{"id":38307,"date":"2023-10-17T17:11:45","date_gmt":"2023-10-17T17:11:45","guid":{"rendered":"https:\/\/skyplanner.ai\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%84%ce%b9-%ce%b5%ce%af%ce%bd%ce%b1%ce%b9-%cf%84%ce%bf-erp\/"},"modified":"2026-10-12T07:59:48","modified_gmt":"2026-10-12T07:59:48","slug":"ti-einai-to-erp","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/","title":{"rendered":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-what-is-erp\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/el\/\">\u0391\u03c1\u03c7\u03b9\u03ba\u03ae<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/\">\u03a0\u03b7\u03b3\u03ad\u03c2<\/a>&nbsp;\u00bb&nbsp;\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2: <\/span><span class=\"yoast-reading-time__reading-time\">34<\/span><span class=\"yoast-reading-time__time-unit\"> \u03bb\u03b5\u03c0\u03c4\u03ac<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u0395\u03af\u03c3\u03c4\u03b5 \u03c0\u03b5\u03c1\u03af\u03b5\u03c1\u03b3\u03bf\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03b9 \u03b5\u03c0\u03b1\u03bd\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03c1\u03bf\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2; \u0395\u03bc\u03b2\u03b1\u03b8\u03cd\u03bd\u03b5\u03c4\u03b5 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b1. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-8036a2df      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03ba\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7-\u03c4\u03bf\u03c5-erp\" class=\"uagb-toc-link__trigger\">\u039a\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03bc\u03b9\u03b1-\u03bc\u03b1\u03c4\u03b9\u03ac-\u03c3\u03c4\u03bf-\u03c0\u03b1\u03c1\u03b5\u03bb\u03b8\u03cc\u03bd-\u03b7-\u03b5\u03be\u03ad\u03bb\u03b9\u03be\u03b7-\u03c4\u03bf\u03c5-erp\" class=\"uagb-toc-link__trigger\">\u039c\u03b9\u03b1 \u03bc\u03b1\u03c4\u03b9\u03ac \u03c3\u03c4\u03bf \u03c0\u03b1\u03c1\u03b5\u03bb\u03b8\u03cc\u03bd: \u0397 \u03b5\u03be\u03ad\u03bb\u03b9\u03be\u03b7 \u03c4\u03bf\u03c5 ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c0\u03ce\u03c2-\u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af-\u03ad\u03bd\u03b1-\u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1-erp\" class=\"uagb-toc-link__trigger\">\u03a0\u03ce\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP;<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03bf\u03c6\u03ad\u03bb\u03b7-\u03b5\u03bd\u03cc\u03c2-\u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2-erp\" class=\"uagb-toc-link__trigger\">\u039f\u03c6\u03ad\u03bb\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c4\u03b9-\u03b5\u03af\u03bd\u03b1\u03b9-\u03bc\u03b9\u03b1-\u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1-erp\" class=\"uagb-toc-link__trigger\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 ERP;<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c0\u03bf\u03b9\u03b1-\u03b5\u03af\u03bd\u03b1\u03b9-\u03c4\u03b1-\u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac-\u03c4\u03bf\u03c5-erp\" class=\"uagb-toc-link__trigger\">\u03a0\u03bf\u03b9\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b1 \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c4\u03bf\u03c5 ERP;<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c4\u03cd\u03c0\u03bf\u03b9-enterprise-resource-planning\" class=\"uagb-toc-link__trigger\">\u03a4\u03cd\u03c0\u03bf\u03b9 Enterprise Resource Planning\u00a0<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c3\u03b7\u03bc\u03ac\u03b4\u03b9\u03b1-\u03cc\u03c4\u03b9-\u03b7-\u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1-\u03c3\u03b1\u03c2-\u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9-\u03bc\u03b9\u03b1-\u03bb\u03cd\u03c3\u03b7-erp\" class=\"uagb-toc-link__trigger\">\u03a3\u03b7\u03bc\u03ac\u03b4\u03b9\u03b1 \u03cc\u03c4\u03b9 \u03b7 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 ERP:<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03ba\u03bb\u03ac\u03b4\u03bf\u03b9-\u03c0\u03bf\u03c5-\u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9-\u03b1\u03c0\u03cc-\u03c4\u03b1-\u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1-erp\" class=\"uagb-toc-link__trigger\">\u039a\u03bb\u03ac\u03b4\u03bf\u03b9 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP:\u00a0<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03b5\u03bd\u03af\u03c3\u03c7\u03c5\u03c3\u03b7-\u03c4\u03bf\u03c5-erp-\u03bc\u03b5-\u03ad\u03bd\u03b1-\u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1-aps-\u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03bf-\u03bc\u03b5-ai\" class=\"uagb-toc-link__trigger\">\u0395\u03bd\u03af\u03c3\u03c7\u03c5\u03c3\u03b7 \u03c4\u03bf\u03c5 ERP \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 APS \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03bf \u03bc\u03b5 AI:<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03b5\u03af\u03c3\u03c4\u03b5-\u03ad\u03c4\u03bf\u03b9\u03bc\u03bf\u03b9-\u03bd\u03b1-\u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03c3\u03b5\u03c4\u03b5-\u03c4\u03b7\u03bd-\u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1-\u03c3\u03b1\u03c2\" class=\"uagb-toc-link__trigger\">\u0395\u03af\u03c3\u03c4\u03b5 \u03ad\u03c4\u03bf\u03b9\u03bc\u03bf\u03b9 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2;\u00a0<\/a><li class=\"uagb-toc__list\"><a href=\"#\u03c3\u03c5\u03c7\u03bd\u03ad\u03c2-\u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2\" class=\"uagb-toc-link__trigger\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u0395\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-c66d854f gb-headline-text\">TL;DR <\/h2>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd, \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7, \u03c4\u03bf HR, \u03b7 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1 \u03ba\u03b1\u03b9 \u03ac\u03bb\u03bb\u03b1. \u0391\u03c5\u03c4\u03ac \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03ba\u03bb\u03ac\u03b4\u03bf\u03c5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7, \u03b7 \u03c5\u03b3\u03b5\u03b9\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03c0\u03b5\u03c1\u03af\u03b8\u03b1\u03bb\u03c8\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u03b5\u03bc\u03c0\u03cc\u03c1\u03b9\u03bf, \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03cc\u03c0\u03c9\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03b5\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1. \u0395\u03bd\u03ce \u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac ERP \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b7 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 (APS) \u03b5\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03c9\u03bd \u03bc\u03b5 \u03a4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u039d\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03c0\u03b9\u03bf \u03b5\u03ba\u03bb\u03b5\u03c0\u03c4\u03c5\u03c3\u03bc\u03ad\u03bd\u03b7 \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7 \u03c3\u03b5 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03bf \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u0397 \u03c5\u03b9\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd ERP \u03bc\u03b5 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 APS \u03c0\u03bf\u03c5 \u03b2\u03b1\u03c3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd AI, \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf Skyplanner, \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03c4\u03bf\u03c7\u03b5\u03cd\u03bf\u03c5\u03bd \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03b8\u03b5\u03ba\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u039a\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 ERP<\/h2>\n\n\n<div class=\"gb-container gb-container-a846a362\"><div class=\"gb-inside-container\">\n\n<p><strong>\u03a3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ac, \u03c4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03b2\u03b1\u03c3\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03b3\u03b9\u03b1 \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.<\/strong>&nbsp;<\/p>\n\n<\/div><\/div>\n\n\n<p>\u0395\u03af\u03bd\u03b1\u03b9 \u03c3\u03b1\u03bd \u03c4\u03bf \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03cc \u03bd\u03b5\u03c5\u03c1\u03b9\u03ba\u03cc \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03bc\u03b9\u03b1\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03c1\u03ad\u03bf\u03c5\u03bd \u03bf\u03bc\u03b1\u03bb\u03ac \u03b1\u03c0\u03cc \u03c4\u03bf \u03ad\u03bd\u03b1 \u03ac\u03ba\u03c1\u03bf \u03c4\u03bf\u03c5 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd \u03c3\u03c4\u03bf \u03ac\u03bb\u03bb\u03bf. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03c0\u03ac\u03bd\u03c4\u03b1 \u03b4\u03b9\u03bf\u03c7\u03b5\u03c4\u03b5\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03ad\u03c3\u03c9 \u03b5\u03bd\u03cc\u03c2 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2, \u03b5\u03af\u03c4\u03b5 \u03c0\u03c1\u03cc\u03ba\u03b5\u03b9\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd, \u03c4\u03b1 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03ae \u03c4\u03bf \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc.<\/p>\n\n\n\n<p><strong>\u039f \u03c3\u03c4\u03cc\u03c7\u03bf\u03c2 \u03c4\u03bf\u03c5 Enterprise Resource Planning \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03bb\u03cc\u03c2 \u03b1\u03bb\u03bb\u03ac \u03bf\u03c5\u03c3\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc\u03c2: \u03bd\u03b1 \u03b1\u03c5\u03be\u03ae\u03c3\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03c0\u03c1\u03c9\u03c4\u03bf\u03c6\u03b1\u03bd\u03ae \u03b4\u03b9\u03b1\u03c6\u03ac\u03bd\u03b5\u03b9\u03b1 \u03c3\u03c4\u03b9\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2, \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03b5\u03b9 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b2\u03ac\u03c3\u03b5\u03b9 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03b1 \u03bc\u03b5 \u03c0\u03c1\u03bf\u03c3\u03b5\u03b3\u03b3\u03af\u03c3\u03b5\u03b9\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/paragogi-just-in-time\/\">\u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae Just-in-Time<\/a><\/strong>.<strong>&nbsp;<\/strong>\u03a3\u03c4\u03bf\u03bd \u03c4\u03bf\u03bc\u03ad\u03b1 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2, \u03b1\u03c5\u03c4\u03cc \u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03bf <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%ba%ce%b1%cf%84%ce%b1%cf%83%ce%ba%ce%b5%cf%85%ce%b1%cf%83%cf%84%ce%b9%ce%ba%cf%8c-erp-%ce%bf%ce%bb%ce%bf%ce%ba%ce%bb%ce%b7%cf%81%cf%89%ce%bc%ce%ad%ce%bd%ce%bf%cf%82-%ce%bf%ce%b4%ce%b7%ce%b3%cf%8c\/\">ERP \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/a>. \u03a3\u03b5 \u03b1\u03bd\u03c4\u03af\u03b8\u03b5\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b1 \u03b3\u03b5\u03bd\u03b9\u03ba\u03ac \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP, \u03c4\u03bf ERP \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03bf \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b5\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03af\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u0392\u03bf\u03b7\u03b8\u03ac \u03c3\u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03c1\u03ce\u03c4\u03c9\u03bd \u03c5\u03bb\u03ce\u03bd \u03ad\u03c9\u03c2 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd lead time, \u03ce\u03c3\u03c4\u03b5 \u03bf\u03b9 \u03c5\u03c0\u03b5\u03cd\u03b8\u03c5\u03bd\u03bf\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bd\u03b1 \u03b1\u03c6\u03ae\u03c3\u03bf\u03c5\u03bd \u03c0\u03af\u03c3\u03c9 \u03c4\u03b1 \u03c0\u03bf\u03bb\u03cd\u03c0\u03bb\u03bf\u03ba\u03b1 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c6\u03cd\u03bb\u03bb\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03c1\u03b3\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03b9\u03bf \u03b1\u03c0\u03bb\u03ac \u03ba\u03b1\u03b9 \u03c0\u03b9\u03bf \u03bf\u03c1\u03b3\u03b1\u03bd\u03c9\u03bc\u03ad\u03bd\u03b1.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03ac \u03b1\u03bd\u03ac\u03bc\u03b5\u03c3\u03b1 \u03c3\u03c4\u03bf\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03c3\u03b9\u03b1\u03ba\u03cc \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c3\u03c4\u03bf shop floor, \u03b4\u03b9\u03b1\u03b2\u03ac\u03c3\u03c4\u03b5 \u03c4\u03b7 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/mes-vs-erp-%cf%80%ce%bf%ce%b9%ce%b1-%ce%b5%ce%af%ce%bd%ce%b1%ce%b9-%ce%b7-%ce%b4%ce%b9%ce%b1%cf%86%ce%bf%cf%81%ce%ac\/\">\u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 MES \u03ba\u03b1\u03b9 ERP<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u039c\u03b9\u03b1 \u03bc\u03b1\u03c4\u03b9\u03ac \u03c3\u03c4\u03bf \u03c0\u03b1\u03c1\u03b5\u03bb\u03b8\u03cc\u03bd: \u0397 \u03b5\u03be\u03ad\u03bb\u03b9\u03be\u03b7 \u03c4\u03bf\u03c5 ERP<\/h2>\n\n\n\n<p>\u03a3\u03c4\u03b7\u03bd \u03b5\u03be\u03ad\u03bb\u03b9\u03be\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b7 \u03c0\u03c1\u03bf\u03ad\u03bb\u03b5\u03c5\u03c3\u03b7 \u03c4\u03bf\u03c5 Enterprise Resource Planning \u03c7\u03c1\u03bf\u03bd\u03bf\u03bb\u03bf\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b4\u03b5\u03ba\u03b1\u03b5\u03c4\u03af\u03b1 \u03c4\u03bf\u03c5 1960. \u0391\u03c1\u03c7\u03b9\u03ba\u03ac, \u03b5\u03bc\u03c6\u03b1\u03bd\u03af\u03c3\u03c4\u03b7\u03ba\u03b5 \u03c9\u03c2 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c6\u03ac\u03bd\u03b5\u03b9\u03b1\u03c2 \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd. \u039a\u03b1\u03b8\u03ce\u03c2 \u03bf \u03c4\u03bf\u03bc\u03ad\u03b1\u03c2 \u03c4\u03b7\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03b5\u03be\u03b5\u03bb\u03b9\u03c3\u03c3\u03cc\u03c4\u03b1\u03bd, \u03c5\u03c0\u03ae\u03c1\u03c7\u03b5 \u03b7 \u03b5\u03c0\u03b9\u03c4\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03b8\u03bf\u03cd\u03bd \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c4\u03c5\u03c7\u03ad\u03c2 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd, \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03ad\u03c9\u03c2 \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae. \u0388\u03c4\u03c3\u03b9, \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 Material Requirements Planning (MRP) \u03b5\u03bc\u03c6\u03b1\u03bd\u03af\u03c3\u03c4\u03b7\u03ba\u03b1\u03bd \u03c9\u03c2 \u03c0\u03c1\u03cc\u03b4\u03c1\u03bf\u03bc\u03bf\u03b9 \u03c4\u03bf\u03c5 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03bf\u03c5 ERP. \u0391\u03c5\u03c4\u03ac \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c7\u03b5\u03b4\u03b9\u03ac\u03c3\u03c4\u03b7\u03ba\u03b1\u03bd \u03b5\u03b9\u03b4\u03b9\u03ba\u03ac \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd, \u03b5\u03c5\u03b8\u03c5\u03b3\u03c1\u03b1\u03bc\u03bc\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03bc\u03ae\u03b8\u03b5\u03b9\u03b1 \u03c0\u03c1\u03ce\u03c4\u03c9\u03bd \u03c5\u03bb\u03ce\u03bd \u03bc\u03b5 \u03c4\u03b1 \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2.<\/p>\n\n\n\n<p>\u039c\u03b5 \u03c4\u03b7\u03bd \u03c0\u03ac\u03c1\u03bf\u03b4\u03bf \u03c4\u03c9\u03bd \u03b5\u03c4\u03ce\u03bd, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03bf\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b5\u03c0\u03b5\u03ba\u03c4\u03ac\u03b8\u03b7\u03ba\u03b1\u03bd \u03c0\u03ad\u03c1\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03ad\u03bb\u03b1\u03b2\u03b1\u03bd \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03ac\u03bb\u03bb\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03c4\u03b1 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac, \u03c4\u03bf \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c0\u03b5\u03bb\u03b1\u03c4\u03b5\u03b9\u03b1\u03ba\u03ce\u03bd \u03c3\u03c7\u03ad\u03c3\u03b5\u03c9\u03bd, \u03c5\u03c0\u03ae\u03c1\u03be\u03b5 \u03b5\u03c0\u03b9\u03c4\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1. \u039c\u03ad\u03c7\u03c1\u03b9 \u03c4\u03b7 \u03b4\u03b5\u03ba\u03b1\u03b5\u03c4\u03af\u03b1 \u03c4\u03bf\u03c5 1990, \u03c4\u03bf MRP \u03b5\u03be\u03b5\u03bb\u03af\u03c7\u03b8\u03b7\u03ba\u03b5 \u03c3\u03b5 MRP II, \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u0391\u03c5\u03c4\u03cc \u03ad\u03b8\u03b5\u03c3\u03b5 \u03c4\u03b5\u03bb\u03b9\u03ba\u03ac \u03c4\u03b1 \u03b8\u03b5\u03bc\u03ad\u03bb\u03b9\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03c4\u03bf\u03c5 \u03c3\u03ae\u03bc\u03b5\u03c1\u03b1. \u039c\u03b5 \u03c4\u03b9\u03c2 \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03b9\u03ba\u03ad\u03c2 \u03b5\u03be\u03b5\u03bb\u03af\u03be\u03b5\u03b9\u03c2, \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03b1\u03bd\u03b1\u03c0\u03c4\u03c5\u03c7\u03b8\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03bc\u03b9\u03b1 \u03c4\u03b5\u03c1\u03ac\u03c3\u03c4\u03b9\u03b1 \u03b3\u03ba\u03ac\u03bc\u03b1 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd, \u03c0\u03bf\u03c5 \u03b4\u03b5\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03b1\u03bb\u03bb\u03ac \u03b5\u03c0\u03b5\u03ba\u03c4\u03b5\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03c5\u03c0\u03b7\u03c1\u03b5\u03c3\u03af\u03b5\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03bc\u03ae\u03b8\u03b5\u03b9\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03ad\u03c1\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ad\u03c2.