entorno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es un dashboard de producci\u00f3n?<\/h2>\n\n\n<p>Un dashboard de producci\u00f3n ofrece una visi\u00f3n general y visual de una selecci\u00f3n de datos de fabricaci\u00f3n, actualizada con la frecuencia necesaria para respaldar las decisiones de sus usuarios. Puede mostrar el avance de la producci\u00f3n, la capacidad, los retrasos y los resultados frente a un objetivo mediante gr\u00e1ficos, indicadores y tablas, en lugar de una larga lista de registros.<\/p>\n\n\n<p>Tambi\u00e9n se conoce como dashboard de fabricaci\u00f3n. Su funci\u00f3n no es mostrar todo lo que se mide en la f\u00e1brica, sino facilitar la identificaci\u00f3n de situaciones relevantes: un trabajo se est\u00e1 retrasando, un recurso productivo ha perdido capacidad o un pedido necesita un plan distinto.<\/p>\n\n\n<p>El dashboard, el informe y el programa de producci\u00f3n respaldan distintas partes de esa decisi\u00f3n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>El dashboard indica d\u00f3nde centrar la atenci\u00f3n.<\/strong> \u00bfQu\u00e9 hay que examinar con m\u00e1s detalle ahora? Las tendencias hist\u00f3ricas pueden aportar contexto, pero la vista diaria debe dejar claras las desviaciones de hoy.<\/li><li><strong>Un <a href=\"\/es\/recursos\/informe-de-produccion\/\">informe de producci\u00f3n<\/a> recoge los resultados de un per\u00edodo definido.<\/strong> \u00bfQu\u00e9 ocurri\u00f3 durante el turno o la jornada y qu\u00e9 explica la diferencia respecto al plan comunicado?<\/li><li><strong>El programa de producci\u00f3n gu\u00eda el trabajo.<\/strong> \u00bfQu\u00e9 operaci\u00f3n debe ejecutarse a continuaci\u00f3n, en qu\u00e9 recurso productivo apto para realizarla y cu\u00e1ndo puede terminar?<\/li><\/ul>\n\n\n<p>Actualizar un gr\u00e1fico no equivale a revisar el programa de producci\u00f3n. Cuando una desviaci\u00f3n requiere intervenir, la <a href=\"\/es\/recursos\/que-es-la-programacion-de-la-produccion\/\">programaci\u00f3n de la producci\u00f3n<\/a> debe tener en cuenta las dem\u00e1s tareas que compiten por el mismo tiempo disponible.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Empieza por quien toma la decisi\u00f3n<\/h2>\n\n\n<p>Define a qui\u00e9n va dirigido el dashboard antes de elegir los gr\u00e1ficos. Una pantalla que intente servir por igual a operarios, planificadores y direcci\u00f3n puede hacer que todos tengan que buscar la informaci\u00f3n que necesitan.<\/p>\n\n\n<p><strong>Un supervisor de turno<\/strong> necesita saber si el equipo puede terminar el trabajo asignado y qu\u00e9 est\u00e1 impidiendo que avance. Las tareas en curso, las interrupciones y la producci\u00f3n utilizable importan m\u00e1s que una media mensual de toda la planta. El detalle \u00fatil es el de la operaci\u00f3n y el turno actual.<\/p>\n\n\n<p><strong>Un responsable o planificador de producci\u00f3n<\/strong> necesita ver qu\u00e9 compromisos est\u00e1n en riesgo y d\u00f3nde el plan ya no encaja con la capacidad disponible. La carga de las estaciones de trabajo, las operaciones retrasadas y la ruta de fabricaci\u00f3n pendiente ayudan a decidir si hay que cambiar una prioridad, ajustar la capacidad o revisar una fecha de finalizaci\u00f3n. El horizonte va m\u00e1s all\u00e1 del turno, porque un retraso de hoy puede bloquear el trabajo de ma\u00f1ana.<\/p>\n\n\n<p><strong>La direcci\u00f3n de planta<\/strong> necesita tendencias que ayuden a decidir sobre recursos productivos y mejoras: cuellos de botella recurrentes, cumplimiento de las entregas y p\u00e9rdidas que persisten en per\u00edodos comparables. Esas tendencias merecen una vista propia, en lugar de sobrecargar la pantalla de desviaciones diarias.<\/p>\n\n\n<p>Empieza por las decisiones que deben salir de tu reuni\u00f3n de seguimiento. Si el objetivo es asegurar las entregas de esta semana, organiza la vista general en torno a esos compromisos y los recursos productivos de los que dependen. A\u00f1ade un indicador solo cuando ayude al equipo a elegir una acci\u00f3n o comprobar su resultado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 indicadores son \u00fatiles en un dashboard de producci\u00f3n?