{"id":102819,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciones\/erp\/dynamics-365-scm\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"dynamics-365-scm","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/","title":{"rendered":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/es\/integraciones\/\">Integraciones<\/a> \/ <a href=\"\/es\/integraciones\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Dynamics 365 Supply Chain Management: <span class=\"hl\">programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS es un complemento de programaci\u00f3n de la producci\u00f3n para Microsoft Dynamics 365 Supply Chain Management que respeta la capacidad real de m\u00e1quinas y personal. Tiene en cuenta las limitaciones de cada orden de producci\u00f3n, recurso productivo, operario, herramienta y material en cada momento, a lo largo de todo el horizonte de programaci\u00f3n. D365 solo considera parcialmente esas limitaciones. Planning Optimization solo tiene en cuenta la capacidad limitada dentro del per\u00edodo de cobertura de capacidad. Microsoft indica que no se debe utilizar la funcionalidad de capacidad finita cuando la capacidad cambia con los turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fuente<\/a>), y la programaci\u00f3n de tareas reserva capacidad para una orden cada vez (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fuente<\/a>). SkyPlanner programa todas las \u00f3rdenes conjuntamente, y Autopilot las reprograma autom\u00e1ticamente cuando cambia la producci\u00f3n.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/es\/prueba\/\">Iniciar prueba gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/es\/contacto-con-ventas\/\">Reservar una demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programaci\u00f3n de la producci\u00f3n<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt de SkyPlanner APS con tareas programadas en distintas estaciones de trabajo y una lista de pedidos debajo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integra con Dynamics 365 Supply Chain Management en ambos sentidos: recibe \u00f3rdenes de producci\u00f3n, operaciones de ruta, recursos productivos, productos emitidos y pedidos de compra, y devuelve las fechas programadas y los recursos productivos asignados. Durante la puesta en marcha, el equipo de SkyPlanner adapta la integraci\u00f3n a su configuraci\u00f3n de Supply Chain Management.<\/p>\n\n\n<p>El precio parte de 199 \u20ac al mes e incluye 5 estaciones de trabajo. Cada estaci\u00f3n de trabajo adicional cuesta 20 \u20ac al mes. La prueba gratuita dura 30 d\u00edas, permite utilizar hasta 20 estaciones de trabajo y no requiere tarjeta de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 cambia en su producci\u00f3n<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Toda la planta en un solo programa.<\/p>\n\n\n<p class=\"fx-pain__b\">La programaci\u00f3n de tareas de D365 SCM asigna las \u00f3rdenes de producci\u00f3n una a una, en los huecos que deja la capacidad ya reservada. SkyPlanner programa conjuntamente todas las \u00f3rdenes abiertas seg\u00fan la capacidad real, de modo que la primera orden que se programa ya no se queda por defecto con las mejores franjas horarias.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Los turnos cuentan de verdad.<\/p>\n\n\n<p class=\"fx-pain__b\">La capacidad de cada m\u00e1quina y cada persona se limita seg\u00fan los turnos reales, las ausencias y las horas extra. Precisamente cuando la capacidad depende de los turnos, Microsoft desaconseja utilizar la funcionalidad de capacidad finita en la planificaci\u00f3n maestra. SkyPlanner est\u00e1 dise\u00f1ado para ello.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos cambios de formato.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner conoce el tiempo de cambio de formato entre cada par de productos, en ambos sentidos. Pasar de azul a rojo puede llevar 30 minutos, y de rojo a azul, 60. El motor secuencia las tareas para perder el menor tiempo posible en preparaciones.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Herramientas y equipos de operarios compartidos, sin solapamientos.<\/p>\n\n\n<p class=\"fx-pain__b\">Un molde que se est\u00e1 utilizando en una m\u00e1quina nunca se reserva en otra al mismo tiempo. Si una tarea necesita tres operarios, se le asignan tres personas con disponibilidad en sus turnos. Cuando un recurso productivo est\u00e1 ocupado, el trabajo se asigna a otra m\u00e1quina o persona.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Un programa que respeta la disponibilidad de material.