{"id":42691,"date":"2024-09-17T07:16:46","date_gmt":"2024-09-17T07:16:46","guid":{"rendered":"https:\/\/skyplanner.ai\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b1%cf%80%ce%bf%ce%b4%ce%bf%cf%84%ce%b9%ce%ba%cf%8c%cf%84%ce%b7%cf%84%ce%b1-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%ce%b5%cf%80%ce%b9%cf%84%cf%85%ce%b3%cf%87%ce%ac%ce%bd%ce%b5\/"},"modified":"2026-10-19T14:42:01","modified_gmt":"2026-10-19T14:42:01","slug":"paragogiki-apotelesmatikotita-perissotera-me-ligoteri","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/","title":{"rendered":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"production-efficiency-calculate-it-and-improve-what-matters\">\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1<\/h1>\n\n\n\n<p>\u0397 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7\u03c2. \u03a4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03c3\u03ac\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b4\u03b9\u03b1\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf. \u03a4\u03bf \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03b2\u03ae\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9 \u03c0\u03c1\u03bf\u03ba\u03ac\u03bb\u03b5\u03c3\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c0\u03bf\u03b9\u03b1 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03b8\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03b9 \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03bf\u03cd\u03bd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.<\/p>\n\n\n\n<p>\u0391\u03c5\u03c4\u03ae \u03b7 \u03b4\u03b9\u03ac\u03ba\u03c1\u03b9\u03c3\u03b7 \u03ad\u03c7\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1 \u03c3\u03c4\u03b7\u03bd \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03ae \u03c0\u03af\u03b5\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5. \u039c\u03b9\u03b1 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03be\u03b5\u03c0\u03b5\u03c1\u03bd\u03ac \u03c4\u03bf\u03bd \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03bc\u03c9\u03c2 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bc\u03b5\u03b3\u03b1\u03bb\u03ce\u03bd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03bf\u03c5\u03c1\u03ac \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7. \u039c\u03b9\u03b1 \u03ac\u03bb\u03bb\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03ad\u03bd\u03b5\u03b9 \u03b1\u03b4\u03c1\u03b1\u03bd\u03ae\u03c2 \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c4\u03bf \u03c5\u03bb\u03b9\u03ba\u03cc \u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03b5\u03af \u03b7 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03cd\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7. \u03a4\u03bf \u03bd\u03b1 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03cc\u03bb\u03b5\u03c2 \u03bf\u03b9 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ad\u03c2 \u03c0\u03b9\u03bf \u03b1\u03c0\u03b1\u03c3\u03c7\u03bf\u03bb\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b4\u03b5\u03bd \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03b1 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03b8\u03b1 \u03c6\u03cd\u03b3\u03bf\u03c5\u03bd \u03bd\u03c9\u03c1\u03af\u03c4\u03b5\u03c1\u03b1.<\/p>\n\n\n\n<p>\u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03ad\u03bd\u03b1\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c0\u03bf\u03cd \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 \u03b7 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1 \u03bc\u03ad\u03c3\u03b1 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1. \u038c\u03c4\u03b1\u03bd \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03b5\u03c7\u03ae\u03c2 \u03b1\u03bd\u03b1\u03b4\u03b9\u03b1\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bf\u03c5\u03c1\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03c4\u03bf SkyPlanner APS \u03c3\u03ac\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c5\u03c4\u03cc \u03c4\u03bf \u03b5\u03cd\u03c1\u03b7\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03bf \u03ba\u03bf\u03b9\u03bd\u03cc \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1, \u03bc\u03b5 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"what-is-production-efficiency\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2;<\/h2>\n\n\n\n<p>\u03a3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7, \u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b4\u03b5\u03af\u03c7\u03bd\u03b5\u03b9 \u03c4\u03b7 \u03c3\u03c7\u03ad\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u03a4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b1\u03bd\u03ac \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03ce\u03c1\u03b1 \u03ae \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b2\u03bb\u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7. \u03a0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ac\u03b3\u03bc\u03b1\u03c4\u03b9 \u03bc\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5.<\/p>\n\n\n\n<p>\u038c\u03c4\u03b1\u03bd \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b1\u03b9 \u03c3\u03c9\u03c3\u03c4\u03ac, \u03b1\u03c5\u03c4\u03cc\u03c2 \u03bf \u03b4\u03b5\u03af\u03ba\u03c4\u03b7\u03c2 \u03c3\u03ac\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03b5\u03c5\u03ba\u03b1\u03b9\u03c1\u03af\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03c6\u03ce\u03bd, \u03bc\u03b5 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03c3\u03c0\u03b1\u03c4\u03ac\u03bb\u03b7 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5, \u03c0\u03c1\u03bf\u03c3\u03c0\u03ac\u03b8\u03b5\u03b9\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd. \u0397 \u03b1\u03bd\u03ac\u03ba\u03c4\u03b7\u03c3\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03b7\u03c2 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03b5\u03b9 \u03c4\u03bf \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03c0\u03cc\u03c1\u03c9\u03bd \u03b1\u03bd\u03ac \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03ae\u03c3\u03b5\u03b9 \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03bf \u03b3\u03b9\u03b1 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2, \u03c7\u03c9\u03c1\u03af\u03c2 \u03ac\u03bc\u03b5\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c3\u03b8\u03ae\u03ba\u03b7 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03bf\u03cd.<\/p>\n\n\n\n<p>\u03a4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03b1\u03c0\u03cc \u03bc\u03cc\u03bd\u03bf \u03c4\u03bf\u03c5 \u03b4\u03b5\u03bd \u03c3\u03b1\u03c2 \u03bb\u03ad\u03b5\u03b9 \u03b1\u03bd \u03c0\u03b1\u03c1\u03ac\u03b3\u03b1\u03c4\u03b5 \u03c4\u03b1 \u03c3\u03c9\u03c3\u03c4\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1, \u03b1\u03bd \u03c4\u03b7\u03c1\u03ae\u03c3\u03b1\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b4\u03b5\u03c3\u03bc\u03b5\u03cd\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2 \u03ae \u03b1\u03bd \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b1\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b5\u03c1\u03b4\u03bf\u03c6\u03bf\u03c1\u03af\u03b1. \u0391\u03c5\u03c4\u03ac \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03bc\u03b1\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c5\u03c0\u03b7\u03c1\u03b5\u03c4\u03b5\u03af \u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03ae \u03c3\u03b1\u03c2. \u0397 \u03c5\u03c8\u03b7\u03bb\u03ae \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c4\u03c1\u03bf\u03c6\u03bf\u03b4\u03bf\u03c4\u03b5\u03af \u03bc\u03b9\u03b1 \u03ae\u03b4\u03b7 \u03b3\u03b5\u03bc\u03ac\u03c4\u03b7 \u03bf\u03c5\u03c1\u03ac \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03b5\u03b9 \u03bc\u03b9\u03ba\u03c1\u03cc\u03c4\u03b5\u03c1\u03b7 \u03b1\u03be\u03af\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b5\u03be\u03ac\u03bb\u03b5\u03b9\u03c8\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03b5\u03c1\u03b5\u03af \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03bc\u03b5 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7 \u03c3\u03ae\u03bc\u03b5\u03c1\u03b1.