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"gb-headline gb-headline-97cf9254 gb-headline-text\">\u03a0\u03ce\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP;<\/h2>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03ad\u03c7\u03b5\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03b9 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03b1 \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b1, \u03c0\u03c1\u03bf\u03c9\u03b8\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b5\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03b5 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c4\u03bc\u03ae\u03bc\u03b1\u03c4\u03b1. \u0391\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03bc\u03b9\u03b1 \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03c4\u03bf\u03c5:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u039a\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd<\/strong>: \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03bc\u03b5 \u03bc\u03b9\u03b1 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03bf\u03b8\u03b7\u03ba\u03b5\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03bc\u03af\u03b1 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c4\u03bf\u03c0\u03bf\u03b8\u03b5\u03c3\u03af\u03b1 \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03c5\u03bd \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03ad\u03c2 \u03b2\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03b3\u03b9\u03b1 \u03b4\u03b9\u03b1\u03c6\u03bf\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03c4\u03bc\u03ae\u03bc\u03b1\u03c4\u03b1, \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf \u0391\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf \u0394\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc, \u03b7 \u03a7\u03c1\u03b7\u03bc\u03b1\u03c4\u03bf\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u039b\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae. \u0391\u03c5\u03c4\u03ae \u03b7 \u03c3\u03c5\u03b3\u03ba\u03ad\u03bd\u03c4\u03c1\u03c9\u03c3\u03b7 \u03b4\u03b9\u03b5\u03c5\u03ba\u03bf\u03bb\u03cd\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b5\u03cd\u03ba\u03bf\u03bb\u03b7 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03ba\u03bf\u03b9\u03bd\u03ae \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ce\u03bd \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03c9\u03bd \u03b4\u03b9\u03b1\u03c6\u03cc\u03c1\u03c9\u03bd \u03c4\u03bc\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd.<\/li>\n\n\n\n<li><strong>\u0395\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7<\/strong>: \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1. \u0393\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03bf\u03b9 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b1\u03bd \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c4\u03bf\u03bc\u03b5\u03af\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03a7\u03c1\u03b7\u03bc\u03b1\u03c4\u03bf\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u039b\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae, \u03c4\u03bf \u0391\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf \u0394\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc, \u03b7 \u0395\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03a0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b7 \u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u0391\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd. \u039a\u03ac\u03b8\u03b5 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03c3\u03b5 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03ac\u03bb\u03bb\u03b5\u03c2, \u03c9\u03c3\u03c4\u03cc\u03c3\u03bf \u03cc\u03bb\u03b5\u03c2 \u03b1\u03bd\u03c4\u03bb\u03bf\u03cd\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd. \u0391\u03c5\u03c4\u03cc \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03c3\u03c5\u03bd\u03b5\u03c0\u03b5\u03af\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03c3\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03bf \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03c0\u03b5\u03c1\u03b9\u03c4\u03c4\u03ad\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c7\u03c9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd.<\/li>\n\n\n\n<li><strong>\u039b\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf<\/strong>: \u0388\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03b4\u03b9\u03b1\u03ba\u03c1\u03b9\u03c4\u03b9\u03ba\u03ac \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c4\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03b9\u03ba\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5\u03c2 \u03bd\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03bd \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03cc\u03c4\u03b1\u03bd \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c4\u03bc\u03ae\u03bc\u03b1, \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03ac\u03bc\u03b5\u03c3\u03b1 \u03c3\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03bf \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1. \u0393\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03b5\u03ac\u03bd \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b3\u03c1\u03ac\u03c8\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c3\u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1, \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd \u03b8\u03b1 \u03b1\u03bd\u03c4\u03b9\u03ba\u03b1\u03c4\u03bf\u03c0\u03c4\u03c1\u03af\u03c3\u03b5\u03b9 \u03b1\u03bc\u03ad\u03c3\u03c9\u03c2 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7\u03bd \u03b1\u03bb\u03bb\u03b1\u03b3\u03ae, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03b1\u03bd\u03c4\u03b9\u03c0\u03c1\u03cc\u03c3\u03c9\u03c0\u03bf\u03b9 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03b1\u03bd\u03ac \u03c0\u03ac\u03c3\u03b1 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03b1\u03ba\u03c1\u03b9\u03b2\u03b5\u03af\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2.<\/li>\n\n\n\n<li><strong>\u03a5\u03c0\u03b7\u03c1\u03b5\u03c3\u03af\u03b5\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd &amp; \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ac \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1<\/strong>: \u03a0\u03ad\u03c1\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03c0\u03bb\u03ae \u03b1\u03c0\u03bf\u03b8\u03ae\u03ba\u03b5\u03c5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03c4\u03b1 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c5\u03c0\u03b7\u03c1\u03b5\u03c3\u03af\u03b5\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd. \u0391\u03c5\u03c4\u03cc \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b5 \u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03bd\u03c4\u03bb\u03ae\u03c3\u03bf\u03c5\u03bd \u03b3\u03bd\u03ce\u03c3\u03b5\u03b9\u03c2 \u03b1\u03c0\u03cc \u03c4\u03b5\u03c1\u03ac\u03c3\u03c4\u03b9\u03bf \u03cc\u03b3\u03ba\u03bf \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ce\u03bd. \u039f\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2, \u03b2\u03b1\u03c3\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c3\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03ac\u03c3\u03b5\u03b9\u03c2, \u03bc\u03bf\u03c4\u03af\u03b2\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03c9\u03bc\u03b1\u03bb\u03af\u03b5\u03c2.<\/li>\n\n\n\n<li><strong>\u0395\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae<\/strong>: \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c4\u03b1\u03b9\u03c1\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03b5 \u03cc\u03bb\u03bf\u03c5\u03c2. \u0395\u03af\u03bd\u03b1\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03bf \u03bd\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c0\u03b5\u03ba\u03c4\u03ac\u03c3\u03b9\u03bc\u03bf, \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03b9\u03bd\u03cc\u03bc\u03b5\u03bd\u03bf \u03c3\u03c4\u03b9\u03c2 \u03b5\u03be\u03b5\u03bb\u03b9\u03c3\u03c3\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b1\u03bd\u03ac\u03b3\u03ba\u03b5\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03c9\u03bd. \u039a\u03b1\u03b8\u03ce\u03c2 \u03bc\u03b9\u03b1 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03b1\u03bd\u03b1\u03c0\u03c4\u03cd\u03c3\u03c3\u03b5\u03c4\u03b1\u03b9, \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03b8\u03bf\u03cd\u03bd \u03c0\u03c1\u03cc\u03c3\u03b8\u03b5\u03c4\u03b5\u03c2 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c7\u03c9\u03c1\u03af\u03c2 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b1\u03c1\u03b1\u03c7\u03b8\u03bf\u03cd\u03bd \u03bf\u03b9 \u03c5\u03c6\u03b9\u03c3\u03c4\u03ac\u03bc\u03b5\u03bd\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd, \u03c0\u03bf\u03bb\u03bb\u03ac \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03bc\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2.<\/li>\n\n\n\n<li><strong>\u03a5\u03c0\u03bf\u03c3\u03c4\u03ae\u03c1\u03b9\u03be\u03b7 \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03c9\u03bd \u03a4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03b9\u03ce\u03bd<\/strong>: \u039c\u03b5 \u03c4\u03b7\u03bd \u03ad\u03bb\u03b5\u03c5\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c8\u03b7\u03c6\u03b9\u03b1\u03ba\u03ae\u03c2 \u03b5\u03c0\u03bf\u03c7\u03ae\u03c2, \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03c4\u03b7\u03ba\u03b1\u03bd \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03c5\u03bd \u03bd\u03b5\u03cc\u03c4\u03b5\u03c1\u03b5\u03c2 \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b5\u03c2. \u0393\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03c0\u03bb\u03ad\u03bf\u03bd \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c3\u03c5\u03c3\u03ba\u03b5\u03c5\u03ad\u03c2 IoT, \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd \u03c4\u03b7\u03bd \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 (AI) \u03b3\u03b9\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03b2\u03b1\u03c3\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c3\u03c4\u03bf cloud \u03b3\u03b9\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03c0\u03c1\u03bf\u03c3\u03b2\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1.<\/li>\n\n\n\n<li><strong>\u0391\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/strong>: \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd \u03b5\u03c0\u03b1\u03bd\u03b1\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2. \u039f\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bc\u03b5\u03b9\u03ce\u03c3\u03bf\u03c5\u03bd \u03c4\u03b1 \u03c3\u03c6\u03ac\u03bb\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03be\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03ae\u03c3\u03bf\u03c5\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03bf\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c1\u03bf\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf order-to-cash \u03ae \u03c4\u03bf procure-to-pay.<\/li>\n<\/ol>\n\n\n\n<p>\u03a4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b7 \u03c1\u03b1\u03c7\u03bf\u03ba\u03bf\u03ba\u03b1\u03bb\u03b9\u03ac \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03bc\u03b9\u03b1\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b1 \u03c4\u03bc\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bc\u03b5\u03bc\u03bf\u03bd\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c4\u03b5\u03b3\u03b1\u03bd\u03ac, \u03b1\u03bb\u03bb\u03ac \u03b4\u03b9\u03b1\u03c3\u03c5\u03bd\u03b4\u03b5\u03b4\u03b5\u03bc\u03ad\u03bd\u03b1 \u03bc\u03ad\u03c1\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03bd\u03b5\u03ba\u03c4\u03b9\u03ba\u03bf\u03cd \u03c3\u03c5\u03bd\u03cc\u03bb\u03bf\u03c5. \u0391\u03c5\u03c4\u03ae \u03b7 \u03b4\u03b9\u03b1\u03c3\u03cd\u03bd\u03b4\u03b5\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b5\u03c2 \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2, \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03c1\u03bf\u03bb\u03b7\u03c0\u03c4\u03b9\u03ba\u03ac \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03c3\u03c4\u03bf \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c0\u03b5\u03c1\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-d098efb1 gb-headline-text\">\u039f\u03c6\u03ad\u03bb\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u0395\u03be\u03bf\u03b9\u03ba\u03bf\u03bd\u03cc\u03bc\u03b7\u03c3\u03b7 \u039a\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u0392\u03b5\u03bb\u03c4\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u0391\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 ROI<\/strong>: \u03a4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc ERP \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03bd\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd. \u0391\u03c5\u03c4\u03cc \u03bf\u03b4\u03b7\u03b3\u03b5\u03af \u03c3\u03b5 \u03b1\u03c5\u03be\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03bc\u03b5 \u03b1\u03c0\u03bf\u03c4\u03ad\u03bb\u03b5\u03c3\u03bc\u03b1 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ae \u03b5\u03be\u03bf\u03b9\u03ba\u03bf\u03bd\u03cc\u03bc\u03b7\u03c3\u03b7 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2. \u039c\u03b5 \u03c4\u03b7\u03bd \u03c0\u03ac\u03c1\u03bf\u03b4\u03bf \u03c4\u03bf\u03c5 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5, \u03bf\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03c4\u03b7\u03c1\u03bf\u03cd\u03bd \u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03ae \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7\u03c2 (ROI).<\/li>\n\n\n\n<li><strong>\u039c\u03af\u03b1 \u0395\u03bd\u03b9\u03b1\u03af\u03b1 \u03a0\u03b7\u03b3\u03ae \u0391\u03bb\u03ae\u03b8\u03b5\u03b9\u03b1\u03c2<\/strong>: \u0397 \u03cd\u03c0\u03b1\u03c1\u03be\u03b7 \u03bc\u03af\u03b1\u03c2 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7\u03c2 \u03b2\u03ac\u03c3\u03b7\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03bb\u03ae\u03c0\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03c3\u03c5\u03bd\u03b5\u03c0\u03ae \u03ba\u03b1\u03b9 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae. \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7 \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b9\u03b8\u03b1\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03ba\u03bb\u03af\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c3\u03c6\u03b1\u03bb\u03bc\u03ac\u03c4\u03c9\u03bd, \u03c0\u03c1\u03bf\u03ac\u03b3\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7.<\/li>\n\n\n\n<li><strong>\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u039a\u03b1\u03bd\u03bf\u03bd\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03a3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7\u03c2<\/strong>: \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03bf\u03cd\u03bd \u03c4\u03b7 \u03c3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7 \u03bc\u03b5 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b1 \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c0\u03c1\u03cc\u03c4\u03c5\u03c0\u03b1. \u0391\u03c5\u03c4\u03cc \u03c3\u03b7\u03bc\u03b1\u03af\u03bd\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c1\u03c5\u03b8\u03bc\u03af\u03b6\u03bf\u03c5\u03bd \u03b5\u03b9\u03b4\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03c0\u03b5\u03c1\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b7 \u03c3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03bf\u03c5\u03bd \u03c0\u03ac\u03bd\u03c4\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03b2\u03bb\u03b5\u03c0\u03cc\u03bc\u03b5\u03bd\u03c9\u03bd \u03ba\u03b1\u03c4\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae\u03c1\u03b9\u03c9\u03bd \u03b3\u03c1\u03b1\u03bc\u03bc\u03ce\u03bd.