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner comprueba las existencias y los pedidos de compra pendientes de recibir. Si una tarea depende de una entrega del proveedor, se programa para despu\u00e9s de esa fecha, en lugar de quedar parada en planta.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pedidos urgentes reprogramados en segundos.<\/p>\n\n\n<p class=\"fx-pain__b\">Cuando se para una m\u00e1quina o llega un pedido urgente, Autopilot reprograma autom\u00e1ticamente la producci\u00f3n. Se respetan los bloqueos y las prioridades que haya definido, y los planificadores pueden ajustar las tareas en un diagrama de Gantt interactivo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operario ve sus pr\u00f3ximas tareas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operario consulta sus pr\u00f3ximas tareas en un m\u00f3vil o una tableta y registra el trabajo a medida que lo realiza. La oficina ve el avance en tiempo real.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opiniones de fabricantes sobre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista en cadena de suministro de UTU, en la planta de producci\u00f3n de cuadros el\u00e9ctricos de Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>de ahorro cada semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCon SkyPlanner hemos pasado de planificar la producci\u00f3n con hojas de Excel a optimizarla en tiempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista en cadena de suministro<\/b><br>UTU \u00b7 Cuadros el\u00e9ctricos y aparamenta<\/p>\n\n\n<p class=\"ind-cust__result\">La planificaci\u00f3n de la producci\u00f3n ahorra 2 horas de trabajo cada semana, y la nueva cola de tareas llega a la l\u00ednea en segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/es\/casos-de-clientes\/utu\/\">Leer la opini\u00f3n de UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operarios con trajes de sala limpia en una l\u00ednea de llenado de frascos de la planta farmac\u00e9utica de Laboratory &amp; Allied en Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de eficiencia en la producci\u00f3n<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cLa eficiencia en producci\u00f3n ha aumentado un 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, responsable de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabricaci\u00f3n farmac\u00e9utica<\/p>\n\n\n<p class=\"ind-cust__result\">La eficiencia en producci\u00f3n ha aumentado un 90%, y se tarda menos de 30 minutos en elaborar un plan optimizado de tres meses para todas las estaciones de trabajo.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/es\/casos-de-clientes\/laboratory-allied\/\">Leer la opini\u00f3n de Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general de Mamec, en la nave de producci\u00f3n de la empresa en Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000s<\/b><span>\u00f3rdenes de trabajo programadas autom\u00e1ticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAhora controlamos la producci\u00f3n de otra manera, y nuestro conocimiento de la capacidad est\u00e1 a un nivel completamente distinto.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mezcladores industriales, bombas y fabricaci\u00f3n de alta tecnolog\u00eda por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">Se programan autom\u00e1ticamente miles de \u00f3rdenes de trabajo, y toda la organizaci\u00f3n dispone de una visi\u00f3n de la producci\u00f3n en tiempo real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/es\/casos-de-clientes\/mamec\/\">Leer la opini\u00f3n de Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, responsable de producci\u00f3n de Fredman Operations, junto a una c\u00e9lula robotizada de paletizado en Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidad disponible que puede consultar el equipo de ventas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner aporta la base y la fiabilidad necesarias para toda la planificaci\u00f3n de la producci\u00f3n.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, responsable de producci\u00f3n<\/b><br>Fredman Operations \u00b7 Papeles de envasado aptos para uso alimentario<\/p>\n\n\n<p class=\"ind-cust__result\">El equipo de ventas ve la capacidad disponible con seis meses de antelaci\u00f3n, y las solicitudes de cambios en el programa que antes requer\u00edan una hora o m\u00e1s se responden en segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/es\/casos-de-clientes\/fredman-operations\/\">Leer la opini\u00f3n de Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-dynamics-365-supply-chain-management-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00f3mo funciona la integraci\u00f3n con Dynamics 365 Supply Chain Management<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Supply Chain Management env\u00eda el trabajo.