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how-to-calculate-production-efficiency\">\u03a0\u03ce\u03c2 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/h2>\n\n\n\n<p>\u0388\u03bd\u03b1\u03c2 \u03c3\u03c5\u03bd\u03b7\u03b8\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c4\u03cd\u03c0\u03bf\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03b5\u03be\u03ae\u03c2:<\/p>\n\n\n\n<p><strong>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 (%) = \u03a0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u00f7 \u03a0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u00d7 100<\/strong><\/p>\n\n\n\n<p>\u03a0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af \u03c3\u03c4\u03bf \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7\u03c2. \u0391\u03bd \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b5 \u03c1\u03c5\u03b8\u03bc\u03bf\u03cd\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b4\u03b9\u03b1\u03b9\u03c1\u03ad\u03c3\u03c4\u03b5 \u03c4\u03bf\u03bd \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c1\u03c5\u03b8\u03bc\u03cc \u03bc\u03b5 \u03c4\u03bf\u03bd \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0394\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b2\u03ac\u03c3\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7\u03c2 \u03c9\u03c2 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd, \u03c4\u03bf\u03bd \u03c0\u03cc\u03c1\u03bf \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"a-worked-example\">\u03a0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd<\/h3>\n\n\n\n<p>\u0391\u03c2 \u03c5\u03c0\u03bf\u03b8\u03ad\u03c3\u03bf\u03c5\u03bc\u03b5 \u03cc\u03c4\u03b9 \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03ae\u03c2 \u03ba\u03b1\u03c4\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ad\u03c7\u03b5\u03b9 \u03c3\u03c5\u03bc\u03c6\u03c9\u03bd\u03b7\u03bc\u03ad\u03bd\u03bf \u03c1\u03c5\u03b8\u03bc\u03cc \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 50 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ac \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b1\u03bd\u03ac \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03ce\u03c1\u03b1. \u039c\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03be\u03ac\u03c9\u03c1\u03bf \u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b1\u03c6\u03bf\u03cd \u03b1\u03c6\u03b1\u03b9\u03c1\u03ad\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03b4\u03b9\u03b1\u03bb\u03b5\u03af\u03bc\u03bc\u03b1\u03c4\u03b1. \u03a3\u03c4\u03bf \u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b1\u03c5\u03c4\u03cc \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b5\u03c2, \u03bf\u03b9 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2. \u039a\u03b1\u03c4\u03ac \u03c4\u03b9\u03c2 \u03ad\u03be\u03b9 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 240 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ac \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u03a5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2<\/th><th>\u0391\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1<\/th><\/tr><\/thead><tbody><tr><td>\u03a0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: 50 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1\/\u03ce\u03c1\u03b1 \u00d7 6 \u03ce\u03c1\u03b5\u03c2<\/td><td>300 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1<\/td><\/tr><tr><td>\u03a0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ce\u03bd \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd<\/td><td>240 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1<\/td><\/tr><tr><td>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: 240 \u00f7 300 \u00d7 100<\/td><td>80%<\/td><\/tr><tr><td>\u03a0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: 240 \u00f7 6<\/td><td>40 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1\/\u03ce\u03c1\u03b1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\u03a0\u03b1\u03c1\u03ac\u03b3\u03b1\u03c4\u03b5 \u03c4\u03bf 80% \u03c4\u03b7\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0397 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c1\u03c5\u03b8\u03bc\u03ce\u03bd \u03b4\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf \u03af\u03b4\u03b9\u03bf \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1: 40 \u00f7 50 \u00d7 100 = 80%.<\/p>\n\n\n\n<p>\u0397 \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 60 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b9\u03c3\u03bf\u03b4\u03c5\u03bd\u03b1\u03bc\u03b5\u03af \u03bc\u03b5 1,2 \u03ce\u03c1\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03bf\u03bd \u03c1\u03c5\u03b8\u03bc\u03cc \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2. \u0391\u03c5\u03c4\u03cc \u03b4\u03b5\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03ad\u03bc\u03b5\u03b9\u03bd\u03b5 \u03b1\u03b4\u03c1\u03b1\u03bd\u03ae\u03c2 \u03b3\u03b9\u03b1 1,2 \u03ce\u03c1\u03b5\u03c2 \u03bf\u03cd\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03b7 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1 \u03b1\u03bb\u03bb\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1. \u0397 \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03c6\u03b5\u03af\u03bb\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ce\u03bd, \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03bc\u03b5 \u03bc\u03b5\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c1\u03c1\u03b9\u03c6\u03b8\u03ad\u03bd\u03c4\u03c9\u03bd \u03c4\u03b5\u03bc\u03b1\u03c7\u03af\u03c9\u03bd. \u03a7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03b1\u03c6\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c6\u03b1\u03c3\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b4\u03b9\u03bf\u03c1\u03b8\u03ce\u03c3\u03b5\u03c4\u03b5.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"make-the-comparison-meaningful\">\u0394\u03ce\u03c3\u03c4\u03b5 \u03bf\u03c5\u03c3\u03af\u03b1 \u03c3\u03c4\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7<\/h3>\n\n\n\n<p>\u03a0\u03c1\u03b9\u03bd \u03c0\u03ac\u03c1\u03b5\u03c4\u03b5 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc, \u03c3\u03c5\u03bc\u03c6\u03c9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03bf \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\u03a4\u03b9 \u03bc\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5 \u03c9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/strong> \u039c\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ac \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b1\u03c0\u03cc \u03bc\u03af\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03ae \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03ad\u03c4\u03bf\u03b9\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03bf\u03c3\u03c4\u03bf\u03bb\u03ae; \u039c\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03bc\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5 \u03b7\u03bc\u03b9\u03c4\u03b5\u03bb\u03b5\u03af\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c9\u03c2 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03ba\u03b1\u03b9 \u03bc\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03bc\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5 \u03b4\u03cd\u03bf \u03c6\u03bf\u03c1\u03ad\u03c2 \u03c4\u03bf \u03af\u03b4\u03b9\u03bf \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03cc \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03bc\u03b1 \u03bc\u03b5\u03c4\u03ac \u03b1\u03c0\u03cc \u03b5\u03c0\u03b1\u03bd\u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1.<\/li>\n\n<li><strong>\u03a0\u03bf\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03bf\u03b9\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03bc\u03b5\u03c4\u03c1\u03ac\u03c4\u03b5.<\/strong> \u039f\u03b9 \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03ce\u03c1\u03b5\u03c2, \u03bf\u03b9 \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03ce\u03c1\u03b5\u03c2 \u03c4\u03c9\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03bf \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03b5\u03b9 \u03c0\u03b1\u03c1\u03ad\u03bb\u03b8\u03b5\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5\u03b3\u03ad\u03b8\u03b7. \u0394\u03b9\u03b5\u03c5\u03ba\u03c1\u03b9\u03bd\u03af\u03c3\u03c4\u03b5 \u03b1\u03bd \u03b7 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf\u03c2 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2. \u0388\u03bd\u03b1\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03b5\u03c4\u03c1\u03b9\u03ad\u03c4\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03cc\u03c3\u03bf \u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03b1\u03c0\u03bf\u03ba\u03c1\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03cc\u03c4\u03b1\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c4\u03b1\u03bc\u03b1\u03c4\u03b7\u03bc\u03ad\u03bd\u03b7.<\/li>\n\n<li><strong>\u03a0\u03bf\u03b9\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b5.<\/strong> \u039a\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03c4\u03b5 \u03c3\u03b5 \u03c0\u03bf\u03b9\u03bf \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd, \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c1\u03bf \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9, \u03b1\u03c0\u03cc \u03c0\u03bf\u03cd \u03c0\u03c1\u03bf\u03ad\u03ba\u03c5\u03c8\u03b5 \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c4\u03b5 \u03b1\u03bd\u03b1\u03b8\u03b5\u03c9\u03c1\u03ae\u03b8\u03b7\u03ba\u03b5. \u0388\u03bd\u03b1\u03c2 \u03c0\u03b1\u03bb\u03b9\u03cc\u03c2 \u03bc\u03ad\u03c3\u03bf\u03c2 \u03cc\u03c1\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03cc\u03c2 \u03c1\u03c5\u03b8\u03bc\u03cc\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03b4\u03b5\u03bd \u03b5\u03ba\u03c6\u03c1\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b4\u03bf\u03ba\u03ce\u03bc\u03b5\u03bd\u03b7 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.