<\/li>\n\n\n\n<li><strong>\u039c\u03b5\u03c4\u03c1\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b9\u03bd\u03b4\u03cd\u03bd\u03bf\u03c5<\/strong>: \u0397 \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b2\u03b1\u03c3\u03b9\u03ba\u03ce\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03b9\u03ce\u03bd \u03ba\u03b1\u03b8\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03b7 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac \u03bc\u03b5\u03b9\u03ce\u03bd\u03bf\u03c5\u03bd \u03c4\u03b1 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03b1 \u03c3\u03c6\u03ac\u03bb\u03bc\u03b1\u03c4\u03b1. \u0391\u03c5\u03c4\u03cc \u03bc\u03b5\u03c4\u03c1\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03b9\u03bd\u03b4\u03cd\u03bd\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03b5\u03bb\u03b5\u03c5\u03b8\u03b5\u03c1\u03ce\u03bd\u03b5\u03b9 \u03c0\u03bf\u03bb\u03cd\u03c4\u03b9\u03bc\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd.<\/li>\n\n\n\n<li><strong>\u0395\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03b7 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1<\/strong>: \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03ba\u03b1\u03c4\u03b1\u03c1\u03b3\u03b5\u03af \u03c4\u03b1 \u03b5\u03bc\u03c0\u03cc\u03b4\u03b9\u03b1 \u03b5\u03c0\u03b9\u03ba\u03bf\u03b9\u03bd\u03c9\u03bd\u03af\u03b1\u03c2 \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c4\u03c9\u03bd \u03c4\u03bc\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03bf\u03b4\u03b7\u03b3\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c3\u03b5 \u03c0\u03b9\u03bf \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ae \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc. \u0397 \u03ba\u03bf\u03b9\u03bd\u03ae \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03ba\u03ac\u03b8\u03b5 \u03bc\u03ad\u03bb\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03bf\u03bc\u03ac\u03b4\u03b1\u03c2 \u03ad\u03c7\u03b5\u03b9 \u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1, \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2.<\/li>\n\n\n\n<li><strong>\u0392\u03b5\u03bb\u03c4\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03b9\u03c3\u03c4\u03af\u03b1 \u03c4\u03b7\u03c2 \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd<\/strong>: \u039c\u03b5 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03bf \u03c0\u03c1\u03bf\u03c3\u03b1\u03bd\u03b1\u03c4\u03bf\u03bb\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u0391\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03c9\u03bd \u03a5\u03bb\u03b9\u03ba\u03ce\u03bd (<a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/mrp-syntomos-odigos\/\">MRP<\/a>), \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c0\u03bf\u03c5\u03bd \u03bc\u03b5 \u03b1\u03ba\u03c1\u03af\u03b2\u03b5\u03b9\u03b1 \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03c6\u03bf\u03c1\u03ac \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7. \u0391\u03c5\u03c4\u03cc \u03c0\u03c1\u03bf\u03b5\u03c4\u03bf\u03b9\u03bc\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03b1\u03c0\u03cc\u03c4\u03bf\u03bc\u03b5\u03c2 \u03bc\u03b5\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03ae \u03c4\u03b7\u03c2 \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03bc\u03bf\u03cd.<\/li>\n\n\n\n<li><strong>\u0395\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1<\/strong>: \u039a\u03b1\u03b8\u03ce\u03c2 \u03bc\u03b9\u03b1 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7 \u03b1\u03bd\u03b1\u03c0\u03c4\u03cd\u03c3\u03c3\u03b5\u03c4\u03b1\u03b9, \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03c4\u03b7\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bd\u03b1\u03c0\u03c4\u03c5\u03c7\u03b8\u03b5\u03af \u03bc\u03b1\u03b6\u03af \u03c4\u03b7\u03c2. \u039c\u03b9\u03b1 \u03c3\u03c5\u03bd\u03b5\u03c0\u03ae\u03c2 \u03c5\u03c0\u03bf\u03b4\u03bf\u03bc\u03ae \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03ba\u03bb\u03b9\u03bc\u03b1\u03ba\u03c9\u03b8\u03bf\u03cd\u03bd \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03c5\u03be\u03b1\u03bd\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2.<\/li>\n\n\n\n<li><strong>\u0392\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03ce\u03bd<\/strong>: \u03a4\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03b1 modules \u03c3\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c3\u03c7\u03ad\u03c3\u03b5\u03c9\u03bd \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b5\u03c2. \u0397 \u03b3\u03bd\u03ce\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03b5\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03b7 \u03ba\u03bf\u03b9\u03bd\u03ae \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ce\u03bd \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03ac\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac.<\/li>\n<\/ol>\n\n\n\n<p>\u0391\u03c5\u03c4\u03ac \u03c4\u03b1 \u03bf\u03c6\u03ad\u03bb\u03b7, \u03c0\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03cd\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2, \u03c5\u03c0\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03af\u03b6\u03bf\u03c5\u03bd \u03c0\u03ce\u03c2 \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b5\u03c1\u03ac\u03c3\u03c4\u03b9\u03b1 \u03b1\u03be\u03af\u03b1 \u03c3\u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2, \u03b5\u03b9\u03b4\u03b9\u03ba\u03ac \u03c3\u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-e27ce618 gb-headline-text\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 ERP;<\/h2>\n\n\n\n<p>\u039c\u03b9\u03b1 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b5%ce%bd%cf%8c%cf%84%ce%b7%cf%84%ce%b5%cf%82-erp\/\">\u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 ERP<\/a> \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03c5\u03c3\u03c4\u03b1\u03c4\u03b9\u03ba\u03cc \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP \u03c0\u03bf\u03c5 \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03ba\u03ac\u03b8\u03b5 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03cc\u03c2 \u03c4\u03bf\u03bc\u03ad\u03b1\u03c2 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03b5\u03bd\u03cc\u03c2 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd \u03c4\u03c5\u03b3\u03c7\u03ac\u03bd\u03b5\u03b9 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7\u03bd \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b1 ERP.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bf%ce%b9%ce%ba%ce%bf%ce%bd%ce%bf%ce%bc%ce%b9%ce%ba%ce%ae-%ce%b4%ce%b9%ce%b1%cf%87%ce%b5%ce%af%cf%81%ce%b9%cf%83%ce%b7-erp\/\">\u039f\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c7\u03c1\u03b7\u03bc\u03b1\u03c4\u03bf\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ad\u03c2 \u03c3\u03c5\u03bd\u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/erp-hrm\/\">ERP HRM (\u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03b1\u03bd\u03b8\u03c1\u03ce\u03c0\u03b9\u03bd\u03bf\u03c5 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03bf\u03cd)<\/a><\/strong>: \u0395\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ce\u03bd \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03bc\u03b9\u03c3\u03b8\u03bf\u03b4\u03bf\u03c3\u03af\u03b1\u03c2, \u03b1\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03b5\u03c9\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd \u03c0\u03c1\u03cc\u03c3\u03bb\u03b7\u03c8\u03b7\u03c2.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/erp-%ce%b4%ce%b9%ce%b1%cf%87%ce%b5%ce%af%cf%81%ce%b9%cf%83%ce%b7-%ce%b5%cf%86%ce%bf%ce%b4%ce%b9%ce%b1%cf%83%cf%84%ce%b9%ce%ba%ce%ae%cf%82-%ce%b1%ce%bb%cf%85%cf%83%ce%af%ce%b4%ce%b1%cf%82\/\">\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u0395\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u0391\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2 ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03c0\u03b9\u03b2\u03bb\u03ad\u03c0\u03b5\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2 \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03ae \u03c4\u03bf\u03c5, \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03b9\u03b6\u03cc\u03bc\u03b5\u03bd\u03b7 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2, \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 logistics.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b4%ce%b9%ce%b1%cf%87%ce%b5%ce%af%cf%81%ce%b9%cf%83%ce%b7-%ce%ad%cf%81%ce%b3%cf%89%ce%bd-erp\/\">\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u0388\u03c1\u03b3\u03c9\u03bd ERP<\/a><\/strong>: \u03a0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc, \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03ad\u03c1\u03b3\u03c9\u03bd, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03cc\u03c4\u03b9 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03bf\u03c5\u03bd \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03bf\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c0\u03c1\u03bf\u03cb\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/erp-analysi-poliseon\/\">\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ac \u03a3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03a0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03bc\u03b2\u03b1\u03b8\u03cd\u03bd\u03b5\u03b9 \u03c3\u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd, \u03c0\u03b1\u03c1\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bc\u03bf\u03c4\u03af\u03b2\u03b1 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ae\u03c3\u03bf\u03c5\u03bd \u03c3\u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ce\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/erp-bi\/\">\u0395\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u0395\u03c5\u03c6\u03c5\u0390\u03b1 ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03c5\u03bb\u03bb\u03ad\u03b3\u03b5\u03b9, \u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03bb\u03cd\u03b5\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b9\u03bc\u03b5\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b4%ce%b9%ce%b1%cf%87%ce%b5%ce%af%cf%81%ce%b9%cf%83%ce%b7-%cf%85%cf%80%ce%b7%cf%81%ce%b5%cf%83%ce%b9%cf%8e%ce%bd-erp\/\">\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03a5\u03c0\u03b7\u03c1\u03b5\u03c3\u03b9\u03ce\u03bd ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03bf\u03c7\u03ae \u03ba\u03b1\u03b9 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c5\u03c0\u03b7\u03c1\u03b5\u03c3\u03b9\u03ce\u03bd, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b9\u03ba\u03b1\u03bd\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03bf\u03c7\u03ae \u03c5\u03c0\u03b7\u03c1\u03b5\u03c3\u03b9\u03ce\u03bd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b7%ce%bb%ce%b5%ce%ba%cf%84%cf%81%ce%bf%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%ce%bc%cf%80%cf%8c%cf%81%ce%b9%ce%bf-erp\/\">\u0397\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u0395\u03bc\u03c0\u03cc\u03c1\u03b9\u03bf ERP<\/a><\/strong>: \u03a3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03bf \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03c4\u03c9\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03c5\u03b1\u03ba\u03ce\u03bd \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03c9\u03bd, \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c7\u03c9\u03c1\u03af\u03c3\u03b5\u03b9\u03c2 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c4\u03ad\u03bb\u03b5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b4%ce%b9%ce%b1%cf%87%ce%b5%ce%af%cf%81%ce%b9%cf%83%ce%b7-%ce%b1%cf%80%ce%bf%ce%b8%ce%b5%ce%bc%ce%ac%cf%84%cf%89%ce%bd-erp\/\">\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u0391\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd ERP<\/a><\/strong>: \u0395\u03c0\u03b9\u03b2\u03bb\u03ad\u03c0\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b1\u03b3\u03b1\u03b8\u03ce\u03bd \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03bb\u03b1\u03b2\u03ae \u03c4\u03b7\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03af\u03b1\u03c2 \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b1 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b1 \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae-erp\/\">\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae ERP<\/a><\/strong>: \u03a0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03bc\u03ad\u03bd\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03ba\u03bb\u03ac\u03b4\u03bf \u03c4\u03b7\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2, \u03b1\u03c5\u03c4\u03ae \u03b7 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03b7 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03c0\u03c1\u03ce\u03c4\u03b5\u03c2 \u03cd\u03bb\u03b5\u03c2 \u03ad\u03c9\u03c2 \u03c4\u03b1 \u03c4\u03b5\u03bb\u03b9\u03ba\u03ac \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03b1.<\/li>\n<\/ol>\n\n\n\n<p>\u0395\u03bd\u03ce \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03bf\u03cd\u03bd \u03c9\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c1\u03b9\u03c4\u03ad\u03c2 \u03bc\u03bf\u03bd\u03ac\u03b4\u03b5\u03c2 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP, \u03ba\u03ac\u03b8\u03b5 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b1\u03bd\u03c4\u03bb\u03b5\u03af \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b5\u03bd\u03b9\u03b1\u03af\u03b1 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03c3\u03b5 \u03bf\u03bb\u03cc\u03ba\u03bb\u03b7\u03c1\u03b7 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-38ad302c gb-headline-text\">\u03a0\u03bf\u03b9\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03b1 \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c4\u03bf\u03c5 ERP;<\/h2>\n\n\n\n<p>\u03a4\u03b1 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%87%ce%b1%cf%81%ce%b1%ce%ba%cf%84%ce%b7%cf%81%ce%b9%cf%83%cf%84%ce%b9%ce%ba%ce%ac-erp\/\">\u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac ERP<\/a> \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP, \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03c5\u03bd \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u03a4\u03b1 \u03c0\u03b9\u03bf \u03ba\u03bf\u03b9\u03bd\u03ac \u03b5\u03af\u03bd\u03b1\u03b9:&nbsp;<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%87%ce%b1%cf%81%ce%b1%ce%ba%cf%84%ce%b7%cf%81%ce%b9%cf%83%cf%84%ce%b9%ce%ba%cf%8c-%ce%b5%ce%bd%cf%83%cf%89%ce%bc%ce%ac%cf%84%cf%89%cf%83%ce%b7%cf%82-erp\/\">\u0395\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03c3\u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03bd\u03b1 \u03c3\u03c5\u03bd\u03b4\u03ad\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b5\u03af \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03bc\u03b5 \u03ac\u03bb\u03bb\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03ae \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%cf%80%ce%b1%cf%81%ce%b1%ce%ba%ce%bf%ce%bb%ce%bf%cf%8d%ce%b8%ce%b7%cf%83%ce%b7-%ce%b5%cf%80%ce%b9%ce%b4%cf%8c%cf%83%ce%b5%cf%89%ce%bd-erp\/\">\u03a0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2 ERP<\/a><\/strong>: \u03a0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03ac\u03bb\u03c5\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b7 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03b1\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf\u03bc\u03b5\u03af\u03c2 \u03c0\u03c1\u03bf\u03c2 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b1%ce%bd%ce%b1%cf%86%ce%bf%cf%81%ce%ad%cf%82-erp\/\">\u0391\u03bd\u03b1\u03c6\u03bf\u03c1\u03ad\u03c2 ERP<\/a><\/strong>: \u0391\u03c5\u03c4\u03ae \u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c4\u03b7 \u03b4\u03b7\u03bc\u03b9\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03bd\u03bf\u03bc\u03ae \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ce\u03bd \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ce\u03bd \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 ERP, \u03b2\u03bf\u03b7\u03b8\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c4\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c3\u03c4\u03b7 \u03b4\u03b9\u03b1\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae\u03c2.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b1%cf%83%cf%86%ce%ac%ce%bb%ce%b5%ce%b9%ce%b1-erp\/\">\u0391\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 ERP<\/a><\/strong>: \u0394\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b4\u03b9\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP \u03c0\u03c1\u03bf\u03c3\u03c4\u03b1\u03c4\u03b5\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03bc\u03b7 \u03b5\u03be\u03bf\u03c5\u03c3\u03b9\u03bf\u03b4\u03bf\u03c4\u03b7\u03bc\u03ad\u03bd\u03b7 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7, \u03c0\u03b1\u03c1\u03b1\u03b2\u03b9\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ae \u03ba\u03c5\u03b2\u03b5\u03c1\u03bd\u03bf\u03b1\u03c0\u03b5\u03b9\u03bb\u03ad\u03c2.