<\/strong> SkyPlanner recibe las \u00f3rdenes de producci\u00f3n confirmadas y liberadas, con sus operaciones de ruta y l\u00edneas de BOM, junto con los recursos productivos, los calendarios, las existencias disponibles y los pedidos de compra.<\/li>\n\n\n<li><strong>SkyPlanner crea el programa y lo mantiene al d\u00eda.<\/strong> El motor Arcturus programa en segundos todas las operaciones en el conjunto de recursos productivos y las reprograma cuando cambia la producci\u00f3n.<\/li>\n\n\n<li><strong>Las fechas vuelven a Supply Chain Management.<\/strong> Las fechas y horas de inicio y fin programadas y el recurso productivo elegido se devuelven a la orden de producci\u00f3n y a sus operaciones de ruta. Los webhooks de SkyPlanner env\u00edan cada cambio del programa en cuanto se produce.<\/li>\n\n<\/ol>\n\n\n<p>Supply Chain Management sigue siendo su sistema de referencia. Conserva los productos emitidos, las BOM, las rutas, Planning Optimization, las compras, el inventario y el c\u00e1lculo de costes. SkyPlanner se encarga de la secuencia y los tiempos de cada operaci\u00f3n.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto de Dynamics 365 SCM<\/th><th>Objeto de SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Productos emitidos<\/td><td>Productos y materiales<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Lista de materiales, l\u00edneas de BOM de producci\u00f3n<\/td><td>Estructura del producto, subproductos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Ruta, operaciones de ruta, propiedades de las operaciones<\/td><td>Etapas del proceso con tiempos de preparaci\u00f3n y ejecuci\u00f3n<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Recursos productivos, grupos de recursos productivos, capacidades<\/td><td>Estaciones de trabajo, grupos de estaciones de trabajo, eficiencias<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Calendarios laborales<\/td><td>Turnos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>\u00d3rdenes de producci\u00f3n, operaciones de ruta, tareas de ruta<\/td><td>\u00d3rdenes y tareas con fechas de vencimiento<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Existencias disponibles, l\u00edneas de pedidos de compra<\/td><td>Existencias y entradas de material previstas<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Inicio y fin programados, recurso productivo<\/td><td>Fechas previstas de la operaci\u00f3n y estaci\u00f3n de trabajo<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><tr><td>Diario de tarjetas de ruta<\/td><td>Horas y cantidades registradas<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>SkyPlanner se conecta a las entidades de datos est\u00e1ndar de Supply Chain Management a trav\u00e9s del endpoint OData REST, con autenticaci\u00f3n mediante un registro de aplicaci\u00f3n en Microsoft Entra ID. No hay que instalar ning\u00fan complemento. Cada planta utiliza D365 SCM de forma distinta, por lo que el equipo de SkyPlanner adapta la integraci\u00f3n a su configuraci\u00f3n durante la puesta en marcha y ofrece soporte una vez que entra en funcionamiento. La integraci\u00f3n se presupuesta de antemano seg\u00fan sus procesos y necesidades. Su partner de Dynamics o sus propios desarrolladores tambi\u00e9n pueden crear la integraci\u00f3n utilizando la API documentada de SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referencia de la API<\/a>).<\/p>\n\n\n<p>Encontrar\u00e1 las entidades, las reglas para la devoluci\u00f3n de datos y los problemas que conviene evitar en la <a href=\"\/es\/integraciones\/erp\/dynamics-365-scm\/guia-de-integracion\/\">gu\u00eda de integraci\u00f3n con Dynamics 365 SCM para la programaci\u00f3n de la producci\u00f3n<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"job-scheduling-planning-optimization-and-finite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Programaci\u00f3n de tareas, Planning Optimization y programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>D365 SCM solo tiene en cuenta parcialmente los l\u00edmites de capacidad. Planning Optimization considera la capacidad limitada dentro de un per\u00edodo de cobertura, pero la trata como ilimitada fuera de \u00e9l. La programaci\u00f3n de tareas reserva capacidad respetando sus l\u00edmites, pero lo hace para una orden cada vez, en los huecos que dejan las \u00f3rdenes programadas anteriormente (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fuente<\/a>). La <a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">propia documentaci\u00f3n de Microsoft<\/a> establece estas limitaciones:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>La planificaci\u00f3n maestra con capacidad finita presupone una capacidad fija.