<\/li>\n<\/ul>\n\n\n\n<p>\u0391\u03bd \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ae \u03c3\u03b1\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b4\u03b5\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03b5\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf, \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03c1\u03b9\u03bd \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03bf\u03bc\u03ac\u03b4\u03b5\u03c2 \u03ae \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03b1. \u039f \u03bf\u03b4\u03b7\u03b3\u03cc\u03c2 \u03bc\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/manufacturing-time-study\/\">\u03bc\u03b5\u03bb\u03ad\u03c4\u03b7 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae<\/a> \u03b5\u03be\u03b7\u03b3\u03b5\u03af \u03c0\u03ce\u03c2 \u03b7 \u03c0\u03b1\u03c1\u03b1\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03bf\u03b4\u03b7\u03b3\u03b5\u03af \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-if-you-make-several-products\">\u03a4\u03b9 \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03cc\u03c4\u03b1\u03bd \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1;<\/h3>\n\n\n\n<p>\u0397 \u03b1\u03c0\u03bb\u03ae \u03ba\u03b1\u03c4\u03b1\u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7 \u03b5\u03be\u03b1\u03c1\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03c0\u03b1\u03c1\u03b1\u03c0\u03bb\u03b1\u03bd\u03b7\u03c4\u03b9\u03ba\u03ae \u03cc\u03c4\u03b1\u03bd \u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03c0\u03bf\u03bb\u03cd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03b1\u03c0\u03cc \u03ad\u03bd\u03b1 \u03ac\u03bb\u03bb\u03bf. \u039c\u03b9\u03b1 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c6\u03c1\u03ac\u03c3\u03b5\u03c4\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1 \u03c3\u03b5 \u03ba\u03bf\u03b9\u03bd\u03ae \u03b2\u03ac\u03c3\u03b7 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03b1\u03c0\u03b1\u03c3\u03c7\u03cc\u03bb\u03b7\u03c3\u03b7\u03c2 \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd:<\/p>\n\n\n\n<p><strong>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 (%) = \u03a0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03bf\u03cd\u03bd \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u00f7 \u03a0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03b8\u03b7\u03ba\u03b1\u03bd \u00d7 100<\/strong><\/p>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03bf\u03cd\u03bd \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03b1\u03c3\u03b9\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ae \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03b1\u03b8\u03c1\u03bf\u03af\u03c3\u03c4\u03b5 \u03c4\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03bc\u03b1\u03c4\u03b1. \u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7: \u03bf\u03b9 \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03ce\u03c1\u03b5\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03ce\u03c1\u03b5\u03c2, \u03cc\u03c7\u03b9 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03ce\u03c1\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ae\u03bb\u03b8\u03b1\u03bd. \u0391\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03af\u03b4\u03b9\u03bf \u03c4\u03c1\u03cc\u03c0\u03bf \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c5\u03be\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03c3\u03b5 \u03cc\u03bb\u03b7 \u03c4\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7.<\/p>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03c9\u03c4\u03b9\u03ba\u03ac \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03bc\u03b1\u03c4\u03b1, \u03b1\u03b8\u03c1\u03bf\u03af\u03c3\u03c4\u03b5 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b5\u03c2 \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b5\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ce\u03c1\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03ad\u03c0\u03b5\u03b9\u03c4\u03b1 \u03ba\u03ac\u03bd\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03af\u03c1\u03b5\u03c3\u03b7. \u039c\u03b7\u03bd \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03c4\u03b5 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03c4\u03bf\u03bd \u03bc\u03ad\u03c3\u03bf \u03cc\u03c1\u03bf \u03c4\u03c9\u03bd \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03ce\u03bd \u03b1\u03c0\u03cc \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc \u03c6\u03cc\u03c1\u03c4\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"production-efficiency-productivity-utilization-and-oee\">\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b2\u03b1\u03b8\u03bc\u03cc\u03c2 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 OEE<\/h2>\n\n\n\n<p>\u0391\u03c5\u03c4\u03bf\u03af \u03bf\u03b9 \u03b4\u03b5\u03af\u03ba\u03c4\u03b5\u03c2 \u03b1\u03c0\u03b1\u03bd\u03c4\u03bf\u03cd\u03bd \u03c3\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03b5\u03c1\u03c9\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1. \u0391\u03bd \u03b3\u03bd\u03c9\u03c1\u03af\u03b6\u03b5\u03c4\u03b5 \u03c0\u03bf\u03b9\u03bf\u03bd \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c3\u03c4\u03b5, \u03b1\u03c0\u03bf\u03c6\u03b5\u03cd\u03b3\u03b5\u03c4\u03b5 \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c8\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03b4\u03af\u03c9\u03be\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7\u03c2 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2 \u03c3\u03b5 \u03bb\u03b1\u03bd\u03b8\u03b1\u03c3\u03bc\u03ad\u03bd\u03bf \u03c3\u03c4\u03cc\u03c7\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u0394\u03b5\u03af\u03ba\u03c4\u03b7\u03c2<\/th><th>\u03a3\u03b5 \u03c0\u03bf\u03b9\u03bf \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03b1 \u03b1\u03c0\u03b1\u03bd\u03c4\u03ac<\/th><\/tr><\/thead><tbody><tr><td>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/td><td>\u03a0\u03ce\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b7 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03bf\u03c1\u03af\u03c3\u03b5\u03b9;<\/td><\/tr><tr><td>\u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1<\/td><td>\u03a0\u03cc\u03c3\u03b7 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b1\u03bc\u03b5 \u03b1\u03bd\u03ac \u03bc\u03bf\u03bd\u03ac\u03b4\u03b1 \u03b5\u03b9\u03c3\u03c1\u03bf\u03ae\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03ce\u03c1\u03b5\u03c2, \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1 \u03ae \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2;<\/td><\/tr><tr><td>\u0392\u03b1\u03b8\u03bc\u03cc\u03c2 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2<\/td><td>\u03a0\u03cc\u03c3\u03bf \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c4\u03bf\u03c5 \u03c0\u03cc\u03c1\u03bf\u03c5 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b1\u03bc\u03b5, \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03bd \u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03c7\u03c1\u03ae\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b8\u03ad\u03c3\u03b5\u03b9;<\/td><\/tr><tr><td>\u03a3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03bf\u03cd (OEE)<\/td><td>\u03a0\u03cc\u03c3\u03bf\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af \u03c3\u03b5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ce\u03bd \u03bc\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03ce\u03c4\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03ae \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\u0397 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bf \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03bc\u03bf\u03bd\u03ac\u03b4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b1\u03b9. \u0397 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03c9\u03c1\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bd\u03b5\u03b2\u03ac\u03c3\u03b5\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b1\u03bb\u03bb\u03ac \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03b1\u03bd\u03ac \u03b1\u03bd\u03b8\u03c1\u03c9\u03c0\u03bf\u03ce\u03c1\u03b1. \u0397 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b8\u03ad\u03c4\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2: \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03bc\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1.