<\/h2>\n\n\n<p>Las siguientes se\u00f1ales son un punto de partida pr\u00e1ctico para la revisi\u00f3n diaria de un responsable de producci\u00f3n. Elige las m\u00e9tricas que ayuden a tu equipo a tomar sus decisiones de producci\u00f3n.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Se\u00f1al<\/th><th>C\u00f3mo interpretarla en su contexto<\/th><th>Decisi\u00f3n que puede orientar<\/th><\/tr><\/thead><tbody><tr><td>Avance respecto al plan<\/td><td>\u00bfQu\u00e9 operaciones deber\u00edan haber empezado o terminado ya y qu\u00e9 queda pendiente?<\/td><td>Investigar una interrupci\u00f3n o actualizar el trabajo pendiente<\/td><\/tr><tr><td>Carga frente a capacidad disponible<\/td><td>\u00bfEn qu\u00e9 estaci\u00f3n de trabajo y franja de tiempo el trabajo requerido supera el tiempo disponible?<\/td><td>Cambiar la asignaci\u00f3n, la capacidad o las prioridades<\/td><\/tr><tr><td>Operaciones retrasadas y pedidos pr\u00f3ximos a su fecha de entrega<\/td><td>\u00bfQu\u00e9 tareas afectadas forman parte de la ruta de fabricaci\u00f3n necesaria para cumplir un compromiso con el cliente?<\/td><td>Asegurar una entrega o comunicar al cliente una nueva fecha cre\u00edble<\/td><\/tr><tr><td>Producci\u00f3n utilizable y p\u00e9rdidas por calidad<\/td><td>\u00bfEst\u00e1n listas las cantidades terminadas para el siguiente paso o faltan unidades debido a piezas desechadas y problemas de calidad sin resolver?<\/td><td>Confirmar el trabajo necesario para reponer las unidades y la capacidad que requiere<\/td><\/tr><tr><td>P\u00e9rdidas recurrentes de tiempo o rendimiento<\/td><td>\u00bfLa misma operaci\u00f3n tarda m\u00e1s de lo previsto de forma recurrente?<\/td><td>Investigar la causa y mejorar la estimaci\u00f3n o el proceso<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>No confundas m\u00e9tricas que tienen significados distintos. El hist\u00f3rico de entregas a tiempo indica c\u00f3mo se cumplieron las entregas ya realizadas. Por s\u00ed solo, no permite saber si los pedidos pendientes que deben entregarse esta semana se terminar\u00e1n a tiempo. Para analizar esa cuesti\u00f3n de cara al futuro, utiliza el programa de producci\u00f3n actual.<\/p>\n\n\n<p>Del mismo modo, un n\u00famero elevado de piezas puede deberse a una serie de productos sencillos, y no a una mejora del rendimiento de toda la f\u00e1brica. Compara trabajos similares y no contabilices el mismo componente en varias operaciones como si fueran varios productos terminados.<\/p>\n\n\n<p>La carga y el tiempo de funcionamiento tambi\u00e9n responden a preguntas distintas. La carga planificada describe el trabajo asignado a la capacidad disponible; el tiempo de funcionamiento registrado describe lo que ocurri\u00f3. Una m\u00e1quina inactiva no es necesariamente el siguiente destino para una tarea: debe poder realizar la operaci\u00f3n y contar con el personal y los insumos necesarios.<\/p>\n\n\n<p>La eficacia global de los equipos, u OEE, puede ayudar a investigar las p\u00e9rdidas de los equipos cuando se mide de forma consistente. Pero mejorar la eficiencia de una m\u00e1quina concreta no sustituye la decisi\u00f3n sobre qu\u00e9 pedidos deben pasar por ella. Una m\u00e1quina ocupada con el trabajo equivocado puede dejar esperando una entrega urgente.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ejemplo: un total de producci\u00f3n en verde y una entrega en riesgo<\/h2>\n\n\n<p>Imagina un taller de mecanizado cuya producci\u00f3n diaria parece ir bien porque ha terminado un lote grande de piezas sencillas. Sin embargo, a un pedido urgente de un cliente todav\u00eda le falta una operaci\u00f3n en un centro de mecanizado que se ha parado. Despu\u00e9s a\u00fan deben realizarse la inspecci\u00f3n y la expedici\u00f3n para que el pedido pueda salir.<\/p>\n\n\n<p>El total general tranquiliza; la ruta de fabricaci\u00f3n que le queda al pedido, no. El dashboard del responsable debe dirigir la atenci\u00f3n hacia el trabajo retrasado y el recurso productivo afectado, no limitarse a celebrar la cantidad de piezas producidas.