<\/strong> Para la planificaci\u00f3n maestra, Microsoft aconseja: \u00abIf your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality.\u00bb (Si la capacidad puede cambiar seg\u00fan las necesidades, por ejemplo, al trabajar por turnos, no se debe utilizar la funcionalidad de capacidad finita).<\/li>\n\n\n<li><strong>La capacidad solo se limita dentro de un horizonte temporal.<\/strong> Fuera del horizonte de capacidad finita, la planificaci\u00f3n maestra considera una capacidad infinita. Microsoft se\u00f1ala: \u00aba single-day time fence is probably too low for most manufacturers.\u00bb (Un horizonte de un solo d\u00eda probablemente sea demasiado corto para la mayor\u00eda de los fabricantes).<\/li>\n\n\n<li><strong>Orden por orden.<\/strong> La programaci\u00f3n de tareas sit\u00faa cada orden de producci\u00f3n hacia delante o hacia atr\u00e1s, respetando las reservas existentes, y selecciona los recursos productivos por el menor lead time o por prioridad. La preparaci\u00f3n se contabiliza como tiempo de la operaci\u00f3n, y la programaci\u00f3n de tareas admite un m\u00e1ximo de 32 recursos productivos por operaci\u00f3n. La planificaci\u00f3n maestra puede secuenciar las \u00f3rdenes planificadas seg\u00fan atributos del producto, como el color y el tama\u00f1o (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">fuente<\/a>).<\/li>\n\n\n<li><strong>El diagrama de Gantt permite realizar ajustes manuales.<\/strong> Los planificadores programan las tareas seleccionadas desde un men\u00fa, ordenan las tareas de un recurso productivo y las reasignan a otro. La funci\u00f3n de arrastrar y soltar mueve una tarea cada vez dentro del mismo recurso productivo. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">fuente<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Fuera del horizonte temporal, y siempre que los turnos modifiquen la capacidad disponible, la planificaci\u00f3n maestra de D365 ofrece un plan aproximado. SkyPlanner programa conjuntamente todas las \u00f3rdenes, m\u00e1quinas, personas, herramientas, materiales y cambios de formato con un \u00fanico motor, respetando la capacidad real de m\u00e1quinas y personal durante todo el horizonte. Autopilot replanifica autom\u00e1ticamente cuando cambia la producci\u00f3n. Encontrar\u00e1 todos los detalles en <a href=\"\/es\/integraciones\/erp\/dynamics-365-scm\/programacion-produccion\/\">\u00bfDispone Dynamics 365 SCM de programaci\u00f3n de la producci\u00f3n con capacidad finita?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dynamics 365 SCM: funcionamiento actual y con SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programaci\u00f3n est\u00e1ndar de D365 SCM<\/th><th>D365 SCM con SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Alcance<\/td><td>Las \u00f3rdenes de producci\u00f3n se programan una a una, respetando las reservas existentes<\/td><td>Todas las \u00f3rdenes de producci\u00f3n se programan conjuntamente en segundos<\/td><\/tr><tr><td>Capacidad<\/td><td>Capacidad finita parcial: la planificaci\u00f3n maestra solo la aplica dentro de un horizonte temporal y no cuando la capacidad var\u00eda por turnos; la programaci\u00f3n de tareas procesa una orden cada vez<\/td><td>Se respeta la disponibilidad real de cada m\u00e1quina, persona, herramienta y material a cada hora, con los turnos y ausencias reales, durante todo el horizonte<\/td><\/tr><tr><td>Cambios de formato<\/td><td>Tiempo de preparaci\u00f3n por operaci\u00f3n; secuenciaci\u00f3n de \u00f3rdenes planificadas por atributos<\/td><td>Las tareas se ordenan para minimizar el tiempo total de preparaci\u00f3n<\/td><\/tr><tr><td>Herramientas y equipos de operarios<\/td><td>Las herramientas y los operarios se reservan orden por orden<\/td><td>Las herramientas compartidas y las tareas que requieren varios operarios se programan teniendo en cuenta todas las \u00f3rdenes<\/td><\/tr><tr><td>Materiales<\/td><td>Disponibilidad limitada de materiales por orden<\/td><td>Las tareas comienzan cuando hay existencias o se reciben las entregas previstas<\/td><\/tr><tr><td>Cambios<\/td><td>El planificador reprograma las \u00f3rdenes y ajusta las tareas en el diagrama de Gantt<\/td><td>Autopilot replanifica toda la planta respetando sus prioridades<\/td><\/tr><tr><td>Planta<\/td><td>Ejecuci\u00f3n en planta<\/td><td>Mobile Confirmations: los operarios consultan su cola de tareas y registran el trabajo desde un m\u00f3vil o una tableta<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-dynamics-365-scm\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00f3mo elegir una herramienta de programaci\u00f3n para Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Para una <a href=\"\/es\/software-de-programacion-de-la-produccion-para-medianas\/\">planta de tama\u00f1o medio<\/a> que quiere dejar atr\u00e1s las hojas de c\u00e1lculo, la elecci\u00f3n est\u00e1 entre la programaci\u00f3n de tareas de D365 junto con Planning Optimization, o SkyPlanner. D365 permite trabajar con capacidad finita dentro de un horizonte temporal y con una orden cada vez. SkyPlanner ofrece un programa que respeta la capacidad real de toda la planta. <strong>Elija SkyPlanner en lugar de la programaci\u00f3n de tareas de D365 y Planning Optimization cuando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Todas las \u00f3rdenes de producci\u00f3n compiten por los mismos recursos productivos.