<\/p>\n\n\n\n<p>\u039f \u03b2\u03b1\u03b8\u03bc\u03cc\u03c2 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03b4\u03b5\u03af\u03c7\u03bd\u03b5\u03b9 \u03c0\u03cc\u03c3\u03bf \u03b1\u03c0\u03b1\u03c3\u03c7\u03bf\u03bb\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03ae\u03c4\u03b1\u03bd \u03ad\u03bd\u03b1\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c2, \u03cc\u03c7\u03b9 \u03b1\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b5 \u03c4\u03b7\u03bd \u03c0\u03b9\u03bf \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b7 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1. \u0391\u03bd \u03ba\u03c1\u03b1\u03c4\u03ac\u03c4\u03b5 \u03b1\u03c0\u03b1\u03c3\u03c7\u03bf\u03bb\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bc\u03b9\u03b1 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03c5\u03be\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03c7\u03c9\u03c1\u03af\u03c2 \u03bd\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c6\u03ac\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd. \u0388\u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03b8\u03ce\u03c1\u03b9\u03bf \u03b1\u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03af\u03b7\u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03cd\u03bb\u03bf\u03b3\u03bf \u03cc\u03c4\u03b1\u03bd \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7, \u03bf\u03b9 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ae \u03b7 \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7 \u03b4\u03b5\u03bd \u03b4\u03b9\u03ba\u03b1\u03b9\u03bf\u03bb\u03bf\u03b3\u03bf\u03cd\u03bd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/p>\n\n\n\n<p>\u039f OEE \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03c4\u03cd\u03c0\u03bf: <strong>\u0394\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u00d7 \u0391\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7 \u00d7 \u03a0\u03bf\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1<\/strong>. \u0394\u03b9\u03b1\u03c7\u03c9\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03b1\u03c0\u03cc \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2, \u03bc\u03b5\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b5\u03bb\u03b1\u03c4\u03c4\u03ce\u03bc\u03b1\u03c4\u03b1, \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5. \u0388\u03bd\u03b1 \u03b3\u03b5\u03bd\u03b9\u03ba\u03cc \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03b2\u03b1\u03c3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b4\u03b5\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03af \u03b1\u03c5\u03c4\u03bf\u03bc\u03ac\u03c4\u03c9\u03c2 \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 OEE. \u0391\u03bd \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c3\u03c4\u03b5 \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b1\u03c0\u03c9\u03bb\u03b5\u03b9\u03ce\u03bd \u03c4\u03bf\u03c5 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03bf\u03cd, \u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03c4\u03b5 \u03b1\u03c5\u03c4\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ac \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b8\u03b5\u03c9\u03c1\u03b5\u03af\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03ad\u03bd\u03b1 \u03bc\u03cc\u03bd\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03b1\u03c1\u03ba\u03b5\u03af \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how-to-improve-production-efficiency-fix-the-loss-behind-the-number\">\u03a0\u03ce\u03c2 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1 \u03c0\u03af\u03c3\u03c9 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03b1\u03c1\u03b9\u03b8\u03bc\u03cc<\/h2>\n\n\n\n<p>\u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03b1\u03c0\u03cc \u03bc\u03b9\u03b1 \u03bf\u03b9\u03ba\u03bf\u03b3\u03ad\u03bd\u03b5\u03b9\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ae \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bf\u03c0\u03bf\u03af\u03b1\u03c2 \u03b7 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03c3\u03b5\u03c4\u03b5. \u0395\u03c0\u03b9\u03b2\u03b5\u03b2\u03b1\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c7\u03b5\u03b9\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03b1\u03c6\u03ad\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03bf \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1. \u039c\u03b9\u03bb\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03bf\u03c5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1: \u03bc\u03b9\u03b1 \u03bc\u03b5\u03b3\u03ac\u03bb\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03c6\u03b5\u03af\u03bb\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b4\u03cd\u03c3\u03ba\u03bf\u03bb\u03b7 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1, \u03b5\u03bb\u03bb\u03b9\u03c0\u03b5\u03af\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2, \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03ae \u03b1\u03bd\u03b1\u03be\u03b9\u03cc\u03c0\u03b9\u03c3\u03c4\u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae. \u039a\u03ac\u03b8\u03b5 \u03b1\u03b9\u03c4\u03af\u03b1 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"remove-avoidable-waits-and-sequence-conflicts\">\u0395\u03be\u03b1\u03bb\u03b5\u03af\u03c8\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c4\u03c1\u03ad\u03c8\u03b9\u03bc\u03b5\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03bf\u03cd\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2<\/h3>\n\n\n\n<p>\u0391\u03bd \u03cc\u03bb\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03c4\u03bf\u03b9\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03b5\u03ba\u03c4\u03cc\u03c2 \u03b1\u03c0\u03cc \u03ad\u03bd\u03b1 \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03bb\u03b5\u03af\u03c0\u03b5\u03b9 \u03ae \u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03b2\u03ae\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03ad\u03c7\u03b5\u03b9 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03b5\u03af, \u03c4\u03bf \u03bd\u03b1 \u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae \u03bd\u03b1 \u03b4\u03bf\u03c5\u03bb\u03ad\u03c8\u03b5\u03b9 \u03c0\u03b9\u03bf \u03b3\u03c1\u03ae\u03b3\u03bf\u03c1\u03b1 \u03b4\u03b5\u03bd \u03b8\u03b1 \u03bb\u03cd\u03c3\u03b5\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1 \u03c4\u03b7\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae\u03c2. \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03b1\u03bd \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03c4\u03b9\u03c2 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03bc\u03bf\u03b9\u03c1\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bf\u03b9 \u03bf\u03c0\u03bf\u03af\u03b5\u03c2 \u03b4\u03b9\u03b5\u03ba\u03b4\u03b9\u03ba\u03bf\u03cd\u03bd \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2.<\/p>\n\n\n\n<p>\u03a6\u03b1\u03bd\u03c4\u03b1\u03c3\u03c4\u03b5\u03af\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03c0\u03b5\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03bc\u03b1, \u03b5\u03bd\u03ce \u03c4\u03bf \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03bf \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b5\u03c0\u03b5\u03af\u03b3\u03bf\u03c5\u03c3\u03b1 \u03c0\u03b1\u03c1\u03c4\u03af\u03b4\u03b1. \u0397 \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03bf \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03c5\u03c1\u03b3\u03b5\u03af\u03bf \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03b1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ae, \u03b1\u03bb\u03bb\u03ac \u03bd\u03b1 \u03b1\u03c6\u03ae\u03bd\u03b5\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03b1\u03b4\u03c1\u03b1\u03bd\u03ae. \u0397 \u03bc\u03b5\u03c4\u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03b7\u03c2 \u03ba\u03b1\u03c4\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03bd\u03c9\u03c1\u03af\u03c4\u03b5\u03c1\u03b1 \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b9\u03bf \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7, \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c7\u03c9\u03c1\u03ae\u03c3\u03b5\u03b9 \u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03b5\u03af.<\/p>\n\n\n\n<p>\u0395\u03b4\u03ce \u03bf \u03ba\u03bf\u03b9\u03bd\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03ac\u03bc\u03b5\u03c3\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03ac. \u03a4\u03bf SkyPlanner \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03c4\u03b9\u03ba\u03ac \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bd\u03b4\u03b5\u03b4\u03b5\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2, \u03ce\u03c3\u03c4\u03b5 \u03bf\u03b9 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b9\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b1\u03bd\u03c4\u03af \u03ba\u03ac\u03b8\u03b5 \u03ba\u03ad\u03bd\u03c4\u03c1\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03b4\u03b9\u03ce\u03ba\u03b5\u03b9 \u03c4\u03bf\u03bd \u03b4\u03b9\u03ba\u03cc \u03c4\u03bf\u03c5 \u03c3\u03c4\u03cc\u03c7\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"reduce-setup-and-process-losses\">\u039c\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1<\/h3>\n\n\n\n<p>\u038c\u03c4\u03b1\u03bd \u03bf\u03b9 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03b1\u03c6\u03ad\u03c2 \u03b4\u03b5\u03af\u03c7\u03bd\u03bf\u03c5\u03bd \u03c3\u03c5\u03c7\u03bd\u03ad\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b5\u03c4\u03bf\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac \u03c0\u03c1\u03b9\u03bd \u03c3\u03c4\u03b1\u03bc\u03b1\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03ba\u03b1\u03b9 \u03b5\u03c0\u03b1\u03bd\u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03bf\u03bc\u03b1\u03b4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd. \u0397 \u03b4\u03b9\u03b1\u03b4\u03bf\u03c7\u03b9\u03ba\u03ae \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c3\u03c5\u03bc\u03b2\u03b1\u03c4\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03b1\u03c3\u03af\u03b1\u03c2. \u03a9\u03c3\u03c4\u03cc\u03c3\u03bf, \u03b7 \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b4\u03c5\u03bd\u03b1\u03c4\u03ae \u03c0\u03b1\u03c1\u03c4\u03af\u03b4\u03b1 \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c5\u03c4\u03bf\u03bc\u03ac\u03c4\u03c9\u03c2 \u03b7 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae, \u03b1\u03bd \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03b5\u03c1\u03b5\u03af \u03b5\u03c0\u03b5\u03af\u03b3\u03bf\u03c5\u03c3\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03b5 \u03ac\u03bb\u03bb\u03bf \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n\n<p>\u0391\u03bd \u03ba\u03c5\u03c1\u03b9\u03b1\u03c1\u03c7\u03bf\u03cd\u03bd \u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03bc\u03b5 \u03bc\u03b5\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b1 \u03b5\u03bb\u03b1\u03c4\u03c4\u03ce\u03bc\u03b1\u03c4\u03b1 \u03ae \u03bf\u03b9 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b2\u03bb\u03ac\u03b2\u03b5\u03c2, \u03b4\u03b9\u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf, \u03c4\u03b9\u03c2 \u03c1\u03c5\u03b8\u03bc\u03af\u03c3\u03b5\u03b9\u03c2, \u03c4\u03b7\u03bd \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7, \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03ae \u03c4\u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c3\u03c7\u03b5\u03c4\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b2\u03bb\u03b7\u03bc\u03b1. \u0394\u03b9\u03bf\u03c1\u03b8\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03b9\u03c4\u03af\u03b1 \u03ba\u03b1\u03b9 \u03ad\u03c0\u03b5\u03b9\u03c4\u03b1 \u03b1\u03c0\u03bf\u03c4\u03c5\u03c0\u03ce\u03c3\u03c4\u03b5 \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c4\u03b7\u03bd \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03ae \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03cc\u03c1\u03bf\u03c5. \u0397 \u03b1\u03bd\u03b1\u03b8\u03b5\u03ce\u03c1\u03b7\u03c3\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03bf\u03c5\u03c1\u03ac\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03b4\u03b5\u03bd \u03c5\u03c0\u03bf\u03ba\u03b1\u03b8\u03b9\u03c3\u03c4\u03ac \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03ba\u03b1\u03c4\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03bc\u03b9\u03b1\u03c2 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b7\u03c2 \u03b2\u03bb\u03ac\u03b2\u03b7\u03c2.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"prioritize-the-effect-on-completed-work\">\u0394\u03ce\u03c3\u03c4\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03c4\u03b9\u03c2 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03b8\u03bf\u03cd\u03bd \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2<\/h3>\n\n\n\n<p>\u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03b1\u03af\u03c1\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03b5\u03bc\u03c0\u03cc\u03b4\u03b9\u03bf \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae. \u03a4\u03b1 \u03bb\u03b5\u03c0\u03c4\u03ac \u03c0\u03bf\u03c5 \u03b1\u03bd\u03b1\u03ba\u03c4\u03ac\u03c4\u03b5 \u03c3\u03b5 \u03ad\u03bd\u03b1\u03bd \u03c0\u03cc\u03c1\u03bf \u03bf \u03bf\u03c0\u03bf\u03af\u03bf\u03c2 \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03b5\u03c1\u03b5\u03af \u03c4\u03b7\u03bd \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b1\u03be\u03af\u03b1 \u03b1\u03c0\u03cc \u03bc\u03b9\u03b1 \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03c4\u03bf\u03c0\u03b9\u03ba\u03ae \u03b5\u03be\u03bf\u03b9\u03ba\u03bf\u03bd\u03cc\u03bc\u03b7\u03c3\u03b7 \u03b5\u03ba\u03b5\u03af \u03cc\u03c0\u03bf\u03c5 \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ae\u03b4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c3\u03b9\u03bc\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u0391\u03bd \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c3\u03c4\u03b5 \u03b2\u03bf\u03ae\u03b8\u03b5\u03b9\u03b1 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc, \u03b4\u03b5\u03af\u03c4\u03b5 \u03c4\u03bf\u03bd \u03bf\u03b4\u03b7\u03b3\u03cc \u03bc\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b1 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/production-bottlenecks\/\">\u03c3\u03b7\u03bc\u03b5\u03af\u03b1 \u03c3\u03c5\u03bc\u03c6\u03cc\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae<\/a>.<\/p>\n\n\n\n<p>\u038c\u03c4\u03b1\u03bd \u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03ae\u03b4\u03b7 \u03bc\u03b5 \u03c3\u03c4\u03b1\u03b8\u03b5\u03c1\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bd\u03b1 \u03c5\u03c0\u03b5\u03c1\u03b2\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03b7 \u03bb\u03cd\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03b2\u03ac\u03c1\u03b4\u03b9\u03b1, \u03b7 \u03b1\u03bd\u03ac\u03b8\u03b5\u03c3\u03b7 \u03c3\u03b5 \u03c5\u03c0\u03b5\u03c1\u03b3\u03bf\u03bb\u03ac\u03b2\u03bf \u03ae \u03bc\u03b9\u03b1 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7, \u03b1\u03bd\u03c4\u03af \u03b3\u03b9\u03b1 \u03ac\u03bb\u03bb\u03b7 \u03bc\u03af\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c0\u03ac\u03b8\u03b5\u03b9\u03b1 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7\u03c2 \u03c4\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2. \u0394\u03b9\u03b1\u03c7\u03c9\u03c1\u03af\u03c3\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03c6\u03b1\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c8\u03b5\u03c4\u03b5 \u03c3\u03c4\u03b7\u03bd \u03c5\u03c6\u03b9\u03c3\u03c4\u03ac\u03bc\u03b5\u03bd\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1.<\/p>\n\n\n\n<p>\u039c\u03b5\u03c4\u03ac \u03c4\u03b7\u03bd \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae, \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b2\u03ac\u03c3\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7\u03c2. \u0395\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ce\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03c7\u03c1\u03ae\u03c3\u03b7\u03c2 \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03b8\u03b7\u03ba\u03b1\u03bd. \u039c\u03b7\u03bd \u03b8\u03b5\u03c9\u03c1\u03ae\u03c3\u03b5\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03b8\u03b7\u03ba\u03b5 \u03bc\u03cc\u03bd\u03bf \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03ac\u03bb\u03bb\u03b1\u03be\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03ae \u03b5\u03c0\u03b5\u03b9\u03b4\u03ae \u03ad\u03bd\u03b1 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03cc \u03bc\u03b5\u03af\u03b3\u03bc\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ad\u03ba\u03b1\u03bd\u03b5 \u03c4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03b5\u03c5\u03ba\u03bf\u03bb\u03cc\u03c4\u03b5\u03c1\u03b1 \u03b5\u03c0\u03b9\u03c4\u03b5\u03cd\u03be\u03b9\u03bc\u03bf.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"turn-the-finding-into-a-better-schedule-with-skyplanner\">\u0391\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b1 \u03b5\u03c5\u03c1\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bc\u03b5 \u03c4\u03bf SkyPlanner<\/h2>\n\n\n\n<p>\u039f \u03b5\u03bd\u03c4\u03bf\u03c0\u03b9\u03c3\u03bc\u03cc\u03c2 \u03bc\u03b9\u03b1\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03cc\u03bd\u03bf \u03b7 \u03b1\u03c1\u03c7\u03ae. \u03a3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03cc\u03c0\u03bf\u03c5 \u03bf\u03b9 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2 \u03b1\u03bb\u03bb\u03ac\u03b6\u03bf\u03c5\u03bd, \u03ba\u03ac\u03c0\u03bf\u03b9\u03bf\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af \u03c4\u03b7 \u03bd\u03ad\u03b1 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03b5\u03c6\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03b7 \u03ba\u03b1\u03b8\u03ce\u03c2 \u03c6\u03c4\u03ac\u03bd\u03bf\u03c5\u03bd \u03b5\u03c0\u03b5\u03af\u03b3\u03bf\u03c5\u03c3\u03b5\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2, \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03c4\u03b1\u03b2\u03ac\u03bb\u03bb\u03b5\u03c4\u03b1\u03b9 \u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1. \u0397 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b7 \u03b1\u03bd\u03b1\u03b4\u03b9\u03b1\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ce\u03bd \u03bf\u03c5\u03c1\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03b3\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03cc\u03bb\u03b9\u03c2 \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c8\u03b1\u03c4\u03b5.