<\/li>\n\n\n\n<li><strong><a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/erp-bom-lista-ylikon\/\">\u039a\u03b1\u03c4\u03ac\u03bb\u03bf\u03b3\u03bf\u03c2 \u03a5\u03bb\u03b9\u03ba\u03ce\u03bd (BOM) ERP<\/a><\/strong>: \u0391\u03c0\u03b1\u03c1\u03b9\u03b8\u03bc\u03b5\u03af \u03cc\u03bb\u03b5\u03c2 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03ce\u03c4\u03b5\u03c2 \u03cd\u03bb\u03b5\u03c2, \u03c4\u03b1 \u03b5\u03be\u03b1\u03c1\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c3\u03c5\u03bd\u03b1\u03c1\u03bc\u03bf\u03bb\u03bf\u03b3\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03bf\u03c2, \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c9\u03c2 \u03c3\u03c5\u03bd\u03c4\u03b1\u03b3\u03ae \u03ae \u03c3\u03c7\u03b5\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/li>\n<\/ol>\n\n\n\n<p>\u0391\u03c5\u03c4\u03ac \u03c4\u03b1 \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac, \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP, \u03c0\u03b1\u03c1\u03ad\u03c7\u03bf\u03c5\u03bd:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u039c\u03b9\u03b1 \u03b9\u03c3\u03c7\u03c5\u03c1\u03ae \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03b2\u03bf\u03b7\u03b8\u03ac \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03c4\u03cd\u03c7\u03bf\u03c5\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03ae \u03b1\u03c1\u03b9\u03c3\u03c4\u03b5\u03af\u03b1.<\/li>\n\n\n\n<li>Enhanced productivity.<\/li>\n\n\n\n<li>Data-driven decision-making.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u03a4\u03cd\u03c0\u03bf\u03b9 Enterprise Resource Planning&nbsp;<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-581a8653 gb-headline-text\">On-Premise ERP<\/h4>\n\n\n\n<p>\u03a4\u03b1 on-premise \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b5\u03b3\u03ba\u03b1\u03b8\u03af\u03c3\u03c4\u03b1\u03bd\u03c4\u03b1\u03b9 \u03ba\u03b1\u03b9 \u03b5\u03ba\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c4\u03bf\u03c0\u03b9\u03ba\u03bf\u03cd\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03bc\u03b9\u03c3\u03c4\u03ad\u03c2 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c6\u03c5\u03c3\u03b9\u03ba\u03ce\u03bd \u03b5\u03b3\u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03ac\u03c3\u03b5\u03c9\u03bd \u03b5\u03bd\u03cc\u03c2 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd. \u0391\u03c5\u03c4\u03ae \u03b7 \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03c3\u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bb\u03ae\u03c1\u03b7 \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf \u03c4\u03bf\u03c5 \u03c0\u03b5\u03c1\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd\u03c4\u03bf\u03c2 ERP \u03c4\u03bf\u03c5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b8\u03ae\u03ba\u03b5\u03c5\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03ad\u03c9\u03c2 \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03bc\u03bf\u03c1\u03c6\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2. \u0395\u03bd\u03ce \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ae \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03c3\u03b5 \u03c5\u03bb\u03b9\u03ba\u03cc, \u03c5\u03c0\u03bf\u03b4\u03bf\u03bc\u03ae \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03cc \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ba\u03ae\u03c2, \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c5\u03c8\u03b7\u03bb\u03ae \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae. \u039f\u03b9 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b9\u03bb\u03ad\u03b3\u03bf\u03c5\u03bd on-premise \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 ERP \u03ad\u03c7\u03bf\u03c5\u03bd \u03c3\u03c5\u03c7\u03bd\u03ac \u03b5\u03b9\u03b4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03bf\u03cd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03ae \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03b7 \u03c5\u03c0\u03bf\u03b4\u03bf\u03bc\u03ae \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ba\u03ae\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9a850226 gb-headline-text\">Cloud-based ERP<\/h4>\n\n\n\n<p>\u03a4\u03b1 cloud-based \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03c6\u03b9\u03bb\u03bf\u03be\u03b5\u03bd\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03bf\u03cd\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03bc\u03b9\u03c3\u03c4\u03ad\u03c2 \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03c4\u03b7\u03c1\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd \u03ba\u03b1\u03b9 \u03b7 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03ac \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03ae\u03c3\u03c4\u03b5\u03c2 \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03cd\u03bf\u03c5. \u0391\u03c5\u03c4\u03cc \u03c4\u03bf \u03bc\u03bf\u03bd\u03c4\u03ad\u03bb\u03bf \u03b5\u03be\u03b1\u03bb\u03b5\u03af\u03c6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03bc\u03b5\u03b3\u03ac\u03bb\u03b5\u03c2 \u03c0\u03c1\u03bf\u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b5\u03bd\u03b4\u03cd\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b5 \u03c5\u03bb\u03b9\u03ba\u03cc, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03b7 \u03b5\u03c5\u03b8\u03cd\u03bd\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7, \u03c4\u03b9\u03c2 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c7\u03c1\u03cc\u03bd\u03bf \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 \u03b1\u03bd\u03ae\u03ba\u03b5\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03ac\u03c1\u03bf\u03c7\u03bf \u03c5\u03c0\u03b7\u03c1\u03b5\u03c3\u03b9\u03ce\u03bd. \u039c\u03b5 \u03bc\u03b9\u03b1 \u03b4\u03bf\u03bc\u03ae \u03c4\u03b9\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7\u03c2 \u03b2\u03ac\u03c3\u03b5\u03b9 \u03c3\u03c5\u03bd\u03b4\u03c1\u03bf\u03bc\u03ae\u03c2, \u03c4\u03b1 cloud-based ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c0\u03b5\u03ba\u03c4\u03ac\u03c3\u03b9\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b5\u03c5\u03b5\u03bb\u03b9\u03be\u03af\u03b1 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7\u03c2 \u03b1\u03c0\u03cc \u03bf\u03c0\u03bf\u03b9\u03b1\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 \u03c4\u03bf\u03c0\u03bf\u03b8\u03b5\u03c3\u03af\u03b1. \u0395\u03af\u03bd\u03b1\u03b9 \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03ae \u03b3\u03b9\u03b1 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ba\u03ae\u03c2 \u03ae \u03b3\u03b9\u03b1 \u03cc\u03c3\u03b5\u03c2 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03bf\u03cd\u03bd \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03bc\u03b5 \u03b5\u03cd\u03ba\u03bf\u03bb\u03b7 \u03b1\u03bd\u03b1\u03b2\u03ac\u03b8\u03bc\u03b9\u03c3\u03b7.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-140fb730 gb-headline-text\">Hybrid ERP<\/h4>\n\n\n\n<p>\u039f\u03b9 \u03c5\u03b2\u03c1\u03b9\u03b4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 ERP \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03c4\u03cc\u03c3\u03bf \u03c4\u03c9\u03bd on-premise \u03cc\u03c3\u03bf \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd cloud-based \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03bc\u03b5 \u03c3\u03c4\u03cc\u03c7\u03bf \u03c4\u03b7\u03bd \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03bb\u03b5\u03bf\u03bd\u03b5\u03ba\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b8\u03b5\u03bd\u03cc\u03c2. \u039c\u03b9\u03b1 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03b5\u03af \u03b5\u03c5\u03b1\u03af\u03c3\u03b8\u03b7\u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ae \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c3\u03c4\u03bf\u03c5\u03c2 \u03c4\u03bf\u03c0\u03b9\u03ba\u03bf\u03cd\u03c2 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03bc\u03b9\u03c3\u03c4\u03ad\u03c2, \u03b5\u03bd\u03ce \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c4\u03bf cloud \u03b3\u03b9\u03b1 \u03c0\u03b9\u03bf \u03b5\u03c0\u03b5\u03ba\u03c4\u03ac\u03c3\u03b9\u03bc\u03b5\u03c2 \u03ae \u03c3\u03c5\u03bd\u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u0391\u03c5\u03c4\u03ae \u03b7 \u03c0\u03c1\u03bf\u03c3\u03ad\u03b3\u03b3\u03b9\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03b9\u03c3\u03bf\u03c1\u03c1\u03bf\u03c0\u03af\u03b1, \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c4\u03b7\u03c1\u03bf\u03cd\u03bd \u03ac\u03bc\u03b5\u03c3\u03bf \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf \u03c3\u03b5 \u03bf\u03c1\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03c4\u03c5\u03c7\u03ad\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2, \u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03bf\u03cd\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03bb\u03bb\u03b7\u03bb\u03b1 \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c0\u03c1\u03bf\u03c3\u03b2\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c4\u03c9\u03bd \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b2\u03b1\u03c3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf cloud. \u03a4\u03b1 \u03c5\u03b2\u03c1\u03b9\u03b4\u03b9\u03ba\u03ac \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03ac \u03b3\u03b9\u03b1 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2 \u03c0\u03bf\u03c5 \u03bc\u03b5\u03c4\u03b1\u03b2\u03b1\u03af\u03bd\u03bf\u03c5\u03bd \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03ae \u03b3\u03b9\u03b1 \u03cc\u03c3\u03bf\u03c5\u03c2 \u03b5\u03c0\u03b9\u03b4\u03b9\u03ce\u03ba\u03bf\u03c5\u03bd \u03bd\u03b1 \u03b5\u03c0\u03b9\u03c4\u03cd\u03c7\u03bf\u03c5\u03bd \u03c4\u03bf \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03bf \u03ba\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03bf\u03c5\u03c2 \u03b4\u03cd\u03bf \u03ba\u03cc\u03c3\u03bc\u03bf\u03c5\u03c2.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-15dd2283 gb-headline-text\">\u03a3\u03b7\u03bc\u03ac\u03b4\u03b9\u03b1 \u03cc\u03c4\u03b9 \u03b7 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 ERP:<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u039a\u03b1\u03c4\u03b1\u03ba\u03b5\u03c1\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1<\/strong>: \u0395\u03ac\u03bd \u03b7 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2 \u03b2\u03b1\u03c3\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03bc\u03b5\u03b3\u03ac\u03bb\u03bf \u03b2\u03b1\u03b8\u03bc\u03cc \u03c3\u03b5 \u03be\u03b5\u03c7\u03c9\u03c1\u03b9\u03c3\u03c4\u03ad\u03c2 \u03b2\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03c6\u03cd\u03bb\u03bb\u03b1 \u03ae \u03b1\u03c3\u03cd\u03bd\u03b4\u03b5\u03c4\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03b1 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd \u03c0\u03bf\u03c5 \u03b1\u03c0\u03b1\u03b9\u03c4\u03bf\u03cd\u03bd \u03c7\u03b5\u03b9\u03c1\u03bf\u03ba\u03af\u03bd\u03b7\u03c4\u03bf \u03c3\u03c5\u03b3\u03c7\u03c1\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc, \u03b1\u03c5\u03c4\u03cc \u03c5\u03c0\u03bf\u03b4\u03b7\u03bb\u03ce\u03bd\u03b5\u03b9 \u03ad\u03bb\u03bb\u03b5\u03b9\u03c8\u03b7 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd, \u03ba\u03ac\u03c4\u03b9 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b5\u03af \u03bc\u03b5 \u03ad\u03bd\u03b1 ERP.<\/li>\n\n\n\n<li><strong>\u03a0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b9\u03c2 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2<\/strong>: \u0395\u03ac\u03bd \u03b7 \u03bf\u03bc\u03ac\u03b4\u03b1 \u03c3\u03b1\u03c2 \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03b5\u03cd\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03b1\u03c0\u03bf\u03ba\u03c4\u03ae\u03c3\u03b5\u03b9 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03ae \u03b5\u03ac\u03bd \u03c4\u03b1 \u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ac \u03c3\u03b1\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c3\u03c5\u03c7\u03bd\u03ac \u03c0\u03b1\u03c1\u03c9\u03c7\u03b7\u03bc\u03ad\u03bd\u03b1, \u03b1\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b4\u03b5\u03b9\u03be\u03b7 \u03cc\u03c4\u03b9 \u03c4\u03b1 \u03c4\u03c1\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03ac \u03c3\u03b1\u03c2 \u03b4\u03b5\u03bd \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03ce\u03bd\u03bf\u03c5\u03bd \u03ba\u03b1\u03b9 \u03b4\u03b5\u03bd \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03bd\u03bf\u03c5\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ac \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1.<\/li>\n\n\n\n<li><strong>\u0391\u03bd\u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2<\/strong>: \u0395\u03ac\u03bd \u03b2\u03b1\u03c3\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac \u03ae \u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae, \u03ad\u03c7\u03bf\u03c5\u03bd \u03b3\u03af\u03bd\u03b5\u03b9 \u03c5\u03c0\u03b5\u03c1\u03b2\u03bf\u03bb\u03b9\u03ba\u03ac \u03c7\u03c1\u03bf\u03bd\u03bf\u03b2\u03cc\u03c1\u03b5\u03c2 \u03ae \u03b5\u03be\u03b1\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b2\u03b1\u03c3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03c7\u03b1\u03c1\u03c4\u03af, \u03b1\u03c5\u03c4\u03cc \u03c5\u03c0\u03bf\u03b4\u03b7\u03bb\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03b1\u03c5\u03c4\u03bf\u03bc\u03b1\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf ERP.<\/li>\n\n\n\n<li><strong>\u0396\u03b7\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1\u03c2 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd<\/strong>: \u038c\u03c4\u03b1\u03bd \u03b1\u03bd\u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03ae \u03b5\u03bb\u03bb\u03b9\u03c0\u03ae \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b9\u03c2 \u03c0\u03c9\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ae \u03c4\u03b7\u03bd \u03b5\u03be\u03c5\u03c0\u03b7\u03c1\u03ad\u03c4\u03b7\u03c3\u03b7 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd \u03c3\u03b1\u03c2, \u03bf\u03b4\u03b7\u03b3\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c3\u03b5 \u03b1\u03bc\u03b1\u03c5\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c6\u03ae\u03bc\u03b7 \u03ae \u03b4\u03c5\u03c3\u03b1\u03c1\u03ad\u03c3\u03ba\u03b5\u03b9\u03b1 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd, \u03b1\u03c5\u03c4\u03cc \u03c5\u03c0\u03bf\u03b4\u03b5\u03b9\u03ba\u03bd\u03cd\u03b5\u03b9 \u03c3\u03b1\u03c6\u03ce\u03c2 \u03cc\u03c4\u03b9 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af\u03c4\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c0\u03b9\u03bf \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1.<\/li>\n\n\n\n<li><strong>\u03a0\u03bf\u03bb\u03cd\u03c0\u03bb\u03bf\u03ba\u03bf \u03c4\u03bf\u03c0\u03af\u03bf IT<\/strong>: \u0395\u03ac\u03bd \u03bf\u03b9 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 IT \u03c3\u03b1\u03c2 \u03c6\u03b1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c0\u03b5\u03c1\u03af\u03c0\u03bb\u03bf\u03ba\u03b5\u03c2, \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03ac \u03c3\u03b1\u03c2 \u03c3\u03c4\u03b5\u03c1\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b5\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ae \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03b6\u03b5\u03c4\u03b5 \u03ba\u03b1\u03c4\u03b1\u03ba\u03b5\u03c1\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03b1\u03bb\u03b1\u03b9\u03bf\u03cd \u03c4\u03cd\u03c0\u03bf\u03c5 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2, \u03ad\u03bd\u03b1 ERP \u03b8\u03b1 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03c3\u03b5 \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03b7 \u03b1\u03c0\u03bb\u03bf\u03cd\u03c3\u03c4\u03b5\u03c5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b5\u03ba\u03c3\u03c5\u03b3\u03c7\u03c1\u03bf\u03bd\u03b9\u03c3\u03bc\u03cc.