<\/strong> En la programaci\u00f3n de tareas, se establece una fecha de inicio o de fin y se ejecuta la programaci\u00f3n. El motor elige el recurso productivo con el menor lead time, respetando las reservas ya realizadas (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fuente<\/a>). La primera orden que se programa obtiene los mejores huecos. SkyPlanner programa todas las \u00f3rdenes conjuntamente en segundos.<\/li>\n\n\n<li><strong>Necesita respetar la capacidad real durante todo el horizonte, con los turnos reales.<\/strong> Planning Optimization solo aplica capacidad finita dentro del horizonte de capacidad, y Microsoft desaconseja utilizarla en la planificaci\u00f3n maestra cuando la capacidad cambia con los turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fuente<\/a>). SkyPlanner planifica cada m\u00e1quina y cada persona seg\u00fan su capacidad real, teniendo en cuenta los turnos, las horas extra y las ausencias durante todo el horizonte.<\/li>\n\n\n<li><strong>Los cambios de formato determinan cu\u00e1nto puede producir.<\/strong> En la programaci\u00f3n de tareas, la preparaci\u00f3n se contabiliza como tiempo de la operaci\u00f3n y se suma al tiempo de ejecuci\u00f3n (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fuente<\/a>). La matriz de tiempos de preparaci\u00f3n de SkyPlanner recoge el tiempo de cambio de formato entre cada par de productos, en ambos sentidos, y ordena las tareas para minimizar el tiempo total de preparaci\u00f3n.<\/li>\n\n\n<li><strong>Las herramientas compartidas, los equipos de operarios y la llegada de materiales determinan qu\u00e9 se puede ejecutar a continuaci\u00f3n.<\/strong> Se respeta la disponibilidad limitada de las herramientas, se asigna todo el personal necesario a las tareas que requieren varios operarios y el trabajo se traslada a estaciones de trabajo alternativas. Las tareas comienzan cuando hay existencias o se reciben las entregas previstas.<\/li>\n\n\n<li><strong>El plan cambia varias veces por semana.<\/strong> Autopilot replanifica autom\u00e1ticamente ante cada cambio relevante y env\u00eda las nuevas fechas a Supply Chain Management.<\/li>\n\n\n<li><strong>Quiere disponer en semanas de un programa que respete la capacidad real.<\/strong> La prueba gratuita de 30 d\u00edas utiliza sus propios datos, los planes parten de 199 \u20ac al mes y los operarios registran el trabajo con Mobile Confirmations en la misma herramienta.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00f3mo empezar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie la prueba gratuita.<\/strong> 30 d\u00edas, hasta 20 estaciones de trabajo y todas las funciones de Basic, sin tarjeta de cr\u00e9dito.<\/li>\n\n\n<li><strong>Defina su producci\u00f3n.<\/strong> Cree las m\u00e1quinas, las personas y los turnos en SkyPlanner, o imp\u00f3rtelos a partir de sus recursos productivos y calendarios. Puede contar con asistencia durante la puesta en marcha.<\/li>\n\n\n<li><strong>Cargue sus \u00f3rdenes de producci\u00f3n.<\/strong> Exporte las \u00f3rdenes de producci\u00f3n abiertas y las operaciones de ruta de D365 SCM mediante un proyecto de exportaci\u00f3n de gesti\u00f3n de datos o el complemento de Excel. Imp\u00f3rtelas y compare el programa de SkyPlanner con su plan actual.<\/li>\n\n\n<li><strong>Conecte Supply Chain Management.<\/strong> El equipo de SkyPlanner configura la integraci\u00f3n bidireccional y ofrece soporte una vez que est\u00e1 en funcionamiento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Precios.