<\/p>\n\n\n\n<p>\u03a4\u03bf SkyPlanner APS \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc. \u03a4\u03bf Arcturus, \u03b7 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 \u03c4\u03bf\u03c5 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc, \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03b9 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b1 \u03ba\u03ad\u03bd\u03c4\u03c1\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2, \u03c4\u03bf\u03c5\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2, \u03c4\u03b9\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2 \u03c4\u03c9\u03bd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd, \u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03ac\u03bb\u03bb\u03b7\u03bb\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03b5\u03c4\u03b5 \u03bf\u03c1\u03af\u03c3\u03b5\u03b9. \u0395\u03c3\u03b5\u03af\u03c2 \u03c4\u03bf \u03ba\u03b1\u03c4\u03b5\u03c5\u03b8\u03cd\u03bd\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03ba\u03bb\u03b5\u03b9\u03b4\u03ce\u03bc\u03b1\u03c4\u03b1. \u038c\u03c4\u03b1\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03b5\u03c1\u03b3\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ac, \u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03bf \u03c0\u03cc\u03c4\u03b5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03bf\u03cd\u03bd \u03bf\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2.<\/p>\n\n\n\n<p>\u03a4\u03bf \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03b5\u03bc\u03c6\u03b1\u03bd\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b2\u03bf\u03bb\u03ae Gantt. \u0392\u03bb\u03ad\u03c0\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2, \u03c4\u03b9\u03c2 \u03c3\u03c5\u03bd\u03b4\u03ad\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03c9\u03bd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03ba\u03b9\u03bd\u03b4\u03c5\u03bd\u03b5\u03cd\u03bf\u03c5\u03bd \u03bd\u03b1 \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03b5\u03c1\u03ae\u03c3\u03bf\u03c5\u03bd. \u0391\u03bd\u03c4\u03af \u03bd\u03b1 \u03b5\u03bb\u03ad\u03b3\u03c7\u03b5\u03c4\u03b5 \u03bc\u03cc\u03bd\u03bf \u03b1\u03bd \u03bc\u03b9\u03b1 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03ad\u03c7\u03b5\u03b9 \u03b1\u03c1\u03ba\u03b5\u03c4\u03ae \u03b4\u03bf\u03c5\u03bb\u03b5\u03b9\u03ac, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03c3\u03b5\u03c4\u03b5 \u03b1\u03bd \u03c4\u03bf \u03b1\u03bd\u03b1\u03b8\u03b5\u03c9\u03c1\u03b7\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03b4\u03b9\u03b5\u03c5\u03ba\u03bf\u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7.<\/p>\n\n\n\n<p>\u03a4\u03bf Autopilot \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03c0\u03ac\u03b8\u03b5\u03b9\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b5 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03c9\u03bc\u03ad\u03bd\u03bf. \u038c\u03c4\u03b1\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03b5\u03c1\u03b3\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf, \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03cc\u03c4\u03b1\u03bd \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03ae \u03cc\u03c4\u03b1\u03bd \u03c4\u03bf \u03ad\u03c7\u03b5\u03c4\u03b5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03c3\u03b5\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b5\u03bb\u03b5\u03af\u03c4\u03b1\u03b9, \u03c7\u03c9\u03c1\u03af\u03c2 \u03bd\u03b1 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af\u03c4\u03b5 \u03c3\u03c5\u03bd\u03b5\u03c7\u03ce\u03c2 \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03be\u03b5\u03ba\u03b9\u03bd\u03ac\u03c4\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b1\u03bd\u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc. \u039f\u03b9 \u03ba\u03b1\u03bd\u03cc\u03bd\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03ba\u03bb\u03b5\u03b9\u03b4\u03ce\u03bc\u03b1\u03c4\u03ac \u03c3\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03bf\u03c5\u03bd \u03c3\u03b5 \u03b9\u03c3\u03c7\u03cd. \u0391\u03c6\u03b9\u03b5\u03c1\u03ce\u03bd\u03b5\u03c4\u03b5 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c3\u03c4\u03b7 \u03b4\u03b9\u03cc\u03c1\u03b8\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bf\u03c5\u03c1\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03c3\u03c4\u03bf \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c6\u03b1\u03c3\u03af\u03b6\u03b5\u03c4\u03b5 \u03c0\u03bf\u03b9\u03b1 \u03b4\u03ad\u03c3\u03bc\u03b5\u03c5\u03c3\u03b7 \u03ae \u03c0\u03bf\u03b9\u03bf \u03b6\u03ae\u03c4\u03b7\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03bf\u03c7\u03ae.<\/p>\n\n\n\n<p>\u0391\u03c5\u03c4\u03cc\u03c2 \u03bf \u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03c4\u03bf SkyPlanner \u03bc\u03b9\u03b1 \u03c0\u03c1\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03cc\u03c4\u03b1\u03bd \u03bf\u03b9 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc: \u03c4\u03bf Arcturus \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03ba\u03bf\u03b9\u03bd\u03ae \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b7 \u03c0\u03c1\u03bf\u03b2\u03bf\u03bb\u03ae Gantt \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03b9\u03ac\u03b6\u03b5\u03b9 \u03bf\u03c0\u03c4\u03b9\u03ba\u03ac \u03c4\u03bf \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03bf Autopilot \u03bc\u03b5\u03b9\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03b5\u03c7\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b5\u03bd\u03b7\u03bc\u03ad\u03c1\u03c9\u03c3\u03b7\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03bf\u03c2. <a href=\"\/el\/%ce%bb%ce%b5%ce%b9%cf%84%ce%bf%cf%85%cf%81%ce%b3%ce%af%ce%b5%cf%82\/\">\u0394\u03b5\u03af\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c4\u03bf\u03c5 SkyPlanner<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-changed-for-eskomatic\">\u03a4\u03b9 \u03ac\u03bb\u03bb\u03b1\u03be\u03b5 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd Eskomatic<\/h3>\n\n\n\n<p>\u0397 Eskomatic, \u03bc\u03b9\u03b1 \u03c6\u03b9\u03bd\u03bb\u03b1\u03bd\u03b4\u03b9\u03ba\u03ae \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03bc\u03b7\u03c7\u03b1\u03bd\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03c4\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03bc\u03b5 \u03bc\u03b5\u03b3\u03ac\u03bb\u03b7 \u03c0\u03bf\u03b9\u03ba\u03b9\u03bb\u03af\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5\u03b3\u03ad\u03b8\u03b7 \u03c0\u03b1\u03c1\u03c4\u03af\u03b4\u03c9\u03bd, \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03b9\u03b6\u03cc\u03c4\u03b1\u03bd \u03c0\u03b1\u03bb\u03b1\u03b9\u03cc\u03c4\u03b5\u03c1\u03b1 \u03c4\u03b9\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03ba\u03c5\u03c1\u03af\u03c9\u03c2 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c0\u03b1\u03bb\u03b1\u03b9\u03cc\u03c4\u03b5\u03c1\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03ba\u03b1\u03b9 \u03b5\u03bb\u03ad\u03b3\u03c7\u03bf\u03c5 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0397 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03b4\u03c5\u03c3\u03ba\u03cc\u03bb\u03b5\u03c5\u03b5 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b5\u03bb\u03bb\u03b5\u03af\u03c8\u03b5\u03c9\u03bd \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03ad\u03bd\u03b1\u03c1\u03be\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd.<\/p>\n\n\n\n<p>\u039c\u03b5 \u03c4\u03b7 \u03c3\u03cd\u03bd\u03b4\u03b5\u03c3\u03b7 \u03c4\u03bf\u03c5 SkyPlanner \u03c3\u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c4\u03bf\u03c5 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03bd\u03c4\u03bf\u03c2 ERP, \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03b1\u03c0\u03ad\u03ba\u03c4\u03b7\u03c3\u03b5 \u03bf\u03c0\u03c4\u03b9\u03ba\u03ae \u03b1\u03c0\u03b5\u03b9\u03ba\u03cc\u03bd\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03bf\u03c5\u03c1\u03ac\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c3\u03b5 Gantt, \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c6\u03cc\u03c1\u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03c3\u03b1\u03c6\u03ad\u03c3\u03c4\u03b5\u03c1\u03b7 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1 \u03c4\u03c9\u03bd \u03b5\u03bb\u03bb\u03b5\u03af\u03c8\u03b5\u03c9\u03bd \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd. \u0397 Eskomatic \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bb\u03cc\u03b3\u03c9 \u03ad\u03bb\u03bb\u03b5\u03b9\u03c8\u03b7\u03c2 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ad\u03c3\u03c4\u03b5\u03c1\u03bf \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03b9\u03ce\u03bd \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2.