<\/li>\n\n\n\n<li><strong>\u03a5\u03c0\u03b5\u03c1\u03b2\u03bf\u03bb\u03b9\u03ba\u03ae \u03a3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 IT<\/strong>: \u0397 \u03c3\u03c0\u03b1\u03c4\u03ac\u03bb\u03b7 \u03c5\u03c0\u03b5\u03c1\u03b2\u03bf\u03bb\u03b9\u03ba\u03bf\u03cd \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5 \u03c3\u03b5 \u03b5\u03c0\u03b9\u03b4\u03b9\u03bf\u03c1\u03b8\u03ce\u03c3\u03b5\u03b9\u03c2, \u03b4\u03b9\u03bf\u03c1\u03b8\u03ce\u03c3\u03b5\u03b9\u03c2 \u03ae \u03c0\u03b1\u03c1\u03b1\u03ba\u03ac\u03bc\u03c8\u03b5\u03b9\u03c2 \u03c4\u03c9\u03bd \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03b9\u03c3\u03bc\u03ce\u03bd \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03c9\u03c7\u03b7\u03bc\u03ad\u03bd\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03c4\u03b5 \u03c3\u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c5\u03c0\u03bf\u03b4\u03b7\u03bb\u03ce\u03bd\u03b5\u03b9 \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03c0\u03b9\u03bf \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03ba\u03b1\u03b9 \u03c3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b7 \u03bb\u03cd\u03c3\u03b7.<\/li>\n\n\n\n<li><strong>\u0388\u03bb\u03bb\u03b5\u03b9\u03c8\u03b7 \u03a5\u03c0\u03bf\u03c3\u03c4\u03ae\u03c1\u03b9\u03be\u03b7\u03c2 \u03b3\u03b9\u03b1 \u03a3\u03cd\u03b3\u03c7\u03c1\u03bf\u03bd\u03b5\u03c2 \u03a4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b5\u03c2<\/strong>: \u0395\u03ac\u03bd \u03c4\u03b1 \u03c4\u03c1\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03ac \u03c3\u03b1\u03c2 \u03b4\u03b5\u03bd \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03ae \u03b4\u03b5\u03bd \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03ba\u03b1\u03bb\u03ac \u03bc\u03b5 \u03bd\u03ad\u03b5\u03c2 \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf \u0394\u03b9\u03b1\u03b4\u03af\u03ba\u03c4\u03c5\u03bf \u03c4\u03c9\u03bd \u03a0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03c9\u03bd (IoT) \u03ae \u03b7 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7, \u03c7\u03ac\u03bd\u03b5\u03c4\u03b5 \u03c4\u03b1 \u03c0\u03bb\u03b5\u03bf\u03bd\u03b5\u03ba\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03b1\u03c5\u03c4\u03ce\u03bd \u03c4\u03c9\u03bd \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03b9\u03ce\u03bd.<\/li>\n\n\n\n<li><strong>\u03a0\u03cc\u03bd\u03bf\u03b9 \u0391\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7\u03c2<\/strong>: \u0395\u03ac\u03bd \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03b1\u03c2 \u03c6\u03b1\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03bc\u03c0\u03bf\u03b4\u03af\u03b6\u03bf\u03c5\u03bd \u03b1\u03bd\u03c4\u03af \u03bd\u03b1 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2, \u03b1\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03ae\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c0\u03b9\u03bf \u03b5\u03c0\u03b5\u03ba\u03c4\u03ac\u03c3\u03b9\u03bc\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03b9\u03bc\u03b5\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2.<\/li>\n<\/ol>\n\n\n\n<p>\u0397 \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03b1\u03bd\u03b1\u03b3\u03bd\u03ce\u03c1\u03b9\u03c3\u03b7 \u03b1\u03c5\u03c4\u03ce\u03bd \u03c4\u03c9\u03bd \u03c3\u03b7\u03bc\u03b1\u03b4\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b7 \u03bb\u03ae\u03c8\u03b7 \u03c0\u03c1\u03bf\u03bb\u03b7\u03c0\u03c4\u03b9\u03ba\u03ce\u03bd \u03bc\u03ad\u03c4\u03c1\u03c9\u03bd \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03c6\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae \u03bc\u03b9\u03b1\u03c2 \u03bb\u03cd\u03c3\u03b7\u03c2 ERP \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03ae \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7.<\/p>\n\n\n\n<p><strong>\u03a0\u03ce\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03c9\u03c3\u03c4\u03ae \u03bb\u03cd\u03c3\u03b7 ERP;&nbsp;<\/strong><\/p>\n\n\n\n<p>\u0397 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03c4\u03b7\u03c2 \u03c3\u03c9\u03c3\u03c4\u03ae\u03c2 \u03bb\u03cd\u03c3\u03b7\u03c2 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03b6\u03c9\u03c4\u03b9\u03ba\u03ae\u03c2 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03cc, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03af \u03bc\u03b9\u03b1 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ae \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03c4\u03cc\u03c3\u03bf \u03c3\u03b5 \u03c7\u03c1\u03cc\u03bd\u03bf \u03cc\u03c3\u03bf \u03ba\u03b1\u03b9 \u03c3\u03b5 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2. \u0391\u03ba\u03bf\u03bb\u03bf\u03c5\u03b8\u03b5\u03af \u03ad\u03bd\u03b1\u03c2 \u03bf\u03b4\u03b7\u03b3\u03cc\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03c9\u03c3\u03c4\u03ae \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae \u03c3\u03b1\u03c2:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u0391\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u0391\u03bd\u03ac\u03b3\u03ba\u03b5\u03c2 \u03c3\u03b1\u03c2<\/strong>: \u039e\u03b5\u03ba\u03b9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2. \u039a\u03b1\u03c4\u03b1\u03bd\u03bf\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03c4\u03c1\u03ad\u03c7\u03bf\u03c5\u03c3\u03b5\u03c2 \u03c0\u03c1\u03bf\u03ba\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae\u03c2 \u03c3\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c3\u03c4\u03b5 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03b1\u03c5\u03c4\u03ce\u03bd \u03c4\u03c9\u03bd \u03b6\u03b7\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd.<\/li>\n\n\n\n<li><strong>\u039a\u03b1\u03b8\u03bf\u03c1\u03af\u03c3\u03c4\u03b5 \u03ad\u03bd\u03b1\u03bd \u03a0\u03c1\u03bf\u03cb\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc<\/strong>: \u039b\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03cc\u03c3\u03bf \u03c4\u03b7\u03bd \u03b1\u03c1\u03c7\u03b9\u03ba\u03ae \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c5\u03bb\u03b9\u03ba\u03cc \u03cc\u03c3\u03bf \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b5\u03c7\u03ad\u03c2 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7, \u03c4\u03b7\u03bd \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03b9\u03b8\u03b1\u03bd\u03ad\u03c2 \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03c3\u03b5\u03b9\u03c2.<\/li>\n\n\n\n<li><strong>\u0394\u03ce\u03c3\u03c4\u03b5 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c3\u03c4\u03b7\u03bd \u03b5\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1<\/strong>: \u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03bd\u03b1\u03c0\u03c4\u03c5\u03c7\u03b8\u03b5\u03af \u03bc\u03b1\u03b6\u03af \u03bc\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03ae \u03c3\u03b1\u03c2. \u0398\u03b1 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b5\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd \u03c7\u03c1\u03ae\u03c3\u03c4\u03b5\u03c2, \u03bd\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03b9 \u03bd\u03ad\u03b1 modules \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c3\u03b5 \u03b5\u03be\u03b5\u03bb\u03b9\u03c3\u03c3\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ac \u03bc\u03bf\u03bd\u03c4\u03ad\u03bb\u03b1.<\/li>\n\n\n\n<li><strong>\u0394\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2<\/strong>: \u0392\u03b5\u03b2\u03b1\u03b9\u03c9\u03b8\u03b5\u03af\u03c4\u03b5 \u03cc\u03c4\u03b9 \u03b7 \u03bb\u03cd\u03c3\u03b7 ERP \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03b1\u03c0\u03c1\u03cc\u03c3\u03ba\u03bf\u03c0\u03c4\u03b1 \u03bc\u03b5 \u03c4\u03b1 \u03c5\u03c0\u03ac\u03c1\u03c7\u03bf\u03bd\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03c4\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2 \u03ae \u03bf\u03c0\u03bf\u03b9\u03b5\u03c3\u03b4\u03ae\u03c0\u03bf\u03c4\u03b5 \u03b5\u03c6\u03b1\u03c1\u03bc\u03bf\u03b3\u03ad\u03c2 \u03c4\u03c1\u03af\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03b5\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c3\u03b1\u03c2.<\/li>\n\n\n\n<li><strong>\u03a6\u03b9\u03bb\u03b9\u03ba\u03cc \u03c0\u03c1\u03bf\u03c2 \u03c4\u03bf\u03bd \u03c7\u03c1\u03ae\u03c3\u03c4\u03b7 \u03c0\u03b5\u03c1\u03b9\u03b2\u03ac\u03bb\u03bb\u03bf\u03bd<\/strong>: \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b4\u03b9\u03b1\u03b9\u03c3\u03b8\u03b7\u03c4\u03b9\u03ba\u03cc \u03ba\u03b1\u03b9 \u03b5\u03cd\u03ba\u03bf\u03bb\u03bf \u03c3\u03c4\u03b7 \u03c7\u03c1\u03ae\u03c3\u03b7 \u03b8\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03c3\u03b5\u03b9 \u03c4\u03b1 \u03c0\u03bf\u03c3\u03bf\u03c3\u03c4\u03ac \u03c5\u03b9\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2 \u03b1\u03c0\u03cc \u03c4\u03bf\u03c5\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03b8\u03b1 \u03b5\u03bb\u03b1\u03c7\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf, \u03c4\u03b7\u03bd \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03cc\u03c1\u03bf\u03c5\u03c2 \u03c0\u03bf\u03c5 \u03b4\u03b1\u03c0\u03b1\u03bd\u03ce\u03bd\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7.<\/li>\n\n\n\n<li><strong>\u03a6\u03ae\u03bc\u03b7 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ae<\/strong>: \u0395\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b9\u03b8\u03b1\u03bd\u03bf\u03cd\u03c2 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03c3\u03b1\u03c2. \u039b\u03ac\u03b2\u03b5\u03c4\u03b5 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b7 \u03c6\u03ae\u03bc\u03b7 \u03c4\u03bf\u03c5\u03c2, \u03c4\u03b9\u03c2 \u03ba\u03c1\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2, \u03c4\u03b9\u03c2 \u03bc\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03c4\u03c9\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03bb\u03ac\u03b4\u03bf\u03c5\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03b5\u03be\u03c5\u03c0\u03b7\u03c1\u03b5\u03c4\u03ae\u03c3\u03b5\u03b9. \u039f\u03b9 \u03ba\u03b1\u03b8\u03b9\u03b5\u03c1\u03c9\u03bc\u03ad\u03bd\u03bf\u03b9 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2 \u03c3\u03c5\u03c7\u03bd\u03ac \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03b1\u03be\u03b9\u03bf\u03c0\u03b9\u03c3\u03c4\u03af\u03b1 \u03ba\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03b1\u03c0\u03bf\u03b4\u03b5\u03b4\u03b5\u03b9\u03b3\u03bc\u03ad\u03bd\u03bf \u03b9\u03c3\u03c4\u03bf\u03c1\u03b9\u03ba\u03cc.<\/li>\n\n\n\n<li><strong>\u0395\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2<\/strong>: \u039a\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03bf\u03bd\u03b1\u03b4\u03b9\u03ba\u03ae. \u039c\u03b9\u03b1 \u03b9\u03b4\u03b1\u03bd\u03b9\u03ba\u03ae \u03bb\u03cd\u03c3\u03b7 ERP \u03b8\u03b1 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03ce\u03c3\u03c4\u03b5 \u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2.<\/li>\n\n\n\n<li><strong>\u03a5\u03c0\u03bf\u03c3\u03c4\u03ae\u03c1\u03b9\u03be\u03b7 \u03a5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u0395\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7<\/strong>: \u0395\u03be\u03b5\u03c4\u03ac\u03c3\u03c4\u03b5 \u03c0\u03ce\u03c2 \u03bf \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ae\u03c2 \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1 \u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7\u03c2. \u0397 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03ba\u03c0\u03b1\u03af\u03b4\u03b5\u03c5\u03c3\u03b7, \u03bf\u03b9 \u03c0\u03cc\u03c1\u03bf\u03b9 \u03ba\u03b1\u03b9 \u03b7 \u03c5\u03c0\u03bf\u03c3\u03c4\u03ae\u03c1\u03b9\u03be\u03b7 \u03bc\u03b5\u03c4\u03ac \u03c4\u03b7\u03bd \u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03bd\u03b5\u03ba\u03c4\u03af\u03bc\u03b7\u03c4\u03b1 \u03b3\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03bf\u03bc\u03b1\u03bb\u03ae \u03bc\u03b5\u03c4\u03ac\u03b2\u03b1\u03c3\u03b7.<\/li>\n\n\n\n<li><strong>\u03a4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b5\u03c2 \u03bc\u03b5 \u0394\u03b9\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u039c\u03ad\u03bb\u03bb\u03bf\u03bd\u03c4\u03bf\u03c2<\/strong>: \u0395\u03c0\u03b9\u03bb\u03ad\u03be\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03b1\u03bd\u03b1\u03b4\u03c5\u03cc\u03bc\u03b5\u03bd\u03b5\u03c2 \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b5\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7, \u03c4\u03bf IoT \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03b1 analytics. \u0391\u03c5\u03c4\u03cc \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c0\u03b1\u03c1\u03b1\u03bc\u03ad\u03bd\u03b5\u03c4\u03b5 \u03bc\u03c0\u03c1\u03bf\u03c3\u03c4\u03ac \u03b1\u03c0\u03cc \u03c4\u03b7\u03bd \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03b9\u03ba\u03ae \u03ba\u03b1\u03bc\u03c0\u03cd\u03bb\u03b7.<\/li>\n\n\n\n<li><strong>\u0391\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1<\/strong>: \u0394\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP, \u03c4\u03b1 \u03b9\u03c3\u03c7\u03c5\u03c1\u03ac \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03b4\u03b9\u03b1\u03c0\u03c1\u03b1\u03b3\u03bc\u03ac\u03c4\u03b5\u03c5\u03c4\u03b1. \u0391\u03bd\u03b1\u03b6\u03b7\u03c4\u03ae\u03c3\u03c4\u03b5 \u03ba\u03c1\u03c5\u03c0\u03c4\u03bf\u03b3\u03c1\u03ac\u03c6\u03b7\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf \u03c4\u03b1\u03c5\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03c7\u03c1\u03ae\u03c3\u03c4\u03b7 \u03ba\u03b1\u03b9 \u03ac\u03bb\u03bb\u03b1 \u03c0\u03c1\u03c9\u03c4\u03cc\u03ba\u03bf\u03bb\u03bb\u03b1 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\u03c2.<\/li>\n\n\n\n<li><strong>\u0394\u03bf\u03ba\u03b9\u03bc\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03a7\u03c1\u03ae\u03c3\u03b7<\/strong>: \u03a0\u03c1\u03b9\u03bd \u03b1\u03c0\u03bf\u03c6\u03b1\u03c3\u03af\u03c3\u03b5\u03c4\u03b5, \u03b6\u03b7\u03c4\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03b5\u03c0\u03af\u03b4\u03b5\u03b9\u03be\u03b7 \u03ae \u03bc\u03b9\u03b1 \u03b4\u03bf\u03ba\u03b9\u03bc\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf. \u0391\u03c5\u03c4\u03cc \u03c3\u03b1\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b2\u03b9\u03ce\u03c3\u03b5\u03c4\u03b5 \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b1\u03c0\u03cc \u03c0\u03c1\u03ce\u03c4\u03bf \u03c7\u03ad\u03c1\u03b9, \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c4\u03bf\u03c5 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b5\u03ba\u03c4\u03b9\u03bc\u03ae\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03ba\u03b1\u03c4\u03b1\u03bb\u03bb\u03b7\u03bb\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03bd \u03bf\u03c1\u03b3\u03b1\u03bd\u03b9\u03c3\u03bc\u03cc \u03c3\u03b1\u03c2.<\/li>\n\n\n\n<li><strong>\u03a3\u03c7\u03cc\u03bb\u03b9\u03b1 \u03b1\u03c0\u03cc \u039f\u03bc\u03cc\u03c4\u03b9\u03bc\u03bf\u03c5\u03c2<\/strong>: \u0395\u03c0\u03b9\u03ba\u03bf\u03b9\u03bd\u03c9\u03bd\u03ae\u03c3\u03c4\u03b5 \u03bc\u03b5 \u03ac\u03bb\u03bb\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03bf\u03bd \u03ba\u03bb\u03ac\u03b4\u03bf \u03c3\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03bf\u03c5\u03bd \u03c5\u03bb\u03bf\u03c0\u03bf\u03b9\u03ae\u03c3\u03b5\u03b9 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP. \u039f\u03b9 \u03b3\u03bd\u03ce\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b5\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c0\u03bf\u03bb\u03cd\u03c4\u03b9\u03bc\u03b7 \u03ba\u03b1\u03b8\u03bf\u03b4\u03ae\u03b3\u03b7\u03c3\u03b7.<\/li>\n<\/ol>\n\n\n\n<p>\u0395\u03be\u03b5\u03c4\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b5\u03ba\u03c4\u03b9\u03ba\u03ac \u03b1\u03c5\u03c4\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bc\u03bc\u03b5\u03c4\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c5\u03bd\u03b5\u03c7\u03ce\u03c2 \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03b5\u03bd\u03b4\u03b9\u03b1\u03c6\u03b5\u03c1\u03cc\u03bc\u03b5\u03bd\u03bf\u03c5\u03c2 \u03c6\u03bf\u03c1\u03b5\u03af\u03c2 \u03ba\u03b1\u03b8&#8217; \u03cc\u03bb\u03b7 \u03c4\u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b1\u03c2 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae\u03c2, \u03b8\u03b1 \u03b5\u03af\u03c3\u03c4\u03b5 \u03c3\u03b5 \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b7 \u03b8\u03ad\u03c3\u03b7 \u03bd\u03b1 \u03b5\u03c0\u03b9\u03bb\u03ad\u03be\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03bb\u03cd\u03c3\u03b7 ERP \u03c0\u03bf\u03c5 \u03b5\u03c5\u03b8\u03c5\u03b3\u03c1\u03b1\u03bc\u03bc\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03bf\u03cd\u03c2 \u03c3\u03b1\u03c2 \u03c3\u03c4\u03cc\u03c7\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03b1\u03ba\u03c1\u03bf\u03c0\u03c1\u03cc\u03b8\u03b5\u03c3\u03bc\u03b7 \u03b1\u03be\u03af\u03b1.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"667\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1024x667.png\" alt=\"SkyPlanner APS production planning eco system\" class=\"wp-image-2170\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1024x667.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-300x195.