<\/strong> Los planes se facturan mensualmente por estaci\u00f3n de trabajo. Puede a\u00f1adir o eliminar estaciones de trabajo, o cancelar, en cualquier momento. Consulte los detalles en <a href=\"\/es\/precios\/\">precios<\/a>. Encontrar\u00e1 otros ERP en la <a href=\"\/es\/integraciones\/erp\/\">secci\u00f3n de integraciones con ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/es\/prueba\/\">Iniciar prueba gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/es\/contacto-con-ventas\/\">Contactar con ventas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Preguntas frecuentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfCu\u00e1l es el mejor complemento de programaci\u00f3n para Dynamics 365 Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS es un complemento de programaci\u00f3n de la producci\u00f3n que respeta la capacidad real de m\u00e1quinas y personal y se integra con Dynamics 365 Supply Chain Management en ambos sentidos: recibe \u00f3rdenes de producci\u00f3n, operaciones de ruta, recursos productivos, productos liberados y pedidos de compra, y devuelve las fechas y los recursos productivos programados. Tiene en cuenta la disponibilidad limitada de cada recurso productivo, operario, herramienta y material. Una matriz de tiempos de preparaci\u00f3n que distingue el sentido de cada cambio secuencia las tareas para minimizar la preparaci\u00f3n. Autopilot reprograma autom\u00e1ticamente cuando cambia la producci\u00f3n. Los precios parten de 199 \u20ac al mes y la prueba gratuita dura 30 d\u00edas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfPermite Dynamics 365 Supply Chain Management programar la producci\u00f3n respetando la capacidad real de m\u00e1quinas y personal?<\/summary>\n<p class=\"sp-faq__a\">Solo en parte. Planning Optimization solo aplica capacidad finita dentro del horizonte de capacidad, y Microsoft desaconseja utilizarla en la planificaci\u00f3n maestra cuando los turnos modifican la capacidad disponible. La programaci\u00f3n de tareas respeta la capacidad finita, pero procesa una orden cada vez teniendo en cuenta la capacidad ya reservada. SkyPlanner APS a\u00f1ade un \u00fanico programa para todas las \u00f3rdenes durante todo el horizonte, respetando la capacidad real de las m\u00e1quinas y las personas y la disponibilidad de herramientas y materiales.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfConviene utilizar la programaci\u00f3n de tareas de D365 y Planning Optimization o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Utilice Planning Optimization para planificar los materiales y SkyPlanner para programar la producci\u00f3n seg\u00fan la capacidad real. D365 solo aplica capacidad finita de forma parcial. Planning Optimization solo la aplica dentro del horizonte temporal, y Microsoft desaconseja la planificaci\u00f3n maestra con capacidad finita cuando los turnos modifican la capacidad disponible. La programaci\u00f3n de tareas sit\u00faa una orden cada vez respetando las reservas existentes, por lo que la primera orden programada ocupa los mejores huecos. SkyPlanner programa conjuntamente todas las \u00f3rdenes, m\u00e1quinas, personas, herramientas y materiales, con una matriz de tiempos de preparaci\u00f3n para los cambios de formato. Autopilot replanifica autom\u00e1ticamente ante cada cambio relevante. El equipo de SkyPlanner configura la integraci\u00f3n bidireccional y ofrece soporte, y el sistema queda operativo en semanas. Los planes parten de 199 \u20ac al mes, con una prueba gratuita de 30 d\u00edas con sus propios datos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfEs necesario instalar un complemento en Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">No. SkyPlanner funciona en la nube junto a D365 SCM y se conecta a trav\u00e9s de sus entidades de datos est\u00e1ndar mediante OData. Su administrador registra una aplicaci\u00f3n en Microsoft Entra ID y la vincula a un usuario con los roles necesarios.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfSustituye SkyPlanner a Planning Optimization o a las funciones de fabricaci\u00f3n de D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">No, los complementa. Planning Optimization sigue planificando los materiales y proponiendo \u00f3rdenes de producci\u00f3n planificadas. Supply Chain Management sigue gestionando los productos, las listas de materiales, las rutas, las compras y el c\u00e1lculo de costes. SkyPlanner programa las \u00f3rdenes de producci\u00f3n confirmadas seg\u00fan la capacidad real y devuelve las fechas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfSkyPlanner solo sirve para Business Central?<\/summary>\n<p class=\"sp-faq__a\">No. Business Central y Supply Chain Management son productos distintos de Microsoft, y SkyPlanner se integra con ambos. Esta p\u00e1gina trata sobre Supply Chain Management: \u00f3rdenes de producci\u00f3n, operaciones de ruta, recursos productivos y grupos de recursos productivos. Business Central tiene su <a href=\"\/es\/integraciones\/erp\/business-central\/\">propia p\u00e1gina<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfCu\u00e1nto cuesta SkyPlanner para una planta que utiliza Dynamics 365 SCM?