<\/p>\n\n\n\n<p>\u03a4\u03bf \u03cc\u03c6\u03b5\u03bb\u03bf\u03c2 \u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03ac\u03bc\u03b5\u03c3\u03b1 \u03bc\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1: \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03c0\u03bf\u03c6\u03b5\u03c5\u03c7\u03b8\u03bf\u03cd\u03bd \u03ba\u03b1\u03b9 \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03ae \u03c0\u03c1\u03bf\u03c3\u03c0\u03ac\u03b8\u03b5\u03b9\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03c0\u03af\u03bb\u03c5\u03c3\u03b7 \u03c0\u03c1\u03bf\u03b2\u03bb\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c3\u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1. <a href=\"\/el\/%ce%b9%cf%83%cf%84%ce%bf%cf%81%ce%af%ce%b5%cf%82-%cf%80%ce%b5%ce%bb%ce%b1%cf%84%cf%8e%ce%bd\/eskomatic\/\">\u0394\u03b9\u03b1\u03b2\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03be\u03b9\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 Eskomatic \u03b3\u03b9\u03b1 \u03c4\u03bf SkyPlanner<\/a> \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03c4\u03b7\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"use-actual-results-to-improve-the-next-plan\">\u0391\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b1 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03bc\u03b1\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1<\/h2>\n\n\n\n<p>\u039c\u03b9\u03b1 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af\u03c4\u03b1\u03b9 \u03b5\u03c5\u03ba\u03bf\u03bb\u03cc\u03c4\u03b5\u03c1\u03b1 \u03cc\u03c4\u03b1\u03bd \u03c4\u03bf \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03b9 \u03cc\u03c3\u03b1 \u03bc\u03ac\u03b8\u03b1\u03c4\u03b5. \u0391\u03bd \u03bc\u03b9\u03b1 \u03c6\u03ac\u03c3\u03b7 \u03b4\u03b9\u03b1\u03c1\u03ba\u03b5\u03af \u03b5\u03c0\u03b1\u03bd\u03b5\u03b9\u03bb\u03b7\u03bc\u03bc\u03ad\u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03c4\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03b7 \u03b5\u03ba\u03c4\u03af\u03bc\u03b7\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03b5\u03b9 \u03b1\u03bc\u03b5\u03c4\u03ac\u03b2\u03bb\u03b7\u03c4\u03b7, \u03b7 \u03af\u03b4\u03b9\u03b1 \u03c3\u03cd\u03b3\u03ba\u03c1\u03bf\u03c5\u03c3\u03b7 \u03c3\u03c4\u03b7\u03bd \u03bf\u03c5\u03c1\u03ac \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03c0\u03b1\u03bd\u03b5\u03bc\u03c6\u03b1\u03bd\u03b9\u03c3\u03c4\u03b5\u03af.<\/p>\n\n\n\n<p>\u03a4\u03bf \u03c7\u03c1\u03bf\u03bd\u03cc\u03bc\u03b5\u03c4\u03c1\u03bf \u03c4\u03bf\u03c5 SkyPlanner \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c6\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03c7\u03b8\u03b5\u03af\u03c3\u03b5\u03c2 \u03ae \u03b5\u03bb\u03b1\u03c4\u03c4\u03c9\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2. \u039f\u03b9 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03c3\u03ac\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03ae \u03b5\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03ba\u03b1\u03c4\u03b1\u03b3\u03b5\u03b3\u03c1\u03b1\u03bc\u03bc\u03ad\u03bd\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03be\u03b5\u03c4\u03ac\u03b6\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b5\u03be\u03b7\u03b3\u03b5\u03af \u03bc\u03b9\u03b1 \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7. \u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03bd\u03c4\u03ac \u03c3\u03c4\u03bf \u03b5\u03c1\u03ce\u03c4\u03b7\u03bc\u03ac \u03c3\u03b1\u03c2: \u03bf \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03c0\u03bf\u03c5 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c6\u03b5\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03c4\u03ae\u03c2 \u03b4\u03b5\u03bd \u03c4\u03b1\u03c5\u03c4\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c5\u03c4\u03bf\u03bc\u03ac\u03c4\u03c9\u03c2 \u03bc\u03b5 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03c4\u03b7\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03c2 \u03ae \u03bc\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03bf \u03c4\u03bf \u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03bc\u03b1 \u03ba\u03b1\u03c4\u03ac \u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03bc\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b2\u03c1\u03b9\u03c3\u03ba\u03cc\u03c4\u03b1\u03bd \u03c3\u03b5 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae.<\/p>\n\n\n\n<p>\u03a4\u03b1 \u03b9\u03c3\u03c4\u03bf\u03c1\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03b1\u03c6\u03ae\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03be\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1\u03c2 \u03c4\u03c9\u03bd \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03c3\u03c4\u03bf SkyPlanner. \u0388\u03c4\u03c3\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af\u03c4\u03b5 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b5 \u03c3\u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc. \u0394\u03b9\u03b1\u03c4\u03b7\u03c1\u03ae\u03c3\u03c4\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03c1\u03b5\u03b1\u03bb\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03b5\u03ba\u03c4\u03af\u03bc\u03b7\u03c3\u03b7 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03b4\u03b9\u03b1\u03ba\u03c1\u03b9\u03c4\u03ae \u03b1\u03c0\u03cc \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03bc\u03b5 \u03c4\u03bf \u03bf\u03c0\u03bf\u03af\u03bf \u03b1\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03b5\u03af\u03c4\u03b5 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7: \u03bc\u03b9\u03b1 \u03bc\u03ad\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03b4\u03b5\u03bd \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03c3\u03b9\u03c9\u03c0\u03b7\u03c1\u03ac \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03c3\u03b5 \u03b1\u03c0\u03bf\u03b4\u03b5\u03ba\u03c4\u03ae \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.<\/p>\n\n\n\n<p>\u0394\u03b5\u03bd \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03ad\u03bd\u03b1 ERP \u03ae MES \u03c0\u03bf\u03c5 \u03ae\u03b4\u03b7 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03bd\u03ac\u03b3\u03ba\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae\u03c2 \u03c3\u03b1\u03c2. \u03a4\u03bf SkyPlanner \u03b4\u03b9\u03b1\u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03bf\u03c0\u03bf\u03b9\u03bf\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 ERP \u03ae MES \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03b1\u03bd\u03bf\u03b9\u03c7\u03c4\u03bf\u03cd REST API \u03c4\u03bf\u03c5, \u03c3\u03c5\u03bd\u03b4\u03ad\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03bd\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03bf\u03b9\u03bd\u03cc \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n\n<p>\u0388\u03bd\u03b1\u03c2 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03bf\u03c2 \u03b4\u03b5\u03af\u03ba\u03c4\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bf\u03b4\u03b7\u03b3\u03b5\u03af \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b7 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae. \u0391\u03bd \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c3\u03b1\u03c2 \u03c7\u03ac\u03bd\u03b5\u03b9 \u03b4\u03b9\u03b1\u03c1\u03ba\u03ce\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf \u03bb\u03cc\u03b3\u03c9 \u03c3\u03c5\u03b3\u03ba\u03c1\u03bf\u03cd\u03c3\u03b5\u03c9\u03bd \u03c3\u03c4\u03b9\u03c2 \u03bf\u03c5\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03c3\u03b5 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ae \u03ba\u03b1\u03b9 \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03bf\u03c5 \u03b5\u03c0\u03b1\u03bd\u03b1\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd, <a href=\"\/el\/%ce%b5%cf%80%ce%b9%ce%ba%ce%bf%ce%b9%ce%bd%cf%89%ce%bd%ce%af%ce%b1-%cf%80%cf%89%ce%bb%ce%ae%cf%83%ce%b5%cf%89%ce%bd\/\">\u03ba\u03bb\u03b5\u03af\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 SkyPlanner<\/a> \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b5\u03af\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03bf \u03ba\u03bf\u03b9\u03bd\u03cc\u03c2 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03c3\u03b1\u03c2. \u03a6\u03ad\u03c1\u03c4\u03b5 \u03c9\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1 \u03bc\u03b9\u03b1 \u03c0\u03c1\u03cc\u03c3\u03c6\u03b1\u03c4\u03b7 \u03ba\u03b1\u03b8\u03c5\u03c3\u03c4\u03ad\u03c1\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03ad\u03b1\u03c3\u03b5. \u0391\u03bd \u03c0\u03c1\u03bf\u03c4\u03b9\u03bc\u03ac\u03c4\u03b5 \u03c0\u03c1\u03ce\u03c4\u03b1 \u03bd\u03b1 \u03c4\u03bf \u03b5\u03be\u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03b5\u03c4\u03b5, <a href=\"\/el\/%ce%b4%ce%bf%ce%ba%ce%b9%ce%bc%ce%ae\/\">\u03b4\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner \u03bc\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c0\u03af\u03b4\u03b5\u03b9\u03be\u03b7\u03c2<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"production-efficiency-faq\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-is-a-good-production-efficiency-percentage\">\u03a0\u03bf\u03b9\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b8\u03b5\u03c9\u03c1\u03b5\u03af\u03c4\u03b1\u03b9 \u03ba\u03b1\u03bb\u03cc;<\/h3>\n\n\n\n<p>\u0394\u03b5\u03bd \u03c5\u03c0\u03ac\u03c1\u03c7\u03b5\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03ba\u03b1\u03b8\u03bf\u03bb\u03b9\u03ba\u03cc\u03c2 \u03c3\u03c4\u03cc\u03c7\u03bf\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf, \u03bc\u03b5\u03af\u03b3\u03bc\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03cc\u03c1\u03b9\u03b1 \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7\u03c2. \u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03b1\u03c0\u03cc \u03bc\u03b9\u03b1 \u03b1\u03be\u03b9\u03cc\u03c0\u03b9\u03c3\u03c4\u03b7 \u03b2\u03ac\u03c3\u03b7 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03ba\u03ae \u03c3\u03b1\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03bb\u03ad\u03b3\u03be\u03c4\u03b5 \u03b1\u03bd \u03bf\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03b9\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03ae \u03bb\u03b9\u03b3\u03cc\u03c4\u03b5\u03c1\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"can-production-efficiency-exceed-100\">\u039c\u03c0\u03bf\u03c1\u03b5\u03af \u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bd\u03b1 \u03c5\u03c0\u03b5\u03c1\u03b2\u03b5\u03af \u03c4\u03bf 100%;<\/h3>\n\n\n\n<p>\u039d\u03b1\u03b9, \u03cc\u03c4\u03b1\u03bd \u03b7 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7 \u03c5\u03c0\u03b5\u03c1\u03b2\u03b1\u03af\u03bd\u03b5\u03b9 \u03c4\u03bf \u03b5\u03c0\u03b9\u03bb\u03b5\u03b3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf. \u0395\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03b1\u03bd \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03b2\u03c1\u03ae\u03ba\u03b5 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03bc\u03ad\u03b8\u03bf\u03b4\u03bf, \u03b1\u03bd \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b5\u03af\u03bd\u03b1\u03b9 \u03be\u03b5\u03c0\u03b5\u03c1\u03b1\u03c3\u03bc\u03ad\u03bd\u03bf \u03ae \u03b1\u03bd \u03b7 \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7 \u03b4\u03b5\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c3\u03c5\u03bd\u03b5\u03c0\u03ae \u03c4\u03c1\u03cc\u03c0\u03bf. \u0391\u03bd \u03b7 \u03b2\u03ac\u03c3\u03b7 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03c1\u03ac\u03b3\u03bc\u03b1\u03c4\u03b9 \u03bf \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03cc\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03ba\u03cd\u03ba\u03bb\u03bf\u03c5, \u03ad\u03bd\u03b1 \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03c0\u03ac\u03bd\u03c9 \u03b1\u03c0\u03cc 100% \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf \u03c4\u03b7\u03c2 \u03b2\u03ac\u03c3\u03b7\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03cc\u03c7\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c7\u03ae \u03cc\u03c4\u03b9 \u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03be\u03b5\u03c0\u03ad\u03c1\u03b1\u03c3\u03b5 \u03c4\u03bf \u03c6\u03c5\u03c3\u03b9\u03ba\u03cc \u03c4\u03b7\u03c2 \u03cc\u03c1\u03b9\u03bf.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"does-higher-machine-utilization-mean-higher-production-efficiency\">\u0397 \u03bc\u03b5\u03b3\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bc\u03b7\u03c7\u03b1\u03bd\u03ce\u03bd \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03ba\u03b1\u03b9 \u03c5\u03c8\u03b7\u03bb\u03cc\u03c4\u03b5\u03c1\u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2;<\/h3>\n\n\n\n<p>\u038c\u03c7\u03b9 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03b1. \u039c\u03b9\u03b1 \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae \u03c0\u03bf\u03c5 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03b9 \u03c4\u03b5\u03bc\u03ac\u03c7\u03b9\u03b1 \u03c4\u03b1 \u03bf\u03c0\u03bf\u03af\u03b1 \u03b7 \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c6\u03ac\u03c3\u03b7 \u03b4\u03b5\u03bd \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b1\u03ba\u03cc\u03bc\u03b7 \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9. \u0392\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03b5\u03b9\u03c1\u03ac \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c4\u03bf\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bc\u03b5\u03bd\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b8\u03ad\u03c4\u03b5\u03c4\u03b5 \u03c9\u03c2 \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03bd \u03c0\u03bb\u03ae\u03c1\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03ac\u03b8\u03b5 \u03c0\u03cc\u03c1\u03bf\u03c5.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1 \u0397 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7\u03c2. \u03a4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03c3\u03ac\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b4\u03b9\u03b1\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf. \u03a4\u03bf \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03b2\u03ae\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9 \u03c0\u03c1\u03bf\u03ba\u03ac\u03bb\u03b5\u03c3\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd &#8230; <a title=\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/\" aria-label=\"Read more about \u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":42064,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2553,477],"tags":[],"class_list":["post-42691","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2553","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2, \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 | SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\" \/>\n<meta property=\"og:description\" content=\"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-17T07:16:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\",\"datePublished\":\"2024-09-17T07:16:46+00:00\",\"dateModified\":\"2026-10-19T14:42:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/\"},\"wordCount\":38,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"articleSection\":[\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/\",\"name\":\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2, \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"datePublished\":\"2024-09-17T07:16:46+00:00\",\"dateModified\":\"2026-10-19T14:42:01+00:00\",\"description\":\"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production efficiency. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2, \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 | SkyPlanner","description":"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/","og_locale":"el_GR","og_type":"article","og_title":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1","og_description":"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/","og_site_name":"SkyPlanner","article_published_time":"2024-09-17T07:16:46+00:00","article_modified_time":"2026-10-19T14:42:01+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"SkyPlanner","\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"12 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1","datePublished":"2024-09-17T07:16:46+00:00","dateModified":"2026-10-19T14:42:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/"},"wordCount":38,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","articleSection":["\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/","name":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc\u03c2, \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","datePublished":"2024-09-17T07:16:46+00:00","dateModified":"2026-10-19T14:42:01+00:00","description":"\u039c\u03b5\u03c4\u03c1\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b7 \u03b2\u03ac\u03c3\u03b7, \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03ce\u03bb\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03b5\u03b9\u03ce\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03c4\u03bf SkyPlanner \u03c4\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bc\u03bf\u03bd\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03bf\u03c6\u03b5\u03af\u03bb\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","width":4990,"height":3327,"caption":"Production efficiency. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogiki-apotelesmatikotita-perissotera-me-ligoteri\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/el\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2: \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03c3\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03c4\u03b5 \u03cc\u03c3\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1 \u0397 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bf\u03c3\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ac\u03b3\u03b5\u03c4\u03b5 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03af\u03b4\u03b9\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf \u03bc\u03ad\u03c4\u03c1\u03b7\u03c3\u03b7\u03c2. \u03a4\u03bf \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03cc \u03c3\u03ac\u03c2 \u03b2\u03bf\u03b7\u03b8\u03ac \u03bd\u03b1 \u03b4\u03b9\u03b1\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03ba\u03bb\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03bf. \u03a4\u03bf \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03bf \u03b2\u03ae\u03bc\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9 \u03c0\u03c1\u03bf\u03ba\u03ac\u03bb\u03b5\u03c3\u03b5 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/42691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=42691"}],"version-history":[{"count":5,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/42691\/revisions"}],"predecessor-version":[{"id":86868,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/42691\/revisions\/86868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/42064"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=42691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=42691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=42691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}