{"id":38237,"date":"2023-09-26T15:29:47","date_gmt":"2023-09-26T15:29:47","guid":{"rendered":"https:\/\/skyplanner.ai\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/"},"modified":"2026-10-03T06:34:16","modified_gmt":"2026-10-03T06:34:16","slug":"%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/","title":{"rendered":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-poland-2026\">\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/el\/\">\u0391\u03c1\u03c7\u03b9\u03ba\u03ae<\/a>\u00a0\u00bb\u00a0<a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/\">\u03a0\u03cc\u03c1\u03bf\u03b9<\/a>\u00a0\u00bb\u00a0\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \u03bb\u03b5\u03c0\u03c4\u03ac<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392, \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03bf \u03bc\u03b5\u03c3\u03b1\u03af\u03bf 80% \u03c4\u03c9\u03bd \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03ca\u03c3\u03c4\u03b1\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03b8\u03b7\u03ba\u03b1\u03bd \u03b1\u03c0\u03cc \u03c4\u03bf <a href=\"https:\/\/www.pensjometr.pl\/wynagrodzenia\/zarzadzanie\/dyrektor-kierownik-produkcji\">Pensjometr<\/a> (\u03ad\u03bb\u03b5\u03b3\u03c7\u03bf\u03c2 \u03c3\u03c4\u03b9\u03c2 3 \u039f\u03ba\u03c4\u03c9\u03b2\u03c1\u03af\u03bf\u03c5 2026).<\/p>\n\n\n\n<p>\u039c\u03b5 12 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2, \u03b1\u03c5\u03c4\u03cc \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af \u03c3\u03b5 PLN 93.228\u2013230.532 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac21.312\u201352.699. \u0397 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c7\u03ae, \u03b7 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03bc\u03ad\u03b3\u03b5\u03b8\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03b2\u03bf\u03b7\u03b8\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b1\u03be\u03b9\u03bf\u03bb\u03bf\u03b3\u03ae\u03c3\u03b5\u03c4\u03b5 \u03bc\u03b9\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03bf\u03c1\u03ac, \u03b5\u03bd\u03ce \u03c4\u03b1 \u03c0\u03bf\u03c3\u03ac \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce \u03b4\u03af\u03bd\u03bf\u03c5\u03bd \u03ad\u03bd\u03b1 \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03b5\u03ba\u03ba\u03af\u03bd\u03b7\u03c3\u03b7\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03b5\u03c5\u03ba\u03b1\u03b9\u03c1\u03b9\u03ce\u03bd \u03bc\u03b5\u03c4\u03b1\u03be\u03cd \u03c7\u03c9\u03c1\u03ce\u03bd.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1: \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u03a0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd<\/th><th>\u039c\u03b9\u03ba\u03c4\u03ad\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c3\u03b5 PLN<\/th><th>\u03a5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03bc\u03b9\u03ba\u03c4\u03cc \u03b9\u03c3\u03bf\u03b4\u03cd\u03bd\u03b1\u03bc\u03bf \u03c3\u03b5 EUR<\/th><\/tr><\/thead><tbody><tr><td>\u039c\u03b7\u03bd\u03b9\u03b1\u03af\u03b1<\/td><td>7.769\u201319.211<\/td><td>\u03a0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392<\/td><\/tr><tr><td>\u0395\u03c4\u03ae\u03c3\u03b9\u03b1, \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u00d7 12<\/td><td>93.228\u2013230.532<\/td><td>\u03a0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac21.312\u201352.699<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\u039f\u03b9 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03af \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd \u03c4\u03b7\u03bd <a href=\"https:\/\/api.nbp.pl\/api\/exchangerates\/rates\/a\/eur\/2026-10-02\/?format=json\">\u03c4\u03b9\u03bc\u03ae \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b5\u03c5\u03c1\u03ce \u03c4\u03bf\u03c5 \u03c0\u03af\u03bd\u03b1\u03ba\u03b1 A \u03c4\u03b7\u03c2 NBP<\/a> \u03b3\u03b9\u03b1 \u03c4\u03b9\u03c2 2 \u039f\u03ba\u03c4\u03c9\u03b2\u03c1\u03af\u03bf\u03c5 2026: \u20ac1 = PLN 4,3745. \u03a4\u03b1 \u03c0\u03bf\u03c3\u03ac \u03c3\u03b5 PLN \u03b4\u03b9\u03b1\u03b9\u03c1\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03bc\u03b5 