<\/summary>\n<p class=\"sp-faq__a\">Desde 199 \u20ac al mes con 5 estaciones de trabajo incluidas, m\u00e1s 20 \u20ac al mes por cada estaci\u00f3n de trabajo adicional. Una estaci\u00f3n de trabajo es un recurso productivo con su propia cola de tareas programadas. La integraci\u00f3n se presupuesta de antemano seg\u00fan sus procesos y necesidades, junto con su plan, para que conozca el coste total antes de empezar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfCu\u00e1nto tarda la implantaci\u00f3n?<\/summary>\n<p class=\"sp-faq__a\">La implantaci\u00f3n suele completarse en semanas desde el inicio de la puesta en marcha, incluso en empresas grandes. El equipo establece las correspondencias de sus recursos productivos y rutas, conecta las \u00f3rdenes de producci\u00f3n y los pedidos de compra, y configura el env\u00edo de datos de vuelta. Todo se contrasta con su plan actual antes de la entrada en producci\u00f3n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00bfPodemos probar SkyPlanner antes de integrarlo con Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">S\u00ed. La prueba de 30 d\u00edas utiliza una exportaci\u00f3n de sus \u00f3rdenes de producci\u00f3n, operaciones de ruta y recursos productivos. Podr\u00e1 ver un programa de su propia producci\u00f3n que respeta la capacidad real antes de que comience cualquier trabajo de integraci\u00f3n.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integraciones \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal SkyPlanner APS es un complemento de programaci\u00f3n de la producci\u00f3n para Microsoft Dynamics 365 Supply Chain Management que respeta la capacidad real de m\u00e1quinas y &#8230; <a title=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/\" aria-label=\"Leer m\u00e1s sobre SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100674,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102819","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM: programaci\u00f3n APS seg\u00fan la capacidad real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/dynamics-365-scm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/dynamics-365-scm\\\/\",\"name\":\"Dynamics 365 SCM: programaci\u00f3n APS seg\u00fan la capacidad real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/dynamics-365-scm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integraciones de software ERP y MES con SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para tu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/integraciones\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM: programaci\u00f3n APS seg\u00fan la capacidad real","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/","og_locale":"es_ES","og_type":"article","og_title":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal","og_description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.","og_url":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tiempo de lectura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/","url":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/","name":"Dynamics 365 SCM: programaci\u00f3n APS seg\u00fan la capacidad real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/es\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa con capacidad real e integraci\u00f3n bidireccional. Desde 199 \u20ac al mes.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/dynamics-365-scm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/es\/"},{"@type":"ListItem","position":2,"name":"Integraciones de software ERP y MES con SkyPlanner","item":"https:\/\/skyplanner.ai\/es\/integraciones\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para tu ERP","item":"https:\/\/skyplanner.ai\/es\/integraciones\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/es\/#website","url":"https:\/\/skyplanner.ai\/es\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/es\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/es\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/es\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integraciones \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programaci\u00f3n de la producci\u00f3n seg\u00fan la capacidad real de m\u00e1quinas y personal SkyPlanner APS es un complemento de programaci\u00f3n de la producci\u00f3n para Microsoft Dynamics 365 Supply Chain Management que respeta la capacidad real de m\u00e1quinas y&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/pages\/102819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/comments?post=102819"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/pages\/102819\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/pages\/100674"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/es\/wp-json\/wp\/v2\/media?parent=102819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}