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-768x500.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1536x1000.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-2048x1334.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">\u039a\u03bb\u03ac\u03b4\u03bf\u03b9 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP:&nbsp;<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-c6151390 gb-headline-text\">\u039c\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7<\/h4>\n\n\n\n<p>\u039f\u03b9 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03ad\u03c2 \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03c9\u03c0\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c0\u03bb\u03bf\u03ba\u03ad\u03c2 \u03c4\u03c9\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ce\u03bd \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03c9\u03bd, \u03c4\u03c9\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03b1\u03b3\u03c1\u03b1\u03bc\u03bc\u03ac\u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7\u03c2 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2. \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b1 \u03c0\u03bf\u03c5 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03b5\u03b9 \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2. \u0394\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c4\u03b1 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b1 \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03b1 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd. \u0395\u03c0\u03b9\u03c0\u03bb\u03ad\u03bf\u03bd, \u03c4\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03c0\u03bf\u03c5 \u03c0\u03b1\u03c1\u03ad\u03c7\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03bb\u03cd\u03c3\u03b5\u03b9\u03c2 ERP \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b4\u03b5\u03af\u03be\u03bf\u03c5\u03bd \u03b3\u03c1\u03ae\u03b3\u03bf\u03c1\u03b1 \u03c4\u03b1 \u03c3\u03b7\u03bc\u03b5\u03af\u03b1 \u03c3\u03c5\u03bc\u03c6\u03cc\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03ad\u03c2 \u03bd\u03b1 \u03ba\u03ac\u03bd\u03bf\u03c5\u03bd \u03b3\u03c1\u03ae\u03b3\u03bf\u03c1\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ad\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5bb862e1 gb-headline-text\">\u03a5\u03b3\u03b5\u03b9\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03c0\u03b5\u03c1\u03af\u03b8\u03b1\u03bb\u03c8\u03b7<\/h4>\n\n\n\n<p>\u039f \u03c4\u03bf\u03bc\u03ad\u03b1\u03c2 \u03c4\u03b7\u03c2 \u03c5\u03b3\u03b5\u03b9\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae\u03c2 \u03c0\u03b5\u03c1\u03af\u03b8\u03b1\u03bb\u03c8\u03b7\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03b5\u03af \u03bb\u03b5\u03c0\u03c4\u03bf\u03bc\u03b5\u03c1\u03ae \u03ba\u03b1\u03b9 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b1\u03c1\u03c7\u03b5\u03af\u03c9\u03bd, \u03c0\u03bf\u03c5 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03b9 \u03c4\u03b1 \u03c0\u03ac\u03bd\u03c4\u03b1, \u03b1\u03c0\u03cc \u03c4\u03bf \u03b9\u03c3\u03c4\u03bf\u03c1\u03b9\u03ba\u03cc \u03c4\u03c9\u03bd \u03b1\u03c3\u03b8\u03b5\u03bd\u03ce\u03bd \u03ad\u03c9\u03c2 \u03c4\u03bf \u03b1\u03c0\u03cc\u03b8\u03b5\u03bc\u03b1 \u03b9\u03b1\u03c4\u03c1\u03b9\u03ba\u03ce\u03bd \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03b9\u03ce\u03bd. \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03c5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c6\u03c1\u03bf\u03bd\u03c4\u03af\u03b4\u03b1 \u03c4\u03c9\u03bd \u03b1\u03c3\u03b8\u03b5\u03bd\u03ce\u03bd \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03c2 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03b1 \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03b3\u03b9\u03b1 \u03cc\u03bb\u03b1 \u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1, \u03b7 \u03bf\u03c0\u03bf\u03af\u03b1 \u03b2\u03bf\u03b7\u03b8\u03ac \u03c3\u03c4\u03b7 \u03c3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2, \u03c4\u03b7\u03bd \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03c4\u03b9\u03bc\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7, \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c1\u03b1\u03bd\u03c4\u03b5\u03b2\u03bf\u03cd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0fa7ca1b gb-headline-text\">\u0397\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u03b5\u03bc\u03c0\u03cc\u03c1\u03b9\u03bf<\/h4>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03bc\u03c0\u03bf\u03c1\u03af\u03bf\u03c5, \u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03c5\u03b1\u03ba\u03bf\u03cd \u03b1\u03c0\u03bf\u03b8\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2, \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd, \u03c4\u03b7\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03c0\u03bf\u03c3\u03c4\u03bf\u03bb\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7\u03c2 \u03c0\u03b5\u03bb\u03b1\u03c4\u03b5\u03b9\u03b1\u03ba\u03ce\u03bd \u03c3\u03c7\u03ad\u03c3\u03b5\u03c9\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\u03c2. \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03c5\u03bd \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03b1\u03bd\u03cc\u03bc\u03bf\u03b9\u03b1 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b1\u03ba\u03c1\u03b9\u03b2\u03b5\u03af\u03c2 \u03ba\u03b1\u03c4\u03b1\u03bc\u03b5\u03c4\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd, \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c0\u03b5\u03be\u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03b3\u03b5\u03bb\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03b5\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03b7 \u03b5\u03be\u03c5\u03c0\u03b7\u03c1\u03ad\u03c4\u03b7\u03c3\u03b7 \u03c0\u03b5\u03bb\u03b1\u03c4\u03ce\u03bd. \u0397 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7\u03c2 \u03c3\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03b2\u03bf\u03b7\u03b8\u03ac \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c4\u03b9\u03c2 \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b5\u03c2 \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03bc\u03c0\u03bf\u03c1\u03af\u03bf\u03c5 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c0\u03bf\u03c5\u03bd \u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03bf\u03c5\u03bd \u03b1\u03bd\u03ac\u03bb\u03bf\u03b3\u03b1 \u03c4\u03b9\u03c2 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ad\u03c2 \u03c4\u03bf\u03c5\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6fc3c573 gb-headline-text\">\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ad\u03c2<\/h4>\n\n\n\n<p>\u039f \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc\u03c2 \u03ba\u03bb\u03ac\u03b4\u03bf\u03c2 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03c4\u03b1\u03c5\u03c4\u03cc\u03c7\u03c1\u03bf\u03bd\u03b1 \u03c0\u03bf\u03bb\u03c5\u03ac\u03c1\u03b9\u03b8\u03bc\u03b1 \u03ad\u03c1\u03b3\u03b1, \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2, \u03c3\u03c5\u03bc\u03b2\u03ac\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03cc \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc. \u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03b2\u03bf\u03b7\u03b8\u03ac \u03c4\u03b9\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b5\u03c2 \u03c3\u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03ad\u03c1\u03b3\u03c9\u03bd, \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03bf\u03cd \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03bf\u03cd. \u03a0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03bf\u03bb\u03bf\u03ba\u03bb\u03b7\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c0\u03b9\u03c3\u03ba\u03cc\u03c0\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03bd \u03b5\u03be\u03b5\u03bb\u03af\u03be\u03b5\u03b9 \u03ad\u03c1\u03b3\u03c9\u03bd, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03bf\u03bb\u03bf\u03ba\u03bb\u03ae\u03c1\u03c9\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03cb\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3a88fdfa gb-headline-text\">\u03a4\u03c1\u03cc\u03c6\u03b9\u03bc\u03b1 \u03ba\u03b1\u03b9 \u03a0\u03bf\u03c4\u03ac<\/h4>\n\n\n\n<p>\u03a3\u03c4\u03b7 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1 \u03c4\u03c1\u03bf\u03c6\u03af\u03bc\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c0\u03bf\u03c4\u03ce\u03bd, \u03b7 \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd, \u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03c5\u03c0\u03b1\u03b8\u03ce\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03b7 \u03b4\u03b9\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03ba\u03b1\u03bd\u03bf\u03bd\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03c3\u03c5\u03bc\u03bc\u03cc\u03c1\u03c6\u03c9\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03bf \u03c7\u03b5\u03b9\u03c1\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03c0\u03b5\u03c1\u03b9\u03c0\u03bb\u03bf\u03ba\u03ce\u03bd \u03c4\u03b7\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c5\u03c8\u03af\u03c3\u03c4\u03b7\u03c2 \u03c3\u03b7\u03bc\u03b1\u03c3\u03af\u03b1\u03c2. \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03c3\u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1\u03c2 \u03b6\u03c9\u03ae\u03c2 \u03c4\u03c9\u03bd \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf\u03bd \u03c0\u03bf\u03b9\u03bf\u03c4\u03b9\u03ba\u03cc \u03ad\u03bb\u03b5\u03b3\u03c7\u03bf, \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03b9\u03b6\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03bb\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b5\u03ac\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03bf \u03ba\u03b1\u03b9 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03bc\u03b5\u03af\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c3\u03c0\u03b1\u03c4\u03ac\u03bb\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b4\u03cc\u03c3\u03b5\u03c9\u03bd.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-74bea653 gb-headline-text\">\u0395\u03bd\u03af\u03c3\u03c7\u03c5\u03c3\u03b7 \u03c4\u03bf\u03c5 ERP \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 APS \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03bf \u03bc\u03b5 AI:<\/h2>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP (Enterprise Resource Planning) \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03bf\u03c5\u03bd \u03ba\u03c5\u03c1\u03af\u03c9\u03c2 \u03c3\u03c4\u03b7 \u03b2\u03b5\u03bb\u03c4\u03af\u03c9\u03c3\u03b7 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03c9\u03bd \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ce\u03bd \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03b9\u03ce\u03bd, \u03ba\u03b1\u03b8\u03ce\u03c2 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03bc\u03b9\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03b1 \u03c0\u03bb\u03b1\u03c4\u03c6\u03cc\u03c1\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03c4\u03b7\u03bd \u03b1\u03bd\u03c4\u03b1\u03bb\u03bb\u03b1\u03b3\u03ae \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd. \u038c\u03c4\u03b1\u03bd \u03cc\u03bc\u03c9\u03c2 \u03c0\u03c1\u03cc\u03ba\u03b5\u03b9\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03c0\u03b9\u03bf \u03b5\u03be\u03b5\u03b9\u03b4\u03b9\u03ba\u03b5\u03c5\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b8\u03ae\u03ba\u03bf\u03bd\u03c4\u03b1, \u03cc\u03c0\u03c9\u03c2 \u03bf <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/production-scheduling\/\">\u03b1\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a>, \u03c4\u03b1 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/proigmenos-programmatismos-paragogis-aps\/\">\u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 APS (Advanced Planning and Scheduling)<\/a> \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c0\u03b9\u03bf \u03b5\u03be\u03b5\u03bb\u03b9\u03b3\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03ba\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2. \u03a4\u03b1 \u03c0\u03b9\u03b8\u03b1\u03bd\u03ac \u03bf\u03c6\u03ad\u03bb\u03b7 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03cc\u03c4\u03b1\u03bd \u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 APS \u03c3\u03c5\u03bc\u03c0\u03bb\u03b7\u03c1\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 (AI).<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03b7 \u03a0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7<\/strong>: \u0397 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 AI \u03c3\u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 APS \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c8\u03b5\u03b9 \u03c0\u03b9\u03bf \u03b1\u03ba\u03c1\u03b9\u03b2\u03ae \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2. \u0397 AI \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ba\u03ac\u03bd\u03b5\u03b9 \u03b5\u03be\u03b1\u03b9\u03c1\u03b5\u03c4\u03b9\u03ba\u03ac \u03b1\u03ba\u03c1\u03b9\u03b2\u03b5\u03af\u03c2 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c8\u03b5\u03b9\u03c2 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b9\u03c3\u03c4\u03bf\u03c1\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03bc\u03bf\u03c4\u03af\u03b2\u03b1 \u03b1\u03c0\u03cc \u03c0\u03bf\u03bb\u03bb\u03ad\u03c2 \u03c0\u03b7\u03b3\u03ad\u03c2 (\u03cc\u03c0\u03c9\u03c2 \u03c4\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c4\u03b7\u03c2 \u03b1\u03b3\u03bf\u03c1\u03ac\u03c2, \u03b5\u03c0\u03bf\u03c7\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c5\u03bc\u03ac\u03bd\u03c3\u03b5\u03b9\u03c2, \u03b1\u03ba\u03cc\u03bc\u03b7 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c5\u03bd\u03b1\u03af\u03c3\u03b8\u03b7\u03bc\u03b1 \u03c3\u03c4\u03b1 \u03bc\u03ad\u03c3\u03b1 \u03ba\u03bf\u03b9\u03bd\u03c9\u03bd\u03b9\u03ba\u03ae\u03c2 \u03b4\u03b9\u03ba\u03c4\u03cd\u03c9\u03c3\u03b7\u03c2). \u0391\u03c5\u03c4\u03cc \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03ba\u03b1\u03b8\u03bf\u03b4\u03b7\u03b3\u03b5\u03af \u03ba\u03b1\u03bb\u03cd\u03c4\u03b5\u03c1\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03b1\u03c0\u03bf\u03b8\u03b5\u03bc\u03ac\u03c4\u03c9\u03bd, \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03b9\u03ce\u03bd.<\/li>\n\n\n\n<li><strong>\u0392\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf\u03c2 \u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 \u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/strong>: \u03a4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b4\u03bf\u03c3\u03b9\u03b1\u03ba\u03ac \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 APS \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03c3\u03c4\u03bf\u03bd \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc, \u03b1\u03bb\u03bb\u03ac \u03b7 AI \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c7\u03c9\u03c1\u03ae\u03c3\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03b2\u03ae\u03bc\u03b1 \u03c0\u03b1\u03c1\u03b1\u03c0\u03ad\u03c1\u03b1 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03b9\u03b8\u03b1\u03bd\u03ad\u03c2 \u03b4\u03b9\u03b1\u03c4\u03b1\u03c1\u03b1\u03c7\u03ad\u03c2, \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ae\u03c2 \u03bc\u03b7\u03c7\u03b1\u03bd\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03ae \u03c3\u03b7\u03bc\u03b5\u03af\u03b1 \u03c3\u03c5\u03bc\u03c6\u03cc\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1. \u0397 AI \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03b5\u03b9 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03ac \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b7 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/li>\n\n\n\n<li><strong>\u0395\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03b7 \u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u0395\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u0391\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2<\/strong>: \u0397 AI \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03b6\u03b5\u03b9 \u03c0\u03c1\u03bf\u03bb\u03b7\u03c0\u03c4\u03b9\u03ba\u03ac \u03c0\u03b9\u03b8\u03b1\u03bd\u03ad\u03c2 \u03b4\u03b9\u03b1\u03c4\u03b1\u03c1\u03b1\u03c7\u03ad\u03c2 \u03c3\u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1 \u03b1\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03b1\u03b3\u03ba\u03cc\u03c3\u03bc\u03b9\u03b1 \u03b3\u03b5\u03b3\u03bf\u03bd\u03cc\u03c4\u03b1, \u03ba\u03b1\u03b9\u03c1\u03b9\u03ba\u03ac \u03bc\u03bf\u03c4\u03af\u03b2\u03b1 \u03ae \u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03ac\u03c3\u03b5\u03b9\u03c2. \u0395\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03b3\u03bd\u03ce\u03c3\u03b7 \u03c3\u03c4\u03bf APS, \u03bf\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2, \u03b1\u03bd\u03b1\u03b4\u03c1\u03bf\u03bc\u03bf\u03bb\u03bf\u03b3\u03ce\u03bd\u03c4\u03b1\u03c2 \u03b1\u03c0\u03bf\u03c3\u03c4\u03bf\u03bb\u03ad\u03c2, \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03c1\u03bf\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ae \u03b2\u03c1\u03af\u03c3\u03ba\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b5\u03bd\u03b1\u03bb\u03bb\u03b1\u03ba\u03c4\u03b9\u03ba\u03bf\u03cd\u03c2 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ad\u03c2, \u03cc\u03bb\u03b1 \u03b4\u03b9\u03b1\u03c7\u03b5\u03b9\u03c1\u03b9\u03b6\u03cc\u03bc\u03b5\u03bd\u03b1 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03bf\u03cd \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP.<\/li>\n\n\n\n<li><strong>\u039b\u03ae\u03c8\u03b7 \u0391\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03c3\u03b5 \u03a0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03a7\u03c1\u03cc\u03bd\u03bf<\/strong>: \u039c\u03b5 \u03c4\u03b7\u03bd AI \u03bd\u03b1 \u03b1\u03bd\u03b1\u03bb\u03cd\u03b5\u03b9 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03bf\u03b9 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c0\u03b9\u03bf \u03c4\u03b5\u03ba\u03bc\u03b7\u03c1\u03b9\u03c9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03b9\u03c2 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03b1. \u0393\u03b9\u03b1 \u03c0\u03b1\u03c1\u03ac\u03b4\u03b5\u03b9\u03b3\u03bc\u03b1, \u03b1\u03bd \u03c5\u03c0\u03ac\u03c1\u03be\u03b5\u03b9 \u03bc\u03b9\u03b1 \u03be\u03b1\u03c6\u03bd\u03b9\u03ba\u03ae \u03b1\u03cd\u03be\u03b7\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7 \u03b3\u03b9\u03b1 \u03ad\u03bd\u03b1 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd, \u03c4\u03bf \u03b5\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03bf \u03bc\u03b5 AI \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 APS \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03cc\u03c3\u03b5\u03b9 \u03c4\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03ac\u03bc\u03bc\u03b1\u03c4\u03b1 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ac\u03bc\u03b5\u03c3\u03b1, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03b5\u03ba\u03c0\u03bb\u03ae\u03c1\u03c9\u03c3\u03b7.<\/li>\n\n\n\n<li><strong>\u03a0\u03c1\u03bf\u03b2\u03bb\u03b5\u03c0\u03c4\u03b9\u03ba\u03ae \u03a3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7<\/strong>: \u03a7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 AI, \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b2\u03bb\u03ad\u03c8\u03b5\u03b9 \u03c0\u03b9\u03b8\u03b1\u03bd\u03ad\u03c2 \u03b2\u03bb\u03ac\u03b2\u03b5\u03c2 \u03c3\u03b5 \u03b5\u03be\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc \u03ae \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03bc\u03b1\u03c4\u03b1 \u03bc\u03b5 \u03b2\u03ac\u03c3\u03b7 \u03b9\u03c3\u03c4\u03bf\u03c1\u03b9\u03ba\u03ac \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03c1\u03ad\u03c7\u03bf\u03c5\u03c3\u03b5\u03c2 \u03bc\u03b5\u03c4\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7\u03c2. \u0391\u03c5\u03c4\u03cc \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03b5\u03af \u03c0\u03c1\u03bf\u03bb\u03b7\u03c0\u03c4\u03b9\u03ba\u03ac, \u03b5\u03bb\u03b1\u03c7\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c5\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03c0\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03cc \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2.<\/li>\n\n\n\n<li><strong>\u0392\u03b5\u03bb\u03c4\u03b9\u03c9\u03bc\u03ad\u03bd\u03b7 \u039a\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03a0\u03cc\u03c1\u03c9\u03bd<\/strong>: \u039f\u03b9 \u03b1\u03bb\u03b3\u03cc\u03c1\u03b9\u03b8\u03bc\u03bf\u03b9 AI \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03c3\u03bf\u03c5\u03bd \u03c4\u03b7 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c4\u03c9\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd, \u03b5\u03af\u03c4\u03b5 \u03c0\u03c1\u03cc\u03ba\u03b5\u03b9\u03c4\u03b1\u03b9 \u03b3\u03b9\u03b1 \u03b5\u03c1\u03b3\u03b1\u03c4\u03b9\u03ba\u03cc \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc, \u03bc\u03b7\u03c7\u03b1\u03bd\u03ae\u03bc\u03b1\u03c4\u03b1 \u03ae \u03c5\u03bb\u03b9\u03ba\u03ac. \u0391\u03bd\u03b1\u03bb\u03cd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03b7\u03b3\u03bf\u03cd\u03bc\u03b5\u03bd\u03b5\u03c2 \u03b5\u03c0\u03b9\u03b4\u03cc\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c4\u03c1\u03ad\u03c7\u03bf\u03c5\u03c3\u03b1 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03b5\u03b9 \u03cc\u03c4\u03b9 \u03bf\u03b9 \u03c0\u03cc\u03c1\u03bf\u03b9 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03bc\u03ad\u03b3\u03b9\u03c3\u03c4\u03bf \u03c4\u03c9\u03bd \u03b4\u03c5\u03bd\u03b1\u03c4\u03bf\u03c4\u03ae\u03c4\u03c9\u03bd \u03c4\u03bf\u03c5\u03c2, \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1.<\/li>\n<\/ol>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03c4\u03b7 \u03b2\u03b1\u03c3\u03b9\u03ba\u03ae \u03c5\u03c0\u03bf\u03b4\u03bf\u03bc\u03ae \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03bc\u03b9\u03b1\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2. \u0397 <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/aps-vs-erp\/\">\u03b4\u03b9\u03b1\u03c3\u03cd\u03bd\u03b4\u03b5\u03c3\u03ae \u03c4\u03bf\u03c5 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 APS \u03c0\u03bf\u03c5 \u03b1\u03be\u03b9\u03bf\u03c0\u03bf\u03b9\u03b5\u03af \u03c4\u03b7\u03bd \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7<\/a> \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03c4\u03b9\u03c2 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03ad\u03c2 \u03c4\u03bf\u03c5, \u03ce\u03c3\u03c4\u03b5 \u03bf\u03b9 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2 \u03bd\u03b1 \u03b3\u03af\u03bd\u03bf\u03c5\u03bd \u03c0\u03b9\u03bf \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ad\u03c2, \u03bd\u03b1 \u03b1\u03bd\u03c4\u03b1\u03c0\u03bf\u03ba\u03c1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c4\u03b1\u03c7\u03cd\u03c4\u03b5\u03c1\u03b1 \u03c3\u03c4\u03b9\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03b8\u03bf\u03cd\u03bd.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u0395\u03af\u03c3\u03c4\u03b5 \u03ad\u03c4\u03bf\u03b9\u03bc\u03bf\u03b9 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7\u03bd \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03c3\u03b1\u03c2;&nbsp;<\/h2>\n\n\n\n<p>\u0388\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 Enterprise Resource Planning (ERP) \u03ad\u03c7\u03b5\u03b9 \u03b5\u03be\u03b5\u03bb\u03b9\u03c7\u03b8\u03b5\u03af \u03b1\u03c0\u03cc \u03bc\u03b9\u03b1 \u03b1\u03c0\u03bb\u03ae \u03c0\u03bf\u03bb\u03c5\u03c4\u03ad\u03bb\u03b5\u03b9\u03b1 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03bf \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03bf \u03b3\u03b9\u03b1 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b5\u03c2 \u03cc\u03bb\u03c9\u03bd \u03c4\u03c9\u03bd \u03bc\u03b5\u03b3\u03b5\u03b8\u03ce\u03bd. \u03a4\u03b1 ERP \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03c4\u03b7 \u03c1\u03b1\u03c7\u03bf\u03ba\u03bf\u03ba\u03b1\u03bb\u03b9\u03ac, \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03b5\u03ba\u03c4\u03b9\u03ba\u03ae \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd, \u03b1\u03c0\u03cc \u03bc\u03b9\u03ba\u03c1\u03ad\u03c2 \u03bd\u03b5\u03bf\u03c6\u03c5\u03b5\u03af\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ad\u03c9\u03c2 \u03c4\u03b5\u03c1\u03ac\u03c3\u03c4\u03b9\u03bf\u03c5\u03c2 \u03bf\u03bc\u03af\u03bb\u03bf\u03c5\u03c2 \u03b5\u03c4\u03b5\u03c1\u03bf\u03b3\u03b5\u03bd\u03ce\u03bd \u03b4\u03c1\u03b1\u03c3\u03c4\u03b7\u03c1\u03b9\u03bf\u03c4\u03ae\u03c4\u03c9\u03bd.&nbsp;<\/p>\n\n\n\n<p>\u0397 \u03b5\u03c0\u03ad\u03bd\u03b4\u03c5\u03c3\u03b7 \u03c3\u03b5 \u03ad\u03bd\u03b1 ERP \u03b4\u03b5\u03bd \u03b1\u03c6\u03bf\u03c1\u03ac \u03bc\u03cc\u03bd\u03bf \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b1\u03c2- \u03b1\u03c6\u03bf\u03c1\u03ac \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03bc\u03ad\u03bb\u03bb\u03bf\u03bd\u03c4\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b5\u03be\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03c3\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2, \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7\u03c2. \u0397 \u03b1\u03be\u03af\u03b1 \u03c4\u03ad\u03c4\u03bf\u03b9\u03c9\u03bd \u03c3\u03c5\u03c3\u03c4\u03b7\u03bc\u03ac\u03c4\u03c9\u03bd \u03c4\u03bf\u03bd\u03af\u03b6\u03b5\u03c4\u03b1\u03b9 \u03b1\u03ba\u03cc\u03bc\u03b7 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03cc\u03c4\u03b1\u03bd \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf\u03c2 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03ba\u03b1\u03b9 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 (APS), \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03b4\u03cd\u03bd\u03b1\u03bc\u03b7 \u03c4\u03b7\u03c2 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae\u03c2 \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7\u03c2 \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf Arcturus \u03c4\u03b7\u03c2 Skyplanner.&nbsp;<\/p>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03ba\u03ac\u03b8\u03b5 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7 \u03c0\u03bf\u03c5 \u03c3\u03c4\u03bf\u03c7\u03b5\u03cd\u03b5\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03b1\u03bc\u03b5\u03af\u03bd\u03b5\u03b9 \u03b1\u03bd\u03b8\u03b5\u03ba\u03c4\u03b9\u03ba\u03ae, \u03b1\u03bd\u03c4\u03b1\u03b3\u03c9\u03bd\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03bd\u03bf\u03b7\u03c4\u03b9\u03ba\u03ae, \u03b7 \u03c5\u03b9\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03c3\u03c5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\u03c2 \u03c4\u03bf\u03c5 ERP \u03ba\u03b1\u03b9 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 APS \u03cc\u03c0\u03c9\u03c2 \u03c4\u03bf Skyplanner \u03b4\u03b5\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03b1\u03c0\u03bb\u03ce\u03c2 \u03bc\u03b9\u03b1 \u03c3\u03c4\u03c1\u03b1\u03c4\u03b7\u03b3\u03b9\u03ba\u03ae \u03ba\u03af\u03bd\u03b7\u03c3\u03b7 \u2013 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03c0\u03b9\u03c4\u03b1\u03ba\u03c4\u03b9\u03ba\u03ae \u03b1\u03bd\u03ac\u03b3\u03ba\u03b7.<\/p>\n\n\n<p>\u0393\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b5\u03af\u03c4\u03b5 \u03c4\u03bf \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03bf \u03c4\u03bf\u03c5 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03b4\u03af\u03c0\u03bb\u03b1 \u03c3\u03c4\u03bf ERP \u03c3\u03b1\u03c2, <a href=\"\/el\/%ce%b4%ce%bf%ce%ba%ce%b9%ce%bc%ce%ae\/\">\u03b4\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner \u03bc\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c0\u03af\u03b4\u03b5\u03b9\u03be\u03b7\u03c2<\/a> \u03ae <a href=\"\/el\/%ce%b5%cf%80%ce%b9%ce%ba%ce%bf%ce%b9%ce%bd%cf%89%ce%bd%ce%af%ce%b1-%cf%80%cf%89%ce%bb%ce%ae%cf%83%ce%b5%cf%89%ce%bd\/\">\u03c3\u03c5\u03b6\u03b7\u03c4\u03ae\u03c3\u03c4\u03b5 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03b1\u03b9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03b1\u03c2 \u03bc\u03b5 \u03c4\u03b7\u03bd \u03bf\u03bc\u03ac\u03b4\u03b1 \u03bc\u03b1\u03c2<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-9ee53b67 gb-headline-text\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u0395\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2<\/h2>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03ad\u03c7\u03bf\u03c5\u03bd \u03b3\u03af\u03bd\u03b5\u03b9 \u03ad\u03bd\u03b1 \u03b1\u03c0\u03b1\u03c1\u03b1\u03af\u03c4\u03b7\u03c4\u03bf \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03bf. \u0394\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03bf\u03bb\u03c5\u03c0\u03bb\u03bf\u03ba\u03bf\u03c4\u03ae\u03c4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03c9\u03bd \u03b5\u03ba\u03c4\u03b5\u03c4\u03b1\u03bc\u03ad\u03bd\u03c9\u03bd \u03b5\u03c0\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03c9\u03bd \u03c4\u03c9\u03bd \u03bb\u03cd\u03c3\u03b5\u03c9\u03bd ERP, \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c0\u03bf\u03bb\u03bb\u03ac \u03b5\u03c1\u03c9\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1. \u0393\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03c0\u03b1\u03bd\u03c4\u03ae\u03c3\u03bf\u03c5\u03bc\u03b5 \u03c3\u03b5 \u03b1\u03c5\u03c4\u03ac \u03c4\u03b1 \u03b5\u03c1\u03c9\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03b1\u03c6\u03ad\u03c3\u03c4\u03b5\u03c1\u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03cc\u03b7\u03c3\u03b7, \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b5\u03c0\u03b9\u03bc\u03b5\u03bb\u03b7\u03b8\u03b5\u03af \u03bc\u03b9\u03b1 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03a3\u03c5\u03c7\u03bd\u03ce\u03bd \u0395\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03c9\u03bd (FAQ) \u03b1\u03c6\u03b9\u03b5\u03c1\u03c9\u03bc\u03ad\u03bd\u03b7 \u03c3\u03c4\u03bf ERP. \u0395\u03af\u03c4\u03b5 \u03b5\u03af\u03c3\u03c4\u03b5 \u03a5\u03c0\u03b5\u03cd\u03b8\u03c5\u03bd\u03bf\u03c2 \u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b5\u03af\u03c4\u03b5 \u03ba\u03ac\u03c0\u03bf\u03b9\u03bf\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b9\u03b8\u03c5\u03bc\u03b5\u03af \u03bd\u03b1 \u03bc\u03ac\u03b8\u03b5\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b1 \u03b3\u03b9\u03b1 \u03b1\u03c5\u03c4\u03ae \u03c4\u03b7 \u03bc\u03b5\u03c4\u03b1\u03c3\u03c7\u03b7\u03bc\u03b1\u03c4\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03c4\u03b5\u03c7\u03bd\u03bf\u03bb\u03bf\u03b3\u03af\u03b1, \u03c4\u03bf FAQ \u03bc\u03b1\u03c2 \u03ad\u03c7\u03b5\u03b9 \u03c3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03c4\u03b5\u03af \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03c3\u03c5\u03bd\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03b1\u03bd\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b1 \u03c0\u03b9\u03bf \u03b4\u03b9\u03b1\u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c1\u03c9\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5 \u03c4\u03bf ERP.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4299242e gb-headline-text\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP;&nbsp;<\/h4>\n\n\n\n<p>\u03a4\u03bf ERP (Enterprise Resource Planning) \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03b7 \u03bb\u03cd\u03c3\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03bf\u03cd \u03c0\u03bf\u03c5 \u03c3\u03c5\u03b3\u03ba\u03b5\u03bd\u03c4\u03c1\u03ce\u03bd\u03b5\u03b9 \u03b4\u03b9\u03ac\u03c6\u03bf\u03c1\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b2\u03b5\u03bb\u03c4\u03b9\u03ce\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1, \u03c4\u03b7 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b1 \u03c4\u03c9\u03bd \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ef98566e gb-headline-text\">\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03b1 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 ERP;<\/h4>\n\n\n\n<p>\u039c\u03b9\u03b1 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03bf \u03c3\u03c5\u03c3\u03c4\u03b1\u03c4\u03b9\u03ba\u03cc \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03bf \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP \u03c0\u03bf\u03c5 \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1, \u03cc\u03c0\u03c9\u03c2 \u03c4\u03b1 \u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac, \u03c4\u03bf HR \u03ae \u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2. \u039a\u03ac\u03b8\u03b5 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b1 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03bc\u03b9\u03b1 \u03ba\u03b5\u03bd\u03c4\u03c1\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03b3\u03b9\u03b1 \u03b5\u03bd\u03b7\u03bc\u03b5\u03c1\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03ad\u03c0\u03b5\u03b9\u03b1 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bd5dbe4c gb-headline-text\">\u03a0\u03ce\u03c2 \u03b4\u03b9\u03b1\u03c6\u03ad\u03c1\u03bf\u03c5\u03bd \u03c4\u03b1 \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac ERP \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2;<\/h4>\n\n\n\n<p>\u0395\u03bd\u03ce \u03bf\u03b9 \u03b5\u03bd\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03c3\u03c4\u03bf\u03c7\u03b5\u03cd\u03bf\u03c5\u03bd \u03c3\u03b5 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2, \u03c4\u03b1 \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac ERP \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b1 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b1 \u03b5\u03c1\u03b3\u03b1\u03bb\u03b5\u03af\u03b1 \u03ba\u03b1\u03b9 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2 (\u03cc\u03c0\u03c9\u03c2 \u03b7 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7, \u03b7 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac \u03ba\u03b1\u03b9 \u03b7 \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1) \u03c0\u03bf\u03c5 \u03b5\u03af\u03bd\u03b1\u03b9 \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03c9\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c4\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03bf\u03c5\u03bd \u03c4\u03b7 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03ac \u03c4\u03bf\u03c5.