<\/p>\n\n\n<p>Primero, confirma la situaci\u00f3n. \u00bfLa operaci\u00f3n sigue realmente sin terminar o simplemente no se ha registrado su finalizaci\u00f3n? \u00bfCu\u00e1nto tiempo se espera que la m\u00e1quina est\u00e9 fuera de servicio? La falta de una actualizaci\u00f3n requiere una respuesta distinta a la de una aver\u00eda.<\/p>\n\n\n<p>Si se confirma la interrupci\u00f3n, el equipo de planificaci\u00f3n puede comparar alternativas viables. Otra m\u00e1quina podr\u00eda ser apta para la operaci\u00f3n, pero trasladar all\u00ed el trabajo urgente ocupar\u00e1 tiempo ya asignado a otros pedidos. Puede ser preferible volver a poner en servicio la m\u00e1quina original, pero solo si sigue habiendo tiempo para completar las operaciones pendientes antes de la expedici\u00f3n. Dar m\u00e1s prioridad a la tarea cambia la secuencia; no crea capacidad adicional.<\/p>\n\n\n<p>Aqu\u00ed es donde el programa de producci\u00f3n demuestra su utilidad junto al dashboard. Revisa el conjunto del trabajo afectado, decide la prioridad y comprueba las fechas de finalizaci\u00f3n resultantes antes de comunicar una nueva secuencia a producci\u00f3n. Si no se puede asegurar la entrega, el equipo comercial necesita una nueva fecha cre\u00edble, no otra promesa optimista.<\/p>\n\n\n<p>El dashboard cumple su funci\u00f3n cuando la desviaci\u00f3n da lugar a una decisi\u00f3n clara y un plan compartido, no cuando se queda en un indicador rojo que todos han visto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">De la visi\u00f3n general a la acci\u00f3n con SkyPlanner<\/h2>\n\n\n<p>Los dashboards de informes de SkyPlanner permiten organizar widgets arrastr\u00e1ndolos y solt\u00e1ndolos, elegir intervalos de fechas y crear distintas vistas para diferentes usuarios. Tambi\u00e9n puedes mostrar un dashboard en una pantalla de producci\u00f3n. As\u00ed es m\u00e1s f\u00e1cil disponer de una visi\u00f3n compartida y relevante para la revisi\u00f3n diaria sin preparar una presentaci\u00f3n aparte cada ma\u00f1ana.<\/p>\n\n\n<p>Para un planificador, la capacidad, la carga y el trabajo retrasado son puntos de partida \u00fatiles. Mant\u00e9n accesibles los registros detallados para responder a las preguntas que surjan de la vista general. Los informes de tareas y l\u00edneas de pedido de SkyPlanner aportan contexto sobre cada trabajo, mientras que Timer registra el tiempo de producci\u00f3n y las cantidades producidas o defectuosas. As\u00ed puedes investigar la operaci\u00f3n afectada en lugar de rastrear un total sin explicaci\u00f3n entre las hojas de c\u00e1lculo de distintos departamentos.<\/p>\n\n\n<p>Despu\u00e9s, utiliza el programa de producci\u00f3n para actuar. Arcturus, la IA de SkyPlanner para la programaci\u00f3n de la producci\u00f3n, calcula c\u00f3mo programar el trabajo seg\u00fan las estaciones de trabajo, los turnos, los operarios, las dependencias entre operaciones y las prioridades que hayas configurado. El diagrama de Gantt muestra la secuencia resultante. Cuando cambia la capacidad o las prioridades, la reprogramaci\u00f3n calcula los efectos sobre todos los trabajos relacionados, en lugar de obligarte a rehacer cada cola de trabajo a mano.<\/p>\n\n\n<p>T\u00fa decides las prioridades y qu\u00e9 decisiones de programaci\u00f3n deben quedar protegidas; Arcturus respeta tus reglas y bloqueos. En el ejemplo del taller de mecanizado, esto significa tener en cuenta la estaci\u00f3n de trabajo no disponible y comprobar c\u00f3mo afecta el programa revisado al pedido urgente y a las tareas que lo rodean.<\/p>\n\n\n<p>SkyPlanner se integra con cualquier ERP o MES a trav\u00e9s de su REST API abierta. As\u00ed, los pedidos y las actualizaciones de producci\u00f3n de tus sistemas actuales pueden vincularse a la programaci\u00f3n, en lugar de servir \u00fanicamente para elaborar m\u00e1s informes desconectados de ella. Explora las <a href=\"\/es\/funciones\/\">funciones de informes y programaci\u00f3n de SkyPlanner<\/a> para ver c\u00f3mo se conectan la visi\u00f3n general, los registros de producci\u00f3n y el plan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Asegura la fiabilidad de la informaci\u00f3n antes de actuar<\/h2>\n\n\n<p>Una pantalla que parece mostrar datos en tiempo real solo resulta \u00fatil si la informaci\u00f3n llega a tiempo para tomar la decisi\u00f3n. Acuerda de d\u00f3nde procede cada se\u00f1al importante, qui\u00e9n registra los cambios y con qu\u00e9 frecuencia se actualiza la fuente. Actualizar la pantalla m\u00e1s a menudo no mostrar\u00e1 que un trabajo ha terminado si nadie ha registrado su finalizaci\u00f3n.