4,3745 \u03ba\u03b1\u03b9 \u03c4\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03ad\u03c3\u03bc\u03b1\u03c4\u03b1 \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce \u03c3\u03c4\u03c1\u03bf\u03b3\u03b3\u03c5\u03bb\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03c0\u03bb\u03b7\u03c3\u03b9\u03ad\u03c3\u03c4\u03b5\u03c1\u03bf \u03b5\u03c5\u03c1\u03ce. \u039f\u03b9 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c3\u03b5 PLN \u03c0\u03c1\u03bf\u03ba\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03b1\u03c0\u03cc \u03c4\u03b9\u03c2 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03b1\u03c3\u03b9\u03b1\u03c3\u03bc\u03ad\u03bd\u03b5\u03c2 \u03b5\u03c0\u03af 12.<\/p>\n\n\n\n<p>\u0393\u03b9\u03b1 \u03bc\u03b9\u03b1 \u03c0\u03c1\u03bf\u03c3\u03c6\u03bf\u03c1\u03ac \u03c3\u03b5 PLN, \u03b7 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b1 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03c4\u03b7\u03bd \u03c0\u03bb\u03b7\u03c3\u03b9\u03ad\u03c3\u03c4\u03b5\u03c1\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03b1\u03bd\u03ac \u03c0\u03b5\u03c1\u03af\u03bf\u03b4\u03bf \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd. \u0397 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b1 \u03b3\u03c1\u03b1\u03bc\u03bc\u03ae \u03b1\u03bd\u03c4\u03b9\u03c3\u03c4\u03bf\u03b9\u03c7\u03af\u03b6\u03b5\u03b9 12 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2 \u03c3\u03c4\u03b7\u03bd \u03af\u03b4\u03b9\u03b1 \u03c7\u03c1\u03bf\u03bd\u03b9\u03ba\u03ae \u03b2\u03ac\u03c3\u03b7 \u03bc\u03b5 \u03ad\u03bd\u03b1\u03bd \u03b5\u03c4\u03ae\u03c3\u03b9\u03bf \u03bc\u03b9\u03c3\u03b8\u03cc \u03c0\u03bf\u03c5 \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03b5\u03be\u03c9\u03c4\u03b5\u03c1\u03b9\u03ba\u03cc.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u039c\u03b9\u03ba\u03c4\u03ac \u03ae \u03ba\u03b1\u03b8\u03b1\u03c1\u03ac: \u03c4\u03b9 \u03ba\u03b1\u03c4\u03b1\u03bb\u03ae\u03b3\u03b5\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c4\u03c1\u03b1\u03c0\u03b5\u03b6\u03b9\u03ba\u03cc \u03c3\u03b1\u03c2 \u03bb\u03bf\u03b3\u03b1\u03c1\u03b9\u03b1\u03c3\u03bc\u03cc;<\/h2>\n\n\n\n<p>\u03a4\u03bf \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 PLN 7.769\u201319.211 \u03b1\u03c6\u03bf\u03c1\u03ac \u03bc\u03b9\u03ba\u03c4\u03ad\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c6\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03b9\u03c3\u03c6\u03bf\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03bf\u03c5. \u039f\u03b9 \u03ba\u03b1\u03b8\u03b1\u03c1\u03ad\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03c0\u03bf\u03c3\u03cc \u03c0\u03bf\u03c5 \u03ba\u03b1\u03c4\u03b1\u03b2\u03ac\u03bb\u03bb\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03bb\u03bf\u03b3\u03b1\u03c1\u03b9\u03b1\u03c3\u03bc\u03cc \u03c3\u03b1\u03c2 \u03bc\u03b5\u03c4\u03ac \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03ad\u03c2 \u03c4\u03b9\u03c2 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2. \u0397 \u03c3\u03cd\u03bc\u03b2\u03b1\u03c3\u03ae \u03c3\u03b1\u03c2, \u03c4\u03bf \u03c6\u03bf\u03c1\u03bf\u03bb\u03bf\u03b3\u03b9\u03ba\u03cc \u03c3\u03b1\u03c2 \u03ba\u03b1\u03b8\u03b5\u03c3\u03c4\u03ce\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2 \u03ba\u03b1\u03b8\u03bf\u03c1\u03af\u03b6\u03bf\u03c5\u03bd \u03c4\u03bf \u03c0\u03bf\u03c3\u03cc \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u03a4\u03b9 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03b5\u03b9 \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1;<\/h2>\n\n\n\n<p>\u0397 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c7\u03ae, \u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03bc\u03ad\u03b3\u03b5\u03b8\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03c0\u03bf\u03c5 \u03b5\u03bd\u03c4\u03bf\u03c0\u03af\u03b6\u03b5\u03b9 \u03b7 \u03c0\u03bf\u03bb\u03c9\u03bd\u03b9\u03ba\u03ae \u03c0\u03b7\u03b3\u03ae \u03bc\u03b9\u03c3\u03b8\u03ce\u03bd. \u03a3\u03b1\u03c2 \u03b4\u03af\u03bd\u03bf\u03c5\u03bd \u03c4\u03c1\u03b5\u03b9\u03c2 