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-826fca63 gb-headline-text\">\u03a0\u03ce\u03c2 \u03ba\u03b1\u03c4\u03b7\u03b3\u03bf\u03c1\u03b9\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03ae \u03c4\u03b1\u03be\u03b9\u03bd\u03bf\u03bc\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03ba\u03c5\u03c1\u03af\u03c9\u03c2 \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP;<\/h4>\n\n\n\n<p>\u039f\u03b9 \u03ba\u03cd\u03c1\u03b9\u03bf\u03b9 \u03c4\u03cd\u03c0\u03bf\u03b9 ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf On-Premise (\u03b5\u03b3\u03ba\u03b1\u03c4\u03b5\u03c3\u03c4\u03b7\u03bc\u03ad\u03bd\u03bf \u03c3\u03b5 \u03c4\u03bf\u03c0\u03b9\u03ba\u03bf\u03cd\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03bc\u03b9\u03c3\u03c4\u03ad\u03c2), \u03c4\u03bf Cloud-based (\u03c6\u03b9\u03bb\u03bf\u03be\u03b5\u03bd\u03bf\u03cd\u03bc\u03b5\u03bd\u03bf \u03c3\u03b5 \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03bf\u03cd\u03c2 \u03b4\u03b9\u03b1\u03ba\u03bf\u03bc\u03b9\u03c3\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03c3\u03b2\u03ac\u03c3\u03b9\u03bc\u03bf \u03bc\u03ad\u03c3\u03c9 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03c4\u03cd\u03bf\u03c5) \u03ba\u03b1\u03b9 \u03c4\u03bf Hybrid (\u03c3\u03c5\u03bd\u03b4\u03c5\u03b1\u03c3\u03bc\u03cc\u03c2 on-premise \u03ba\u03b1\u03b9 cloud \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd).<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a631a9bf gb-headline-text\">\u03a0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03ce \u03bd\u03b1 \u03be\u03ad\u03c1\u03c9 \u03b1\u03bd \u03b7 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1 \u03bc\u03bf\u03c5 \u03c7\u03c1\u03b5\u03b9\u03ac\u03b6\u03b5\u03c4\u03b1\u03b9 \u03ad\u03bd\u03b1 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP;<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03b7\u03bc\u03ac\u03b4\u03b9\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b5\u03be\u03ac\u03c1\u03c4\u03b7\u03c3\u03b7 \u03b1\u03c0\u03cc \u03ba\u03b1\u03c4\u03b1\u03ba\u03b5\u03c1\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03ad\u03bd\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1, \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03af\u03b5\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03c1\u03cc\u03c3\u03b2\u03b1\u03c3\u03b7 \u03c3\u03b5 \u03b4\u03b5\u03b4\u03bf\u03bc\u03ad\u03bd\u03b1 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03b1\u03bd\u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03ba\u03b1\u03b8\u03b7\u03bc\u03b5\u03c1\u03b9\u03bd\u03ad\u03c2 \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03af\u03b5\u03c2, \u03c0\u03c1\u03bf\u03b2\u03bb\u03ae\u03bc\u03b1\u03c4\u03b1 \u03c3\u03c4\u03b7\u03bd \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03c4\u03bf\u03c5 \u03c0\u03b5\u03bb\u03ac\u03c4\u03b7, \u03c0\u03b5\u03c1\u03af\u03c0\u03bb\u03bf\u03ba\u03bf \u03c4\u03bf\u03c0\u03af\u03bf \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03b9\u03ba\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03b4\u03c5\u03c3\u03ba\u03bf\u03bb\u03b9\u03ce\u03bd \u03b1\u03bd\u03ac\u03c0\u03c4\u03c5\u03be\u03b7\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-35729caa gb-headline-text\">\u03a0\u03bf\u03b9\u03bf\u03c5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03bb\u03ac\u03b2\u03c9 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03ba\u03b1\u03c4\u03ac \u03c4\u03b7\u03bd \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ae \u03bc\u03b9\u03b1\u03c2 \u03bb\u03cd\u03c3\u03b7\u03c2 ERP;<\/h4>\n\n\n\n<p>\u03a3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03b1\u03c1\u03ac\u03bc\u03b5\u03c4\u03c1\u03bf\u03b9 \u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03c5\u03bd \u03c4\u03b7\u03bd \u03b1\u03be\u03b9\u03bf\u03bb\u03cc\u03b3\u03b7\u03c3\u03b7 \u03c4\u03c9\u03bd \u03b5\u03b9\u03b4\u03b9\u03ba\u03ce\u03bd \u03b1\u03bd\u03b1\u03b3\u03ba\u03ce\u03bd \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2, \u03c4\u03bf\u03bd \u03ba\u03b1\u03b8\u03bf\u03c1\u03b9\u03c3\u03bc\u03cc \u03c0\u03c1\u03bf\u03cb\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd, \u03c4\u03b7 \u03b4\u03b9\u03b1\u03c3\u03c6\u03ac\u03bb\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b5\u03ba\u03c4\u03b1\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7\u03c2, \u03c4\u03b9\u03c2 \u03c6\u03b9\u03bb\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03c2 \u03c4\u03bf \u03c7\u03c1\u03ae\u03c3\u03c4\u03b7 \u03b4\u03b9\u03b5\u03c0\u03b1\u03c6\u03ad\u03c2, \u03c4\u03b7 \u03c6\u03ae\u03bc\u03b7 \u03c4\u03bf\u03c5 \u03c0\u03c1\u03bf\u03bc\u03b7\u03b8\u03b5\u03c5\u03c4\u03ae, \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03bb\u03bf\u03b3\u03ad\u03c2 \u03c0\u03c1\u03bf\u03c3\u03b1\u03c1\u03bc\u03bf\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b9\u03c3\u03c7\u03c5\u03c1\u03ac \u03c7\u03b1\u03c1\u03b1\u03ba\u03c4\u03b7\u03c1\u03b9\u03c3\u03c4\u03b9\u03ba\u03ac \u03b1\u03c3\u03c6\u03b1\u03bb\u03b5\u03af\u03b1\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9aa5c616 gb-headline-text\">\u03a0\u03bf\u03b9\u03bf\u03b9 \u03ba\u03bb\u03ac\u03b4\u03bf\u03b9 \u03b5\u03c0\u03c9\u03c6\u03b5\u03bb\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03bf \u03b1\u03c0\u03cc \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP;<\/h4>\n\n\n\n<p>\u039a\u03bb\u03ac\u03b4\u03bf\u03b9 \u03cc\u03c0\u03c9\u03c2 \u03b7 \u03bc\u03b5\u03c4\u03b1\u03c0\u03bf\u03af\u03b7\u03c3\u03b7, \u03b7 \u03c5\u03b3\u03b5\u03b9\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ae \u03c0\u03b5\u03c1\u03af\u03b8\u03b1\u03bb\u03c8\u03b7, \u03c4\u03bf \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03bf\u03bd\u03b9\u03ba\u03cc \u03b5\u03bc\u03c0\u03cc\u03c1\u03b9\u03bf, \u03bf\u03b9 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03c4\u03c1\u03cc\u03c6\u03b9\u03bc\u03b1 &amp; \u03c0\u03bf\u03c4\u03ac \u03ad\u03c7\u03bf\u03c5\u03bd \u03b4\u03b5\u03b9 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ac \u03bf\u03c6\u03ad\u03bb\u03b7 \u03b1\u03c0\u03cc \u03c4\u03bf ERP \u03bb\u03cc\u03b3\u03c9 \u03c4\u03b7\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03bb\u03bf\u03ba\u03b7\u03c2 \u03c6\u03cd\u03c3\u03b7\u03c2 \u03c4\u03c9\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03c4\u03bf\u03c5\u03c2.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b0154963 gb-headline-text\">\u03a0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03b7 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 AI \u03bc\u03b5 \u03c4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03bd\u03b1 \u03b5\u03bd\u03b9\u03c3\u03c7\u03cd\u03c3\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b4\u03c5\u03bd\u03b1\u03c4\u03cc\u03c4\u03b7\u03c4\u03ad\u03c2 \u03c4\u03bf\u03c5\u03c2, \u03b9\u03b4\u03b9\u03b1\u03af\u03c4\u03b5\u03c1\u03b1 \u03c3\u03c4\u03bf\u03bd \u03a0\u03c1\u03bf\u03b7\u03b3\u03bc\u03ad\u03bd\u03bf \u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03ba\u03b1\u03b9 \u03a7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc (APS);<\/h4>\n\n\n\n<p>\u0397 \u03b5\u03bd\u03c3\u03c9\u03bc\u03ac\u03c4\u03c9\u03c3\u03b7 \u03c4\u03b7\u03c2 AI \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03bf\u03b4\u03b7\u03b3\u03ae\u03c3\u03b5\u03b9 \u03c3\u03b5 \u03b1\u03ba\u03c1\u03b9\u03b2\u03ad\u03c3\u03c4\u03b5\u03c1\u03b7 \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7 \u03b6\u03ae\u03c4\u03b7\u03c3\u03b7\u03c2, \u03b2\u03b5\u03bb\u03c4\u03b9\u03c3\u03c4\u03bf\u03c0\u03bf\u03b9\u03b7\u03bc\u03ad\u03bd\u03bf \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03b5\u03bd\u03b9\u03c3\u03c7\u03c5\u03bc\u03ad\u03bd\u03b7 \u03b4\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c4\u03b7\u03c2 \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae\u03c2 \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1\u03c2, \u03bb\u03ae\u03c8\u03b7 \u03b1\u03c0\u03bf\u03c6\u03ac\u03c3\u03b5\u03c9\u03bd \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf, \u03c0\u03c1\u03bf\u03bb\u03b7\u03c0\u03c4\u03b9\u03ba\u03ae \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03b5\u03c3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c0\u03cc\u03c1\u03c9\u03bd.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-14351acb gb-headline-text\">\u03a0\u03bf\u03b9\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03c1\u03cc\u03bb\u03bf\u03c2 \u03b5\u03bd\u03cc\u03c2 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03bf\u03c2 ERP \u03c3\u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2;<\/h4>\n\n\n\n<p>\u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 ERP \u03b5\u03be\u03bf\u03c1\u03b8\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b4\u03b9\u03b1\u03c3\u03c6\u03b1\u03bb\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03ad\u03b3\u03ba\u03b1\u03b9\u03c1\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae, \u03c4\u03b7 \u03b2\u03ad\u03bb\u03c4\u03b9\u03c3\u03c4\u03b7 \u03ba\u03b1\u03c4\u03b1\u03bd\u03bf\u03bc\u03ae \u03c0\u03cc\u03c1\u03c9\u03bd, \u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03ba\u03bf\u03bb\u03bf\u03cd\u03b8\u03b7\u03c3\u03b7 \u03c3\u03b5 \u03c0\u03c1\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03cc\u03bd\u03bf \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03c4\u03b1\u03c7\u03b5\u03af\u03b1 \u03b5\u03c0\u03b9\u03c3\u03ae\u03bc\u03b1\u03bd\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03b1\u03bd\u03c4\u03b9\u03bc\u03b5\u03c4\u03ce\u03c0\u03b9\u03c3\u03b7 \u03c4\u03c9\u03bd \u03c3\u03b7\u03bc\u03b5\u03af\u03c9\u03bd \u03c3\u03c5\u03bc\u03c6\u03cc\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c3\u03c4\u03b7\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u0391\u03c1\u03c7\u03b9\u03ba\u03ae&nbsp;\u00bb&nbsp;\u03a0\u03b7\u03b3\u03ad\u03c2&nbsp;\u00bb&nbsp;\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7. \u0395\u03af\u03c3\u03c4\u03b5 \u03c0\u03b5\u03c1\u03af\u03b5\u03c1\u03b3\u03bf\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03b9 \u03b5\u03c0\u03b1\u03bd\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03c1\u03bf\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2; \u0395\u03bc\u03b2\u03b1\u03b8\u03cd\u03bd\u03b5\u03c4\u03b5 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b1. TL;DR \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1 &#8230; <a title=\"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/\" aria-label=\"Read more about \u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38308,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2731,477],"tags":[],"class_list":["post-38307","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-el","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;\" \/>\n<meta property=\"og:description\" content=\"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-17T17:11:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-12T07:59:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data2\" content=\"34 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;\",\"datePublished\":\"2023-10-17T17:11:45+00:00\",\"dateModified\":\"2026-10-12T07:59:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/\"},\"wordCount\":250,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Enterprise-Resource-Planning-scaled.jpg\",\"articleSection\":[\"ERP\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/\",\"name\":\"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Enterprise-Resource-Planning-scaled.jpg\",\"datePublished\":\"2023-10-17T17:11:45+00:00\",\"dateModified\":\"2026-10-12T07:59:48+00:00\",\"description\":\"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Enterprise-Resource-Planning-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Enterprise-Resource-Planning-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Enterprise Resource Planning\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/ti-einai-to-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u2013 SkyPlanner","description":"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/","og_locale":"el_GR","og_type":"article","og_title":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;","og_description":"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-17T17:11:45+00:00","article_modified_time":"2026-10-12T07:59:48+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"SkyPlanner","\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"34 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;","datePublished":"2023-10-17T17:11:45+00:00","dateModified":"2026-10-12T07:59:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/"},"wordCount":250,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg","articleSection":["ERP","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/","name":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg","datePublished":"2023-10-17T17:11:45+00:00","dateModified":"2026-10-12T07:59:48+00:00","description":"\u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03c5\u03be\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg","width":2560,"height":1707,"caption":"Enterprise Resource Planning"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/ti-einai-to-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP;"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Enterprise-Resource-Planning-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/el\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u0391\u03c1\u03c7\u03b9\u03ba\u03ae&nbsp;\u00bb&nbsp;\u03a0\u03b7\u03b3\u03ad\u03c2&nbsp;\u00bb&nbsp;\u03a4\u03b9 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf ERP; \u03a4\u03bf ERP \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c0\u03bf\u03c5 \u03c3\u03c5\u03bd\u03b4\u03c5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b4\u03b9\u03b1\u03b4\u03b9\u03ba\u03b1\u03c3\u03af\u03b5\u03c2, \u03b1\u03c0\u03cc \u03c4\u03b7 \u03bb\u03bf\u03b3\u03b9\u03c3\u03c4\u03b9\u03ba\u03ae \u03ad\u03c9\u03c2 \u03c4\u03b7\u03bd \u03b5\u03c6\u03bf\u03b4\u03b9\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b1\u03bb\u03c5\u03c3\u03af\u03b4\u03b1, \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b5\u03bd\u03b9\u03b1\u03af\u03bf \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1, \u03b1\u03bd\u03b1\u03b2\u03b1\u03b8\u03bc\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03b1\u03c0\u03cc\u03b4\u03bf\u03c3\u03b7. \u0395\u03af\u03c3\u03c4\u03b5 \u03c0\u03b5\u03c1\u03af\u03b5\u03c1\u03b3\u03bf\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf \u03c0\u03ce\u03c2 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03c6\u03ad\u03c1\u03b5\u03b9 \u03b5\u03c0\u03b1\u03bd\u03ac\u03c3\u03c4\u03b1\u03c3\u03b7 \u03c3\u03c4\u03b7 \u03c1\u03bf\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c3\u03b1\u03c2; \u0395\u03bc\u03b2\u03b1\u03b8\u03cd\u03bd\u03b5\u03c4\u03b5 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b1\u03bd\u03b1\u03ba\u03b1\u03bb\u03cd\u03c8\u03b5\u03c4\u03b5 \u03c0\u03b5\u03c1\u03b9\u03c3\u03c3\u03cc\u03c4\u03b5\u03c1\u03b1. TL;DR \u03a4\u03b1 \u03c3\u03c5\u03c3\u03c4\u03ae\u03bc\u03b1\u03c4\u03b1&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=38307"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38307\/revisions"}],"predecessor-version":[{"id":86588,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38307\/revisions\/86588"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/38308"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=38307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=38307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=38307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}