<\/p>\n\n\n<p>Deja claro el alcance de la vista: la f\u00e1brica o el departamento, el periodo del informe, el objetivo y la antig\u00fcedad de los datos de origen. Una decisi\u00f3n de producci\u00f3n que se toma cada hora puede requerir actualizaciones frecuentes del avance; una revisi\u00f3n semanal de capacidad tiene otras necesidades. Elige la frecuencia de actualizaci\u00f3n de los datos en funci\u00f3n del tiempo de respuesta que necesitas, no del atractivo de las palabras \u00abtiempo real\u00bb.<\/p>\n\n\n<p>Deja tambi\u00e9n claro cu\u00e1l es el plan de referencia. El programa vigente debe adaptarse a los cambios de producci\u00f3n, mientras que una comparaci\u00f3n del rendimiento necesita un objetivo identificable. De lo contrario, modificar el plan de hoy puede dar la impresi\u00f3n de que el incumplimiento de ayer ha desaparecido.<\/p>\n\n\n<p>Durante la revisi\u00f3n, asigna a cada desviaci\u00f3n importante una acci\u00f3n, un responsable y una pr\u00f3xima comprobaci\u00f3n. Define los umbrales de atenci\u00f3n seg\u00fan las consecuencias relevantes para tu f\u00e1brica, como una operaci\u00f3n retrasada que pone en riesgo la entrega de un pedido. Una advertencia debe indicar al equipo qu\u00e9 investigar, no culpar autom\u00e1ticamente al operario ni exigir un cambio precipitado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Una visi\u00f3n compartida de la producci\u00f3n en UTU<\/h2>\n\n\n<p>UTU, fabricante de cuadros el\u00e9ctricos y aparamenta, antes planificaba con hojas de Excel independientes para cada departamento. Cuando la secuencia cambiaba en el ERP, la actualizaci\u00f3n no siempre llegaba a planta. Era dif\u00edcil saber con qu\u00e9 capacidad se pod\u00eda contar realmente y el equipo dedicaba tiempo cada ma\u00f1ana a confirmar qu\u00e9 deb\u00eda hacer y en qu\u00e9 orden.<\/p>\n\n\n<p>Al integrar SkyPlanner con Oracle NetSuite y su sistema de n\u00f3minas, UTU reuni\u00f3 las l\u00edneas y los departamentos de la f\u00e1brica de Ulvila en un \u00fanico entorno. Los gr\u00e1ficos de capacidad y carga ayudan al control diario, junto con el diagrama de Gantt y la programaci\u00f3n basada en IA. Seg\u00fan UTU, la cola de trabajo revisada llega a los instaladores de la l\u00ednea en segundos.<\/p>\n\n\n<p>La mejora clave est\u00e1 en esa conexi\u00f3n: las personas pueden ver la situaci\u00f3n de la producci\u00f3n y trabajar siguiendo la secuencia actualizada. El <a href=\"\/es\/casos-de-clientes\/utu\/\">testimonio de UTU sobre SkyPlanner<\/a> muestra por qu\u00e9 una visi\u00f3n compartida aporta m\u00e1s valor cuando est\u00e1 conectada con el plan que realmente se sigue en planta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Centra tu pr\u00f3xima revisi\u00f3n diaria en una desviaci\u00f3n real<\/h2>\n\n\n<p>Piensa en un problema de tu \u00faltima reuni\u00f3n de producci\u00f3n. \u00bfPudo el equipo identificar el trabajo afectado, confirmar la causa y ver c\u00f3mo repercutir\u00eda un cambio en las dem\u00e1s entregas? Si para responder hubo que preparar otro informe y actualizar varias colas de trabajo por separado, mejorar los gr\u00e1ficos no bastar\u00e1 para eliminar buena parte de ese trabajo.<\/p>\n\n\n<p><a href=\"\/es\/contacto-con-ventas\/\">Reserva una demo de SkyPlanner<\/a> y trae ese caso, los pedidos afectados y el recurso productivo que comparten. Descubre c\u00f3mo una visi\u00f3n de la producci\u00f3n centrada en lo importante y la programaci\u00f3n a capacidad finita pueden ayudarte a responder con menos coordinaci\u00f3n manual. Si prefieres explorar primero el entorno, <a href=\"\/es\/prueba\/\">prueba SkyPlanner con datos de demostraci\u00f3n<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy La producci\u00f3n de la f\u00e1brica supera el objetivo, pero un pedido que debe entregarse ma\u00f1ana est\u00e1 esperando en una m\u00e1quina parada. En