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03b5\u03c2 \u03b4\u03b9\u03b1\u03c3\u03c4\u03ac\u03c3\u03b5\u03b9\u03c2 \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c1\u03af\u03c3\u03b5\u03c4\u03b5 \u03c4\u03b7 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03ae \u03c3\u03b1\u03c2: \u03c4\u03b7\u03bd \u03c4\u03bf\u03c0\u03bf\u03b8\u03b5\u03c3\u03af\u03b1 \u03c4\u03b7\u03c2 \u03b8\u03ad\u03c3\u03b7\u03c2, \u03c4\u03b7\u03bd \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03c0\u03bf\u03c5 \u03b4\u03b9\u03b1\u03b8\u03ad\u03c4\u03b5\u03c4\u03b5 \u03ba\u03b1\u03b9 \u03c4\u03b7\u03bd \u03ba\u03bb\u03af\u03bc\u03b1\u03ba\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03c0\u03b9\u03c7\u03b5\u03af\u03c1\u03b7\u03c3\u03b7\u03c2.<\/p>\n\n\n\n<p>\u0397 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1 \u03b3\u03af\u03bd\u03b5\u03c4\u03b1\u03b9 \u03c3\u03c5\u03b3\u03ba\u03b5\u03ba\u03c1\u03b9\u03bc\u03ad\u03bd\u03b7 \u03bc\u03ad\u03c3\u03b1 \u03b1\u03c0\u03cc \u03c4\u03bf \u03ad\u03c1\u03b3\u03bf \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03b5\u03c4\u03b5 \u03b4\u03b9\u03b5\u03c5\u03b8\u03cd\u03bd\u03b5\u03b9. \u0397 \u03c0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae \u03c4\u03bf\u03c5 \u03c1\u03cc\u03bb\u03bf\u03c5 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03bf\u03bd \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03b4\u03c5\u03bd\u03b1\u03bc\u03b9\u03ba\u03cc\u03c4\u03b7\u03c4\u03b1\u03c2, \u03c4\u03bf\u03c5\u03c2 \u03c0\u03c1\u03bf\u03cb\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03bf\u03cd\u03c2, \u03c4\u03b7\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c4\u03b9\u03ba\u03ae \u03c7\u03c1\u03ae\u03c3\u03b7 \u03c0\u03cc\u03c1\u03c9\u03bd, \u03c4\u03b7\u03bd \u03b7\u03b3\u03b5\u03c3\u03af\u03b1 \u03bf\u03bc\u03ac\u03b4\u03c9\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c4\u03b5\u03c7\u03bd\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bb\u03bb\u03b1\u03b3\u03ad\u03c2. \u03a0\u03b1\u03c1\u03b1\u03b4\u03b5\u03af\u03b3\u03bc\u03b1\u03c4\u03b1 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03bf\u03cd\u03c2 \u03c4\u03bf\u03c5\u03c2 \u03c4\u03bf\u03bc\u03b5\u03af\u03c2 \u03c3\u03ac\u03c2 \u03b5\u03c0\u03b9\u03c4\u03c1\u03ad\u03c0\u03bf\u03c5\u03bd \u03bd\u03b1 \u03b1\u03bd\u03b1\u03b4\u03b5\u03af\u03be\u03b5\u03c4\u03b5 \u03c4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b4\u03b9\u03bf\u03b9\u03ba\u03b7\u03c4\u03b9\u03ba\u03ae\u03c2 \u03c3\u03b1\u03c2 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1\u03c2 \u03c3\u03b5 \u03bc\u03b9\u03b1 \u03b1\u03af\u03c4\u03b7\u03c3\u03b7 \u03ae \u03c3\u03c5\u03bd\u03ad\u03bd\u03c4\u03b5\u03c5\u03be\u03b7.<\/p>\n\n\n\n<p>\u039f \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b7\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03b9\u03ba\u03ce\u03bd \u03bb\u03b5\u03b9\u03c4\u03bf\u03c5\u03c1\u03b3\u03b9\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c4\u03b7\u03c2 \u03bf\u03bc\u03ac\u03b4\u03b1\u03c2, \u03b5\u03bd\u03ce \u03bf production planner \u03b5\u03c3\u03c4\u03b9\u03ac\u03b6\u03b5\u03b9 \u03c3\u03c4\u03bf \u03c0\u03bb\u03ac\u03bd\u03bf \u03ba\u03b1\u03b9 \u03c4\u03bf\u03bd \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2, \u03cc\u03c0\u03c9\u03c2 \u03b5\u03be\u03b7\u03b3\u03b5\u03af\u03c4\u03b1\u03b9 \u03c3\u03c4\u03b7\u03bd <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae%cf%82-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%80%ce%b5%cf%81%ce%b9%ce%b3%cf%81%ce%b1%cf%86%ce%ae-%ce%b5%cf%81%ce%b3%ce%b1\/\">\u03c0\u03b5\u03c1\u03b9\u03b3\u03c1\u03b1\u03c6\u03ae \u03b8\u03ad\u03c3\u03b7\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 \u03c3\u03b5 \u03c3\u03cd\u03b3\u03ba\u03c1\u03b9\u03c3\u03b7 \u03bc\u03b5 \u03c4\u03b7 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1<\/h2>\n\n\n\n<p>\u0397 Hays \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03bc\u03ad\u03c3\u03bf \u03cc\u03c1\u03bf \u20ac64.000 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03b3\u03b9\u03b1 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1, \u03c0\u03bf\u03c5 \u03b9\u03c3\u03bf\u03b4\u03c5\u03bd\u03b1\u03bc\u03b5\u03af \u03bc\u03b5 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac5.333 \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1 \u03cc\u03c4\u03b1\u03bd \u03b4\u03b9\u03b1\u03b9\u03c1\u03b5\u03b8\u03b5\u03af \u03b4\u03b9\u03ac 12. \u03a4\u03bf \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03b5\u03c4\u03ae\u03c3\u03b9\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1\u03c2, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac21.312\u201352.699, \u03b2\u03c1\u03af\u03c3\u03ba\u03b5\u03c4\u03b1\u03b9 \u03ba\u03ac\u03c4\u03c9 \u03b1\u03c0\u03cc \u03b1\u03c5\u03c4\u03cc\u03bd \u03c4\u03bf\u03bd \u03b3\u03b5\u03c1\u03bc\u03b1\u03bd\u03b9\u03ba\u03cc \u03bc\u03ad\u03c3\u03bf \u03cc\u03c1\u03bf \u03bc\u03b5 \u03c4\u03b7 \u03c3\u03c5\u03bd\u03b1\u03bb\u03bb\u03b1\u03b3\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03b9\u03c3\u03bf\u03c4\u03b9\u03bc\u03af\u03b1 \u03c0\u03bf\u03c5 \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03b5\u03af\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf\u03bd \u03c0\u03af\u03bd\u03b1\u03ba\u03b1.<\/p>\n\n\n\n<p>\u039f <a href=\"\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7-%ce%b3%ce%b5%cf%81%ce%bc%ce%b1\/\">\u03bf\u03b4\u03b7\u03b3\u03cc\u03c2 \u03bc\u03b9\u03c3\u03b8\u03ce\u03bd \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b7 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1<\/a> \u03c0\u03b1\u03c1\u03ad\u03c7\u03b5\u03b9 \u03b5\u03c0\u03af\u03c3\u03b7\u03c2 \u03c3\u03c4\u03bf\u03b9\u03c7\u03b5\u03af\u03b1 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03c4\u03b7\u03c2 Hays \u03b3\u03b9\u03b1 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac46.000 \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf \u03b3\u03b9\u03b1 junior \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03ac\u03bd\u03c9 \u03b1\u03c0\u03cc \u20ac77.000 \u03b3\u03b9\u03b1 \u03ad\u03bc\u03c0\u03b5\u03b9\u03c1\u03bf\u03c5\u03c2 senior \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2. \u03a4\u03bf \u03c0\u03bf\u03c3\u03cc \u03b3\u03b9\u03b1 junior \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03b7 \u03b2\u03c1\u03af\u03c3\u03ba\u03b5\u03c4\u03b1\u03b9 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03b5\u03cd\u03c1\u03bf\u03c5\u03c2 \u03c4\u03b7\u03c2 \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1\u03c2 \u03c0\u03bf\u03c5 \u03ad\u03c7\u03b5\u03b9 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03b1\u03c0\u03b5\u03af \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce, \u03c0\u03c1\u03bf\u03c3\u03c6\u03ad\u03c1\u03bf\u03bd\u03c4\u03b1\u03c2 \u03ad\u03bd\u03b1 \u03c7\u03c1\u03ae\u03c3\u03b9\u03bc\u03bf \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b1\u03bd\u03ac \u03b5\u03c0\u03af\u03c0\u03b5\u03b4\u03bf \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1\u03c2 \u03b4\u03af\u03c0\u03bb\u03b1 \u03c3\u03c4\u03bf\u03bd \u03b3\u03b5\u03c1\u03bc\u03b1\u03bd\u03b9\u03ba\u03cc \u03bc\u03ad\u03c3\u03bf \u03cc\u03c1\u03bf.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u03a5\u03c0\u03bf\u03c3\u03c4\u03b7\u03c1\u03af\u03be\u03c4\u03b5 \u03c4\u03b7 \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03bc\u03b5 \u03c4\u03bf SkyPlanner APS<\/h2>\n\n\n\n<p>\u03a4\u03bf SkyPlanner APS \u03b5\u03af\u03bd\u03b1\u03b9 \u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc APS (Advanced Planning and Scheduling) \u03bc\u03b5 \u03c4\u03b5\u03c7\u03bd\u03b7\u03c4\u03ae \u03bd\u03bf\u03b7\u03bc\u03bf\u03c3\u03cd\u03bd\u03b7 \u03b3\u03b9\u03b1 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03ad\u03c2 \u03b4\u03b9\u03b1\u03ba\u03c1\u03b9\u03c4\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2. \u03a7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03af\u03b6\u03b5\u03b9 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b5\u03c2 \u03c3\u03b5 \u03c3\u03c4\u03b1\u03b8\u03bc\u03bf\u03cd\u03c2 \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2, \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c5\u03c0\u03cc\u03c8\u03b7 \u03c4\u03b7 \u03b4\u03b9\u03b1\u03b8\u03b5\u03c3\u03b9\u03bc\u03cc\u03c4\u03b7\u03c4\u03b1 \u03c5\u03bb\u03b9\u03ba\u03ce\u03bd, \u03c4\u03b9\u03c2 \u03b2\u03ac\u03c1\u03b4\u03b9\u03b5\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c4\u03b5\u03c1\u03b1\u03b9\u03cc\u03c4\u03b7\u03c4\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b7\u03bc\u03b5\u03c1\u03bf\u03bc\u03b7\u03bd\u03af\u03b5\u03c2 \u03c0\u03b1\u03c1\u03ac\u03b4\u03bf\u03c3\u03b7\u03c2. \u039f\u03b9 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03bf\u03b9 \u03c5\u03c0\u03b5\u03cd\u03b8\u03c5\u03bd\u03bf\u03b9 \u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03bc\u03c0\u03bf\u03c1\u03bf\u03cd\u03bd \u03bd\u03b1 \u03b2\u03bb\u03ad\u03c0\u03bf\u03c5\u03bd \u03c4\u03bf \u03c0\u03c1\u03cc\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 \u03c3\u03b5 \u03ad\u03bd\u03b1 \u03b4\u03b9\u03b1\u03b4\u03c1\u03b1\u03c3\u03c4\u03b9\u03ba\u03cc \u03c7\u03c1\u03bf\u03bd\u03bf\u03b4\u03b9\u03ac\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1 Gantt.<\/p>\n\n\n\n<p>\u03a4\u03bf SkyPlanner \u03b5\u03bd\u03c3\u03c9\u03bc\u03b1\u03c4\u03ce\u03bd\u03b5\u03c4\u03b1\u03b9 \u03bc\u03b5 \u03ba\u03ac\u03b8\u03b5 \u03c3\u03cd\u03c3\u03c4\u03b7\u03bc\u03b1 ERP \u03ae MES \u03bc\u03ad\u03c3\u03c9 \u03c4\u03bf\u03c5 \u03b1\u03bd\u03bf\u03b9\u03c7\u03c4\u03bf\u03cd REST API \u03c4\u03bf\u03c5. \u0395\u03be\u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03c3\u03c4\u03b5 \u03c4\u03bf <a href=\"\/el\/\">\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03b9\u03ba\u03cc \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2<\/a> \u03ba\u03b1\u03b9 <a href=\"\/el\/%ce%b4%ce%bf%ce%ba%ce%b9%ce%bc%ce%ae\/\">\u03b4\u03bf\u03ba\u03b9\u03bc\u03ac\u03c3\u03c4\u03b5 \u03c4\u03bf SkyPlanner<\/a> \u03b3\u03b9\u03b1 \u03bd\u03b1 \u03b4\u03b5\u03af\u03c4\u03b5 \u03bc\u03cc\u03bd\u03bf\u03b9 \u03c3\u03b1\u03c2 \u03c4\u03b7 \u03c1\u03bf\u03ae \u03b5\u03c1\u03b3\u03b1\u03c3\u03af\u03b1\u03c2 \u03c7\u03c1\u03bf\u03bd\u03bf\u03c0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03bf\u03cd.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u03a3\u03c5\u03c7\u03bd\u03ad\u03c2 \u03b5\u03c1\u03c9\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">\u03a0\u03cc\u03c3\u03b1 \u03ba\u03b5\u03c1\u03b4\u03af\u03b6\u03b5\u03b9 \u03ad\u03bd\u03b1\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae\u03c2 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1;<\/h3>\n\n\n\n<p>PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03bf\u03c5\u03bd \u03c4\u03bf \u03bc\u03b5\u03c3\u03b1\u03af\u03bf 80% \u03c4\u03b7\u03c2 \u03ba\u03b1\u03c4\u03b7\u03b3\u03bf\u03c1\u03af\u03b1\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03ca\u03c3\u03c4\u03b1\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c4\u03b7\u03c2 \u03c0\u03b7\u03b3\u03ae\u03c2. \u039c\u03b5 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03cc \u03b2\u03ac\u03c3\u03b5\u03b9 \u03c4\u03b7\u03c2 \u03b9\u03c3\u03bf\u03c4\u03b9\u03bc\u03af\u03b1\u03c2 NBP \u03c4\u03bf\u03c5 \u03c0\u03af\u03bd\u03b1\u03ba\u03b1, \u03b1\u03c5\u03c4\u03cc \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392 \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1. \u039f \u03c0\u03bf\u03bb\u03bb\u03b1\u03c0\u03bb\u03b1\u03c3\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03c4\u03c9\u03bd \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03c9\u03bd \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03b5\u03c0\u03af 12 \u03b4\u03af\u03bd\u03b5\u03b9 PLN 93.228\u2013230.532 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac21.312\u201352.699.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u03a0\u03cc\u03c3\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce \u03ba\u03b1\u03b9 \u03b1\u03bd\u03ac \u03ad\u03c4\u03bf\u03c2;<\/h3>\n\n\n\n<p>\u03a4\u03bf \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03b9\u03c3\u03bf\u03b4\u03cd\u03bd\u03b1\u03bc\u03bf \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1 \u03ae \u20ac21.312\u201352.699 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf. \u039f\u03b9 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03af\u03b6\u03bf\u03bd\u03c4\u03b1\u03b9 \u03c9\u03c2 12 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2, \u03bc\u03b5 \u03c4\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03c4\u03c1\u03bf\u03c0\u03ad\u03c2 \u03c3\u03b5 \u03b5\u03c5\u03c1\u03ce \u03bd\u03b1 \u03c3\u03c4\u03c1\u03bf\u03b3\u03b3\u03c5\u03bb\u03bf\u03c0\u03bf\u03b9\u03bf\u03cd\u03bd\u03c4\u03b1\u03b9 \u03c3\u03c4\u03bf \u03c0\u03bb\u03b7\u03c3\u03b9\u03ad\u03c3\u03c4\u03b5\u03c1\u03bf \u03b5\u03c5\u03c1\u03ce \u03c7\u03c1\u03b7\u03c3\u03b9\u03bc\u03bf\u03c0\u03bf\u03b9\u03ce\u03bd\u03c4\u03b1\u03c2 \u03c4\u03b7\u03bd \u03b9\u03c3\u03bf\u03c4\u03b9\u03bc\u03af\u03b1 NBP \u03c4\u03bf\u03c5 \u03c0\u03af\u03bd\u03b1\u03ba\u03b1.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u039f\u03b9 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03ba\u03c4\u03ad\u03c2 \u03ae \u03ba\u03b1\u03b8\u03b1\u03c1\u03ad\u03c2;<\/h3>\n\n\n\n<p>\u03a4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03b5\u03af\u03bd\u03b1\u03b9 \u03bc\u03b9\u03ba\u03c4\u03cc, \u03c0\u03c1\u03b9\u03bd \u03b1\u03c0\u03cc \u03c6\u03cc\u03c1\u03bf\u03c5\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03b9\u03c3\u03c6\u03bf\u03c1\u03ad\u03c2 \u03b5\u03c1\u03b3\u03b1\u03b6\u03bf\u03bc\u03ad\u03bd\u03bf\u03c5. \u039f\u03b9 \u03ba\u03b1\u03b8\u03b1\u03c1\u03ad\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03c0\u03bf\u03c3\u03cc \u03c0\u03bf\u03c5 \u03bb\u03b1\u03bc\u03b2\u03ac\u03bd\u03b5\u03c4\u03b5 \u03bc\u03b5\u03c4\u03ac \u03c4\u03b9\u03c2 \u03ba\u03c1\u03b1\u03c4\u03ae\u03c3\u03b5\u03b9\u03c2 \u03ba\u03b1\u03b9 \u03b5\u03be\u03b1\u03c1\u03c4\u03ce\u03bd\u03c4\u03b1\u03b9 \u03b1\u03c0\u03cc \u03c4\u03b7 \u03c3\u03cd\u03bc\u03b2\u03b1\u03c3\u03ae \u03c3\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03c0\u03c1\u03bf\u03c3\u03c9\u03c0\u03b9\u03ba\u03ad\u03c2 \u03c6\u03bf\u03c1\u03bf\u03bb\u03bf\u03b3\u03b9\u03ba\u03ad\u03c2 \u03c3\u03b1\u03c2 \u03c3\u03c5\u03bd\u03b8\u03ae\u03ba\u03b5\u03c2.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u03a4\u03b9 \u03bc\u03c0\u03bf\u03c1\u03b5\u03af \u03bd\u03b1 \u03b1\u03c5\u03be\u03ae\u03c3\u03b5\u03b9 \u03c4\u03bf\u03bd \u03bc\u03b9\u03c3\u03b8\u03cc \u03b5\u03bd\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1;<\/h3>\n\n\n\n<p>\u0397 \u03c0\u03b5\u03c1\u03b9\u03bf\u03c7\u03ae, \u03b7 \u03b4\u03b9\u03ac\u03c1\u03ba\u03b5\u03b9\u03b1 \u03c4\u03b7\u03c2 \u03b5\u03bc\u03c0\u03b5\u03b9\u03c1\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03bf \u03bc\u03ad\u03b3\u03b5\u03b8\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03b5\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03bf\u03b9 \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03c0\u03bf\u03c5, \u03c3\u03cd\u03bc\u03c6\u03c9\u03bd\u03b1 \u03bc\u03b5 \u03c4\u03b7\u03bd \u03c0\u03bf\u03bb\u03c9\u03bd\u03b9\u03ba\u03ae \u03c0\u03b7\u03b3\u03ae \u03bc\u03b9\u03c3\u03b8\u03ce\u03bd, \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b9\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u03a0\u03ce\u03c2 \u03c3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03bf\u03bd\u03c4\u03b1\u03b9 \u03bf\u03b9 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 \u03bc\u03b5 \u03c4\u03b7 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1;<\/h3>\n\n\n\n<p>\u03a4\u03bf \u03c5\u03c0\u03bf\u03bb\u03bf\u03b3\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03c4\u03b7\u03c2 \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac21.312\u201352.699 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03c7\u03c1\u03cc\u03bd\u03bf. \u0397 Hays \u03b1\u03bd\u03b1\u03c6\u03ad\u03c1\u03b5\u03b9 \u03b3\u03b5\u03c1\u03bc\u03b1\u03bd\u03b9\u03ba\u03cc \u03bc\u03ad\u03c3\u03bf \u03cc\u03c1\u03bf \u20ac64.000, \u03bc\u03b5 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac46.000 \u03b3\u03b9\u03b1 junior \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2 \u03ba\u03b1\u03b9 \u03c0\u03ac\u03bd\u03c9 \u03b1\u03c0\u03cc \u20ac77.000 \u03b3\u03b9\u03b1 \u03ad\u03bc\u03c0\u03b5\u03b9\u03c1\u03bf\u03c5\u03c2 senior \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ad\u03c2. \u03a4\u03bf \u03b3\u03b5\u03c1\u03bc\u03b1\u03bd\u03b9\u03ba\u03cc \u03c3\u03b7\u03bc\u03b5\u03af\u03bf \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b3\u03b9\u03b1 junior \u03c3\u03c4\u03b5\u03bb\u03ad\u03c7\u03b7 \u03b2\u03c1\u03af\u03c3\u03ba\u03b5\u03c4\u03b1\u03b9 \u03b5\u03bd\u03c4\u03cc\u03c2 \u03c4\u03bf\u03c5 \u03c0\u03bf\u03bb\u03c9\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03cd\u03c1\u03bf\u03c5\u03c2, \u03b5\u03bd\u03ce \u03bf \u03b3\u03b5\u03c1\u03bc\u03b1\u03bd\u03b9\u03ba\u03cc\u03c2 \u03bc\u03ad\u03c3\u03bf\u03c2 \u03cc\u03c1\u03bf\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 \u03c0\u03ac\u03bd\u03c9 \u03b1\u03c0\u03cc \u03c4\u03bf \u03b1\u03bd\u03ce\u03c4\u03b1\u03c4\u03bf \u03cc\u03c1\u03b9\u03cc \u03c4\u03bf\u03c5.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 \u0391\u03c1\u03c7\u03b9\u03ba\u03ae\u00a0\u00bb\u00a0\u03a0\u03cc\u03c1\u03bf\u03b9\u00a0\u00bb\u00a0\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392, \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03bf \u03bc\u03b5\u03c3\u03b1\u03af\u03bf 80% \u03c4\u03c9\u03bd \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03ca\u03c3\u03c4\u03b1\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03b8\u03b7\u03ba\u03b1\u03bd \u03b1\u03c0\u03cc \u03c4\u03bf Pensjometr (\u03ad\u03bb\u03b5\u03b3\u03c7\u03bf\u03c2 \u03c3\u03c4\u03b9\u03c2 3 \u039f\u03ba\u03c4\u03c9\u03b2\u03c1\u03af\u03bf\u03c5 2026). \u039c\u03b5 12 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2, &#8230; <a title=\"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/\" aria-label=\"Read more about \u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38238,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2732,477],"tags":[],"class_list":["post-38237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2732","category-477","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026\" \/>\n<meta property=\"og:description\" content=\"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-26T15:29:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T06:34:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026\",\"datePublished\":\"2023-09-26T15:29:47+00:00\",\"dateModified\":\"2026-10-03T06:34:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/\"},\"wordCount\":43,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Poland.png\",\"articleSection\":[\"\u039a\u03b1\u03c1\u03b9\u03ad\u03c1\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b9\u03c3\u03b8\u03bf\u03af\",\"\u03c0\u03cc\u03c1\u03bf\u03b9\"],\"inLanguage\":\"el\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/\",\"name\":\"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Poland.png\",\"datePublished\":\"2023-09-26T15:29:47+00:00\",\"dateModified\":\"2026-10-03T06:34:16+00:00\",\"description\":\"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\\\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Poland.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Poland.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in Poland\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\\\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/el\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 &#8211; SkyPlanner","description":"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/","og_locale":"el_GR","og_type":"article","og_title":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026","og_description":"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.","og_url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-26T15:29:47+00:00","article_modified_time":"2026-10-03T06:34:16+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026","datePublished":"2023-09-26T15:29:47+00:00","dateModified":"2026-10-03T06:34:16+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/"},"wordCount":43,"publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png","articleSection":["\u039a\u03b1\u03c1\u03b9\u03ad\u03c1\u03b1 \u03ba\u03b1\u03b9 \u03bc\u03b9\u03c3\u03b8\u03bf\u03af","\u03c0\u03cc\u03c1\u03bf\u03b9"],"inLanguage":"el"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/","url":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/","name":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/el\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png","datePublished":"2023-09-26T15:29:47+00:00","dateModified":"2026-10-03T06:34:16+00:00","description":"PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac\/\u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392: \u03bc\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a3\u03c5\u03b3\u03ba\u03c1\u03af\u03bd\u03b5\u03c4\u03b5 \u03b5\u03c4\u03ae\u03c3\u03b9\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ad\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b5\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03ba\u03b1\u03b9 \u0393\u03b5\u03c1\u03bc\u03b1\u03bd\u03af\u03b1.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png","width":4990,"height":3327,"caption":"Production Manager Salary in Poland"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/el\/%cf%80%cf%8c%cf%81%ce%bf%ce%b9\/%ce%bc%ce%b9%cf%83%ce%b8%cf%8c%cf%82-%ce%b4%ce%b9%ce%b5%cf%85%ce%b8%cf%85%ce%bd%cf%84%ce%ae-%cf%80%ce%b1%cf%81%ce%b1%ce%b3%cf%89%ce%b3%ce%ae%cf%82-%cf%83%cf%84%ce%b7%ce%bd-%cf%80%ce%bf%ce%bb%cf%89\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/el\/"},{"@type":"ListItem","position":2,"name":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/el\/#website","url":"https:\/\/skyplanner.ai\/el\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/el\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/el\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/el\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/el\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/el\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Poland.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/el\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 \u0391\u03c1\u03c7\u03b9\u03ba\u03ae\u00a0\u00bb\u00a0\u03a0\u03cc\u03c1\u03bf\u03b9\u00a0\u00bb\u00a0\u039c\u03b9\u03c3\u03b8\u03cc\u03c2 \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ae \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1 2026 PLN 7.769\u201319.211 \u03bc\u03b9\u03ba\u03c4\u03ac \u03c4\u03bf\u03bd \u03bc\u03ae\u03bd\u03b1, \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u20ac1.776\u20134.392, \u03b5\u03af\u03bd\u03b1\u03b9 \u03c4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03b1\u03bd\u03b1\u03c6\u03bf\u03c1\u03ac\u03c2 \u03b1\u03c0\u03bf\u03b4\u03bf\u03c7\u03ce\u03bd \u03b3\u03b9\u03b1 \u03c4\u03b7 \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c3\u03c4\u03b7\u03bd \u03a0\u03bf\u03bb\u03c9\u03bd\u03af\u03b1. \u03a4\u03bf \u03b5\u03cd\u03c1\u03bf\u03c2 \u03ba\u03b1\u03bb\u03cd\u03c0\u03c4\u03b5\u03b9 \u03c4\u03bf \u03bc\u03b5\u03c3\u03b1\u03af\u03bf 80% \u03c4\u03c9\u03bd \u03b4\u03b9\u03b5\u03c5\u03b8\u03c5\u03bd\u03c4\u03ce\u03bd \u03ba\u03b1\u03b9 \u03c0\u03c1\u03bf\u03ca\u03c3\u03c4\u03b1\u03bc\u03ad\u03bd\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae\u03c2 \u03c0\u03bf\u03c5 \u03b5\u03c1\u03b5\u03c5\u03bd\u03ae\u03b8\u03b7\u03ba\u03b1\u03bd \u03b1\u03c0\u03cc \u03c4\u03bf Pensjometr (\u03ad\u03bb\u03b5\u03b3\u03c7\u03bf\u03c2 \u03c3\u03c4\u03b9\u03c2 3 \u039f\u03ba\u03c4\u03c9\u03b2\u03c1\u03af\u03bf\u03c5 2026). \u039c\u03b5 12 \u03bc\u03b7\u03bd\u03b9\u03b1\u03af\u03b5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03b2\u03bf\u03bb\u03ad\u03c2,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/comments?post=38237"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/posts\/38237\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media\/38238"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/media?parent=38237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/categories?post=38237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/el\/wp-json\/wp\/v2\/tags?post=38237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}