la reuni\u00f3n de la ma\u00f1ana, un total en verde indica que la producci\u00f3n va bien. El cliente est\u00e1 a punto de recibir un mensaje muy distinto. &#8230; <a title=\"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/\" aria-label=\"Leer m\u00e1s sobre Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":102249,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2568,306],"tags":[],"class_list":["post-102219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-en-fabricacion","category-recursos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy<\/title>\n<meta name=\"description\" content=\"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\" \/>\n<meta property=\"og:description\" content=\"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T08:15:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T03:23:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\",\"datePublished\":\"2026-10-20T08:15:33+00:00\",\"dateModified\":\"2026-10-21T03:23:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/\"},\"wordCount\":2564,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"articleSection\":[\"Eficiencia en fabricaci\u00f3n\",\"recursos\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/\",\"name\":\"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"datePublished\":\"2026-10-20T08:15:33+00:00\",\"dateModified\":\"2026-10-21T03:23:08+00:00\",\"description\":\"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A magnifying glass highlights a paused machining station and waiting work within an otherwise orderly production flow.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/recursos\\\/dashboard-de-produccion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy","description":"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/","og_locale":"es_ES","og_type":"article","og_title":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy","og_description":"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T08:15:33+00:00","article_modified_time":"2026-10-21T03:23:08+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tiempo de lectura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy","datePublished":"2026-10-20T08:15:33+00:00","dateModified":"2026-10-21T03:23:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/"},"wordCount":2564,"publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","articleSection":["Eficiencia en fabricaci\u00f3n","recursos"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/","url":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/","name":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","datePublished":"2026-10-20T08:15:33+00:00","dateModified":"2026-10-21T03:23:08+00:00","description":"Un total de producci\u00f3n en verde puede ocultar un pedido atrasado. Elige se\u00f1ales del dashboard de producci\u00f3n para decidir hoy y ajustar el programa con SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","width":1672,"height":941,"caption":"A magnifying glass highlights a paused machining station and waiting work within an otherwise orderly production flow."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/recursos\/dashboard-de-produccion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Dashboard de producci\u00f3n: qu\u00e9 requiere atenci\u00f3n hoy La producci\u00f3n de la f\u00e1brica supera el objetivo, pero un pedido que debe entregarse ma\u00f1ana est\u00e1 esperando en una m\u00e1quina parada. En la reuni\u00f3n de la ma\u00f1ana, un total en verde indica que la producci\u00f3n va bien. El cliente est\u00e1 a punto de recibir un mensaje muy distinto.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=102219"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102219\/revisions"}],"predecessor-version":[{"id":102282,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/posts\/102219\/revisions\/102282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media\/102249"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=102219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/categories?post=102219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/tags?post=102219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}